Discovered Small Field Bid Round: 2016
September 12, 2016London
Ministry of Petroleum and Natural Gas Government of India
Directorate General of Hydrocarbons
Interactive Session
DGH
Agenda
2
Exploration and Production Regime in India1
Model Revenue Sharing Contract4
Discovered Small Field Bid Round2
Bid Process5
Contract Areas on Offer3
Key Success Stories6
3
Exploration and Production Regime in India
1948
State Monopoly
Public Sector Upstream Oil Companies
Nomination Era Pre-NELP PSCs
NELP/CBM PSCs Future
1991 1997
Beginning of de-regulation
28 producing fields and 28 exploratory blocks offered including private
players
Liberalization of E&P Sector (1997- 2009)
9 NELP and 4 CBM rounds.254 exploratory and 33 CBM blocks
through competitive bidding
2016
Further liberalization of the sector
Discovered small field bid round-2016 HELP - Hydrocarbon Exploration licensing
policy Open acreage licensing Revenue Sharing Model Pricing Guidelines for difficult gas fields
2015
Discovered Small Field
Policy
New Domestic Gas
Pricing Guidelines
20142009
4
Contract Areas on Offer (1/2)
For Further details, visit the website http://www.indiadsf.com
Assam fields – 13Reserves – 21.8 MmtoeArea – 119 SKM
Andhra Pradesh fields –15 (7 Offshore)Reserves – 4.4 MmtoeArea – 263 SKM
Tamil Nadu fields – 2Reserves – 0.4 MmtoeArea – 20 SKM
Mumbai fields – 27(all offshore)
Reserves – 55 MmtoeArea – 1001 SKM
Gujarat fields – 7 (2 offshore)Reserves – 4.1 MmtoeArea – 109 SKM
Madhya Pradesh – 1Reserves – 0.5 MmtoeArea – 15 SKM67 fields offered
under 46 contract areas
Rajasthan fields – 2Reserves – 0.1 MmtoeArea – 24 SKM
5
Contract Areas on Offer (2/2)
For Further details, visit the website http://www.indiadsf.com
46 contract areas containing 67 Discovered Small fields in 9 sedimentary basins 26 Onland 18 Shallow Water 2 Deepwater fields
Over 1500 sq. kms. of area on offer comprising 20% of the area under development
Initial In-place Volume: Over 48 MMT of Oil reserves (Onshore: 17.85 MMT, Offshore: 30.19 MMT) Over 38 BCM of Gas reserves (Onshore: 7.20 BCM, Offshore: 31.18 BCM)
Geo-scientific data available for: 2042 LKM 2D 1336 SKM 3D 130 Wells
Many of the blocks offered are located in the vicinity of the existing operating fields of ONGC/ OIL enabling possibility of use of existing facilities by successful bidders
Terms of the Offer (1/2)
6
No prior technical experience required
Ease of Entry –encourages entry of start-up, juniors and non-E&P firms into Indian E&P sectors
Revenue sharing modelNon-intrusive and simplified contract regime – encourages efficient & low cost operations
Free pricing and marketing freedom Higher revenue realization for producers
Up to 100% FDI allowed Enables and encourages entry of foreign players
No upfront signature bonus and zero book value
No upfront payment to ONGC/ OIL or Government
No carried interest by NOCs
Encourages participation of global and Indian private firms
Terms of the Offer (2/2)
7
Fair and transparent process improves investor confidenceLow regulatory burden & transparent bid process
No mandatory minimum work program
No exploration obligation Development work program is biddable
Single license forconventional & un-conventional fields
Maximizes resources potential from all type of hydrocarbons including CBM, Shale Gas/Oil, Tight Gas, Gas Hydrates etc.
No oil cess,Custom duty exemption Improves the cost of production for operator
Continuous exploration permitted during contract period
Operational flexibility to operators to maximize the hydrocarbon recovery
Provision for sharing of common facilities
Common use to result in optimization of costs and early monetization
8
Model Revenue Sharing Contract (1/2)
Free pricing & marketing freedomMarketing & Pricing
Effective Date – later of contract signing date or date of issue / transfer of lease
Period of 20 years or economic life of the field, whichever is less and extendable upto 10 years
Contract Duration
Biddable work program – Number of development/ appraisal wells
Liquidated damages (LD) - US$ 1 Mn (On-land), US$ 3 Mn. (Shallow Water) & US$ 6 Mn. (Deepwater)
Proportionate reduction in work program due to denial of clearances by Government agencies
Work Programme
1
2
3
9
Model Revenue Sharing Contract (2/2)
Assistance to contractors in permits, approvals, work permits, licenses, leases, right of way, etc.
Government Assistance to Contractors
Government revenue (%) determined on a linear scale interpolated between LRP & HRP
Prices as per realized average daily revenue during each month
Revenue = Amount accrued (produced & saved) – Taxes on sale – Royalty
Revenue Share
Joint development of more than one contract areas operated by more than one companies
Mutual use or development of common infrastructure
Joint use of Common Infrastructure & Provision for Unit Development of Reservoir
4
5
6
A Safe Investment Opportunity
10
1 Low geological risk as the fields offered are already discovered
2 Low market risk – due to free pricing, marketing freedom and robustdemand for oil & gas
3 Availability of processing and evacuation Infrastructure throughnearby ONGC and OIL facility
4 Large amount of data available for the offered fields for viewing andinterpretation
5 Synergy and consistency with the upcoming exploration auctionsunder HELP regime
DSF Bid Round 2016 Information Access
11
Technical Information Portal http://www.indiadsf.com/
• Ready reckoner on ‘how to access portal’• Bidders can view E&P data, Contract Areas
related data, Information guides (free of cost)• Schedule bookings for Physical data room
viewing, roadshows, one-to-one meetings
E-Bidding portal http://mstcecommerce.com/eprochome/dsfbi
dding/index.jsp• User-friendly interface for uploading bid
documents with easy registration process• Instruction to bidders on bid upload process• Secure gateway - Digital Signature Certificate• Field information dockets can be purchased
DSF Bid Round 2016 Information Access
12
Physical Data Centers• Data centers with interpretation facility at Noida • Data centers setup at Calgary and Houston and
soon in London• For first two days, free viewing of data and
interpretation available• All exploration data related to the contract areas
are available in data centers• Bookings tab on www.indiadsf.com allows users to
create new booking for data room
Virtual Data Centers• All G&G data with required software license
is made available with VDR• VDR booking can be done by 6 users in a
day as per their suitability and time zone.• Confirmation of bookings will be provided
after the realization of payment. • VDR booking via www.indiadsf.com
Bid Process and Important Dates
13
Bid Process
Bidders to bid* online** at
designated portal
Hardcopy submission of all supporting
documents to DGH
DGH to submit bid evaluation reports to the Government for
consideration
Ministry to accord approval based on
ECS recommendations
After due approvals, RSC***
to be finalized with awardees
*Any number of Contract Areas can be bid for** Most of the documents will be uploaded online*** Revenue Sharing Contract
Important Dates
Activity Date
Launch 25th May, 2016
Data Rooms
Data centers at Noida, Houston, Calgary operationalized
Data Centre at London shall be operationalized
soon
Virtual Data Room
Operationalized since 23rd August, 2016
Bid start date 15th July, 2016
Bid closing 31st October, 2016
Award Within 2 months
Bid Qualifying Criteria
14
1Payment of Tender Fees on or before bid closing date, by way ofpurchase of requisite Information docket (USD 1000 for all 26 onlandcontract areas and USD 1000 for all 20 offshore contract areas)
2 Bidder must be a company individually or in association with othercompanies, through an incorporated or unincorporated venture
3 Net worth of the bidding company’s should be equal to or more than itsParticipating Interest value of the Biddable Work Program commitment
4 Annual Report including audited annual accounts certified bycompany’s statutory auditor(s)
All the above criteria needs to be fulfilled for qualification
Bid Parameters
15
80%
20%
1.Contractor to bid the Government Share of revenue (%) against
Lower Revenue Point (LRP) ≤ US$ 0.0100 mn/dayHigher Revenue Point (HRP) ≥ US$ 1.000 mn/day
2. Bid yielding highest NPV will get 80 marks and rest bids would be scored on pro-rata basis
1.Bid proposing maximum number of appraisal / development wells would get 20 marks
2.Rest bids would be scored on pro-rata basis
Revenue Share
Biddable Work
Program
Weights
13
Key Success Stories
14Other Success Stories - Panna-Mukta | Mid & South Tapti | Kharsang | Dholka
• At the time of taking over the field, the Expected ultimaterecoverable reserves were 101 mmbl
• JV consisted of Cairn, Ravva Oil (Singapore), ONGC, Videocon• Already recovered cumulatively 277 mmbbl of oil and additional
11 BCM of gas & still producing - Highest recovery factor in thecountry
• Total Investment – US$ 0.91 Billion• Cumulative revenue - US$ 14.6 Billion• Contractor share of profit – US$ 5.3 Billion
Ravva - One of the most successful discovery
• At the time of taking over the field, Oil & Gas In-place reserve(OGIP) about 1.6 BCF
• JV consisted of Niko Resources and GSPC• Already produced cumulatively 348 BCF of gas & still producing• Total Investment – US$ 0.33 Billion• Cumulative revenue - US$ 1.5 Billion• Contractor share of profit – US$ 0.68 Billion
Hazira - One of the major gas producers in Gujarat
Ready Reference for Bidders (1/2)
17
Existing & Nearby Infrastructure
• Connectivity through existing facilities/wells in contracted area would be handed over to license holders at no cost
• Contractors would have access to the facilities available in nearby areas operated by ONGC/ OIL at cost
• Use of ONGC/ OIL facilities is not mandatory. Bidder is free to setup independent facilities or use any other operator’s facilities.
Indicative Viability Calculator
• Familiarize potential bidders/ investors with the key factors that influence the viability of E&P projects
• User-friendly dashboard where user can fill in the parameter inputs as per their choice in order to understand the viability of the project
• Available for download at DSF website
Facilitation Desk for Bidders
• Bidders can address their queries and provide feedback through the Facilitation Desk provided in website
• Queries related to Roadshows/Upcoming events, bidding procedure, data rooms booking, Technical data purchase, contract, online bidding, etc. will be addressed by the Facilitation desk as soon as possible
DSF Calculator
• Familiarize bidders with the bid evaluation demonstrating ranking of bids
• No of wells, LRP% and HRP% input values can be entered by user
• Calculator will rank bids basis scoring of average NPV of GOI share of Notional Revenue Profile and number of wells
• Available for download at DSF website
Ready Reference for Bidders (2/2)
18
Bid Evaluation & Process
• No reserve price for any discovered small field
• Book value of offered Discovered Small Fields is NIL
• Notional Revenue Profile given on website will be used for evaluation of bid
• MSTC bidders guide is available at e-bidding portal which clearly demonstrates step-by-step bidding details
• Consortium of companies are allowed to participate in the bid round
Reduced Fiscal Burden
• No cost approval required from government
• Revenue post payment of royalty to be shared with government based on the % share quoted by the contractor on a linear sliding scale basis
• Free/hassle-free transfer of Participating Interest (PI)
• No mandatory JV with Indian companies or NOCs
• No upfront payment, No signature bonus and No carried Interest by NOCs
• No step-in rights for contractors• Increased tax stability to bidders
through exemption from custom duty• Government would extend all possible
assistance to awardees’ in acquisition of various approvals
•
19
Thank you
Directorate General of Hydrocarbons(Under Ministry of Petroleum & Natural Gas)Phone: 0120-2472000, Fax: 0120-2472049Email: [email protected]: www.dghindia.gov.in