www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
30/04
/2015
12:17
:37
Renders
Project Number
Performing Arts Centre
OwnerChecker
A111
Author 04/27/15
Coventry University, Performing Arts Centre
UP
UP
UP
UP
-
-
A121 4
Technicalstore
Technicianroom
Costumeroom
small propsroom
Toiletschangingroom, WCChanging rooms
Rehearsalroom
Rehearsal room
Green room Workshop doubleheight
Dressingroom
Staircase
Toilets
Storage
Administrator'soffice
Auditorium
Stage
A116 2
www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
1 : 100
30/04
/2015
12:14
:24
Ground Floor
Project Number
Performing Arts Centre
OwnerChecker
A106
Author 04/24/15
1 : 10000 Ground floor
Bar
DN
DN
DN
DN
Dance studio Office Classroom Classroom Changingroom
CR,WC
Rehearsalroom
Toilets
Dancestudio
Staircase
Office
OfficeVoid
Toilets
Sound & Lighting
Stairs going down to lowerlevel of auditorium
Workshop- doubleheight
3
A120
www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
1 : 100
30/04
/2015
12:34
:28
First Floor
Project Number
Performing Arts Centre
OwnerChecker
A115
Author 04/27/15 1 : 10001 first floor
www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
30/04
/2015
12:17
:01
Elevations
Project Number
Performing Arts Centre
OwnerChecker
A110
Author 04/27/15
east elevation
north elevation Copy 1
south elevation
west elevation
Aluminium cladding panels
Glazed panels
Auditorium roofing
Hexagonal panels cladding
Fire exit
Glazed roofing
Below ground levelauditorium seating
Glazed Curtain wall
Entrance
Delivery access
Rectangle claddingpanels
Auditorium roof
Stud wall
Rigid insulation
Acoustic wall tieJack up Spring floating floor Air gapMesh Reinforcement
Perimeter IsolationFarat jack up mount www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
As indicated
30/04
/2015
13:12
:58
POSTER 1
Project Number
Performing Arts Centre
OwnerChecker
A118
Author 04/29/15 1 : 5technical detail- floating floor Copy 1 Copy 1
1 : 10technical detail- floating floor Copy 2
For the internal floors the method i will be using is the ‘Jack-Up’ construction technique. The advantages to this type of system is that it eradicates the need for permanent formwork aswell as being quick and simple to install hence decreasing the cost.The ‘Jack-Up’ floating floor system is contained of a concrete slab which is poured on a dampproof membrane on the structural slab. The slab is then ‘jacked’ up by way of units cast into the slab
When designing and constructing theexternal walls for the theatre, there willbe more of a focus on the soundinsulation of the wall to reduce theamount of sound entering the buildingfrom the outside and also to reduce theamount of sound leaving the building.Doors, windows and types of HVACsystems installed in the external wall willalso have a major effect of the acousticperformance.
Coventry University , Performing Arts Centre-Technical Focus
. They are favoured by acoustic consultantsbecause of the certainty that the slab isfully decoupled from the surrounding structure.[Jack-up] floor slabs must be made fromconcrete and reinforced using mesh ratherthan fibres as the [Jack-up] mounts aredesigned to link with the mesh to spread loadwhen the slab is lifted.
Concrete slab
DPM Sand
Hardcore
Pile Cap
Skirting board
Pile head waterproofing solution
Block work fixed tosteel structureusing proprietarysteel fixings
Aluminiumcladding panelsfixed to block work
Cavity fireBarrier
Rigid Insulation
Mineral wool
5
Treated sill plate
Floor sheathing
2 layer sof plasterboard at 25mm
Small Gap with acousticsealant
Platform floortreatment
Shallowdecking
Mineral wool inserts
Joints sealed with tape or caulked with acoustic sealant
Dense mineral wool and fire protection as required
Acoustic sealant
Deflection head
Steel frameinner leaf
Mineralwoolpacking
Cavitybarrier tofloor /walljunctionwith cavitytray over
Cavity(50mmminimum)
Rigidinsulationin externalcavity
Rigid insulationinexternal cavity
Gypsum wall board painted with a vapour barrier primer or paint
Structural sheathing
Concrete slab
www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
As indicated
30/04
/2015
12:16
:27
Details 1
Project Number
Performing Arts Centre
OwnerChecker
A109
Author 04/27/15
1 : 10wall to ground floor
1 : 5wall to intermediate floor
Separating wall insulation stops heat and noise from being movedthrough the separating walls while providing a fire protection layer. Theseseparating walls are often load- bearing and hence entail a greateramount of fire protection than internal walls.Concrete block cavity walls not only depend on the mass but also onisolation that is given by the cavity.Mass and airtightness is very important when concerning effectiveinsulation and the conduction of airborne sound and how practical it is forseparating walls. The weight of the wall is determined by the density andhow thick the material is that’s used. The design, details and theconstruction is what makes the separating wall reach good acousticperformance
A pile foundation consists of two components: Pile capand single or group of piles. Piles transfers the loadsfrom structures to the hard strata, rocks or soil with highbearing capacity.
DPM Aluminium cladding panelsRigidInsulation
Cavity BarrierBlock work
CavityCloser
Aluminium cladding panelsMetal window frame
Support bracket
Brickwork
Cavity(50mmminimum)
Cavity fire barrier
Mineral wool packing
Steel frame inner leaf
Deflection head
Dense mineral wool
Joints sealed with tape or caulked with acoustic sealant
Acoustic sealant
Profiled metal deck
Vapour control layer
Rockwool insulation
Carrier membrane
Waterproof membrane
Top coat
Gant
Sloped metal coping cap
wood nailer with anchor bolts
Flashing
Approved fastners
Perimeter channel
Pressed steel ceiling sections
Slotted bolt fixing to provide leveling adjustment
Sloted bolt fixing to provideleveling adjustment
Angle cleats
25mm wide mild steel hangers
1 or 2 layersof thick plasterboardscrewed to ceiling sections
www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
As indicated
30/04
/2015
12:25
:23
Details 2
Project Number
Performing Arts Centre
OwnerChecker
A112
Author 04/27/15
1 : 5window
1 : 5wall to roof
00 Ground floor
0
01 first floor
4000
1 2 3 4 5 6 7 8 11 1224 25
03 ROOF
800004 GLAZED ROOF
8500
Auditorium higherlevel
2000
Auditorium roof
11200
Dance Studio Office Classroom Classroom Changing room Changing room with WCRehearsal room
Rehearsal room Rehearsal room Changing room Changing room Toilets Small props roomCostume room Technical room
Fire exit
00 Ground floor
0
01 first floor
4000
03 ROOF
8000
04 GLAZED ROOF
8500
Auditorium higherlevel
2000
Auditorium roof
11200
Dance Studio Toilets
CorridorDisabled access to and from stageGreen room
Access to lower level to auditorium
Foyer
Void looking down the foyer
Sound & Lighting
www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
As indicated
30/04
/2015
12:15
:21
Section Detail
Project Number
Performing Arts Centre
OwnerChecker
A107
Author 04/25/15
1 : 100section detail 2
{3D} Copy 2
{3D} Copy 3
1 : 1render final 1
1 : 1render final 3
1 : 100section detail Copy 1 Copy 1