24

DIE CAST AREA - US EPA...C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR Building foundation

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • DIE CAST AREA

    ENGINEERED CONTROL (CAP)

    WORK PLAN

    FOR THE

    CARTER CARBURETOR SUPERFUND SITE

    Prepared for:

    ACF Industries LLC

    101 Clark Street

    St. Charles, Missouri 63301

    Prepared by:

    HRP Associates, Inc. 2500 South Old Highway 94, Suite 202

    St. Charles, Missouri 63303

    Project No. ACF0001.RA

    March 26, 2015

    HRP Associates, Inc.

    http:ACF0001.RA

  • IMPORTANT NOTICE This report was prepared exclusively for ACF Industries, LLC. By HRP Associates, Inc. The quality of information, conclusions and estimates contained herein is consistent with the level of effort involved in HRP’s services and based on: i) information available at the time of preparation, ii) data supplied by outside sources and iii) the assumptions, conditions and qualifications set forth in this report. This report is intended to be used by ACF Industries, LLC only, subject to the terms and conditions of its contract with HRP. Any other use of, or reliance on, this report by any third party is at that party’s sole risk.

    Project No. ACF0001.RA March 26, 2015 HRP Associates, Inc.

    http:ACF0001.RA

  • Die Cast Area Engineered Control (CAP)

    Work Plan

    for the

    Carter Carburetor Superfund Site

    St. Louis, Missouri

    REVIEW AND APPROVALS:

    Prepared by:

    3/26/2015

    Date Project Manager

    Reviewed by:

    Eric J. Boswell, LEP

    Christopher L. Tedder, RG QA Reviewer

    Approved by:

    Eugene M. Watson Program Director

    3/26/2015

    Date

    3/26/2015

    Date

    Jeff Weatherford, Project Manager Date USEPA, Region 7

    Project No. ACF0001.RA March 26, 2015 HRP Associates, Inc.

    http:ACF0001.RA

  •    

          

                

         

             

                    

       

                 

       

                

             

           

    DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    TABLE OF CONTENTS

    Section Page

    Abbreviations and Acronyms ..............................................................................................ii 1.0 INTRODUCTION ......................................................................................................1-1

    1.1 Regulatory Framework ..................................................................................1-1 1.2 Background ...................................................................................................1-1

    1.2.1 Site Description ..................................................................................1-2 1.2.2 CBI. Building.......................................................................................1-2 1.2.3 WILLCO Plastics Building ..................................................................1-2 1.2.4 Die Cast Area .....................................................................................1-2

    1.3 Approach for Removal of PCB-Impacted Soils and Debris ...........................1-3

    2.0 DESIGN SUMMARY.................................................................................................2-1 2.1 Materials ........................................................................................................2-1 2.2 Equipment .....................................................................................................2-1 2.3 Cap Description .............................................................................................2-1

    2.3.1 Compacted Clean Fill .........................................................................2-2 2.3.2 Warning Burial Tape/Witness Barrier .................................................2-2 2.3.3 HDPE Geomembrane Liner ...............................................................2-3 2.3.4 Liner Drainage System .......................................................................2-3 2.3.5 Land Survey Markers .........................................................................2-3 2.3.6 Surface Finish ....................................................................................2-3

    3.0 SEQUENCE OF OPERATIONS...............................................................................3-5 3.1 Planning.........................................................................................................3-5 3.2 Pre-Construction Activities ............................................................................3-5 3.3 Planned Construction Sequence ...................................................................3-6 3.4 Post Construction Activities ...........................................................................3-6 3.5 Control Measures ..........................................................................................3-6

    4.0 QUALITY ASSURANCE PLAN ...............................................................................4-1 4.1 Documentation and Reporting .......................................................................4-1 4.2 Field Records ................................................................................................4-1 4.3 Equipment Mobilization .................................................................................4-1 4.4 Entry and Exit Procedures .............................................................................4-2

    4.4.1 Exclusion Zone...................................................................................4-2 4.4.2 Contaminant Reduction Zone ............................................................4-2 4.4.3 Decontamination and PPE .................................................................4-2

    4.5 Dust Control...................................................................................................4-3 4.6 Surface Water Runoff Management ..............................................................4-4 4.7 Visual Inspection ...........................................................................................4-5

    i C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  •    

             

    DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    5.0 CLOSURE ACTIVITIES............................................................................................5-6 5.1 Institutional Control Plan................................................................................5-6 5.2 Post Removal Site Control ............................................................................5-6 5.3 Closure Report ..............................................................................................5-6

    List of Figures

    Figure 1 Engineered Control Layout and Profiles

    ii C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  • DIE CAST AREA CAP WORK PLAN

    A B B R E V I A T I O N S A N D A C R O N Y M S

    ACF ACF Industries, LLC AOC Administrative Order on Consent ASA Administrative Settlement Agreement BMP Best Management Practices CBI Carter Building, Inc. CERCLA Comprehensive Environmental Response, Compensation and Liability Act CFR Code of Federal Regulations CY cubic yards DCA ECWP Die Cast Area Engineered Control Work Plan EE/CA Engineering Evaluation and Cost Analysis ft foot (or feet) ft2 square feet HAZWOPER Hazardous Waste Operations and Emergency Response HDPE High-Density Polyethylene HRP HRP Associates, Inc. HASP Health and Safety Plan mg/kg milligrams per kilogram MoDOT Missouri Department of Transportation MSD Metropolitan St. Louis Sewer District OSC On-Scene Coordinator OSHA Occupational Safety and Health Administration ppm parts per million PCB polychlorinated biphenyl PE Professional Engineer POTW publicly owned treatment works PPE personal protective equipment RAWP Removal Action Work Plan RC reinforced concrete RCRA Resource Conservation and Recovery Act Site Carter Carburetor Superfund Site SOW Scope of Work TSCA Toxic Substances Control Act TSDF treatment storage and disposal facility USEPA United States Environmental Protection Agency

    iii C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HRP

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    1.0 INTRODUCTION The purpose of this Die Cast Area Engineered Control Work Plan (DCA ECWP) is to describe in detail the scope of work (SOW) to be executed for construction and installation of an engineered protective cover within the former Die Cast Area of the Carter Carburetor Superfund Site (“the Site”). The protective cover is necessary to allow the beneficial reuse of polychlorinated biphenyls (PCB) impacted concrete debris and site material for fill material at the Site. The beneficial reuse is limited to materials containing less than 100 milligrams per kilogram (mg/kg)/parts per million (ppm) of PCBs and must be placed within the Die Cast Area excavation.

    1.1 Regulatory Framework The DCA ECWP documents the SOW necessary to meet the guidance provided in the Administrative Settlement Agreement (ASA) and Administrative Order on Consent (AOC) CERCLA 07-2013-0008. Specifically, the DCA ECWP was prepared in accordance with Attachment II, Section III Tasks; paragraph A.2 Addendum B – CBI Building Work Plan Addendum and paragraph A.3 Addendum C-Die Cast Area Work Plan Addendum.

    The Site is subject to a Non-Time Critical Removal Action. This portion of the Removal Action includes the demolition of the WILLCO Building and Carter Building, Inc building (CBI Building) and excavation of soil from the Die Cast Area to address PCBs present in these areas of the Site.

    As provided in the ASA AOC Attachment II, Section II, paragraph D; institutional controls, including engineered controls as defined by the ASA AOC, may be used at the Die Cast Area. The required engineered control includes a protective cover, hereinafter referred to as the “Cap” that allows reuse of demolition debris and addresses residual soil that are impacted with PCBs at concentrations greater than 25 ppm and less than 100 ppm. In conjunction with engineered control, deed restrictions will be recorded as part of the institutional control measures to limit use and access to the area.

    1.2 Background As described in Section 2.0 of the “Engineering Evaluation and Cost Analysis (EE/CA) for the Carter Carburetor Site. September 22, 2010”, the Die Cast Area and CBI building are impacted with PCBs. PCBs were detected in brick and concrete in the CBI building, the concrete slab at the Die Cast Area, and soil below the former Die Cast Building floor slabs. The selected remedies for the CBI building and Die Cast Area are demolition and excavations, respectively, followed by management of PCB impacted materials. It is important to note that reuse of the material is to occur within the excavation limits of the Die Cast Area.

    In addition to the demolition and removal action required under the ASA AOC, demolition of the WILLCO Plastics building will be performed. The WILLCO and CBI Buildings are connected, independent structures. Demolition of the WILLCO building has been included into the project to facilitate demolition of the CBI building and reuse of the site. The WILLCO Building was investigated in 2006 and 2007 and was found to contain PCB impacted materials

    1-1 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    at concentrations less than 10 ppm. The demolition debris from the WILLCO building will be used for backfill within the Die Cast Area excavation.

    1.2.1 Site Description The Site is located in the City of St. Louis and encompasses approximately ten (10) acres. The vicinity of the Site is a historically developed mixed-use urban area and is bounded as follows:

    West: North Spring Avenue (adjacent to CBI Building) and Hyams Avenue;

    South: St. Louis Avenue;

    East: North Grand Boulevard; and

    North: Dodier Street.

    Detailed descriptions of the CBI and WILLCO buildings were provided in the respective Demolition Work Plans. A detailed description of the Die Cast Area was provided in the respective Excavation Work Plan. A summary of key building and area features is provided below. The site location and layout is illustrated on Figure 1.

    1.2.2 CBI. Building Four (4) story reinforced concrete (RC) framed structure;

    Brick exterior;

    First floor footprint is approximately 139,600 square feet (ft2);

    Second floor footprint is approximately 133,200 ft2;

    Third floor footprint is approximately 122,800 ft2;

    Fourth floor footprint is approximately 83,650 ft2;

    Six open areaways/breezeways are located within the building.

    1.2.3 WILLCO Plastics Building Two (2) story RC framed structure;

    Brick exterior;

    Each floor of the WILLCO Building is approximately 25,350 ft2;

    The WILLCO Building was constructed adjacent to and is connected with the CBI Building, but each building remains an independent structure.

    1.2.4 Die Cast Area Approximately 31,250 ft2 rectangular area;

    1-2 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    Building foundation remnants (knee walls, slab, footings, etc.) are present from the former Die Cast Buildings;

    Oriented length-wise in an east-west cardinal direction;

    Extends from the CBI building eastward to the sidewalk at North Grand Avenue;

    A limestone gravel cover, serving as a temporary cap, was placed as part of a time-critical action at 36-inches thick. The remaining limestone cover thickness ranges from 4 inches to 24 inches.

    1.3 Approach for Removal of PCB-Impacted Soils and Debris The disposal of PCB remediation waste is addressed under Title 40 CFR Part 761.61(c) of the PCB Regulations (Mega-Rule). This regulatory information is governed by Code of Federal Regulation (CFR) Title 40, Protection of Environment; Chapter I, Environmental Protection Agency (USEPA); Subchapter R, Toxic Substance Control Act (TSCA); Part 761, Polychlorinated Biphenyl (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions; Subpart D, Storage and Disposal; Section 761.61, PCB Remediation Waste; dated July 1, 2011.

    The Die Cast Area Excavation Work Plan and CBI Building Demolition Work Plan contain special handling and disposal considerations for the management of PCB impacted debris as well as workers, equipment, and materials that come into contact with PCB impacted materials within the site. Those same considerations will be used in order to facilitate the installation of the Cap in a timely basis and minimize the numerous project related risks, including, but not limited to:

    Fugitive dust generation,

    Worker exposure,

    Management of PCB impacted storm water runoff,

    Generation of PCB decontamination fluids, and

    Management of PCB impacted soil and demolition debris.

    1-3 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    2.0 DESIGN SUMMARY The Cap will be designed and constructed to limit infiltration and prevent human exposure to impacted demolition debris and residual impacted site material placed in the Die Cast Area excavation.

    The Cap is a physical barrier system to prevent human exposure and limit infiltration to underlying PCB impacted site materials. The Cap will be constructed over the excavation limits of the Die Cast Area where soil was removed to meet the site-specific Removal Action goals. The finished surface will consist of a Vegetated Cover (Alternative 1) or Bituminous Concrete Surface (Alternative 2). The layout of the Cap and construction profiles for both surface finish alternatives are shown on Figure 1.

    2.1 Materials All materials imported to the site for construction of the Cap will be evaluated to determine the potential to contain PCBs. Specifications for manufactured materials, including but not limited to, Safety Data Sheets will be reviewed. Samples of manufactured materials may be collected and analyzed for PCBs. All sources of granular fill will be reviewed and inspected by the ACF Project Coordinator and the USEPA On-Scene Coordinator (OSC). Representative samples of all granular fill imported to the site will be collected and analyzed for PCBs and may be analyzed for additional constituents pending the review of the source.

    2.2 Equipment Construction equipment was listed in the CBI Building Demolition Work Plan and Die Cast Area Excavation Work Plan. Several pieces of the equipment listed will be used for construction of the Cap. Equipment previously in contact with PCB-impacted materials will be decontaminated using the double-wash double-rinse protocol prior to use for Cap construction.

    2.3 Cap Description

    The planned Die Cast Area excavation for the PCB Removal Action is rectangular shaped and encompasses approximately 31,250 square feet (ft2), excluding the over excavation area for sidewall stability (i.e. benchout areas and/or side wall slopes). Per the Die Cast Area Excavation Work Plan, this excavation area may be backfilled with demolition debris and site materials containing PCBs at levels less than 100 ppm, which will be generated from on-site building demolition and soil removal activities.

    The Cap will cover the rectangular planned removal action excavation, which will include the area of impacted backfill materials. The Cap will extend beyond this area, as described below, to prevent exposure to persons excavating proximal to the placed impacted materials.

    The north side toward Dodier Street,

    The west side toward the CBI Building and North Spring Street, and

    The south side toward St. Louis Avenue.

    2-1 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    The planned Cap area will encompass approximately 34,425ft2. The east side of the Cap, toward North Grand Boulevard, will extend to the property line. The Cap system will include:

    2.3.1 Compacted Clean Fill The Cap system will include several layers of granular clean fill material. Inclusive of all layers, a minimum of three feet of compacted clean fill will be incorporated into the Cap system. The clean fill will contain less than 1 ppm of PCBs. These layers of fill will serve to prevent direct human exposure to underlying impacted materials during typical commercial site activities.

    The fill materials will consist of gravel and other granular materials that will be installed in varying thickness intervals as needed to allow installation of the components of the Cap and liner system, as described below.

    o Coarser material containing sand and gravel up to 6-inches in diameter will comprise the majority of the cap volume, and will be used from below the Surface Finish Alternative 1 or 2 to the depth of the liner system.

    o As part of the liner system, finer grained granular materials will be installed to protect the liner during Cap construction and for drainage of surface water infiltration. These materials will be installed at minimum thicknesses of 4 inches both above and below (base layer) the HDPE liner.

    The clean fill cover material will be installed in lifts not to exceed 12-inches thick and compacted to 95% relative density with relation to the standard Proctor (ASTM D698)

    2.3.2 Warning Burial Tape/Witness Barrier Although institutional control measures (e.g. deed restrictions) will be implemented/recorded to restrict access to the area, a physical warning system is necessary to protect the liner system. In addition to risks associated with approved and planned future site redevelopment, a risk of unauthorized construction or excavation activities occurring at the site is recognized. To prevent construction worker exposure to underlying materials and reduce the risk of damage to the Cap liner, a buried warning system will be installed. Detectable burial tape, similar to that used for buried utilities, and orange construction fence (a.k.a. snow fence) will be installed below grade over the Cap area.

    The warning tape and fence will provide a warning to any construction workers that may perform excavation activities over the Cap area. The burial tape and fence will be placed at a minimum depth of 2 feet below the finished surface, and a minimum of 1 foot above the HDPE liner system. The burial tape will contain metal and be detectable from the surface during pre-excavation buried utility clearance. The tape’s

    2-2 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    grid pattern will be square with tape lines approximately 10 feet apart. The grid orientation and tape lines will be parallel to North Grand Boulevard and Dodier Street. Since this type of material is commercially available and pre-marked with standard utilities, tape marked as “Sewer” or “Storm” will be used. Construction fence will be placed directly over the burial tape, and will provide a contiguous visible marker over the entire Cap. The brightly colored fence and reflective tape will serve as a witness barrier.

    2.3.3 HDPE Geomembrane Liner A geomembrane liner and drainage system will be installed at the bottom of the Cap. The geomembrane liner will consist of a black High-Density Polyethylene (HDPE) liner, with 40 mil thickness. This type of liner is a durable material, chemically resistant, and has a very low permeability (estimated coefficient of permeability at 10-13 cm/sec). Given this very low permeability, the liner exceeds the performance of compacted clay caps by several orders of magnitude and will reliably limit surface water infiltration to underlying materials. Geotextile and finer grained clean granular fill will be placed below and above the liner to prevent punctures from larger diameter gravel and concrete debris included in the overlying compacted fill and underlying impacted materials, respectively.

    2.3.4 Liner Drainage System Since the liner will prevent infiltration to the underlying materials, surface infiltrate will require management to prevent accumulation of liquids on top of the liner, differential settlement and erosion over the Cap area. An integrated passive drainage system will be constructed with the liner (Figure 1). The underlying bedding material for the liner will be graded with a high point ridge parallel with Dodier Street, which is the longer axis of the Cap, and then sloping evenly away from the ridge. The liner will be installed following these same contours. The geotextile placed over the liner will include geocomposite drainage net to provide a pathway for flow of infiltrate. Gravel (open stone) filled trenches, wrapped in geotextile, will be installed along the down-slope sides and along the west end of the Cap. The trenches will be configured to receive flow from the drainage layer and direct away from the liner.

    2.3.5 Land Survey Markers Survey boundary markers will be installed at the corners of the Cap. The survey markers will be iron pins or similar that will be driven into the ground and flush to the final surface grade. The markers will be surveyed by a licensed land surveyor for incorporation into land records. The survey markers will facilitate determining the horizontal extent of the cap during future site activities.

    2.3.6 Surface Finish Following construction of the Cap, the ground surface over the Cap will be finished with a Vegetated Cover or Bituminous Concrete Surface depending on the final

    2-3 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    selection by the PRP. The Vegetated Cover Alternative (Alternative 1) is preferred for its lower long-term maintenance requirements.

    Alternative 1 – Vegetated Cover The Vegetated Cover will have a final surface that will be grass. The cover will include a minimum of 4 inches of top soil that is graded to mimic the surface of the underlying liner. The Cap area will then be hydro-seeded with a perennial grass seed mixture.

    Alternative 2 – Bituminous Concrete Surface The Bituminous Concrete surface will be designed and constructed to support commercial parking activities. The pavement profile will include compacted sub-base aggregate materials consistent with MoDOT specifications. The paved surface will be graded to direct runoff north toward Dodier Street. A gravel filled trench drain will be located along the north side of the pavement to receive stormwater runoff. The trench drain will provide limited stormwater storage, infiltration capacity, and absorb energy from sheet flow.

    2-4 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    3.0 SEQUENCE OF OPERATIONS This section provides an overall strategy for the construction of the Cap. Work will be sequenced and executed in a safe and efficient manner and according to all applicable regulations, including but not limited to, OSHA and 29 CFR Parts 1910 and 1926.

    3.1 Planning Cap construction can be initiated following completion of prerequisite Removal Action activities (i.e. building demolition, soil excavation, concrete processing, etc.). Preliminary project schedule estimates that the Cap can be completed within six (6) to eight (8) weeks after the area has been rough graded. At the completion of the Cap, an institutional control plan will be developed and implemented.

    Several site tasks that are integral to the Removal Action must be completed prior to construction of the Cap. These Removal Action tasks include, but are not limited to:

    ACM Abatement and Universal Waste removal from site buildings;

    Demolition of the WILLCO Plastics building;

    Demolition of the CBI building;

    Demolition and Excavation of the Die Cast Area;

    Processing of demolition debris;

    Confirmation that PCB Removal Action goals were achieved (see Section 5.2 of the Die Cast Area Excavation Work Plan for detail); and

    Backfilling and rough grading of the Die Cast Area excavation.

    3.2 Pre-Construction Activities At the completion of the prerequisite Removal Action tasks, the following activities must be completed by a selected specialty contractor prior to beginning of installation of the Cap:

    Preparation of a final design for the installation of the HDPE liner. This design will include all OSHA compliant safety measures.

    Provide a site specific health and safety plan, which will include employee HAZWOPER and other OSHA training documentation.

    Mobilize Personnel, Materials and Equipment.

    All equipment planned for installation of the Cap that has been used elsewhere on the Site as part of the PCB Removal Action will be required to be de-contaminated following the double wash-double rinse protocol, as described and referenced in the CBI Building Demolition Work Plan (Section 5.6.3) and Die Cast Area Excavation Work Plan (Section 4.4.1) prior to Cap construction.

    3-5 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    3.3 Planned Construction Sequence Construction of the Cap will commence following pre-construction activities. The generalized sequence of construction work is listed chronologically below:

    1. Place, compact and grade base layer for liner system;

    2. Install liner system (geotextiles, HDPE liner, geocomposite drainage net, drainage trenches, etc.)

    3. Place, compact, and grade bedding material over liner system;

    4. Install compacted granular fill to achieve a minimum of 3-feet of cover, and place warning burial tape/witness barrier;

    5. Complete vegetated cover; and

    6. Install and survey boundary markers.

    Following installation of the base layer for the liner, workers will be not be in contact with backfill materials containing PCBs at levels greater than 1 ppm. The base layer shall be placed in manner that equipment does not come into contact with the placed backfilled materials that may contain PCBs at levels greater than 1 ppm. Personnel will minimize contact with PCB impacted materials during installation of the base layer, and will follow decontamination procedures including changing of any personal protective equipment (PPE) prior to proceeding with installation of other Cap system components.

    3.4 Post Construction Activities Several administrative and documentation activities are necessary following Cap construction. These activities include:

    Survey of Cap boundary markers;

    Develop a closure report;

    Develop an institutional control plan; and

    Record deed restrictions.

    3.5 Control Measures The following is a list of control measures that were detailed in several sections of the CBI Building Demolition Work Plan and Die Cast Area Excavation Work Plan. These control measures will continue to be observed during installation of the Cap (described in Section 4):

    Entry and Exit Procedures;

    Dust Control;

    Dust Suppression and Surface Water Runoff Management;

    Safety Controls to protect the Work Site and Traveling Public

    3-6 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    4.0 QUALITY ASSURANCE PLAN

    4.1 Documentation and Reporting The Site Supervisor will oversee the implementation of the Die Cast Area Engineered Control Work Plan; prepare, maintain and document a complete record of construction activities performed at the Site; and ensure that the project is completed in accordance with the specifications of the Die Cast Area work plans, the HASP, and generally accepted industry/engineering standards.

    4.2 Field Records The Site Supervisor will maintain a daily field log of all activities associated with construction progress. The following specific documentation and reporting requirements including, but not limited to, will be the responsibility of the Site Manager and Site Supervisor.

    Daily inspection(s) of the construction progress;

    Inspection of each Cap component, as required;

    Review all quantitative testing results from the liner seams and verify within performance specifications;

    Ensure compliance with provisions of the HASP, including completion of all logs;

    Ensure proper management of PCB impacted materials and wastes; including excavating, relocating, stockpiling, loading for transport, etc.;

    Maintain an accurate accounting of all materials/equipment entering and exiting the Site, including PCB impacted debris/material, other materials, and placement of each type of backfill material on the site;

    Document Cap installation activities including; all drawings, photographic and video logs;

    Document sampling of materials, including copies of chain of custodies, a log of cooler temperatures, measurements of sample locations in reference to fixed Site features;

    Document and report of spills, leaks, or other discharges occurring at the Site during implementation and continuous construction activities;

    Document and report disruption/damage to utilities.

    Document and report disruption/damage to the sidewalks, curbing and roadway of the public right-of way.

    4.3 Equipment Mobilization Equipment will be mobilized on an as needed basis due to the limited area of the Site. Equipment may be stored on the west side of North Spring Avenue inside the fenced area, if

    4-1 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    approved in advance by the Site Supervisor. Heavy equipment mobilization for the Cap installation must be coordinated with the Site Supervisor to minimize impact to local businesses and traffic. Some equipment may require assembly on-site if approved in advance by the Site Supervisor. Assembled equipment will be inspected and tested by the operator or contractor supervisor to ensure a safe working condition and that all safety apparatus’ are in place and functioning as designed. Equipment operators will be competent, experienced and properly trained.

    4.4 Entry and Exit Procedures Site Access Control is discussed in detail in Section 5.6 of the RAWP. General site access will continue to be controlled to prevent unauthorized access to the Site in accordance with the RAWP and subsequent approvals by the USEPA OSC and ACF Project Coordinator.

    4.4.1 Exclusion Zone The area of the site where Cap installation activity will occur (i.e. equipment staging areas, materials stockpiles, etc) will be considered part of the HAZWOPER designated Exclusion Zone. The Exclusion Zone will be delineated in the field with high visibility construction fencing with signage indicating that it is an Exclusion Zone. The entire area will remain the exclusion zone until the Cap is completed.

    4.4.2 Contaminant Reduction Zone The second area of the Site for Cap installation, outside of the Exclusion Zone, will be designated a Contaminant Reduction Zone. Within this area, HAZWOPER approved decontamination and PPE protocols will be applied. The Contaminant Reduction Zone will have a decontamination strategy which will identify, establish and determine:

    1) Procedures to prevent contamination of clean areas;

    2) The appropriate decontamination methods;

    3) Methods and procedures to minimize worker contact with contaminants during removal of personal PPE;

    4) The decontamination equipment required;

    5) The number and layout of the decontamination stations; and

    6) Methods for disposing of clothing and equipment that are not completely decontaminated when completed for a work shift.

    4.4.3 Decontamination and PPE All personnel entering the exclusion zone will be required to wear the appropriate PPE as designated by the Site Health and Safety Officer prior to entry and continuously, while in the exclusion zone. The required PPE during all phases of work will include:

    4-2 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    High visibility shirts, vests, or similar garment(s);

    Hard hat;

    Eye protection;

    Hearing protection; and

    Steel-toed boots.

    When PCBs are present in the work areas at levels greater than 25 ppm, the following additional PPE may be required within the exclusion zone, as deemed necessary by the Site Health and Safety Officer:

    Boot covers

    Respirator;

    Tyvek chemical resistant suits; and

    Chemical resistant gloves.

    Single use disposable PPE will be used to the maximum extent. While impacted materials are exposed, used PPE will be containerized and transported off-site for disposal as TSCA regulated waste (greater than 50 ppm). After the base layer is completed, used PPE will be containerized and characterized for disposal.

    Durable PPE and all other durable equipment that may have potentially been in contact with PCB impacted materials will be cleaned using the double wash and double rinse method consistent with Subpart S of the PCB Regulations prior to exiting the exclusion zone. Decontamination of personnel and equipment will be performed on an appropriately sized and constructed (i.e. sufficient to contain and clean the largest equipment) decontamination pad located within the contaminant reduction zone. The decontamination pad will be configured such that all wash-waters will be contained and can be easily collected. The used wash-waters will be containerized and transferred to the on-site process wastewater treatment system.

    4.5 Dust Control A fugitive dust suppression program will be implemented in accordance with the project specifications to prevent the off-site migration of particulate matter and/or dust resulting from excavation, loading, transportation, and filling operations associated with site materials as described in the CBI Building Demolition Work Plan (Sections 5.9 and 7.3). The following measures will be implemented continuously during site activities:

    1) The construction/demolition contractor will supervise and maintain fugitive dust control measures;

    4-3 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    4-4 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

    2) The Site Supervisor will monitor, document and report airborne particulate matter (visual and metered); and

    4) The ACF Project Coordinator will coordinate with the USEPA for the results of perimeter air monitoring and impact on installation activities, if any.

    The area of the Site to be used for vehicle traffic, dry excavation surfaces, and backfill surfaces that contain fine materials and cause dust will be wetted as needed to contain airborne fugitive dust. The travel paths on-site will be swept on a weekly basis and wetted as needed to prevent airborne dust. It is the intent of the dust control actions to avoid any airborne fugitive dust generated by Site activities from leaving the Site.

    4.6 Surface Water Runoff Management Surface water management will be controlled utilizing a series of Best Management Practices (BMPs) such as seeding, sodding, soil roughening, geotextiles, slit fences, etc combined with Site Specific Water Runoff Controls such as strategically placed berms, a process water collection tank and process/stormwater treatment system to ensure the Site can meet the local POTW requirements prior to discharge. Site specific water runoff controls that are available include, but are not limited to, the following:

    Land grading to help control surface runoff, soil erosion and sedimentation (with the potential for COC transport mechanisms);

    Semi-permanent diversions (berms) which can be constructed by creating channels with supporting earthen ridges on the bottom sides of the slopes to collect storm water runoff and to deflect the runoff to acceptable outlets that convey it without erosion;

    Stabilized construction entrances to minimize the amount of sediment leaving the Site (gravel pad over filter cloth) in conjunction with vehicle/tire wash station;

    Filter berms made up of a temporary loose gravel ridge on the roadway that diverts storm water flow from an open traffic area and acts as an efficient form of sediment control (intended for gentle slopes, have a short life span, and require maintenance due to clogging from mud/soil on tires); and

    Dust control management with a dust control plan (CBI Building Demolition Work Plan Sections 6.2 and 7.3).

    All measures will be taken on-site to insure that all surface water, process water, and storm water is captured, collected, treated and released to the POTW in accordance with the Metropolitan Sewer District (MSD) and United States Environmental Protection Agency standards.

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    4-5 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

    4.7 Visual Inspection Visual inspections will be necessary to verify materials imported to the site and construction activities are in conformance with approvals and work plans. At the time of delivery, trucks and their respective loads shall be inspected to ensure materials are consistent with those approved for Site use. Each component of the Cap will be inspected by HRP and USEPA for final approval and use prior to final implementation of the Cap.

  • DIE CAST AREA ENGINEERED CONTROL WORK PLAN

    5-6 C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

    5.0 CLOSURE ACTIVITIES

    5.1 Institutional Control Plan A draft preliminary Institutional Control Plan (ICP) will be submitted to USEPA a minimum of thirty (30) days prior to the estimated completion date of the Die Cast Area Engineered Control for review and approval. The ICP will include details of the land use restrictions necessary to ensure the continued long-term effectiveness of the Removal Actions at the Die Cast Area, including the Engineered Control. If Environmental Covenants are necessary, the ICP will include a process for developing and implementing such. The ICP will conform to all applicable USEPA guidance documents.

    5.2 Post Removal Site Control A draft preliminary Post-Removal Control Plan (PRCP) will be will be prepared and submitted to USEPA for review and approval consistent with Section 300.415(1) of the NCP and OSWER Directive No. 9360.2-02. The draft PRCP will be submitted a minimum of thirty (30) days prior to the estimated completion date of the Die Cast Area Engineered Control. The plan will include:

      Details of the completed Engineered Control;   Maintenance requirements for the Institutional Controls; and   Monitoring requirements for the Institutional Controls.  

     

    5.3 Closure Report A detailed closure report will be prepared following completion of the Die Cast Area Engineered Control. Within one hundred twenty (120) days after completions of all Work as required by the Oder, ACF shall submit for USEPA review and approval a final report summarizing the actions taken to comply with the Settlement Agreement. The final report will conform, at a minimum, with the requirements set forth in Section 300.165 of the NCP entitled “OSC Reports”, and shall be prepared in compliance with “Superfund Removal Procedures: Removal Response Reporting – POLREPS and OSC Reports” (OSWER Directive No. 936.3-03, June 1, 1994. The final report will include a listing of quantities and types of materials removed off-Site or managed on-Site, a discussion of the removal and disposal options notifying Respondent of the deficiencies and USEPA’s decision to modify or develop the required deliverable. The final report will include the following:  

    Narrative discussing construction activities; Photographic documentation for all phases of the construction; Testing results for seams; As-built drawings; and

    Land survey data.  

    The closure report will be submitted to the USEPA for review and approval.

  • C:\Users\emw2.HRP\Documents\ACF Carter Carburetor\Work Plans\Die Cast Area Cap Work Plan\20150326_FINAL_Die Cast Area Cap Work Plan.docx HR

    Figures

  • 5' 2'

    DRAINAGE MAT LAYER EXTENDS TO THE EDGEOF THE STONE TRENCH WITH A MIN. 6" OVERHANG

    DIE CAST EXCAVATION AREA125± FT

    5' 2'2' 5'

    DRAINAGE MAT LAYER EXTENDS TO THE EDGEOF THE EARTH TRENCH WITH A MIN. 6" OVERHANG

    DIE CAST EXCAVATION AREA125± FT

    2' 5'

    6"2'

    2'

    2'

    2'

    6"2'

    2'

    ADJACENT FINISHED GRADEADJACENT FINISHED GRADE

    ENGINEERED CONTROLALTERNATIVE 1: VEGETATED COVER

    ENGINEERED CONTROLALTERNATIVE 2: BITUMINOUS CONCRETE SURFACE

    1% SLOPE

    69.5± FT

    1% SLOPE

    CONTAMINATED FILL & SOIL

    139± FT

    SECTION B-BDIE CAST ENGINEERED CONTROL (a/k/a CAP)

    NTS

    GEOCOMPOSITEDRAINAGE LAYER

    TOPSOIL WITH VEGETATIVE COVER (GRASS)-SEE NOTES FOR SEED MIX REQUIREMENTS

    COMMON FILLMEETING THE REQUIREMENTS OF SECTION 203OF THE GUIDE FOR 90% COMPACTION

    DETECTABLE BURIAL WARNING TAPE(SEE PLAN VIEW FOR CONFIGURATION)

    40 MIL HIGH DENSITYPOLYETHYLENEGEOMEMBRANE

    10 OZ.NON-WOVENGEOTEXTILE

    3/8-INCH MINUS BEDDING MATERIALPLACEMENT AND COMPACTION SHALL BEIN ACCORDANCE WITH SECTION 304 OFTHE MoDOT EPG

    CONTAMINATED FILL & SOILPLACED AND COMPACTED IN ACCORDANCE

    WITH SECTIONS 209 & 210 OF THE MoDOT EPG

    LANDSCAPED SECTION (GRASS SURFACE)NTS

    4" MIN.

    16" MIN.

    DETECTABLE BURIALWARNING TAPE

    STONE TRENCH NOTES:1. TRENCH TO BE FULLY WRAPPED IN GEOTEXTILE WITH MAXIMUM APPARENT OPENING SIZE OF US SIEVE 100.2. LAP GEOTEXTILE AT TOP OF TRENCH.3. STONE MATERIAL SHALL CONFORM WITH SECTION 1009 OF THE MoDOT EPG.4. THE ENGINEERED CAP WRAPS UNDER THE STONE TRENCH AND UP THE FULL STONE TRENCH DEPTH.

    CAP MATERIALS

    3' MIN.

    1% SLOPE1% SLOPE

    COMMON FILLCAP MATERIAL

    WITH ROLLED BASE

    12" MIN.COMMON FILL

    4" MIN. BEDDING MATERIAL

    4" MIN. BEDDING MATERIAL

    2'-8" MIN.

    1% SLOPE

    69.5± FT

    1% SLOPE

    CONTAMINATED FILL & SOIL

    139± FT

    SOIL ANCHOR-SEE NOTES

    -SEE ALT2-C DETAIL

    SECTION B-BDIE CAST ENGINEERED CONTROL (a/k/a CAP)

    NTS

    GEOCOMPOSITEDRAINAGE LAYER

    DETECTABLE BURIAL WARNING TAPE(SEE PLAN VIEW FOR CONFIGURATION)

    40 MIL HIGH DENSITYPOLYETHYLENEGEOMEMBRANE

    10 OZ.NON-WOVENGEOTEXTILE

    3/8-INCH MINUS BEDDING MATERIALPLACEMENT AND COMPACTION SHALL BEIN ACCORDANCE WITH SECTION 304 OFTHE MoDOT EPGBITUMINOUS CONCRETE SURFACE

    NTS

    3 3/4" MIN.

    NOTES:1. "MoDOT EPG" REFERS TO THE MISSOURI DEPARTMENT OF TRANSPORTATION ENGINEERING POLICY GUIDE MOST CURRENT UPDATES.2. SEE SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS FOR BEDDING MATERIAL.3. PAVEMENT, BASE MATERIALS, AND INSTALLATION SHALL CONFORM TO THE REQUIREMENTS SET FORTH IN THE MoDOT EPG SECTION 400.

    DETECTABLE BURIALWARNING TAPE

    CAP MATERIALS

    3' MIN.

    1% SLOPE1% SLOPE

    COMMON FILLCAP MATERIAL

    WITH ROLLED BASE

    4" MIN. BEDDING MATERIAL

    4" MIN. BEDDING MATERIAL

    2'-8" MIN. 4" MIN. TYPE 1 AGGREGATE STONE(PER SECTION 304 OF THE MoDOT EPG)

    1 3/4" HMA BP-1(PER SECTION 400 OF THE MoDOT EPG)

    2" HMA BP-1(PER SECTION 400 OF THE MoDOT EPG)

    STONE ANCHOR-SEE NOTES

    -SEE ALT1-A DETAIL

    STONE ANCHOR-SEE NOTES-SEE ALT1-A DETAIL

    END GEOCOMPOSITEDRAINAGE LAYER ATEDGE OF STONETRENCH FOR FULLPERIMETER.GEOTEXTILE ANDBEDDING MATERIALCONTINUE TO LIMITOF ENGINEEREDCONTROL.

    LIMIT OFENGINEEREDCONTROL

    LIMIT OFENGINEEREDCONTROL

    PROPOSED FINISHED GRADE-SEE PLAN VIEW DETAIL

    PROPOSED FINISHED GRADE-SEE PLAN VIEW DETAIL

    LIMIT OFENGINEERED

    CONTROL

    LIMIT OFENGINEERED

    CONTROL

    COMMON FILL - SUBGRADE(PER SECTION 209 OF THE MoDOT EPG)

    12" MIN. COMMON FILL

    NOTES:1. "MoDOT EPG" REFERS TO THE MISSOURI DEPARTMENT OF TRANSPORTATION ENGINEERING POLICY GUIDE MOST CURRENT UPDATES.2. SEE SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS FOR BEDDING MATERIAL.3. INSTALL TOPSOIL AND SEEDING IN ACCORDANCE WITH SECTIONS 804 AND 805 OF THE MoDOT EPG.4. PERMANENT SEEDING FOR ESTABLISHING VEGETATION ON DISTURBED AREAS SHALL BE A MIX LISTED IN THE MOST CURRENT "PROTECTING WATER QUALITY, A FIELD GUIDE TO EROSION,

    SEDIMENT AND STORMWATER BEST MANAGEMENT PRACTICES FOR DEVELOPMENT SITES IN MISSOURI AND KANSAS," PREPARED BY THE MISSOURI DEPARTMENT OF NATURAL RESOURCES,REVISED JANUARY 2011, AND ALL UPDATES AND SHALL BE SELECTED FOR THE SEASON IN WHICH THE SEEDING IS PLACED FOR PERMANENT STABILIZATION.

    TACK COAT(PER SECTIONS 407 & 450 OF THE MoDOT EPG)

    END GEOCOMPOSITEDRAINAGE LAYER ATEDGE OF STONETRENCH FOR FULLPERIMETER.GEOTEXTILE ANDBEDDING MATERIALCONTINUE TO LIMITOF ENGINEEREDCONTROL.

    SOIL TRENCH NOTES:1. SOIL MATERIAL SHALL BE COMMON FILL OR APPROVED EQUAL

    1% SLOPE1% SLOPE

    CONTAMINATED FILL & SOILPLACED AND COMPACTED IN ACCORDANCE

    WITH SECTIONS 209 & 210 OF THE MoDOT EPG

    STONE TRENCH ATSURFACE-SEE PLAN VIEW-SEE ALT2-C DETAIL

    1% SLOPE

    ALT1-A DETAILLINER CONFIGURATION AT

    STONE ANCHOR

    SOIL ANCHOR-SEE NOTES-SEE BID ALT2-A DETAIL

    PAVEMENT SURFACE-SEE ALT2-B DETAIL

    GEOTEXTILE-SEE STONETRENCH NOTES

    BID ALT2-A DETAILLINER CONFIGURATION AT SOIL ANCHOR

    1% SLOPE LIMIT OF ENGINEEREDCONTROL

    ALT2-B DETAILFOR ALL PERIMETERS OF THE PAVEMENT

    EXCEPT FOR THE NORTHERN EDGE ALT2-C DETAILFOR NORTHERN EDGE

    WITH STONE TRENCH AT PERIMETER

    NOTES:1. PAVEMENT IS TO BE INSTALLED SUCH THAT THE VERTICAL ALIGNMENT OF THE VARIOUS

    MATERIAL SECTIONS CONTAIN UNDER-HANGING SECTIONS AS ILLUSTRATED HERE.2. GEOTEXTILE WITH MAXIMUM APPARENT OPENING SIZE OF US SIEVE 100.

    2" CRUSHED STONEGEOTEXTILE-SEE NOTES

    WITNESS BARRIER(aka ORANGE CONSTRUCTION FENCE)SAME EXTENT AS DETECTABLEBURIAL WARNING TAPE

    WITNESS BARRIER(aka ORANGE CONSTRUCTION FENCE)SAME EXTENT AS DETECTABLEBURIAL WARNING TAPE

    3'-6"MIN.

    SHORING SYSTEMTO BE REMOVED

    DIECAST EXCAVATION AREAFILLED AND COMPACTED

    HDPE LINER-SEE DETAILS

    ON THIS SHEET

    3.'MIN.

    1'-6"MIN.1'-0"MIN.SHORING SYSTEM

    TO REMAIN

    CUT AND REMOVE SHORINGPRIOR TO THE INSTALLATION

    OF THE ENGINEERED CAP

    NORTH GRAND BOULEVARDRIGHT-OF-WAY

    (CITY OF ST. LOUIS)

    PR

    OP

    ER

    TY L

    INE

    (AP

    PR

    OX

    IMA

    TE)

    PROPOSEDGROUND SURFACE

    RE

    VIS

    ION

    SN

    O.

    DA

    TED

    ES

    CR

    IPTI

    ON

    FIGURE

    DE

    SIG

    NE

    D:

    EJB

    AC

    F000

    1.R

    A

    EM

    W

    GD

    W

    GD

    WA

    S S

    HO

    WN

    01/0

    7/20

    15

    CA

    RTE

    R C

    AR

    BU

    RE

    TOR

    DIE

    CA

    ST

    AR

    EA

    EN

    GIN

    EE

    RE

    DC

    ON

    TRO

    L W

    OR

    K P

    LAN

    2800

    BLO

    CK

    OF

    NO

    RTH

    SP

    RIN

    G A

    VE

    NU

    ES

    T. L

    OU

    IS, M

    ISS

    OU

    RI

    DR

    AW

    N:

    RE

    VIE

    WE

    D:

    AP

    PR

    OV

    ED

    :

    SC

    ALE

    :

    ISS

    UE

    DA

    TE:

    PR

    OJE

    CT

    NU

    MB

    ER

    :

    SH

    EE

    T S

    IZE

    :

    24"x

    36"

    EN

    GIN

    EE

    RE

    DC

    ON

    TRO

    L LA

    YO

    UT

    AN

    D P

    RO

    FILE

    S

    DR

    AW

    ING

    NA

    ME:

    J:\A

    \AC

    FIN

    - A

    CF

    IND

    UST

    RIE

    S, IN

    C\2

    804

    NO

    RT

    H S

    PRIN

    G A

    VEN

    UE,

    ST

    LO

    UIS

    , MO

    63\

    AC

    F000

    1RA

    \CA

    D\C

    AD

    for E

    ngin

    eerin

    g\Bi

    d Pa

    ckag

    e\A

    CF0

    001R

    A-0

    9-02

    - C

    AP

    DET

    AIL

    S.dw

    g

    LAY

    OU

    T: 1

    7 SH

    OR

    ING

    & E

    NG

    INEE

    RED

    CO

    NT

    RO

    L D

    ETA

    ILS

    (2)

    PLO

    T D

    AT

    E: F

    eb 2

    0, 2

    015

    - 12:

    43pm

    OPE

    RA

    TO

    R: G

    DW

    P.E

    . SE

    AL

    1

    PLAN VIEW OF ENGINEERED CONTROL1"=50'

    Ph:(314)200-4720 Fax:(314)200-4721www.hrpassociates.com

    St. Charles, Missouri 633032500 South Old Highway 94, Suite 202

    0 25' 50'

    SECTION A-ASHORING ABONDONMENT IN-PLACE

    NTS

    PLAN VIEW OF ENGINEERED CONTROL1"=50'

    0 25' 50'

    NOTE:THE LIMITS OF THE CAP ARE TO BE MARKEDWITH IRON PINS. AT MINIMUM, PINS ARE TO BEPLACED AT EACH OF THE FOUR CORNERS.

    NOTE:THE LIMITS OF THE CAP ARE TO BE MARKEDWITH IRON PINS. AT MINIMUM, PINS ARE TO BEPLACED AT EACH OF THE FOUR CORNERS.

    N. SPRING AVE.

    N. GRAND AVE.

    ST.

    LO

    UIS

    AV

    E.

    DO

    DIE

    R S

    TRE

    ET

    LOCATION OF DIECAST AREA CAP

    LOCATION MAPNTS

    CBI BUILDING

    WILLCOBUILDING