Natural Resources Board District 3 Environmental Commission
100 Mineral Street, Suite 305, Springfield, VT 05156-3168
Act 250 Jurisdictional Opinion
This Jurisdictional Opinion addresses Act 250 Jurisdiction only. Other permits may be required; see http://dec.vermont.gov/environmental-assistance/permits. For additional information, please contact the Agency of Natural Resources permit specialist, John Fay, at 802-279-4747 or [email protected].
In a letter from Brittany LeBeau, Trudell Consulting Engineers, to Linda Matteson, District Coordinator, dated July 12, 2019, Ms. LeBeau requested a “project classification determination” as to whether Lot 3 of the permitted Kline Commercial/Light Industrial Subdivision meets the definition of “industrial park” pursuant to 10 V.S.A. § 6001(37). Ms. Matteson considers this a request for a jurisdictional opinion and is therefore, responding with this Act 250 Jurisdictional Opinion letter. The letter from Ms. LeBeau is attached. Representative for Landowner/Applicant: Brittany LeBeau
Trudell Consulting Engineers 478 Blair Park Road
Williston, VT 05495 [email protected]
Project Description: Apex Storage, LLC, represented by Trudell Consulting Engineers, Inc., is submitting an Act 250 permit amendment application for a proposed 20,000+/- SF self-storage facility to be located on Lot 3 of the previously permitted Kline Subdivision. Permit #3W0124, issued in 1974 approved a 7-lot commercial and light industrial subdivision. Three of the lots have been developed and consist of a tire store with auto repair services on Lot 1; a permitted computer office in a separately permitted building on Lot 1; a building supply warehouse on Lot 2; and an indoor tennis court on Lot 3. 10 V.S.A. § 6001(37) defines “Industrial park” as:
An area of land permitted under this chapter that is planned, designed, and zoned as a location for one or more industrial buildings, that includes adequate access roads, utilities, water, sewer, and other services necessary for the uses of the industrial buildings, and includes no retail use except that which is incidental to an industrial use, and no office use except that which is incidental or secondary to an industrial use. [Emphasis added].
The existing subdivision contains a tire store and a tennis facility – both are “retail” uses, and not “incidental to an industrial use,” therefore it fails to meet the statutory definition. Existing Act 250 permit: _3W0124 and amendments Town: _Hartford_
Project Type: Commercial Residential Municipal/State
IS AN ACT 250 PERMIT IS REQUIRED? YES NO BASIS FOR DECISION: The construction of a 20,000 SF self-storage facility on Lot 3 is a material change to the permitted project. Act 250 Rule 2(C)(6). The existing permitted subdivision does not meet the definition of “industrial park.”
Signature: Date: July 30, 2019_ Linda Matteson, District Coordinator District 3 Environmental Commission 100 Mineral Street, Suite 305, Springfield, VT 05156-3168 802-289-0598 / [email protected]
This is a jurisdictional opinion issued pursuant to 10 V.S.A. § 6007(c) and Act 250 Rule 3(A). Reconsideration requests are governed by Act 250 Rule 3(B) and should be directed to the district coordinator at the above address. Any appeal of this decision must be filed with the Superior Court, Environmental Division (32 Cherry Street, 2nd Floor, Ste. 303, Burlington, VT 05401) within 30 days of the date the decision was issued, pursuant to 10 V.S.A. Chapter 220. The Notice of Appeal must comply with the Vermont Rules for Environmental Court Proceedings (VRECP). The appellant must file with the Notice of Appeal the entry fee required by 32 V.S.A. § 1431(b)(1) (2015), which is $295.00. The appellant also must serve a copy of the Notice of Appeal on the Natural Resources Board, 10 Baldwin Street, Montpelier, VT 05633-3201, and on other parties in accordance with Rule 5(b)(4)(B) of the VRECP. cc: Hartford Selectboard; Hartford Town Planning; Two Rivers-Ottauquechee Regional Commission; ANR Office of Planning & Policy; John Fay, ANR Permit Specialist
See: Letter to District Coordinator and Site Plans
Civil Engineering Land Surveying Landscape Architecture Environmental Services
478 Blair Park Road Williston, VT 05495 802 879 6331 www.tcevt.com
T R U D E L LConsulting Engineers
July 12, 2019
Linda MattesonState of VermontAgency of Natural ResourcesEnvironmental Board, District 3 Coordinator100 Mineral Street, Suite 305Springfield, Vermont 05156-3168
Subject: Classification Request: 3W0124 Kline Industrial ParkAs Defined by 10 V.S.A. § 6001(37)RE: Castell – Apex Storage – Hartford, VT
Dear Linda,
On behalf of Apex Storage, LLC, Trudell Consulting Engineers, Inc. (TCE) ispreparing an Act 250 permit amendment application to the Permit Series 3W0124 for aproposed ±20,000 SF self-storage facility to be located on Lot 3 of the Kline IndustrialPark in Hartford, Vermont. We are requesting a project classification determination forthis as an Industrial Park in conjunction with 10 V.S.A. § 6001(37) which states that:
(37) "Industrial park" means an area of land permitted under this chapter that isplanned, designed, and zoned as a location for one or more industrial buildings, thatincludes adequate access roads, utilities, water, sewer, and other services necessary forthe uses of the industrial buildings, and includes no retail use except that which isincidental to an industrial use, and no office use except that which is incidental orsecondary to an industrial use.
Pursuant to Criterion #9(B) Primary Agricultural Soils of the Act 250 Land Use Permit, anindustrial park project is subject to a 1:1 mitigation ratio when the project proposesimpacts to soils with primary agricultural importance. Historically this Park has beenexempt from PAS impact mitigation due to limited economic importance, however, thisis the first lot seeking development since the definition of PAS 10 V.S.A. § 6001(15) wasamended by the legislature in 2014 and no longer includes an inquiry into theeconomic or commercial viability of the soils, therefore this project must considermitigation for impacts. In order to provide a soil matrix with a 1:1 ratio, the VermontAgency of Agriculture, Food & Markets has requested we obtain project classificationfrom the District Coordinator to confirm this is project is considered an Industrial Park.
Provided herein is a summary of information indicating this project meets the definitionof 10 V.S.A. § 6001(37) Industrial Park.
OHOH
OHOH
OHOH
OHOH
OHOH
OHOH
OHOH
OHOHOH
WW
WW
WW
WW
WW
WW
W
588
588
587
587
587
586
586
585
585
584
584
583
583
582
582
580
579
579
578
578 577
576
238' ±
178' ±
496' ±
140' ±
280' ±
82' ±109' ±
KLINE DRIVE
UTILITYBOX
50'WETLAND
BUFFER
577
576
575
580
582
582
583
583 574
573
589
N/F RICHARD KLINEc/o K + W TIRE
735 NORTH PRINCE STREETLANCASTER, PA 17603-2729
tax map no. 14-67-0
N/F HARVEY PROPCO LLC
1400 MAIN STREETWALTHAM, MA 02451tax map no. 14-48-0
N/FRICHARD KLINEc/o K + W TIRE
735 NORTH PRINCESTREET
LANCASTER, PA17603-2729
tax map no. 14-49-0
N/F HERITAGE OPERATING LP
c/o YOUNGS PROPANEPO BOX 965
VALLEY FORGE, PA 19482tax map no. 14-50-0
N/F OUR COURT INC
PO BOX 1376WHITE RIVER JCT, VT
05001-1376tax map no. 14-59-0
23"8
22"
9
22"
10
24" est
7
30"
3
26"
5
35"
2
36"
1
42"
12
36"
11
28"
6
587
U.S.
RO
UTE
NO
. 5
N/FGREGORY CASTELL
PO BOX 222MERIDEN, NH 03770tax map no. 14-57-0
N/FBUSSIERE EMILE R TRUSTEE
E R B REV. TRUSTMGK INVESTMENTS LLC
954 STRAW HILLMANCHESTER, NH 03104
tax map no. 14-56-0
ASSUMED LOCATION OFEXISTING 8" C.I. WATER MAIN
TBM 1 ELEV. 582.34'
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
PROPOSED FLUSHING HYDRANT, LOCATION TOBE FIELD VERIFIED BY CONTRACTOR. HYDRANT
TO BE PAINTED DIFFERENT COLOR THANMUNICIPAL HYDRANTS TO DISTINGUISH
FLUSHING.
BUILDING B
BUIL
DIN
G A
20'
40'
GRASSSTORAGE
AREA9,945± SF
30'
FRONTSETBACK
30'
30'
SIDESETBACK
20.00'
SIDE SETBACK20'
30'
15'
30'
10'
20'
R15'
24'
25'
20'
R58'R76'
10'
20'
10'
15'
15'
15'
15'
15'
15'
10'
580
585.25+
585.25+
585.25+584.25+
584.25+583.25+
582.25+581.25+
583.25+582.25+
581.25+ 10'
585.25+
585.25+584.25+
584.25+583.25+
582.25+581.25+
583.25+582.25+
581.25+
585.25+
585.25+584.25+
584.25+583.25+
582.25+581.25+
583.25+582.25+
581.25+
584.70+584.20+
583.70+583.20+
581.70+581.20+
582.70+582.20+
+584.70+584.20
+583.70+583.20
+582.70+582.20
+581.70+581.20
+584.70
+580.72+580.72
KNOX BOX MOUNTED ONKEYPAD POLE BELOW KEYPAD
FIRE WALL, TYP.
STO
RMW
ATE
R IN
FILT
RATIO
N B
ASI
N
SIDESETBACK
20'
PROPOSED MANAGEMENT OFFICE SPACEFOR STORAGE OF MANAGEMENTMATERIALS, CLEANING SUPPLIES, ETC.
OUTDOOR STORAGEOF RVs, BOATS,MOBILE STORAGEUNITS, ETC.
FIRE WALL, TYP.
1 OFFICE
UG
UG
UG
SENSOR TO OPEN GATE UPONVEHICLE EXIT APPROACH
SMALLER SERVICE LINE TO OFFICE BUILDING,SIZE, MATERIAL, DEPTH UNKNOWN.TO BE FIELD VERIFIED BY CONTRACTOR.NOTIFY ENGINEER
CONTRACTOR TO COORDINATEWITH POWER COMPANY
232' SIGHT DISTANCE
519' SIGHT DISTANGE
PROPOSED SNOWSTORAGE AREA
0Feet
Graphic Scale
30 30 60 90 120
15°±
VT
Grid
Mag
netic
Sheet Title
Project Title
Use of These Drawings
Proj
ect R
efer
ence
:
Scale:
Project Number:
Date:
Drawn By:
Project Engineer:
Approved By:
No. Description Date ByRevisions
478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495
802 879 6331 | WWW.TCEVT.COM
ENGINEERING SURVEY
No. 9020CIVIL
AB
I GA I L A . D
ER
Y
S TA T E OF V E RMON
T
PRO
F E S S I ONA L ENG
I NE E
R
L I C E N S E D
Field Book:
1. Unless otherwise noted, these Drawings are intended forpreliminary planning, coordination with other disciplines orutilities, and/or approval from the regulatory authorities. They are not intended as construction drawings unless notedas such or marked approved by a regulatory authority.
2. By use of these drawings for construction of the Project,the Owner represents that they have reviewed, approved,and accepted the drawings, obtained all necessary permits,and have met with all applicable parties/disciplines,including but not limited to, the Engineer and the Architect,to insure these plans are properly coordinated including, butnot limited to, contract documents, specifications,owner/contractor agreements, building and mechanicalplans, private and public utilities, and other pertinent permitsfor construction.
3. Owner and Architect, are responsible for final design andlocation of buildings shown, including an area measured aminimum five (5) feet around any building and coordinatingfinal utility connections shown on these plans.
4. Prior to using these plans for construction layout, the usershall contact TCE to ensure the plan contains the mostcurrent revisions.
5. These Drawings are specific to the Project and are nottransferable. As instruments of service, these drawings, andcopies thereof, furnished by TCE are its exclusive property. Changes to the drawings may only be made by TCE. Iferrors or omissions are discovered, they shall be brought tothe attention of TCE immediately.
6. It is the User's responsibility to ensure this copy containsthe most current revisions.
PLANNING ENVIRONMENTAL
1 05/14/19 ALRAdded Office, Site Revisions
Site Plan
C2-01
5/3/2019
1" = 30'
19-008
ALR
ALR
AAD
339
Apex Storage, LLCLOT 3 Kline Drive
Hartford, Vermont
PROJECT INFORMATION:
1. OWNER OF RECORD: GREGORY CASTELLPO BOX 222MERIDEN, NH 03770
2. TAX PARCEL ID: PARCEL:14-57-0 SPAN:285-090-12930
3. PHYSICAL ADDRESS LOT 3 KLINE DRIVE OF PROPERTY: HARTFORD, VERMONT 05047
4. PARCEL SIZE:PARCEL AREA: ± 3.23 ACRESPARCEL WIDTH: (E-W) ± 450 FTPARCEL DEPTH: (N-S) ± 370 FTPARCELCOVERAGE: 43,416 SF (0.99 AC)
31%
5. DIMENSIONAL STANDARDS:MIN. LOT AREA: 20,000 SFMIN.LOT WIDTH: 125 FTMIN.LOT DEPTH: 100 FTMAX. LOTCOVERAGE: 75%
6. SETBACK REQUIREMENTS:FRONT: 30 FTREAR: N/A - TWO SIDES CORNER LOTSIDE: 20 FT
6. ZONING DISTRICT: HIGHWAY COMMERCIAL (H-C)
7. LOT CLASSIFICATION: CLASS 2* *WATER/SEWER SERVICES NOT REQUIRED
FOR PROJECT
8. PROPOSED PARKING: ONE (1) SPACE FOR MANAGEMENT
9. EASEMENTS: PARCEL IS SUBJECT TO A NONEXCLUSIVEROW FOR INGRESS AND EGRESS ONKLINE DRIVE. PARCEL HAS EASEMENT TOCONSTRUCT UTILITIES FROM ROUTE 5 TOSUBJECT PARCEL WITHIN ROW (KLINEDRIVE). PARCEL HAS EASEMENT TO CONSTRUCT STORMWATER INFRASTRUCTURE ON LOT 4 (TM 14-67-0).
PROJECT LOCATION
UTILITY POLE
PROPERTY LINE
BUILDING SETBACKS
FM
W
S
SEWER FORCEMAIN
OHP
TOPOGRAPHIC CONTOURS
GRAVEL DRIVE OR ROAD
PERCOLATION TEST
MONITOR WELL
PROJECT BENCHMARK
SEWER MAINSAND SERVICES
WATER MAINSAND SERVICES
OVERHEAD POWER &TELEPHONE & CABLE
124
BUILDING
FM
W
S
OHP
124
(E)(P)
(E)(P)
(E)(P)
(E)(P)
(E)(P)
(E)(P)
(E)(P)
(E)(P)
(E)(P)
LEGEND
PT-1
TP-1
CONE OF INFLUENCE (E)(P)
XFENCEX
(E)(P)
CURB STOP(E)(P)
(E)(P)
PROJECT DESCRIPTION:
THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT SELF STORAGE UNITS ON A VACANT PARCEL KNOWN ASLOT 3 LOCATED ON KLINE DRIVE IN HARTFORD, VT. THE PROJECT WILL CREATE LESS THAN 1 ACRE (43416 SF)OF IMPERVIOUS SURFACE AND WILL NOT REQUIRE POTABLE WATER OR SANITARY SEWER SERVICES.
UGUNDERGROUNDPOWER &COMMUNICATION
(E)(P)
BUILDING UNITSBUILDING A BUILDING B BUILDING C TOTAL
AREA (SF) 4,500 10,400 4,725 19,625 SF
10'x10' (100sf) 8 8
10'x15' (150sf) 30 16 46
10'x20' (200sf) 48 48
15'X15' (225sf) 2 2
15'x25' (375sf) 5 5
TOTAL UNITS 30 56 28 114
FIRE HYDRANT (HYD)(E)(P)
PARCEL:14-57-0 SPAN:285-090-12930
14,474
735.3
3W0124 Kline commercial/lt ind subdivisionVermont Agency of Natural Resources
10,964
© Vermont Agency of Natural Resources
557.0
1:
WGS_1984_Web_Mercator_Auxiliary_Sphere
Meters557.00
NOTES
Map created using ANR's Natural Resources Atlas - Route 5 South, Hartford
LEGEND
278.00
vermont.gov
DISCLAIMER: This map is for general reference only. Data layers that appearon this map may or may not be accurate, current, or otherwise reliable. ANR and
the State of Vermont make no representations of any kind, including but notlimited to, the warranties of merchantability, or fitness for a particular use, nor
are any such warranties to be implied with respect to the data on this map.
July 25, 2019
THIS MAP IS NOT TO BE USED FOR NAVIGATION
1" = 914 1cm = 110Ft. Meters
Parcels (standardized)
Parcels (non-standardized)
Act250 Permits **INCOMPLETE**
Roads
Interstate
Principal Arterial
Minor Arterial
Major Collector
Minor Collector
Local
Not part of function Classification System
Waterbody
Stream
Town Boundary