27
PREMIUM VALUE. DEFINED GROWTH. INDEPENDENT. DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE HEATER EXPERIMENTAL SCHEME APPROVAL 12582 May 23, 2019

DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

PREMIUM VALUE. DEFINED GROWTH. INDEPENDENT.

DIRECTIVE 54 PRESENTATION

06/05-11-084-17W5 DOWNHOLE HEATER

EXPERIMENTAL SCHEME APPROVAL 12582

May 23, 2019

Page 2: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

• Current Approval• Geology Overview• Completions, and Artificial Lift• Performance and Surveillance• Facilities• Measurement and Reporting• AER Compliance• Conclusions

2

Agenda

Page 3: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

Current Approval

3

Page 4: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

4

Cliffdale Location

06/05-11-084-17W5

Page 5: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

• Experimental scheme approved Feb 10, 2017• Approval included single well in the Cliffdale heavy

oil field.• CNRL is current operator and 100% interest

owner. Acquired from Shell Canada in 2017.• Objective of experimental scheme was to enhance

the production of a well by means of adding a downhole, electric, wellbore heater in the horizontal leg.

• Premise behind project was that insitu wellbore heating would reduce oil viscosity and thus reduce pressure differential inside the horizontal section of the wellbore resulting in higher production and increased reserves.

5

Experimental Scheme 12528A

Page 6: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

Geology

6

Page 7: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

7

Type Log

Type Log Location

06/05-11-084-17W5

g

Page 8: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

8

Bluesky Gross Thickness Map

06/05-11-084-17W5

Page 9: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

9

Bluesky Top Structure Map

06/05-11-084-17W5

Page 10: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

10

Bluesky Base Structure Map

06/05-11-084-17W5

Page 11: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

• Bluesky Sand Thickness: 25.0m Depth: 630 – 655m TVD Net Pay: ~18.0m Average Core Porosity: ~28% Average Core Permeability: 463mD Temperature: 18°C Water Saturation 20 – 35% Core Oil Viscosity Range: 8,200 – 120,000cP @20°C Initial Reservoir Pressure: 3 800kpa

11

Cliffdale Reservoir Properties (From 02-14 Type Log and Core)

Page 12: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

Completions and Artificial Lift

12

Page 13: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

13

Completions and Artificial Lift

Completion History• Dec 9 -17, 2016

• Install heater BHA w/ 17-1500 insert PCP• Oct 18 – 30, 2017

• Replace worn pump

Page 14: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

Performance And Surveillance

14

Page 15: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

15

Production History – 06/05-11

0.00

20.00

40.00

60.00

80.00

100.00

120.00

Jan‐08

Nov‐08

Sep‐09

Jul‐1

0May‐11

Mar‐12

Jan‐13

Nov‐13

Sep‐14

Jul‐1

5May‐16

Mar‐17

Jan‐18

Nov‐18

Sep‐19

Jul‐2

0May‐21

Mar‐22

Jan‐23

Oil Ra

te (b

opd)

Base Case vs. Incremental ‐ Oil Rate

Base Case Heater Well Case Actuals

0

50,000

100,000

150,000

200,000

250,000

Jan‐08

Nov‐08

Sep‐09

Jul‐1

0May‐11

Mar‐12

Jan‐13

Nov‐13

Sep‐14

Jul‐1

5May‐16

Mar‐17

Jan‐18

Nov‐18

Sep‐19

Jul‐2

0May‐21

Mar‐22

Jan‐23

Cumulative Oil Prod

uctio

n (bbl)

Base Case vs. Incremental – Cum Production

Base Case Heater Well Case

Page 16: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

16

Production History Details

• Heater online April 14, 2017• Well down time events

Pump Change October 2017 Curtailment April 2018 Curtailment November 2018 to

January 2019• Heater down time events

Feb 2018 – May 2018 Jan 2019 – April 2019

Page 17: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

17

Surveillance –Temperature Profile

• Temperatures of heated section continuously monitored using thermocouples and optical fiber• Temperature profile along heater shown below• Average heater temperature of 170 – 186o C observed during steady-state production

Page 18: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

Facilities

18

Page 19: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

19

Wellsite 106/05-11-084-17W5/00

Page 20: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

Plot Plan

20

Page 21: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

Facility Modifications

• Original facility modifications completed in 2017 and included: Control skid Transformer

• Since start-up, no additional facility modifications were carried out

21

Page 22: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

• Wellsite Facilities (106/05-11): Production goes to a 1000 bbl tank Fluids are heated to ~70°C Oil and water are trucked separately to the Cliffdale Battery All produced gas is collected in a combined VRU/gas header and also sent to the Cliffdale

Battery Power consumption: Average / Maximum – 300 kW / 482 kW

• Cliffdale Battery (03-25-084-17W5): Produced water is de-oiled and discharged to a disposal well Oil is further treated before sales Produced gas from pads is scavenged for H2S, compressed and conveyed to Peace River

Complex for either use as fuel for steam generation or storage

22

Facilities Summary

Page 23: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

AER Compliance

23

Page 24: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

• CNRL’s Cliffdale field lies with-in the AER defined Peace River area that is subject to AER Directive 84

• Directive 84 states operators in the Peace River area must conserve at least 95 percent of all solution gas produced.

• All solution gas associated with the operation of the 06/05-11-084-17W5 well is conserved and then utilized in field operations or injected and stored at CNRL’s Three Creeks gas storage pool.

24

AER Directive 84

Page 25: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

Conclusions

25

Page 26: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

• Oil production pre-startup of the downhole heater was ~25bbls/d oil.• Post startup of heater, oil production increased to an average of 37bbls/d oil, an

increase of ~12bbls/d oil. During periods of heater downtime, oil production decreased by this same volume.

• Increased oil production observed during operation of downhole electric heater provided evidence that the downhole electric heater experimental trial was successful in validating original theory.

• Increased oil rates have proven economics of continuing the operation of the down hole electric heater and CNRL will be applying to continue the enhanced oil recovery process.

26

Project Summary

Page 27: DIRECTIVE 54 PRESENTATION 06/05-11-084-17W5 DOWNHOLE ... · • Experimental scheme approved Feb 10, 2017 • Approval included single well in the Cliffdale heavy oil field. • CNRL

PROVEN EFFECTIVE STRATEGY