I« ltpiy T*j FO-2-1 July 20, I W
Anavada itotit Corporatian AtUBt'Ofil Mr. C. J . Zruk« 1200 Hii**, 6th floor Houston, TSJBVI 77002
uxyitl
Bafarano* l s mads to /our I n i t i a l Davalop^aot Operations CoortfiaatiatJ Dooutfastit (DOCD) rscsistKJ July 8, 19o6, for Las^aa OCS-fl 5412-ami W L Blocks 205, 20ft, smi 225>f raapactivaly, ftouta Tiabsitar I r s a . This DuCD inolusiss ths sct iv i t iaa propesad for Platf orm t in Elock 205, rutfora A in clock 206, sod 12 riaila.
ir. acccjxisncs wit* 30 CFR 250.3*, Uus L/0CV i s haraby daCBtaci susr.it*-ad r.od Ifl now i i . - considered for approve
Tour SfiBfrfyf nurbor LC U-^07O an/; r.'.jould ba raferooce<: in your aou«asil-catlou sad oorraspoodoncs cono*. tiXOfc tfcii DOCD.
sincaraly yocrs,
. S r ;?r
^ D. J . Scurgaols Rs^lonal Ai^snri*or Piald Oparatlrais
bcc: Laaaa OCS-G 612 (GPS~3-«) (FILE ROOM) Laaaa OCS-C 5613 (0*3-3-2) (FILE BOON) Laaaa OCS-0 5224 (OPS-3-2) {PILE ROOM)
LOP5-3-4 v/Publio infb. Copy aa7 tba DOCD (PUBLIC
WWiUisiiaoiisooki07/U/862doodcori
Office of Prog'am Services
JUL 2 2 1988 information Services
Section
-Ws1. !S
-
i t
''ft
RMERRDR HEBS CDRPDRRTIDN
ISOO M I L A M . OTH F L O O R H O U S T O N . T E X A S 77002
711-0 90-0770
July 5, 1988
Mr. Daniel J . Bourgeois Regional Supervisor Minerals Management Service, FO-2-1 1201 Elmwood Park Blvd. New Orleans, Lcj isiana 70123-2394
Subject: South Timbalier Block 205 and Block 206 OCS-G 5612 and OCS-G 5613
In i t i a l Development Operations and Coordination Document
Dear Nr. Bourgeois: In accordance with 30 CFR 250.34 et seq. and Notice to Lessees and Operators No. 84-01, Amerada Hess Corporation hereby submits for your approval the Development Operations and Coordination Document (DOCD) for South Timbalier Block 205 and Block 206 area, OCS-G 5612 and OCS-G 5613.
Enclosed are five (5) copies of the subject DOCD for confidential use and four (4) copies for public information. Because the development location 1s located off the coas* of Louisiana, an Environmental Report and Coastal Zone Management Plan Consistency Certifioation is required and enclosed.
Should the Minerals Managements. Service require any additional information, please do not hesitate to contact me at (713) 951-5680.
Very truly yours,
Environmental Regulatory Special ist
SJZ:db/091 Enc.
R M E R R D R H E B S CDRPORRTIUN
DEVELOPMENT OPERATIONS AND COORDINATION DOCUMENT INITIAL PLAN
GULF OF MEXICO: OFFSHORE LOUISIANA SOUTH TlMBAUER AREA, BLOCK 205 AND BLOCK 206
LEASES OCS-G 5612 AND OCS-G 5613
UNITED STATES EXPLORATION AND PRODUCTION OFFSHORE REGION OPERATIONS
HOUSTON, TEXAS
DEVELOPMENT OPERATIONS AND COORDINATION DOCUMENT
INITIAL PLAN
GULF OF MEXICO: OFFSHORE LOUISIANA
SOUTH TIMBALIER AREA, BLOCK 205 AND BLOCK 206
LEASES OCS-G 5612 and OCS-G 5613
OPERATOR
AMERADA HESS CORPORATION
1201 LOUISIANA, SUITE 700
HOUSTON, TEXAS 77002-5681
CONTACT: S. J. ZRAKE (713) 951-5680
JULY 1983
PUBLIC INFORNATION
AMEkADA HESS CORPORATION DEVELOPMENT OPERATIONS AND COORDINATION DOCUMENT SOUTH TIMBALIER AREA. BLOCK 205 AND BLOCK 206
LEASES OCS-G 5612 AND OCS-G 5613
IN ACCORDANCE WITH 30 CFR 250.34 ET SEQ. AND NOTICE TO LESSEES AND OPERATORS NO. 84-01, AMERADA HESS CORPORATION HEREBY SUBMITS THE FOLLOWING INFORMATION FOR THE PLANNED DEVELOPMENT AND PRODUCTION.
A. DESCRIPTION
AMERADA HESS PROPOSES TO DEVELOP SOUTH TIMBALIER BLOCKS 205 AND 206 CONCURRENTLY. FIELD DEVELOPMENT MILL START WITH THE DRILLING OF WELL NO. 3 FROM THE EXISTING TEMPLATE ON BLOCK 205 ATTEMPTING TO PROVE UP ADDITIONAL RESERVES. DETAILED DESIGN, FABRICATION AND INSTALLATION OF PLATFORMS, PRODUCTION FACILITIES AND PIPELINES WOULD THEN BE COMPLETED AND PRODUCTION INITIATED.
THE PLATFORM FOR BLOCK 205 WILL BE A FOUR PILE, UNMANNED FACILITY SET NEXT TO THE EXISTING NINE SLOT TEMPLATE CAPABLE OF PRODUCING 50 MMCFD OF GAS. WELLS NO. 1, 2, AND 3 WILL BE TIED-BACK TO THE PLATFORM AND COMPLETED FOR PRODUCTION USING A CANTILEVER TYPE JACK UP DRILLING PIG.
THE BLOCK 206 PLATFORM WILL BE A 24 SLOT, 8 PILE MANNED STRUCTURE SET OVER THE EXISTING TEMPLATE CAPABLE OF PRODUCING 150 MMCFD. A PLATFORM DRILLING RIG WOULD THEN BE MOVED ONTO THE PLATFORM. WELLS NO. 1 AND 3 WILL BE TIED-BACK TO THE PLATFORM AND COMPLETED FOR PRODUCTION. WELL NO. 2 WILL BE SIDETRACKED, TIED-BACK TO THE PLATFORM AND COMPLETED IN SANDS PREVIOUSLY LOGGED. SIX ADDITIONAL NEW WELLS WILL BE DRILLED TO OPTIMIZE RESERVOIR DEPLETION. SIMULTANEOUS DRILLING AND PRODUCTION WILL TAKE PLACE DURING THE TWO YEAR DEVELOPMENT DRILLING PROGRAM.
PRODUCT TRANSPORTATION WILL USE SUBSEA PIPELINES TO THE NEAREST SHORELINE SYSTEM TAKE POINT THAT RESULTS IN THE BEST OVERALL ECONOMICS. NO NEW NEARSHORE OR ONSHORE PIPELINES OR FACILITIES WILL BE CONSTRUCTED. THE SPECIFIC SYSTEM WILL BE DETERMINED DURING THE NEGOTIATION OF THE GAS MARKETING CONTRACT WHICH IS EXPECTED TO TAKE PLACE DURING THE FIRST HALF OF 1989.
B. SCHEDULE
THE ANTICIPATED SCHEDULE IS PRESENTED BELOW. THE TOTAL TIME TO COMPLETE THIS PROJECT IS ESTIMATED TO BE 21 MONTHS TO INITIAL PRODUCTION WITH AN ADDITIONAL 24 MONTHS TO COMPLETE THE DEVELOPMENT DRILLING PROGRAM.
2
PROPOSED DATES ACTIVITY
DRILL 205/225 WELL NO. 3
DESIGN PRODUCTION FACILITIES
SECURE GAS CONTRACT
FABRICATE AND INSTALL FACILITIES
TIEBACK AND COMPLETE
COMMENCE PRODUCTION - BLOCKS 205 AND 206
BLOCK 206 DEVELOPMENT DRILLING
START
AUG 1988
JUL 1988
ONGOING
FEB 1989
NOV 1989
JAN 1990
JAN 1990
COMPLETE
OCT 1988
FEB 1989
DEC 1988
NOV 1989
JAN 1990
ONGOING
JAN 1992
GEOLOGICAL, GEOPHYSICAL AND CULTURAL RESOURCE
1. SHALLOW HAZARD ANALYSIS
A SITE SPECIFIC SHALLOW HAZARD ANALYSIS WAS COMPLETED AND SUBMITTED AS PART OF THE PLAN OF EXPLORATION. THE WELLS PREVIOUSLY DRILLED AT THESE LOCATIONS VERIFY NO SHALLOW GAC HAZARDS EXIST. SOIL BORINGS WILL BE TAKEN AT THE PROPOSED DEVELOPMENT LOCATIONS TO PROPERLY DESIGN AND SIZE THE PRODUCTION PLATFORMS.
2. SITE SPECIFIC CULTURAL RESOURCE ASSESSMENT
NO IMPACT TO ANY HISTORICAL OR ARCHAEOLOGICAL CULTURAL RESOURCES IS EXPECTED FROM THIS DEVELOPMENT AS IT IS OUTSIDE THE AREA WHERE SIGNIFICANT CULTURAL RESOURCES WOULD BE FOUND. THE HIGH RESOLUTION GEOPHYSICAL SURVEY CONDUCTED ON 8L0CKS 205 AND 206 INDICATED SEVERAL SMALL MAGNETIC ANOMALIES THAT PROBABLY REPRESENT FERROMAGNETIC DEBRIS.
3. STRUCTURE MAP OF SANDS AND WELL LOCATIONS
EXHIBITS 1,2, 3 - CONFIDENTIAL
THE LOCATIONS OF THE EXISTING AND FUTURE DEVELOPMENT WELLS ARE AS FOLLOWS:
WELL # BKL* TVD TYPE
BLOCK 205 A-l CONFIDENTIAL CONFIDENTIAL EXISTING A-2 S/T " " EXISTING A-3 " • PiMHCd
BLOCK 206 A-l A-2 S/T
CONFIDENTIAL CONFIDENTIAL EXISTING PLANNED EXISTING PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED
A-3 A-4 A-5 A-6 A-7 A-S A-9
i t
•SURFACE LOCATION IS AT RESPECTIVE PLATFORM LOCATION.
4. CROSS-SECTIONAL MAP
EXHIBITS 4 AND 5 - CONFIDENTIAL
5. SURFACE LOCATION
EXHIBIT 6 - PUBLIC INFORMATION
6. SPIDER MAP
EXHIBIT 7 - CONFIDENTIAL
D. LOCATION MAP
1. LOCATION MAP OF LEASE BLOCKS
EXHIBIT 6 - PUBLIC INFORMATION
2. LOCATION OF ONSHORE SUPPORT BASE FACILITY
FOURCHON, LOUISIANA IS THE ONSHORE SUPPORT BASE FACILITY. SEE EXHIBIT 6 - PUBLIC INFORMATION
3. WELL AND PLATFORM SURFACE LOCATION
EXHIBIT 7 - CONFIDENTIAL
E. OIL SPILL CONTINGENCY PLAN INFORMATION
1. CONTINGENCY PLAN REFERENCE
AMERADA HESS' GULF OF MEXICO OPERATIONS AR COVERED BY THE APPROVED AMERADA HESS OIL SPILL CONTINGENCY PLAN. AS A MEMBER COMPANY, AMERADA HESS COULD CALL UPON CLEAN GULF ASSOCIATES FOR ASSISTANCE Itf A MAJOR SPILL INCIDENT SHOULD IT BE NECESSARY.
2. EQUIPMENT BASE OF OPERATIONS AND DEPLOYMENT TIME
CLEAN GULF ASSOCIATES' CLEANUP EQUIPMENT WOULD BE DEPLOYED FROM GRAND ISLE, LOUISIANA WITH BACK-UP FROM HOUMA OR VENICE, LOUISIANA. RESPONSE TINE FROM GRAND ISLE TO THE DEVELOPMENT LOCATION WOULD BE
4
ABOUT 9-11 HOURS (INCLUDING RIG UP). THE BACK-UP LOCATIONS WOULD TAKE AN ADDITIONAL I TO 3 HOURS.
F. OTHER
1. WATER DEPTH
THE WATER DEPTH AT EACH DEVELOPMENT LOCATION IS AS FOLLOWS:
(A) BLOCK 205 - 161 FEET
(B) BLOCK 206 - \V> FEET
2. DESCRIPTION OF DRILLING RIG AND POLLUTION PREVENTION EQUIPMENT
A TYPICAL CAN"! I LEVER JACK-UP TYPE RIG WILL BE USED TO COMPLETE THE WELLS ON BLOCK 205. THE BLOCK 206 PLATFORM WILL USE A PLATFORM DRILLING RIG. DECK DRAINAGE FROM BOTH PLATFORMS WILL FLOW INTO A SUMP BEFORE DISCHARGE INTO THE SEA. SANITARY AND PRODUCED WASTEWATER, DRILLING FLUID, AND DRILL CUTTINGS PROCESS AND TREATMENT SYSTEMS WILL BE OPERATED IN ACCORDANCE WITH APPLICABLE RULES AND REGULATIONS. SORBENT PADS WILL BE KEPT ON EACH PLATFORM TO WIPE UP SMALL DRIPS AND SPILLS OF PETROLEUM PRODUCTS AND DAILY VISUAL INSPECTIONS FOR ANY SOURCES OF POLLUTION WILL BE DONE.
3. AIR EMISSION CALCULATIONS'1K2)
AIR EMISSIONS PRESENTED ARE SUMMARIES CALCULATED ON AN ANNUAL BASIS FOLLOWING THE CHRONOLOGICAL STAGES OF DEVELOPMENT BY LEASE BLOCK AS NOTED IN SECTION B. SCHEDULE. THE LAST YEAR'S EMISSIONS LISTED FOR EACH BLOCK ARE REPRESENTATIVE OF REMAINING PRODUCTION YEARS.
(A) BLOCK 205 (TONS/YEAR)
CO VOC N0X SO2 TSP
1988 2.3 .9 10.6 .7 .8
1989 17.5 6.4 79.8 5.3 5.7
1990 2.5 .3 2.0 .2 .2
! l ) "ATMOSPHERIC EMISSIONS FROM OFFSHORE OIL AND GAS DEVELOPMENT AND PRODUCTION," EPA NO. 450/3-77-026, TABLE 4-3, JUNE 1977.
(2) "COMPILATION OF AIR POLLUTANT EMISSION FACTORS," THIRD EDITION, EPA REPORT AP-42 TABLES 3.3.2-1 AND 3.3.3-1, AUGUST 1977.
5
(B) BLOCK 206 (TONS/YEAR)
£Q VOC N0X SO2 TSP
1988 NO FIELC OPERATIONS
1989 62.3 22.9 284.8 18.9 20.4
1990 131.0 274.2 850.8 15.7 18.5
1991 131 .0 274 2 850.8 15.7 18.5
1992 116.0 268.7 783.1 11.2 13.6
(C) EMISSION EXEMPTION (E) CALCULATIONS
FOR CO: E = 3400 D2/3 WHERE 0 = 45 (MILES TO SHORELINE)
E = 3400 (45) 2 / 3 -- 43,070 TONS'YEAR
FOR N0X, VOC, TSP, S02: E = 33.3 (D)
E - 33.3 (45) = 1,499 TONS/YEAR
OFFSHORE: ALL OFFSHORE OPERATIONS FOR DEVELOPMENT AND PRODUCTION ARE EXEMPT FROM FURTHER AIR QUALITY ANALYSIS.
ONSHORE: NO NEW FACILITIES WILL BE CONSTRUCTED
(D) AIR EMISSIONS ARE CALCULATED USING THE DOCUMENTS REFERENCED IN FOOTNOTES 1 AND 2 AND THE FOLLOWING ASSUMPTIONS:
• DRILLING THE BLOCK 205 (225) WELL NO. 3 AT RATE OF 200 7DAY TO A TVD OF 11,400 FEET.
• PLATFORM INSTALLATION REQUIRES TWO 7000 HP TUGS OPERAT'NG AT 70X CAPACITY, TWO HELICOPTER LTO CYCLES/DAY, AND THE CRANE BARGE HAS FIVE 2700 HP ENGINES OPERATING AT 50% CAPACITY.
• DRILLING RIG EMISSIONS FOR TIEBACK AND COMPLETION OF WELLS AND DEVELOPMENT DRILLING ARE ESTIMATED TO BE THE SAME AS FOR DRILLING 200 FEET OF HOLE ON A DAILY BASIS.
• PRODUCTION EMISSIONS FOR BLOCK 206 ARE BASED ON THE BURNING OF 1 MMSCF/DAY OF NATURAL GAS FOR POWER GENERATION, ONE HELICOPTER LTO CYCLE/DAY, AND A 3500 HP SUPPLY VESSEL OPERATING 48 HOURS/WEEK AT 70* CAPACITY. PRODUCTION EMI SIONS FOR BLOCK 205 ARE BASED ON ONE HELICOPTER LTO CYCLE/DAY AND A 30 KW GENERATOR OPERAT IN6 AT EIGHT HOURS/DAY. ALL OTHER EMISSIONS ARE CON DERED NEGLIGIBLE.
6
ENVIRONMENTAL REPORT
SEE APPENDIX A - PUBLIC INFORMATION
CZM CONSISTENCY CERTIFICATION
EXHIBIT 10 - PUBLIC INFORMATION
LEASE STIPULATIONS
THE ONLY APPLICABLE LEASE STIPULATION IS NO. 1 CULT AL RESOURCE ASSESSMENT. IN A LETTER TO LESSEES DATED JULY 1, 1983, THE MINERALS MANAGEMENT SERVICE HAS DETERMINED THAT SOUTH TIMBALIER BLOCK 205 AND BLOCK 206 HOULD NOT LIKELY CONTAIN ANY SIGNIFICANT CULTURAL RESOURCES, THEREFORE THE PROVISIONS OF STIPULATION NO. 1 WOULD NOT BE APPLICABLE AND A CULTURAL RESOURCES REPORT WOULD NOT BE REQUIRED.
ESTIMATED LIFE OF RESERVES THE RESERVE LIFE OF THIS DEVELOPMENT IS EXPECTED TO BE APPROXIMATELY 10 YEARS.
DESCRIPTION OF PROPOSED PLATFORM
THE PLATFORM SET ON BLOCK 205 WILL BE AN UNMANNED BOTTOM FOUNDED FOUR PILE DESIGN TO BE SET NEXT TO THE EXISTING TEMPLATE. BLOCK 206 WILL HAVE A MANNED BOTTOM FOUNDED EIGHT PILE DESIGN PLATFORM SET OVER THE EXISTING TEMPLATE. NO NEW OR UNUSUAL TECHNOLOGIES WILL BE DESIGNED INTO EITHER PLATFORM. EXHIBITS 8 AND 9 ILLUSTRATE THE TYPICAL PLATFORM DESIGNS TO BE USED. EXHIBITS 8A ANO 9A DETAIL OUT THE KEY CHARACTERISTICS. EXHIBITS 8, 8A, 9, AND 9A ARE PUBLIC INFORMATION.
OCS-G 5612 205 OCS-G 5613 206
SURFACE LOCATION F
i -12750*
SURFACE LOCATION F
i SURFAv.£ LOCATION I 5000'
224 225
ACACt IN P U T
Wii
EXHIBIT 6 VICINITY MAP AND SURFACE LOCATION PUBLIC INFORMATION
PROPOSED MINERAL DEVELOPMENT
GULP OP MEXICO CO«PORA"»ON
RMERRDR HESS CORPORRTION ARGALI PROSPECT
SOUTH TMBAUER BLOCK 205 PLATFORM "A" DATA SHEET
GENERAL DATA PLATFORM TONNAGE SUMMARY
- FOUR PILE DESIGN
- PLATFORM TO BE SET NEXT TO EXISTING TEMPLATE
- UNGROUTED MAIN PILES ARE TO BE USED
- HEUDECK TO ACCOMMOOATE A BELL MODEL 214 ST HELICOPTER
- SACRIFICIAL ANOOES TO PROTECT THE JACKET FOR A 20 YEAR LIFE
- SPLASH ZONE TO RECEIVE "TIDEGUARD 171" COATING
- PLATFORM TO BE COATED WITH A ZINC, EPOXY, URETHANE SYSTEM
- BOAT LANDING TO USE BARGE BUMPERS FOR ATTACHMENT TO PLATFORM
-JACKET
- PILES - DECK - HELIDECK
PROOUCTION MODULE
500S.T. 500 S.T 81 S T 25 S T
FACILITIES STRUCTURAL 43 S.T
93 S T
- TOTAL 610 S T - WELL BAY AREA TO RECEIVE GRATING - PRODUCTION DECK TO BE DESIGNED FOR 350 PSF LOADING
- WELL BAY AREA TO BE DESIGNED FOR 350 PSF LOADING
- LIFTING EYES ARE TO BE LEFT ON JACKET AND DECK - MAINTENANCE ACCESS TO BE PROVIDED ON ENTIRE PLATFORM
- DECK IS TO BE LIFTED ONTO LOCATION
- JACKET IS TO BE LAUNCHED ONTO LOCATION - PLATFORM IS TO ACCOMMOOATE BOTH SLOT AND CANTILEVER RJGo
- PLATFORM IS TO BE AN UNMANNED FACILITY
- WATER DEPTH: 161 FEET
- 9 SLOT EXISTING TEMPLATE
- PILES: 36 INCH O.D. 2" WALL, 410 FEET LONG
- JACKET LEGS: 38 INCH I D., 1.00 WALL, 190 FEET LONG
- JACKET BASE DIMENSIONS: 80 FEET BY 70 FEET
- DECK COLUMN SPACING 30 FEET B v 50 FEET
- DECK COLUMNS: 36 INCH I D., 1.00 WALL
- PROOUCTION MODULE DIMENSIONS: 30 FEET BY 50 FEET EXHIBIT 8A
- HEUDECK DIMENSIONS: 49 FEET BY 49 FEET PLATFORM "A" DATA S H E E T
- PROOUCTION DECK HEIGHT: 54'-*" ABOVE M.LW. S O U T H TIMBALIER B L O C K 205
APPROXIMATE PLATFORM SIZES
RMERRDR HEBS CORPORRTION ARGALI PROSPECT
SOUTH TMBAUER BLOCK 206 PLATFORM "A" DATA SHEET
GENERAL DATA PLATFORM TONNAGE SUMMARY EIGHT PLE DESIGN PLATFORM TO BE SET OVER EXISTING TEMPLATE THREE PRODUCING WELLS. TA. MUD UNE HANGERS UNGROUTED MAIN PILES ARE TO BE USED : JELDECK TO ACCOMODATE A BELL MODEL 214 ST HELICOPTER SACRIFICIAL ANOOES TO PROTECT THE JACKET FOR A 20 YEAR LIFE SPLASH ZONE TO RECEIVE "TIDEGUARD 171" COATING PLATFORM TO BE COATED WITH A ZINC. EPOXY. URETHANE SYSTEM BOAT LANDING AND BARGE BUMPERS INSTALLED FOR WATER TRAFFIC WELL BAY AREA TO RECEIVE GRATING PROOUCTION DECK TO BE DESIGNED FOR 350 PSF LOADING WELL BAY AREA TO BE DESIGNED FOR 350 PSF LOADING LIFTING EYES ARE TO BE LEFT ON JACKET AND DECK MAINTENANCE ACCESS TO BE PROVIDED ON ENTIRE PLATFORM JACKET IS TO BE LAUNCHED DECKS ARE TO BE LIFTED INTO LOCA ON WITH ONE UFT PLATFORM IS TO ACCOMMOOATE A PLATFORM DRILLING RIG PLATFORM IS TO BE MANNED WITH 32 BEDS WATER DEPTH: 165 FEET 9 SLOT EXISTING TEMPLATE
- JACKET MAIN STEEL 1913 S.T. - BOAT LANDING AND BARGE BUMPERS 45 S.T. - P1UNG 1961 S T. - CONDUCTORS 320 S.T. - DECK. INCLUDING FACILITIES 2016 S.T. - OUARTERS. HELIDECK CRANE N/A
TOTAL 6.255 3 T.
PLATFORM SIZES - PILES: 4 INTERIOR RLES. 46 INCH OUTSIDE DIAMETER. 2.250 WALL, 596 FEET LONG
4 EXTERIOR PILES. 54 INCH OUTSIDE DIAMETER. 2.250 WALL. 604 FEET LONG - JACKET LEGS: 4 INTERIOR LEGS. 55 INCH OUTSIDE DIAMETER. 2.500 WALL. 187 FEET LONG
4 EXTERIOR LEGS. 61 INCH OUTSIDE DIAMETER. 2 500 WALL. 189 FEET LONG - JACKET BASE DIMENSIONS: 92 FEET BY 177 FEET - DECK COLUMN SPACING: 45 FEET BY 45 FEET - DECK COLUMNS: 48 MCH I D , 1.75 WALL - DRILLING DECK DIMENSIONS 70 FEET BY 160 FEET - DRILLING DECK HEIGHT: 93 -3" ABOVE M.L.W - PROOUCTION DECK DIMENSIONS: 86 FEET BY 170 FEET - PROOUCTION DECK HEIGHT: 66 -3" . A ROVE M.LW. - SUB-CELLAR DECK DIMENSIONS: 26 FEET BY 87 FEET - SUB-CELLAR DECK HEIGHT: 50'-0" ABOVE M.L.W. - HEUDECK DIMENSIONS: 38 FEET BY 52 FEET - HELIDECK HEIGHT: 145 -0" ABOVE M.LW.
EXHIBIT 9A PLATFORM "A" DATA SHEET SOUTH TIMBALIER BLOCK 206
COASTAL 7ONE MANAGEMENT
CONSISTENCY CERTIFICATION
DEVELOPMENT OPERATIONS AND COORDINATION DOCUMENT
TYPE OF PLAN
SOUTH TIMBALIER BLOCK 205 AND BLOCK 206 AREA AND BLOCKS
OCS-G 5612 AND OCS-G 5613
LEASE NUMBERS
THE PROPOSED ACTIVITIES DESCRIBED IN DETAIL IN THIS PLAN COMPLY WITH THE STATE OF LOUISIANA'S APPROVED COASTAL ZONE MANAGEMENT PROGRAM AND WILL BE CONDUCTED IN A MANNER CONSISTENT WITH SUCH PROGRAM.
AMERADA HESS CORPORATION LESSEE OR OPERATOR
CERTIFYING OFFICIAL
EXHIBIT 10 PUBLIC INFORMATION
DEVELOPMENT OPERATIONS AND COORDINATION DOCUMENT
INITIAL PLAN
GULF OF MEXICO: OFFSHORE LOUISIANA
SOUTH TIMBALIER AREA, BLOCK 205 AND BLOCK 206
LEASES OCS-G 5612 and OCS-G 5613
OPERATOR
AMERADA HESS CORPORATION
1201 LOUISIANA, SUITE 700
HOUSTON, TEXAS 77002-5681
CONTACT: S. J. ZRAKE (713) 951-5690
JULY 1988
PUBLIC INFORMATION
AMERAOA HESS CORPORATION DEVELOPMENT OPERATIONS AND COORDINATION DOCUMENT SOUTH TIMBALIER AREA, BLOCK 205 AND BLOCK 206
LEASES OCS-G 5612 AND OCS-G 5613
IN ACCORDANCE WITH 30 CFR 250.34 ET SFQ. AND NOTICE TO LESSEES AND OPERATORS NO. 84-01, AMERADA HESS CORPORATION HEREBY SUBMITS THE FOLLOWING INFORMATION FOR THE PLANNED DEVELOPMENT AND PRODUCTION.
A. DESCRIPTION
AMERADA HESS PROPOSES TO DEVELOP SOUTH TIMBALIER BLOCKS 205 AND 206 CONCURRENTLY. FIELD DEVELOPMENT WILL START WITH THE DRILLING OF WELL NO. 3 FROM THE EXISTING TEMPLATE ON BLOCK 205 ATTEMPTING TO PROVE UP ADDITIONAL RESERVES. DETAILED DESIGN, FABRICATION AND INSTALLATION OF PLATFORMS, PRODUCTION FACILITIES AND PIPELINES WOULD THEN BE COMPLETED AND PRODUCTION INITIATED.
THE PLATFORM FOR BLOCK 205 WILL BE A FOUR PILE, UNMANNED FACILITY SET NEXT TO THE EXISTING NINE SLOT TEMPLATE CAPABLE OF PRODUCING 50 MMCFD OF GAS. WELLS NO. 1, 2, AND 3 WILL BE TIED-BACK TO THE PLATFORM AND COMPLETED FOR PRODUCTION USING A CANTILEVER TYPE JACK UP DRILLING RIG.
THE BLOCK 206 PLATFORM WILL BE A 24 SLOT, 8 PILE MANNED STRUCTURE SET OVER THE EXISTING TEMPLATE CAPABLE OF PRODUCING 150 MMCFD. A PLATFORM DRILLING RIG WOULD THEN BE MOVED ONTO THE PLATFORM. WELLS NO. 1 AND 3 WILL BE TIED-BACK TO THE PLATFORM AND COMPLETED FOR PRODUCTION. WELL NO. 2 WILL BE SIDETRACKED, TIED-BACK TO THE PLATFORM ANT COMPLETED IN SANDS PREVIOUSLY LOGGED. SIX ADDITIONAL NEW WELLS WILL BE DRILLED TO OPTIMIZE RESERVOIR DEPLETION. SIMULTANEOUS DRILLING AND PRODUCTION WILL TAKE PLACE DURING THE TWO YEAR DEVELOPMENT DRILLING PROGRAM.
PRODUCT TRANSPORTATION WILL USE SUBSEA PIPELINES TO THE NEAREST SHORELINE SYSTEM TAKE POINT THAT RESULTS IN THE BEST OVERALL ECONOMICS. NO NEW NEARSHORE OR ONSHORE PIPELINES OR FACILITIES WILL BE CONSTRUCTED. THE SPECIFIC SYSTEM WILL BE DETERMINED DURING THE NEGOTIATION OF THE GAS MARKETING CONTRACT WHICH IS EXPECTED TO TAKE PLACE DURING THE FIRST HALF OF 1989.
B. SCHEDULE
THE ANTICIPATED SCHEDULE IS PRESENTED BELOW. THE TOTAL TIME TO COMPLETE THIS PROJECT IS ESTIMATED TO BE 21 MONTHS TO INITIAL PRODUCTION WITH AN ADDITIONAL 24 MONTHS TO COMPLETE THE DEVELOPMENT DRILLING PR06RAM.
PROPOSED DATES ACTIVITY START COMPLETE
DRILL 205/225 WELL NO . 3 AUG 1988 OCT 1988
DESIGN PRODUCTION FACILITIES JUL 1988 FEB 1989
SECURE GAS CONTRACT ONGOING DEC 1988
FABRICATE AND INSTALL FACILITIES FEB 1989 NOV 1989
TIEBACK AND COMPLETE NOV 1989 JAN 1990
COMMENCE PRODUCTION -BLOCKS 205 AND 206 uAN 1990 ONGOING
BLOCK 206 DEVELOPMENT DRILLING JAN 1990 JAN 1992
C. GEOLOGICAL, GEOPHYSICAL AND CULTURAL RESOURCE
1. SHALLOW HAZARD ANALYSIS
A SITE SPECIFIC SHALLOW HAZARD ANALYSIS WAS COMPLETED AND SUBMITTED AS PART OF THF PLAN OF EXPLORATION. THE WELLS PREVIOUSLY DRILLED AT THESE LOCATIONS VERIFY NO SHALLOW GAS HAZARDS EXIST. SOIL BORINGS WILL BE TAKEN AT THE PROPOSED DEVELOPMENT LOCATIONS TO PROPERLY DESIGN AND SIZE THE PRODUCTION PLATFORMS.
2. SITE SPECIFIC CULTURAL RESOURCE ASSESSMENT
NO IMPACT TO ANY HISTORICAL OR ARCHAEOLOGICAL CULTURAL RESOURCES IS EXPECTED FROM THIS DEVELOPMENT AS IT IS OUTSIDE THE AREA WHERE SIGNIFICANT CULTURAL RESOURCES WOULD BE FOUND. THE HIGH RESOLUTION GEOPHYSICAL SURVEY CONDUCTED ON BLOCKS 205 AND 206 INDICATED SEVERAL SMALL MAGNETIC ANOMALIES THAT PROBABLY REPRESENT FERROMAGNETIC DEBRIS.
3. STRUCTURE MAP OF SANDS AND WELL LOCATIONS
EXHIBITS 1, 2, 3 - CONFIDENTIAL
THE LOCATIONS OF THE EXISTING AND FUTURE DEVELOPMENT WELLS ARE AS FOLLOWS:
WELL # BHL* TVD TYPE
BLOCK 205 A-l CONFIDENTIAL CONFIDENTIAL EXISTING A-2 S/T " M EXISTING A-3 " " PLANNED
3
BLOCK 206 A-l CONFIDENTIAL CONFIDENTIAL EXISTING A-2 S/T " - PLANNED A-3 " H EXISTING A-4 " " PLANNED A-5 " " PLANNED A-6 • M PLANNED A-7 " » PLANNED A-8 " " PLANNED A-9 " " PLANNED
•SURFACE LOCATION IS AT RESPECTIVE PLATFORM LOCATION.
4. CROSS-SECTIONAL MAP
EXHIBITS 4 AND 5 - CONFIDENTIAL
5. SURFACE LOCATION
EXHIBIT 6 - PUBLIC INFORMATION
6. SPIDER MAP
EXHIBIT 7 - CONFIDENTIAL
D. LOCATION MAP
1. LOCATION MAP OF LEASE BLOCKS
EXHIBIT 6 - PUBLIC INFORMATION
2. LOCATION OF ONSHORE SUPPORT BASE FACILITY
FOURCHON, LOUISIANA IS THE ONSHORE SUPPORT BASE FACILITY. SEE EXHIBIT 6 - PUBLIC INFORMATION
3. WELL AND PLATFORM SURFACE LOCATION
EXHIBIT 7 - CONFIDENTIAL
E. OIL SPILL CONTINGENCV PLAN INFORMATION
1. CONTINGENCY PLAN REFERENCE
AMERADA HESS' GULF OF MEXICO OPERATIONS ARE COVERED BY THE APPROVED AMERADA HESS OIL SPILL CONTINGENCY PLAN. AS A MEMBER COMPANY, AMERADA HESS COULD CALL UPON CLEAN GULF ASSOCIATES FOR ASSISTANCE IN A MAJOR SPILL INCIDENT SHOULD IT BE NECESSARY.
2. EQUIPMENT BASE OF OPERATIONS AND DEPLOYMENT TIME
CLEAN GULF ASSOCIATES' CLEANUP EQUIPMENT WOULD BE DEPLOYED FROM GRAND ISLE, LOUISIANA WITH BACK-UP FROM HOUMA OR VENICE, LOUISIANA. RESPONSE TIME FROM GRAND ISLE TO THE DEVELOPMENT LOCATION WOULD BE
ABOUT 9-11 HOURS (INCLUDING RIG UP). THE BACK-UP LOCATIONS WOULD TAKE AN ADDITIONAL 2 TO 3 HOURS.
F. OTHER
1. WATER DEPTH
THE WATER DEPTH AT EACH DEVELOPMENT LOCATION IS AS FOLLOWS:
(A) BLOCK 205 - 161 FEET
(B) BLOCK 206 - 165 FEET
2. DESCRIPTION OF DRILLING RIG AND POLLUTION PREVENTION EQUIPMENT
A TYPICAL CANTILEVER JACK-UP TYPE RIG WILL BE USED TO COMPLETE THE WELLS ON BLOCK 205. THE BLOCK 206 PLATFORM WILL USE A PLATFORM DRILLING RIG. DECK DRAINAGE FROM BOTH PLATFORMS WILL FLOW INTO A SUMP BEFORE DISCHARGE INTO THE SEA. SANITARY AND PRODUCED WASTEWATER, DRILLING FLUID, AND DRILL CUTTINGS PROCESS AND TREATMENT SYSTEMS WILL BE OPERATED IN ACCORDANCE WITH APPLICABLE RULES AND REGULATIONS. SORBENT PADS WILL BE KEPT ON EACH PLATFORM TO WIPE UP SMALL DRIPS AND SPILLS OF PETROLEUM PRODUCTS AND DAILY VISUAL INSPECTIONS FOR ANY SOURCES OF POLLUTION WILL BE DONE.
3. AIR EMISSION CALCULATIONS 1"2'
AIR EMISSIONS PRESENTED ARE SUMMARIES CALCULATED ON AN ANNUAL BASIS FOLLOWING THE CHRONOLOGICAL STAGES OF DEVELOPMENT BY LEASE BLOCK AS NOTED IN SECTION B. SCHEDULE. THE LAST YEAR'S EMISSIONS LISTED FOR EACH BLOCK ARE REPRESENTATIVE OF REMAINING PRODUCTION YEARS.
(A) BLOCK 205 (TONS/YEAR)
CO VOL N0X SOo TSP
1988 2.3 .9 10.6 .7 .8
1989 NO FIELD OPERATIONS
1990 I8.0 6.6 80.7 5.4 5.8
1991 2.5 .3 2.0 .2 .2
( 1 ) "ATMOSPHERIC EMISSIONS FROM OFFSHORE OIL ANO GAS DEVELOPMENT AND PRODUCTION," EPA NO. 450/3-77-026, TABLE 4-3, JUNE 1977.
"COMPILATION OF AIR POLLUTANT EMISSION FACTORS," THIRD EDITION, EPA REPORT AP-42 TABLES 3.3.2-1 AND 3.3.3-1, AUGUST 1977.
(B) BLOCK 206 (TONS/YEAR)
CO VOC NOx SQ? TSP
1988 NO FIELD OPERATIONS
1989 NO FIELD OPERATIONS
1990 111.2 133.7 612.2 23.8 26.4
1991 131.0 274.2 850.8 15.7 18.5
1992 124.4 271.8 821.0 13.8 16.3
1993 116.0 268.7 783.1 11.2 13.6
(C) EMISSION EXEMPTION (E) CALCULATIONS
FOR CO: E = 3400 D2/3 WHERE D = 45 (MILES TO SHORELINE)
E = 3400 ( 4 5 ) 2 / 3 = 43,070 TONS/YEAR
FOR N0X, VOC, TSP, S02: E = 33.3 (D)
E = 33.3 (45) = 1,499 TONS/YEAR
ONSHORE: ALL OFFSHORE OPERATIONS FOR DEVELOPMENT AND PRODUCTION ARE EXEMPT FROM FURTHER AIR QUALITY ANALYSIS.
ONSHORE: NO NEW FACILITIES WILL BE CONSTRUCTED
(D) AIR EMISSIONS ARE CALCULATED USING THE DOCUMENTS REFERENCED IN FOOTNOTES 1 AND 2 AND THE FOLLOWING ASSUMPTIONS:
• DRILLING THE BLOCK 203 (225) WELL NO. 3 AT RATE OF 200'/DAY TO A TVD OF 11,400 FEET.
• PLATFORM INSTALLATION REQUIRES TWO 7000 HP TUGS OPERATING AT 701 CAPACITY, TWO HELICOPTER LTO CYCLES/DAY, AND THE CRANE BARGE HAS FIVE 2700 HP ENGINES OPERATING AT 501 CAPACITY.
• DRILLING RIG EMISSIONS FOR TIEBACK AND COMPLETION OF WELLS AND DEVELOPMENT DRILLING ARE ESTIMATED TO BE THE SAME AS FOR DRILLING 200 FEET OF HOLE ON A DAILY BASIS.
• PRODUCTION EM SIONS FOR BLOCK 206 ARE BASED ON THE BURNING OF 1 MMSCF/DAY OF NATURAL GAS FOR POWER GENERATION, ONE HELICOPTER LTO CYCLE/DAY, AND A 3500 HP SUPPLY VESSEL OPERATING 48 HOURS/L'EEK AT 701 CAPACITY. PRODUCTION EMISSIONS FOR BLOCK 205 ARE BASED ON ONE HELICOPTER LTO CYCLE/DAY AND A 30 KW GENERATOR OPERATING AT KIGHT HOURS/DAY. ALL OTHER EMISSIONS ARE CONSIDERED NEGLIGIBLE.
6
4. ENVIRONMENTAL REPORT
SEE APPENDIX A - PUBLIC INFORMATION
5. CZM CONSISTENCY CERTIFICATION
EXHIBIT 10 - PUBLIC INFORMATION
6. LEASE STIPULATIONS
THE ONLY APPLICABLE LEASE STIPULATION IS NO. 1 CULTURAL RESOURCE ASSESSMENT. IN A LETTER TO LESSEES DATED JULY 1, 1983, THE MINERALS MANAGEMENT SERVICE HAS DETERMINED THAT SOUTH TIMBALIER BLOCK 205 AND BLOCK 206 WOULD NOT LIKELY CONTAIN ANY SIGNIFICANT CULTURAL RESOURCES, THEREFORE THE PROVISIONS OF STIPULATION NO. 1 WOULD NOT BE APPLICABLE AND A CULTURAL RESOURCES REPORT WOULD NOT BE REQUIRED.
7. ESTIMATED LIFE OF RESERVES
THE RESERVE LIFE OF THIS DEVELOPMENT IS EXPECTED TO EE APPROXIMATELY 10 YEARS.
8. DESCRIPTION OF PROPOSED PLATFORM
THE PLATFORM SET ON BLOCK 205 WILL BE AN UNMANNED BOTTOM FOUNDED FOUR PILE DESIGN TO BE SET NEXT TO THE EXISTING TEMPLATE. BLOCK 206 WILL HAVE A MANNED BOTTOM FOUNDED EIGHT PILE DESIGN PLATFORM SET OVER THE EXISTING TEMPLATE. NO NEW OR UNUSUAL TECHNOLOGIES WILL BE DESIGNED INTO EITHER PLATFORM. EXHIBITS 8 AND 9 ILLUSTRATE THE TYPICAL PLATFORM DESIGNS TO BE USED. EXHIBITS 8A AND 9A DETAIL OUT THE KEY CHARACTERISTICS. EXHIBITS 8, 8A, 9, ANO 9A ARE PUBLIC INFORMATION.
7