Disadvantaged Business Participation at DIA
Please refer to:
– Denver Revised Municipal Code, Chapter 28, Article III, Divisions 1 and 3 (S/MWBE)
– 49 C.F.R., Part 23 (ACDBE)
3
SBE MWBE DBE ACDBE
Race and Gender Neutral Race and Gender Conscious
Race and Gender Conscious
Race and Gender Conscious
Business Size ½ SBA Size Standards (averaged over 3 years)
½ SBA Size Standards (averaged over 5 years)
SBA Size Standard with an overall cap of $22.41 M (averaged over 3 years)
Overall cap of $56.42 million (averaged over 3 years)
Ownership At least 51% of owners must be members of economically and socially disadvantaged groups (Woman, Hispanic, Asian, Black, Native American)
At least 51% of owners must be members of economically and socially disadvantaged groups (Woman, Hispanic, Asian, Black, Native American)
At least 51% of owners must be members of economically and socially disadvantaged groups (Woman, Hispanic, Asian, Black, Native American)
Time Business Six (6) months Six (6) months
Actively in business Actively in business
PNW Less than $1.32M excluding primary residence and ownership interest in applicant business enterprise
Less than $1.32M excluding primary residence and ownership interest in applicant business enterprise
Less than $1.32M excluding primary residence and ownership interest in applicant business enterprise
Less than $1.32M excluding primary residence and ownership interest in applicant business enterprise
Work Type Construction Construction Commercially useful function
Concessionaire or Provides Goods or Services to Concessionaires
Fee $200 ($50 renewal) $200 ($50 renewal) Free Free
Certification Requirements
– Must be certified by the City & County of Denver (For ACDBE, out of state firms must be certified in home state prior to applying for certification in CO)
– Must be certified in Colorado/Denver at the time the LOIs (S/MWBE), proposal or JV paperwork, whichever is earlier (ACDBE), is submitted
– Certification must be updated annually
Certification Requirements, cont.
– Attend certification workshop
– Complete application (available online) and submit supporting documentation and fee (if applicable)
– Onsite visit
– Committee review
– 60-90 day timeframe
ACDBE Compliance
– Goals can be met by:
– Concession owner/operator ACDBE certified
– Non-certified owner obtaining goods and/or services from ACDBE certified firms
– Agreements entered into by two or more firms
DIA ACDBE Program Results 2006 - 2013
7
*Denotes projected revenues for 2012 & 2013 and projected FAA ACDBE goals
CRR.Aug 2012 FAA ACDBE DIA ACDBE Total DIA Concession
% Goal % Actual Revenues ACDBE Only NON-ACDBE
2013 36.3%* 38%* $298,105,354 $111,978,561 $186,126,793
2012 36.3% 34%* $274,849,331 $92,987,283 $181,862,048
2011 36.3% 34% $269,795,418 $92,828,715 $176,966,703
2010 36.3% 35% $257,901,954 $91,426,965 $166,474,989
2009 36.3% 36% $241,988,900 $87,328,573 $154,660,327
2008 36.3% 35% $251,609,678 $88,609,961 $162,999,717
2007 36.3% 35% $245,072,457 $85,462,054 $159,610,403
2006 36.3% 34% $211,000,000 $72,093,416 $138,906,584
Good Faith Efforts
– To be used only when all efforts to obtain full participation have failed
– ‘Good Faith Effort Checklist’ must be completed and submitted with supporting documentation
– Must work with DSBO office during process
When should firms apply for certification?
When should I start looking for a partner and/or supplier?
Please refer to:
– Denver Revised Municipal Code, Chapter 28, Article III, Divisions 1 and 3 (S/MWBE)
– 49 C.F.R., Part 23 (ACDBE)
Contacts
– http://business.flydenver.com/bizops/smallBus.asp
ACDBE Program Coordinator ACDBE Program Specialist ACDBE Certification
Vicki Padilla Julie Wilson Alicia Sewell
(303) 342-4358 (303) 342-2434 (303) 342-2185
[email protected] [email protected] [email protected]
S/MWBE Certification S/MWBE Tenant Finish
Downtown Certification Unit Diana Lopez
(720) 913-1999 (303) 342-2189
References
Certification Application:
https://denver.mwdbe.com/vendorstart.asp
DRMC, Chapter 28, Article III, Divisions 1 and 3:
http://library.municode.com/HTML/10257/level3/TITIIREMUCO_CH28HURI_ARTIIINOCOCOREREPRDECOSE.html#TOPTITLE
49 C.F.R., Part 23:
http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&sid=b880432dedbe5f0d12a2409fe5535503&tpl=/ecfrbrowse/Title49/49cfr23_main_02.tpl
JV Guidance: http://www.osdbu.dot.gov/documents/pdf/dbe/JointVentureGuidance-final.pdf
S/MWBE Tenant Finish Goals
– Construction / Refurbishments / Ongoing Maintenance
– MBE and WBE Ordinance
Established Goals for Design and Construction
$0 $30,000 0% SBE
$30,000 $90,000 3% SBE
$90,000 $150,000 5% SBE
$150,000 Above TBD by Goals Committee