117
DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABAS TECI MI ENTO COORDINADO DE INVENTARIOS MULTIPRODUCTO PARA MINIMIZAR LOS COSTOS Y MEJORAR LOS NIVELES DE SERVICIO EN LA CADENA DE SUMINISTROS DE LA EMPRESA PROCAFECOL S.A. MARLETH JUDITH MORALES MARENCO UNIVERSIDAD DE LOS ANDES FACULTAD DE INGENIERIA MAESTRIA EN INGENIERIA INDUSTRIAL BOGOTA-COLOMBIA 2008

DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECI MI ENTO COORDINADO DE INVENTARIOS MULTIPRODUCTO PARA

MINIMIZAR LOS COSTOS Y MEJORAR LOS NIVELES DE SERVICIO EN LA CADENA DE SUMI NISTROS DE LA EMPRESA

PROCAFECOL S.A.

MARLETH JUDITH MORALES MARENCO

UNIVERSIDAD DE LOS ANDES FACULTAD DE INGENI ERIA

MAESTRIA EN INGENI ERIA INDUSTRIAL BOGOTA-COLOMBIA 2008

Page 2: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

 

DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECI MI ENTO COORDINADO DE INVENTARIOS MULTIPRODUCTO PARA

MINIMIZAR LOS COSTOS Y MEJORAR LOS NIVELES DE SERVICIO EN LA CADENA DE SUMI NISTROS DE LA EMPRESA

PROCAFECOL S.A.

MARLETH MORALES MARENCO

Asesor: JOSE FIDEL TORRES DELGADO PhD.

UNIVERSIDAD DE LOS ANDES FACULTAD DE INGENI ERIA

MAESTRIA EN INGENI ERIA INDUSTRIAL BOGOTA-COLOMBIA 2008

Page 3: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

 

CONTENIDO

INTRODUCCION .................................................................................................................. 8 CAPÌTULO 1.  GENERALIDADES DE LA INVESTIGACIÓN ........................................ 9 

1.1.  DESCRIPCIÓN DE LA COMPAÑÍA: ...................................................................... 9 1.1.1.  Generalidades .................................................................................................... 9 

1.2.  SITUACIÓN ACTUAL............................................................................................. 9 1.3.  DESCRIPCIÓN DEL PROBLEMA ........................................................................ 10 1.4.  JUSTIFICACIÓN.................................................................................................... 12 

1.5.  PREGUNTA DE INVESTIGACIÓN ...................................................................... 12 1.6.  OBJETIVOS ........................................................................................................... 12 

1.6.1.  General ............................................................................................................ 12 1.6.2.  Específicos....................................................................................................... 12 

1.7.  IMPORTANCIA Y RELEVANCIA DEL PROYECTO .......................................... 13 

1.8.  METODOLOGIA ................................................................................................... 13 1.8.1.  Revisión bibliográfica del Estado del arte......................................................... 13 

1.8.2.  Descripción la cadena de suministros de la comercialización del café colombiano y productos complementarios utilizando el modelo SCOR ........................... 14 

1.8.3.  Formulación Conceptual del Problema ............................................................. 14 1.8.4.  Planteamiento del M odelo M atemático............................................................. 14 

1.8.5.  Desarrollo del Algoritmo de solución del problema planteado .......................... 14 1.8.6.  Simulación del modelo con todas las variables que lo afectan:.......................... 14 

1.8.7.  Análisis de Resultados y Hallazgos .................................................................. 15 

1.8.8.  Conclusiones y Futuras Investigaciones............................................................ 15 

CAPÌTULO 2.  DESCRIPCIÓN LA CADENA DE SUMINISTROS DE LA COM ERCIALIZACIÓN DEL CAFÉ COLOMBIANO Y PRODUCTOS

COM PLEM ENTARIOS UTILIZANDO EL MODELO SCOR ........................................... 16 2.1.  GENERALIDADES DEL MODELO SCOR ........................................................... 16 

2.2.  DESCRIPCIÓN LA CADENA DE SUMINISTROS DE LA COMERCIALIZACIÓN DEL CAFÉ COLOMBIANO JUAN VALDEZ Y PRODUCTOS COMPLEMENTARIOS..................................................................................................... 16 

Page 4: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

 

2.2.1.  Representación geográfica del estado actual de la cadena de suministros .......... 16 2.2.2.  Niveles identificados en la cadena de suministros............................................. 19 

CAPÌTULO 3.  MARCO TEORICO ................................................................................ 24 

3.1.  ALGUNAS DEFINICIONES RELEVANTES ........................................................ 24 

3.1.1.  Cadena de Suministro ...................................................................................... 24 3.2.  MODELOS CONCEPTUALES PARA LA PLANIFICACIÓN DE CADENAS DE SUM INISTRO ................................................................................................................... 25 

3.2.1.  Modelo SCOR ................................................................................................. 25 

3.3.  MECANISMOS DE COORDINACIÓN M EDIANTE MODELOS DE PROGRAMACIÓN MATEMÁTICA................................................................................. 28 3.4.  TÉCNICA DE SOLUCIÓN - RELAJACIÓN LAGRANGIANA............................. 28 

3.4.1.  Técnica de Optimización Subgradiente:............................................................ 30 3.5.  APLICACIONES SIMILARES ENCONTRADAS EN LA LITERATURA ............ 31 

3.5.1.  MODELADO, HEURISTICAS Y POLÍTICAS DE INVENTARIOS EN LA CADENA DE SUMINISTROS ...................................................................................... 31 

CAPÌTULO 4.  FORMULACIÓN DEL MODELO MATEMATICO .............................. 34 4.1.  SUPUESTOS .......................................................................................................... 34 

4.2.  EXQUEMATIZACIÓN DE LA CADENA ............................................................. 34 

4.3.  FORMULACION.................................................................................................... 36 

4.3.1.  Elementos básicos para la estandarización del problema................................... 36 4.3.2.  Formulación matemática del modelo ................................................................ 41 

CAPÌTULO 5.  TECNICA DE SOLUCIÓN ...................................................................... 43 

5.1.  PROCEDIMIENTO DE SOLUCIÓN ...................................................................... 43 

5.1.1.  Relajación Lagrangiana.................................................................................... 43 

5.1.2.  Búsqueda Local................................................................................................ 46 CAPÌTULO 6.  TECNICA DE SIMULACIÓN ................................................................ 47 

6.1.  DESCRIPCIÓN DE LA SIMULACIÓN ................................................................. 47 

6.1.1.  Etapa 1 Especificación ..................................................................................... 47 6.1.2.  Etapa 2 Desarrollo............................................................................................ 48 

6.1.3.  Etapa 3 Estudio ................................................................................................ 50 CAPÌTULO 7.  EXPERIM ENTACIÒN Y ANÀLISIS DE RESULTADOS .................... 52 

7.1.  DEFINICIÓN DE INSTANCIAS NUMÉRICAS .................................................... 52 

Page 5: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

 

7.1.1.  Cálculo de los costos asociados ........................................................................ 52 7.2.  CODIFICACIÓN DEL ALGORITMO DE RELAJACION LAGRANGIANA ........ 53 

7.3.  RESULTADOS COMPUTACIONALES DEL MODELO PRIMAL ....................... 53 

7.4.  DEFINICIÓN DE INSTANCIAS PARA LA SIMULACIÒN.................................. 55 

7.5.  RESULTADOS COMPUTACIONALES DE LA SIMULACIÓN ........................... 55 7.5.1.  Primer Escenario.............................................................................................. 55 7.5.2.  Segundo escenario ........................................................................................... 56 

7.5.3.  Análisis de sensibilidad .................................................................................... 57 

7.5.4.  Algunas conclusiones de la simulación............................................................. 58 

CAPÌTULO 8.  CONCLUSIONES Y FUTURAS INVESTIGACIONES ........................ 60 REFERENCIAS BIBLIOGRAFICAS .................................................................................. 62 

Page 6: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

 

LISTA DE TABLAS Tabla 1. Descripción de los procesos de la cadena de suministros de Procafecol S.A. Tabla 2. Resumen de instancias Tabla 3. Resumen resultados computacionales modelo matemático Tabla 4. Tamaño de lotes Qrki obtenidos Tabla 5. Tiempos de reaprovisionamiento Tabla 6. Cantidades a pedir en el CD obtenidas Tabla 7. Comparación entre costos actuales y obtenidos en la optimización Tabla 8. Comparación. Resultados modelo matemático Vs Simulación Alternativa 1 Tabla 9. Nieves de servicios obtenidos en la simulación – Escenario 1 Tabla 10. Comparación. Resultados modelo matemático Vs Simulación Alternativa 2 Tabla 11. Nieves de servicios obtenidos en la simulación – Escenario 2 Tabla 12. Resultados obtenidos en la optimización con Arena 12.0 para el escenario 1A. Tabla 13. Niveles de servicio optimización con Arena 12.0 para el escenario 1A Tabla 14. . Resultados obtenidos en la optimización con Arena 12.0 para el escenario 2A. Tabla 15. Niveles de servicio optimización con Arena 12.0 para el escenario 2A Tabla 16. Comparación de costos con resultados de la simulación Alternativa 1. 

Page 7: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

 

LISTA DE GRÁFICAS Figura 1 Mapa de la cadena de comercialización del Café Colombiano Juan Valdez Figura 2. M apa de Procesos de la Cadena de Comercialización del Café Juan Valdez Figura 3. Diagrama de relaciones ente procesos cadena de suministros del café colombiano Juan Valdez Figura 4. Procesos del modelo SCOR Figura 5. Niveles del Modelo SCOR Figura 6. Seudocódigo técnica de optimización sub-gradiente Figura 7. Esquema de la Cadena de Suministros de Procafecol S.A: Figura 8. Esquema de la Cadena de Suministros a Modelar Figura 9. Coordinación Distribuidor-Minorista Figura 10. Coordinación Productor - Distribuidor Figura 11. Esquema de diseño para la simulación Figura 12. Esquema del modelo desarrollado en Arena. Abstracción para un producto y una tienda 

Page 8: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

 

INTRODUCCION

La inclusión de nuevos conceptos en el estado del arte en cadenas de suministro, los procesos de expansión en los que ha venido apuntado el mercado de café industrializado en Colombia desde comienzos del siglo XXI, el entorno globalizado en donde cafés de múltiples orígenes han ampliado la oferta mundial del grano, la desaceleración de la economía que ha llevado a grandes cadenas de comercialización de café industrializado a la reducción de costos operacionales, han llevado a Procafecol S.A. y al gremio cafetero en Colombia a plantear estrategias y/o diseñar políticas que permitan optimizar el flujo de los productos a lo largo de la cadena de suministros y cooperar con las partes involucradas para minimizar los costos asociados a la distribución de productos sin afectar los niveles de servicios deseados, de tal manera que se aumente la competitividad en el mercado colombiano.

Teniendo en cuenta la necesidad de mejorar la competitividad en la cadena de suministros de productos industrializados del café colombiano, Procafecol S.A. ha desarrollado estrategias de integración a lo largo de su red de suministros que permiten el intercambio de información en todas las partes de la cadena. Dado lo anterior, Procafecol S.A. desea establecer esquemas de distribución con entregas que consideren los recursos que tienen las diferentes tiendas Juan Valdez y la coordinación entre las diferentes partes de la cadena.

Para aprovechar las estrategias de integración que ha diseñado Procafecol con sus proveedores, la compañía ha incluido en su plan estratégico (2008) “M ejorar la eficiencia de la cadena de abastecimiento hacia las Tiendas Juan Valdez”. Con este objetivo se busca la minimización de los costos a través de la cadena de suministros, especialmente los asociados al mantenimiento de inventario.

Por tales razones el propósito de este proyecto de investigación está encaminado al cumplimiento de dicho objetivo buscando una alternativa que permita planear en el mediano plazo la operación logística de la red de abastecimiento de las Tiendas Juan Valdez, con el fin de minimizar los costos totales de almacenamiento y operación, considerando las restricciones asociadas a los recursos.

Page 9: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

 

CAPÌTULO 1. GENERALIDADES DE LA INVESTI GACIÓN

En este primer capítulo se presentan las generalidades de la investigación tales como la descripción de la compañía en la cual se estudia la situación problemática, el problema planteado, los objetivos del trabajo, la pregunta de investigación y la metodología utilizada.

1.1.DESCRIPCIÓN DE LA COMPAÑÍA:

1.1.1. Generalidades

La Promotora de Café Colombia, Procafecol S.A Es una sociedad colombiana subsidiaria de la Federación Nacional de Cafeteros, creada por el gremio cafetero en noviembre del 2002, cuya actividad principal es comercializar café colombiano en todas sus formas (tostado, molido y en grano), crear tiendas de café para administración directa o a través de terceros y otorgar franquicias a nivel nacional e internacional. Esta sociedad opera directamente el negocio de las Tiendas Juan Valdez en Colombia y en el exterior a través de sus filiales.

Entre las operaciones logísticas de Procafecol S.A. Se encuentran la compra de las referencias ofrecidas en las tiendas Juan Valdez, la gestión del almacenamiento, la distribución de estos productos a nivel nacional y la exportación a tiendas fuera de Colombia. De la misma manera hace parte de la gestión de Procafecol S.A. el abastecimiento todos los artículos complementarios para la operación de las Tiendas Juan Valdez.

Actualmente Procafecol S.A. Comercializa los productos Juan Valdez en sus familias: Bebidas de café, café empacado, artículos portadores de marca, repostería, entre otros.

Basado en lo descrito anteriormente, uno de los grandes retos de Procafecol S.A. es agregar mayor valor al negocio del café colombiano, dándole mayor visibilidad y reconocimiento en el mundo, con el fin de obtener mayores ingresos para los productores.

1.2.SITUACIÓN ACTUAL

Procafecol S.A. ha establecido como prioridad para alcanzar el objetivo anterior diseñar un sistema adecuado de abastecimiento para los minoristas: tiendas Juan Valdez, clientes institucionales y grandes superficies, que permita ofrecer los productos que ellos requieren minimizando los costos internos de la compañía. Es por ello, que la Dirección de Compras y

Page 10: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

10 

 

Logística de Procafecol S.A. Ha venido examinando su operación, evidenciando los siguientes resultados (Análisis Logístico Procafecol, 2007):

• Del análisis de la demanda de minoristas se puede observar que: la familia de productos del café y la familia de artículos portadores de marca Juan Valdez (productos de vestir) representan el 45 y 30% de las ventas (en volumen y valor comercial) (Procafecol, 2007). Esto indica que estos grupos constituyen familias críticas a la hora de tomar decisiones referentes a cuando y cuanto pedir.

• La mayor criticidad en los pedidos a mayoristas se refleja en los productos de vestir, ya que se tienen tiempos de entrega de tres meses, lo que conlleva a tener sumo cuidado en la programación de los pedidos y en la definición de políticas de inventario que permitan alcanzar niveles de servicios superiores al 90%.

• No se tienen lotes definidos para entrega a los minoristas. En el caso de las tiendas Juan Valdez formato “Express” (sin almacenamiento) el aprovisionamiento se realiza diariamente en las cantidades que se espera se demanden. En el caso de los clientes institucionales y grandes superficies se reciben pedidos mensuales de acuerdo a cantidades proyectadas por la demanda, la cual varía estacionalmente.

• Se ha establecido un tiempo de entrega de 3 días para clientes nacionales y según fecha de entrega para clientes fuera de Colombia. Por consiguiente, la compañía ha planteado la necesidad de revisión de los tamaños de lote despachados a minoristas y los tiempos de entrega con base en la demanda final.

• Por otra parte, Procafecol S.A. ha venido implementando un programa de expansión en Colombia, en el cual se ha pasado a distribuir de 50 Tiendas Juan Valdez en 2006 a 200 en 2007, 25 clientes en grandes superficies en 2006 a 150 en 2007 y 35 clientes institucionales en 2006 a 190 en 2007. Esto evidencia claramente la necesidad de mejorar constantemente los canales de distribución apoyados en pronósticos cercanos a la demanda en los diferentes minoristas y a la coordinación con los proveedores para optimizar la entrega en los diferentes destinos del país.

Debido a que Procafecol S.A. es una empresa en etapa de desarrollo, ha venido desarrollando programas enfocados a optimizar la logística de distribución hacia las Tiendas Juan Valdez, Clientes Institucionales y Grandes Superficies con cooperación de sus proveedores mayoristas. Es por ello que se plantea la necesidad de elaborar un modelo que permita coordinar y optimizar los tamaños de lotes y tiempos de revisión de inventario, por familias de productos, para cada uno de los actores en la cadena, de tal manera que se minimicen los costos, la rotación del inventario y se alcancen niveles de servicio superiores al 95%.

1.3.DESCRIPCIÓN DEL PROBLEMA

En las actividades de abastecimiento, producción y distribución de productos a las tiendas Juan Valdez, diariamente se toman decisiones de alto impacto tanto para los costos de la operación

Page 11: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

11 

 

como para el nivel de servicio al cliente. En entre las decisiones que deben ser tomadas, se destacan:

• Que cantidades por producto se deben producir o comprar, necesarios para coordinar con el centro de distribución en cada ciclo productivo?

• Que cantidades de productos deben ser enviados al centro de distribución, de tal manera que se supla la demanda de todas las tiendas?

• Qué cantidades por producto deben ser enviadas del centro de distribución a cada una de las tiendas?

• Cuantos ciclos de reaprovisionamiento del centro de distribución deben establecerse en cada ciclo de producción?

• Cuantos ciclos de reaprovisionamiento por cada tienda deben establecerse en cada ciclo de distribución?

Todas estas decisiones se encuentran centralizadas en la Dirección de Compras y Logística de Procafecol S.A., la cual coordina las operaciones de producción, compras, distribución interna y externa. El hecho de tener un punto de decisión centralizado es una característica positiva, de acuerdo con Meixell y Gargeya (2005), donde mencionan que la integración de procesos en la cadena de suministros es la mejor práctica utilizada, y en el mismo texto citando a Kouvelis y Gutierrez (1997) concluye que un sistema con decisiones centralizadas a través de la cadena de abastecimiento tiene ventajas sobre un sistema con decisiones descentralizadas.

Estas decisiones dependen de diferentes parámetros cualitativos y cuantitativos que aumentan la complejidad del problema. Algunas de estas variables son:

Tiempos de entrega del proveedor: este parámetro hace referencia al tiempo de demora del proveedor para colocar un pedido en el centro de distribución. Procafecol S.A. ha coordinado con sus proveedores estos tiempos de la siguiente manera: para productos derivados del café siete días posterior a la puesta de la orden y para productos de fijación de marca como prendas de vestir 30 días a partir de colocada la orden.

Capacidad de producción: está es definida por cada proveedor de acuerdo a los recursos que posee en su planta de producción y hace referencia al número de unidades que puede entregar por período de tiempo.

Tipología de la Tienda: Está dada por el tamaño, diseño y la capacidad de almacenamiento que posea. Encontramos tres tipos de formatos: Estándar, Express y Cineco. Para este estudio solo utilizaremos los dos primeros formatos.

Capacidad de Almacenamiento de las Tiendas: Se refiere al espacio dispuesto por cada tienda para colocar los productos de acuerdo a su familia. En todos los formatos los estantes para la ubicación de productos de café y productos de vestir, está separada de acuerdo a técnicas de merchandising.

Page 12: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

12 

 

1.4.JUSTIFICACIÓN

Este trabajo tiene su justificación en el plan estratégico Procafecol S.A. en el cual se plantea explícitamente como uno de los objetivos estratégicos del área de compras y logística: “Mejorar la eficiencia de la cadena de abastecimiento entendida hasta puerto de embarque”. La estrategia planteada para el cumplimiento de este objetivo estratégico es disminuir al máximo los costos sin sacrificar los niveles de servicios asociados a la proyección de crecimiento y expansión del negocio como otro de los objetivos de la compañía.

El planteamiento de este proyecto de investigación apunta directamente al cumplimiento de dicho objetivo buscando modelar la cadena de suministros mediante coordinación de inventarios, de tal manera que se minimice el costo total anual de operación, manteniendo niveles de servicio superiores al 95%.

1.5.PREGUNTA DE INVESTIGACIÓN

¿Cómo minimizar los costos y mejorar el nivel de servicio en la cadena de abastecimiento de Procafecol S.A. mediante coordinación de inventarios con los actores mayoristas, distribuidores y minoristas?

1.6.OBJETIVOS

1.6.1. General

Diseñar un sistema de abastecimiento coordinado multiproducto para minimizar los costos y mejorar el nivel de servicio en la cadena de suministros para la empresa Procafecol S.A

1.6.2. Específicos

• Describir la cadena de suministros de la comercialización del café colombiano y productos complementarios utilizando el modelo SCOR1.

• Diseñar un modelo matemático de coordinación de inventarios, entre Proveedores Mayoristas – Procafecol S.A –Tiendas Minoristas, enfocado hacia la optimización del flujo de inventarios en los productos del café y los productos de vestir.

• Desarrollar una aplicación computacional en GAM S que permita resolver el modelo propuesto

1 Stephens and Supp ly Chain Council (2007) SUPPLY‐CHAIN OPERATIONS REFERENCE ‐MODEL.   Recuperado el 16/11/07 del sitio web 

www.supply‐chain.org. 

Page 13: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

13 

 

• Realizar una simulación en Arena para validar el modelo propuesto, incluyendo políticas de control de inventario para evaluar la minimización de los costos y el mejoramiento del nivel de servicio en la cadena de suministros.

1.7.IMPORTANCIA Y RELEVANCIA DEL PROYECTO

El desarrollo de negocios competitivos y productivos en los actuales ambientes globalizados de comercialización, ha llevado a las empresas que producen, distribuyen y comercializan productos de consumo masivo a replantear sus operaciones logísticas para llegar de manera eficiente al cliente y minimizar los costos asociados a estos altos niveles de servicio.

Una de las formas más utilizadas lograr los objetivos anteriores es la coordinación entre los diferentes niveles de la cadena de suministros. Es así como retoman gran importancia las decisiones de cuanto producir, cual debe ser la política y el tamaño de los lotes de transferencia entre las partes de la cadena, en que períodos se debe revisar el inventario en cada eslabón de la cadena de suministro, entre otras. Estas decisiones llevan a integración de sistemas de inventarios entre productores, distribuidores y minoristas y al establecimiento de estrategias que sincronizan las operaciones logísticas logrando mejor posicionamiento ante los clientes y comodidad en el desarrollo de las actividades precedentes a la venta final.

Es por ello que en la cadena de comercialización de productos industrializados del café, la cual no ha sido ampliamente estudiada en la literatura y su historia en Colombia es reciente (no más de 5 años), recobra vital importancia en el desarrollo de este tipo de proyectos dado que su estructura es particular y provee supuestos de integración que pueden ser optimizados mediante herramientas matemáticas, heurísticas y de simulación, logrando nuevos aportes en el estado del arte de la investigación.

De acuerdo a lo descrito anteriormente Procafecol S.A., ha manifestado su compromiso para impulsar alternativas que permitan mejorar los niveles de servicio y minimizar los costos en la cadena de suministros del café industrializado, utilizando las herramientas de optimización que provee la ingeniera.

1.8.METODOLOGIA

La metodología utilizada en el desarrollo del proyecto consta de varias fases. A continuación se presenta la metodología con sus fases y su descripción.

1.8.1. Revisión bibliográfica del Estado del arte

Se utilizaron las bases de datos a las que se tiene acceso por medio de la Universidad de los Andes, con el fin de identificar investigaciones que apunten a dar solución a problemas de abastecimiento coordinado en la cadena de suministros en la comercialización del café y productos complementarios y problemas similares. Finalmente se realizó una selección de aquellas que impliquen utilización de técnicas de optimización avanzada y simulación de inventarios.

Page 14: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

14 

 

1.8.2. Descripción la cadena de suministros de la comercialización del café colombiano y productos complementarios utilizando el modelo SCOR

Mediante participación de los diferentes involucrados en la cadena de suministros de Procafecol S.A., se realizó un equipo de trabajo en donde usando las técnicas presentadas en el modelo SCOR se llegó a un modelo por procesos, el cual se presenta en el capítulo II.

1.8.3. Formulación Conceptual del Problema

Partiendo de la descripción del problema presentada, se buscan herramientas que permitan modelar y analizar el comportamiento del sistema descrito, y métodos para obtener una solución al problema. Esta etapa se dividió en dos fases:

• Investigación de técnicas de optimización para la minimización del costo total en problemas de coordinación en la cadena de suministros

• Investigación de técnicas que permitan modelar las variables presentadas en la situación problema.

El desarrollo completo de la revisión de la literatura, se encuentra en el capítulo III.

1.8.4. Planteamiento del Modelo Matemático

En esta etapa se Identificaron los elementos básicos para la estandarización del problema tales como: conjuntos, parámetros, variables y restricciones que formulen el problema de abastecimiento coordinado en la cadena de suministro en la comercialización del café y productos complementarios, de tal manera que pueda ser entendido matemáticamente

El desarrollo completo de la formulación del problema y el planteamiento del modelo matemático se presenta en el capítulo IV.

1.8.5. Desarrollo del Algoritmo de solución del problema planteado

Apoyado en una revisión bibliográfica exhaustiva, se desarrolló un algoritmo capaz de arrojar soluciones factibles a instancias del problema propuesto.

La técnica de solución y el algoritmo propuesto se desarrolla a profundidad en el capitulo V.

1.8.6. Simulación del modelo con todas las variables que lo afectan:

En esta etapa con los resultados obtenidos del modelo agregado de coordinación, se incluyen las variables que modelan el problema de una manera más real, simulando el funcionamiento de la cadena de suministros.

Los resultados obtenidos pueden observarse detalladamente en el capítulo VI.

Page 15: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

15 

 

1.8.7. Análisis de Resultados y Hallazgos

Una vez desarrollada la herramienta computacional de simulación, se hace un análisis profundo de los resultados obtenidos por medio de diferentes instancias numéricas. Igualmente se analizarán las ventajas y limitaciones que ésta presenta.

Los resultados computacionales se presentan en profundidad en el capítulo VII.

1.8.8. Conclusiones y Futuras Investigaciones

De acuerdo con los resultados y las limitaciones evidenciadas en la simulación, se presentan propuestas para mejoras en los métodos utilizados y temas para futuras investigaciones en esta misma línea.

Page 16: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

16 

 

CAPÌTULO 2. DESCRIPCIÓN LA CADENA DE SUMI NISTROS DE LA COMERCIALI ZACIÓN DEL CAFÉ

COLOMBIANO Y PRODUCTOS COMPLEMENTARIOS UTILI ZANDO EL MODELO SCOR

En este capítulo se presentan la descripción de la cadena de suministros que siguen los derivados industrializados del café colombiano y aquellos que apoyan la generación de valor asociado mediante la utilización de las técnicas presentadas en el modelo SCOR.

2.1.GENERALIDADES DEL MODELO SCOR

El modelo SCOR (Supply Chain Operations Reference model, SCOR-model), (1996) desarrollado en por el Consejo de la Cadena de Suministro, Supply-Chain Council (SCC) es una herramienta que permite representar, analizar y configurar Cadenas de Suministro. En este caso será usado como herramienta de diseño para la Gestión de la Cadena de suministros de Procafecol S.A. Las bases que fundamentan este modelo se encuentran en el capítulo III.

2.2. DESCRIPCIÓN LA CADENA DE SUMINISTROS DE LA COMERCIALIZACIÓN DEL CAFÉ COLOMBIANO JUAN VALDEZ Y PRODUCTOS COMPLEMENTARIOS

2.2.1. Representación geográfica del estado actual de la cadena de suministros

La cadena de comercialización de productos industrializados del café colombiano, inicia con la producción en dos plantas ubicadas en las Ciudades de M anizales y Bogotá. La primera productora de café liofilizado y colas de café y la segunda es una torrefactora que produce cafés de línea, cafés de origen y cafés sostenibles empacados.

Para apoyar el negocio de comercialización del café industrializado, esta cadena es acompañada de proveedores de artículos de consumo, tales como alimentos y bebidas, artículos de mercadeo como prendas de vestir, kits para la elaboración de café en casa, artesanías, entre otros.

Page 17: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

17 

 

Los productos derivados del café son almacenados en un centro de distribución (CEDI) ubicado en la ciudad de Bogotá, para ser distribuidos a los diferentes canales de comercialización, de acuerdo a la demanda de los mismos. En el centro de distribución se realiza el recibo, almacenamiento, preparación y entrega de órdenes.

Otros productos comercializados en las Tiendas Juan Valdez, son suministrados directamente a través de los operadores logísticos ó directamente por los proveedores.

Para la comercialización de los productos de Marca Juan Valdez, se han definido los siguientes canales a saber:

• Canal Tiendas: Es el canal que gestiona distribución y la comercialización de productos en las tiendas Juan Valdez ubicadas en el territorio nacional.

• Canal Institucional Colombia: Es el canal encargado de la comercialización de la M arca Juan Valdez, en grandes y medianas empresas colombianas como estrategia de marca para apoyar sus actividades comerciales.

• Canal Grandes Superficies Colombia: Su función radica en la venta y distribución del Café Colombiano Juan Valdez a grandes almacenes de cadena y ventas FOB a compradores internacionales.

Para la gestión de los diferentes procesos de distribución física nacional es internacional estos canales están apoyados en las siguientes empresas:

• Procafecol S.A.: Cuya actividad principal es comercializar café colombiano en todas sus formas (tostado, molido y en grano), crear tiendas de café para administración directa o a través de terceros y otorgar franquicias a nivel nacional e internacional.

• NFCGC Enterprice LLC: Encargada de la logística y la comercialización del café colombiano en las Tiendas Juan Valdez, localizadas en Norte América.

• NFCGC Retail LLC: Cuya función es la comercialización de la marca Juan Valdez en las Grandes Superficies de USA.

• CAFESCOL: Operador estratégico para la operación de Tiendas Juan Valdez en España

• Organización Fallabela Chile: Operador estratégico para la operación de Tiendas Juan Valdez en Chile

Page 18: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

18 

 

• Otros: Definidos como compradores FOB ó distribuidores directos de grandes superficies, que penetran el mercado en otros países (Costa Rica, Panamá, Ecuador y México).

Figura 1 Mapa de la cadena de comercialización del Café Colombiano Juan Valdez 

Fuente: División de Compras y Logística – Procafecol S.A.

En esta cadena los minoristas están representados por:

Centro América(C.Rica, Panamá, Salvador, México): Venta FOB Intermediarios -Cliente

Perú:

Venta FOB Intermediario -Cliente

Walt-Mart

NFCGC

10 Tiendas USA

NFCGC Retail

CAFESCOL

4 Tiendas España

Tiendas Swiss

Falabella

Colombia

102 Tiendas

Torrefactora

Prov. USA

Provs. Col.

CEDI

Mc M.

Page 19: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

19 

 

• Tiendas Juan Valdez: Encargadas de la venta final de los productos de marca Juan Valdez y otros que generan valor a la marca. Caracterizados por tener almacenamiento limitado, realizar procesos de preparación y prestar el servicio al consumidor final.

• Retailers ó grandes Cadenas de ventas de consumo masivo: Su función es distribuir al consumidor final los productos Juan Valdez para el uso doméstico.

• Instituciones Comerciales: Hacen parte de este grupo, aquellas empresas que cumplen las condiciones establecidas para usar la marca, utilizar los productos y agregar valor al café Colombiano.

Las interacciones entre los diferentes miembros de la cadena de comercialización del Café Colombiano Juan Valdez, pueden ser observados en la Figura 1.

2.2.2. Niveles identificados en la cadena de suministros

2.2.2.1.Primer Nivel: Procesos Asociados a la Cadena de suministros (Situación Esperada):

Para el desarrollo adecuado de las diferentes actividades logísticas en la Cadena de Comercialización del Café Colombiano Juan Valdez se han definido los siguientes macro procesos:

• PLANEAR , COMUNICAR Y CONTROLAR LA ESTRATEGIA:

Hace parte del nivel estratégico y tiene como misión la planeación del funcionamiento de toda la cadena de suministros, así como también la definición de políticas gerenciales y la gestión presupuestal.

• GESTIONAR LOGISTICA DE APROVISIONAMIENTO

Este macro proceso hace parte del nivel operacional en la cadena de valor y su misión es asegurar el abastecimiento de la materia prima de café para la producción, el aprovisionamiento de los productos que agregan valor a la marca y preservar los productos almacenados en el centro de distribución y en las tiendas Juan Valdez.

• FABRICAR PRODUCTO Y CONTROLAR LA CALIDAD

Hacen parte de este macro proceso todos aquellos que implican transformar el café verde en café para el consumo masivo marca Juan Valdez, así como también asegurar la calidad del producto.

• GESTIONAR LOGISTICA DE DISTRIBUCION

Page 20: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

20 

 

En este macro proceso se gestionan la entrega de órdenes en los diferentes canales de distribución para asegurar que los productos lleguen al consumidor final.

• GESTIONAR LOGÍSTICA DE REVERSA

En este proceso de apoyo se gestionan todas las devoluciones de los clientes y se aplican las políticas definidas para el manejo de desperdicios y productos vencidos.

Estos macro procesos se han agrupado teniendo en cuenta los niveles establecidos en el modelo SCOR, y se pueden observar en la Figura 2.

Figura 2. Mapa de Procesos de  la Cadena de Comercialización del Café Juan  Valdez  

Fuente: División de Compras y Logística – Procafecol S.A. 

2.2.2.2. Segundo nivel: Descripción de Subprocesos y sus relaciones

Tabla 1. Descripción de  los procesos de la  cadena de suministros de Procafecol S.A. 

MACROPROCESO PROCESO SUBPROCESO

P. Planear, comunicar y controlar la

P1. Planear cadena de suministro

Planeación del aprovisionamiento

Planeación de la producción

8. GESTIONAR LOGISTICA DE

APROVISIONAM.

9. FABRICAR PRODUCTO

10. GESTIONAR

LOGISTICA DE DISTRIBUCION

PR

OV

EE

DO

RE

S

TIENDAS

GRANDES SUPERFICIES

INTERNET

INSTITUCIONAL

2. PLANEAR , COMUNICAR Y CONTROLAR LA ESTRATEGIA

12. Logística de Reversa CL

IEN

TE

S C

ON

SU

MID

OR

ES

Page 21: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

21 

 

MACROPROCESO PROCESO SUBPROCESO

estrategia Planeación de la distribución

S. Gestionar logística de

aprovisionamiento

S2. Aprovisionar Aprovisionar materia prima en CEDI

Aprovisionar productos en tiendas

S2. Almacenar productos

Recibir materiales

Ingreso de materiales

Control de inventario

M. Fabricar producto y

controlar calidad

M1. Programar recursos de la producción

Programar la producción detallada.

Comunicar la Planeación

M2. Transformar producto

Tostar y moler café

M3. Empacar Empacar

M4. Controlar la calidad

Realizar verificación y certificar calidad

D. Gestionar logística de distribución

D1. Gestionar pedido en el CEDI

Preparar Pedidos en el CEDI

Verificar Pedido

Entregar a operador de transporte

D2. Gestionar pedido para exportación

Administrar requerimiento de importaciones/exportaciones

Gestionar medios de transporte

Recibir en puerto, generar documentación y embarcar

Acusar recibo a conformidad por parte del cliente

D3. Administrar inventarios

Ejecutar política de revisión de inventario

Evaluar y controlar la implementación de la política

D4. Trasladar Trasladar inventario tienda a tienda

Page 22: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

22 

 

MACROPROCESO PROCESO SUBPROCESO

productos entre canales

Trasladar inventario entre canales

D5. Administrar operadores logísticos

Elaborar contratos de operación logística

Realizar seguimiento al servicio

D6. Administrar logística de transporte

Planear Rutas

Realizar seguimiento al servicio

R. Gestionar logística de reversa

R1. Gestionar reversa de productos defectuosos

Registrar Devolución

Recibir devolución de cliente

Aplicar política de devolución de acuerdo al producto

Enviar la devolución

R2. Gestionar reversa de desperdicios

Registrar Desperdicios

R3. Gestionar reversa de sobrantes / vencidos

Aplicar política de reversa de sobrantes

Fuente: Direcciòn de Compras y Logística – Procafecol S.A.

Los subprocesos que describen la cadena de comercialización están interrelacionados entre si, tal como se observa en la Figura 3.

Page 23: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

23 

 

Figura 3. Diagrama de relaciones ente procesos cadena de  suminis tros del café  colombiano Juan Valdez  

O TROSPROVEEDORES

PROVEEDORESCAFÉ VERDE

O PERADORES LOGISTICOS

PLANTAS DE TIENDASPRO DUCCIÓN CONSUMIDORES

OTROS CANALES

FLUJO DE MATERIALES CEDI

P3

S2 S2

S2

M1 M2 M3 M4

M4

D1

D2

D3 D4

D5

P3

S1

P1

S2

D6

R1

R1

R2

R3R3R3

R1 R1

P2

R1

S1

Page 24: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

24 

 

CAPÌTULO 3. MARCO TEORICO

En este capítulo se presentan problemas de la literatura relacionados y técnicas de solución, que serán utilizados en el desarrollo de este trabajo. Partiendo de la descripción del problema presentada en el capítulo anterior, se buscan herramientas que permitan estructurar el problema base y simular el comportamiento del sistema descrito.

3.1.ALGUNAS DEFINICIONES RELEVANTES

3.1.1. Cadena de Suministro

El concepto de cadena de suministros aparece por primera vez en las investigaciones realizadas por Forrester (1961), cuando indicó que la competitividad de una empresa dependía de la interacción entre los flujos de información, materiales, pedidos, dinero, mano de obra y equipos, y declaró que la comprensión y el control de estos flujos era el trabajo primordial de la gestión. Forrester planteó en sus experimentos un modelo compuesto por cuatro niveles: productor, almacén, distribuidor y minorista.

De acuerdo con Companys (2005) la cadena de suministros es una red de organizaciones interrelacionadas que intervienen en diferentes fases del proceso productivo mediante actividades que pretenden añadir valor, desde el punto de vista del cliente, al producto, bien o servicio.

Stadler (2005), define la gestión de la cadena de suministros como la tarea de integrar diferentes organizaciones a lo largo de la cadena de suministros coordinando el flujo de materiales, información y finanzas de forma que se satisfaga la demanda de los clientes e incremente la competitividad.

Bourland et al (1996), Reiman et al (1998), Gavirneni et al. (1999), Cachon y Fisher (2000), Lee et al. (2000), han realizado investigaciones que apuntan a que las tareas de planificación coordinación entre los eslabones de la cadena de suministros puede aportar beneficios sustanciales. Cabe resaltar que estas investigaciones implican tres tipos de coordinación:

Page 25: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

25 

 

mediante contratos, a través de sistemas multiagentes ó a través de modelos de programación matemática.

3.2.MODELOS CONCEPTUALES PARA LA PLANIFICACIÓN DE CADENAS DE SUMINISTRO

Entre los modelos más utilizados encontramos:

La matriz SCP (Supply Chain M anagment and Advanced Planning) presentada por Fleischmann et al. (2002), que presenta distintos escenarios para la toma de decisiones (corto, mediano y largo plazo). En este método se plantea analizar el proceso de planificación de operaciones en el contexto de orientación por procesos, usando modelado de redes en una empresa (Proyecto V-Chain GRDI-2000-25881).

El M odelo de Referencia de Operaciones en la cadena de suministros (SCOR), el cual es una herramienta para analizar, representar, configurar y rediseñar una cadena de suministros. Fue desarrollado por el Supply Chain Council (2002), y permite describir la cadena de suministros de acuerdo a una metodología estandarizada por procesos.

3.2.1. Modelo SCOR

El modelo SCOR (Supply Chain Operations Reference model, SCOR-model) (2008) desarrollado en por el Consejo de la Cadena de Suministro, Supply-Chain Council (SCC) es una herramienta que permite representar, analizar y configurar Cadenas de Suministro.

De acuerdo con Calderón (2005) éste modelo parte de una definición de los Procesos core de Negocio, los Indicadores de Gestión, las M ejores Prácticas y las Tecnologías en una estructura unificada para apoyar la comunicación entre los Socios de la Cadena de Suministro y mejorar la eficacia de la Gestión de la Cadena de Suministro (GCS) y de las actividades de mejora de la Cadena de Suministro (CS) relacionadas. El M odelo es considerado como una herramienta que permite proporcionar una base para la mejora de la CS en proyectos a nivel global y local.

Para estandarizar la terminología y los procesos de una cadena de suministros que se desea modelar se han definido indicadores claves de rendimiento KPI s (Key Performance Indicators) los cuales permiten comparar y analizar diferentes alternativas y estrategias planeadas para una cadena de suministros.

El modelo SCOR permite describir las actividades de una organización necesarias para satisfacer la demanda de un cliente. El M odelo está organizado alrededor de los cinco Procesos Principales de Gestión: Planificación (Plan), Aprovisionamiento (Source), Manufactura (Make), Distribución (Deliver) y Devolución (Return) (Ver la Figura 4). De acuerdo con el Supply-Chain Council (1998), El modelo SCOR abarca todas las interacciones con los Clientes (desde la entrada de órdenes hasta el pago de las facturas),

Page 26: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

26 

 

todas las transacciones físicas de materiales (desde los Proveedores de los Proveedores –Suppliers- hasta los Clientes de los Clientes –Customers-, incluyendo equipos, suministros, repuestos, productos a granel, software, etc.) y todas las interacciones con el Mercado (desde la Demanda Agregada hasta el cumplimiento de cada Orden). Sin embargo no intenta describir cada Proceso de Negocio o Actividad. Específicamente; el modelo no contiene: Ventas y Marketing (generación de la Demanda), Desarrollo del producto, Investigación y Desarrollo, y algunos elementos de Servicio Posventa al Cliente. El Modelo no abarca pero presupone la existencia de las actividades de Recursos Humanos, Capacitación, Sistemas, Administración (no de GCS) y Aseguramiento de la Calidad, entre otras.

Figura 4. Procesos del modelo SCOR 

Fuente: Supply-Chain Operations Reference-model SCOR Version 8.0

SCOR contiene cuatro niveles de detalle de procesos: Nivel 1 ò Superior (Tipos de Procesos), Nivel 2 ó de Configuración (Categorías de Procesos), Nivel 3 de tareas de Procesos (Descomposición de los Procesos) y nivel 4 de actividades (descomposición de tareas) (Ver figura 5) En el desarrollo de esta investigación haremos referencia a los niveles 1 y dos del modelo SCOR: Nivel: En este nivel se define el alcance y contenido del SCOR-model, es decir aquellos procesos bases del negocio que son objeto de medición y seguimiento y que permiten comparar a una compañía con otra de talla mundial. Nivel 2: En este nivel, la Cadena de Suministros debe representarse usando las categorías de Procesos conforme a su estado actual (AS IS), tanto geográficamente (Geographic Map) como mediante Diagramas de Hilos (Thread Diagram), estableciendo las especificaciones

Page 27: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

27 

 

de diseño del estado deseado. En esta etapa se obtiene finalmente el mapa de procesos de una compañía.

Figura 5. Niveles del Modelo SCOR  

Fuente: Supply-Chain Operations Reference-model SCOR Version 8.0

Page 28: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

28 

 

3.3.MECANISMOS DE COORDINACIÓN MEDIANTE MODELOS DE PROGRAMACIÓN MATEMÁTICA

Según Ribas et al. (2006), en las investigaciones realizadas encontramos dos tipos de herramientas de coordinación matemática: La planificación secuencial de arriba abajo (Top-Down) y la aproximación mediante relajación Lagrangiana.

La planificación secuencial de arriba abajo (Top-Down) fue introducida por Bhatnagar et al. (1993), esta implicaba planeación uno a uno de cada distribuidor y pasar las necesidades resultantes a todos los proveedores con base en las ventas. Es así como los pedidos se acuerdan con cada proveedor.

Simpson y Erenguc (2001), analizaron una cadena de suministros de tres fases (múltiples proveedores, un centro de distribución, varios minoristas) modelándola como un problema de tamaño de lote multinivel con variaciones en los parámetros de costo y demanda, obteniendo mejores resultados en la planificación de arriba abajo.

Dudek and Stadtler (2005) realizaron mejoras en la calidad de los resultados en un esquema de planificación colaborativa en dos fases; la primera implica top-down y la segunda un esquema de negociación en cuanto a cantidades pedidas, de acuerdo a los costos obtenidos en la fase inicial.

La coordinación mediante relajación Lagrangiana ha sido planteada por Barbarosoglu y Ozgur (1999), Ertogral y Wu (2000), con procedimientos iterativos que hacen posible la coordinación a través de dominios individuales.

3.4.TÉCNICA DE SOLUCIÓN - RELAJACIÓN LAGRANGIANA

Encontramos en la literatura autores como Ahuja et al. (1993), Ghiani et al. (2004), Villavicencio (2005) y Castro (2003) entre otros, quienes afirman que una de las técnicas más utilizadas en la solución de problemas de coordinación de inventarios multiproducto con más de una restricción es la relajación lagrangiana. A continuación se hace una breve explicación de los principios teóricos en los cuales se fundamenta la relajación lagrangiana que presenta Ahuja et al. (1993).

Consideremos el problema (P): z* = min cx

Sujeto a:

Ax = b x X

Este modelo (P) tiene función objetivo lineal cx y un conjunto Ax = b de restricciones lineales

Page 29: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

29 

 

explicitas. Las variables de decisión x también están restringidas por un conjunto X que se tomará como un conjunto finito. Por ejemplo, el conjunto X = {x : Nx = q,0 ≤ x ≤ u} es el un conjunto de soluciones finito para un problema de flujo en redes con vector de demanda q.

La técnica de relajación lagrangiana consiste en relajar restricciones explicitas del problema lineal, llevándolas a la función objetivo asociadas con un coeficiente µ llamado multiplicador lagrangiano. Así, el problema resultante al relajar P es: min cx +µ(Ax − b) Sujeto a

x X . Véase que el conjunto de restricciones Ax = b fueron ya no están en la formulación del problema y ahora hacen parte de la función objetivo seguidas por el vector de multiplicadores lagrangianos µ. Esto no garantiza que la solución óptima de este problema (en adelante problema lagrangeano) sea factible en el problema original (P), pero como se enunciará más adelante, si brinda información importante acerca del problema original. La relajación Lagrangiana o el problema lagrangiano se conoce con la siguiente función:

L(µ) = Min{cx +µ(Ax − b): x X}

Ahuja et al. (1993) enuncia dos lemas que brindan información importante del problema original P partiendo del problema lagrangiano:

• Principio de cota lagrangiana: para cualquier vector µ de multiplicadores lagrangianos, el valor L(µ) es una cota inferior de la función objetivo z* del problema original P. Su demostración se basa en el hecho que la región factible del problema lagrangiano es mayor a la del problema original P. Por lo tanto L* = maxµ L(µ) es la cota inferior más cercana a z*.

• Dualidad débil: El valor de función objetivo óptimo del problema L* del problema lagrangiano es siempre una cota inferior de la función objetivo z* del problema original P.

Después de enunciar los principios básicos se puede inferir que: L(µ) ≤ L* ≤ z* ≤ cx

Estas inecuaciones permiten garantizar cuándo un valor de µ o una solución factible de P son óptimas a través de las siguientes propiedades:

• Si µ es un vector de multiplicadores lagrangianos y x es una solución factible de P que

satisface la condición L(µ)=cx. Entonces L(µ) es el valor de la función objetivo óptima del problema lagrangiano y x la solución óptima de P.

Page 30: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

30 

 

• Si para una elección de µ la solución x* es factible en P, entonces x* es una solución óptima de P y µ una solución óptima del problema lagrangiano.

Cabe anotar que estas propiedades son muy útiles ya que brindan cotas que permiten desarrollar algoritmos de búsqueda de soluciones a través de la evaluación de la calidad de soluciones factibles por medio de las cotas obtenidas.

Inicialmente se presentó el problema con restricciones de igualdad. Sin pérdida de generalidad, se puede afirmar que en casos que se desea relajar restricciones con desigualdades de tipo menor o igual (≤) se deben restringir los multiplicadores a:

L* = maxµ≥0 L(µ)

De la misma manera cuando se trabaje con restricciones con desigualdades de tipo mayor o igual (≥) se deben restringir los multiplicadores a:

L* = maxµ≤0 L(µ)

Las demostraciones de estas propiedades son presentadas por el Ahuja et al. (1993) y no son el objeto de este trabajo.

3.4.1. Técnica de Optimización Subgradiente:

Una de las técnicas más sencillas y más utilizadas para encontrar soluciones al problema lagrangiano es la técnica de optimización subgradiente.

Partiendo de los principios de cálculo vectorial de los cuales se conoce que teniendo una función f(x), al moverse en dirección al vector gradiente d* f(x) una magnitud d positiva y lo suficientemente pequeña, se obtendrá un mayor valor de la función f(x).

En el caso del problema de multiplicadores lagrangianos, si se encuentra en el punto de la función lagrangiana: L(µ) = Min{cx +µ(Ax − b): x X}tiene solución única x , por lo tanto es diferenciable. Así, L(µ) = cx +µ(Ax − b) y la solución x se mantienen óptimas para pequeños cambios en µ, el gradiente en este punto es (Ax–b). Así el método del gradiente va variando µ de la siguiente manera:

µ ←µ+θ (Ax − b) Donde θ es un escalar que representa el tamaño del paso, lo cual indica que tan lejos se mueve en la dirección del gradiente. Kalvelagen (2002), hace una descripción sencilla de un posible algoritmo de optimización subgradiente. Cabe mencionar que este algoritmo no es una camisa de fuerza y depende del

Page 31: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

31 

 

investigador las variantes que utilice en la actualización de los parámetros del algoritmo. La figura 6 presenta el pseudos-código presentado por Kalvelagen (2002).

Figura 6. Seudocódigo  técnica de optimización sub‐gradiente  

Fuente: Tomado de Kalvelagen (2002) Cabe subrayar que el uso de estos métodos y técnicas basadas en relajación lagrangiana no garantizan la obtención de soluciones óptimas, pero su ventaja es que permiten hacer evaluaciones completas de cotas y soluciones no óptimas.

3.5.APLICACIONES SIMILARES ENCONTRADAS EN LA LITERATURA

Teniendo en cuenta las anteriores definiciones y técnicas descritas, se realizó una búsqueda profunda de problemas en la literatura con características similares en trabajos de investigación recientes. A continuación se presenta una breve descripción de los trabajos más destacados y su aporte a este trabajo de investigación:

3.5.1. MODELADO, HEURISTICAS Y POLÍTICAS DE INVENTARIOS EN LA CADENA DE SUMINISTROS

Clark & Scarf (1960, 1962) desarrollaron el primer trabajo enfocado al estudio de las políticas óptimas en sistemas multi escalonados con estructuras seriales y distribuidas, presentando un

Page 32: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

32 

 

enfoque recursivo que permite determinar las políticas óptimas de un sistema multi-escalonado serial.

Schwartz (1973) fue el primero en estudiar el sistema determinantico una bodega – N minoristas y mostró que las políticas óptimas de reposición de inventarios en este contexto pueden llegar a ser muy complejas.

Schwartz (1973) y Love (1972) presentaron un concepto de políticas estacionarias y encadenadas usadas para sistemas continuos.

Para atacar las debilidades del modelo EOQ Blackburn & Millen (1982); Williams (1981); Crowston & Wagner (1973); Crowston, Wagner & Henshaw (1972); Crowston, Wagner & Williams (1973), Graves (1985), Jensen & Khan (1972) y M cLaren (1976) han desarrollado heurísticas de acercamiento a problemas en ambientes multiproducto.

Para redes de dos niveles que incluyen una bodega y N minoristas, Graves & Schwartz (1977) desarrollaron una técnica inspirada en una procedimiento de ramificación y acotamiento que permite calcular las política óptimas estacionarias y encadenadas de reposición de inventarios. Sin embargo el enfoque es impráctico ya que genera un conjunto de ramas en el árbol de búsqueda que incrementa exponencialmente con el número de minoristas.

Muckstad & Roundy (1987) desarrollaron un método eficiente para calcular políticas estacionarias enlazadas de orden dos para el caso multi producto, 1 bodega- N minoristas. El método corre en tiempo O(NlogN) y permite obtener soluciones al 2% del óptimo, para políticas de un solo ciclo.

Modelos integrados de inventario en la situación de un solo vendedor y múltiples compradores han sido desarrollados por Lu, Banerjee, Goyal, Lal & Staelin, Rossemblatt & Lee, Kim & Hwang en donde se considerar diferentes esquemas de descuentos por cantidad para los clientes y políticas lote-a-lote por parte del vendedor.

Goyal (1977) sugirió un modelo de lote económico conjunto (JELS) en donde su objetivo era minimizar los costos totales relevantes en la cadena comprador-vendedor. Banerjee (1986) generalizó este modelo incorporando tasas finitas de producción. Luego Goyal (1988) extendió el modelo de Banerjee relajando la restricción de producción lote-a-lote para el vendedor.

Wee & Yang (2004) propusieron una revisión al modelo de Goyal y desarrollaron soluciones óptimas y heurísticas en una red productor – distribuidores – minoristas de un solo producto, usando el principio de abastecimiento coordinado en la cadena de suministros. Este enfoque permite obtener reducciones significativas de costo con relación al modelo de Goyal (1988).

Recientemente Abdul-Jalbar et al (2006) propusieron una heurística eficiente de tiempo O(NlogN) para calcular políticas estacionarias enlazadas de orden dos para el caso 1 producto, 1 bodega- N minoristas y obtienen soluciones de un solo ciclo a menos del 1% del óptimo.

Page 33: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

33 

 

Para el caso de demanda estocástica, de acuerdo con Zipkin (2000), el estudio de sistemas seriales con lead times constante fue iniciado por Clark & Scarf (1960) y redefinidos posteriormente por Federgruen & Zipkin (1984), Rosling (1989) y Chen & Zheng (1994). Una revisión de las diferentes técnicas con las cuales se puede estudiar este problema en el caso estocástico, puede ser encontrada en Axsäter (1993), Federgruen (1995) y en los libros de texto de Axsäter (2000) y Zipkin (2000). El modelo básico fue llamado M ETRIC y fue desarrollado en los años 1960 por Sherbrooke (1968). Muchos modelos estocásticos en la situación 1 bodega – N minoristas están basados en extensiones de este enfoque: Axsäter (1993, 1996, 1997, 2003) y Cheng & Zheng (1994, 1998, 2001).

La coordinación conjunta de los inventarios de producción en el caso multi-productos determinístico ha sido modelada en la literatura de diferentes formas. Asumiendo tasas finitas de producción, el modelo ELSP asume que el productor produce en lotes un solo producto a la vez. El trabajo pionero, fue hecho por Hanssman (1962) y Maxwell (1964). Elmaghraby (1978) realizó una revisión del problema a finales de 1970s. De acuerdo con el libro de texto de Zipkin (2000), desarrollos más recientes incluyen los trabajos de Dobson (1987, 1992), Jones & Inmann (1989), Roundy (1989), Gallego (1990) y Zipkin (2000). Davis (1995) propuso un método enumerativo que combina una técnica de optimización no lineal, un procedimiento heurístico y un modelo de programación entera mixta. El modelo ELSP ha sido extendido para incorporar backorders en Gallego & Roundy (1992), Dobson & Yano (1990). Varias extensiones a sistemas seriales fueron estudiadas en Dobson & Yano (1990), El-Najdawi (1992) y El-Najdawi & Kleindorfer (1993).

Page 34: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

34 

 

CAPÌTULO 4. FORMULACIÓN DEL MODELO MATEMATICO

En el presente capítulo se desarrolla el modelo matemático que busca mejorar el nivel de servicio y minimizar los costos en la cadena de suministros para la empresa Procafecol S.A de acuerdo con la situación problemática planteada.

4.1.SUPUESTOS

La demanda no es constante. El tipo de demanda varía de acuerdo a la familia de productos, por lo cual se requiere simular su comportamiento.

El ambiente de producción, distribución y consumo es multiproducto. Se considera un sistema coordinado multiproducto de una cadena de suministros múltiple productor/proveedor-múltiples distribuidores- múltiples minoristas

La tasa de producción de los productores es finita para cada producto. El ambiente de producción es make to order y la producción se realiza en lotes (ELSP). Se conocen los tiempos de preparación por cada lote de producto.

La capacidad de entrega de cada proveedor es conocida y limitada. Se tienen tiempos ente pedido.

La información de cada miembro de la cadena es conocida por todos los demás. Esto implica que los datos de demanda de los minoristas son compartidos por los distribuidores y los productores. Los minoristas, los distribuidores y el productor pueden sincronizar los niveles de inventario y tamaños de lotes de producción para cada tipo de producto.

Existe un productor para cada familia de productos. Lo que implica que el sistema puede ser dividido en subcadenas para facilitar su análisis.

4.2.EXQUEMATIZACIÓN DE LA CADENA

En la Figura 7 observamos un esquema multiproducto compuesto por dos productores, un centro de distribución y múltiples minoristas. En él se ha representado el flujo de los productos analizados en este estudio para las familias de productos que han sido seleccionadas.

Encontramos dos proveedores, uno de productos industrializados del café y otro que produce prendas de vestir que apoyan la creación de valor en las tiendas Juan Valdez. Seguidamente se observa un centro de distribución en el cual son consolidados todos los productos. En este

Page 35: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

35 

 

centro se realizan las operaciones de preparación y despacho de productos a las tiendas Juan Valdez. Finalmente, se observa que los productos son consumidos o entregados al cliente final.

Figura 7. Esquema de  la Cadena de Suministros de Procafecol S.A: 

 

Respondiendo a políticas de la compañía, se ha dividido el problema en dos cadenas similares, dado que cada proveedor tiene bajo su responsabilidad familias de productos diferentes y se han establecido prioridades siguiendo el objetivo de expansión de las tiendas, enfocado a aumentar el consumo de café en las familias colombianas.

En este esquema cada familia de producto es simulada mediante la misma red, estableciendo parámetros asociados que permiten la coordinación de manera independiente con cada proveedor.

vz

Minorista 1

Minorista 2

Minorista 3

Minorista 4

Proveedor 2

CEDI

Proveedor 1

Minorista 5

Minorista 6

Minorista R

Consumidores

Page 36: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

36 

 

Figura 8. Esquema de la Cadena de Suministros a Modelar  

En la Figura 8, consideramos el sistema propuesto, el cual consta de un productor/Proveedor– un distribuidor y múltiples minoristas. Este esquema representa el comportamiento de la cadena de suministros de Procafecol S.A. para cada familia de producto.

4.3.FORMULACION

La formulación que se presenta a continuación será utilizada para cada familia de productos.

4.3.1. Elementos básicos para la estandarización del problema

4.3.1.1. Conjuntos:

I: conjunto de productos indexados con i

vz

Tienda 1

Tienda 2

Tienda 3

Tienda 4 CEDI Proveedor 2

Tienda 5

Tienda 6

Tienda R

Consumidores

vz

T ie nda 1

T ie nda 2

T ie nda 3

T ie nda 4 CE D I Pr ove e dor 1

T ie nda 5

T ie nda 6

T ie nda R

Consumidores

Page 37: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

37 

 

K: conjunto de minoristas indexados con k

4.3.1.2. Parámetros:

kid = Demanda anual en la tienda k para el producto i

kiIr = Inventario promedio en la tienda k para el producto i

iId = Inventario promedio en el centro de distribución para el producto i

iIp = Inventario promedio en el productor para producto i con relación al centro de distribución

iKHr = Costo anual de mantenimiento de inventario del producto i en cada tienda k ($/unidad/año)

iHd = Costo anual de mantenimiento de inventario del producto i en el centro de distribución ($/unidad/año)

iHp = Costo anual de mantenimiento de inventario del producto i en el productor ($/unidad/año)

kiCr = Costo de ordenar el producto i en cada tienda k ($)

iCd = Costo de ordenar el producto i en el centro de distribución ($)

iCp = Costo de producir un lote del producto i en el productor ($)

iHC =Costo total anual de mantenimiento de inventario del producto i ($/año)

iAC =Costo total anual de pedidos del producto i ($/año)

iTset =Tiempo de preparación en producción de un lote de producto i (años)

ip =Capacidad de producción del producto i (unidades/año)

id =Demanda total anual del producto i (unidades/año)

iW = Volumen ocupado por una unidad del producto i (m3)

kW = Capacidad disponible de almacenamiento en la tienda k (m3)

Page 38: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

38 

 

iTs = Tiempo de subida del productor, correspondiente al centro de distribución para el producto i

Variables:

Tp: Tiempo del ciclo común del productor (años)

kTr = Tiempo de reaprovisionamiento de la tienda k (años)

Td = Tiempo de reaprovisionamiento del centro de distribución (años)

N = Número de ciclos de reaprovisionamiento del centro de distribución en cada ciclo de producción

kN = Número de ciclos de reaprovisionamiento de la tienda k en cada ciclo del centro de distribución

kiQr = Cantidad del lote del producto i para la tienda k (unidades)

iQd = Cantidad del lote del producto i para el centro de distribución (unidades), necesario para coordinar con todas las tiendas

kiQd = Cantidad del lote del producto i para el centro de distribución (unidades), necesario para coordinar con la tienda k

iQp = Cantidad del lote del productor para el producto i, requerido para el centro de distribución en cada ciclo de producción (unidades)

Estos parámetros nos indican un sistema L-proveedores, 1-bodega, K-minoristas el cual se trata en este estudio a partir del enfoque de solución del modelo ELSP, coordinando los tiempos de reabastecimiento de los distintos niveles planteados para un ambiente multiproducto.

4.3.1.3. Cálculo de los Inventarios Promedios

Los niveles de inventario promedios para la Coordinación entre Distribuidor j y M inorista k se calcularon de acuerdo a los planteamientos de Wee and Yang (2004):

La coordinación entre un minorista k (tienda) y el centro de distribución conectados en la red, se puede lograr si durante el ciclo de reposición de inventarios del distribuidor, los inventarios del minorista son adecuadamente cubiertos, sin faltantes. Esta afirmación se representa en la

Page 39: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

39 

 

Figura 6, en la cual los períodos de reaprovisionamiento del minorista (tienda) y el distribuidor se encuentran relacionados por la constante kN

Figura 9. Coordinación Distr ibuidor‐Minorista  

kTr Td

kiQd

Centro de distribución

Nivel de Inventario

Minorista

Centro de distribución y minorista

kiQr

)(tI

t

Fuente: G. M ejía, F. Torres. Soluciones óptimas para un Modelo Multiproducto Coordinado de Producción, Distribución y Abastecimiento

De acuerdo a la Figura:

,kkTrNTd = para cada minorista k conectados en la red.

De la misma manera, las cantidades de lote del centro de distribución necesario para coordinar con el minorista (tiendas) asociadas a cada producto i se deducen de:

kiki TddQd = y kikki dTrQr = para todo minorista k conectado en la red.

De la misma manera, la coordinación entre el productor y el centro de distribución se logra si durante el ciclo de producción, se consigue el abastecimiento por varios ciclos de distribución, Esto puede observarse más fácilmente en la Figura 7.

Page 40: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

40 

 

Figura 10. Coordinación Productor ‐ Dis tribuidor 

Td t

iQd

Td Td

Tp

iQd

iTs

1

ip

Tasa de producción )(tI

Adaptado de: G. Mejía, F. Torres. Soluciones óptimas para un Modelo Multiproducto Coordinado de Producción, Distribución y Abastecimiento

De la anterior figura se puede inferir que.

,TdDdQd ii =

,TdNTp= p or consiguiente NTpTd = y

kk NN

TpTr = p ara todo minorista k conectados en

la red.

Los niveles de inventario p romedios se p ueden calcular de acuerdo con las figuras 6 y 7, de la siguiente manera, siguiendo lo propuesto por We and Yang (2004):

k

kikikikiki NN

TpdTrdQrIr222

=== , para todo producto i y para todo distribuidor j y minorista k

conectados en la red.

∑∑ ⎟⎟⎠

⎞⎜⎜⎝

⎛−=⎟

⎠⎞⎜

⎝⎛ −=

k k

ki

k

kikii NN

TpdQrQdId 1122

para todo producto i.

Page 41: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

41 

 

El cálculo del nivel de inventario promedio en el productor para producto i con relación al distribuidor, se realiza, de acuerdo a la Figura 7 de la siguiente manera:

[ ]( ) [ ]( ) [ ]( ) ⎥⎦⎤

⎢⎣⎡ −−++−−+−−+= iiiiii

iii QdTsNTdQdTsTdNQdTsTdNQdTsN

TpIp 1...221

21

( )( ) ⎥⎦⎤

⎢⎣⎡ −−++++= ii

ii QdTsTdNQdTs

NTp

1...212

1

( )⎥⎥⎥

⎢⎢⎢

⎡−⎟⎟

⎞⎜⎜⎝

⎛−+=

∑11

221

2

Npd

QdTpdpNdQd

Tp i

ii

kkií

ii

En donde,

∑∑ ==k

kik

kii dTdQdQd

4.3.2. Formulación matemática del modelo

4.3.2.1. Función Objetiva: Minimizar el costo total anual.

Representa el costo total anual, y esta dado por la suma de los costos anuales de pedido y de mantenimiento, de cada producto a la largo de la cadena:

( )∑=

+=M

iii HCACMinFO

1

, en donde:

Los cotos de manejo de inventarios se representan por iiiik

kiiki IpHpIdHdIrHrHC ++= ∑ ,

∑k

kiik IrHr indica los costos anuales asociados al almacenamiento de producto en cada uno de

las tiendas (minoristas), ii IdHd contiene los costos anuales asociados al almacenamiento del producto en el centro de distribución y IpHpi los costos anuales de mantenimiento de inventarios asociados al productor.

Los costos anuales de ordenar están dados por: Tp

CrNNNCdCpAC k

ikkii

i

∑++=

, en donde se incluyen los costos de producir, de ordenar en el centro de distribución y en cada uno de los minoristas.

4.3.2.2. Restricciones:

• Capacidad de producción

Page 42: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

42 

 

( ) TpTsetTsNM

iii ≤+∑

=1

,

pero, de la Figura 7 se puede observar que: i

i

i

i

kkii

iii p

dTppTdNd

dpQdNd

TsN ===∑

,

por lo cual la restricción puede ser escrita de la siguiente manera:

TpTsetpdTp

M

ii

i

i ≤⎟⎟⎠

⎞⎜⎜⎝

⎛+∑

=1

Esto nos lleva a inferir la siguiente condición de factibilidad: 11

≤∑=

M

i i

i

pd

• Capacidad de los minoristas: Esta restricción implica que la capacidad de almacenamiento de los minoristas es limitada, debido a que estos varían en su forma y tamaño y está dada por:

kWIrW kki

M

ii ∀≤∑

=

, .max1

, teniendo en cuenta que el máximo inventario que se puede

llegar a tener en el minorista es Qrki, pero k

kikikiki NN

TpdTrdQr == por tanto, la

restricción se reformula de la siguiente manera:

kWNNTpdW k

k

kiM

ii ∀≤∑

=

, 1

• Definición de variables enteras para garantizar la coordinación +∈ ZNN k,

Page 43: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

43 

 

CAPÌTULO 5. TECNICA DE SOLUCIÓN

En este capítulo se describe el algoritmo propuesto para la obtención de soluciones al problema planteado y al modelo formulado a nivel agregado.

Para llegar a una solución al problema planteado, se presenta el siguiente procedimiento:

• Incluir la familia de restricciones de capacidad en la función objetivo para definir el subproblema lagrangeano

• Obtener una solución factible real vía multiplicadores lagrangenanos • Aplicar Búsqueda local para hallar los valores enteros de las variables principales del

problema y evaluar cumplimiento de condiciones integralidad • Hallar los valores las variables restantes a partir de las variables de coordinación

Cada uno de estos pasos es explicado detalladamente dentro de este capítulo.

5.1.PROCEDIMIENTO DE SOLUCIÓN

5.1.1. Relajación Lagrangiana

Expresando el problema plantado en el capitulo anterior:

Minimizar Costo Total Anual =

( )∑

∑∑∑

=

⎟⎟⎟⎟⎟⎟⎟

⎜⎜⎜⎜⎜⎜⎜

⎥⎥⎥

⎢⎢⎢

⎡−⎟⎟

⎞⎜⎜⎝

⎛−+

+⎟⎟⎠

⎞⎜⎜⎝

⎛−++

++

M

i

i

ii

kkií

iii

k k

kii

k k

kii

kikii

Npd

QdTp

dpNdQd

TpHp

NNTpdHd

NNTpdHr

Tp

CrNNNCdCp

Min1 2

1122

1...

...1122

(1)

Sujeto a las siguientes restricciones:

TpTpreppdTp

M

ii

i

i ≤⎟⎟⎠

⎞⎜⎜⎝

⎛+∑

=1

(2)

Page 44: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

44 

 

KkWNNTpdW k

k

kiM

ii ∈∀≤∑

=

, 1

(3)

kZNZN k ∀∈∈ ++ ,; , (4)

+∈ RTp (5)

Teniendo en cuenta el problema p lanteado, se busca relajar el conjunto de restricciones (3) relacionadas con la capacidad de los minoristas, en el cual interactúan las tres variables principales que afectan el p roblema.

Haciendo la relajación respectiva, e incluyendo los multiplicadores lagrangeanos en la función objetivo, se obtiene la siguiente expresión como función objetivo del subproblema relajado:

Min

( )∑

∑∑

∑∑∑

∑∑∑

=

⎟⎟⎟⎟⎟⎟⎟⎟⎟⎟⎟⎟⎟

⎜⎜⎜⎜⎜⎜⎜⎜⎜⎜⎜⎜⎜

⎥⎦

⎤⎢⎣

⎡−+

+

⎥⎥⎥⎥⎥

⎢⎢⎢⎢⎢

−⎟⎟⎠

⎞⎜⎜⎝

⎛−+

⎟⎠

⎞⎜⎝

+

+⎟⎟⎠

⎞⎜⎜⎝

⎛−++

++

=M

i

ki

iik

p

kk

i

i

ki

kkií

ik

i

i

k k

kii

k k

kii

kikii

kk

WdkWNNT

NpddkTdTp

dp

NddkTd

TpHp

NNTpdHd

NNTpdHr

Tp

CrNNNCdCp

NNTpL1

2

)(...

...1122

1...

...1122

),,,(

λ

λ

Sujeto a:

• TpTprep

pdTp

M

ii

i

i ≤⎟⎟⎠

⎞⎜⎜⎝

⎛+∑

=1 • λk≥0, • N≥0, Nk≥0, enteros • Tp≥0

Debe cumplirse las condiciones de optimalidad y la de holgura complementaria para encontrar el óptimo del problema de coordinación planteado, es decir, si el subproblema lagrangiano

Page 45: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

45 

 

),,,( kk NNTpL λ tiene una solución factible ),,( ***kNNTp tal que k

iii

k

p WdkWNN

T≤∑ )(**

*

y

se cumple que 0)( =⎥⎦

⎤⎢⎣

⎡−∑∑ k

iii

k

p

kk WdkW

NNT

λ , entonces ),,( ***kNNTp es un óptimo real

del p roblema p lanteado.

Para resolver este subproblema se utilizó GAMS Profesional, mediante el uso del método planteado por Kalvelagen (2002). La programación de este modelo se encuentra en el anexo 1.

Se inicializó la heurística lagrangiana con la cota superior obtenida al problema primal sin incluir la restricción de capacidad de los minoristas.

5.1.1.1. Descripción de la Heurística

• Inicializar 0)0( =kλ , j=1 como el número de iteración, UB ),,( UBkUBUB NNTp como la

cota superior hallada, valor de la tolerancia €=0.00000000001 , tamaño del paso )0(γ =2

• Para j=1 hasta que se esté por debajo de la tolerancia: o Resolver el subproblema M in ),,,( )()()()( j

kjjj

k NNTpL λ

o Sea ki

iijk

j

jpj

k WdkWNN

T−= ∑ )()()(

)()(χ , se define 2)(

)()( ))((j

k

jji LUB

χ

λγθ

−= ,

donde llamaremos )(),,,( )()()()()( jjk

jjjk LNNTpL µλ =

o Calcule )0;max( )()()(1 jk

jjj χθλλ +=+

o Si ελλ ≤−+ jj 1 se detiene el algoritmo

o Si no se obtienen mejoras en )( )( jL λ entonces divida el tamaño del paso hasta

obtener la tolerancia deseada. 2

)(1)(

jj γγ =+

• Evaluar condiciones de factibilidad y optimalidad. Si ki

iik

p WdkWNN

T≤∑ )(**

*

y

0)( =⎥⎦

⎤⎢⎣

⎡−∑∑ k

iii

k

p

kk WdkW

NNT

λ , entonces ),,( ***kNNTp es un optimo real del

problema planteado.

Page 46: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

46 

 

5.1.2. Búsqueda Local

Las ecuaciones anteriores permiten calcular los valores óptimos de todas las variables, sin considerar las restricciones de integralidad, es por tal motivo que solo el valor obtenido de Tp, satisface las condiciones planteadas en el problema inicial. Para calcular los valores de N y Nk tal que se cumpla la condición de integralidad se ha desarrollada un método basado en búsqueda local, en el cual se busca que las variables cumplas las siguientes condiciones de optimalizad:

( ) ( )**** ,1, kk NNFNNF +≤ ,

( ) ( )**** ,1, kk NNFNNF −≤ ,

( ) ( )1,, **** −≤ kk NNFNNF ,

( ) ( )1,, **** +≤ kk NNFNNF , para todo k

5.1.2.1. Algoritmo de búsqueda local

Para calcular las variables de coordinación del problema se propone el siguiente algoritmo de búsqueda local:

1. Inicializar con la parte entera de la solución factible hallada en el subproblema lagrangeano para **

kNyN 2. Se determina el espacio factible de solución, a partir de valores enteros ubicados en una

vecindad de radio fijo, cuyo centro se encuentra en las constantes de coordinación consideradas para la solución inicial

3. En cada iteración se procede a seleccionar diferentes valores factibles y se verifican las condiciones de optimalidad

1. El algoritmo se detiene al encontrar valores para que cumplan las condiciones descritas en el numeral anterior

Finalmente, los valores hallados de las variables se han tomado como entrada para la simulación, la cual se describe en el siguiente capítulo.

Page 47: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

47 

 

CAPÌTULO 6. TECNICA DE SI MULACIÓN

Dado que la solución hallada en el capítulo anterior no satisface totalmente las condiciones presentadas en la descripción del problema, debido a que plantea solución al problema de manera agregado, sin incluir la aleatoriedad en la demanda y los tiempos de entrega, se requiere simular el comportamiento de las variables de coordinación a través del tiempo, de tal manera que se puedan calcular y establecer niveles de servicio y evaluar el impacto en los costos generados por las fluctuaciones de la demanda.

6.1.DESCRIPCIÓN DE LA SIMULACIÓN

Para realizar la simulación que se describe a continuación se ha utilizado la siguiente metodología:

6.1.1. Etapa 1 Especificación

6.1.1.1. Definición del Sistema

En esta etapa se tomó el p lanteamiento del problema especificado en el Capítulo I y se definieron los requerimientos conceptuales para la simulación:

• Validar los resultados obtenidos con el modelo matemático presentado en el capítulo IV.

• Definir escenarios que permitan evaluar el objetivo principal del proyecto, es decir que se pueda medir la minimización de costos y el mejoramiento en los niveles de servicio.

6.1.1.2. Formulación Conceptual del Modelo

Como resultado del análisis del problema se planteó un esquema para la simulación, el cual se muestra en la figura 11.

Page 48: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

48 

 

Figura 11. Esquema de  diseño para la s imulación  

E. Definición de Indicadores

Consiste en la selección de indicadores de eficiencia y estadísticas que el modelo deberá generar. Estos son: los costos totales anuales en la cadena de suministros y el nivel de servicio tipo II.

6.1.2. Etapa 2 Desarrollo

6.1.2.1. F. Recolección y Preparación de Datos

Como entrada a la simulación seleccionamos las variables relevantes en el modelo matemático de acuerdo a los posibles escenarios a simular y toda la información de costos suministrada por Procafecol S.A.

6.1.2.2. Desarrollo del modelo

En este caso se utilizó el software Arena 12.0, para esquematizar por procesos el comportamiento de la cadena de suministros. Este desarrollo se presenta en la figura 12. Nótese que se ha extraído parte del desarrollo total para generar una mayor comprensión del problema.

Submodelo 1. Simular relaciòn 

Proveedor ‐CD

Submodelo 2. Simular 

Relación CD  ‐Tienas

Submodelo 3. Simular Demanda Aleatoria

Conectar los submodelos  por medio de  

señales

Incluir la politica a 

modelar en cada 

submodelo

Generar las estadisticas asociadas a 

los indicadores 

de  simulaciòn

Usar simulador OptQues 

Variando las entradas al modelo

Page 49: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

49 

 

Figura 12. Esquema del modelo desarrollado en Arena.  Abstracción para un producto y una tienda 

Page 50: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

50 

 

6.1.2.3. Verificación y Validación

En esta etapa se buscó garantizar que los resultados que se obtuvieron en el modelo se ajusten a la realidad, en caso de implementarse las alternativas y variaciones modelizadas. La verificación busca asegurar que el comportamiento se ajuste a la lógica pretendida. La validación fue realizada para asegurar que datos se ajusten a la realidad dentro de un margen de error razonable. Para ello, se analizaron múltiples corridas utilizando las herramientas que nos brinda Arena 12.0 y teniendo en cuenta las teorías estadísticas que implican niveles de confianza superiores al 95%.

6.1.3. Etapa 3 Estudio

En esta etapa se definieron los escenarios de estudio, basadas en las premisas planteadas en el capítulo II y sus diferentes alternativas de variabilidad.

Los resultados de la simulación para cada uno de los escenarios se encuentran descritos en el capítulo 7.

Los escenarios expuestos a continuación fueron seleccionados teniendo en cuenta las siguientes características del problema:

• Dado el comportamiento de la demanda y los tiempos de entrega del proveedor, se sugiere una política coordinada de revisión periódica de inventario multiproducto.

• Se busca minimizar los costos asociados a la cadena de suministros y maximizar los niveles de servicio esperados. Se utilizará nivel de servicio tipo II promedio para cualquier producto, el cual por políticas de la compañía debe ser mayor al 95%.

• Se contemplan ventas perdidas en los minoristas.

6.1.3.1. Primer Escenario:

Consiste en ingresar al modelo de simulación las constantes finales de coordinación obtenidas en el modelo agregado de simulación, tales como:

kTr = Tiempo de reaprovisionamiento de la tienda k (años)

Td = Tiempo de reaprovisionamiento del centro de distribución (años)

kiQr = Cantidad del lote del producto i para la tienda k (unidades)

iQd = Cantidad del lote del producto i para el centro de distribución (unidades), necesario para coordinar con todas las tiendas

Page 51: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

51 

 

En este escenario la simulación consiste en una política en la cual para cada tienda la cantidad a pedir en cada ciclo de revisión kTr estará dada por kiQr . Es decir que se tendrá pedido con tamaño constante para cada producto y con la misma frecuencia para todos los productos.

De la misma manera la revisión del inventario en el centro de distribución se simula cada Tdperiodos y las cantidades a pedir para coordinar con todas las tiendas será constante y está dada por iQd .

En este primer escenario se incluyen los tiempos de demora acordados con los proveedores para la entrega de productos.

El análisis de sensibilidad en este escenario está dado por los posibles cambios en las cantidades a pedir, para lo cual se ha definido un rango de variabilidad, en el cual los resultados serán evaluados a partir de los costos resultantes Vs el nivel de servicio obtenido.

6.1.3.2. Segundo Escenario

En este escenario se ha definido la utilización de una política (S,T), en la cual se han traído los tiempos de reaprovisionamiento obtenidos para la coordinación en el modelo agregado y un nivel meta de inventario que permita absorber las variaciones de la demanda.

Se han definido:

• Srki, como el nivel meta de control en el inventario de la tienda k para el producto i, utilizando la notación de Sipper (1998), en equivalencia con el modelo ELSP está dado por: kitkiki ssrSr += + )( τµ ,es decir, la media de la demanda de cada tienda para cada producto en t+τ mas un inventario de seguridad.

• Sdi, como el nivel meta de control en el inventario en el centro de distribución para el producto i, analógicamente ditii ssdSd += + )( τµ

La política a simular consistirá en determinar la cantidad a pedir cada vez que se revise el inventario para llevar la posición del inventario hasta el nivel meta.

En este escenario se incluyen los tiempos de demora acordados con los proveedores para la entrega de productos.

El análisis de sensibilidad en este escenario está dado por los posibles cambios en los niveles de inventario de seguridad y por consiguiente en los niveles meta de inventario, para lo cual se ha definido un rango de variabilidad, en el cual los resultados son evaluados a partir de los costos resultantes Vs el nivel de servicio obtenido.

Page 52: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

52 

 

CAPÌTULO 7. EXPERI MENTACIÒN Y ANÀLISIS DE RESULTADOS

En la fase de experimentación, inicialmente se crearon instancias numéricas con las cuales se probó el algoritmo codificado para obtener resultados que permitieran se usados en la simulación de políticas de inventarios.

7.1. DEFINICIÓN DE INSTANCIAS NUMÉRICAS

La definición de parámetros utilizada en el modelo matemático, se hace a partir de datos de la operación real obtenidos en conjunto con las áreas Financieras y de compras y suministros de Procafecol S.A. Estos datos permiten la generación de conjuntos, la creación de la cadena de suministros presentada en la figura 4 y la definición de los parámetros de entrada básicos del problema formulado.

Familia Tamaño2

Productos de café 15-1-1-60

Productos de café 20-1-1-80

Productos de vestir 15-1-1-50

Productos de vestir 20-1-1-60

Tabla 2. Resumen  de  ins tancias  

7.1.1. Cálculo de los costos asociados

Los costos de mantenimiento de inventario en los minoristas se calcularon en función del tipo de minorista, dado que su estructura operativa depende de su tamaño. Corresponden a ponderaciones sobre los costos totales por cada tienda.

Los costos de ordenar en una tienda están dados por los costos preparar un pedido en el centro de distribución, transportar el producto a su destino y por costos variables ponderados asociados a los cargos cuya funcionalidad implica la puesta de una orden de pedido en el centro de distribución.

2 Productos‐productor‐CD‐Tiendas. 

Page 53: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

53 

 

Los costos de ordenar por producto en el centro de distribución corresponden a la ponderación de los costos asociados a las actividades de planeación de pedidos en el centro de distribución. Los costos de mantenimiento de producto han sido ponderados de acuerdo al tipo de familia, al espacio ocupado, a las actividades de picking y conservación que involucran dichos productos.

7.2.CODIFICACIÓN DEL ALGORITMO DE RELAJACION LAGRANGIANA

El algoritmo propuesto para obtener soluciones del modelo planteado con instancias numéricas, fue codificado y compilado en GAM S. El anexo 2 presenta los códigos de dicho modelo.

Con el fin de probar la efectividad del algoritmo de solución planteado, se probaron las cuatro instancias descritas en la tabla

7.3.RESULTADOS COMPUTACIONALES DEL MODELO PRIMAL

Una vez definidas las instancias numéricas y codificadas los algoritmos para hallar las constantes de coordinación y para la solución del problema, se obtuvieron los resultados presentados en la tabla 3 presenta el resumen de los resultados obtenidos para cada una de las instancias probadas.

Tabla 3. Resumen resultados  computacionales modelo matemático  

Para cada instancia, el algoritmo arroja una solución factible del problema que cumple con las condiciones de optimalizad e integralidad planteadas en el capítulo IV. Por ejemplo, para el caso de la instancia 15-1-1-60 se describe la coordinación obtenida a lo largo de toda la cadena para las tiendas 1 y 2:

i  Qr1i (Unid.)   Qr2i (Unid.)  1  50  10 2  56  11 3  38  2 4  36  10 5  24  10 6  24  10 7  48  16 8  37  18 9  38  17 

Instancia Cota superior Relajación

Optimo búsqueda

Local

GAP (%) Tiempo Computacion

al (Horas)15-1-1-60 2.983.224.441 2.874.011.986 3,66 0,566720-1-1-80 3.758.323.366 3.684.630.751 1,96 0,683315-1-1-50 3266977856 3.177.994.023 2,72 0,616720-1-1-60 4360207800 4.237.325.364 2,82 0,7167

Page 54: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

54 

 

10  24  14 11  38  19 12  30  10 13  26  13 14  23  13 15  22  12 

Tabla 4. Tamaño de  lotes Qrki obtenidos  

 

Tabla 5. Tiempos de reaprovisionamiento   

Tienda 1: Cada 3,5 días se revisa el inventario en la tienda 1 y se coloca un pedido de 50 unidades del producto 1, 56 unidades del producto 2, 38 unidades del producto 3 y así sucesivamente hasta 22 unidades del producto 15. (Ver tablas 4.y 5)

i  Qdi 1  1297 2  1218 3  1084 4  959 5  762 6  950 7  1161 8  958 9  886 10  750 11  1112 12  850 13  713 14  653 15  559 

Tabla 6. Cantidades a  pedir en e l CD obtenidas  

Para coordinar con todas las tiendas que comercializan el producto 1, el centro de distribución revisa el inventario de todos sus productos cada 7 días y coloca un pedido al proveedor de 1297 unidades. (Ver tabla 6).

De la misma manera, estos resultados nos permiten comparar con los costos actuales acarreados por la cadena para cada una de las instancias estudiadas. Encontrando significativas minorías, tal como se muestra en la tabla 7.

k Trk (años) TRK (días)1 0,011217949 3,52 0,011217949 3,5

Page 55: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

55 

 

Instancia Costos Actuales CS

Costos arrojados por el Algoritmo

GAP (%)

15-1-1-60 3.678.735.342 2.874.011.986 21,88 20-1-1-80 4.753.173.669    3.684.630.751  22,48 15-1-1-50 4.163.172.170    3.177.994.023   23,66 20-1-1-60 5.678.015.988    4.237.325.364   25,37

Tabla 7. Comparación entre costos  actua les y obtenidos en la  optimización  

7.4.DEFINICIÓN DE INSTANCIAS PARA LA SIMULACIÒN

Con los resultados obtenidos del modelo primal, es decir con la definición de constantes de coordinación se asumen estas constantes como entradas al modelo de simulación, teniendo en cuenta los escenarios definidos en el Capítulo VI.

La particularidad de la simulación se presenta en cuanto a que se contempla la aleatoriedad en la demanda en los minoristas. Para tales efectos se realizó un análisis estadístico del comportamiento de la demanda, en el cual usando las pruebas de bondad de ajuste Chi-cuadrado y Kolmogorov-Smirnof, con un 95% de confianza, se ajustaron los parámetros a distribuciones exponenciales. Estos datos se presentan en el anexo 2.

7.5.RESULTADOS COMPUTACIONALES DE LA SIMULACIÓN

A continuación se presentan los resultados obtenidos posterior a la simulación con software Arena 12.0:

7.5.1. Primer Escenario

En este escenario se simularon 312 (sin incluir domingos) días de operación bajo la política de tamaño fijo de pedido.

Los resultados obtenidos en este escenario reflejan en gran medida los resultados presentados en el modelo matemático de optimización. Esto se puede observar en la tabla 8.

Instancia Cota Superior Modelo Primal

Cota Inferior Simulación

Cota Superior Simulación

Costo Promedio Simulación

GAP Promedio

(%)

Número de Iteraciones

15-1-1-60 2.874.011.986 2.746.118.453 2.886.945.040 2.816.531.746 2,0 40 20-1-1-80 3.684.630.751 3.542.219.772 3.723.872.068 3.633.045.920 1,4 50 15-1-1-50 3.177.994.023 3.033.474.745 3.189.037.552 3.111.256.149 2,1 40 20-1-1-60 4.237.325.364 4.077.684.131 4.286.796.138 4.182.240.134 1,3 50

Tabla 8.  Comparación. Resultados modelo matemático Vs  Simulación Alternativa 1  

Page 56: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

56 

 

Las cotas obtenidas en la simulación se encuentran en un intervalo de confianza del 95%, situación que nos indica que dentro de ese rango de confiabilidad el modelo agregado está siendo validado por la simulación al incluir los tiempos de entrega y la aleatoriedad en la demanda.

Instancia Cota Inferior Nivel de

servicio (%)

Cota Superior Nivel de

Servicio (%)

Nivel de Servicio Medio Simulación (%)

Error Medio (%)

Número de

Iteraciones

15-1-1-60 92,30 99,99 96,14 3,85 40 20-1-1-80 92,15 99,83 95,99 3,84 50 15-1-1-50 92,12 99,80 95,96 3,84 40 20-1-1-60 92,11 99,79 95,95 3,84 50

Tabla 9.  Nieves de servicios obtenidos en  la s imulación –  Escenario  1  

Por otra parte (ver tabla 9), al calcular el porcentaje de ventar perdidas en el minorista, y calcular el nivel de servicio asociado, encontramos que en la simulación de este escenario, con el 95% de confianza y un error medio cercano al 4%, el nivel de servicio promedio está sobre el 95%, lo que nos indica que este escenario va acorde con la política definida por Procafecol S.A.

7.5.2. Segundo escenario

 

Tabla 10. Comparación. Resultados modelo matemático Vs Simulación Alternativa 2  

Observamos que el GAP para esta alternativa, disminuye con respecto a la alternativa 1, situación que se refleja claramente en el aumento de los costos que se obtienen en la simulación del escenario 2. (Ver tabla 10).

Tabla 11. Nieves de  servicios obtenidos en  la s imulación – Escenario 2  

Instancia Cota Superior Modelo Primal

Cota Inferior Simulación

Cota Superior Simulación

Costo Promedio Simulaciòn

GAP Promedio

(%)

Nùmero de Iteraciones

15-1-1-60 2.874.011.986 2.810.848.388 2.954.994.459 2.882.921.423 -0,31 6,520-1-1-80 3.684.630.751 3.599.700.012 3.784.300.013 3.692.000.013 -0,20 7,015-1-1-50 3.177.994.023 3.102.262.425 3.261.352.806 3.181.807.616 -0,12 6,020-1-1-60 4.237.325.364 4.141.307.571 4.353.682.318 4.247.494.945 -0,24 6,5

Instancia Cota Inferior Nivel de servicio

(%)

Cota Superior Nivel de Servicio

(%)

Nivel de Servicio Medio

Simulaciòn (%)

Error Medio (%)

Nùmero de Iteraciones

15-1-1-60 99,22 99,47 99,34 0,124 4020-1-1-80 99,16 99,40 99,28 0,123 5015-1-1-50 99,56 99,82 99,69 0,131 4020-1-1-60 99,43 99,67 99,55 0,122 50

Page 57: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

57 

 

Caso contrario ocurre con los niveles de servicio, lo que nos indica que esta alternativa, en la cual se calcula un nivel meta de inventario para cada producto, en cada tienda y en el centro de distribución, aumenta la satisfacción a los clientes finales, pero incrementa los costos de operación a lo largo de la cadena (ver tabla 11).

7.5.3. Análisis de sen sibilidad

Para cada uno de los escenarios anteriormente estudiados, se diseñó un análisis de sensibilidad usando la herramienta OptQuest de Arena 12.0, estos se describen a continuación:

7.5.3.1. Escenario 1A

En este escenario asociado al primero, se oscila el tamaño de las cantidades a pedir en las tiendas y en centro de distribución un 5% por encima y un 5% por debajo del los obtenidos en el modelo de optimización. Por medio de la herramienta Optquest se corre una optimización variando el número de iteraciones. Los resultados obtenidos se muestran en la tabla 10.

 

Tabla 12. Resultados obtenidos en  la optimización con Arena 12.0 para el escenario  1A. 

Tabla 13.  Niveles de servic io optimización con Arena 12.0 para el escenario 1A  

Encontramos que el escenario óptimo en esta optimización nos arroja costos menores, pero nos reduce de manera no muy significativa los niveles de servicio esperados. Cabe anotar que se agregó como condición a esta optimización la restricción de que en promedio las ventas perdidas en las tiendas fueran inferiores al 5%.

7.5.3.2. Escenario 2A

Esta alternativa presenta un análisis de sensibilidad para el escenario dos en el cual se desea observar cómo se afectan los costos y el nivel de servicio con los cambios en los niveles de

Instancia Cota Superior Modelo Primal

Cota Inferior Simulación

Cota Superior Simulación

Costo Promedio Simulaciòn

GAP Promedio

(%)

Tiempo de Simulación

(Horas)15-1-1-60 2.874.011.986 2.634.031.985 2.769.110.549 2.701.571.267 6,0 6,520-1-1-80 3.684.630.751 3.398.519.173 3.572.802.208 3.485.660.690 5,4 7,015-1-1-50 3.177.994.023 2.909.532.978 3.058.739.797 2.984.136.388 6,1 6,020-1-1-60 4.237.325.364 3.912.428.442 4.113.065.798 4.012.747.120 5,3 6,5

Instancia Cota Inferior Nivel de servicio

(%)

Cota Superior Nivel de

Servicio (%)

Nivel de Servicio Medio

Simulaciòn (%)

Error Medio (%)

Nùmero de Iteraciones

Tiempo de Simulación

(Horas)15-1-1-60 91,02 99,00 95,01 3,99 40 6,520-1-1-80 90,45 99,77 95,11 4,66 50 7,015-1-1-50 90,83 99,19 95,01 4,18 40 6,020-1-1-60 90,72 99,47 95,10 4,37 50 6,5

Page 58: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

58 

 

inventario de seguridad para las tiendas y para el centro de distribución. En este caso se ha variado el inventario de seguridad un 5% alrededor de los valores base. Los resultados obtenidos se muestran en la tabla 11.

 

Tabla 14. . Resultados obtenidos en  la optimización con Arena 12.0 para el escenario 2A. 

Tabla 15. Niveles  de servic io optimización con Arena 12.0 para el escenario  2A  

Encontramos que el escenario óptimo en esta optimización nos arroja costos menores, afectando de manera poco significativa el nivel de servicio medio. Cabe anotar que se agregó como condición a esta optimización la restricción de que en promedio las ventas perdidas en las tiendas fueran inferiores al 5%.

7.5.4. Algunas conclusiones de la simulación

Los resultados obtenidos nos permiten comparar el objetivo de la formulación matemática de este proyecto con los resultados arrojados por la simulación para cada uno de los escenarios estudiados. Encontrando significativas minorías, tal como se muestra en la tabla 16 que resume la alternativa 1.

 

Tabla 16. Comparación de costos  con  resultados  de  la simulación Alternativa 1. 

Instancia Cota Superior Modelo Primal

Cota Inferior Simulación

Cota Superior Simulación

Costo Promedio Simulaciòn

GAP Promedio

(%)

Tiempo de Simulación

(Horas)15-1-1-60 2.874.011.986 2.776.942.231 2.919.349.525 2.848.145.878 0,90 6,520-1-1-80 3.684.630.751 3.563.774.862 3.746.532.548 3.655.153.705 0,80 7,015-1-1-50 3.177.994.023 3.072.206.547 3.229.755.601 3.150.981.074 0,85 6,020-1-1-60 4.237.325.364 4.097.927.953 4.308.078.104 4.203.003.029 0,81 6,5

Instancia Cota Inferior Nivel de servicio

(%)

Cota Superior Nivel de

Servicio (%)

Nivel de Servicio Medio

Simulaciòn (%)

Error Medio (%)

Nùmero de Iteraciones

Tiempo de Simulación

(Horas)15-1-1-60 99,20 99,46 99,33 0,125 40 6,520-1-1-80 99,16 99,42 99,29 0,126 50 7,015-1-1-50 99,46 99,72 99,59 0,133 40 6,020-1-1-60 99,32 99,58 99,45 0,127 50 6,5

Instancia Escenario Costos Modelo Matemàtico

Costos promedio Escenario

GAP (%)

15-1-1-60 1,00 2.874.011.986 2.816.531.746 2,002,00 2.874.011.986 2.882.921.423 -0,31

1 A (Con sensibilidad) 2.874.011.986 2.701.571.267 6,002 A (Con sensibilidad) 2.874.011.986 2.848.145.878 0,90

Page 59: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

59 

 

En este caso la simulación nos permite apoyar los supuestos del modelo matemático, dado que al tomar estos datos como entrada para simular la realidad y desagregarlos teniendo en cuenta las oscilaciones de la demanda durante un año de estudio, se obtienen costos muy cercanos, lo que se refleja en los GAP’s presentados. No obstante, cabe anotar que esta simulación refleja el diseño y los datos de entrada, lo que no necesariamente significa que estos supuestos se cumplan ante cambios significativos que afecten el problema planteado.

Page 60: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

60 

 

CAPÌTULO 8. CONCLUSIONES Y FUTURAS INVESTI GACIONES

Se identificó que las restricciones del problema, tales como la capacidad de almacenamiento de los minoristas y la capacidad de producción de los proveedores afectan de gran manera la convergencia del modelo de optimización, lo que indica que estos parámetros son de vital importancia en la toma de decisiones a nivel estratégico y táctico en la cadena de suministros de Procafecol S.A. ya que limita la actuación del planeador de la cadena y obliga a adoptar políticas de inventario de permitan una rápida rotación del inventario para poder lograr mejores niveles de servicio. Por tales razones, en este tipo de circunstancias, la simulación de políticas de inventario nos ayuda en la validación de este tipo de esquemas de suministro y se convierte en una opción para ser estudiada en la literatura combinada con optimización.

Para lograr un acercamiento a la realidad, estudiando inicialmente el problema de forma agregada, se utilizó relajación lagrangiana para obtener soluciones factibles de acuerdo a las instancias definidas, las cuales por medio de un algoritmo de búsqueda local nos permitieron llegar a cotas que cumplen las condiciones de integralidad y optimalizad del problema. Con base en la información de entrada, se obtienen las constantes de coordinación del problema, las cuales son la entrada para una planeación agregada del manejo del inventario en la cadena de suministro para un año dado.

Por otra parte, esta investigación servirá como base para futuras investigaciones, tales como: la elaboración de una formulación desagregada que contemple la estacionalidad y aleatoriedad en la demanda de los productos que comercializan las tiendas Juan Valdez, así como también la creación de algoritmos basados en otras metaheurísticas que permitan un mayor acercamiento al problema en su nivel táctico. De la misma manera, se puede contemplar la ruptura de supuestos que han sido definidos en el modelo matemático, entre otras. Otras investigaciones que se pueden derivar de este proyecto de investigación podrían incluir:

• La aleatoriedad en los tiempos de reposición utilizando desarrollo estadístico significativo en la modelación del comportamiento entre los nodos de la cadena de abastecimiento, en el que se crean nuevas funciones de probabilidad para el fenómeno dependiendo del contexto de operación.

• La inclusión de diversos indicadores logísticos tales como los presentados como claves de rendimiento en el modelo SCOR.

Page 61: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

61 

 

• El diseño y evaluación de nuevas técnicas de optimización y simulación que permitan determinar la mejor forma de relacionar los modelos agregados con lo que sucede en tiempo real.

• La formulación y aplicación de modelos con mayor complejidad que integren totalmente el problema de investigación planteado, incluyendo la aleatoriedad de la demanda y los tiempos de reposición, la determinación de inventarios de seguridad, la localización de inventarios y demás características de los entornos multiproducto.

• La formulación de modelos que incluyan parámetros relacionadas con la distribución física internacional.

Finalmente, se destaca esta investigación como una aproximación a un modelo agregado de coordinación de inventarios en una cadena de suministros multi-proveedor, distribuidor y múltiples minoristas en una cadena de suministros a nivel nacional, la cual a través de mezcla de modelos de optimización, técnicas heurísticas y simulación pretende reflejar aquellos supuestos no incluidos en el modelo matemático básico (tiempos de entrega, estacionalidad en la demanda), logrando un acercamiento a la realidad con soluciones factibles e integrales en instancias que contemplan hasta 20 productos, 80 minoristas.

Page 62: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

62 

 

REFERENCIAS BIBLIOGRAFICAS

Abdul, Gutiérrez y Sicilia (2006). Single Cycle Policies for the One-Warehouse N-retailer Inventory/Distribution System. To appear in Omega.

Ahuja, Magnanti y Orlin (1993). Network Flows: Theory, Algorithms and applications. Prentice Hall.

Axsäter (1990). Modelling emergency lateral transshipments in inventory systems. Management Science, 36, 1329—1338.

Axsäter (1993). Continuous review policies for multi-level inventory systems with stochastic demand. In: Graves SC, et al., editor. Handbooks in OR & MS, vol. 4. Amsterdam: Elsevier Science Publishers, 175—197.

Axsäter (2000). Inventory Control, Kluwer Academic Publishers.

Axsäter, S., 2003. Evaluation of unidirectional lateral transshipments and substitutions in inventory systems. European Journal of Operational Research, 149(2), 438-447.

Banerjee (1986). A joint economic lot size model for purchaser and vendor. Decision Sciences, 17, 292-311.

Banerjee, Burton y Banerjee (2003). A simulation study of lateral shipments in single supplier, multiple buyers supply chain networks. International Journal of Production Economics, 81—82, 103—114.

Barbarosoglu y Özgur (1999). Hierarchical designo f an integrated production ans 2.echelon distribution system. European Journal of Operacional Research, 118: 464-484.

Bhatnagar, Chandra y Goyal (1993). M odels for multi-plant coordination. European Journal of Operational Research, 67: 141-160.

Blackburn y Millen (1985). An evaluation of heuristic performance in multi-stage lot-sizing systems. International Journal of Production Research, 23, 857—866.

Bourland, Powell y Pike (1996). Exploiting timely demand information to reduce inventories, European Journal of Operacional Research, 92:239-253.

Cachon y Fischer (2000). Supply chain inventory management and the value of shared information, Management Science, 46(8): 1032-1048.

Page 63: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

63 

 

Calderón (2005). Análisis del modelo SCOR para la Gestión de la Cadena deSuministro. Proyecto de Investigación del Programa de Doctorado “Gestión de la Cadena de Suministro en el contexto de Empresa Virtual, Ingeniería y Modelización Empresarial”. Universidad Politécnica de Valencia.

Castro (2003). Solving Difficult Multicommodity Problems with a Specialized Interior-Point Algorithm. Annals of Operations Research. vol. 124 pag. 35-48.

Chen y Zheng, (1994a). Evaluating echelon stock (R, nQ) policies in serial production/inventory systems with stochastic demand. M anagement Science, 40 (10), 1262-1275.

Chen y Zheng, (1994b). Lower Bounds for Multi-Echelon Stochastic Inventory Systems. Management Science, 40, 1426-1443.

Chen, Federgruen y Zheng (2001). Coordination mechanisms for a distribution system with one supplier and multiple retailers. Management Science 47 (5), 693–708.

Clark y Scarf (1960). Optimal policies for a multi-echelon inventory problem. Management Science, 6: 475-490.

Companys, R. (2005). Diseño de sistemas productivos y logísticos. EPSEB-UPC.

Crowston, Wagner y Williams (1973). Economic lot size determination in multi-stage assembly systems. Management Science, 19, 517-527.

Dudek y Stadtler (2005). Negotiation-based collaborative planning between supply chains partners. European Journal of Operational Research, 163: 668-687

El-Najdawi (1992) y El-Najdawi & Kleindorfer (1993).

Ertogral y Wu (2000). Auction-theoretic coordination of production planning in the supply Chain. IIE Transactions, 32(10): 931-940.

Federgruen y Zipkin (1984). Computational issues in an infinitehorizon, multi-echelon inventory model. Operations Research, 32, 818—836.

Federgruen y Tzur, (1994b). The Joint Replenishment Problem with time-varying parameters: Eficient, asymptotic and �-optimal solutions. Operations Research, 42, 1067-1087.

Federgruen y Tzur (1995). Fast Solution and Detection of Minimal Forecast Horizons in Dynamic Programs with a Single Indicator of the Future: Applications to Dynamic Lot-Sizing Models. Management Science, 41, 874- g893.

Fleischmann, Meyr y Wagner (2002). Advanced Planning in supply chain management. Springer, Berlin.

Page 64: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

64 

 

Forrester, J. W. (1961). Industrial Dynamics, Portland (OR): Productivity Press.

Gavirneni, Kapuscin y Tayur (1999). Value of information in capacitated supply chains. Management Science, 45(1): 16-24.

Graves (1985). A multiechelon inventory model for a repairable item with one-for-one replenishment. Management Science, 31, 1247-1256.

Graves y Schwarz (1977). Single cycle continuous review policies for arborescent Production/Inventory systems. Management Science, 23, 529-540.

Ghiani G., Laporte G. and Musmanno R. (2004) Introduction to Logistics Systems Planning and Control. John Wiley & Sons, Ltd.

Goyal (1976). An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research, 15 (1), 107-111.

Goyal, (1988). Joint economic lot size model for purchaser and vendor: A comment. Decision Sciences, 19, 236-241.

Goyal (1995). A one-vendor multi-buyer integrated inventory model: A comment. European Journal of Operational Research, 82, 209-210.

Jensen & Khan (1972) . Scheduling in a Multistage Production System with Set-up and Inventory Costs. University of Texas at Austin, Brown & Root, Inc.

Jones & Inmann (1989)

Kalvelagen (2002). Langrangian relaxation with Gams. Disponible en URL http://www.gams.com/~erwin/

Lee et al (2000), The value of information sharing in a two-level supply chain. Management Science, 46(5): 626-643.

Love (1972). A facilities in series inventory model with nested schedules. Management Science, 18, 327-338

McLaren y Whybark (1976). A Comparison of Heuristic Approaches to Locating a Fixed Number of Facilities. The Logistics and Transportation Review.

Muckstadt y Roundy (1993). Analysis of Multistage Production Systems. Handbooks in OR & MS, Vol 4. Chapter 2.

Reiman, Wein y Chen (1998). Echelon reorder points, installation reorder points and the value of centralized demand information. Management Science, 44(2): 693-708.

Ribas y Companys (2006).Estado del arte de la planificación colaborativa en la cadena de sum inistro: Contexto determ inista e incierto. Universidad Politécnica de Catalunya.

Page 65: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

65 

 

Schwarz, L.B., 1973. A simple continuous review determ inistic one-warehouse N-retailer inventory problem. Management Science 19 (5), 555–566.

Sherbrooke (1968). METRIC: a mult i-echelon technique for recoverable item control. Operations Research, 16, 103-121.

Simpson y Erengüc (2001). Modeling the order picking function in supply chain systems: formulation, experimentation, and insights. IIE Transactions, 33: 119-130.

Sipper (1998). Planeación y Control de la Producción. Editorial M c Graw Hill.

Rosling (1989). Optimal inventory policies for assembly under random demand. Operations Research, 37(4), 565—579

Roundy (1983). 98% Efective equal-order-interval lot-sizing for one warehouse

multi-retailer systems, Technical Report, No. 561, School of Operations Research and Industrial Engineering, Cornell University , Ithaca, N.Y.

Roundy (1985). 98% Efective integer-ratio lot sizing for one-warehouse multi-retailer systems. Management Science, 31 (11), 1416-1430.

Roundy (1986). 98%-E�ective lot-sizing for multi-product, multi-stage production/inventory systems. M athematics of Operations Research, 11, 699-727.

Stadtler, H. (2005). Supply chain management and advanced planning-basics,

overview and challenges. European Journal of Operational Research, 163: 575-588.

SCC Inc (2008). Supply-Chain Operations Reference-model SCOR Version 8.0. Overview.

Wee y Yang (2004). The optimal and heuristic solutions of a distribution network. European Journal of Operational Research, 158, 626-632.

Williams (1981). Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons. Management Science, 27, 336-352.

Zipkin (2000). Foundations of Inventory Management. McGraw-Hill, New York

Page 66: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

66 

 

ANEXO 1

INSTANCIAS Y CODIFICACIÓN DE LOS ALGORI TMO DE RELAJACIÓN LAGRANGIANA.

Page 67: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

67 

 

$title La gra ngia n Re la xa tion for Mutiproduc t c oorina tion m ode l

$stitle origina l m ode l de finition $e olc om ! $O ntext --- origina l m ode l de finition $O fftext Se ts i products /1*20/

k re ta ilers /1*80/; ta ble d(k,i) ‘D e ma nda a nua l e n la tie nda k pa ra e l produc to i’ i1 i2 i3 i4 i5 i6 i7 i8 i9 i10 i11 i12 i13 i14 i15 i16 i17 i18 i19 i20 k1 5421,55 6091,45 4081,75 3858,45 2518,65 2518,65 5198,25 3970,1 4081,75 2518,65 4081,75 3188,55 2741,95 2407 2295,35 5644,85 6203,1 3970,1 3635,15 2741,95 k2 787 879 141 787 787 787 1335 1518 1427 1153 1610 787 1061 1061 970 970 970 78 605 970 k3 1914 1061 1305 1183 1061 1305 1183 818 1061 1061 1061 818 940 940 818 2158 1183 1183 940 1305 k4 1201 1109 1109 1018 835 744 1109 653 653 653 1018 653 744 561 470 1383 1201 1018 835 1018 k5 1605 1240 1362 1118 387 753 509 874 387 387 753 753 631 265 167 1849 1362 1240 874 631 k6 766 583 1040 583 492 583 948 674 674 492 857 766 218 400 309 948 674 948 400 674 k7 674 948 1040 948 766 948 857 583 583 400 857 400 400 309 218 857 1040 948 766 948 k8 387 387 544 387 544 2110 439 283 387 283 700 387 387 231 178 492 439 492 283 648 k9 713 896 531 439 531 896 622 348 531 439 896 622 531 348 257 896 987 439 257 713 k10 622 518 518 465 465 413 309 465 309 413 570 674 204 361 309 726 570 465 361 570 k11 805 439 531 439 348 257 805 713 439 622 805 713 531 531 439 987 531 439 257 531 k12 766 583 766 583 583 400 857 948 309 948 583 583 583 857 766 948 674 674 400 766 k13 509 509 613 352 457 457 300 248 352 248 457 352 144 196 144 613 561 561 248 561

Page 68: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

68 

 

k14 513 409 461 305 200 305 409 357 409 357 252 513 357 305 252 618 461 409 200 305 k15 413 361 465 361 413 361 465 361 257 257 309 257 257 204 152 518 413 413 257 518 k16 5859 6590 4398 4154 2693 2693 5616 4276 4398 2693 4398 3423 2936 2571 2449 6103 6712 4276 3911 2936 k17 766 857 79 766 766 766 1314 1496 1405 1131 1588 766 1040 1040 948 948 948 52 583 948 k18 1770 918 1161 1040 918 1161 1040 674 918 918 918 674 796 796 674 2014 1040 1040 796 1161 k19 1105 1014 1014 922 740 648 1014 557 557 557 922 557 648 465 374 1288 1105 922 740 922 k20 1540 1175 1296 1053 322 687 444 809 322 322 687 687 566 200 110 1784 1296 1175 809 566 k21 670 487 944 487 396 487 853 579 579 396 761 670 131 305 213 853 579 853 305 579 k22 583 857 948 857 674 857 766 492 492 309 766 309 309 218 135 766 948 857 674 857 k23 365 365 522 365 522 2088 418 261 365 261 679 365 365 209 157 470 418 470 261 626 k24 679 861 496 405 496 861 587 313 496 405 861 587 496 313 222 861 953 405 222 679 k25 574 470 470 418 418 365 261 418 261 365 522 626 157 313 261 679 522 418 313 522 k26 761 396 487 396 305 213 761 670 396 579 761 670 487 487 396 944 487 396 213 487 k27 687 505 687 505 505 322 779 870 231 870 505 505 505 779 687 870 596 596 322 687 k28 470 470 574 313 418 418 261 209 313 209 418 313 122 157 122 574 522 522 209 522 k29 465 361 413 257 152 257 361 309 361 309 204 465 309 257 204 570 413 361 152 257 k30 357 305 409 305 357 305 409 305 200 200 252 200 200 148 113 461 357 357 200 461 k31 5625 6355 4163 3919 2458 2458 5381 4041 4163 2458 4163 3189 2701 2336 2214 5868 6477 4041 3676 2701 k32 674 766 52 674 674 674 1222 1405 1314 1040 1496 674 948 948 857 857 857 52 492 857 k33 1462 609 853 731 609 853 731 365 609 609 609 365 487 487 365 1705 731 731 487 853

Page 69: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

69 

 

k34 957 866 866 774 592 500 866 409 409 409 774 409 500 318 226 1140 957 774 592 774 k35 1414 1048 1170 927 196 561 318 683 196 196 561 561 439 106 61 1657 1170 1048 683 439 k36 548 365 822 365 274 365 731 457 457 274 639 548 62 186 117 731 457 731 186 457 k37 500 774 866 774 592 774 683 409 409 226 683 226 226 144 88 683 866 774 592 774 k38 309 309 465 309 465 2031 361 204 309 204 622 309 309 152 117 413 361 413 204 570 k39 552 735 370 278 370 735 461 197 370 278 735 461 370 197 135 735 827 278 135 552 k40 513 409 409 357 357 305 200 357 200 305 461 566 113 252 200 618 461 357 252 461 k41 683 318 409 318 226 144 683 592 318 500 683 592 409 409 318 866 409 318 144 409 k42 583 400 583 400 400 218 674 766 135 766 400 400 400 674 583 766 492 492 218 583 k43 418 418 522 261 365 365 209 157 261 157 365 261 91 122 91 522 470 470 157 470 k44 409 305 357 200 113 200 305 252 305 252 148 409 252 200 148 513 357 305 113 200 k45 309 257 361 257 309 257 361 257 152 152 204 152 152 117 87 413 309 309 152 413 k46 5481 6212 4019 3776 2314 2314 5237 3898 4019 2314 4019 3045 2558 2192 2071 5725 6334 3898 3532 2558 k47 405 492 70 400 400 400 948 1131 1040 766 1222 400 674 674 583 583 583 44 284 583 k48 1536 683 927 805 683 927 805 439 683 683 683 439 561 561 439 1779 805 805 561 927 k49 948 857 857 766 583 492 857 400 400 400 766 400 492 309 218 1131 948 766 583 766 k50 1244 879 1001 757 83 392 148 513 83 83 392 392 270 17 30 1488 1001 879 513 270 k51 509 326 783 326 235 326 692 418 418 235 600 509 70 152 97 692 418 692 152 418 k52 400 674 766 674 492 674 583 309 309 135 583 135 135 79 52 583 766 674 492 674 k53 252 252 409 252 409 1975 305 148 252 148 566 252 252 113 83 357 305 357 148 513

Page 70: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

70 

 

k54 492 674 309 218 309 674 400 135 309 218 674 400 309 135 79 674 766 218 79 492 k55 483 378 378 326 326 274 170 326 170 274 431 535 83 222 170 587 431 326 222 431 k56 551 216 300 216 133 71 551 468 216 384 551 468 300 300 216 719 300 216 71 300 k57 470 287 470 287 287 122 561 653 66 653 287 287 287 561 470 653 378 378 122 470 k58 387 387 492 231 335 335 178 126 231 126 335 231 61 91 61 492 439 439 126 439 k59 326 222 274 170 91 152 222 170 222 170 131 326 170 170 131 431 274 222 91 170 k60 222 170 274 170 222 170 274 170 109 109 152 109 126 87 91 326 222 222 131 326 k61 5359 6090 3898 3654 2192 2192 5116 3776 3898 2192 3898 2923 2436 2071 1949 5603 6212 3776 3410 2436 k62 474 566 44 474 474 474 1022 1205 1114 840 1296 474 748 748 657 657 657 30 291 657 k63 1370 518 761 639 518 761 639 274 518 518 518 274 396 396 274 1614 639 639 396 761 k64 861 770 770 679 496 405 770 313 313 313 679 313 405 222 137 1044 861 679 496 679 k65 1127 761 883 639 48 274 93 396 48 48 274 274 170 48 48 1370 883 761 396 170 k66 426 244 700 244 152 244 609 335 335 152 518 426 52 83 52 609 335 609 83 335 k67 431 705 796 705 522 705 613 339 339 157 613 157 157 83 83 613 796 705 522 705 k68 331 331 487 331 487 2053 383 226 331 226 644 331 331 174 122 435 383 435 226 592 k69 522 705 339 248 339 705 431 157 339 248 705 431 339 157 83 705 796 248 83 522 k70 448 344 344 291 291 239 161 291 161 239 396 500 91 187 161 552 396 291 187 396 k71 613 248 339 248 157 83 613 522 248 431 613 522 339 339 248 796 339 248 83 339 k72 418 235 418 235 235 82 509 600 65 600 235 235 235 509 418 600 326 326 69 418 k73 387 387 492 231 335 335 178 126 231 126 335 231 52 74 52 492 439 439 126 439

Page 71: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

71 

 

k74 300 196 248 104 39 104 196 144 196 144 61 300 144 104 70 405 248 196 39 104 k75 274 222 326 222 274 222 326 222 117 117 170 117 117 65 44 378 274 274 117 378 k76 4133 4681 3036 2854 1757 1757 3950 2945 3036 1757 3036 2306 1940 1666 1575 4315 4772 2945 2671 1940 k77 487 579 61 487 487 487 1035 1218 1127 853 1309 487 761 761 670 670 670 61 305 670 k78 648 283 387 335 283 387 335 178 283 283 283 178 231 231 178 753 335 335 231 387 k79 552 500 500 448 344 291 500 239 239 239 448 239 291 187 135 657 552 448 344 448 k80 548 392 444 339 96 183 96 235 96 96 183 183 131 96 96 653 444 392 235 131 ; Ta ble H r (k,i) ‘Cos to a nua l de ma nte nimie nto de inve ntario del produc to i e n ca da tie nda k ($/unida d/a ño)’ i1 i2 i3 i4 i5 i6 i7 i8 i9 i10 i11 i12 i13 i14 i15 i16 i17 i18 i19 i20 k1 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 k2 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k3 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k4 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k5 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k6 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k7 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k8 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k9 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k10 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189

Page 72: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

72 

 

k11 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k12 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k13 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k14 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k15 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k16 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 k17 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 k18 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k19 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k20 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k21 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k22 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k23 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k24 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k25 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k26 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k27 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k28 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k29 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k30 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189

Page 73: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

73 

 

k31 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 k32 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 k33 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k34 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k35 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k36 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k37 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 k38 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k39 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k40 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k41 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k42 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k43 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k44 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k45 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k46 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 k47 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 k48 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k49 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k50 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315

Page 74: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

74 

 

k51 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k52 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 k53 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k54 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k55 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k56 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k57 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k58 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k59 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k60 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k61 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 k62 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 k63 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k64 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k65 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k66 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k67 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 k68 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k69 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k70 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189

Page 75: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

75 

 

k71 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k72 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k73 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k74 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 k75 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 189 k76 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260 k77 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 k78 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k79 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 630 k80 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 315 ; P a rame ter H d(i) ‘Costo a nua l de m a ntenim ie nto de inve nta rio de l producto i e n e l ce ntro de distr ibuc ión ($/unida d/a ño)’ / i1 i2 i3 i4 i5 i6 i7 i8 i9 i10 i11 i12 i13 i14 i15 i16 i17 i18 i19 i20 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 /; P a rame ter H p(i) ‘Costo a nual de m a nte nim ie nto de inve nta rio de l produc to i e n e l produc tor ($/unida d/a ño)’ / i1 i2 i3 i4 i5 i6 i7 i8 i9 i10 i11 i12 i13 i14 i15 i16 i17 i18 i19 i20 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 /; Ta ble Cr(k,i) ‘Costo de orde na r e l produc to i e n ca da tie nda k ($)’ i1 i2 i3 i4 i5 i6 i7 i8 i9 i10 i11 i12 i13 i14 i15 i16 i17 i18 i19 i20 k1 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900

Page 76: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

76 

 

k2 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k3 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k4 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k5 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k6 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k7 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k8 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k9 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k10 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k11 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k12 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k13 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k14 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k15 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k16 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 k17 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 k18 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k19 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k20 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k21 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450

Page 77: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

77 

 

k22 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k23 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k24 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k25 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k26 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k27 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k28 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k29 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k30 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k31 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 k32 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 k33 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k34 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k35 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k36 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k37 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 k38 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k39 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k40 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k41 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225

Page 78: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

78 

 

k42 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k43 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k44 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k45 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k46 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 k47 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 k48 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k49 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k50 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k51 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k52 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 k53 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k54 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k55 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k56 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k57 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k58 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k59 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k60 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k61 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900

Page 79: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

79 

 

k62 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 k63 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k64 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k65 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k66 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k67 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 k68 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k69 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k70 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k71 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k72 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k73 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k74 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 k75 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 k76 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 k77 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 675 k78 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k79 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 k80 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 ; P a rame ter Cd(i) ‘Costo de orde na r e l produc to i e n el ce ntro de distr ibuc ión ($)’ /

Page 80: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

80 

 

i1 i2 i3 i4 i5 i6 i7 i8 i9 i10 i11 i12 i13 i14 i15 i16 i17 i18 i19 i20 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 /; P a rame ter Cp(i) ‘Costo de produc ir un lote de l produc to i e n el produc tor ($)’ i1 i2 i3 i4 i5 i6 i7 i8 i9 i10 i11 i12 i13 i14 i15 i16 i17 i18 i19 i20 583.328 583.328 583.328 583.328 583.328 583.328 583.328 583.328 583.328 583.328 583.328 583.328 583.328 583.328 583.328 583.328 583.328 583.328 583.328 583.328 /; P a rame ter Tse t( i) ‘Tiem po de pre parac ión e n produc c ión de un lote de produc to i (a ños)’ / i1 i2 i3 i4 i5 i6 i7 i8 i9 i10 i11 i12 i13 i14 i15 i16 i17 i18 i19 i20 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 0,001602564 /; P a rame ter P (i) ‘Capa c ida d de producc ión de l produc to i (unidade s/a ño)’ / i1 i2 i3 i4 i5 i6 i7 i8 i9 i10 i11 i12 i13 i14 i15 i16 i17 i18 i19 i20 1844 1738 1513 1339 1037 1299 1647 1346 1246 1026 1567 1167 980 889 752 2125 1878 1380 1058 1317 /; P a rame ter W (i) ‘ V olum e n oc upa do por una unida d de l producto i (m 3)’ / i1 i2 i3 i4 i5 i6 i7 i8 i9 i10 i11 i12 i13 i14 i15 i16 i17 i18 i19 i20 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 /; P a rame ter W k) ‘Ca pa c ida d disponible de a lma c e nam ie nto e n la tie nda k (m 3)’ / k1 k2 k3 k4 k5 k6 k7 k8 k9 k10 k11 k12 k13 k14 k15 k16 k17 k18 k19 k20 k21 k22 k23 k24 k25 k26 k27 k28 k29 k30 k31 k32 k33 k34 k35 k36 k37 k38 k39 k40 k41 k42 k43 k44 k45 k46 k47 k48 k49 k50 k51 k52 k53 k54 k55 k56 k57 k58 k59 k60 k61 k62 k63 k64 k65 k66 k67 k68 k69 k70 k71 k72 k73 k74 k75 k76 k77 k78 k79 k80

Page 81: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

81 

 

0,630 0,210 0,158 0,158 0,158 0,158 0,095 0,095 0,095 0,095 0,095 0,158 0,095 0,095 0,095 0,630 0,210 0,158 0,158 0,158 0,158 0,095 0,095 0,095 0,095 0,095 0,158 0,095 0,095 0,095 0,630 0,210 0,158 0,158 0,158 0,158 0,095 0,095 0,095 0,095 0,095 0,158 0,095 0,095 0,095 0,630 0,210 0,158 0,158 0,158 0,158 0,095 0,095 0,095 0,095 0,095 0,158 0,095 0,095 0,095 0,630 0,210 0,158 0,158 0,158 0,158 0,095 0,095 0,095 0,095 0,095 0,158 0,095 0,095 0,095 0,630 0,210 0,158 0,158 0,158 /; *-------------------------------------------------------------------- * Sta nda rd problem form ula tion * solve a s RMIP to ge t initial va lue s for the dua ls *-------------------------------------------------------------------- va ria ble s c ost 'Func iòn obje tiva ' N 'N úm ero de c ic los de re a provisionam ie nto de l c e ntro de distr ibuc ión e n ca da cic lo de produc c ión' N (k) 'N úme ro de c ic los de rea provisionam ie nto de la tie nda k e n c a da cic lo de l c e ntro de distribuc ión Tp 'Tiem po del c ic lo c omùn de l produc tor ' ; e qua tions obj 'obje c tive' Ma ke(i) 'produc tion c onstra int' c a pac ity(k) ' re sourc e lim itation c onstraint' ; obj .. c ost =e = sum ((i, (A C(i)+ H C(i))) ; Ma ke (i) .. sum(i, (Tp*(d(i) /p(i)))+ Tse t( i) ) = l= Tp; c a pac ity(k) .. sum(i, ((W (i)*d(k,i)*Tp)/((N *N (k)) ) = l= W (k); H C.up(i)= sum(k, (H R(i,k)*Ir(k,i) + Hd(i)*Id(i)+ Hp(i)*Ip(i))) ; ; A C.up(i)= ( (Cp(i)+ N *Cd(i)+ sum (k, N*N (k)*Cr(i,k))) /Tp; Td.up = (Tp/N ) ; d(i) .up = (k, d(k,i)) ; I r(k,i) .up = (d(k,i)/2)*Tp/(N *N(k)) Id(i) .up = sum (k, (d(k,i)*Tp/(2*N ))*(1-(N *N (k)))) ; Ip(i) .up = (1/Tp)*( (((Td*(sum (k, d(k,i))))^2))*d(i)*N )/(2*P (i)*(sum (k, d(k,i))))) + (Tp/2)*(Td*(sum (k, d(k,i))))*(1-(d(i) /P(i)))*(N -1) ) option optc r= 0; m ode l ge na ssign /obj ,Ma ke ,ca pac ity /;

Page 82: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

82 

 

solve ge na ssign minim izing cost using rmip; *--------------------------------------------------------------------- * La gra ngia n dual *--------------------------------------------------------------------- pa rame te r u(i) ; va ria ble bound; e qua tion LR ' la gra ngia n re la xa tion' ; LR.. bound = e = =e= sum((i, (A C(i)+ H C(i))) + sum (i, u(i)*[W(k)- ((W (i)*d(k,i)*Tp)/((N*N (k))) ]); m ode l ldua l /LR,Ma ke /; *--------------------------------------------------------------------- * ite ratione s subgra die nte *--------------------------------------------------------------------- se t ite r /ite r1*ite r250/; sc a la r c ontinue /1/; pa rame te r ste psize ; sc a la r the ta /2/; sc a la r noim proveme nt /0/; sc a la r be stbound /-IN F/; pa rame te r gamm a(i) ; sc a la r norm ; sc a la r uppe rbound; pa ram ete r upre vious(i) ; sc a la r de lta u; pa rame te r re sults(ite r ,*); * * initialize u c on dua ls re la jados * u(i) = ca pac ity .m(i) ; displa y u;

Page 83: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

83 

 

* * a n uppe rbound on L * pa rame te r initx(i,k) / i. k 1 /; uppe rbound = sum[(i,k) , c ( i,k)*initx(i, k)] ; displa y upperbound; loop(ite r$c ontinue , * * Re sue lve e l problema dua l la gra ngia no * option optc r= 0; option lim row = 0; option lim c ol = 0; ldual.solprint = 0; solve ldua l m inim izing bound using mip; re sults( ite r ,'dual obj' ) = bound.l; if (bound.l > bestbound, bestbound = bound.l; displa y be stbound; noim provement = 0; e lse noim provement = noim provem e nt + 1; if (noim provem e nt > 1, the ta = the ta/2; noim proveme nt = 0; ) ; ) ; re sults( ite r ,'noimprov' ) = noim proveme nt; re sults( ite r ,' the ta ') = the ta ; * * c a lcula ta ma ño de l pa so * ga mm a(i) = [W(k)- ((W(i)*d(k,i)*Tp.l) /((N .l*N .l(k))) ] ; norm = sum(i,sqr(gamm a(i))) ; ste psize = the ta*(upperbound-bound.l) /norm ;

Page 84: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

84 

 

re sults( ite r ,'norm') = norm; re sults( ite r ,' ste p' ) = ste psize ; * * re fresca r dua ls u * uprevious(i) = u(i) ; u( i) = m a x(0, u(i)+ ste psize*ga mma (i)) ; displa y u; * * prueba de c onverge nc ia ? * de ltau = sm a x(i,a bs(upre vious(i)-u(i))); re sults( ite r ,'de ltau') = de lta u; if ( de lta u < 0.01, displa y "Conve rge d"; c ontinue = 0; ) ; ) ; displa y re sults;

Page 85: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

85 

 

ANEXO 2.

CODIFICACIÓN DE LA SIMULACIÓN.

Page 86: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

86 

 

DEMANDA ALEATORIA FAMILIA PRODUCTOS INDUSTRIALIZADOS DEL CAFÈ (PARÀMETROS DE DISTRIBUCIÓN EXPONENCIAL EN CADA MINORISTA) Instancia 1-1-20-80

Tienda 1 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 116 130 88 83 55 55 111 85 88 55 88 69 60 53 50 120 132 85 78 60Mes 2 108 122 80 75 47 47 103 77 80 47 80 61 52 45 42 112 124 77 70 52Mes 3 110 124 82 77 49 49 105 79 82 49 82 63 54 47 44 114 126 79 72 54Mes 4 104 118 76 71 43 43 99 73 76 43 76 57 48 41 38 108 120 73 66 48Mes 5 113 127 85 80 52 52 108 82 85 52 85 66 57 50 47 117 129 82 75 57Mes 6 116 130 88 83 55 55 111 85 88 55 88 69 60 53 50 120 132 85 78 60Mes 7 121 135 93 88 60 60 116 90 93 60 93 74 65 58 55 125 137 90 83 65Mes 8 114 128 86 81 53 53 109 83 86 53 86 67 58 51 48 118 130 83 76 58Mes 9 115 129 87 82 54 54 110 84 87 54 87 68 59 52 49 119 131 84 77 59Mes 10 116 130 88 83 55 55 111 85 88 55 88 69 60 53 50 120 132 85 78 60Mes 11 117 131 89 84 56 56 112 86 89 56 89 70 61 54 51 121 133 86 79 61Mes 12 122 136 94 89 61 61 117 91 94 61 94 75 66 59 56 126 138 91 84 66

Tienda 2 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 16 17 2 16 16 16 26 30 28 23 31 16 21 21 19 19 19 0 12 19Mes 2 8 9 0 8 8 8 18 22 20 15 23 8 13 13 11 11 11 0 4 11Mes 3 9 10 1 9 9 9 19 23 21 16 24 9 14 14 12 12 12 1 5 12Mes 4 8 9 0 8 8 8 18 22 20 15 23 8 13 13 11 11 11 0 4 11Mes 5 17 18 3 17 17 17 27 31 29 24 32 17 22 22 20 20 20 1 13 20Mes 6 18 19 4 18 18 18 28 32 30 25 33 18 23 23 21 21 21 2 14 21Mes 7 17 18 3 17 17 17 27 31 29 24 32 17 22 22 20 20 20 1 13 20Mes 8 16 17 2 16 16 16 26 30 28 23 31 16 21 21 19 19 19 0 12 19Mes 9 15 16 1 15 15 15 25 29 27 22 30 15 20 20 18 18 18 0 11 18Mes 10 17 18 3 17 17 17 27 31 29 24 32 17 22 22 20 20 20 1 13 20Mes 11 18 19 4 18 18 18 28 32 30 25 33 18 23 23 21 21 21 2 14 21Mes 12 28 29 14 28 28 28 38 42 40 35 43 28 33 33 31 31 31 12 24 31

Page 87: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

87 

 

Tienda 3 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 35 19 24 21 19 24 21 14 19 19 19 14 17 17 14 40 21 21 17 24Mes 2 33 17 22 19 17 22 19 12 17 17 17 12 15 15 12 38 19 19 15 22Mes 3 36 20 25 22 20 25 22 15 20 20 20 15 18 18 15 41 22 22 18 25Mes 4 34 18 23 20 18 23 20 13 18 18 18 13 16 16 13 39 20 20 16 23Mes 5 35 19 24 21 19 24 21 14 19 19 19 14 17 17 14 40 21 21 17 24Mes 6 38 22 27 24 22 27 24 17 22 22 22 17 20 20 17 43 24 24 20 27Mes 7 37 21 26 23 21 26 23 16 21 21 21 16 19 19 16 42 23 23 19 26Mes 8 37 21 26 23 21 26 23 16 21 21 21 16 19 19 16 42 23 23 19 26Mes 9 35 19 24 21 19 24 21 14 19 19 19 14 17 17 14 40 21 21 17 24Mes 10 36 20 25 22 20 25 22 15 20 20 20 15 18 18 15 41 22 22 18 25Mes 11 37 21 26 23 21 26 23 16 21 21 21 16 19 19 16 42 23 23 19 26Mes 12 43 27 32 29 27 32 29 22 27 27 27 22 25 25 22 48 29 29 25 32

Tienda 4 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 22 20 20 18 15 13 20 11 11 11 18 11 13 9 8 25 22 18 15 18Mes 2 21 19 19 17 14 12 19 10 10 10 17 10 12 8 7 24 21 17 14 17Mes 3 20 18 18 16 13 11 18 9 9 9 16 9 11 7 6 23 20 16 13 16Mes 4 20 18 18 16 13 11 18 9 9 9 16 9 11 7 6 23 20 16 13 16Mes 5 21 19 19 17 14 12 19 10 10 10 17 10 12 8 7 24 21 17 14 17Mes 6 22 20 20 18 15 13 20 11 11 11 18 11 13 9 8 25 22 18 15 18Mes 7 26 24 24 22 19 17 24 15 15 15 22 15 17 13 12 29 26 22 19 22Mes 8 25 23 23 21 18 16 23 14 14 14 21 14 16 12 11 28 25 21 18 21Mes 9 25 23 23 21 18 16 23 14 14 14 21 14 16 12 11 28 25 21 18 21Mes 10 24 22 22 20 17 15 22 13 13 13 20 13 15 11 10 27 24 20 17 20Mes 11 25 23 23 21 18 16 23 14 14 14 21 14 16 12 11 28 25 21 18 21Mes 12 31 29 29 27 24 22 29 20 20 20 27 20 22 18 17 34 31 27 24 27

Tienda 5 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 29 22 24 19 5 12 8 15 5 5 12 12 10 3 1 33 24 22 15 10Mes 2 28 21 23 18 4 11 7 14 4 4 11 11 9 2 0 32 23 21 14 9Mes 3 27 20 22 17 3 10 6 13 3 3 10 10 8 1 0 31 22 20 13 8Mes 4 27 20 22 17 3 10 6 13 3 3 10 10 8 1 0 31 22 20 13 8Mes 5 28 21 23 18 4 11 7 14 4 4 11 11 9 2 1 32 23 21 14 9Mes 6 29 22 24 19 5 12 8 15 5 5 12 12 10 3 2 33 24 22 15 10Mes 7 34 27 29 24 10 17 13 20 10 10 17 17 15 8 6 38 29 27 20 15Mes 8 33 26 28 23 9 16 12 19 9 9 16 16 14 7 5 37 28 26 19 14Mes 9 33 26 28 23 9 16 12 19 9 9 16 16 14 7 5 37 28 26 19 14Mes 10 32 25 27 22 8 15 11 18 8 8 15 15 13 6 4 36 27 25 18 13Mes 11 33 26 28 23 9 16 12 19 9 9 16 16 14 7 5 37 28 26 19 14Mes 12 40 33 35 30 16 23 19 26 16 16 23 23 21 14 12 44 35 33 26 21

Page 88: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

88 

 

Tienda 6 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 14 10 19 10 9 10 17 12 12 9 16 14 3 7 5 17 12 17 7 12Mes 2 13 9 18 9 8 9 16 11 11 8 15 13 2 6 4 16 11 16 6 11Mes 3 12 8 17 8 7 8 15 10 10 7 14 12 1 5 3 15 10 15 5 10Mes 4 12 8 17 8 7 8 15 10 10 7 14 12 1 5 3 15 10 15 5 10Mes 5 13 9 18 9 8 9 16 11 11 8 15 13 2 6 4 16 11 16 6 11Mes 6 14 10 19 10 9 10 17 12 12 9 16 14 3 7 5 17 12 17 7 12Mes 7 17 13 22 13 12 13 20 15 15 12 19 17 6 10 8 20 15 20 10 15Mes 8 16 12 21 12 11 12 19 14 14 11 18 16 5 9 7 19 14 19 9 14Mes 9 16 12 21 12 11 12 19 14 14 11 18 16 5 9 7 19 14 19 9 14Mes 10 15 11 20 11 10 11 18 13 13 10 17 15 4 8 6 18 13 18 8 13Mes 11 16 12 21 12 11 12 19 14 14 11 18 16 5 9 7 19 14 19 9 14Mes 12 21 17 26 17 16 17 24 19 19 16 23 21 10 14 12 24 19 24 14 19

Tienda 7 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 12 17 19 17 14 17 16 10 10 7 16 7 7 5 3 16 19 17 14 17Mes 2 11 16 18 16 13 16 15 9 9 6 15 6 6 4 2 15 18 16 13 16Mes 3 10 15 17 15 12 15 14 8 8 5 14 5 5 3 1 14 17 15 12 15Mes 4 10 15 17 15 12 15 14 8 8 5 14 5 5 3 1 14 17 15 12 15Mes 5 11 16 18 16 13 16 15 9 9 6 15 6 6 4 2 15 18 16 13 16Mes 6 12 17 19 17 14 17 16 10 10 7 16 7 7 5 3 16 19 17 14 17Mes 7 15 20 22 20 17 20 19 13 13 10 19 10 10 8 6 19 22 20 17 20Mes 8 14 19 21 19 16 19 18 12 12 9 18 9 9 7 5 18 21 19 16 19Mes 9 14 19 21 19 16 19 18 12 12 9 18 9 9 7 5 18 21 19 16 19Mes 10 13 18 20 18 15 18 17 11 11 8 17 8 8 6 4 17 20 18 15 18Mes 11 14 19 21 19 16 19 18 12 12 9 18 9 9 7 5 18 21 19 16 19Mes 12 19 24 26 24 21 24 23 17 17 14 23 14 14 12 10 23 26 24 21 24

Tienda 8 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 6 6 9 6 9 39 7 4 6 4 12 6 6 3 2 8 7 8 4 11Mes 2 5 5 8 5 8 38 6 3 5 3 11 5 5 2 1 7 6 7 3 10Mes 3 4 4 7 4 7 37 5 2 4 2 10 4 4 1 0 6 5 6 2 9Mes 4 4 4 7 4 7 37 5 2 4 2 10 4 4 1 0 6 5 6 2 9Mes 5 5 5 8 5 8 38 6 3 5 3 11 5 5 2 1 7 6 7 3 10Mes 6 6 6 9 6 9 39 7 4 6 4 12 6 6 3 2 8 7 8 4 11Mes 7 10 10 13 10 13 43 11 8 10 8 16 10 10 7 6 12 11 12 8 15Mes 8 9 9 12 9 12 42 10 7 9 7 15 9 9 6 5 11 10 11 7 14Mes 9 9 9 12 9 12 42 10 7 9 7 15 9 9 6 5 11 10 11 7 14Mes 10 8 8 11 8 11 41 9 6 8 6 14 8 8 5 4 10 9 10 6 13Mes 11 9 9 12 9 12 42 10 7 9 7 15 9 9 6 5 11 10 11 7 14Mes 12 14 14 17 14 17 47 15 12 14 12 20 14 14 11 10 16 15 16 12 19

Page 89: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

89 

 

Tienda 9 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 12 15 8 7 8 15 10 5 8 7 15 10 8 5 3 15 17 7 3 12Mes 2 11 14 7 6 7 14 9 4 7 6 14 9 7 4 2 14 16 6 2 11Mes 3 10 13 6 5 6 13 8 3 6 5 13 8 6 3 1 13 15 5 1 10Mes 4 10 13 6 5 6 13 8 3 6 5 13 8 6 3 1 13 15 5 1 10Mes 5 11 14 7 6 7 14 9 4 7 6 14 9 7 4 2 14 16 6 2 11Mes 6 12 15 8 7 8 15 10 5 8 7 15 10 8 5 3 15 17 7 3 12Mes 7 17 20 13 12 13 20 15 10 13 12 20 15 13 10 8 20 22 12 8 17Mes 8 16 19 12 11 12 19 14 9 12 11 19 14 12 9 7 19 21 11 7 16Mes 9 16 19 12 11 12 19 14 9 12 11 19 14 12 9 7 19 21 11 7 16Mes 10 15 18 11 10 11 18 13 8 11 10 18 13 11 8 6 18 20 10 6 15Mes 11 16 19 12 11 12 19 14 9 12 11 19 14 12 9 7 19 21 11 7 16Mes 12 21 24 17 16 17 24 19 14 17 16 24 19 17 14 12 24 26 16 12 21

Tienda 10 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 11 9 9 8 8 7 5 8 5 7 10 12 3 6 5 13 10 8 6 10Mes 2 10 8 8 7 7 6 4 7 4 6 9 11 2 5 4 12 9 7 5 9Mes 3 9 7 7 6 6 5 3 6 3 5 8 10 1 4 3 11 8 6 4 8Mes 4 9 7 7 6 6 5 3 6 3 5 8 10 1 4 3 11 8 6 4 8Mes 5 10 8 8 7 7 6 4 7 4 6 9 11 2 5 4 12 9 7 5 9Mes 6 11 9 9 8 8 7 5 8 5 7 10 12 3 6 5 13 10 8 6 10Mes 7 14 12 12 11 11 10 8 11 8 10 13 15 6 9 8 16 13 11 9 13Mes 8 13 11 11 10 10 9 7 10 7 9 12 14 5 8 7 15 12 10 8 12Mes 9 13 11 11 10 10 9 7 10 7 9 12 14 5 8 7 15 12 10 8 12Mes 10 12 10 10 9 9 8 6 9 6 8 11 13 4 7 6 14 11 9 7 11Mes 11 13 11 11 10 10 9 7 10 7 9 12 14 5 8 7 15 12 10 8 12Mes 12 18 16 16 15 15 14 12 15 12 14 17 19 10 13 12 20 17 15 13 17

Page 90: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

90 

 

Tienda 11 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 14 7 8 7 5 3 14 12 7 10 14 12 8 8 7 17 8 7 3 8Mes 2 13 6 7 6 4 2 13 11 6 9 13 11 7 7 6 16 7 6 2 7Mes 3 12 5 6 5 3 1 12 10 5 8 12 10 6 6 5 15 6 5 1 6Mes 4 12 5 6 5 3 1 12 10 5 8 12 10 6 6 5 15 6 5 1 6Mes 5 13 6 7 6 4 2 13 11 6 9 13 11 7 7 6 16 7 6 2 7Mes 6 14 7 8 7 5 3 14 12 7 10 14 12 8 8 7 17 8 7 3 8Mes 7 19 12 13 12 10 8 19 17 12 15 19 17 13 13 12 22 13 12 8 13Mes 8 18 11 12 11 9 7 18 16 11 14 18 16 12 12 11 21 12 11 7 12Mes 9 18 11 12 11 9 7 18 16 11 14 18 16 12 12 11 21 12 11 7 12Mes 10 17 10 11 10 8 6 17 15 10 13 17 15 11 11 10 20 11 10 6 11Mes 11 18 11 12 11 9 7 18 16 11 14 18 16 12 12 11 21 12 11 7 12Mes 12 23 16 17 16 14 12 23 21 16 19 23 21 17 17 16 26 17 16 12 17

Tienda 12 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 14 10 14 10 10 7 16 17 5 17 10 10 10 16 14 17 12 12 7 14Mes 2 13 9 13 9 9 6 15 16 4 16 9 9 9 15 13 16 11 11 6 13Mes 3 12 8 12 8 8 5 14 15 3 15 8 8 8 14 12 15 10 10 5 12Mes 4 12 8 12 8 8 5 14 15 3 15 8 8 8 14 12 15 10 10 5 12Mes 5 13 9 13 9 9 6 15 16 4 16 9 9 9 15 13 16 11 11 6 13Mes 6 14 10 14 10 10 7 16 17 5 17 10 10 10 16 14 17 12 12 7 14Mes 7 17 13 17 13 13 10 19 20 8 20 13 13 13 19 17 20 15 15 10 17Mes 8 16 12 16 12 12 9 18 19 7 19 12 12 12 18 16 19 14 14 9 16Mes 9 16 12 16 12 12 9 18 19 7 19 12 12 12 18 16 19 14 14 9 16Mes 10 15 11 15 11 11 8 17 18 6 18 11 11 11 17 15 18 13 13 8 15Mes 11 16 12 16 12 12 9 18 19 7 19 12 12 12 18 16 19 14 14 9 16Mes 12 21 17 21 17 17 14 23 24 12 24 17 17 17 23 21 24 19 19 14 21

Tienda 13 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 9 9 11 6 8 8 5 4 6 4 8 6 2 3 2 11 10 10 4 10Mes 2 8 8 10 5 7 7 4 3 5 3 7 5 1 2 1 10 9 9 3 9Mes 3 7 7 9 4 6 6 3 2 4 2 6 4 0 1 0 9 8 8 2 8Mes 4 7 7 9 4 6 6 3 2 4 2 6 4 0 1 0 9 8 8 2 8Mes 5 8 8 10 5 7 7 4 3 5 3 7 5 1 2 1 10 9 9 3 9Mes 6 9 9 11 6 8 8 5 4 6 4 8 6 2 3 2 11 10 10 4 10Mes 7 12 12 14 9 11 11 8 7 9 7 11 9 5 6 5 14 13 13 7 13Mes 8 11 11 13 8 10 10 7 6 8 6 10 8 4 5 4 13 12 12 6 12Mes 9 11 11 13 8 10 10 7 6 8 6 10 8 4 5 4 13 12 12 6 12Mes 10 10 10 12 7 9 9 6 5 7 5 9 7 3 4 3 12 11 11 5 11Mes 11 11 11 13 8 10 10 7 6 8 6 10 8 4 5 4 13 12 12 6 12Mes 12 14 14 16 11 13 13 10 9 11 9 13 11 7 8 7 16 15 15 9 15

Page 91: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

91 

 

Tienda 14 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 9 7 8 5 3 5 7 6 7 6 4 9 6 5 4 11 8 7 3 5Mes 2 8 6 7 4 2 4 6 5 6 5 3 8 5 4 3 10 7 6 2 4Mes 3 7 5 6 3 1 3 5 4 5 4 2 7 4 3 2 9 6 5 1 3Mes 4 7 5 6 3 1 3 5 4 5 4 2 7 4 3 2 9 6 5 1 3Mes 5 8 6 7 4 2 4 6 5 6 5 3 8 5 4 3 10 7 6 2 4Mes 6 9 7 8 5 3 5 7 6 7 6 4 9 6 5 4 11 8 7 3 5Mes 7 12 10 11 8 6 8 10 9 10 9 7 12 9 8 7 14 11 10 6 8Mes 8 11 9 10 7 5 7 9 8 9 8 6 11 8 7 6 13 10 9 5 7Mes 9 11 9 10 7 5 7 9 8 9 8 6 11 8 7 6 13 10 9 5 7Mes 10 10 8 9 6 4 6 8 7 8 7 5 10 7 6 5 12 9 8 4 6Mes 11 11 9 10 7 5 7 9 8 9 8 6 11 8 7 6 13 10 9 5 7Mes 12 15 13 14 11 9 11 13 12 13 12 10 15 12 11 10 17 14 13 9 11

Tienda 15 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 7 6 8 6 7 6 8 6 4 4 5 4 4 3 2 9 7 7 4 9Mes 2 6 5 7 5 6 5 7 5 3 3 4 3 3 2 1 8 6 6 3 8Mes 3 5 4 6 4 5 4 6 4 2 2 3 2 2 1 0 7 5 5 2 7Mes 4 5 4 6 4 5 4 6 4 2 2 3 2 2 1 0 7 5 5 2 7Mes 5 6 5 7 5 6 5 7 5 3 3 4 3 3 2 1 8 6 6 3 8Mes 6 7 6 8 6 7 6 8 6 4 4 5 4 4 3 2 9 7 7 4 9Mes 7 10 9 11 9 10 9 11 9 7 7 8 7 7 6 5 12 10 10 7 12Mes 8 9 8 10 8 9 8 10 8 6 6 7 6 6 5 4 11 9 9 6 11Mes 9 9 8 10 8 9 8 10 8 6 6 7 6 6 5 4 11 9 9 6 11Mes 10 8 7 9 7 8 7 9 7 5 5 6 5 5 4 3 10 8 8 5 10Mes 11 9 8 10 8 9 8 10 8 6 6 7 6 6 5 4 11 9 9 6 11Mes 12 14 13 15 13 14 13 15 13 11 11 12 11 11 10 9 16 14 14 11 16

Page 92: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

92 

 

Tienda  16 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 112 126 84 80 52 52 108 82 84 52 84 66 56 49 47 117 129 82 75 56Mes 2 110 124 82 78 50 50 106 80 82 50 82 64 54 47 45 115 127 80 73 54Mes 3 107 121 79 75 47 47 103 77 79 47 79 61 51 44 42 112 124 77 70 51Mes 4 107 121 79 75 47 47 103 77 79 47 79 61 51 44 42 112 124 77 70 51Mes 5 108 122 80 76 48 48 104 78 80 48 80 62 52 45 43 113 125 78 71 52Mes 6 109 123 81 77 49 49 105 79 81 49 81 63 53 46 44 114 126 79 72 53Mes 7 115 129 87 83 55 55 111 85 87 55 87 69 59 52 50 120 132 85 78 59Mes 8 114 128 86 82 54 54 110 84 86 54 86 68 58 51 49 119 131 84 77 58Mes 9 114 128 86 82 54 54 110 84 86 54 86 68 58 51 49 119 131 84 77 58Mes 10 113 127 85 81 53 53 109 83 85 53 85 67 57 50 48 118 130 83 76 57Mes 11 114 128 86 82 54 54 110 84 86 54 86 68 58 51 49 119 131 84 77 58Mes 12 120 134 92 88 60 60 116 90 92 60 92 74 64 57 55 125 137 90 83 64

Tienda  17 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 14 16 0 14 14 14 24 28 26 21 30 14 19 19 17 17 17 0 10 17Mes 2 13 15 0 13 13 13 23 27 25 20 29 13 18 18 16 16 16 0 9 16Mes 3 12 14 0 12 12 12 22 26 24 19 28 12 17 17 15 15 15 0 8 15Mes 4 12 14 0 12 12 12 22 26 24 19 28 12 17 17 15 15 15 0 8 15Mes 5 13 15 1 13 13 13 23 27 25 20 29 13 18 18 16 16 16 1 9 16Mes 6 14 16 2 14 14 14 24 28 26 21 30 14 19 19 17 17 17 2 10 17Mes 7 17 19 3 17 17 17 27 31 29 24 33 17 22 22 20 20 20 2 13 20Mes 8 16 18 2 16 16 16 26 30 28 23 32 16 21 21 19 19 19 1 12 19Mes 9 16 18 2 16 16 16 26 30 28 23 32 16 21 21 19 19 19 1 12 19Mes 10 15 17 1 15 15 15 25 29 27 22 31 15 20 20 18 18 18 0 11 18Mes 11 16 18 2 16 16 16 26 30 28 23 32 16 21 21 19 19 19 0 12 19Mes 12 21 23 7 21 21 21 31 35 33 28 37 21 26 26 24 24 24 5 17 24

Tienda 18 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 33 17 21 19 17 21 19 12 17 17 17 12 14 14 12 38 19 19 14 21Mes 2 32 16 20 18 16 20 18 11 16 16 16 11 13 13 11 37 18 18 13 20Mes 3 31 15 19 17 15 19 17 10 15 15 15 10 12 12 10 36 17 17 12 19Mes 4 31 15 19 17 15 19 17 10 15 15 15 10 12 12 10 36 17 17 12 19Mes 5 32 16 20 18 16 20 18 11 16 16 16 11 13 13 11 37 18 18 13 20Mes 6 33 17 21 19 17 21 19 12 17 17 17 12 14 14 12 38 19 19 14 21Mes 7 36 20 24 22 20 24 22 15 20 20 20 15 17 17 15 41 22 22 17 24Mes 8 35 19 23 21 19 23 21 14 19 19 19 14 16 16 14 40 21 21 16 23Mes 9 35 19 23 21 19 23 21 14 19 19 19 14 16 16 14 40 21 21 16 23Mes 10 34 18 22 20 18 22 20 13 18 18 18 13 15 15 13 39 20 20 15 22Mes 11 35 19 23 21 19 23 21 14 19 19 19 14 16 16 14 40 21 21 16 23Mes 12 40 24 28 26 24 28 26 19 24 24 24 19 21 21 19 45 26 26 21 28

Page 93: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

93 

 

Tienda 19 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 21 19 19 17 14 12 19 10 10 10 17 10 12 9 7 24 21 17 14 17Mes 2 19 17 17 15 12 10 17 8 8 8 15 8 10 7 5 22 19 15 12 15Mes 3 18 16 16 14 11 9 16 7 7 7 14 7 9 6 4 21 18 14 11 14Mes 4 18 16 16 14 11 9 16 7 7 7 14 7 9 6 4 21 18 14 11 14Mes 5 19 17 17 15 12 10 17 8 8 8 15 8 10 7 5 22 19 15 12 15Mes 6 20 18 18 16 13 11 18 9 9 9 16 9 11 8 6 23 20 16 13 16Mes 7 24 22 22 20 17 15 22 13 13 13 20 13 15 12 10 27 24 20 17 20Mes 8 23 21 21 19 16 14 21 12 12 12 19 12 14 11 9 26 23 19 16 19Mes 9 23 21 21 19 16 14 21 12 12 12 19 12 14 11 9 26 23 19 16 19Mes 10 22 20 20 18 15 13 20 11 11 11 18 11 13 10 8 25 22 18 15 18Mes 11 23 21 21 19 16 14 21 12 12 12 19 12 14 11 9 26 23 19 16 19Mes 12 27 25 25 23 20 18 25 16 16 16 23 16 18 15 13 30 27 23 20 23

Tienda 20 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 28 21 24 19 5 12 7 14 5 5 12 12 10 3 0 33 24 21 14 10Mes 2 27 20 23 18 4 11 6 13 4 4 11 11 9 2 0 32 23 20 13 9Mes 3 26 19 22 17 3 10 5 12 3 3 10 10 8 1 0 31 22 19 12 8Mes 4 26 19 22 17 3 10 5 12 3 3 10 10 8 1 0 31 22 19 12 8Mes 5 27 20 23 18 4 11 6 13 4 4 11 11 9 2 1 32 23 20 13 9Mes 6 28 21 24 19 5 12 7 14 5 5 12 12 10 3 2 33 24 21 14 10Mes 7 31 24 27 22 8 15 10 17 8 8 15 15 13 6 3 36 27 24 17 13Mes 8 30 23 26 21 7 14 9 16 7 7 14 14 12 5 2 35 26 23 16 12Mes 9 30 23 26 21 7 14 9 16 7 7 14 14 12 5 2 35 26 23 16 12Mes 10 29 22 25 20 6 13 8 15 6 6 13 13 11 4 1 34 25 22 15 11Mes 11 30 23 26 21 7 14 9 16 7 7 14 14 12 5 2 35 26 23 16 12Mes 12 38 31 34 29 15 22 17 24 15 15 22 22 20 13 10 43 34 31 24 20

Tienda 21 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 12 9 17 9 7 9 16 10 10 7 14 12 2 5 3 16 10 16 5 10Mes 2 11 8 16 8 6 8 15 9 9 6 13 11 1 4 2 15 9 15 4 9Mes 3 10 7 15 7 5 7 14 8 8 5 12 10 0 3 1 14 8 14 3 8Mes 4 10 7 15 7 5 7 14 8 8 5 12 10 0 3 1 14 8 14 3 8Mes 5 11 8 16 8 6 8 15 9 9 6 13 11 1 4 2 15 9 15 4 9Mes 6 12 9 17 9 7 9 16 10 10 7 14 12 2 5 3 16 10 16 5 10Mes 7 15 12 20 12 10 12 19 13 13 10 17 15 5 8 6 19 13 19 8 13Mes 8 14 11 19 11 9 11 18 12 12 9 16 14 4 7 5 18 12 18 7 12Mes 9 14 11 19 11 9 11 18 12 12 9 16 14 4 7 5 18 12 18 7 12Mes 10 13 10 18 10 8 10 17 11 11 8 15 13 3 6 4 17 11 17 6 11Mes 11 14 11 19 11 9 11 18 12 12 9 16 14 4 7 5 18 12 18 7 12Mes 12 18 15 23 15 13 15 22 16 16 13 20 18 8 11 9 22 16 22 11 16

Page 94: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

94 

 

Tienda 22 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 10 16 17 16 12 16 14 9 9 5 14 5 5 3 2 14 17 16 12 16Mes 2 9 15 16 15 11 15 13 8 8 4 13 4 4 2 1 13 16 15 11 15Mes 3 8 14 15 14 10 14 12 7 7 3 12 3 3 1 0 12 15 14 10 14Mes 4 8 14 15 14 10 14 12 7 7 3 12 3 3 1 0 12 15 14 10 14Mes 5 9 15 16 15 11 15 13 8 8 4 13 4 4 2 1 13 16 15 11 15Mes 6 10 16 17 16 12 16 14 9 9 5 14 5 5 3 2 14 17 16 12 16Mes 7 13 19 20 19 15 19 17 12 12 8 17 8 8 6 5 17 20 19 15 19Mes 8 12 18 19 18 14 18 16 11 11 7 16 7 7 5 4 16 19 18 14 18Mes 9 12 18 19 18 14 18 16 11 11 7 16 7 7 5 4 16 19 18 14 18Mes 10 11 17 18 17 13 17 15 10 10 6 15 6 6 4 3 15 18 17 13 17Mes 11 12 18 19 18 14 18 16 11 11 7 16 7 7 5 4 16 19 18 14 18Mes 12 17 23 24 23 19 23 21 16 16 12 21 12 12 10 9 21 24 23 19 23

Tienda 23 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 6 6 9 6 9 39 7 4 6 4 12 6 6 3 2 8 7 8 4 11Mes 2 5 5 8 5 8 38 6 3 5 3 11 5 5 2 1 7 6 7 3 10Mes 3 4 4 7 4 7 37 5 2 4 2 10 4 4 1 0 6 5 6 2 9Mes 4 4 4 7 4 7 37 5 2 4 2 10 4 4 1 0 6 5 6 2 9Mes 5 5 5 8 5 8 38 6 3 5 3 11 5 5 2 1 7 6 7 3 10Mes 6 6 6 9 6 9 39 7 4 6 4 12 6 6 3 2 8 7 8 4 11Mes 7 9 9 12 9 12 42 10 7 9 7 15 9 9 6 5 11 10 11 7 14Mes 8 8 8 11 8 11 41 9 6 8 6 14 8 8 5 4 10 9 10 6 13Mes 9 8 8 11 8 11 41 9 6 8 6 14 8 8 5 4 10 9 10 6 13Mes 10 7 7 10 7 10 40 8 5 7 5 13 7 7 4 3 9 8 9 5 12Mes 11 8 8 11 8 11 41 9 6 8 6 14 8 8 5 4 10 9 10 6 13Mes 12 14 14 17 14 17 47 15 12 14 12 20 14 14 11 10 16 15 16 12 19

Tienda 24 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 12 16 9 7 9 16 10 5 9 7 16 10 9 5 3 16 17 7 3 12Mes 2 11 15 8 6 8 15 9 4 8 6 15 9 8 4 2 15 16 6 2 11Mes 3 10 14 7 5 7 14 8 3 7 5 14 8 7 3 1 14 15 5 1 10Mes 4 10 14 7 5 7 14 8 3 7 5 14 8 7 3 1 14 15 5 1 10Mes 5 11 15 8 6 8 15 9 4 8 6 15 9 8 4 2 15 16 6 2 11Mes 6 12 16 9 7 9 16 10 5 9 7 16 10 9 5 3 16 17 7 3 12Mes 7 15 19 12 10 12 19 13 8 12 10 19 13 12 8 6 19 20 10 6 15Mes 8 14 18 11 9 11 18 12 7 11 9 18 12 11 7 5 18 19 9 5 14Mes 9 14 18 11 9 11 18 12 7 11 9 18 12 11 7 5 18 19 9 5 14Mes 10 13 17 10 8 10 17 11 6 10 8 17 11 10 6 4 17 18 8 4 13Mes 11 14 18 11 9 11 18 12 7 11 9 18 12 11 7 5 18 19 9 5 14Mes 12 20 24 17 15 17 24 18 13 17 15 24 18 17 13 11 24 25 15 11 20

Page 95: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

95 

 

Tienda 25 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 10 8 8 7 7 6 4 7 4 6 9 11 2 5 4 12 9 7 5 9Mes 2 9 7 7 6 6 5 3 6 3 5 8 10 1 4 3 11 8 6 4 8Mes 3 8 6 6 5 5 4 2 5 2 4 7 9 0 3 2 10 7 5 3 7Mes 4 8 6 6 5 5 4 2 5 2 4 7 9 0 3 2 10 7 5 3 7Mes 5 9 7 7 6 6 5 3 6 3 5 8 10 1 4 3 11 8 6 4 8Mes 6 10 8 8 7 7 6 4 7 4 6 9 11 2 5 4 12 9 7 5 9Mes 7 13 11 11 10 10 9 7 10 7 9 12 14 5 8 7 15 12 10 8 12Mes 8 12 10 10 9 9 8 6 9 6 8 11 13 4 7 6 14 11 9 7 11Mes 9 12 10 10 9 9 8 6 9 6 8 11 13 4 7 6 14 11 9 7 11Mes 10 11 9 9 8 8 7 5 8 5 7 10 12 3 6 5 13 10 8 6 10Mes 11 12 10 10 9 9 8 6 9 6 8 11 13 4 7 6 14 11 9 7 11Mes 12 18 16 16 15 15 14 12 15 12 14 17 19 10 13 12 20 17 15 13 17

Tienda 26 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 14 7 9 7 5 3 14 12 7 10 14 12 9 9 7 17 9 7 3 9Mes 2 13 6 8 6 4 2 13 11 6 9 13 11 8 8 6 16 8 6 2 8Mes 3 12 5 7 5 3 1 12 10 5 8 12 10 7 7 5 15 7 5 1 7Mes 4 12 5 7 5 3 1 12 10 5 8 12 10 7 7 5 15 7 5 1 7Mes 5 13 6 8 6 4 2 13 11 6 9 13 11 8 8 6 16 8 6 2 8Mes 6 14 7 9 7 5 3 14 12 7 10 14 12 9 9 7 17 9 7 3 9Mes 7 17 10 12 10 8 6 17 15 10 13 17 15 12 12 10 20 12 10 6 12Mes 8 16 9 11 9 7 5 16 14 9 12 16 14 11 11 9 19 11 9 5 11Mes 9 16 9 11 9 7 5 16 14 9 12 16 14 11 11 9 19 11 9 5 11Mes 10 15 8 10 8 6 4 15 13 8 11 15 13 10 10 8 18 10 8 4 10Mes 11 16 9 11 9 7 5 16 14 9 12 16 14 11 11 9 19 11 9 5 11Mes 12 20 13 15 13 11 9 20 18 13 16 20 18 15 15 13 23 15 13 9 15

Tienda 27 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 12 9 12 9 9 5 14 16 3 16 9 9 9 14 12 16 10 10 5 12Mes 2 11 8 11 8 8 4 13 15 2 15 8 8 8 13 11 15 9 9 4 11Mes 3 10 7 10 7 7 3 12 14 1 14 7 7 7 12 10 14 8 8 3 10Mes 4 10 7 10 7 7 3 12 14 1 14 7 7 7 12 10 14 8 8 3 10Mes 5 11 8 11 8 8 4 13 15 2 15 8 8 8 13 11 15 9 9 4 11Mes 6 12 9 12 9 9 5 14 16 3 16 9 9 9 14 12 16 10 10 5 12Mes 7 15 12 15 12 12 8 17 19 6 19 12 12 12 17 15 19 13 13 8 15Mes 8 14 11 14 11 11 7 16 18 5 18 11 11 11 16 14 18 12 12 7 14Mes 9 14 11 14 11 11 7 16 18 5 18 11 11 11 16 14 18 12 12 7 14Mes 10 13 10 13 10 10 6 15 17 4 17 10 10 10 15 13 17 11 11 6 13Mes 11 14 11 14 11 11 7 16 18 5 18 11 11 11 16 14 18 12 12 7 14Mes 12 22 19 22 19 19 15 24 26 13 26 19 19 19 24 22 26 20 20 15 22

Page 96: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

96 

 

Tienda 28 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 8 8 10 5 7 7 4 3 5 3 7 5 1 2 1 10 9 9 3 9Mes 2 7 7 9 4 6 6 3 2 4 2 6 4 0 1 0 9 8 8 2 8Mes 3 6 6 8 3 5 5 2 1 3 1 5 3 0 0 0 8 7 7 1 7Mes 4 6 6 8 3 5 5 2 1 3 1 5 3 0 0 0 8 7 7 1 7Mes 5 7 7 9 4 6 6 3 2 4 2 6 4 1 1 1 9 8 8 2 8Mes 6 8 8 10 5 7 7 4 3 5 3 7 5 2 2 2 10 9 9 3 9Mes 7 11 11 13 8 10 10 7 6 8 6 10 8 4 5 4 13 12 12 6 12Mes 8 10 10 12 7 9 9 6 5 7 5 9 7 3 4 3 12 11 11 5 11Mes 9 10 10 12 7 9 9 6 5 7 5 9 7 3 4 3 12 11 11 5 11Mes 10 9 9 11 6 8 8 5 4 6 4 8 6 2 3 2 11 10 10 4 10Mes 11 10 10 12 7 9 9 6 5 7 5 9 7 3 4 3 12 11 11 5 11Mes 12 16 16 18 13 15 15 12 11 13 11 15 13 9 10 9 18 17 17 11 17

Tienda 29 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 8 6 7 4 2 4 6 5 6 5 3 8 5 4 3 10 7 6 2 4Mes 2 7 5 6 3 1 3 5 4 5 4 2 7 4 3 2 9 6 5 1 3Mes 3 6 4 5 2 0 2 4 3 4 3 1 6 3 2 1 8 5 4 0 2Mes 4 6 4 5 2 0 2 4 3 4 3 1 6 3 2 1 8 5 4 0 2Mes 5 7 5 6 3 1 3 5 4 5 4 2 7 4 3 2 9 6 5 1 3Mes 6 8 6 7 4 2 4 6 5 6 5 3 8 5 4 3 10 7 6 2 4Mes 7 11 9 10 7 5 7 9 8 9 8 6 11 8 7 6 13 10 9 5 7Mes 8 10 8 9 6 4 6 8 7 8 7 5 10 7 6 5 12 9 8 4 6Mes 9 10 8 9 6 4 6 8 7 8 7 5 10 7 6 5 12 9 8 4 6Mes 10 9 7 8 5 3 5 7 6 7 6 4 9 6 5 4 11 8 7 3 5Mes 11 10 8 9 6 4 6 8 7 8 7 5 10 7 6 5 12 9 8 4 6Mes 12 15 13 14 11 9 11 13 12 13 12 10 15 12 11 10 17 14 13 9 11

Tienda 30 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 6 5 7 5 6 5 7 5 3 3 4 3 3 2 1 8 6 6 3 8Mes 2 5 4 6 4 5 4 6 4 2 2 3 2 2 1 0 7 5 5 2 7Mes 3 4 3 5 3 4 3 5 3 1 1 2 1 1 0 0 6 4 4 1 6Mes 4 4 3 5 3 4 3 5 3 1 1 2 1 1 0 0 6 4 4 1 6Mes 5 5 4 6 4 5 4 6 4 2 2 3 2 2 1 1 7 5 5 2 7Mes 6 6 5 7 5 6 5 7 5 3 3 4 3 3 2 2 8 6 6 3 8Mes 7 9 8 10 8 9 8 10 8 6 6 7 6 6 5 4 11 9 9 6 11Mes 8 8 7 9 7 8 7 9 7 5 5 6 5 5 4 3 10 8 8 5 10Mes 9 8 7 9 7 8 7 9 7 5 5 6 5 5 4 3 10 8 8 5 10Mes 10 7 6 8 6 7 6 8 6 4 4 5 4 4 3 2 9 7 7 4 9Mes 11 8 7 9 7 8 7 9 7 5 5 6 5 5 4 3 10 8 8 5 10Mes 12 12 11 13 11 12 11 13 11 9 9 10 9 9 8 7 14 12 12 9 14

Page 97: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

97 

 

Tienda 31 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 106 120 78 73 45 45 101 76 78 45 78 59 50 43 41 111 122 76 69 50Mes 2 103 117 75 70 42 42 98 73 75 42 75 56 47 40 38 108 119 73 66 47Mes 3 102 116 74 69 41 41 97 72 74 41 74 55 46 39 37 107 118 72 65 46Mes 4 101 115 73 68 40 40 96 71 73 40 73 54 45 38 36 106 117 71 64 45Mes 5 102 116 74 69 41 41 97 72 74 41 74 55 46 39 37 107 118 72 65 46Mes 6 103 117 75 70 42 42 98 73 75 42 75 56 47 40 38 108 119 73 66 47Mes 7 113 127 85 80 52 52 108 83 85 52 85 66 57 50 48 118 129 83 76 57Mes 8 112 126 84 79 51 51 107 82 84 51 84 65 56 49 47 117 128 82 75 56Mes 9 112 126 84 79 51 51 107 82 84 51 84 65 56 49 47 117 128 82 75 56Mes 10 111 125 83 78 50 50 106 81 83 50 83 64 55 48 46 116 127 81 74 55Mes 11 112 126 84 79 51 51 107 82 84 51 84 65 56 49 47 117 128 82 75 56Mes 12 116 130 88 83 55 55 111 86 88 55 88 69 60 53 51 121 132 86 79 60

Tienda 32 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 12 14 0 12 12 12 23 26 24 19 28 12 17 17 16 16 16 0 9 16Mes 2 11 13 0 11 11 11 22 25 23 18 27 11 16 16 15 15 15 0 8 15Mes 3 10 12 0 10 10 10 21 24 22 17 26 10 15 15 14 14 14 0 7 14Mes 4 10 12 0 10 10 10 21 24 22 17 26 10 15 15 14 14 14 0 7 14Mes 5 11 13 1 11 11 11 22 25 23 18 27 11 16 16 15 15 15 1 8 15Mes 6 12 14 2 12 12 12 23 26 24 19 28 12 17 17 16 16 16 2 9 16Mes 7 15 17 2 15 15 15 26 29 27 22 31 15 20 20 19 19 19 2 12 19Mes 8 14 16 1 14 14 14 25 28 26 21 30 14 19 19 18 18 18 1 11 18Mes 9 14 16 1 14 14 14 25 28 26 21 30 14 19 19 18 18 18 1 11 18Mes 10 13 15 0 13 13 13 24 27 25 20 29 13 18 18 17 17 17 0 10 17Mes 11 14 16 0 14 14 14 25 28 26 21 30 14 19 19 18 18 18 0 11 18Mes 12 19 21 5 19 19 19 30 33 31 26 35 19 24 24 23 23 23 5 16 23

Tienda 33 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 27 10 15 13 10 15 13 6 10 10 10 6 8 8 6 31 13 13 8 15Mes 2 26 9 14 12 9 14 12 5 9 9 9 5 7 7 5 30 12 12 7 14Mes 3 23 6 11 9 6 11 9 2 6 6 6 2 4 4 2 27 9 9 4 11Mes 4 23 6 11 9 6 11 9 2 6 6 6 2 4 4 2 27 9 9 4 11Mes 5 24 7 12 10 7 12 10 3 7 7 7 3 5 5 3 28 10 10 5 12Mes 6 25 8 13 11 8 13 11 4 8 8 8 4 6 6 4 29 11 11 6 13Mes 7 24 7 12 10 7 12 10 3 7 7 7 3 5 5 3 28 10 10 5 12Mes 8 33 16 21 19 16 21 19 12 16 16 16 12 14 14 12 37 19 19 14 21Mes 9 32 15 20 18 15 20 18 11 15 15 15 11 13 13 11 36 18 18 13 20Mes 10 33 16 21 19 16 21 19 12 16 16 16 12 14 14 12 37 19 19 14 21Mes 11 33 16 21 19 16 21 19 12 16 16 16 12 14 14 12 37 19 19 14 21Mes 12 37 20 25 23 20 25 23 16 20 20 20 16 18 18 16 41 23 23 18 25D ANUAL 1462 609 853 731 609 853 731 365 609 609 609 365 487 487 365 1705 731 731 487 853

Page 98: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

98 

 

Tienda 34 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 19 17 17 16 12 10 17 9 9 9 16 9 10 7 5 23 19 16 12 16Mes 2 18 16 16 15 11 9 16 8 8 8 15 8 9 6 4 22 18 15 11 15Mes 3 15 13 13 12 8 6 13 5 5 5 12 5 6 3 1 19 15 12 8 12Mes 4 14 12 12 11 7 5 12 4 4 4 11 4 5 2 0 18 14 11 7 11Mes 5 15 13 13 12 8 6 13 5 5 5 12 5 6 3 1 19 15 12 8 12Mes 6 16 14 14 13 9 7 14 6 6 6 13 6 7 4 2 20 16 13 9 13Mes 7 17 15 15 14 10 8 15 7 7 7 14 7 8 5 3 21 17 14 10 14Mes 8 18 16 16 15 11 9 16 8 8 8 15 8 9 6 4 22 18 15 11 15Mes 9 21 19 19 18 14 12 19 11 11 11 18 11 12 9 7 25 21 18 14 18Mes 10 20 18 18 17 13 11 18 10 10 10 17 10 11 8 6 24 20 17 13 17Mes 11 21 19 19 18 14 12 19 11 11 11 18 11 12 9 7 25 21 18 14 18Mes 12 26 24 24 23 19 17 24 16 16 16 23 16 17 14 12 30 26 23 19 23D ANUAL 957 866 866 774 592 500 866 409 409 409 774 409 500 318 226 1140 957 774 592 774

Tienda 35 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 26 19 21 17 3 10 5 12 3 3 10 10 7 0 0 31 21 19 12 7Mes 2 25 18 20 16 2 9 4 11 2 2 9 9 6 0 0 30 20 18 11 6Mes 3 24 17 19 15 1 8 3 10 1 1 8 8 5 0 0 29 19 17 10 5Mes 4 24 17 19 15 1 8 3 10 1 1 8 8 5 0 0 29 19 17 10 5Mes 5 25 18 20 16 2 9 4 11 2 2 9 9 6 1 1 30 20 18 11 6Mes 6 26 19 21 17 3 10 5 12 3 3 10 10 7 2 2 31 21 19 12 7Mes 7 29 22 24 20 6 13 8 15 6 6 13 13 10 3 2 34 24 22 15 10Mes 8 28 21 23 19 5 12 7 14 5 5 12 12 9 2 1 33 23 21 14 9Mes 9 28 21 23 19 5 12 7 14 5 5 12 12 9 2 1 33 23 21 14 9Mes 10 27 20 22 18 4 11 6 13 4 4 11 11 8 1 0 32 22 20 13 8Mes 11 28 21 23 19 5 12 7 14 5 5 12 12 9 2 0 33 23 21 14 9Mes 12 35 28 30 26 12 19 14 21 12 12 19 19 16 9 7 40 30 28 21 16D ANUAL 1414 1048 1170 927 196 561 318 683 196 196 561 561 439 106 61 1657 1170 1048 683 439

Page 99: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

99 

 

Tienda 36 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 10 7 16 7 5 7 14 9 9 5 12 10 0 3 2 14 9 14 3 9Mes 2 9 6 15 6 4 6 13 8 8 4 11 9 0 2 1 13 8 13 2 8Mes 3 8 5 14 5 3 5 12 7 7 3 10 8 0 1 0 12 7 12 1 7Mes 4 7 4 13 4 2 4 11 6 6 2 9 7 0 0 0 11 6 11 0 6Mes 5 8 5 14 5 3 5 12 7 7 3 10 8 1 1 1 12 7 12 1 7Mes 6 6 3 12 3 1 3 10 5 5 1 8 6 0 0 0 10 5 10 0 5Mes 7 13 10 19 10 8 10 17 12 12 8 15 13 3 6 5 17 12 17 6 12Mes 8 12 9 18 9 7 9 16 11 11 7 14 12 2 5 4 16 11 16 5 11Mes 9 12 9 18 9 7 9 16 11 11 7 14 12 2 5 4 16 11 16 5 11Mes 10 11 8 17 8 6 8 15 10 10 6 13 11 1 4 3 15 10 15 4 10Mes 11 12 9 18 9 7 9 16 11 11 7 14 12 2 5 4 16 11 16 5 11Mes 12 15 12 21 12 10 12 19 14 14 10 17 15 5 8 7 19 14 19 8 14D ANUAL 548 365 822 365 274 365 731 457 457 274 639 548 62 186 117 731 457 731 186 457

Tienda 37 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 9 14 16 14 10 14 12 7 7 3 12 3 3 2 0 12 16 14 10 14Mes 2 8 13 15 13 9 13 11 6 6 2 11 2 2 1 0 11 15 13 9 13Mes 3 7 12 14 12 8 12 10 5 5 1 10 1 1 0 0 10 14 12 8 12Mes 4 7 12 14 12 8 12 10 5 5 1 10 1 1 0 0 10 14 12 8 12Mes 5 8 13 15 13 9 13 11 6 6 2 11 2 2 1 1 11 15 13 9 13Mes 6 9 14 16 14 10 14 12 7 7 3 12 3 3 2 2 12 16 14 10 14Mes 7 12 17 19 17 13 17 15 10 10 6 15 6 6 5 3 15 19 17 13 17Mes 8 11 16 18 16 12 16 14 9 9 5 14 5 5 4 2 14 18 16 12 16Mes 9 11 16 18 16 12 16 14 9 9 5 14 5 5 4 2 14 18 16 12 16Mes 10 10 15 17 15 11 15 13 8 8 4 13 4 4 3 1 13 17 15 11 15Mes 11 11 16 18 16 12 16 14 9 9 5 14 5 5 4 2 14 18 16 12 16Mes 12 18 23 25 23 19 23 21 16 16 12 21 12 12 11 9 21 25 23 19 23

Tienda 38 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 5 5 8 5 8 38 6 3 5 3 11 5 5 2 1 7 6 7 3 10Mes 2 4 4 7 4 7 37 5 2 4 2 10 4 4 1 0 6 5 6 2 9Mes 3 3 3 6 3 6 36 4 1 3 1 9 3 3 0 0 5 4 5 1 8Mes 4 3 3 6 3 6 36 4 1 3 1 9 3 3 0 0 5 4 5 1 8Mes 5 4 4 7 4 7 37 5 2 4 2 10 4 4 1 1 6 5 6 2 9Mes 6 5 5 8 5 8 38 6 3 5 3 11 5 5 2 2 7 6 7 3 10Mes 7 8 8 11 8 11 41 9 6 8 6 14 8 8 5 4 10 9 10 6 13Mes 8 7 7 10 7 10 40 8 5 7 5 13 7 7 4 3 9 8 9 5 12Mes 9 7 7 10 7 10 40 8 5 7 5 13 7 7 4 3 9 8 9 5 12Mes 10 6 6 9 6 9 39 7 4 6 4 12 6 6 3 2 8 7 8 4 11Mes 11 7 7 10 7 10 40 8 5 7 5 13 7 7 4 3 9 8 9 5 12Mes 12 12 12 15 12 15 45 13 10 12 10 18 12 12 9 8 14 13 14 10 17

Page 100: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

100 

 

Tienda 39 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 10 14 7 5 7 14 9 3 7 5 14 9 7 3 2 14 16 5 2 10Mes 2 9 13 6 4 6 13 8 2 6 4 13 8 6 2 1 13 15 4 1 9Mes 3 7 11 4 2 4 11 6 0 4 2 11 6 4 0 0 11 13 2 0 7Mes 4 6 10 3 1 3 10 5 0 3 1 10 5 3 0 0 10 12 1 0 6Mes 5 7 11 4 2 4 11 6 1 4 2 11 6 4 1 1 11 13 2 1 7Mes 6 8 12 5 3 5 12 7 2 5 3 12 7 5 2 2 12 14 3 2 8Mes 7 13 17 10 8 10 17 12 6 10 8 17 12 10 6 5 17 19 8 5 13Mes 8 12 16 9 7 9 16 11 5 9 7 16 11 9 5 4 16 18 7 4 12Mes 9 12 16 9 7 9 16 11 5 9 7 16 11 9 5 4 16 18 7 4 12Mes 10 11 15 8 6 8 15 10 4 8 6 15 10 8 4 3 15 17 6 3 11Mes 11 12 16 9 7 9 16 11 5 9 7 16 11 9 5 4 16 18 7 4 12Mes 12 17 21 14 12 14 21 16 10 14 12 21 16 14 10 9 21 23 12 9 17

Tienda 40 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 9 7 7 6 6 5 3 6 3 5 8 10 1 4 3 11 8 6 4 8Mes 2 8 6 6 5 5 4 2 5 2 4 7 9 0 3 2 10 7 5 3 7Mes 3 7 5 5 4 4 3 1 4 1 3 6 8 0 2 1 9 6 4 2 6Mes 4 7 5 5 4 4 3 1 4 1 3 6 8 0 2 1 9 6 4 2 6Mes 5 8 6 6 5 5 4 2 5 2 4 7 9 1 3 2 10 7 5 3 7Mes 6 9 7 7 6 6 5 3 6 3 5 8 10 2 4 3 11 8 6 4 8Mes 7 12 10 10 9 9 8 6 9 6 8 11 13 4 7 6 14 11 9 7 11Mes 8 11 9 9 8 8 7 5 8 5 7 10 12 3 6 5 13 10 8 6 10Mes 9 11 9 9 8 8 7 5 8 5 7 10 12 3 6 5 13 10 8 6 10Mes 10 10 8 8 7 7 6 4 7 4 6 9 11 2 5 4 12 9 7 5 9Mes 11 11 9 9 8 8 7 5 8 5 7 10 12 3 6 5 13 10 8 6 10Mes 12 15 13 13 12 12 11 9 12 9 11 14 16 7 10 9 17 14 12 10 14

Tienda 41 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 12 5 7 5 3 2 12 10 5 9 12 10 7 7 5 16 7 5 2 7Mes 2 11 4 6 4 2 1 11 9 4 8 11 9 6 6 4 15 6 4 1 6Mes 3 10 3 5 3 1 0 10 8 3 7 10 8 5 5 3 14 5 3 0 5Mes 4 10 3 5 3 1 0 10 8 3 7 10 8 5 5 3 14 5 3 0 5Mes 5 11 4 6 4 2 1 11 9 4 8 11 9 6 6 4 15 6 4 1 6Mes 6 12 5 7 5 3 2 12 10 5 9 12 10 7 7 5 16 7 5 2 7Mes 7 15 8 10 8 6 5 15 13 8 12 15 13 10 10 8 19 10 8 5 10Mes 8 14 7 9 7 5 4 14 12 7 11 14 12 9 9 7 18 9 7 4 9Mes 9 14 7 9 7 5 4 14 12 7 11 14 12 9 9 7 18 9 7 4 9Mes 10 13 6 8 6 4 3 13 11 6 10 13 11 8 8 6 17 8 6 3 8Mes 11 14 7 9 7 5 4 14 12 7 11 14 12 9 9 7 18 9 7 4 9Mes 12 21 14 16 14 12 11 21 19 14 18 21 19 16 16 14 25 16 14 11 16

Page 101: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

101 

 

Tienda 42 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 10 7 10 7 7 3 12 14 2 14 7 7 7 12 10 14 9 9 3 10Mes 2 9 6 9 6 6 2 11 13 1 13 6 6 6 11 9 13 8 8 2 9Mes 3 8 5 8 5 5 1 10 12 0 12 5 5 5 10 8 12 7 7 1 8Mes 4 8 5 8 5 5 1 10 12 0 12 5 5 5 10 8 12 7 7 1 8Mes 5 9 6 9 6 6 2 11 13 1 13 6 6 6 11 9 13 8 8 2 9Mes 6 10 7 10 7 7 3 12 14 2 14 7 7 7 12 10 14 9 9 3 10Mes 7 13 10 13 10 10 6 15 17 5 17 10 10 10 15 13 17 12 12 6 13Mes 8 12 9 12 9 9 5 14 16 4 16 9 9 9 14 12 16 11 11 5 12Mes 9 12 9 12 9 9 5 14 16 4 16 9 9 9 14 12 16 11 11 5 12Mes 10 11 8 11 8 8 4 13 15 3 15 8 8 8 13 11 15 10 10 4 11Mes 11 12 9 12 9 9 5 14 16 4 16 9 9 9 14 12 16 11 11 5 12Mes 12 17 14 17 14 14 10 19 21 9 21 14 14 14 19 17 21 16 16 10 17

Tienda 43 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 7 7 9 4 6 6 3 2 4 2 6 4 0 1 0 9 8 8 2 8Mes 2 6 6 8 3 5 5 2 1 3 1 5 3 0 0 0 8 7 7 1 7Mes 3 5 5 7 2 4 4 1 0 2 0 4 2 0 0 0 7 6 6 0 6Mes 4 5 5 7 2 4 4 1 0 2 0 4 2 0 0 0 7 6 6 0 6Mes 5 6 6 8 3 5 5 2 1 3 1 5 3 1 1 1 8 7 7 1 7Mes 6 7 7 9 4 6 6 3 2 4 2 6 4 2 2 2 9 8 8 2 8Mes 7 10 10 12 7 9 9 6 5 7 5 9 7 3 4 3 12 11 11 5 11Mes 8 9 9 11 6 8 8 5 4 6 4 8 6 2 3 2 11 10 10 4 10Mes 9 9 9 11 6 8 8 5 4 6 4 8 6 2 3 2 11 10 10 4 10Mes 10 8 8 10 5 7 7 4 3 5 3 7 5 1 2 1 10 9 9 3 9Mes 11 9 9 11 6 8 8 5 4 6 4 8 6 2 3 2 11 10 10 4 10Mes 12 15 15 17 12 14 14 11 10 12 10 14 12 8 9 8 17 16 16 10 16

Tienda 44 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 7 5 6 3 1 3 5 4 5 4 2 7 4 3 2 9 6 5 1 3Mes 2 6 4 5 2 0 2 4 3 4 3 1 6 3 2 1 8 5 4 0 2Mes 3 5 3 4 1 0 1 3 2 3 2 0 5 2 1 0 7 4 3 0 1Mes 4 5 3 4 1 0 1 3 2 3 2 0 5 2 1 0 7 4 3 0 1Mes 5 6 4 5 2 1 2 4 3 4 3 1 6 3 2 1 8 5 4 1 2Mes 6 7 5 6 3 2 3 5 4 5 4 2 7 4 3 2 9 6 5 2 3Mes 7 10 8 9 6 4 6 8 7 8 7 5 10 7 6 5 12 9 8 4 6Mes 8 9 7 8 5 3 5 7 6 7 6 4 9 6 5 4 11 8 7 3 5Mes 9 9 7 8 5 3 5 7 6 7 6 4 9 6 5 4 11 8 7 3 5Mes 10 8 6 7 4 2 4 6 5 6 5 3 8 5 4 3 10 7 6 2 4Mes 11 9 7 8 5 3 5 7 6 7 6 4 9 6 5 4 11 8 7 3 5Mes 12 13 11 12 9 7 9 11 10 11 10 8 13 10 9 8 15 12 11 7 9D ANUAL 409 305 357 200 113 200 305 252 305 252 148 409 252 200 148 513 357 305 113 200

Page 102: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

102 

 

Tienda 45 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 5 4 6 4 5 4 6 4 2 2 3 2 2 1 0 7 5 5 2 7Mes 2 4 3 5 3 4 3 5 3 1 1 2 1 1 0 0 6 4 4 1 6Mes 3 3 2 4 2 3 2 4 2 0 0 1 0 0 0 0 5 3 3 0 5Mes 4 3 2 4 2 3 2 4 2 0 0 1 0 0 0 0 5 3 3 0 5Mes 5 4 3 5 3 4 3 5 3 1 1 2 1 1 1 1 6 4 4 1 6Mes 6 5 4 6 4 5 4 6 4 2 2 3 2 2 2 2 7 5 5 2 7Mes 7 8 7 9 7 8 7 9 7 5 5 6 5 5 4 3 10 8 8 5 10Mes 8 7 6 8 6 7 6 8 6 4 4 5 4 4 3 2 9 7 7 4 9Mes 9 7 6 8 6 7 6 8 6 4 4 5 4 4 3 2 9 7 7 4 9Mes 10 6 5 7 5 6 5 7 5 3 3 4 3 3 2 1 8 6 6 3 8Mes 11 7 6 8 6 7 6 8 6 4 4 5 4 4 3 2 9 7 7 4 9Mes 12 12 11 13 11 12 11 13 11 9 9 10 9 9 8 7 14 12 12 9 14

Tienda 46 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 102 116 74 69 41 41 97 71 74 41 74 55 46 39 36 106 118 71 64 46Mes 2 99 113 71 66 38 38 94 68 71 38 71 52 43 36 33 103 115 68 61 43Mes 3 98 112 70 65 37 37 93 67 70 37 70 51 42 35 32 102 114 67 60 42Mes 4 100 114 72 67 39 39 95 69 72 39 72 53 44 37 34 104 116 69 62 44Mes 5 101 115 73 68 40 40 96 70 73 40 73 54 45 38 35 105 117 70 63 45Mes 6 102 116 74 69 41 41 97 71 74 41 74 55 46 39 36 106 118 71 64 46Mes 7 111 125 83 78 50 50 106 80 83 50 83 64 55 48 45 115 127 80 73 55Mes 8 110 124 82 77 49 49 105 79 82 49 82 63 54 47 44 114 126 79 72 54Mes 9 110 124 82 77 49 49 105 79 82 49 82 63 54 47 44 114 126 79 72 54Mes 10 109 123 81 76 48 48 104 78 81 48 81 62 53 46 43 113 125 78 71 53Mes 11 110 124 82 77 49 49 105 79 82 49 82 63 54 47 44 114 126 79 72 54Mes 12 112 126 84 79 51 51 107 81 84 51 84 65 56 49 46 116 128 81 74 56

Tienda 47 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 4 6 0 4 4 4 15 18 17 11 20 4 10 10 8 8 8 0 1 8Mes 2 1 3 0 1 1 1 12 15 14 8 17 1 7 7 5 5 5 0 0 5Mes 3 0 2 0 0 0 0 11 14 13 7 16 0 6 6 4 4 4 0 0 4Mes 4 2 4 2 2 2 2 13 16 15 9 18 2 8 8 6 6 6 0 2 6Mes 5 3 5 3 3 3 3 14 17 16 10 19 3 9 9 7 7 7 1 3 7Mes 6 4 6 4 4 4 4 15 18 17 11 20 4 10 10 8 8 8 2 4 8Mes 7 13 15 2 13 13 13 24 27 26 20 29 13 19 19 17 17 17 2 10 17Mes 8 12 14 1 12 12 12 23 26 25 19 28 12 18 18 16 16 16 1 9 16Mes 9 12 14 1 12 12 12 23 26 25 19 28 12 18 18 16 16 16 1 9 16Mes 10 11 13 0 11 11 11 22 25 24 18 27 11 17 17 15 15 15 0 8 15Mes 11 12 14 0 12 12 12 23 26 25 19 28 12 18 18 16 16 16 0 9 16Mes 12 16 17 3 15 15 15 26 29 28 22 31 15 21 21 19 19 19 3 12 19

Page 103: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

103 

 

Tienda 48 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 28 12 17 14 12 17 14 7 12 12 12 7 10 10 7 33 14 14 10 17Mes 2 27 11 16 13 11 16 13 6 11 11 11 6 9 9 6 32 13 13 9 16Mes 3 26 10 15 12 10 15 12 5 10 10 10 5 8 8 5 31 12 12 8 15Mes 4 26 10 15 12 10 15 12 5 10 10 10 5 8 8 5 31 12 12 8 15Mes 5 27 11 16 13 11 16 13 6 11 11 11 6 9 9 6 32 13 13 9 16Mes 6 28 12 17 14 12 17 14 7 12 12 12 7 10 10 7 33 14 14 10 17Mes 7 31 15 20 17 15 20 17 10 15 15 15 10 13 13 10 36 17 17 13 20Mes 8 30 14 19 16 14 19 16 9 14 14 14 9 12 12 9 35 16 16 12 19Mes 9 30 14 19 16 14 19 16 9 14 14 14 9 12 12 9 35 16 16 12 19Mes 10 29 13 18 15 13 18 15 8 13 13 13 8 11 11 8 34 15 15 11 18Mes 11 30 14 19 16 14 19 16 9 14 14 14 9 12 12 9 35 16 16 12 19Mes 12 37 21 26 23 21 26 23 16 21 21 21 16 19 19 16 42 23 23 19 26

Tienda 49 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 17 16 16 14 10 9 16 7 7 7 14 7 9 5 3 21 17 14 10 14Mes 2 16 15 15 13 9 8 15 6 6 6 13 6 8 4 2 20 16 13 9 13Mes 3 15 14 14 12 8 7 14 5 5 5 12 5 7 3 1 19 15 12 8 12Mes 4 15 14 14 12 8 7 14 5 5 5 12 5 7 3 1 19 15 12 8 12Mes 5 16 15 15 13 9 8 15 6 6 6 13 6 8 4 2 20 16 13 9 13Mes 6 17 16 16 14 10 9 16 7 7 7 14 7 9 5 3 21 17 14 10 14Mes 7 20 19 19 17 13 12 19 10 10 10 17 10 12 8 6 24 20 17 13 17Mes 8 19 18 18 16 12 11 18 9 9 9 16 9 11 7 5 23 19 16 12 16Mes 9 19 18 18 16 12 11 18 9 9 9 16 9 11 7 5 23 19 16 12 16Mes 10 18 17 17 15 11 10 17 8 8 8 15 8 10 6 4 22 18 15 11 15Mes 11 19 18 18 16 12 11 18 9 9 9 16 9 11 7 5 23 19 16 12 16Mes 12 24 23 23 21 17 16 23 14 14 14 21 14 16 12 10 28 24 21 17 21

Tienda 50 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 23 16 18 13 0 6 2 9 0 0 6 6 4 0 0 27 18 16 9 4Mes 2 22 15 17 12 0 5 1 8 0 0 5 5 3 0 0 26 17 15 8 3Mes 3 21 14 16 11 0 4 0 7 0 0 4 4 2 0 0 25 16 14 7 2Mes 4 21 14 16 11 0 4 0 7 0 0 4 4 2 0 0 25 16 14 7 2Mes 5 22 15 17 12 1 5 1 8 1 1 5 5 3 0 1 26 17 15 8 3Mes 6 23 16 18 13 2 6 2 9 2 2 6 6 4 0 2 27 18 16 9 4Mes 7 25 18 20 15 1 8 4 11 1 1 8 8 6 0 0 29 20 18 11 6Mes 8 26 19 21 16 2 9 5 12 2 2 9 9 7 0 0 30 21 19 12 7Mes 9 26 19 21 16 2 9 5 12 2 2 9 9 7 0 0 30 21 19 12 7Mes 10 25 18 20 15 1 8 4 11 1 1 8 8 6 0 0 29 20 18 11 6Mes 11 26 19 21 16 2 9 5 12 2 2 9 9 7 0 0 30 21 19 12 7Mes 12 30 23 25 20 6 13 9 16 6 6 13 13 11 4 4 34 25 23 16 11

Page 104: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

104 

 

Tienda 51 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 9 5 14 5 3 5 12 7 7 3 10 9 0 2 0 12 7 12 2 7Mes 2 8 4 13 4 2 4 11 6 6 2 9 8 0 1 0 11 6 11 1 6Mes 3 7 3 12 3 1 3 10 5 5 1 8 7 0 0 0 10 5 10 0 5Mes 4 7 3 12 3 1 3 10 5 5 1 8 7 0 0 0 10 5 10 0 5Mes 5 8 4 13 4 2 4 11 6 6 2 9 8 1 1 1 11 6 11 1 6Mes 6 9 5 14 5 3 5 12 7 7 3 10 9 2 2 2 12 7 12 2 7Mes 7 12 8 17 8 6 8 15 10 10 6 13 12 2 5 3 15 10 15 5 10Mes 8 11 7 16 7 5 7 14 9 9 5 12 11 1 4 2 14 9 14 4 9Mes 9 11 7 16 7 5 7 14 9 9 5 12 11 1 4 2 14 9 14 4 9Mes 10 10 6 15 6 4 6 13 8 8 4 11 10 0 3 1 13 8 13 3 8Mes 11 11 7 16 7 5 7 14 9 9 5 12 11 0 4 2 14 9 14 4 9Mes 12 20 16 25 16 14 16 23 18 18 14 21 20 9 13 11 23 18 23 13 18

Tienda 52 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 7 12 14 12 9 12 10 5 5 2 10 2 2 0 0 10 14 12 9 12Mes 2 6 11 13 11 8 11 9 4 4 1 9 1 1 0 0 9 13 11 8 11Mes 3 5 10 12 10 7 10 8 3 3 0 8 0 0 0 0 8 12 10 7 10Mes 4 5 10 12 10 7 10 8 3 3 0 8 0 0 0 0 8 12 10 7 10Mes 5 6 11 13 11 8 11 9 4 4 1 9 1 1 1 1 9 13 11 8 11Mes 6 7 12 14 12 9 12 10 5 5 2 10 2 2 2 2 10 14 12 9 12Mes 7 10 15 17 15 12 15 13 8 8 5 13 5 5 3 2 13 17 15 12 15Mes 8 9 14 16 14 11 14 12 7 7 4 12 4 4 2 1 12 16 14 11 14Mes 9 9 14 16 14 11 14 12 7 7 4 12 4 4 2 1 12 16 14 11 14Mes 10 8 13 15 13 10 13 11 6 6 3 11 3 3 1 0 11 15 13 10 13Mes 11 9 14 16 14 11 14 12 7 7 4 12 4 4 2 0 12 16 14 11 14Mes 12 14 19 21 19 16 19 17 12 12 9 17 9 9 7 5 17 21 19 16 19

Tienda 53 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 4 4 7 4 7 37 5 2 4 2 10 4 4 1 0 6 5 6 2 9Mes 2 3 3 6 3 6 36 4 1 3 1 9 3 3 0 0 5 4 5 1 8Mes 3 2 2 5 2 5 35 3 0 2 0 8 2 2 0 0 4 3 4 0 7Mes 4 2 2 5 2 5 35 3 0 2 0 8 2 2 0 0 4 3 4 0 7Mes 5 3 3 6 3 6 36 4 1 3 1 9 3 3 1 1 5 4 5 1 8Mes 6 4 4 7 4 7 37 5 2 4 2 10 4 4 2 2 6 5 6 2 9Mes 7 7 7 10 7 10 40 8 5 7 5 13 7 7 4 3 9 8 9 5 12Mes 8 6 6 9 6 9 39 7 4 6 4 12 6 6 3 2 8 7 8 4 11Mes 9 6 6 9 6 9 39 7 4 6 4 12 6 6 3 2 8 7 8 4 11Mes 10 5 5 8 5 8 38 6 3 5 3 11 5 5 2 1 7 6 7 3 10Mes 11 6 6 9 6 9 39 7 4 6 4 12 6 6 3 2 8 7 8 4 11Mes 12 10 10 13 10 13 43 11 8 10 8 16 10 10 7 6 12 11 12 8 15

Page 105: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

105 

 

Tienda 54 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 9 12 5 3 5 12 7 2 5 3 12 7 5 2 0 12 14 3 0 9Mes 2 8 11 4 2 4 11 6 1 4 2 11 6 4 1 0 11 13 2 0 8Mes 3 7 10 3 1 3 10 5 0 3 1 10 5 3 0 0 10 12 1 0 7Mes 4 7 10 3 1 3 10 5 0 3 1 10 5 3 0 0 10 12 1 0 7Mes 5 8 11 4 2 4 11 6 1 4 2 11 6 4 1 1 11 13 2 1 8Mes 6 9 12 5 3 5 12 7 2 5 3 12 7 5 2 2 12 14 3 2 9Mes 7 12 15 8 6 8 15 10 5 8 6 15 10 8 5 3 15 17 6 3 12Mes 8 11 14 7 5 7 14 9 4 7 5 14 9 7 4 2 14 16 5 2 11Mes 9 11 14 7 5 7 14 9 4 7 5 14 9 7 4 2 14 16 5 2 11Mes 10 10 13 6 4 6 13 8 3 6 4 13 8 6 3 1 13 15 4 1 10Mes 11 11 14 7 5 7 14 9 4 7 5 14 9 7 4 2 14 16 5 2 11Mes 12 16 19 12 10 12 19 14 9 12 10 19 14 12 9 7 19 21 10 7 16

Tienda 55 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 9 7 7 6 6 5 3 6 3 5 8 10 1 4 3 11 8 6 4 8Mes 2 8 6 6 5 5 4 2 5 2 4 7 9 0 3 2 10 7 5 3 7Mes 3 7 5 5 4 4 3 1 4 1 3 6 8 0 2 1 9 6 4 2 6Mes 4 7 5 5 4 4 3 1 4 1 3 6 8 0 2 1 9 6 4 2 6Mes 5 8 6 6 5 5 4 2 5 2 4 7 9 1 3 2 10 7 5 3 7Mes 6 9 7 7 6 6 5 3 6 3 5 8 10 2 4 3 11 8 6 4 8Mes 7 11 9 9 8 8 7 5 8 5 7 10 12 3 6 5 13 10 8 6 10Mes 8 10 8 8 7 7 6 4 7 4 6 9 11 2 5 4 12 9 7 5 9Mes 9 10 8 8 7 7 6 4 7 4 6 9 11 2 5 4 12 9 7 5 9Mes 10 9 7 7 6 6 5 3 6 3 5 8 10 1 4 3 11 8 6 4 8Mes 11 10 8 8 7 7 6 4 7 4 6 9 11 2 5 4 12 9 7 5 9Mes 12 13 11 11 10 10 9 7 10 7 9 12 14 5 8 7 15 12 10 8 12

Page 106: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

106 

 

Tienda 56 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 11 4 6 4 3 1 11 10 4 8 11 10 6 6 4 15 6 4 1 6Mes 2 10 3 5 3 2 0 10 9 3 7 10 9 5 5 3 14 5 3 0 5Mes 3 9 2 4 2 1 0 9 8 2 6 9 8 4 4 2 13 4 2 0 4Mes 4 9 2 4 2 1 0 9 8 2 6 9 8 4 4 2 13 4 2 0 4Mes 5 10 3 5 3 2 1 10 9 3 7 10 9 5 5 3 14 5 3 1 5Mes 6 11 4 6 4 3 2 11 10 4 8 11 10 6 6 4 15 6 4 2 6Mes 7 13 6 8 6 5 3 13 12 6 10 13 12 8 8 6 17 8 6 3 8Mes 8 12 5 7 5 4 2 12 11 5 9 12 11 7 7 5 16 7 5 2 7Mes 9 12 5 7 5 4 2 12 11 5 9 12 11 7 7 5 16 7 5 2 7Mes 10 11 4 6 4 3 1 11 10 4 8 11 10 6 6 4 15 6 4 1 6Mes 11 12 5 7 5 4 2 12 11 5 9 12 11 7 7 5 16 7 5 2 7Mes 12 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

Tienda 57 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 9 5 9 5 5 2 10 12 0 12 5 5 5 10 9 12 7 7 2 9Mes 2 8 4 8 4 4 1 9 11 0 11 4 4 4 9 8 11 6 6 1 8Mes 3 7 3 7 3 3 0 8 10 0 10 3 3 3 8 7 10 5 5 0 7Mes 4 7 3 7 3 3 0 8 10 0 10 3 3 3 8 7 10 5 5 0 7Mes 5 6 2 6 2 2 0 7 9 0 9 2 2 2 7 6 9 4 4 0 6Mes 6 7 3 7 3 3 1 8 10 1 10 3 3 3 8 7 10 5 5 1 7Mes 7 12 8 12 8 8 5 13 15 3 15 8 8 8 13 12 15 10 10 5 12Mes 8 11 7 11 7 7 4 12 14 2 14 7 7 7 12 11 14 9 9 4 11Mes 9 11 7 11 7 7 4 12 14 2 14 7 7 7 12 11 14 9 9 4 11Mes 10 10 6 10 6 6 3 11 13 1 13 6 6 6 11 10 13 8 8 3 10Mes 11 11 7 11 7 7 4 12 14 2 14 7 7 7 12 11 14 9 9 4 11Mes 12 15 11 15 11 11 8 16 18 6 18 11 11 11 16 15 18 13 13 8 15

Page 107: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

107 

 

Tienda 58 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 7 7 9 4 6 6 3 2 4 2 6 4 0 1 0 9 8 8 2 8Mes 2 6 6 8 3 5 5 2 1 3 1 5 3 0 0 0 8 7 7 1 7Mes 3 5 5 7 2 4 4 1 0 2 0 4 2 0 0 0 7 6 6 0 6Mes 4 5 5 7 2 4 4 1 0 2 0 4 2 0 0 0 7 6 6 0 6Mes 5 6 6 8 3 5 5 2 1 3 1 5 3 1 1 1 8 7 7 1 7Mes 6 7 7 9 4 6 6 3 2 4 2 6 4 2 2 2 9 8 8 2 8Mes 7 9 9 11 6 8 8 5 4 6 4 8 6 2 3 2 11 10 10 4 10Mes 8 8 8 10 5 7 7 4 3 5 3 7 5 1 2 1 10 9 9 3 9Mes 9 8 8 10 5 7 7 4 3 5 3 7 5 1 2 1 10 9 9 3 9Mes 10 7 7 9 4 6 6 3 2 4 2 6 4 0 1 0 9 8 8 2 8Mes 11 8 8 10 5 7 7 4 3 5 3 7 5 1 2 1 10 9 9 3 9Mes 12 13 13 15 10 12 12 9 8 10 8 12 10 6 7 6 15 14 14 8 14

Tienda 59 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 5 3 4 1 2 1 3 2 3 2 0 5 2 1 0 7 4 3 2 1Mes 2 4 2 3 0 1 0 2 1 2 1 2 4 1 0 2 6 3 2 1 0Mes 3 3 1 2 2 0 1 1 0 1 0 1 3 0 2 1 5 2 1 0 2Mes 4 3 1 2 2 0 1 1 0 1 0 1 3 0 2 1 5 2 1 0 2Mes 5 4 2 3 3 1 2 2 1 2 1 2 4 1 3 2 6 3 2 1 3Mes 6 5 3 4 4 2 3 3 2 3 2 3 5 2 4 3 7 4 3 2 4Mes 7 9 7 8 5 3 5 7 6 7 6 4 9 6 5 4 11 8 7 3 5Mes 8 8 6 7 4 2 4 6 5 6 5 3 8 5 4 3 10 7 6 2 4Mes 9 8 6 7 4 2 4 6 5 6 5 3 8 5 4 3 10 7 6 2 4Mes 10 7 5 6 3 1 3 5 4 5 4 2 7 4 3 2 9 6 5 1 3Mes 11 8 6 7 4 2 4 6 5 6 5 3 8 5 4 3 10 7 6 2 4Mes 12 11 9 10 7 5 7 9 8 9 8 6 11 8 7 6 13 10 9 5 7

Tienda 60 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 3 2 4 2 3 2 4 2 0 0 1 0 0 1 1 5 3 3 0 5Mes 2 2 1 3 1 2 1 3 1 1 1 0 1 1 1 0 4 2 2 2 4Mes 3 1 0 2 0 1 0 2 0 0 0 1 0 1 0 2 3 1 1 1 3Mes 4 1 0 2 0 1 0 2 0 0 0 1 0 1 0 2 3 1 1 1 3Mes 5 2 1 3 1 2 1 3 1 1 1 2 1 2 1 3 4 2 2 2 4Mes 6 3 2 4 2 3 2 4 2 2 2 3 2 3 2 4 5 3 3 3 5Mes 7 7 6 8 6 7 6 8 6 4 4 5 4 4 3 2 9 7 7 4 9Mes 8 6 5 7 5 6 5 7 5 3 3 4 3 3 2 1 8 6 6 3 8Mes 9 6 5 7 5 6 5 7 5 3 3 4 3 3 2 1 8 6 6 3 8Mes 10 5 4 6 4 5 4 6 4 2 2 3 2 2 1 0 7 5 5 2 7Mes 11 6 5 7 5 6 5 7 5 3 3 4 3 3 2 1 8 6 6 3 8Mes 12 9 8 10 8 9 8 10 8 6 6 7 6 6 5 4 11 9 9 6 11

Page 108: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

108 

 

Tienda 61 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 101 115 73 69 41 41 97 71 73 41 73 55 45 38 36 106 118 71 64 45Mes 2 100 114 72 68 40 40 96 70 72 40 72 54 44 37 35 105 117 70 63 44Mes 3 99 113 71 67 39 39 95 69 71 39 71 53 43 36 34 104 116 69 62 43Mes 4 99 113 71 67 39 39 95 69 71 39 71 53 43 36 34 104 116 69 62 43Mes 5 96 110 68 64 36 36 92 66 68 36 68 50 40 33 31 101 113 66 59 40Mes 6 97 111 69 65 37 37 93 67 69 37 69 51 41 34 32 102 114 67 60 41Mes 7 104 118 76 72 44 44 100 74 76 44 76 58 48 41 39 109 121 74 67 48Mes 8 103 117 75 71 43 43 99 73 75 43 75 57 47 40 38 108 120 73 66 47Mes 9 104 118 76 72 44 44 100 74 76 44 76 58 48 41 39 109 121 74 67 48Mes 10 106 120 78 74 46 46 102 76 78 46 78 60 50 43 41 111 123 76 69 50Mes 11 107 121 79 75 47 47 103 77 79 47 79 61 51 44 42 112 124 77 70 51Mes 12 112 126 84 80 52 52 108 82 84 52 84 66 56 49 47 117 129 82 75 56

Tienda 62 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 10 11 0 10 10 10 20 24 22 17 25 10 15 15 13 13 13 0 6 13Mes 2 8 9 0 8 8 8 18 22 20 15 23 8 13 13 11 11 11 0 4 11Mes 3 7 8 0 7 7 7 17 21 19 14 22 7 12 12 10 10 10 0 3 10Mes 4 6 7 0 6 6 6 16 20 18 13 21 6 11 11 9 9 9 0 2 9Mes 5 7 8 1 7 7 7 17 21 19 14 22 7 12 12 10 10 10 0 3 10Mes 6 8 9 2 8 8 8 18 22 20 15 23 8 13 13 11 11 11 0 4 11Mes 7 12 13 2 12 12 12 22 26 24 19 27 12 17 17 15 15 15 2 8 15Mes 8 11 12 1 11 11 11 21 25 23 18 26 11 16 16 14 14 14 1 7 14Mes 9 11 12 1 11 11 11 21 25 23 18 26 11 16 16 14 14 14 1 7 14Mes 10 10 11 0 10 10 10 20 24 22 17 25 10 15 15 13 13 13 0 6 13Mes 11 11 12 0 11 11 11 21 25 23 18 26 11 16 16 14 14 14 0 7 14Mes 12 14 15 3 14 14 14 24 28 26 21 29 14 19 19 17 17 17 3 10 17

Tienda 63 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 26 10 14 12 10 14 12 5 10 10 10 5 7 7 5 31 12 12 7 14Mes 2 24 8 12 10 8 12 10 3 8 8 8 3 5 5 3 29 10 10 5 12Mes 3 23 7 11 9 7 11 9 2 7 7 7 2 4 4 2 28 9 9 4 11Mes 4 22 6 10 8 6 10 8 1 6 6 6 1 3 3 1 27 8 8 3 10Mes 5 23 7 11 9 7 11 9 2 7 7 7 2 4 4 2 28 9 9 4 11Mes 6 24 8 12 10 8 12 10 3 8 8 8 3 5 5 3 29 10 10 5 12Mes 7 29 13 17 15 13 17 15 8 13 13 13 8 10 10 8 34 15 15 10 17Mes 8 28 12 16 14 12 16 14 7 12 12 12 7 9 9 7 33 14 14 9 16Mes 9 28 12 16 14 12 16 14 7 12 12 12 7 9 9 7 33 14 14 9 16Mes 10 27 11 15 13 11 15 13 6 11 11 11 6 8 8 6 32 13 13 8 15Mes 11 28 12 16 14 12 16 14 7 12 12 12 7 9 9 7 33 14 14 9 16Mes 12 33 17 21 19 17 21 19 12 17 17 17 12 14 14 12 38 19 19 14 21

Page 109: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

109 

 

Tienda 64 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 17 15 15 13 10 8 15 6 6 6 13 6 8 4 3 20 17 13 10 13Mes 2 16 14 14 12 9 7 14 5 5 5 12 5 7 3 2 19 16 12 9 12Mes 3 15 13 13 11 8 6 13 4 4 4 11 4 6 2 1 18 15 11 8 11Mes 4 14 12 12 10 7 5 12 3 3 3 10 3 5 1 0 17 14 10 7 10Mes 5 15 13 13 11 8 6 13 4 4 4 11 4 6 2 1 18 15 11 8 11Mes 6 16 14 14 12 9 7 14 5 5 5 12 5 7 3 2 19 16 12 9 12Mes 7 19 17 17 15 12 10 17 8 8 8 15 8 10 6 5 22 19 15 12 15Mes 8 18 16 16 14 11 9 16 7 7 7 14 7 9 5 4 21 18 14 11 14Mes 9 18 16 16 14 11 9 16 7 7 7 14 7 9 5 4 21 18 14 11 14Mes 10 17 15 15 13 10 8 15 6 6 6 13 6 8 4 3 20 17 13 10 13Mes 11 18 16 16 14 11 9 16 7 7 7 14 7 9 5 4 21 18 14 11 14Mes 12 21 19 19 17 14 12 19 10 10 10 17 10 12 8 7 24 21 17 14 17

Tienda 65 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 21 14 17 12 0 5 0 7 0 0 5 5 3 0 0 26 17 14 7 3Mes 2 20 13 16 11 0 4 0 6 0 0 4 4 2 0 0 25 16 13 6 2Mes 3 18 11 14 9 0 2 0 4 0 0 2 2 0 0 0 23 14 11 4 0Mes 4 17 10 13 8 0 1 0 3 0 0 1 1 0 0 0 22 13 10 3 0Mes 5 18 11 14 9 1 2 1 4 1 1 2 2 1 1 1 23 14 11 4 1Mes 6 19 12 15 10 2 3 2 5 2 2 3 3 2 2 2 24 15 12 5 2Mes 7 24 17 20 15 2 8 3 10 2 2 8 8 6 2 2 29 20 17 10 6Mes 8 23 16 19 14 1 7 2 9 1 1 7 7 5 1 1 28 19 16 9 5Mes 9 23 16 19 14 1 7 2 9 1 1 7 7 5 1 1 28 19 16 9 5Mes 10 22 15 18 13 0 6 1 8 0 0 6 6 4 0 0 27 18 15 8 4Mes 11 23 16 19 14 0 7 2 9 0 0 7 7 5 0 0 28 19 16 9 5Mes 12 27 20 23 18 4 11 6 13 4 4 11 11 9 4 4 32 23 20 13 9

Tienda 66 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 8 4 13 4 3 4 11 6 6 3 10 8 0 1 0 11 6 11 1 6Mes 2 7 3 12 3 2 3 10 5 5 2 9 7 0 0 0 10 5 10 0 5Mes 3 6 2 11 2 1 2 9 4 4 1 8 6 0 0 0 9 4 9 0 4Mes 4 6 2 11 2 1 2 9 4 4 1 8 6 0 0 0 9 4 9 0 4Mes 5 7 3 12 3 2 3 10 5 5 2 9 7 1 1 1 10 5 10 1 5Mes 6 8 4 13 4 3 4 11 6 6 3 10 8 2 2 2 11 6 11 2 6Mes 7 10 6 15 6 5 6 13 8 8 5 12 10 2 3 2 13 8 13 3 8Mes 8 9 5 14 5 4 5 12 7 7 4 11 9 1 2 1 12 7 12 2 7Mes 9 9 5 14 5 4 5 12 7 7 4 11 9 1 2 1 12 7 12 2 7Mes 11 9 5 14 5 4 5 12 7 7 4 11 9 0 2 0 12 7 12 2 7Mes 12 14 10 19 10 9 10 17 12 12 9 16 14 5 7 5 17 12 17 7 12

Page 110: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

110 

 

Tienda 67 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 10 15 17 15 12 15 14 8 8 5 14 5 5 3 3 14 17 15 12 15Mes 2 9 14 16 14 11 14 13 7 7 4 13 4 4 2 2 13 16 14 11 14Mes 3 8 13 15 13 10 13 12 6 6 3 12 3 3 1 1 12 15 13 10 13Mes 4 8 13 15 13 10 13 12 6 6 3 12 3 3 1 1 12 15 13 10 13Mes 5 9 14 16 14 11 14 13 7 7 4 13 4 4 2 2 13 16 14 11 14Mes 6 10 15 17 15 12 15 14 8 8 5 14 5 5 3 3 14 17 15 12 15Mes 7 8 13 15 13 10 13 12 6 6 3 12 3 3 2 2 12 15 13 10 13Mes 8 7 12 14 12 9 12 11 5 5 2 11 2 2 1 1 11 14 12 9 12Mes 9 7 12 14 12 9 12 11 5 5 2 11 2 2 1 1 11 14 12 9 12Mes 10 6 11 13 11 8 11 10 4 4 1 10 1 1 0 0 10 13 11 8 11Mes 11 7 12 14 12 9 12 11 5 5 2 11 2 2 0 0 11 14 12 9 12Mes 12 10 15 17 15 12 15 14 8 8 5 14 5 5 3 3 14 17 15 12 15

Tienda 68 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 8 8 11 8 11 41 9 6 8 6 14 8 8 5 4 10 9 10 6 13Mes 2 7 7 10 7 10 40 8 5 7 5 13 7 7 4 3 9 8 9 5 12Mes 3 6 6 9 6 9 39 7 4 6 4 12 6 6 3 2 8 7 8 4 11Mes 4 6 6 9 6 9 39 7 4 6 4 12 6 6 3 2 8 7 8 4 11Mes 5 7 7 10 7 10 40 8 5 7 5 13 7 7 4 3 9 8 9 5 12Mes 6 8 8 11 8 11 41 9 6 8 6 14 8 8 5 4 10 9 10 6 13Mes 7 6 6 9 6 9 39 7 4 6 4 12 6 6 3 2 8 7 8 4 11Mes 8 5 5 8 5 8 38 6 3 5 3 11 5 5 2 1 7 6 7 3 10Mes 9 5 5 8 5 8 38 6 3 5 3 11 5 5 2 1 7 6 7 3 10Mes 10 4 4 7 4 7 37 5 2 4 2 10 4 4 1 0 6 5 6 2 9Mes 11 5 5 8 5 8 38 6 3 5 3 11 5 5 2 1 7 6 7 3 10Mes 12 9 9 12 9 12 42 10 7 9 7 15 9 9 6 5 11 10 11 7 14

Tienda 69 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 12 15 8 7 8 15 10 5 8 7 15 10 8 5 3 15 17 7 3 12Mes 2 11 14 7 6 7 14 9 4 7 6 14 9 7 4 2 14 16 6 2 11Mes 3 10 13 6 5 6 13 8 3 6 5 13 8 6 3 1 13 15 5 1 10Mes 4 10 13 6 5 6 13 8 3 6 5 13 8 6 3 1 13 15 5 1 10Mes 5 11 14 7 6 7 14 9 4 7 6 14 9 7 4 2 14 16 6 2 11Mes 6 12 15 8 7 8 15 10 5 8 7 15 10 8 5 3 15 17 7 3 12Mes 7 10 13 6 5 6 13 8 3 6 5 13 8 6 3 2 13 15 5 2 10Mes 8 9 12 5 4 5 12 7 2 5 4 12 7 5 2 1 12 14 4 1 9Mes 9 9 12 5 4 5 12 7 2 5 4 12 7 5 2 1 12 14 4 1 9Mes 10 8 11 4 3 4 11 6 1 4 3 11 6 4 1 0 11 13 3 0 8Mes 11 9 12 5 4 5 12 7 2 5 4 12 7 5 2 0 12 14 4 0 9Mes 12 12 15 8 7 8 15 10 5 8 7 15 10 8 5 3 15 17 7 3 12

Page 111: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

111 

 

Tienda 70 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 10 8 8 7 7 6 4 7 4 6 9 11 2 5 4 12 9 7 5 9Mes 2 9 7 7 6 6 5 3 6 3 5 8 10 1 4 3 11 8 6 4 8Mes 3 7 5 5 4 4 3 1 4 1 3 6 8 1 2 1 9 6 4 2 6Mes 4 5 3 3 2 2 1 1 2 1 1 4 6 1 0 1 7 4 2 0 4Mes 5 6 4 4 3 3 2 2 3 2 2 5 7 2 1 2 8 5 3 1 5Mes 6 7 5 5 4 4 3 3 4 3 3 6 8 3 2 3 9 6 4 2 6Mes 7 10 8 8 7 7 6 4 7 4 6 9 11 2 5 4 12 9 7 5 9Mes 8 9 7 7 6 6 5 3 6 3 5 8 10 1 4 3 11 8 6 4 8Mes 9 9 7 7 6 6 5 3 6 3 5 8 10 1 4 3 11 8 6 4 8Mes 10 8 6 6 5 5 4 2 5 2 4 7 9 0 3 2 10 7 5 3 7Mes 11 9 7 7 6 6 5 3 6 3 5 8 10 1 4 3 11 8 6 4 8Mes 12 14 12 12 11 11 10 8 11 8 10 13 15 6 9 8 16 13 11 9 13

Tienda 71 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 14 7 8 7 5 3 14 12 7 10 14 12 8 8 7 17 8 7 3 8Mes 2 13 6 7 6 4 2 13 11 6 9 13 11 7 7 6 16 7 6 2 7Mes 3 12 5 6 5 3 1 12 10 5 8 12 10 6 6 5 15 6 5 1 6Mes 4 12 5 6 5 3 1 12 10 5 8 12 10 6 6 5 15 6 5 1 6Mes 5 13 6 7 6 4 2 13 11 6 9 13 11 7 7 6 16 7 6 2 7Mes 6 14 7 8 7 5 3 14 12 7 10 14 12 8 8 7 17 8 7 3 8Mes 7 12 5 6 5 3 2 12 10 5 8 12 10 6 6 5 15 6 5 2 6Mes 8 11 4 5 4 2 1 11 9 4 7 11 9 5 5 4 14 5 4 1 5Mes 9 11 4 5 4 2 1 11 9 4 7 11 9 5 5 4 14 5 4 1 5Mes 10 10 3 4 3 1 0 10 8 3 6 10 8 4 4 3 13 4 3 0 4Mes 11 11 4 5 4 2 0 11 9 4 7 11 9 5 5 4 14 5 4 0 5Mes 12 14 7 8 7 5 3 14 12 7 10 14 12 8 8 7 17 8 7 3 8

Tienda 72 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 10 6 10 6 6 3 12 13 1 13 6 6 6 12 10 13 8 8 3 10Mes 2 8 4 8 4 4 1 10 11 1 11 4 4 4 10 8 11 6 6 1 8Mes 3 7 3 7 3 3 0 9 10 0 10 3 3 3 9 7 10 5 5 0 7Mes 4 6 2 6 2 2 1 8 9 1 9 2 2 2 8 6 9 4 4 0 6Mes 5 7 3 7 3 3 2 9 10 2 10 3 3 3 9 7 10 5 5 1 7Mes 6 8 4 8 4 4 3 10 11 3 11 4 4 4 10 8 11 6 6 2 8Mes 7 9 5 9 5 5 2 11 12 2 12 5 5 5 11 9 12 7 7 2 9Mes 8 8 4 8 4 4 1 10 11 1 11 4 4 4 10 8 11 6 6 1 8Mes 9 9 5 9 5 5 2 11 12 2 12 5 5 5 11 9 12 7 7 2 9Mes 10 8 4 8 4 4 1 10 11 1 11 4 4 4 10 8 11 6 6 1 8Mes 11 9 5 9 5 5 2 11 12 0 12 5 5 5 11 9 12 7 7 2 9Mes 12 10 6 10 6 6 3 12 13 1 13 6 6 6 12 10 13 8 8 3 10

Page 112: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

112 

 

Tienda 73 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 9 9 11 6 8 8 5 4 6 4 8 6 2 3 2 11 10 10 4 10Mes 2 8 8 10 5 7 7 4 3 5 3 7 5 1 2 1 10 9 9 3 9Mes 3 7 7 9 4 6 6 3 2 4 2 6 4 0 1 0 9 8 8 2 8Mes 4 6 6 8 3 5 5 2 1 3 1 5 3 0 0 0 8 7 7 1 7Mes 5 7 7 9 4 6 6 3 2 4 2 6 4 1 1 1 9 8 8 2 8Mes 6 8 8 10 5 7 7 4 3 5 3 7 5 2 2 2 10 9 9 3 9Mes 7 7 7 9 4 6 6 3 2 4 2 6 4 1 1 1 9 8 8 2 8Mes 8 6 6 8 3 5 5 2 1 3 1 5 3 0 0 0 8 7 7 1 7Mes 9 7 7 9 4 6 6 3 2 4 2 6 4 1 1 1 9 8 8 2 8Mes 10 6 6 8 3 5 5 2 1 3 1 5 3 0 0 0 8 7 7 1 7Mes 11 7 7 9 4 6 6 3 2 4 2 6 4 0 1 0 9 8 8 2 8Mes 12 11 11 13 8 10 10 7 6 8 6 10 8 4 5 4 13 12 12 6 12

Tienda 74 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 6 4 5 2 0 2 4 3 4 3 1 6 3 2 1 8 5 4 0 2Mes 2 5 3 4 1 0 1 3 2 3 2 0 5 2 1 0 7 4 3 0 1Mes 3 4 2 3 0 0 0 2 1 2 1 0 4 1 0 0 6 3 2 0 0Mes 4 3 1 2 0 0 0 1 0 1 0 0 3 0 0 0 5 2 1 0 0Mes 5 4 2 3 1 1 1 2 1 2 1 0 4 1 1 1 6 3 2 1 1Mes 6 5 3 4 2 2 2 3 2 3 2 1 5 2 2 2 7 4 3 2 2Mes 7 7 5 6 3 1 3 5 4 5 4 2 7 4 3 2 9 6 5 1 3Mes 8 6 4 5 2 0 2 4 3 4 3 1 6 3 2 1 8 5 4 0 2Mes 9 7 5 6 3 1 3 5 4 5 4 2 7 4 3 2 9 6 5 1 3Mes 10 6 4 5 2 0 2 4 3 4 3 1 6 3 2 1 8 5 4 0 2Mes 11 7 5 6 3 1 3 5 4 5 4 2 7 4 3 2 9 6 5 1 3Mes 12 9 7 8 5 3 5 7 6 7 6 4 9 6 5 4 11 8 7 3 5

Tienda 75 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 7 6 8 6 7 6 8 6 4 4 5 4 4 3 2 9 7 7 4 9Mes 2 6 5 7 5 6 5 7 5 3 3 4 3 3 2 1 8 6 6 3 8Mes 3 5 4 6 4 5 4 6 4 2 2 3 2 2 1 0 7 5 5 2 7Mes 4 4 3 5 3 4 3 5 3 1 1 2 1 1 0 0 6 4 4 1 6Mes 5 5 4 6 4 5 4 6 4 2 2 3 2 2 1 1 7 5 5 2 7Mes 6 6 5 7 5 6 5 7 5 3 3 4 3 3 2 2 8 6 6 3 8Mes 7 5 4 6 4 5 4 6 4 2 2 3 2 2 1 1 7 5 5 2 7Mes 8 4 3 5 3 4 3 5 3 1 1 2 1 1 0 0 6 4 4 1 6Mes 9 5 4 6 4 5 4 6 4 2 2 3 2 2 1 1 7 5 5 2 7Mes 10 4 3 5 3 4 3 5 3 1 1 2 1 1 0 0 6 4 4 1 6Mes 11 5 4 6 4 5 4 6 4 2 2 3 2 2 1 0 7 5 5 2 7Mes 12 7 6 8 6 7 6 8 6 4 4 5 4 4 3 2 9 7 7 4 9

Page 113: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

113 

 

Tienda 76 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 81 91 60 56 35 35 77 58 60 35 60 46 39 34 32 84 93 58 53 39Mes 2 80 90 59 55 34 34 76 57 59 34 59 45 38 33 31 83 92 57 52 38Mes 3 79 89 58 54 33 33 75 56 58 33 58 44 37 32 30 82 91 56 51 37Mes 4 78 88 57 53 32 32 74 55 57 32 57 43 36 31 29 81 90 55 50 36Mes 5 79 89 58 54 33 33 75 56 58 33 58 44 37 32 30 82 91 56 51 37Mes 6 80 90 59 55 34 34 76 57 59 34 59 45 38 33 31 83 92 57 52 38Mes 7 79 89 58 54 33 33 75 56 58 33 58 44 37 32 30 82 91 56 51 37Mes 8 78 88 57 53 32 32 74 55 57 32 57 43 36 31 29 81 90 55 50 36Mes 9 79 89 58 54 33 33 75 56 58 33 58 44 37 32 30 82 91 56 51 37Mes 10 78 88 57 53 32 32 74 55 57 32 57 43 36 31 29 81 90 55 50 36Mes 11 79 89 58 54 33 33 75 56 58 33 58 44 37 32 30 82 91 56 51 37Mes 12 83 93 62 58 37 37 79 60 62 37 62 48 41 36 34 86 95 60 55 41

Tienda 77 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 11 13 2 11 11 11 21 25 23 18 27 11 16 16 14 14 14 2 7 14Mes 2 10 12 1 10 10 10 20 24 22 17 26 10 15 15 13 13 13 1 6 13Mes 3 9 11 0 9 9 9 19 23 21 16 25 9 14 14 12 12 12 0 5 12Mes 4 8 10 0 8 8 8 18 22 20 15 24 8 13 13 11 11 11 0 4 11Mes 5 9 11 1 9 9 9 19 23 21 16 25 9 14 14 12 12 12 1 5 12Mes 6 10 12 2 10 10 10 20 24 22 17 26 10 15 15 13 13 13 2 6 13Mes 7 9 11 1 9 9 9 19 23 21 16 25 9 14 14 12 12 12 1 5 12Mes 8 8 10 0 8 8 8 18 22 20 15 24 8 13 13 11 11 11 0 4 11Mes 9 9 11 1 9 9 9 19 23 21 16 25 9 14 14 12 12 12 1 5 12Mes 10 8 10 0 8 8 8 18 22 20 15 24 8 13 13 11 11 11 0 4 11Mes 11 9 11 0 9 9 9 19 23 21 16 25 9 14 14 12 12 12 0 5 12Mes 12 15 17 6 15 15 15 25 29 27 22 31 15 20 20 18 18 18 6 11 18

Tienda 78 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 14 7 9 8 7 9 8 5 7 7 7 5 6 6 5 16 8 8 6 9Mes 2 13 6 8 7 6 8 7 4 6 6 6 4 5 5 4 15 7 7 5 8Mes 3 12 5 7 6 5 7 6 3 5 5 5 3 4 4 3 14 6 6 4 7Mes 4 12 5 7 6 5 7 6 3 5 5 5 3 4 4 3 14 6 6 4 7Mes 5 13 6 8 7 6 8 7 4 6 6 6 4 5 5 4 15 7 7 5 8Mes 6 14 7 9 8 7 9 8 5 7 7 7 5 6 6 5 16 8 8 6 9Mes 7 12 5 7 6 5 7 6 3 5 5 5 3 4 4 3 14 6 6 4 7Mes 8 11 4 6 5 4 6 5 2 4 4 4 2 3 3 2 13 5 5 3 6Mes 9 11 4 6 5 4 6 5 2 4 4 4 2 3 3 2 13 5 5 3 6Mes 10 10 3 5 4 3 5 4 1 3 3 3 1 2 2 1 12 4 4 2 5Mes 11 11 4 6 5 4 6 5 2 4 4 4 2 3 3 2 13 5 5 3 6Mes 12 16 9 11 10 9 11 10 7 9 9 9 7 8 8 7 18 10 10 8 11

Page 114: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

114 

 

Tienda 79 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 12 11 11 10 8 7 11 6 6 6 10 6 7 5 4 14 12 10 8 10Mes 2 11 10 10 9 7 6 10 5 5 5 9 5 6 4 3 13 11 9 7 9Mes 3 10 9 9 8 6 5 9 4 4 4 8 4 5 3 2 12 10 8 6 8Mes 4 10 9 9 8 6 5 9 4 4 4 8 4 5 3 2 12 10 8 6 8Mes 5 11 10 10 9 7 6 10 5 5 5 9 5 6 4 3 13 11 9 7 9Mes 6 12 11 11 10 8 7 11 6 6 6 10 6 7 5 4 14 12 10 8 10Mes 7 10 9 9 8 6 5 9 4 4 4 8 4 5 3 2 12 10 8 6 8Mes 8 9 8 8 7 5 4 8 3 3 3 7 3 4 2 1 11 9 7 5 7Mes 9 9 8 8 7 5 4 8 3 3 3 7 3 4 2 1 11 9 7 5 7Mes 10 8 7 7 6 4 3 7 2 2 2 6 2 3 1 0 10 8 6 4 6Mes 11 9 8 8 7 5 4 8 3 3 3 7 3 4 2 1 11 9 7 5 7Mes 12 16 15 15 14 12 11 15 10 10 10 14 10 11 9 8 18 16 14 12 14

Tienda 80 PROD 1 PROD 2 PROD 3 PROD 4 PROD 5 PROD 6 PROD 7 PROD 8 PROD 9 PROD 10 PROD 11 PROD 12 PROD 13 PROD 14 PROD 15 PROD 16 PROD 17 PROD 18 PROD 19 PROD 20Mes 1 12 9 10 8 3 5 3 6 3 3 5 5 4 3 3 14 10 9 6 4Mes 2 11 8 9 7 2 4 2 5 2 2 4 4 3 2 2 13 9 8 5 3Mes 3 10 7 8 6 1 3 1 4 1 1 3 3 2 1 1 12 8 7 4 2Mes 4 10 7 8 6 1 3 1 4 1 1 3 3 2 1 1 12 8 7 4 2Mes 5 11 8 9 7 2 4 2 5 2 2 4 4 3 2 2 13 9 8 5 3Mes 6 12 9 10 8 3 5 3 6 3 3 5 5 4 3 3 14 10 9 6 4Mes 7 10 7 8 6 2 3 2 4 2 2 3 3 2 2 2 12 8 7 4 2Mes 8 9 6 7 5 1 2 1 3 1 1 2 2 1 1 1 11 7 6 3 1Mes 9 9 6 7 5 1 2 1 3 1 1 2 2 1 1 1 11 7 6 3 1Mes 10 8 5 6 4 0 1 0 2 0 0 1 1 0 0 0 10 6 5 2 0Mes 11 9 6 7 5 0 2 0 3 0 0 2 2 1 0 0 11 7 6 3 1Mes 12 15 12 13 11 6 8 6 9 6 6 8 8 7 6 6 17 13 12 9 7

Page 115: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

115 

 

MODELO PROGRAMADO EN ARENA

SUBMODELOS DE ABASTECIMIENTO DEL CENTRO DE DISTRIBUCIÓN DESDE CADA PROVEEDOR

Prov eedor 1Dist ribucion

Cen tro deAba stecimient o

Proveedor 1Lead Time

P1I niciar Cont ador

CDP1Cargar In ventario True

False

productos P1?Se alcanzo el numero de

CDP1Fin aba stecimien to

Prov eedor 2Dist ribucion

Cen tro deAba stecimient o

Proveedor 2Lead Time

P2I niciar Cont ador

CDP2Cargar In ventario True

False

productos P2?Se alcanzo el numero de

CDP2Fin aba stecimien to

0

0

0

0

0

0

00

Page 116: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

116 

 

SUBMODELO DE ABASTECIMIENTO DE TIENDAS PARA LA FAMILIA DE PRODUCTOS INDUSTRIALIZADOS DE CAFE

SUBMODELO DE ABASTECIMIENTO DE TIENDAS PARA LA FAMILIA DE PRODUCTOS DE VERTIR

T ie n d a s P1A b a s t e c im ie n t o

T ie n d a s P1I n ic ia r C o n t a d o r d e

T ie n d a s P1Co n t a d o r d e

I n c r e m e n t a rDu p lic a r T ie n d a P1

O r ig in a l

D u p lic a t e

t ie ndas P 1?Se alc anz o el num er o d eT r u e

F a ls e

t ie n d a s P1Fin a b a s t e c im ie n t o

E s el ins t ant e 0 par a P 1?T r u e

F a ls e

Tienda s P1Abas t ec im ient o

Fr ec u enc ia

O r ig in a l

D u p lic a t e

t ie n d a s P1a b a s t e c im ie n t o

Du p lic a r

Pr o d u c t o s P 1I n ic ia r Co n t a d o r d e

Pr o d u c t o s P1Co n t a d o r d e

I n c r e m e n t a r

P1Du p lic a r Pr o d u c t o

O r ig in a l

D u p lic a t e

pr oduc t o s P1 po r t iend a?Se alc anz o el num er o d eT r u e

F a ls e

CDP1?Hay in v ent ar io s uf ic ien t eT r u e

F a ls e

in v e n t a r io CDP1D e s c o n t a r

f a lt a n t e P1E s t a b le c e r p e d id o

P1Le ad Tim e Tienda s

t ie n d a s P1Ca r g a r in v e n t a r io

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

T ie n d a s P2A b a s t e c im ie n t o

T ie n d a s P2I n ic ia r Co n t a d o r d e

T ie n d a s P2C o n t a d o r d e

I n c r e m e n t a rDu p lic a r T ie n d a P 2

O r ig in a l

D u p lic a t e

t ienda s P2?Se a lc anz o e l nu m er o deT r u e

F a ls e

t ie n d a s P2F in a b a s t e c im ie n t o

Es e l ins t ant e 0 par a P2?T r u e

F a ls e

T iendas P2A bas t ec im ient o

F r ec uenc ia

O r ig in a l

D u p lic a t e

t ie n d a s P2a b a s t e c im ie n t o

Du p lic a r

P r o d u c t o s P2I n ic ia r Co n t a d o r d e

Pr o d u c t o s P2Co n t a d o r d e

I n c r e m e n t a rP2

Du p lic a r P r o d u c t oO r ig in a l

D u p lic a t e

pr o duc t os P 2 por t ie nda?Se a lc anz o e l num er o deT r u e

F a ls e

CDP2?Hay inv en t ar io s uf ic ient eT r u e

F a ls e

in v e n t a r io CDP2De s c o n t a r

f a lt a n t e P2Es t a b le c e r p e d id o

P 2L ead Tim e Tiendas

t ie n d a s P2Ca r g a r in v e n t a r io

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Page 117: DISEÑO Y SIMULACIÓN DE UN SISTEMA DE ABASTECIMIENTO

117 

 

SUBMODELO QUE REPLICA LA LLEGADA DE LOS CIENTES A LAS TIENDAS PARA COMPRAR PRODUCTOS DE CAFE

SUBMODELO DE QUE REPLICA LA LLEGADA DE LOS CIENTES A LAS TIENDAS PARA COMPRAR PRODUCTOS DE VISTIR

C lie n t e s P 1L le g a d a d e

Clie n t e s P1d e T ie n d a s p a r aI n ic ia r Co n t a d o r

Clie n t e s P1T ie n d a s p a r aCo n t a d o r d e

I n c r e m e n t a r

O r ig in a l

D u p lic a t e

p a r a Clie n t e s P1Du p lic a r T ie n d a s

c lie n t e s P1 ?d e t ie n d a s p a r a

Se a lc a n z o e l n u m e r oT r u e

F a ls e

d e Clie n t e s P1Fin d e L le g a d a

p a r a Clie n t e s P1d e Pr o d u c t o s

I n ic ia r Co n t a d o r

Clie n t e s P1Pr o d u c t o s p a r a

Co n t a d o r d eI n c r e m e n t a r

O r ig in a l

D u p lic a t e

Clie n t e s P1Pr o d u c t o s p a r a

Du p lic a r

c lie n t e ?d e p r o d u c t o s P1 p o rSe a lc a n z o e l n u m e r o

T r u e

F a ls e

c o n r e s id u oCa lc u la r M e s P1

c a lc u lo d e M e s P1 ?Ha y r e s id u o p a r aT r u e

F a ls e

s in r e s id u oCa lc u la r M e s P1

c lie n t e s P1lle g a d a d e

Fr e c u e n c ia d e

d e c lie n t e s P1Du p lic a r lle g a d a

O r ig in a l

D u p lic a t e

P1Co n t a r Clie n t e s T r u e

F a ls e

P1 ?s u f ic ie n t e e n t ie n d a s

Ha y in v e n t a r io

Tie n d a s P1I n v e n t a r io e nDe c r e m e n t a r

Pe r d id a s P1Co n t a r Ve n t a s

M e s P1 ?Ha y d e m a n d a e n e lT r u e

F a ls e

d e m a n d ac lie n t e s P1 s in

lle g a d a d eFr e c u e n c ia d e

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Clie n t e s P2L le g a d a d e

Clie n t e s P 2d e T ie n d a s p a r aI n ic ia r Co n t a d o r

Clie n t e s P2T ie n d a s p a r aCo n t a d o r d e

I n c r e m e n t a r

O r ig in a l

D u p lic a t e

p a r a Clie n t e s P2Du p lic a r T ie n d a s

c lien t es P2?de t iend as p a r a

Se a lc an z o e l num er oT r u e

F a ls e

de C lien t es P2Fin d e L leg ada

par a Clien t es P 2de P r oduc t os

I n ic ia r Con t ado r

Clien t es P2Pr o duc t os p a r a

Con t ado r deI nc r em en t a r

O r ig in a l

D u p lic a t e

Clien t es P2Pr o duc t os p a r a

Dup lic a r

c lien t e?de p r od uc t os P2 po rSe a lc an z o e l num er o

T r u e

F a ls e

c on r es idu oC a lc u la r M es P 2

c a lc u lo d e M e s P2 ?Hay r es iduo p a r a T r u e

F a ls e

s in r es iduoCa lc u la r M e s P2

c lie n t es P2lleg ada de

Fr ec ue nc ia de

de c lien t es P2Du p lic a r llega da

O r ig in a l

D u p lic a t e

P2Con t a r C lien t e s T r u e

F a ls e

P 2?s u f ic ie n t e en t iendas

H ay in v en t a r io

Tien das P2I nv en t a r io e nDec r em en t a r

Pe r d idas P2Con t a r Ven t as

M e s P2 ?Hay dem and a en e lT r u e

F a ls e

dem and ac lien t es P2 s in

llega da d eFr e c uen c ia d e

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0