www.sfplanning.org Discretionary Review Analysis Medical Cannabis Dispensary HEARING DATE JANUARY 26, 2017 Date: January 13, 2017 Case No.: 2016005312DRM Project Address: 3185 Mission Street Zoning: NC3 (Neighborhood Commercial – Moderate Scale) Zoning District 40X Height and Bulk District Block/Lot: 5609/015 Project Sponsor: Sean Killen 2060 Pacific Ave #307 San Francisco, CA 94109 Staff Contact: Jeffrey Speirs – (415) 5759106 [email protected] Recommendation: Take Discretionary Review and Approve PROJECT DESCRIPTION The proposal is to establish a new Medical Cannabis Dispensary (MCD) at 3185 Mission Street (d.b.a Bernal Heights Cooperative), to replace a vacant ground floor commercial space previously occupied by a gun shop (d.b.a. High Bridge Arms). The space is approximately 1,350 square feet in size. No parking is provided or required and no physical expansion is proposed for the structure. The proposed MCD will also dispense medical cannabis in the form of food or drink, and will permit onsite consumption. The MCD will not cultivate cannabis on site. Tenant improvements will be made on this property to comply with Mayor’s Office of Disability requirements. The proposed hours of operation are 8 a.m. to 10 p.m., daily. The subject commercial space has approximately 25feet of frontage on Mission Street. The project sponsor will maintain fulltime security, which includes indoor and outdoor video cameras, security guards stationed at the front door, and security personnel to monitor the immediate area. The project sponsor will also participate in keeping the streets clean and safe through graffiti removal, touchup painting, pressure washing and window cleaning to contribute positively to the commercial district. To address odor concerns, a negative pressure ventilation system with charcoal airfilters will be used indoors; however, the proposed MCD intends to only allow vaporizing to preclude the most offensive odors. Planning Code Section 790.141 states that all MCDs are required to be heard by the Planning Commission, which will consider whether or not to exercise their discretionary review powers over the building permit application.

Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

www.sfplanning.org

Discretionary Review Analysis

Medical Cannabis Dispensary HEARING DATE JANUARY 26, 2017

Date:  January 13, 2017 

Case No.:  2016‐005312DRM Project Address:  3185 Mission Street Zoning:  NC‐3 (Neighborhood Commercial – Moderate Scale) Zoning District 

  40‐X Height and Bulk District 

Block/Lot:  5609/015 

Project Sponsor:  Sean Killen 

  2060 Pacific Ave #307 

  San Francisco, CA  94109 

Staff Contact:  Jeffrey Speirs – (415) 575‐9106 

[email protected]  

Recommendation:  Take Discretionary Review and Approve  

 

PROJECT DESCRIPTION The proposal  is  to  establish  a new Medical Cannabis Dispensary  (MCD)  at  3185 Mission  Street  (d.b.a 

Bernal Heights Cooperative), to replace a vacant ground floor commercial space previously occupied by a 

gun shop (d.b.a. High Bridge Arms). The space is approximately 1,350 square feet in size. No parking is 

provided or required and no physical expansion is proposed for the structure.   

  

The proposed MCD will also dispense medical cannabis in the form of food or drink, and will permit on‐

site consumption. The MCD will not cultivate cannabis on site. Tenant  improvements will be made on 

this property to comply with Mayor’s Office of Disability requirements. The proposed hours of operation 

are  8  a.m.  to  10  p.m.,  daily.  The  subject  commercial  space  has  approximately  25‐feet  of  frontage  on 

Mission Street.  

 

The project sponsor will maintain full‐time security, which includes indoor and outdoor video cameras, 

security guards stationed at  the  front door, and security personnel  to monitor  the  immediate area. The 

project sponsor will also participate in keeping the streets clean and safe through graffiti removal, touch‐

up painting, pressure washing and window cleaning to contribute positively to the commercial district. 

To address odor  concerns, a negative pressure ventilation  system with  charcoal air‐filters will be used 

indoors; however,  the proposed MCD  intends  to only allow vaporizing  to preclude  the most offensive 

odors. 

 

Planning  Code  Section  790.141  states  that  all  MCDs  are  required  to  be  heard  by  the  Planning 

Commission, which will consider whether or not to exercise their discretionary review powers over the 

building permit application. 

Page 2: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Discretionary Review Analysis Summary January 26, 2017

2

CASE NO. 2016-005312DRM3185 Mission Street

SITE DESCRIPTION AND PRESENT USE The project site is a 2,086 square foot (sf) lot, developed with a two‐story mixed‐use building located on 

the east side of Mission Street, between Powers and Fair Avenues, in the Bernal Heights neighborhood. 

The  building  consists  of  ground  floor  commercial  space  that  has  been  vacant  since  late  2015,  and  a 

residential unit at  the second  level. The commercial space  in question was most recently occupied by a 

gun shop (d.b.a. “High Bridge Arms”).  

 

SURROUNDING PROPERTIES AND NEIGHBORHOOD The Moderate‐Scale Neighborhood Commercial District (NC‐3) covers multiple sections of Mission Street 

between Cesar Chavez and Randall Streets  in  the Bernal Heights neighborhood. Properties behind  the 

subject property,  to  the  east,  are within  the RH‐2  (Residential  – House, Two Family) Zoning District. 

Generally, the NC‐3 Districts are mixed use districts that support neighborhood‐serving commercial uses 

to  a  population  greater  than  the  immediate  neighborhood.  These Districts  are well‐served  by  public 

transit and  located along heavily  trafficked  thoroughfares with major  transit routes. Buildings range  in 

height, with height limits generally allowing up to four stories, occasionally taller. Lots vary in size, with 

generally small‐ or medium‐sized parcels. 

 

The subject district is mixed use, with a mix of street‐fronting retail businesses at the ground floor, and 

residential above. The buildings on the subject block range from one to two stories in height. The range of 

comparison  of  goods  and  services  offered  is  varied, with  uses  such  as  restaurant,  limited  restaurant, 

printing services, church, barber shop and other retail services. To the north of the subject property is a 

two‐story mixed‐use  building with  a  printing  services  space  and  two  dwellings.  To  the  south  of  the 

subject property  is a  two‐story mixed‐use building with a bar and  three dwellings. The area  is  transit‐

oriented  and  the  commercial  uses  serve  residents  of  the  area  as well  as  residents  and  visitors  from 

adjacent and other neighborhoods.  

 

The District is served by transit along Mission Street, with major bus  lines (#12, 14, 14R, 27, 36, and 49) 

within  a  quarter mile  of  the  subject  block.   Within  250  feet  of  the  subject  property,  15  bikeways  are 

available to the public as well.  

 

ISSUES AND OTHER CONSIDERATIONS Medical Cannabis Dispensary  (MCD). Planning Code Section 202.2(e)(1)  states  that all MCDs 

are  required  to be heard by  the Planning Commission, which will  consider whether or not  to 

exercise its discretionary review powers over the building permit application. 

 

San Francisco Health Code, Article 33, Medical Cannabis Act 3308: 

(e)   It  is  unlawful  for  any  person  or  association  operating  a  medical  cannabis  dispensary  under  the 

provisions  of  this Article  to  permit  any  breach  of  peace  therein  or  any  disturbance  of  public  order  or 

decorum by any tumultuous, riotous or disorderly conduct, or otherwise, or to permit such dispensary to 

remain open, or patrons to remain upon the premises, between the hours of 10 p.m. and 8 a.m. the next day. 

However,  the Department  shall  issue  permits  to  two medical  cannabis  dispensaries  permitting  them  to 

remain  open 24 hours per day. These medical  cannabis dispensaries  shall be  located  in  order  to provide 

services  to  the  population most  in need  of  24  hour  access  to medical  cannabis. These medical  cannabis 

Page 3: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Discretionary Review Analysis Summary January 26, 2017

3

CASE NO. 2016-005312DRM3185 Mission Street

dispensaries shall be  located at  least one mile  from each other and shall be accessible by  late night public 

transportation services. However, in no event shall a medical cannabis dispensary located in a Small‐Scale 

Neighborhood  Commercial  District,  a  Moderate  Scale  Neighborhood  Commercial  District,  or  a 

Neighborhood  Commercial  Shopping  Center  District  as  defined  in  Sections  711,  712  and  713  of  the 

Planning Code, be one of the two medical cannabis dispensaries permitted to remain open 24 hours per day. 

 

The 3185 Mission Street MCD project will afford the sponsor the opportunity to comply with the 

SF Health Code and operate  legally and under SFDPH  supervision. The applicant will  still be 

required  to obtain a permit  from SFDPH and will be  subject  to  their  regulations  including  tax 

compliance, non‐profit operation, background  checks and annual  compliance  inspections. This 

proposal would convert a vacant retail space to a medical cannabis dispensary use and would be 

independent of the residential use within the existing building.   

 

Planning  Code  Compliance.  The  proposed MCD  complies  with  all  relevant  Planning  Code 

requirements. Most notably,  the subject property was  found  to not  fall within 1,000  feet of any 

public  or  private  elementary  or  secondary  school  or  community  facility  or  recreation  center 

primarily serving persons younger than 18 years of age. However, the MCD is within 1,000 feet 

of  two  locations  with  preschools  (d.b.a  “Little  Tree  Preschool”,  and  “Family  School”).  A 

preschool  is not  considered an elementary  school, and  is more alike  to  childcare or a Personal 

Service use; therefore, the MCD complies with the Planning Code.  

 

Previous Planning Code Violation. The proposed MCD relocated from their previous location at 

33 29th Street and reopened at the subject property without required approvals from the Planning 

Department or Department of Public Health. An enforcement case (2016‐009240ENF) was opened 

by  the  Planning Department  to  ensure  the  dispensary would  not  operate  until  receiving  the 

required City approvals. The enforcement case was opened on 7/15/2016 and abated on 7/27/16. 

The Department  of Public Health  is  currently working with  the project  sponsor  to  resolve  an 

issue with a delivery  service allegedly associated with  the project  sponsor, which  is operating 

without a permit.     

 

Clustering and Neighborhood Impact. In the subject zoning district, the Planning Code does not 

prohibit the clustering of MCDs, nor does the San Francisco Health Code. However, there are two 

other existing MCDs  in  the vicinity. The previous  location of  the proposed MCD,  located at 33 

29th  Street,  is  now  operated  by  a  different MCD,  doing  business  as  “Harvest.” An  additional 

MCD  (d.b.a  “Cookie  Co.  415”)  is  located  at  3139  Mission  Street,  while  a  pending  MCD 

application is currently under review at 3326 Mission Street. Clustering is an issue that has been 

raised and may create unique neighborhood  impact issues. However, with actions proposed by 

the  project  sponsor,  and  associated  conditions  of  approval,  to  enhance  safety  on  the  street, 

prevent  loitering,  and  to  promote  cleanliness  in  the  immediate  area,  there  are  no  substantial 

negative impacts foreseen by three MCDs in this area of Bernal Heights.  

 

Traffic Impact. The proposed collective will not be utilizing a dedicated on‐street parking space 

for pick up and/or delivery point for medical marijuana. As the subject space is 1,644 square feet, 

it  is  very unlikely  to  cause  any  negative  traffic  impact  around  the  project  site. Therefore,  the 

Page 4: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Discretionary Review Analysis Summary January 26, 2017

4

CASE NO. 2016-005312DRM3185 Mission Street

Department does not  anticipate  any negative  impact  on  traffic  on  the  streets  surrounding  the 

project site. 

Proposition  64/Adult Use  of Marijuana Act. Although  approved  by  the  voters  in November 

2016, the Adult Use of Marijuana Act does not authorize any existing or future MCD to distribute 

nonmedical  (aka “adult use”) cannabis without  (1) a  state  license and  (2) compliance with San 

Francisco’s  local  laws. While  Proposition  64  requires  the  State  to  begin  issuing  licenses  by 

January 2018, the Planning Department, along with other City agencies, is crafting local land use 

and  other  regulatory  controls  to  address  the  production,  processing,  and  sale  of  adult  use 

cannabis. Per Mayor Lee’s Executive Directive 16‐05,  these  regulations are  to be  introduced by 

September 2017 so that they can be effective prior to the onset of the State licensing system.  The 

Department  maintains  a  very  high  level  of  confidence  that  San  Francisco  will  embrace  the 

opportunity  to  establish  local  land  use  regulations  for  adult  use  cannabis  businesses,  and  in 

particular that these controls will articulate a discretionary process through which existing MCDs 

can  apply  to  convert  in whole or part  to  adult use  cannabis dispensaries.  It  is unlikely  in  the 

extreme  that  existing MCDs will be  allowed  to dispense  adult use  cannabis dispensaries on  a 

ministerial (or “automatic”) basis. As with any change to the Planning Code, these controls will 

be presented to the Planning Commission for review and discussion prior to consideration by the 

Board of Supervisors and Mayor. 

 

HEARING NOTIFICATION

TYPE REQUIRED

PERIOD REQUIRED NOTICE DATE ACTUAL NOTICE DATE ACTUAL PERIOD

Posted Notice  30 days  December 27, 2016 December 27, 2016  30 days

Mailed Notice  30 days  December 23, 2016 December 23, 2016  34 days

PUBLIC COMMENT

SUPPORT OPPOSED NO POSITION

Adjacent neighbor(s)  ‐ ‐ ‐

Other neighbors on the block or 

directly across the street‐  ‐  ‐ 

Neighborhood groups or others  ‐ 3 3

 

The Department has received 3 letters from the public regarding the proposed MCD, expressing general 

opposition to the project. 

 

PROJECT ANALYSIS MEDICAL CANNABIS DISPENSARY CRITERIA Below are the six criteria to be considered by the Planning Commission in evaluating Medical Cannabis 

Dispensaries, per Planning Code Section 790.141: 

Page 5: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Discretionary Review Analysis Summary January 26, 2017

5

CASE NO. 2016-005312DRM3185 Mission Street

 

1. That the proposed parcel is located not less than 1,000 feet from a parcel containing a public or 

private elementary or secondary school; or a community  facility and/or a recreation center  that 

primarily serves persons under 18 years of age. 

 

The parcel containing the MCD is not located within 1,000 feet of a parcel containing a public or private 

elementary or secondary school, or a community  facility and/or a recreation center  that primarily serves 

persons under 18 years of age as defined by Section 790.141 of the Planning Code.  

 

2. The  parcel  containing  the MCD  cannot  be  located  on  the  same  parcel  as  a  facility  providing 

substance abuse services  that  is  licensed or certified by  the State of California or funded by  the 

Department of Public Health.  

 

The subject parcel does not contain a facility providing substance abuse services that is licensed or certified 

by the State of California or funded by the Department of Public Health. 

 

3. No alcohol is sold or distributed on the premises for on or off site consumption.  

 

No alcohol is sold or distributed on the premises for on or off‐site consumption. 

 

4. If Medical Cannabis is smoked on the premises the dispensary shall provide adequate ventilation 

within  the  structure  such  that  doors  and/or  windows  are  not  left  open  for  such  purposes 

resulting in odor emission from the premises.  

 

A  negative  pressure  ventilation  system  is  proposed, with  a  carbon  filter  and  fan muffler.  The  project 

sponsor does not intend to allow traditional smoking, but will allow vaporizing on the premises. 

 

5. The Medical Cannabis Dispensary has applied for a permit from the Department of Public Health 

pursuant to Section 3304 of the San Francisco Health Code.  

 

The applicant has applied for a permit from the Department of Public Health.   

 

6. A notice shall be sent out  to all properties within 300‐feet of  the subject  lot and  individuals or 

groups  that  have made  a written  request  for  notice  or  regarding  specific  properties,  areas  or 

Medical Cannabis Dispensaries.  Such notice shall be held for 30 days. 

 

A 30‐day notice was sent to owners and occupants within 300‐feet of the subject parcel identifying that a 

MCD  is  proposed  at  the  subject  property  and  that  the  building  permit  was  subject  to  a Mandatory 

Discretionary Review Hearing.   

 

GENERAL PLAN COMPLIANCE:   

The Project is, on balance, consistent with the following Objectives and Policies of the General Plan: 

 

COMMERCE AND INDUSTRY Objectives and Policies 

Page 6: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Discretionary Review Analysis Summary January 26, 2017

6

CASE NO. 2016-005312DRM3185 Mission Street

 

OBJECTIVE 1: 

MANAGE  ECONOMIC GROWTH AND  CHANGE  TO  ENSURE  ENHANCEMENT OF  THE 

TOTAL CITY LIVING AND WORKING ENVIRONMENT. 

 

Policy 1.1 

Encourage  development  which  provides  substantial  net  benefits  and  minimizes  undesirable 

consequences.  Discourage  development which  has  substantial  undesirable  consequences  that 

cannot be mitigated. 

 

The Project will provide access to safe, convenient access to medical cannabis, which has been recognized as 

beneficial option to the residents of San Francisco. 

 

Policy 1.2: 

Assure    that   all   commercial   and    industrial   uses   meet   minimum,   reasonable   performance 

standards. 

 

The location for the proposed MCD meets all of the requirements in Section 790.141 of the Planning Code. 

 

OBJECTIVE 2: 

MAINTAIN AND ENHANCE A SOUND AND DIVERSE ECONOMIC BASE AND FISCAL 

STRUCTURE FOR THE CITY. 

 

Policy 2.1 

Seek to retain existing commercial and industrial activity and to attract new such activity to the 

city. 

 

The Project  allows  an  existing  business  to  remain  in  the  Bernal Heights  neighborhood,  increasing  the 

diversity  of  job  and  activity  types within  this District, at  its new  location. The previous  location of  the 

Bernal Heights Cooperative was 33 29th Street. 

 

OBJECTIVE 7: 

ENHANCE SAN FRANCISCO’S  POSITION  AS  A  NATIONAL  AND  REGIONAL 

CENTER FOR GOVERNMENTAL, HEALTH, AND EDUCATIONAL SERVICES. 

 

Policy 7.3:   

Promote  the provision of adequate health and educational services  to all geographical districts 

and cultural groups in the city. 

 

The Project will service chronically  ill patients who are  in great need of this type of medical service.   By 

allowing  the  services  provided  by  the MCD,  its  patients  are  provided with  convenient,  safe  access  to 

medication for their aliments. 

 

Page 7: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Discretionary Review Analysis Summary January 26, 2017

7

CASE NO. 2016-005312DRM3185 Mission Street

SECTION 101.1 PRIORITY POLICIES Planning  Code  Section  101.1  establishes  eight  priority  policies  and  requires  review  of  permits  for 

consistency, on balance, with these policies.  The Project complies with these policies as follows:    

 

1. Existing neighborhood‐serving  retail uses be preserved and enhanced and  future opportunities  for 

resident employment in and ownership of such businesses enhanced. 

 

The proposed use is a neighborhood‐serving use.  The location for the MCD is currently vacant so the new use 

will not displace a previous neighborhood serving use. 

 

2. That existing housing and neighborhood character be conserved and protected  in order to preserve 

the cultural and economic diversity of our neighborhoods. 

 

The project occupies a ground  floor commercial space and will adhere with all signage regulations defined  in 

Article 33 of the Health Code to help preserve the existing neighborhood character. The proposed use would not 

adversely affect the existing neighborhood character. 

 

3. That the Cityʹs supply of affordable housing be preserved and enhanced. 

 

The proposed use  is  located  in a space previous occupied by non‐residential uses so the proposed use will not 

displace any affordable housing.  

 

4. That commuter traffic not impede MUNI transit service or overburden our streets or neighborhood 

parking. 

 

The site is close to multiple public transit lines and the immediate neighborhood provides sufficient short‐term 

parking so the use will not impede transit operations or impact parking.  

 

5. A  diverse  economic  base  be  maintained  by  protecting  our  industrial  and  service  sectors  from 

displacement  due  to  commercial  office  development,  and  that  future  opportunities  for  resident 

employment and ownership in these sectors be enhanced. 

 

The subject space is vacant and will not displace any industrial or service industry establishments. 

 

6. The City achieves  the greatest possible preparedness  to protect against  injury and  loss of  life  in an 

earthquake. 

 

The MCD will follow standard earthquake preparedness procedures and any construction would comply with 

contemporary building and seismic codes. 

 

7. Landmarks and historic buildings be preserved. 

 

The existing building has not been designated as a historic resource; however, it remains as a potential historic 

resource. The proposed project will not alter expand or significantly alter the existing building. 

 

Page 8: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Discretionary Review Analysis Summary January 26, 2017

8

CASE NO. 2016-005312DRM3185 Mission Street

8. Parks and open space and their access to sunlight and vistas be protected from development. 

 

The project will not restrict access  to any open space or parks and will not  impact any open space or park’s 

access to sunlight or vistas. 

 

ENVIRONMENTAL REVIEW The project is categorically exempt from the environmental review process under Section 15301 Class 1(a) 

of the State CEQA Guidelines, pursuant to Title 14 of the California Administrative Code. 

BASIS FOR RECOMMENDATION In  1996,  California  voters  passed  Proposition  215,  known  as  the  Compassionate  Use  Act,  by  a  56% 

majority.    In San Francisco, Proposition 215 passed by a 78% majority.   The  legislation established  the 

right  of  seriously  ill  Californians,  including  those  suffering  from  illnesses  such  as AIDS,  cancer  and 

glaucoma, to obtain and use marijuana for medical purposes when prescribed by a physician. 

 

MCDs  began  to  be  established  in  San  Francisco  shortly  after  Proposition  215  passed  as  a means  of 

providing safe access to medical cannabis for those suffering from debilitating illnesses.  At that time, San 

Francisco did not have any  regulatory controls  in place  to  restrict  the placement and operations of  the 

dispensaries.  As a result, over 40 dispensaries were established in the city without any land use controls, 

often resulting in incompatible uses next to each other. 

 

On December 30, 2005, the Medical Cannabis Act, as approved by the Board of Supervisors and Mayor, 

became effective. The Act, set forth in Ordinance 275‐05 and supported by Ordinances 271‐05 and 273‐05, 

amended  the Planning, Health, Traffic, and Business and Tax Regulation Codes  in order  to establish a 

comprehensive regulatory framework for MCDs in San Francisco. 

 

The Act designates  the Department of Public Health  (DPH)  as  the  lead  agency  for permitting MCDs. 

DPH  conducts  its  own  review  of  all  applications  and  also  refers  applications  to  other  involved City 

Agencies, including the Planning Department, in order to verify compliance with relevant requirements. 

The  Planning Department’s  review  is  generally  limited  to  the  location  and  physical  characteristics  of 

MCDs.   

The MCD complies with all standards and requirements of the Planning Code and advances the 

objectives and policies of the General Plan. 

This Site will not significantly impact public transit. 

The Site is more than 1,000ʹ from any primary and secondary school. 

The Site is more than 1,000ʹ from any active youth‐services facility. 

No cannabis plants would be cultivated on‐site. 

Filtered ventilation is provided for consumption on‐site. 

Only employees registered with SFDPH will be at the subject property. 

 

Page 9: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Discretionary Review Analysis Summary January 26, 2017

9

CASE NO. 2016-005312DRM3185 Mission Street

CONDITIONS OF APPROVAL To  minimize  the  potential  impact  of  the  proposed  use  on  the  surrounding  commercial  area  the 

following conditions are recommended for imposition on the project: 

1. The  operator  of  the  establishment  shall maintain  the  entrances  and  all  sidewalks  abutting  the 

subject  property  in  a  clean  condition.  Such  maintenance  shall  include,  at  minimum,  daily 

sweeping and litter pickup and disposal and washing or steam/pressure cleaning of the entrances 

and abutting sidewalks at least once every month.  

2. The  operator  shall  maintain  appropriate  odor  control  equipment  to  prevent  any  significant 

noxious or offensive odors from escaping the premises. 

3. An  enclosed  garbage  area  shall  be  provided within  the  establishment. All  garbage  containers 

shall be kept within the building until pick‐up by the disposal company. 

 

RECOMMENDATION

RECOMMENDATION:  Take Discretionary Review and Approve  

Attachments: 

Parcel Map  

Sanborn Map 

Zoning Map 

Height & Bulk Map 

Aerial Photograph 

Site Photographs 

1,000’ Radius Map 

MCD DR Notice 

Applicant’s MCD Application 

SFDPH Application 

Public Comment 

Environmental Evaluation 

Floor Plans 

 

Page 10: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Parcel Map

Mandatory Discretionary Review Hearing January 26, 2017 Case Number 2016-005312DRM 3185 Mission Street

SUBJECT PROPERTY

Page 11: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

*The Sanborn Maps in San Francisco have not been updated since 1998, and this map may not accurately reflect existing conditions.

Sanborn Map*

SUBJECT PROPERTY

Mandatory Discretionary Review Hearing January 26, 2017 Case Number 2016-005312DRM 3185 Mission Street

Page 12: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Aerial Photo

SUBJECT PROPERTY

Mandatory Discretionary Review Hearing January 26, 2017 Case Number 2016-005312DRM 3185 Mission Street

Page 13: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Aerial Photo

SUBJECT PROPERTY

Mandatory Discretionary Review Hearing January 26, 2017 Case Number 2016-005312DRM 3185 Mission Street

Page 14: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Zoning Map

Mandatory Discretionary Review Hearing January 26, 2017 Case Number 2016-005312DRM 3185 Mission Street

Page 15: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Height and Bulk Map

Mandatory Discretionary Review Hearing January 26, 2017 Case Number 2016-005312DRM 3185 Mission Street

Page 16: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Site Photo

SUBJECT PROPERTY

Mandatory Discretionary Review Hearing January 26, 2017 Case Number 2016-005312DRM 3185 Mission Street

Page 17: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Site Photo

SUBJECT PROPERTY

Mandatory Discretionary Review Hearing January 26, 2017 Case Number 2016-005312DRM 3185 Mission Street

Page 18: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security
Page 19: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

中文詢問請電: 415.575.9010 | Para Información en Español Llamar al: 415.575.9010 | Para sa Impormasyon sa Tagalog Tumawag sa: 415.575.9121

1650 Miss ion St reet , Sui te 400 • San Franc isco, CA 94103 • Fax (415) 558-6409

NOTICE OF PUBLIC HEARING Hearing Date: Thursday, January 26, 2017 Time: Not before 12:00 PM (noon) Location: City Hall, 1 Dr. Carlton B. Goodlett Place, Room 400 Case Type: Mandatory Discretionary Review Hearing Body: Planning Commission

P R O P E R T Y I N F O R M A T I O N A P P L I C A T I O N I N F O R M A T I O N

P R O J E C T D E S C R I P T I O N

The Request is for a Mandatory Discretionary Review of an application for a change of use from a vacant gun shop to a Medical Cannabis Dispensary (MCD). The proposed MCD (d.b.a Bernal Heights Cooperative) will be approximately 1,745 square feet in total at the ground level. The MCD is relocating from its previous location at 33 29th Street. Only vaporizing of cannabis is proposed on-site, with an interior air-filtration system. The associated Building Permit Application 2016.02.11.9450 is for tenant improvements only. No exterior changes are proposed. A Planning Commission approval at the public hearing would constitute the Approval Action for the project for the purposes of CEQA, pursuant to San Francisco Administrative Code Section 31.04(h).

Project Address: 3185 Mission Street Cross Street(s): Powers Avenue Block /Lot No.: 5609/015 Zoning District(s): NC-3 / 40-X Area Plan: N/A

Case No.: 2016-005312DRM Building Permit: 2016.02.11.9450 Applicant: Sean Killen Telephone: (415) 608-7177 E-Mail: [email protected]

A D D I T I O N A L I N F O R M A T I O N

FOR MORE INFORMATION, PLEASE CONTACT PLANNING DEPARTMENT STAFF: Planner: Jeffrey Speirs Telephone: (415) 575-9106 E-Mail: [email protected]

ARCHITECTURAL PLANS: If you are interested in viewing the plans for the proposed project please contact the planner listed below. The plans and Department recommendation of the proposed project will be available prior to the hearing through the Planning Commission agenda at: http://www.sf-planning.org or by request at the Planning Department office located at 1650 Mission Street, 4th Floor. Members of the public are not required to provide personal identifying information when they communicate with the Commission or the Department. All written or oral communications, including submitted personal contact information, may be made available to the public for inspection and copying upon request and may appear on the Department’s website or in other public documents.

Page 20: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

GENERAL INFORMATION ABOUT PROCEDURES HEARING INFORMATION

You are receiving this notice because you are either a property owner or resident that is adjacent to the proposed project or are an interested party on record with the Planning Department. You are not required to take any action. For more information regarding the proposed work, or to express concerns about the project, please contact the Applicant or Planner listed on this notice as soon as possible. Additionally, you may wish to discuss the project with your neighbors and/or neighborhood association as they may already be aware of the project.

Persons who are unable to attend the public hearing may submit written comments regarding this application to the Planner listed on the front of this notice, Planning Department, 1650 Mission Street, Suite 400, San Francisco, CA 94103, by 5:00 pm the day before the hearing. These comments will be made a part of the official public record and will be brought to the attention of the person or persons conducting the public hearing.

Comments that cannot be delivered by 5:00 pm the day before the hearing may be taken directly to the hearing at the location listed on the front of this notice. Comments received at 1650 Mission Street after the deadline will be placed in the project file, but may not be brought to the attention of the Planning Commission at the public hearing.

BUILDING PERMIT APPLICATION INFORMATION

Pursuant to Planning Code Section 311 or 312, the Building Permit Application for this proposal may also be subject to a 30-day notification of property owners and residents within 150-feet of the subject property. This notice covers the Section 311 or 312 notification requirements, if required.

APPEAL INFORMATION

An appeal of the approval (or denial) of a Conditional Use application and/or building permit application associated with the Conditional Use application may be made to the Board of Supervisors within 30 calendar days after the date of action by the Planning Commission pursuant to the provisions of Section 308.1(b). Appeals must be submitted in person at the Board’s office at 1 Dr. Carlton B. Goodlett Place, Room 244. For further information about appeals to the Board of Supervisors, including current fees, contact the Clerk of the Board of Supervisors at (415) 554-5184.

An appeal of the approval (or denial) of a building permit application by the Planning Commission may be made to the Board of Appeals within 15 calendar days after the building permit is issued (or denied) by the Director of the Department of Building Inspection. Appeals must be submitted in person at the Board's office at 1650 Mission Street, 3rd Floor, Room 304. For further information about appeals to the Board of Appeals, including current fees, contact the Board of Appeals at (415) 575-6880.

Pursuant to California Government Code Section 65009, if you challenge, in court, the decision of an entitlement or permit, the issues raised shall be limited to those raised in the public hearing or in written correspondence delivered to the Planning Commission prior to, or at, the public hearing.

ENVIRONMENTAL REVIEW

This project has undergone preliminary review pursuant to California Environmental Quality Act (CEQA). If, as part of this process, the Department’s Environmental Review Officer has deemed this project to be exempt from further environmental review, an exemption determination has been prepared and can be obtained through the Exemption Map, on-line, at www.sfplanning.org. An appeal of the decision to exempt the proposed project from CEQA may be made to the Board of Supervisors within 30 calendar days after the project approval action identified on the determination. The procedures for filing an appeal of an exemption determination are available from the Clerk of the Board at City Hall, Room 244, or by calling (415) 554-5184.

Under CEQA, in a later court challenge, a litigant may be limited to raising only those issues previously raised at a hearing on the project or in written correspondence delivered to the Board of Supervisors, Planning Commission, Planning Department or other City board, commission or department at, or prior to, such hearing, or as part of the appeal hearing process on the CEQA decision.

Page 21: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

i

APPLICATION TO OPERATE A

TELEPHONE

'; (415) 298-8188____ __.EMAIL:

APPLICANT'S NAME:

jean Killen Same as Above '._...t

APPLICANT'S ADDRESS:

~,C~6Q ~CAc,-~7~c ~'c~~. ~ ~A~~

Scan ~~~~isc4~ C,A 941~~

TELEPHONE:

(415 > 608-7177EMAIL:

[email protected]

Same as Above ~~

ADDRESS: TELEPHONE:

' ~

EMAIL

ZIP CODE__ ...

___94110

_ __

FLOOR ON WHICHDiSPENSARY IS LOCATED::

Ground

_ _ _ _ _ _ __ __IOPOSED BUSINESS NAME QF KNOWN).— _

~rnal Heights Cooperative _ . _. _IESENT OR PREVIOUS USE.

reviously Retail Gun Store

Page 22: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

PROXIMITY TO SCHOOLS - (Initial Below

have used all reasonable resources available to me, including maps and zoning ',information made available by the Planning Department and a personal and thoroughinspection of the broader vicinity of the subject property and have found that, to the best of ';my knowledge, the property is not within 1,000 feet of an elementary or secondary school, ';public or private.

PROXIMITY TO RECREATION BUILDINGS ( Initial Below

have used all reasonable resources available to me, including maps and zoninginformation made available by the Planning Department and a personal and thoroughinspection of the broader vicinity of the subject property and have found that, to the best of ' ~.my knowledge, the property is not within 1,000 feet of a recreation building, as defined in ~the Planning Code.

PROXIMITY TO SUBSTANCE ABUSE TREATMENT FACILITIES

have-used all reasonable resources available to me, including a personal inspection ofthe subject property and have found that, to the best of my knowledge, the property doesnot contain a substance abuse treatment facility.

...~ ;-, . _... .

ON SITE MEDICATING

Will you allow patrons or employees to smoke or vaporize medical cannabis, or otherwisemedicate with medical cannabis, on the premises?

( Initial Below )

~.

NO

~I YES

MEDICAL CANNABIS EDIBLES

Will you offer medical cannabis in the form of food or drink or will medical cannabis edibles ~ Npbe produced on-site? If so, please check the appropriate boxes and, if applicable, declare ~i YESthe proposed square footage to be dedicated to on-site production of edibles.

!,~',~ Dispensing( Note that Planning Code standards may prohibit [1] the dedication of more than 1/4 of the total floor area oT the dispensary for the

Productionproduction of food andlor [2] the off-site dispensing of any products that are made on-site. Also please note that if food is provided orproduced, additional permits will be required from the Department of Public Health.) gp ~ ~"'"" "'~ ̀ " "~

l

ON-SITE MEDICAL CANNABIS CULTIVATION

Will any live marijuana plants be kept on the premises for purposes of harvesting medical ~ NOproduct? If so, please declare the proposed square footage to be dedicated to growing --activities. __~ YES

SO FT ~ E( Note that additional safety measures maybe required. Consult with the Department of Public Health regarding the use and storageof chemicals associated with the growing process and with the Department of Building Inspection regarding associated building safetyissues. Also note that the Planning Code may prohibit the use of more than 1/4 of the total area of the dispensary for such purpose. )

OFF-SITE MEDICAL CANNABIS CULTIVATION

Will any medical cannabis distributed on the premises have been grown elsewhere than on NOthe premises? If so, please declare whether medical cannabis cultivation will occur within ', ~~( YESor outside the City and County of San Francisco.

~ Witliin San Francisco(Note that any off-site growing facility located in San Francisco must be properly permitted under applicable state and local law. )

!....~ OuSideSanFrancisco

SAN FRANCISCO PLANNING DEPARTMENT V.10.02.201a

Page 23: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

~ r el q. j~b~ y~. ;b s~ u~_

C4SE NUMBER: ! '.

......_ ____. ____. .._..... __... ..__ i

~ f. ..., -~tfaW~ ~ ~ ~~~ ~I .

Please discuss:

1. The business plan for the proposed Medical Cannabis Dispensary;

Specific factors which contribute to the compatibility and appropriateness of the Medical Cannabis Dispensary

with the immediate neighborhood and broader City environment;

C

Page 24: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

3. Neighborhood outreach efforts made and the results/input from those efforts;

4. Any other circumstances applying to the property involved which you feel support your application.

4 ____._

SAN FRANCISCO PLANNING DEPARTMENT V.10.02.2014

Page 25: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

~~~ ~s:=. i ✓ is. 4P e ~ii ~aa i1... .. A. -~ .. s .., c :.3 s.

c:A~t NUMCCN: '. '.

Proposition M was adopted by the voters on November 4, 1986. It requires that the City shall find that proposed

projects and demolitions are consistent with eight priority policies set forth in Section 101.1 of the City Planning

Code. These eight policies are listed below. Please state how the project is consistent or inconsistent with each policy.

Each statement should refer to specific circumstances or conditions applicable to the property. Each policy must have

a response. IF A GIVEN POLICY DOES NOT APPLY TO YOUR PROJECT, EXPLAIN WHY IT DOES NOT.

That existing neighborhood-serving retail uses be preserved and enhanced and future opportunities for resident

employment in and ownership of such businesses enhanced;

2. That existing housing and neighborhood character be conserved and protected in order to preserve the cultural

and economic diversity of our neighborhoods;

3. That the City's supply of affordable housing be preserved and enhanced;

Page 26: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

4. That commuter traffic not impede Muni transit service or overburden our streets or neighborhood parking;

__

5. That a diverse economic base be maintained by protecting our industrial and service sectors from displacement

due to commercial office development, and that future opportunities for resident employment and ownership in

these sectors be enhanced;

J@e _ rtk~-~c1n M~:~- ~ _ _ _ _

6. That the City achieve the greatest possible preparedness to protect against injury and loss of life in an earthquake;

7. That landmarks and historic buildings be preserved; and

c- ~ . ............ '~x A ~~<~M

8. That our parks and open space and their access to sunlight and vistas be protected from development.

~~-~

SAN FRANCISCO PLANNING DEPARTMENT V.10.02.2014

Page 27: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

1, ~Lw s sus 3 +~ ~ ~. jt` ~:

Fa1'~a~ 5 .~t~~.. '0..'i t a`Y.

(:AaE NUMtltn: ''.

Under penalty of perjury the following declarations are made:

a: The undersigned is the owner or authorized agent of the owner of this property.

b: The information presented is true and correct to the best of my knowledge.

c: The other informarion or applications may be required.

.~ ,.Signature: ~->_;;~~ --•'' __.__--- Date: ~Z~Z.3IJ~?

f ~

Print name, and indicate whether owner, or authorized agent:

Owner /Authorized Agent (circle one)

For Department Use Only

Application received by Planning Department:

By: Date:

Page 28: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

11

Bernal Heights Cooperative

Attachment A

Business Plan

Applicant's Statement -Planning Department Application for MCD - 3185 Mission Street

Contents

I. Executive Summary

II. Business History, Background, and Objectives

III. Present Market

IV. Competition

V. Marketing Plan

VI. Management and Organization

Page 1

Page 1-3

Page 4

Page 5

Page 6Page 6-7

Attachment A -Business Plan

Page 29: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

11

Bernal Heights Cooperative

SECTION I -EXECUTIVE SUMMARY

Bernal Heights Cooperative is anon-profit established with the mission to provide access to safe,

high-quality and affordable medical cannabis to patients in need under Proposition 215, SB 420,

and Article 33 of the San Francisco Health Code. We are an organization that embraces San

Francisco's vibrantly diverse cultural and economic communities. We serve medical cannabis

patients with compassion and respect, in a welcoming environment that aims to make all patients

feel safe and comfortable. Bernal Heights Cooperative is an active member of the local

community, actively contributing to the success of other local business and to the benefit of other

non-profit, community organizations. We are a group of San Francisco and Bay Area natives

who take pride in serving the community we call home.

SECTION II -BUSINESS HISTORY, BACKGROUND, AND OBJECTIVES

1. Briefly describe when, how, and why you formed the company and its development so far

Bernal Heights Collective was originally formed in 2005 by Johnny Battista, and was awarded one

of San Francisco's first MCD permits. Bernal Heights Collective was considered "the city's

dispensary' whose mission was to "serve the underserved" in San Francisco.

In 2012, Johnny Battista converted the MCD permit from Bernal Heights Collective, to Bernal

Heights Cooperative.

In July of 2015, the building at 33 29th Street was purchased by the investment group behind

Harvest, a new luxury dispensary chain in San Francisco. The Cooperative was informed by the

new building owner that the Cooperative would be evicted at the end of the lease in March 2016,

and would be replaced by the second Harvest chain dispensary location.

In October 2015, Johnny Battista signed Sean Killen and Nathan DeSomber onto the Board to

oversee the permit application process for the new MCD location, and successful transition of

Cooperative operations.

Between October 2nd, and December 31st 2015, the Cooperative was able to remedy over

$100k in vendor debt, local business debt, and tax debt that had been accrued by Johnny

Battista since 2012.

Attachment A -Business Plan

Page 30: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

1

Bernal Heights Cooperative

In January 2016, it was discovered that the application for the new MCD location at 3185 Mission

Street had not submitted as promised by Nathan DeSomber, the money for the $8,800 MCD

application fee was gone, and over $30k more of the Cooperative's money that was earmarked

for vendors and taxes had been embezzled by Johnny Battista and Nathan DeSomber. A

Cooperative vote was held, and approved, to remove both from their management positions in the

Cooperative.

On June 15th 2015, the Cooperative was evicted from 33 29th Street.

With the support of thousands of local residents, local businesses, and neighborhood associations,

managing members of the Cooperative have since made every effort to oversee the transition of

the Cooperative's MCD permit from 33 29th Street, to 3185 Mission Street, in the very same

neighborhood, serving the very same patient base, less than 1000 feet away.

2. Lisf your short term and long term objectives

Our short term objective is simple;

seek approval from Planning to use 3185 Mission Street as the new location of our

MCD, and to reacquire our MCD permit from the Health Department.

Our long term objectives, pursuant to our approval by Planning and Permitting by Health;

Seek approval to begin cultivation of medical cannabis at a location within San Francisco

Create more employment and ownership opportunities for members of the community

Strive for excellence in product and service

Serve our patient base through a strategy of excellence in quality, service, and price

Grow through word-of-mouth.

Continue and expand our community service/compassion programs

Offer a delivery service for patients who are unable to easily make it into the MCD

3. Describe your company's major successes or achievements to date including difficulties

and/or obsfac/es that your company has overcome

Our most major success to date, has been sticking together to survive a tremendously challenging

year. Maintaining positive relationships with our patient community, and the local business

community, and navigating a new MCD application process that seemed financially untenable.

Attachment A -Business Plan2

Page 31: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

1

Bernal Heights Cooperative

The Cooperative lost its MCD permit through process of eviction by an out-of-town investment

group who specifically evicted the Cooperative to open their own MCD without having to go

through Discretionary review process with the City's Planning Commission. A loophole, cleverly

exploited, by an investment group that manages their MCD chain as afor-profit corporation under

the expectation of maximum investor return. Not patient care. A group that has made a mockery

of the guiding tenets of San Francisco's Medical Cannabis Dispensary permitting process. To

make things worse, the Cooperative lost tens of thousands of dollars to embezzlement by people

who were trusted to protect the group's best interests and economic sustainability. The only way

for the Cooperative to survive, was to band together, take charitable donations, secure another

location, and absorb the costs associated with a new application and renovations to achieve ADA

compliance and receive signoff from MOD for our new location.

Over a year fraught with obstacles, the Cooperative has banded together to support a cause we

all feel is tremendously important and worthy of our efforts and sacrifice.

Although understandably not at the forefront of City considerations, "Corporate Cannabis" is a

genuine threat to the preservation of our City's cultural and economic diversity. BHC represents

a long-standing approach to "Community Cannabis", an inclusive approach where the best

interests of patients, and the local community, is prioritized over profits.

Our ultimate success would come from The City recognizing, and protecting, Community

Cannabis as the best path forward for the cannabis industry in San Francisco.

5. Describe how the company was initially capitalized, and how if has been funded since

its founding

Bernal Heights Cooperative is self-funded non-profit, operating from donations by patients in and

around the community

6. Describe any important changes in the structure, ownership, management, or key

personnel which have taken place in the past year.

Changes to the Cooperative's management over the last year are addressed in Section II above

Attachment A -Business Plan

3

Page 32: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

11

Bernal Heights Cooperative

SECTION III -PRESENT MARKET

7. Describe your present market. Give geographic location of your customers and types of

customers you serve.

Bernal Heights Cooperative present market consists of medical cannabis patients, largely

residents of the Mission, Outer Mission, Bernal Heights, Portola, Castro, Noe Valley, Excelsior,

and Visitation Valley. Our patient base consists of people from all cultural and economic

backgrounds, however, we do serve a larger percentage of seniors, disabled, and members

of the LGBT community, than other MCDs in the area, as we are known to offer a more

medically focused menu in a more welcoming environment

8. Identify major customers and include a brief description and explanation of any special

relationship between your company and its customers.

Although our patient base is wide and diverse, the common ground among all is the need for

reliable, safe, and discreet access to medical cannabis. Our patients depend on our service to

treat symptoms from the everyday, to the extraordinary. Over the years we have developed a

relationship with thousands of patients in order to understand their individual needs, and cater our

MCD to accommodate as many patients as possible. BHC was the only MCD in the City to carry

many specialty products, such as whole-plant "Rick Simpson Oil", CBD rich options, topicals, and

suppositories. While expensive and inconvenient to carry, it is these kinds of medical cannabis

products that are sought out by patients who are suffering from some of the most severe

medical conditions.

9. Describe your current marketing approach. How do you sell your products/services?

Our marketing approach can best be described as a word-of-mouth strategy. Our only form of

advertising had been a listing on the popular medical cannabis review site, Weedmaps.

Otherwise, we rely on exceptional quality and service to create word-of-mouth referrals to grow

our patient base and build loyalty within that base.

Attachment A -Business Plan►.i

Page 33: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

11

Bernal Heights Cooperative

SECTION IV -COMPETITION

10. List those firms you have identified as primary competitors in your market(s). Identify

their strengths and weaknesses.

Although we don't view other MCDs as competitors, they do represent alternative options to the

experience we provide at BHC. In our community, there are two other MCDs for patients to

choose:

Cookie Co. 415 - 3139 Mission Street

- Sfrengths- A popular hip-hop lifestyle brand, primarily among the 18-25 age bracket, Cookies

has a devoted following of younger patients who are seeking specific strains that

are popular among Rap artists

- Weaknesses

- Reported by BHC patients as an unsuitable alternative for them because they do

not feel safe or comfortable in that environment

Harvest - 33 29th Street

- Strengths- Well-funded

- Beautifully designed

- Weaknesses- Limited selection due to poor industry relationships

- Selection is typically reviewed as "overpriced" compared to alternatives

- Neighboring businesses have reported that the design of Harvest, although

beautiful, is not medical, and people have been confusing it for ahigh-end grocery

market

- The consumption lounge is for "members only", and membership requires a

monthly payment, making it an exclusionary environment that BHC patients are not

accustomed

Attachment A -Business Plan5

Page 34: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

1

Bernal Heights Cooperative

11. What advantages and disadvantages does your company have as compared with its

primary competitors?

Our advantage include:

1. Longstanding relationship with the patients in the community

2. More affordable products and a broader selection of specifically medical products

3. More experienced cultivators who can ensure the best quality medicine is being delivered

at the most affordable rate to the patient possible

4. An open and welcoming environment that is meant to serve all members of the community

equally

5. We are not a business focused on maximizing the bottom line. We are a Cooperative of

the community, for the community, that the community feels proud to support

SECTION V -MARKETING PLAN

12. Describe your marketing plan

Our marketing plan is simple; provide excellence in quality, service, affordability, and accessibility.

Then let patients handle our marketing through word-of-mouth referrals

SECTION VI -MANAGEMENT AND ORGANIZATION

73. Describe your management team and list its strengths and weaknesses

Our management team consists of San Francisco and Bay Area natives between the ages of

36-60. The team holds a combined:

- Four Bachelors Degrees from California Universities

- One JD Degree from USF

- A Certification in Ethics and Compliance

- Over 40 years of combined cultivation experience for San Francisco's medical cannabis

patients- Over 10 years of MCD management experience

Attachment A -Business PlanC:

Page 35: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

11

Bernal Heights Cooperative

We are an experienced, capable, and committed team that is passionate about our service

to the community. We are true believers in the tenets of Proposition 215, in the

importance to safe access to medically focused cannabis products, and we are proud

members of our community. We believe we have a responsibility to put patients above

profits and to give back abundantly to our local communities.

Attachment A -Business Plan7

Page 36: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

11

Bernal Heights Cooperative

ATTACHMENT B

Applicant's Statement -Planning Department Application for MCD - 3185 Mission Street

2. Specific factors which contribute to the compatibility and appropriateness of the Medical

Cannabis Dispensary wifh the immediate neighborhood and broader City environment;

Bernal Heights Cooperative has been serving patients in the community from its permitted MCD

at 33 29th Street since 2005. In the Summer of 2015, the building at 33 29th Street was sold to

the investment group behind the new luxury dispensary chain in San Francisco, Harvest. The

same investment group that purchased the building at 4811 Geary Street and evicted The Hemp

Center in order to obtain a location that was already approved by the Planning Department to

operate as an MCD. Harvest on Geary opened in December of 2015.

In June of 2016, Bernal Heights Cooperative was evicted from 33 29th Street. A second Harvest

location, Harvest off Mission, now exists in that location.

We are a community organization with a track record of discreetly, responsibly, and

respectfully serving a large and diverse base of medical cannabis patients in the

community. We pride ourselves in providing safe and affordable medicine in a comfortable,

service oriented setting that is open to all of San Francisco's vibrantly diverse communities. Our

patients in the community appreciate the service we provide and have signed an abundance of

petitions supporting our efforts to reopen in our new location following our eviction.

We pride ourselves in being good neighbors, and contributing back into the community and to the

benefit of other local businesses. We are supported by local businesses and neighborhood

organizations as a contributing member of the small-business community.

The managing members and staff of the Cooperative are all San Francisco and Bay Area natives.

We are not outside investors who look at an MCD as a bottom line business. We believe in

Proposition 215, we believe in Cannabis as natural medicine for awide-array of symptoms, and

we take pride in the service we provide to communities we care about in the city we call home.

Attachment B

Page 37: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

'~

Bernal Heights Cooperative

3. Neighborhood outreach efforts made and the results/input from those efforts;

Pertaining to the proposed, we have made outreach efforts to all neighboring businesses

within 300 feet, and beyond, and all relevant community associations.

The feedback from local businesses has been fully supportive. Letters of support

will be available on the date of hearing along with petitions of support from local

residents.

Our outreach to Neighborhood associations are as follows:

- Mission Bernal Merchants Association

- July 19th -Afternoon -spoke to Eden Stein at her place of business, Secession Art

& Design at 3235 Mission Street. I Informed her of our situation and our pending

application, she explained she was already aware as she knew people close to her

who are members of the Cooperative and appreciated our efforts at the MCD to

provide for patients in the community. When asked how she felt about us moving,

she said she had heard good things about us from people close to her in the

community and she supports us opening as long as we do it the "right" way.

- December 22nd - 1:15pm -Spoke to Eden Stein, she said she still supports us

opening, as long as we're doing it the "right" way. I explained our current situation

and our pending Discretionary Review with Planning and asked if she would be

willing to provide a formal letter of support. She declined, stating that she had

decided to remain "neutral" between Bernal Heights Cooperative and Harvest.

Harvest being the corporation that runs atwo-location chain of MCDs in our

previously permitted location at 33 29th Street

- Tiffany Street Neighborhood Association

The owners of our neighboring coffee shop on 29th Street, Cafe 48, lead the

Tiffany Street Association. We have along-standing positive relationship as

neighbors who have been respectful, have contributed to the neighborhood, and

have contributed to the benefit of local business. A formal letter of support will

be available on our hearing date

Attachment B2

Page 38: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

r

Bernal Heights Cooperative

- Bernal Heights Neighborhood Center

- BHC has worked with BHNC for years, contributing to food drives and other

neighborhood efforts. Gina Dacus, Executive Director of BHNC, wsa contacted on

12/22 and 12/23 to request a formal letter of support. We hope to have one

available on our hearing date

- Northwest Bernal Business Alliance

- Unreachable by phone. No website. Unclaimed Yelp page with no additional

contact information

4. Any other circumstances applying to the property involved which you feel suppo►t yourapplication;

The proposed is located on a block of Mission Street in Bernal Heights that is seeing morecommunity restaurants and shops being added to the already lively bar scene in theneighborhood. The presence of a clean, safe; and respectable MCD in the area, operating fromthe full business hours of Sam-10pm everyday, would be a tremendous benefit to all of thelocally owned small businesses in the area. With the application of our Crime Preventionthrough Environmental Design, our presence on the block will serve to further benefit thecommunity through Cooperative funded cleanup and beautification services and daily streetsecurity from the hours of Sam-10pm. Since the block is all ground level commercial and athoroughfare of muni transit, our operating hours would not be an interruption to the quietenjoyment of the residential tenants. The area has plenty of public transportation, meteredparking, and is within walking distance to three major neighborhoods in the community. Theproposed would allow a long time, medically-focused, community non-profit to continue its longstanding service to the community without disturbing the enjoyment of the local community.

Attachment B3

Page 39: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Bernal Heights Cooperative

Attachment C

Priority General Plan Policies Findings

1. That existing neighborhood-serving retail uses be preserved and enhanced and future

opportunities for resident employment in and ownership of such businesses enhanced;

The proposed is aneighborhood-serving use. Previously a retail use guns store, the location has

been vacant since October 2015. The proposed will provide dozens of resident employment

opportunities that wouldn't otherwise exist..

2. That existing housing and neighborhood character be conserved and protected in order to

preserve the cultural and economic diversity of our neighborhoods;

The project occupies a ground floor commercial space and will adhere with all signage regulations

defined in Article 33 of the San Francisco Health Code to visually preserve the existing

neighborhood character. The proposed use would protect the neighborhood's existing diverse

cultural and economic character by providing equally for patients in the community, and by

providing dozens of employment opportunities for residents in the community who are in need of

such opportunities to sustain a livelihood in San Francisco.

3. Thaf the City's supply of affordable housing be preserved and enhanced;

The proposed use is located in a space previous occupied by non-residential uses so the

proposed use wilt not displace any affordable housing.

4. Thaf commuter traffic not impede Muni transit service or overburden our sfreefs or

neighborhood parking;

The site is close to multiple public transit lines and the immediate neighborhood provides sufficient

short-term, metered parking so the use will not impede transit operations or impact parking.

Further, Security door staff will be tasked to ensure

Attachment C

Page 40: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

11

Bernal Heights Cooperative

5. That a diverse economic base be maintained by protecting our industrial and service sectors

from displacement due to commercial office development, and that future opportunities for

resident employment and ownership in these sectors be enhanced;

The subject space is vacant and will not displace any industrial or service industry establishments.

Further, the proposed will serve to provide dozens of resident employment and ownership

opportunities where none currently exist.

6. That the City achieve the greatest possible preparedness to protect against injury and loss of

life in an earthquake;

The MCD will follow standard earthquake preparedness procedures and any construction would

comply with contemporary building and seismic codes.

7. That landmarks and historic buildings be preserved;

The Project scope is for interior tenant improvements only, with no exterior work on the subject

building proposed

8. That our parks and open space and their access to sunlight and vistas be protected from

development.

The proposed is a ground floor commercial unit of a two-story Victorian. The project will not

restrict access to any open space or parks and will not impact any open space or park's access to

sunlight or vistas.

Attachment C2

Page 41: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

11

Bernal Heights Coopective

Security PlanBernal Heights Cooperative - 3185 Mission Street

Our security philosophy at BHC is Crime Prevention through Environmental Design. The

principles of CPTED are:

- Natural Surveillance- Natural Access Control

- Territorial Reinforcement- Maintenance and Management

The Bernal Heights community is evolving. Having historically been an area of San Francisco with

a higher level of crime, the last few years have seen new developments along Mission Street that

aim to shape the neighborhood as a safer and friendly place. With several locally owned and

operated bars, restaurants and shops, neighborhood businesses rely on each other to define the

tone and safety of the local environment. BHC aims to be a leader in that effort. In addition to the

on-site security factors outlined below, we will also continue our efforts to keep the streets on and

around our establishment clean and monitored for security. Those efforts include weekly Sunday

street cleaning, and once a month "deep" cleaning. Through our compassion programs, we have

enlisted the efforts of San Francisco's well-intending, and under-employed who are in need of

access to free medical cannabis, to serve the Bernal Heights Community through street

cleaning and neighborhood volunteer efforts.

Although successful, and appreciated by the neighbors in our last location, we intend to expand

the scope of the "Maintenance and Management" aspect of our practiced CPTED as we are

looking at a location on a bigger block with more public foot, muni, and automobile traffic. We will

make our compassion team available to the neighborhood for projects upon request. We intend

the program to service requests including, but not limited to; graffiti removal and touch up

painting, pressure washing, and window cleaning. With resources applied to keeping our

neighborhood clean and safe for all, the presence of any criminal element, and therefore the risk

of being targeted by any criminal element, will decrease.

With that in mind, to cover the aspects of Natural Surveillance, Natural Access Control, and

Territorial Reinforcement, we have implemented the following Security Controls:

1. Fixtures

a. Roll down gate at the street

b. Triple bolted front door

c. Four Protective Bollards bolted into cement foundation on the inside of the front

door

Security Plan

Page 42: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

f1

Bernal Heights Coopective

BHC Security Plan - 3185 Mission Street

2. Cameras

a. 2 - 180 degree high-resolution security cameras facing the street

b. 1 -camera monitoring adjacent breezeway

c. 9 -cameras providing 100% visibility of internal floorplan

3. Alarm &Monitoring

a. Camera feeds are stored remotely and monitored by A&S Alarm

b. Alarm is monitored by A8~S Alarm

4. Security Staff &Protocol

a. The premise shall have one to two security personnel on staff at all times

b. No firearms will be kept on premise

c. Security will be unarmed and trained in one or more applicable forms of

preventative, non-lethal, self-defense security protocol

d. Security staff will be positioned at the front door, on the street, to provide natural

surveillance and visible reinforcement

5. Neighborhood Involvement

a. Over the last ten years, Bernal Heights Cooperative has provided local law

enforcement with street security footage to aid in local cases. With security

cameras covering the area around the intersection at Mission Street and Valencia

Street, BHC will be able to continue community policing efforts with trained, local,

community-focused security personnel. Security personnel will be responsible for

maintaining adirect-line relationship with local law enforcement.

b. Neighboring businesses will have a direct line to security personnel to address any

issues or concerns they feel may involve the Cooperative

Security Plan2

Page 43: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Bernal Heights Cooperative

Ventilation Plan

Having operated an MCD with on-site consumption in Bernal Heights for the last ten years, we

have along-standing relationship with the neighboring community and an understanding of the

importance in being a polite and considerate neighbor. We understand the odor associated with

medical cannabis can be a concern for people in the community. To ensure no noxious or

offensive odors escape from the premises, we have implemented a two factor approach.

As a primary step, we will not allow smoking. Only vaping will be allowed on premise, thus

eliminating the most offensive of odors associated with cannabis consumption.

Secondly, we have installed a system for negative pressure ventilation. The system consists of the

following:

1. Can-Max Filter 2500 CFM - 2.5 inch active carbon filter bed

2. 12" Can Fan Max-Fan - 1708 CFM

3. Phat Muffler - NRC (Noise Reduction Coefficient) 85%

4. Sound Isolated Flex Duct with external ventilation

By running active charcoal filtration and external ventilation at 1708 Cubic Feet Per Minute, the

entire atmosphere of the unit will be charcoal filtered and externally ventilated every other minute.

The ventilated air will be active charcoal filtered and free of any odor. The muffler and sound

isolated flex duct will ensure neighboring units will not be disturbed by the sound of of the

ventilation fan. When the front door opens, air will be pulled in, charcoal filtered, and exhausted

outside of the unit. Thus ensuring no odors escapes out of the unit when the front door is opened.

Page 44: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security
Page 45: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

From: Joshua ArceTo: Speirs, Jeffrey (CPC)Subject: Question re Bernal Heights CollectiveDate: Tuesday, May 17, 2016 7:37:19 AM

Hi Jeffrey, how are you. My name is Joshua Arce and I live in the Mission District.Many neighbors have asked me if I know anything about the status of city permittingfor the relocation of their local dispensary, Bernal Heights Collective.

I understand you are working on the project for the Planning Department. If so, I'mwondering what information you can share regarding status, perhaps starting withany upcoming hearing dates on the Collective's new location?

Thank you

Josh

Page 46: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

From: jaime or betsyTo: Speirs, Jeffrey (CPC)Cc: Laurel Muniz; Eloise Bates; Joe Porcoro; Jose MunizSubject: 3185 MISSION ST Medical Cannibus Dispendary PermitDate: Monday, August 15, 2016 8:34:42 PM

Hi Jeff,

Just checking in with you on this.We have a few questions if you don't mind.As you recall, they were discovered selling without a permit so we'd like to stay on topthings. Can you give us a ballpark of where in the permit process they are.Shouldn't there be a community meeting before anything else?And how long in advance of the permit application will we be notified?Regards,Jaime RossNorth West Bernal Alliance

Page 47: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

From: Michelle kriebelTo: Speirs, Jeffrey (CPC)Subject: 3158 MISSION STREETDate: Monday, September 12, 2016 2:47:00 PM

Dear Mr. Speirs,

I have been a resident of Bernal Heights for over 19 years and I'm writing to you to protestthe permit request for 3158 MISSION STREET

It is my understanding that this applicant took it upon himself to begin selling without apermit and is advertising online with claims that the dispensary is open. According to Yelpand their own website, the applicant claims to be open and is currently delivering.

We already have 2 medical cannibus dispensaries located approximately 2-3 blocks from

each other at 33 29th Street and 3139 Mission Street. I believe the neighborhood is wellserved. I strongly agree with legal sale of cannibus and access to it for those in need. But Ido not believe there is need for yet another medical cannibus dispensary in such closeproximity.

I am especially opposed as this one has exhibited behavior that doesn't respect the law likeall the other businesses in our neighborhood.

I ask that you please deny this permit.

Thank you for your thoughtful decision on this matter

Michelle Kriebel

30 Winfield Street

Bernal Heights

Page 48: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

From: Anita KlineTo: Speirs, Jeffrey (CPC)Cc: [email protected]: Please deny permit for medical cannabis dispensary at 3158 Mission St.Date: Wednesday, September 14, 2016 2:24:39 PM

September 14, 2016

Mr. Jeffrey SpeirsPlanner – Southeast QuadrantPlanning DepartmentCity and County of San Francisco1650 Mission Street, Suite400 San Francisco, CA 94103 Phone: 415.575.9106│Fax: 415.558.6409 RE: 3158 MISSION STREET (Medical Cannabis Dispensary) Dear Mr. Speirs I am a 30-year resident of Bernal Heights living in the home Iown at 19 Mirabel Avenue. I'm writing to protest the permitrequest for a business license at the above address. This neighborhood already has two medical cannabis dispensarieslocated less than a block from the license applicant's business,approximately 2-3 blocks from each other, and all within a fewblocks of me. The existing dispensaries are located at 3329th Street and 3139 Mission Street. In addition there are manymore dispensaries along the Mission Street corridor. We believewe're well served by the existing dispensaries. I am also very concerned about the fact that this applicant tookit upon him/herself to begin selling without a permit and isadvertising online with claims that the dispensary is open. According to Yelp and the business’ own website, this location isopen and currently delivering. There is no need for yet another medical cannabis dispensary inour neighborhood, much less one that doesn't respect the law. Forthese reasons I ask that you deny this permit. Thank you. Sincerely, Anita Kline19 Mirabel Ave.San Francisco, CA 94110

Page 49: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

1

Speirs, Jeffrey (CPC)

From: Shelley Bradford Bell <[email protected]> on behalf of [email protected]

Sent: Monday, December 19, 2016 1:17 PMTo: Speirs, Jeffrey (CPC)Cc: [email protected]: Seeking Info on 3185 Mission Project (2016-005312DRM )

Importance: High

Follow Up Flag: Follow upFlag Status: Flagged

Happy Holidays Jeff!   I left you a voicemail message a few minutes ago.  Being the week before Christmas you may be off on Holiday, so I’m emailing as promised.   I would like to receive information that you have on the MCD at 3185 Mission Street.  I see it is on calendar for January 26th, so I know the package to the Commission is not ready.  But I would like to receive any other information you have on the project to date; (i.e. application, emails from project sponsors) stuff like that!   Thanks Jeff.  Have a wonderful holiday!!  Shelley Bradford Bell 415‐749‐1083 direct 415‐724‐0136 Cell    

Page 50: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

From: JC RaffertyTo: Speirs, Jeffrey (CPC)Subject: MMD on Mission in BernalDate: Sunday, January 08, 2017 8:19:17 PM

Mr. Speirs,There's a good size thread on NextDoor about the application for one or possible two new potdispensaries on Mission Street between Cesar Chavez and Cortland. In this stretch, we currently havetwo dispensaries on or just off Mission, or it sounds like three (as if a dispensary moves the permitremains with the building so a new on can just move in there? Really? Weird).

Anyway, I am concerned about the concentration of dispensaries in this stretch and urge the PlanningCommission to limit the number of dispensaries to a reasonable number. Three seems prettyreasonable to me. Five definitely less so (that's almost one per block!). There is no reason to create aghetto for marijuana or any other thing in a single area. Diversity is nice.

Please take these comments into consideration when reviewing the permit application for approval. Thanks for your time.

Best, JC

JC Rafferty221 Precita AvenueSFCA 94110

Page 51: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

Revised: 4/11/16

CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address  Block/Lot(s) 

   

Case No.  Permit No.  Plans Dated 

     

  Addition/ 

       Alteration 

Demolition  

     (requires HRER if over 45 years  old) 

New        

     Construction 

 Project Modification  

     (GO TO STEP 7) 

Project description for Planning Department approval. 

 

 

 

 

STEP 1: EXEMPTION CLASS  TO BE COMPLETED BY PROJECT PLANNER 

*Note: If neither class applies, an Environmental Evaluation Application is required.*  

 Class 1 – Existing Facilities. Interior and exterior alterations; additions under 10,000 sq. ft.

 

 Class 3 – New Construction/ Conversion of Small Structures. Up to three (3) new single‐family 

residences or six (6) dwelling units in one building; commercial/office structures; utility extensions.; .; 

change of use under 10,000 sq. ft. if principally permitted or with a CU. Change of use under 10,000 

sq. ft. if principally permitted or with a CU. 

  Class___  

 

STEP 2: CEQA IMPACTS TO BE COMPLETED BY PROJECT PLANNER If any box is checked below, an Environmental Evaluation Application is required.  

 

Air Quality: Would the project add new sensitive receptors (specifically, schools, day care facilities, 

hospitals, residential dwellings, and senior‐care facilities) within an Air Pollution Exposure Zone? 

Does the project have the potential to emit substantial pollutant concentrations (e.g., backup diesel 

generators, heavy industry, diesel trucks)? Exceptions: do not check box if the applicant presents 

documentation of enrollment in the San Francisco Department of Public Health (DPH) Article 38 program and 

the project would not have the potential to emit substantial pollutant concentrations. (refer to EP _ArcMap > CEQA Catex Determination Layers > Air Pollutant Exposure Zone) 

 

Hazardous Materials: If the project site is located on the Maher map or is suspected of containing 

hazardous materials (based on a previous use such as gas station, auto repair, dry cleaners, or heavy 

manufacturing, or a site with underground storage tanks): Would the project involve 50 cubic yards 

or more of soil disturbance ‐ or a change of use from industrial to residential? If yes, this box must be 

checked and the project applicant must submit an Environmental Application with a Phase I 

Environmental Site Assessment. Exceptions: do not check box if the applicant presents documentation of 

enrollment in the San Francisco Department of Public Health (DPH) Maher program, a DPH waiver from the 

Erussell
Typewritten Text
Erussell
Typewritten Text
Erussell
Typewritten Text
中文詢問請電: 415.575.9010 Para información en Español llamar al: 415.575.9010 Para sa impormasyon sa Tagalog tumawag sa: 415.575.9121
Erussell
Typewritten Text
Erussell
Typewritten Text
Erussell
Typewritten Text
Erussell
Typewritten Text
Erussell
Typewritten Text
Erussell
Typewritten Text
Erussell
Typewritten Text
Erussell
Typewritten Text
Erussell
Typewritten Text
Erussell
Typewritten Text
Erussell
Typewritten Text
Page 52: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

 

Revised: 4/11/16 2

Maher program, or other documentation from Environmental Planning staff that hazardous material effects 

would be less than significant (refer to EP_ArcMap > Maher layer). 

 

Transportation: Does the project create six (6) or more net new parking spaces or residential units? 

Does the project have the potential to adversely affect transit, pedestrian and/or bicycle safety 

(hazards) or the adequacy of nearby transit, pedestrian and/or bicycle facilities? 

Archeological Resources: Would the project result in soil disturbance/modification greater than two 

(2) feet below grade in an archeological sensitive area or eight (8) feet in a non‐archeological sensitive 

area? (refer to EP_ArcMap > CEQA Catex Determination Layers > Archeological Sensitive Area) 

 

Subdivision/Lot Line Adjustment: Does the project site involve a subdivision or lot line adjustment 

on a lot with a slope average of 20% or more? (refer to EP_ArcMap > CEQA Catex Determination Layers > Topography) 

Slope = or > 20%: Does the project involve any of the following: (1) square footage expansion greater 

than 1,000 sq. ft. outside of the existing building footprint, (2) excavation of 50 cubic yards or more of 

soil, (3) new construction? (refer to EP_ArcMap > CEQA Catex Determination Layers > Topography) If box is checked, a geotechnical report is required. 

 

Seismic: Landslide Zone: Does the project involve any of the following: (1) square footage expansion 

greater than 1,000 sq. ft. outside of the existing building footprint, (2) excavation of 50 cubic yards or 

more of soil, (3) new construction? (refer to EP_ArcMap > CEQA Catex Determination Layers > Seismic Hazard 

Zones) If box is checked, a geotechnical report is required.  

Seismic: Liquefaction Zone: Does the project involve any of the following: (1) square footage 

expansion greater than 1,000 sq. ft. outside of the existing building footprint, (2) excavation of 50 

cubic yards or more of soil, (3) new construction? (refer to EP_ArcMap > CEQA Catex Determination Layers > Seismic Hazard Zones) If box is checked, a geotechnical report will likely be required.  

If no boxes are checked above, GO TO STEP 3.  If one or more boxes are checked above, an Environmental 

Evaluation Application is required, unless reviewed by an Environmental Planner. 

 Project can proceed with categorical exemption review. The project does not trigger any of the 

CEQA impacts listed above. 

Comments and Planner Signature (optional): 

 

 

 

 

 

STEP 3: PROPERTY STATUS – HISTORIC RESOURCE TO BE COMPLETED BY PROJECT PLANNER PROPERTY IS ONE OF THE FOLLOWING: (refer to Parcel Information Map) 

  Category A: Known Historical Resource. GO TO STEP 5. 

  Category B: Potential Historical Resource (over 45 years of age). GO TO STEP 4. 

  Category C: Not a Historical Resource or Not Age Eligible (under 45 years of age). GO TO STEP 6. 

Erussell
Typewritten Text
Erussell
Typewritten Text
Erussell
Typewritten Text
Erussell
Typewritten Text
Page 53: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

 

Revised: 4/11/16 3

STEP 4: PROPOSED WORK CHECKLIST TO BE COMPLETED BY PROJECT PLANNER   

Check all that apply to the project. 

1. Change of use and new construction. Tenant improvements not included. 

  2. Regular maintenance or repair to correct or repair deterioration, decay, or damage to building. 

 3. Window replacement that meets the Department’s Window Replacement Standards. Does not include 

storefront window alterations. 

 4. Garage work. A new opening that meets the Guidelines for Adding Garages and Curb Cuts, and/or 

replacement of a garage door in an existing opening that meets the Residential Design Guidelines. 

  5. Deck, terrace construction, or fences not visible from any immediately adjacent public right‐of‐way. 

 6. Mechanical equipment installation that is not visible from any immediately adjacent public right‐of‐

way. 

 7. Dormer installation that meets the requirements for exemption from public notification under Zoning 

Administrator Bulletin No. 3: Dormer Windows. 

 

8. Addition(s) that are not visible from any immediately adjacent public right‐of‐way for 150 feet in each 

direction; does not extend vertically beyond the floor level of the top story of the structure or is only a 

single story in height; does not have a footprint that is more than 50% larger than that of the original 

building; and does not cause the removal of architectural significant roofing features. 

Note: Project Planner must check box below before proceeding.    Project is not listed. GO TO STEP 5.  Project does not conform to the scopes of work. GO TO STEP 5.   Project involves four or more work descriptions. GO TO STEP 5.  Project involves less than four work descriptions. GO TO STEP 6. 

STEP 5: CEQA IMPACTS – ADVANCED HISTORICAL REVIEW TO BE COMPLETED BY PRESERVATION PLANNER

Check all that apply to the project. 

 1. Project involves a known historical resource (CEQA Category A) as determined by Step 3 and 

conforms entirely to proposed work checklist in Step 4. 

  2. Interior alterations to publicly accessible spaces.

 3. Window replacement of original/historic windows that are not “in‐kind” but are consistent with 

existing historic character. 

  4. Façade/storefront alterations that do not remove, alter, or obscure character‐defining features.

 5. Raising the building in a manner that does not remove, alter, or obscure character‐defining 

features. 

 6. Restoration based upon documented evidence of a building’s historic condition, such as historic 

photographs, plans, physical evidence, or similar buildings. 

 7. Addition(s), including mechanical equipment that are minimally visible from a public right‐of‐way 

and meet the Secretary of the Interior’s Standards for Rehabilitation. 

 

8. Other work consistent with the Secretary of the Interior Standards for the Treatment of Historic Properties (specify or add comments): 

 

 

Page 54: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

 

Revised: 4/11/16 4

 

9. Other work that would not materially impair a historic district (specify or add comments): 

 

 

 

(Requires approval by Senior Preservation Planner/Preservation Coordinator) ________________________ 

10. Reclassification of property status. (Requires approval by Senior Preservation Planner/Preservation 

Coordinator) 

        Reclassify to Category A       Reclassify to Category C 

a. Per HRER dated:   (attach HRER) 

b. Other (specify): 

 

Note: If ANY box in STEP 5 above is checked, a Preservation Planner MUST check one box below. 

Further environmental review required. Based on the information provided, the project requires an 

Environmental Evaluation Application to be submitted. GO TO STEP 6. 

Project can proceed with categorical exemption review. The project has been reviewed by the 

Preservation Planner and can proceed with categorical exemption review. GO TO STEP 6. 

Comments (optional): 

 

 

Preservation Planner Signature: 

STEP 6: CATEGORICAL EXEMPTION DETERMINATION  TO BE COMPLETED BY PROJECT PLANNER

Further environmental review required. Proposed project does not meet scopes of work in either (check 

all that apply):  

Step 2 – CEQA Impacts 

  Step 5 – Advanced Historical Review  

STOP! Must file an Environmental Evaluation Application. 

No further environmental review is required. The project is categorically exempt under CEQA.  

Planner Name:  Signature: 

 

Project Approval Action:   

 

 

 

If Discretionary Review before the Planning Commission is requested, 

the Discretionary Review hearing is the Approval Action for the 

project. 

Once signed or stamped and dated, this document constitutes a categorical exemption pursuant to CEQA Guidelines and Chapter 31 

of the Administrative Code. 

In accordance with Chapter 31 of the San Francisco Administrative Code, an appeal of an exemption determination can only be filed 

within 30 days of the project receiving the first approval action.

Page 55: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

 

Revised: 4/11/16 5

STEP 7: MODIFICATION OF A CEQA EXEMPT PROJECT TO BE COMPLETED BY PROJECT PLANNER In  accordance with Chapter  31 of  the San Francisco Administrative Code, when  a California Environmental 

Quality Act (CEQA) exempt project changes after the Approval Action and requires a subsequent approval, the 

Environmental Review Officer (or his or her designee) must determine whether the proposed change constitutes 

a  substantial modification  of  that  project.    This  checklist  shall  be  used  to  determine whether  the  proposed 

changes  to  the  approved  project would  constitute  a  “substantial modification”  and,  therefore,  be  subject  to 

additional environmental review pursuant to CEQA. PROPERTY INFORMATION/PROJECT DESCRIPTION

Project Address (If different than front page)  Block/Lot(s) (If different than 

front page) 

   

Case No.  Previous Building Permit No.  New Building Permit No. 

     

Plans Dated  Previous Approval Action  New Approval Action 

     

Modified Project Description: 

 

 

 

DETERMINATION IF PROJECT CONSTITUTES SUBSTANTIAL MODIFICATION Compared to the approved project, would the modified project: 

Result in expansion of the building envelope, as defined in the Planning Code; 

Result in the change of use that would require public notice under Planning Code 

Sections 311 or 312; 

Result in demolition as defined under Planning Code Section 317 or 19005(f)? 

Is any information being presented that was not known and could not have been known 

at the time of the original determination, that shows the originally approved project may 

no longer qualify for the exemption? 

If at least one of the above boxes is checked, further environmental review is required.   

DETERMINATION OF NO SUBSTANTIAL MODIFICATION The proposed modification would not result in any of the above changes.  

If this box is checked, the proposed modifications are categorically exempt under CEQA, in accordance with prior project 

approval and no additional environmental review is required.  This determination shall be posted on the Planning 

Department website and office and mailed to the applicant, City approving entities, and anyone requesting written notice. 

Planner Name:  Signature or Stamp: 

 

 

 

 

 

Page 56: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

SCOPE OF WORK SUMMARY

LOCATION : 3185 MISSION STLOT : 015BLOCK : 56090BUILDING AREA: 1745 S.F.TYPE: 1 STORIES, ABOVE COMMERCIALEXISTING USE - RETAILPROPOSED USE - CHANGE OF USE TO MEDICAL CANNABIS DISPENSARY

TENANT IMPROVEMENT AT EXISTING RETAIL LOCATION, (201602119450) FOR CHANGE OF USE TO A MEDICALCANNABIS DISPENSARY WITH AN OCCUPANCY OF 49 PEOPLE MAX.

IMPROVEMENT ARE COSMETIC, NO STRUCTURAL CHANGES, ADD ADA COMPLIANT BATHROOM, T24 INCLUDEDWITH PLANS FOR NEW LIGHTING. NEW EXIT SIGN AND ADA BA

VICINITY MAP

A.0 - COVERA.1 - EXISTING & PROPOSED FLOOR PLANSA.2 - INTERIOR ELEVATIONS & ADA BATHROOMA.3 - INTERIOR ELEVATIONS & POINT OF SALEA.4 - DA COMPLIANCE CHECKLIST

GENERAL NOTES

HAZARDOUS MATERIALS IN EXISTING CONSTRUCTION:

BASIS ARCHITECTURE & CONSULTING ASSUMES NO RESPONSIBILITY FOR THE MANAGEMENTOF HAZARDOUS MATERIALS THAT MAY BE ON SITE. THE CONTRACTOR SHALL BERESPONSIBLE FOR INSURING THAT PERSONNEL WITHIN THE WORK AREA ARE PROTECTEDFROM EXPOSURE TO HAZARDOUS MATERIALS. IF MATERIALS ARE DISCOVERED THAT MAY BEHAZARDOUS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND CEASEWORK UNTIL CONDITIONS CAN BE MAINTAINED IN COMPLIANCE WITH ALL APPLICABLEREGULATIONS.

1. ALL WORK SHALL CONFORM TO APPLICABLE CODES AND ORDINANCES OF THE CITYOF SAN FRANCISCO, CALIFORNIA, INCLUDING:

2013 CALIFORNIA RESIDENTIAL CODE (CRC)2013 CALIFORNIA BUILDING CODE (CBC)2013 CALIFORNIA ELECTRICAL CODE (CEC)2013 CALIFORNIA PLUMBING CODE (CPC)2013 CALIFORNIA MECHANICAL CODE (CMC)2010 ADA STANDARDSGREEN BUILDING CODEUNIFORM HOUSING CODEUNIFORM SECURITY CODE

ALONG WITH ANY OTHER APPLICABLE LOCAL AND STATE LAWS AND REGULATIONS.

HOURS OF CONSTRUCTIONMONDAY - FRIDAY & SATURDAY 7:00 AM - 7:00 PM

CONSTRUCTION NOISE GUIDELINES:CONTRACTOR SHALL OBTAIN A COPY OF THE CONSTRUCTION NOISE GUIDELINES ANDBECOME SELF-AWARE OF ALL REQUIREMENTS AND BE SOLELY RESPONSIBLE FORCOMPLYING WITH THE GUIDELINES.

BUILDING INFO:OCCUPANCY TYPES: R3- MIX USECONSTRUCTION TYPE: TYPE V-A

THREE-STORY APARTMENT BUILDINGS WITH 11 UNITS.

2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, CONDITIONS & SHALL NOTIFY THEARCHITECT OF ANY DIMENSIONS & CONDITIONS, WHICH DIFFER FROM THOSE SHOWN,BEFORE STARTING WORK. DIMENSIONS GIVEN AS (CLR.) ARE CODE REQUIRED &SHALL BE MAINTAINED.

3. ALL DIMENSIONS FOR NEW CONSTRUCTION ARE TO FACE OF STUD. ALL DIMENSIONSFROM EXISTING CONSTRUCTION ARE FROM FACE TO FINISH, UNLESS OTHER WISENOTED (U.O.N.).

4. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALEDDIMENSIONS. DIMENSIONS FOR EXISTING CONDITIONS & ELEVATIONS MAY BEAPPROXIMATE.

5. ALL INSTALLATIONS TO BE IN ACCORDANCE WITH BEST INDUSTRY STANDARDS &MANUFACTURER'S REQUIREMENTS, SEE ATTACHED SPECIFICATIONS.

6. ALL THE DRAWINGS SHOW REPRESENTATIVE & TYPICAL ATTACHMENTS,CONNECTIONS, FASTENINGS & ETC. SHALL BE PROPERLY SECURED INCONFORMANCE WITH BEST PRACTICE.

7. THE PLANS ARE NOT BASED ON A SURVEY & ARE INTENDED ONLY TO SHOW GENERALLAYOUT OF PROPERTY & WORK LOCATIONS. CONDITIONS SHOWN APPROXIMATE.

8. ALL SURFACES, EXISTING AND NEW TO BE PREPARED, PRIMED AND PAINTED U.O.N.

9. ALL WORK SUBJECT TO ASSOCIATED PROJECT MANUAL SPECIFICATIONS ANDINSTRUCTIONS BY ARCHITECT.

10. ALL CONDITIONS ARE EXISTING UNLESS OTHERWISE NOTED.

1/16"=1'-0"

Pro

ject

Dat

aTi

tle P

age

A.05Of Total

Sheets

P

lann

ing

In

terio

r Des

ign

La

ndsc

ape

C

onst

ruct

ion

Man

agm

ent

Ew

ell D

esig

n S

tudi

o

2016.02.05

Revision:

9430

1P

alo

Alto

, Cal

iforn

ia61

9 B

Cha

nnin

g A

veFa

x: (8

88) 3

50.3

908

Pho

ne: (

650)

315

.576

3

E-m

ail:

Jerr

od@

JLE

Des

igns

.com

She

et C

onte

nts

9411

0S

an F

ranc

isco

, Cal

iforn

ia31

85 M

issi

on A

ve

Tena

nt Im

prov

emen

t For

:

New

Ber

nal H

eigh

ts Lot:

Blo

ck:

-

RL I FO

NI AA

ST

EO

TF CA

SUBJECTPROP.

Page 57: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

2A1

PROPOSED FLOOR PLANSCALE: 1/4"=1'-0"

1A1

EXISTING FLOOR PLANSCALE: 1/4"=1'-0"

UP

(E)CLO.

OPEN SPACE

(E)CLO.

(E) STORAGE

AA.2

Rec

eptio

nFu

rnitu

re

ADA COMPLIANTDOOR ACTUATOR

PROVIDE or VERIFY

RE

LOC

ATE

D B

OO

KS

HE

LF

Furniture

ADA complianttable & seating

(N) ADARESTROOM

RE

LOC

ATE

DD

ISP

LAY

AA.3

AA.3

91'-1

0" T

OTA

L E

GR

ES

S

A.3

54'-8" EGRESS

EXIT SIGNAGE

(E) 1

-1/2

" : 3

'-0"

HIGH & LOW, SEE B

PROVIDE or VERIFYTACTILE EXIT SIGNAGE

DETAIL FLOOR PLAN

(N) FRAMING ANDFINISHES TOMATCH ADJACENTWALL SURFACE.

Floo

r Pla

n(s)

A.1

DBI Review D

Of Total Sheets

Pla

nnin

gIn

terio

rDes

ign

Land

scap

eC

onst

ruct

ion

Man

agm

ent

Ew

ell D

esig

n S

tudi

o

2016.0

Revision:

She

et C

onte

nts

3185

Mis

sion

Ave

Tena

nt Im

prov

emen

t For

:

New

Ber

nal H

eigh

ts

-

AS

T

EO

TF CA

Page 58: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

ADA TOILET

42" MIN. LENGTH

24" MIN

33"-

36"

1-1/2 MAX Ø1-1/4 MIN Ø

54" MIN

20"

REAR WALL

7"-9"

SEAT COVERDISPENSER

(FRONT)ADA TOILET

36"40

" M

AX

12"24"

33"-

36"

17"-

19"

1'-6"

SIDE WALL

FLUSHACTIVATOR ONTRANSFER SIDE

EQ EQCL

48"

MAX

LATCH: OPERATION SHALL NOT REQUIREANY TWISTING OR GRASPING, MOUNT @36"A.F.F. PROVIDE INTEGRAL LOCK

FLAT FACED HOOK: MOUNT ONWALL IF DOOR SWINGS OUT

& MIRRORWALL-MOUNT LAVATORY

INSULATED PIPE WRAP

34"

MAX

29"

MIN

27"

MIN

9" M

IN

74"

MAX

40"

MAX

TO REFLECTIVE SURFACE

TOILET ROOM IDENTIFICATION SIGN,PICTORIAL SYMBOL SIGN w/ TACTILE& RAISED (1/32"min) BORDER DIM'SOF PICTORGRAM SHALL BE 6"minHIGH. TEXT HEIGHT 7/8"min.'ACCESSIBLE' & 'RESTROOM' UPPERCASE SERIF TYPE POSITIONEDDIRECTLY BELOW THE PICTOGRAM.GRADE 2 BRAILLE DIRECTLY BELOWTEXT. MATTE, TEXTUREDBACKGROUND W/ CONTRASTINGWHITE GRAPHICS

EXTERIOR OF BATHROOM DOOR

NOTE:SOAP DISPENSER AND PAPERTOWEL DISPENSER w/ OPERABLEPARTS @ 40"max A.F.F.

PROVIDE or VERIFY 10" SMOOTH PANEL@ PUSH SIDE OF BATHROOM DOOR

BOTTOM

NOTES:1. GRAB BARS AND TOILET SEAT AND ALL ASSOCIATED FASTENERS

SHALL SUSTAIN 250 POUND FORCE IN DIRECT LOAD, POINTLOAD OR SHEAR AT ANY POINT. GRAB BARS SHALL NOTROTATE WITHIN FITTINGS. INSTALL BLOCKING AS REQUIRED.

2. WALL SURFACES SHALL BE FREE OF SHARP OR ABRASIVEELEMENTS. EDGES SHALL HAVE A MINIMUM RADIUS OF 1

8".3. ALL FAUCETS SHALL BE OF LEVER TYPE AND USABLE WITH ONE

HAND TO OPERATE.

1. DOOR AND GATE CLOSERS SHALL BE ADJUSTED SO THAT FROM AN OPENPOSITION OF 90 DEGREES, THE TIME REQUIRED TO MOVE THE DOORPOSITION 12 DEGREES FROM THE LATCH IS 5 SECONDS MINIMUM.

2. DOOR AND GATE SPRING HINGES SHALL BE ADJUSTED SO THAT FROM THEOPEN POSITION OF 70 DEGREES, THE DOOR OR GATE SHALL MOVE TOTHE CLOSED POSITION IN 1.5 SECONDS MINIMUM.

60"

to C

ENTE

R

(N) ADARESTROOM

RESS

17-1/2" to CL

10'-3

" EX

ISTI

NG

2'-8

"3'

-0"

2'-0

"CLE

AR

1'-6

"CLE

AR

5'-0" CLEAR 5'-1" CLEAR

1'-6" CL

2x6 CEILING JOISTs @ 16" O.C., LAP @ WALL

EXISTING STRUCTURETO REMAIN

5/8" TYPE 'X' 1-HOURGYPSUM BOARD @EGRESS CORRIDOR

2x8 SOLID BLOCKING @GRAB BAR LOCATIONS,

MOUNT MID HEIGHT 3'-0"

2x6 SOLID BLOCKING

2x4 TOP PLATE

2x4 WALL STUDs@ 16"O.C.

2x4 WALL STUDs@ 16"O.C.

2x6 SOLID BLOCKING

2x4 SOLID BLOCKING

Y

CE

Ele

vatio

ns

A.2

Interior Elevations: Bathroom 1SCALE: 1/2" = 1'-0"

Detail Floor Plan: BathroomASCALE: 1/2" = 1'-0"

Section: Bathroom2SCALE: 1/2" = 1'-0"

DBI Review D

Of Total Sheets

Pla

nnin

gIn

terio

rDes

ign

Land

scap

eC

onst

ruct

ion

Man

agm

ent

Ew

ell D

esig

n S

tudi

o

2016.0

Revision:

She

et C

onte

nts

3185

Mis

sion

Ave

Tena

nt Im

prov

emen

t For

:

New

Ber

nal H

eigh

ts

-

AS

T

EO

TF CA

NEW BERNAL HEIGHTS

3185 Mission Street, San Francisco CA

Page 59: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

4" sq ADA COMPLIANTDOOR ACUTATOR, MOUNT@ 36" & 7-1/2"A.F.F.

1-1/2 TOTAL SLOPEEXISTING (±1/2" per FOOT)

EXISTING GLASSSTORE FRONT& MATCHINGDOOR

EXISTING ALUMINUMTHRESHOLD 1/2" MAX

1/2" MAX THRESHOLD

10"min KICK PLATE4" sq ADA COMPLIANTDOOR ACUTATOR, MOUNT@ 36" & 7-1/2" A.F.F.

PROVIDE or VERIFYEXISTING EXIT SIGNAGE

PROVIDE or VERIFYEXISTING TACTILEEXIT SIGNAGE

29"

CLEA

R

34"

30" MIN

4'-0" CLEAR

3'-0

"

2'-0" CLEAR 3'-0" CLEAR

5'-0

" CL

EAR"

EXISTING CLERESTORYWINDOW & LIGHT SHELFTO REMAIN

EXISTING STRUCTURETO REMAIN

EXISTING STORE FRONTWIDOWs & MATCHINGENTRY DOOR TO REMAIN

EXISTING 8'-0" SIDEWALK

EXISTING STORE FRONTWIDOWs & MATCHINGENTRY DOOR TO REMAIN

ADA COMPLIANTPOWERED DOORACTUATOR SYSTEMMOUNT @36"&7-1/2"A.F.F

EXISTING SLOPE: 1 1/2"TOTAL (±3/8"per FOOT)

1/2"

MAX

1:13

RAM

P (d

own)

5'-8

"

4'-6"

4'-0" CLEAR

1'-0

"

SLIP RESISTANTBROOM FINISHEDCONCRETE FLOOR

4'-0

"1'

-0"

42"

GU

ARDR

AIL36"H

I HAN

DRAIL

5"

42" GUARDRAIL

2"dia METAL GUARD RAIL(SEE OWNER for SPEC)

1-1/2"dia GRASPMETAL HANDRAIL (SEEOWNER for SPEC)

NEW RAMP1:13 MAX SLOPE

24"

24"

4'-8" CLEAR

2'-0

" CL

RKN

EE S

PACE

5'-0

" CL

EAR

3'-0"min CLEAR

3'-0

" W

IDTH

Ele

vatio

ns

A.3

Interior Elevation: Entry2SCALE: 1/2" = 1'-0"

Detail Plan: EntrycSCALE: 1/2" = 1'-0"

Section: Entry1SCALE: 1/2" = 1'-0"

Detail Floor Plan: RampBSCALE: 1/2" = 1'-0"

Section: Ramp3SCALE: 1/2" = 1'-0"

Detail Floor Plan: Point of Sale CabinetASCALE: 1/2" = 1'-0"

Interior Elevation: Point of Sale Cabinet(s)4SCALE: 1/2" = 1'-0"

Threshold Detail5SCALE: 1" = 1'-0"

DOOR ACUTATOR(S)

TACTILE EXIT SIGANGE

DBI Review D

Of Total Sheets

Pla

nnin

gIn

terio

rDes

ign

Land

scap

eC

onst

ruct

ion

Man

agm

ent

Ew

ell D

esig

n S

tudi

o

2016.0

Revision:

She

et C

onte

nts

3185

Mis

sion

Ave

Tena

nt Im

prov

emen

t For

:

New

Ber

nal H

eigh

ts

-

AS

T

EO

TF CA

Page 60: Discretionary Review Analysiscommissions.sfplanning.org/cpcpackets/2016-005312DRM.pdf · San Francisco, CA 94109 Staff ... security guards stationed at the front door, and security

DA

Che

cklis

t

A.4

DBI Review D

Of Total Sheets

Pla

nnin

gIn

terio

rDes

ign

Land

scap

eC

onst

ruct

ion

Man

agm

ent

Ew

ell D

esig

n S

tudi

o

2016.0

Revision:

She

et C

onte

nts

3185

Mis

sion

Ave

Tena

nt Im

prov

emen

t For

:

New

Ber

nal H

eigh

ts

-

AS

T

EO

TF CA

NEW BERNAL HEIGHTS

3185 Mission Street, San Francisco CA

3185 Mission Street, Sf.. CA

Retail/ MCD

±1000sf - Steet Level

$20,000

signageonly

3185 Mission Street, Sf.. CA

20,000

2,000

UNISEX ACC BATHROOM 9,000

RAMP 3,000EGRESS DOOR TO ALLEY 2,000ENTRY DOOR ACCESS 4,000ELECTRIC & MISC 2,000

20,000

Signage Detail 1NO SCALE