Prepared for:
European Bank for Reconstruction and Development
Prepared by:
October 2011
DEVELOPMENT OF A LEGAL FRAMEWORK FOR
PROGRAMME OF ACTIVITIES IN UKRAINE
Ukraine Carbon Market Facilitation Programme
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 2
Prepared for:
European Bank for Reconstruction and Development
1 Exchange Square
London EC2A 2JN
United Kingdom
Prepared by:
Factor CO2
Orense, 16 - 12D
28020 Madrid
Spain
DISCLAIMER This report was prepared as part of the Ukraine Carbon Market Facilitation Programme, a technical assistance programme commissioned by the European Bank for Reconstruction and Development (EBRD) at the request and in close consultation with Ukraine’s State Environmental Investment Agency (SEIA). The documents presented in this report are a mere technical proposal and do not constitute part of the Ukrainian legal framework. Furthermore, the report does not necessarily represent the views of the EBRD or SEIA. This report has not been
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 3
approved or disapproved by EBRD or SEIA nor is the EBRD or SEIA responsible for the accuracy of any of the information supplied in this report.
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 4
TABLE OF CONTENTS
I. BACKGROUND AND RATIONALE FOR A NATIONAL POA PROCEDURE IN UKRAINE 5
II. DRAFT INSTRUCTION FOR A NATIONAL POA PROCERURE IN UKRAINE 8
ANNEX 1 ‐ PIN FORM 22
1. General information 23
2. Programme information 27
3. Monitoring of GHG emission reductions 34
4. Financial project indicators (confidential information) 35
5 Risk factors 36
6 Socio‐economic and environmental benefits 37
7 Additional Information (Optional) 38
ANNEX 2 – JI POA DD FORM 39
Section A. General description of the JI PoA 40
Section B. Duration of the JI PoA / crediting period 41
Section C. Environmental impacts 41
Section D. Stakeholders’ comments 42
Section E. Baseline setting for each type of JPA: 43
Section F. Application of monitoring plan for each type of JPA 43
Section G. Description of real JPA of each type comprising JI PoA 49
Annex 1 – Contact Information 52
Annex 2 – Information table of JPAs under the present JI PoA 53
Annex 3 – Additional Baseline Information 55
Annex 4 – Monitoring Plan 55
III. GUIDELINES FOR COMPLETING THE JI POA DD FORM 56
Section A. General description of the JI PoA 57
Section B. Duration of the JI PoA / crediting period 61
Section C. Environmental impacts 62
Section D. Stakeholders’ comments 63
Section E. Baseline setting for each type of JPA: 64
Section F. Application of monitoring plan for each type of JPA 69
Section G. Description of real JPA of each type comprising JI PoA 83
Annex 1 – Contact Information 89
Annex 2 – Information table on JPAs under the present JI PoA 91
Annex 3 – Baseline Information 93
Annex 4 – Monitoring Plan 93
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 5
I. BACKGROUND AND RATIONALE FOR A NATIONAL POA PROCEDURE IN UKRAINE
Up to now the conventional JI has been mainly limited to larger stand-alone GHG
emission reduction projects. Successful mobilisation of smaller project activities in
many areas with economically feasible emission reduction potential has been hindered
by a number of barriers, including the nature of the JI project cycle as well as the
increasing complexity of the rules, which leads to high transaction costs for project
activities. JI-related transaction costs occurring both before and during a project’s
implementation constitute a obstacle especially for small and dispersed projects which
have low volumes of emission reductions if submitted as separate JI projects.
Programmatic approach foresees aggregation of the emission reductions from projects
of the different participants in the programme, is therefore an option to achieve
economies of scale for small and dispersed activities and at the same time to reach
wider groups of stakeholders and types of activities that are too small to be developed
as stand-alone JI projects.
Program of Activities enables also simplification of project organization and
implementation procedure for larger-sized projects that employ similar technology but
are geographically and temporarily dispersed.
PoA allows also expansion of stakeholders that can be involved as
proponents/developers of climate mitigation projects. Actual experience with PoA in
other countries (e.g. Germany) shows that the developers of PoAs must not be
involved in carbon finance yet but must have experience in setting up programmes for
a wide range of participants. Examples include but are not limited to banks with
environmental finance experience, including promotional banks and microfinance
institutions; utilities, municipalities, and public sector entities like energy agencies or
public authorities in the areas of environmental protection, energy, industry, transport
or housing.
In this context, CMP decided to introduce the “Programmes of Activities” (PoA) as a
variation of the CDM. The Programme of Activities is defined as voluntary coordinated
action by a private or public entity which coordinates and implements any
policy/measure or stated goal (i.e. incentive schemes and voluntary programmes),
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 6
which leads to anthropogenic GHG emission reductions or net anthropogenic
greenhouse gas removals by sinks that are additional to any that would occur in the
absence of the PoA, via an unlimited number of CDM programme activities (CPAs).
Programme activity is defined as a single or set of voluntary interrelated measures to
reduce GHG emissions undertaken in single or multiple facilities/installations, that can
be registered as a single CDM project.
In June - Oct 2007, CDM Executive Board operationalised PoA at its 32nd and 33rd
meetings.
At the 4th CMP (paragraph 6 of decision 5/CMP.4) the Conference of the Parties
requested the Joint Implementation Supervisory Committee (JISC) to develop
procedures and guidelines for projects under programmes of activities, based on the
work done by the Executive Board of the Clean Development Mechanism in this area.
The JISC at its 15th meeting has drafted definitions, forms, guidelines and procedures
for projects under programmes of activities.
Both JISC and CDM guidelines are taken into account in the course of development of
legal basis for PoA in Ukraine.
Advantages of the PoA scheme compared to conventional JI project cycle:
- The individual project activities need not to be defined in advance
- the exact sites of project activities need not to be defined in advance
- JPAs can be added after registration
- PoA lifetime can be unlimited.
PoAs will find their natural niches in the field of small to medium-sized projects which
are geographically and/or temporally dispersed and have a large number of project
owners unknown before the start of the PoA. The prospects of programmatic approach
in different sectors in Ukraine are shortly outlined below.
The potential of PoA in Ukrainian conditions lies in large numbers of small and
homogeneous low-cost greenhouse gas abatement activities. Of particular importance
is renewable energies and waste management activities, district heating sector,
demand-side energy efficiency (efficient lighting; appliances; industrial equipment like
boilers, motors, pumps etc.). Another perspective sector for introduction of PoA are
large projects applying similar technology in many projects (coal mine methane,
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 7
reconstruction of TPPs, etc.). Some project types typical for Ukrainian conditions that
would fit in the framework of PoA in Ukraine are given below:
1. RES projects
2. Cogeneration facilities
3. Energy efficiency projects in industrial and housing sector
4. Rehabilitation of district heating and water supply systems
5. Rehabilitation of industrial boilers
6. Building refurbishment
7. Efficient lighting
8. other activities
This list is not deemed to be comprehensive, since practically any type of the project
can be implemented under PoA scheme as long as it is in line with one or several
characteristics typical for PoA that are mentioned below:
- Small to medium size units (also large units if they apply similar technology)
- Replication of the same technology in all projects
- Geographically dispersed
- Temporarily dispersed
- Large number of owners
Flexibility of measures/methodologies application in the registered PoA
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 8
II. DRAFT INSTRUCTION FOR A NATIONAL POA PROCERURE IN UKRAINE
APPROVED
By the Order of State Environmental Investment Agency
from _________ 2011 N ___
Registered
In Ministry of Justice of Ukraine
_____________ 2011 N ___________
INSTRUCTION
On the realization of JI Program of Activities according to the national
procedure
1. Present Instruction is developed according to the Order on development,
consideration, approval and realization of the projects aimed at the anthropogenic
greenhouse gas (GHG) emission reduction, approved by the Decree of the Cabinet of
Ministers of Ukraine from _____________________ 2010 № “number of the new
edition of current order 206” (hereinafter – Order)
2. Present Instruction stipulates the mechanisms of preliminary consideration, approval
and realization of JI Programme of activities (hereinafter – JI PoA) according to the
national procedure, which are to be adopted by SEIA as well as establishes the
principal requirements to PDD, baseline and monitoring, justification of additionality,
determination and verification of projects under JI PoA.
3. Terms, used in present document have the following meaning:
Accredited independent entity (AIE) – independent entity, accredited by the JISC
that is entitled to carry out determination and verification of JI projects according to
international and national procedures, or independent specialized entity, accredited by
SEIA, that is entitled to carry out determination and verification of JI projects according
to national procedure.
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 9
Verification report – report by a national or international verifier regarding review of
annual report (monitoring report) submitted by JI PoA Coordinating entity and
confirmation of achieved amount of anthropogenic GHG emission reduction as a result
of JI project realization;
Determination report – report of national or international determinator on expertise
of the PDD of JI project aimed at revision, analysis and quantitative assessment of the
possible emission reductions, as well as the correspondence of mentioned JI PoA to
requirements, established for the JI PoA projects.
JI programmatic activity (hereinafter referred as JPA) is an organizational
technical measure or project that results in additional volume of anthropogenic GHG
emission reductions comparing with situation that would happen in the absence of
such organizational technical measure or project, for each of which either the installed
capacity does not exceed 15 MW in electrical power equivalent, or annual energy
consumption reduction does not exceed 60 GWh in electrical power equivalent, or
annual emission reduction does not exceed 60 thousand tonnes of carbon dioxide
equivalent, or annual greenhouse gas removal by sinks as a result of reforestation or
afforestation and/or forest management does not exceed 8 thousand tonnes of carbon
dioxide, and which can be replicated at other installations and/or removal sinks and
number of such individual projects under the joint implementation programme of
activities may be changed during the programme implementation period.
JI Programme of Activities Coordinating entity (hereinafter referred to as JI PoA
Coordinating entity) is a juridical person resident of Ukraine entitled by object owners
to develop and implement JI programmatic activities under JI PoA. Coordinating entity
may be an owner of achieved emission reductions if required contracts were signed
with object owners.
JI PoA Coordinating entity’s account – the account opened for the Coordinating
entity in the National Registry for entry of emission reduction units obtained due to the
JI PoA implementation.
Type of JPA is defined by the technologies or measures to be used under
corresponding JPA.
Project stakeholders – public, including individual persons, groups or communities
that are affected or may be affected by the JI PoA.
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 10
Joint Implementation guidelines (JI guidelines) – guidelines on implementation
of Article 6 to the Kyoto Protocol included into the Decision 9/CMP.1 and Annexes to it.
JI Guidance on criteria for baseline setting and monitoring – the recently
approved version of document “Guidance on criteria for baseline setting and
monitoring”, developed by the JISC and published on the JISC’s web-site.
Conference of the Parties – the highest legal authority of the UNFCCC.
Other terms are used in the meaning, presented in the Order.
4. JI PoA Coordinating entity shall obtain all required credentials in order to develop
and implement JPAs under such JI PoA on the basis of appropriate agreements with
object owners.
Such agreements shall foresee:
1. Entitlement of Coordinating entity to develop and implement JPAs under the JI
PoA;
2. Entitlement of Coordinating entity to represent object owners before the SEIA
and other central and local authorities, as well as international or national
determinators/verificators;
3. Entitlement of Coordinating entity to open in the own name an account in the
National Registry in order to enrol emission reduction units (ERUs);
4. Entitlement of Coordinating entity to sign agreement with the Buyer of emission
reduction units;
5. Obligations of object owners to provide information required in order to
conduct determination and verification.
5. JI PoA Coordinating entity in order to obtain the LoE submits to SEIA an application
for the LoE, which includes petition concerning the preliminary agreement with SEIA
about the possibility of JI PoA implementation according to the national procedure, JI
PoA Project idea note (JI PoA PIN) substantiating anthropogenic emissions reduction or
greenhouse gas removal enhancement and statutory documents, notarized in the
established order copies of contracts signed with object owners.
Template of the application form and form of project proposal are approved by the
SEIA.
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 11
Project proposal is submitted in the written and digital forms.
SEIA considers in a month term starting from the date when all required documents
are submitted by the Coordinating entity and in case of positive decision, issues letter
of endorsement. In case SEIA refuses to issues such letter, the Coordinating entity is
informed about such decision in a month term in a written form with indication of
reasons for such refusal.
6. On the basis of the LoE issued by SEIA, and according to the JI PoA PIN, JI PoA
Coordinating Entity develops JI PoA DD and submits it for determination to the national
or international determinator.
Project design documentation shall contain:
6. Title and summary of JI PoA;
7. Name of the JI PoA Coordinating entity;
8. Contact information of responsible representative of the JI PoA Coordinating
entity;
9. Description of JI PoA goals and its compliance with provisions established by
the UNFCCC and Kyoto Protocol, as well as with priorities of national economy
development;
10. Starting date and duration of JI PoA;
11. Description of each type of JPAs under the JI PoA, including description of
technologies to be implemented, justification of baseline setting and monitoring
for each type of JPA under the JI PoA;
12. Description of at least one real type of JPA under the JI PoA;
13. Additionality justification for each type of JPA or the whole JI PoA;
14. Eligibility criteria for inclusion of new JPAs into JI PoA;
15. Table with JPAs under the given JI PoA;
16. Environmental impact assessment;
17. Comments of the parties involved.
Table with JPAs shall contain the following information:
1. Title and summary of JPAs;
2. Location of JPAs;
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 12
3. Name and contact information of organization responsible for development and
implementation of a JPA;
4. Starting date of JPA.
5. Duration of JPA;
6. Reference to the corresponding baseline provided in the PDD;
7. Reference to corresponding monitoring plan provided in PDD;
8. Assessment of emission reduction;
9. Indication that a given JPA has not been implemented as a separate JI project
or under the other JI PoA.
JI PoA DD form, requirements and guidelines on how to fill in the JI PoA DD form are
established and approved by SEIA.
The JI PoA DD shall be drafted in the Ukrainian and English languages and submitted
to the SEIA in writing form and on electronic media.
7. JI PoA additionality shall be demonstrated according to article 6 paragraph 1b of
Kyoto Protocol either for JI PoA or for the each type of JPA in the JI PoA (at the level
of each type of JPA or at the level of Programme of activities), in accordance with
Appendix B of the JI guidelines and the “Guidance on criteria for baseline setting and
monitoring.
8. JI PoA DD that has passed the procedure of determination and has obtained the
positive determination report and conclusion from national or international accredited
independent entity shall be submitted to SEIA for the further SEIA’s approval by means
of issuing of corresponding letter of approval (LoA).
In order to obtain Letter of approval Coordinating entity submits to the SEIA an
application, JI PoA DD, determination report, financing plan, notarized in the
established order copies of agreements with object owners, and supplementary
documents.
Determination report in its format and content shall comply with requirements
established by the JISC, and is prepared in Ukrainian and English, submitted in a
written and digital format.
Template of an application, list of supplementary documents, and requirements
concerning their content and design are approved by the SEIA.
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 13
SEIA considers in month term from the date when all required documents were
submitted by the Coordinating entity, and in case of positive decision issues Letter of
approval indicating conditions of JI PoA approval. In case SEIA refuses to issue the
LoA, Coordinating entity is informed in a month term in a written form with indication
of reasons for such decision.
9. JI PoA Coordinating entity is eligible to include into already determined JI PoA
additional JPAs. Additional JPAs may be included into JI PoA in case they comply with
eligibility criteria for inclusion of additional JPAs indicated in PDD.
For inclusion of additional JPAs into JI PoA, Coordinating entity shall add data on these
JPAs to already existing table of JPAs and submit it for approval by SEIA together with
notarized in established order copies of corresponding agreements with object owners
on which additional JPAs are to be implemented.
Table of JPAs is prepared in Ukrainian and English and submitted in a written and
digital form.
Submission of a table with JPAs to SEIA with amendments in order to include
additional JPAs into JI PoA may take place not more often that once in a six month.
SEIA in a month term assesses and registers new version of table with JPAs. The
registration of new table with JPAs may be declined in case of non-compliance of
proposed additional JPAs with established eligibility criteria on their inclusion into JI
PoA.
10. The requirements to the documents necessary for obtaining LoE and LoA, their
contents and execution as well as the reasons for rejection in issuing such a Letters,
are established by SEIA.
11. For the JI PoA approval the Coordinating entity submits to SEIA:
1. Declaration about the approval of JI PoA by the national procedure;
2. Copy of the LoE;
3. The letter of agreement issued by an authorized body of a foreign country,
which approves the JI PoA and Ukrainian translation of this letter, notarized by
the Coordinating entity in the established order in written form and on the
electronic carrier (CD-R or DVD-R) in PDF-format;
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 14
4. Copy of the contract (preliminary agreement) of the purchase and sale of ERUs
with the Buyer, notarized by the Coordinating entity in the established order.
12. The JI PoA Coordinating entity, which performed the preparation of JI PoA
according to the international procedure and obtained the Letter of Approval, may
submit an application about the JI PoA approval according to the national procedure.
In this case JI PoA Coordinating entity submits to SEIA application and documents,
foreseen in the paragraph 11.
13. If the LoA for JI PoA was issued under the national procedure (Track 1),
determination was carried out by international AIE and if the JI PoA was not yet
registered at SEIA under the national procedure (Track 1), then the JI PoA
Coordinating entity has the right to submit a request to SEIA to approve the
corresponding JI PoA according to the international procedure (Track 2). In this case JI
PoA Coordinating entity submits to SEIA application about JI PoA approval according to
the international procedure and documents listed in paragraph 11, number 2, 3 and 4
of present Instruction.
14. SEIA approves JI PoA during 10-day term starting from the date of obtaining
necessary documents, defined by the paragraph 11 of present Instruction by an
appropriate order.
15. If documents are incomplete or mismatch with the established requirements, SEIA
refuses to approve JI PoA by means of issuing the corresponding order and informs
about the refusal the Coordinating entity in writing form during 10 days.
16. SEIA sends through official electronic communication channels to the UNFCCC
Secretariat the PDD, LoA, determination report and the information about JI PoA
approval during 10 days starting from the moment of JI PoA approval, for publication
and registration by means of assignment of an identification number to JI PoA in the
International Transaction Log (ITL).
17. After obtaining the information from UNFCCC Secretariat about JI PoA registration
SEIA informs the Coordinating entity about this registration, opens in the National
Registry the project account and transferring account (if necessary) and deposits on
this(ese) account(s) an appropriate quantity of AAUs.
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 15
18. In case of changing of the Coordinating entity, the new Coordinating entity (if this
entity wants to continue further realization of JI PoA) is obliged to inform SEIA on this
matter and to provide the appropriate copies of documents, notarized in the
established order, which confirm transfer of the right of ownership and right to
implement the project activity (means JI PoA) by such Coordinating entity.
19. The JI PoA Coordinating entity should guarantee that any JPA has not passed
determination as a separate JI project and was not included into another JI PoA.
Inclusion of additional JPA into the JI PoA
20. The JI PoA Coordinating entity may include additional JPAs into the JI PoA, which
passed through determination. Additional JPAs may be included into the JI PoA as long
as each proposed JPA fulfills the eligibility requirements on additional JPA inclusion,
defined in the JI PoA. The principal criterion of inclusion of additional JPA is its
belonging to one of the JPA type, which already passed determination and this fact is
indicated in the positive determination report.
For the inclusion of additional JPA into the JI PoA, the JI PoA Coordinating entity shall
include the data regarding these JPAs into the JPA table and to submit the updated
table for the SEIA’s approval together with notarized in the established order copies of
the appropriate agreements with the object owners, at which the implementation of
JPA is planned.
The JPA table should be prepared in Ukrainian and English and shall be submitted in
writing form and on an electronic media.
The submission of JPA table to SEIA with amendments regarding inclusion of new JPAs
into the JI PoA may occur not more often than once per six months.
If additional information, included into the table contains any confidential data, JI PoA
Coordinating entity should submit two versions of documentation and additional
documents (if it is reasonable):
1. Version, in which all confidential information is marked in such way, that makes
impossible its reading (for instance, by covering those parts with black ink), so
such version may be made public;
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 16
2. Version, which contains all information, including parts, that are strictly
confidential and need to be appropriately treated by all persons, that will have
access to this version.
SEIA in a month term assesses and registers new version of table with JPAs. The
registration of new table with JPAs may be declined in case of non-compliance of
proposed additional JPAs with established eligibility criteria on their inclusion into JI
PoA.
21. New version of JPAs table is to be approved by SEIA with issuing the
corresponding written confirmation regarding registration of updated table with JPAs
and providing this confirmation to the JI PoA Coordinating entity.
22. Every 6 months SEIA shall sent to the UNFCCC Secretariat through the official
electronic channels new versions of the JI PoA DD, including the tables according to
the paragraphs 20 and 21 regarding inclusion of new JPA(s) into the JI PoA under
appropriate indexes in the International Transaction Log (ITL).
23. After obtaining the information from UNFCCC Secretariat regarding inclusion of
new JPA(s) into the JI PoA, SEIA informs the Coordinating entities on this issue,
updates the data at the project accounts in the National Registry as well as deposits on
these accounts the appropriate quantity of AAUs.
Determination of the JI PoA
24. During the implementation of JI PoA the Coordinating entity shall conclude
contract for the determination to be performed. The JI PoA Coordinating entity shall
provide AIE with all necessary documentation to carry out determination, including
filled-in form of the JI PoA DD, which contains the list of all JPAs, included into the JI
PoA at that moment.
25. During determination AIE shall check whether:
1. The latest version of JI PoA DD form is used;
2. Each type of JPA under the JI PoA is defined correctly and the separate JPA are
reasonably labeled to the appropriate JPA.
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 17
26. If AIE discovers mismatches in the labeling of separate JPA to each JPA type, AIE
shall indicate in the preliminary report the necessity of the appropriate editing of the JI
PoA DD.
If during the preparation stage of the preliminary determination report AIE discovers
the contradiction of one or number of included JPA with the eligibility criteria of
inclusion to the JI PoA, AIE shall inform the Coordinating entity about such situation.
The Coordinating entity shall provide the appropriate editing of JPA DD and other
documentation. If indicated contradiction could not be corrected by means of JPA DD
correction, the Coordinating entity shall agree upon voluntary exclusion of JPAs from
the JI PoA with the object owner, at which mentioned JPAs are proposed and provide
the preparation of corrected JI PoA DD based on JPAs, which remained in the JI PoA
content.
27. AIE may not visit all objects, at which the implementation of every JPA is
performed. The order of sampling of objects to be visited during determination is the
same as for verification visits and is defined in paragraphs 32-33.
28. Other procedures of determination of the JI PoA are performed according to the
Order.
Verification of the JI PoA
29. The JI PoA Coordinating entity shall save all monitoring report for all JPAs included
in the JI PoA and provide them by request of AIE and/or SEIA.
30. To carry out verification AIE chooses the method of sampling of objects to be
visited.
31. The method, chosen for the verification of emission reductions shall take into
account the monitoring reports from all JPAs and could apply any type of the audit
common practice, including the statistically sound sampling method. Method, used in
the verification process shall guarantee conservativeness and accuracy of assessment
of emission reductions achieved by each JPA.
32. It is recommended to use the approach according to which the number of site
visits shall be at least the square root of the number of total JPAs which are included
into JI PoA and have monitoring reports, rounded to the upper whole number.
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 18
The distribution of the JPAs quantity by types to be of site visited is performed
according to the below presented formulas with rounding of the results to the upper
whole number.
,)( 1 NAAMA where
A – total number of site visits with JPAs;
М – total amount of JPAs which are included in the JI PoA;
A1…AN – amount of objects of types 1…N for the JI PoA implementation to be site
visited;
,; 22
11
Q
QАA
Q
QАA
Q
QАA N
N where:
Q1…QN – total average annual GHG emission reductions for JPAs of each type 1…N;
ΣQ = Q1+ Q2+…+ QN – total average annual GHG emission reductions of all JPA types,
included in the JI PoA.
It is obligatory to visit at least one object of each JPA type.
33. During the verification process of the JI PoA each next year the number of site
visits to JPA implementation objects is defined according to the paragraphs 32-33,
herein in frames of one JPA type the following objects are to be visited in the first
place (in order of the priority decreasing):
1. Objects, which were not visited before by verifiers during determination or
verification;
2. Objects with the higher rate of annual average GHG emission reductions;
3. Objects, which are first time passing through verification (added to the JI PoA).
34. If during the verification process the contradiction between the monitoring report
data and the real achieved emission reductions has been discovered, the verified
emission reductions shall be corrected by verifier as follows:
1. If the contradiction is discovered on the working object of JPA implementation
and is subjected to the mistakes during calculation of emission reduction and
preparation of monitoring report, verifier shall correct the total amount of
verified emission reductions according to the discovered uncertainties;
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 19
2. If the JPA is not really implemented on the visited object and the submission of
fake monitoring report is discovered, the JI PoA shall be penalized by means of
decreasing of achieved GHG emission reductions for the appropriate year. The
amount of penalty, at which the verified emission reductions shall be decreased
is calculated as follows:
- the percentage, which comprises the ratio between the emission
reduction of inoperative JPA, mentioned in the monitoring report and
the total emission reduction from all JPAs, verified in appropriate year
with site visits, is calculated;
- the amount of GHG emission reduction, which comprises the same
percentage from total amount of GHG emission reductions for the
appropriate JI PoA for this year is calculated;
- defined according to the above mentioned amount of GHG reductions is
doubled and removed from the total verified GHG emission reduction for
the JI PoA in the appropriate year;
3. If the inoperative object of JPA has passed through verification in previous
years, but was not visited by verifier and all monitoring reports and appropriate
GHG emission reduction was included into total GHG emission reductions of the
JI PoA for these years, it is necessary to calculate the volumes of penalties for
every year and to remove them from the total verified amount of emission
reductions for the JI PoA for the year, when inoperative object has been
discovered. The amount of penalty shall be calculated according to the above
mentioned procedure.
35. The procedures of determination, monitoring and verification regarding the JI PoA
realization not regulated by this Order, are performed according to the procedures,
contained in the Order and the Instruction about the realization of JI project according
to the national procedure # 79 from 16th of January 2009.
36. In case of event occurrence, which could lead to the changes in the monitoring
plan during JI PoA implementation, the Coordinating entity shall perform refinement of
the monitoring plan, to include all necessary amendments into the JI PoA DD agreed
with verifier and to indicate the results of such changes in the annual report
(monitoring report).
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 20
37. If the Buyer of emission reductions has been changed during the JI PoA
realization, the JI PoA Coordinating entity shall submit to SEIA the letter of agreement
of foreign country, by which the transaction of AAUs is confirmed (if the necessity of
such transaction agreement is foreseen by the legislation of the foreign country) and
the copy of new contract with Buyer, notarised by the JI PoA Coordinating entity in the
established order.
38. SEIA may terminate realization of the JI PoA according to the national procedure
by means of cancellation of order about approval of the appropriate JI PoA, which will
result in cancellation of registration of this JI PoA in the International Transaction Log
(ITL).
39. The reasons for termination of the JI PoA realization, approved by the national
procedure are:
1. Written application by the JI PoA Coordinator or its legal successor about
cancellation of the JI PoA realization;
2. Discovery of uncertain information in documents, provided for approval of the
JI PoA and submitted for registration in annual report (monitoring report) and
verification report;
3. Termination of the activity of JI PoA Coordinating entity;
4. Not submission for registration of annual report (monitoring report) and
verification report on JI PoA project implementation, as well as achieved GHG
emission reduction till 1st November of the year coming after the reporting year,
or in case when JI PoA Coordinating entity made decision on not performing
verification in current year JI PoA Coordinating entity shall submit to SEIA letter
of explanation till 1st November of year coming after reporting year, indicating
further intentions concerning implementation and verification of JI PoA.
40. In order to prove the achieved emission reductions, the JI PoA Coordinating entity
shall submit to SEIA the annual report (monitoring report) in Ukrainian together with
the verification report in Ukrainian and English in written and electronic carriers (CD-R
or DVD-R) in PDF-format.
Together with the first annual report (monitoring report) and verification report, the JI
PoA Coordinating entity shall submit to SEIA for registration the copy of contract with
Buyer and its Ukrainian translation, approved in the established order. The JI PoA
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 21
Coordinating entity may ask for the registration of contract with Buyer before the first
monitoring report is submitted.
Annual report (monitoring report) shall fulfill by its content the requirements of
monitoring report for the JI PoA DD.
Verification report shall fulfill by its content and form the requirements established by
the JISC.
41. SEIA shall check and register submitted by the JI PoA Coordinating entity annual
report (monitoring report) and verification report during one month starting from the
date of receiving it.
SEIA may refuse to register the annual report (monitoring report) and verification
report if these documents do not fulfill requirements, established by paragraph 40 of
present Instruction.
42. After the registration of the first annual report (monitoring report) and the
verification report, according to the request form Coordinating entity, SEIA opens the
account for Coordinating entity.
43. Based on the registered annual report (monitoring report) and verification report,
SEIA during the 10 days period converts AAUs into ERUs at the appropriate project
account and transfer them to the account of the JI PoA Coordinating entity.
44. The transfer of ERUs is performed on the basis of commission provided to SEIA by
the JI PoA Coordinating entity and a registered contract with a Buyer by means of
electronic transfer from the account of the JI PoA Coordinating entity in National
Registry to the Buyer’s account in the national registry of a foreign country.
45. The JI PoA DD, Letters of Endorsement, Letters of Approval, determination
reports, information regarding the approval and registration of JI PoA, verification
reports and information foreseen by the paragraph 38 of present Instruction, shall be
made publicly available on the SEIA web-site and UNFCCC Secretariat.
Director of the Department -
Head of the Divison
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 22
ANNEX 1 - PIN FORM
FOR PROJECT OF JOINT IMPLEMENTATION PROGRAMME OF ACTIVITIES
Sample of title
EXPLANATION MATERIALS REGARDING POSSIBLE JI PROGRAMME OF ACTIVITIES FOR OBTAINING OF THE LETTER OF ENDORSEMENT
_________________________________________________
(Title of JI PoA)
Position of the head of organization,
institution, company – project developer
____________
(date)
____________
(signature)
_____________________
(full name of person)
S. P.
Position of the Head of organization –
JI PoA Coordinating Entity
____________
(date)
____________
(signature)
_____________________
(full name of person)
S. P.
City, month, year
Head of the Department
Name____________
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 23
1. GENERAL INFORMATION
1.1 THE OBJECTIVE FOR DOCUMENTS PROVISION
Receiving of the Letter of Endorsement (LoE) by the Joint Implementation Programme of Activities Coordinating Entity.
1.2 CONTACT INFORMATION OF THE JI POA COORDINATING ENTITY Name of organization
Juridical address
Postal address
Name of the contact person
Position
Telephone
Fax
E-mail address, web of organization, if any
Code of the object according to the USREOU11
Name of economic activity type of the object by EATC (Economic activity type code)
Role of organization within the project
Іnvestor Consultant
GHG Emission reduction owner
New equipment supplier
GHG emissions seller Project developer
JI project developer Other, please indicate
1 United State Registry of enterprises, organizations, institutions
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 24
1.3 INFORMATION ABOUT THE ORGANIZATION, THAT PREPARED SUBSTANIATING DOCUMENTS FOR THE POSSIBLE JI PROJECT
Name of organization
Type of organization Ltd. CJSC
OJSC;
Municipal entity
Common enterprise
Private entity
State Enterprise Other, please indicate
Status of organization within the project
Іnvestor Consultant
GHG Emission reduction owner
New equipment supplier
GHG emissions seller Project developer
JI project developer Other, please indicate
Main activity status, knowledge and experience
Name of the contact person Address
Tel./fax
Web-page
E-mail address
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 25
1.4 INFORMATION ABOUT OTHER PROJECT PARTICIPANTS INDICATING THEIR ROLE WITHIN THE PROJECT (EXCEPT OF THE OBJECT OWNERS AT WHICH JPAS ARE TO BE IMPLEMENTED)
Name of organization
Type of organization Ltd. CJSC
OJSC;
Municipal entity
Common enterprise
Private entity
State Enterprise Other, please indicate
Status of organization within the project
Іnvestor Consultant
GHG Emission reduction owner
New equipment supplier
GHG emissions seller Project developer
JI project developer Other, please indicate
Main activity status, knowledge and experience
Name of the contact person Address
Tel./fax
Web-page
E-mail address
Please, add information about other project participants if necessary.
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 26
1.5 PROGRAMMATIC ACTIVITIES PROPOSED UNDER THE GIVEN JI POA CORRESPOND TO THE FOLLOWING DIRECTIONS
1. Modernization of district heating systems at housing and communal and municipal objects
2. Collection and utilization of biogas form SMW landfills 3. Switch from fossil fuels to biogas and other renewable energy sources 4. Utilization of coal mine methane for energy purposes
5. Other directions (please choose form the categories list):
Cogeneration Reconstruction of power-generating units at TPP
Completion of HPP
Utilization of methane at the gas transporting and distributing systems
Utilization of methane for waste water treatment (without substitution of fossil fuels)
Energy saving in industry
N2O or HFC emission reduction Transportation
Restoration, planting and protection of forests; changes in land-use
Other (please indicate)
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 27
2. PROGRAMME INFORMATION
2.1 NON-TECHNICAL PROJECT SUMMARY
Please provide description of JI PoA understandable for non-specialized organizations, institutions, and public:
Description of Programme in general, its goals, prerequisites of its implementation, key foreseen technologies and measures
Short description of major object types (О_), where JPAs are foreseen to be implemented
О 1:
О 2:
О 3:
О 4:
2.2 TECHNICAL ASPECTS OF THE PROJECT
Description of technical aspects of the project: technologies and measures, including their major technical parameters, types of objects to which they are applied
Technology (activity) № 1 (Т1):
Technology (activity) № 2 (Т2):
Technology (activity) № 3 (Т3):
Technology (activity) № 4 (Т4):
2.3 PROJECT IDEA
Programme initialization reasons
Description of major programmatic activities (JPAs), foreseen by present JI PoA (technologies and activities, foreseen under each JPA)
Programmatic activity
Technology (activity) under JI PoA -mark (√)
Т1 Т2 Т3 Т4
JPA №1
JPA №2:
JPA №3:
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 28
JPA №4:
Description of how mentioned JPAs will result in anthropogenic GHG emission reduction and/or enhancement of removal by sinks.
JPA №1:
JPA №2:
JPA №3:
JPA №4:
2.4 PROJECT LOCATION (UKRAINE)
# Address of implementation object Programmatic activity
Object type
(О_ )-see
Table p.2.1
region rayon City/town/village (name)
Street, building. JPA №
(see p.2.3)
amount,
figure
1 2 3 4 5 6 7 8
1
2
3
4
2.5 PROJECT BOUNDARIES
Determination of boundaries that limit the assessment of project impact on GHG emission change (absorption). These boundaries determine activity counted under the assessment of anthropogenic GHG emissions and/or absorption after the baseline and also as a result of the project implementation and is the subject of monitoring after the project implementation
Project boundaries – limits, which include all significant anthropogenic greenhouse gas emissions, which are under control of the project participants and may be substantially connected with the project activity Project boundaries should be clearly described and illustrated for each JPAs:
JPA №1:
JPA №2:
JPA №3:
JPA №4:
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 29
2.6 PROJECT BACKGROUND Brief description of project background, i.e. information about legal entity interested in project successfulness and main competitors
Characteristic of state and assessment of market development perspective for project production adduced if necessary
2.7 PROSPECTED SCHEDULE OF PROJECT IMPLEMENTATION Date of beginning of investment activity
Day/Мonth/Year
Date of ending of the investment activity
Day/Мonth/Year
Date of beginning of project operation
Day/Мonth/Year
Date of ending of project operation
Day/Мonth/Year
Preparation of the work project documentation /receiving of the appropriate building allowances
From: Day/Мonth/Year_to: Day/Мonth/Year
Operation and maintenance of equipment
From: Day/Мonth/Year_to: Day/Мonth/Year
Expected project start date
From: Day/Мonth/Year_
Expected operational lifetime of the project
From: Day/Мonth/Year_to: Day/Мonth/Year
2.8 PROJECT IMPLEMENTATION STAGE
Availability of feasibility study (preliminary, complete – please mention)
Yes
No, please mention the expected development period (date of beginning-date of ending)
On the stage of development
Project business-plan Yes
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 30
availability No, please mention the expected development period (date of beginning-date of ending)
On the stage of development
The tender of the main equipment supplying is announced, commercial offers obtained, negotiations are in process
Yes
No
On the stage of development
Agreements regarding the consultancy and/or project services have been made
Yes
No
On the stage of negotiations/signing-up
Agreement regarding the equipment supply have been made
Yes
No
On the stage of negotiations/signing-up
2.9 BASELINE DESCRIPTION (GHG EMISSIONS IN THE BASELINE SCENARIO)
Greenhouse gases to be reduced by the Programme activity (please, check the appropriate)
Programmatic activity
GHG -check (√)
CO2 CH4 N2O HFCs PFCs SF6
JPA №1
JPA №2:
JPA №3:
JPA №4:
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 31
The preliminary description of the baseline scenario and the approximate calculation of the greenhouse gas emission reduction and/or absorption separately and in total (in the metric tonnes of CO2-equivalent) in the frames of the defined project boundaries for the crediting period years, as well as for the all lifetime of the project – for each JPA as for the moment of submission
JPA №1:
JPA №2:
JPA №3:
JPA №4:
The brief description of methodology, which will be used for the estimation of the greenhouse gas emission reduction (absorption) according to the baseline scenario on the stage of preparation of project documentation should be provided – for each JPA as for the moment of submission
JPA №1:
JPA №2:
JPA №3:
JPA №4:
JI PoA shall result in GHG emissions being lower than “business-as-usual” in the Host Country. At the PIN stage questions to be answered are at least:
Which emissions are being reduced by the proposed JI PoA?
What would the future look like without the proposed JI PoA?
Provide the most probable forecast of the anthropogenic GHG emissions and/or absorptions dynamics, which could occur without implementation of the JI PoA:
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 32
2.10 PROJECT ADDITIONALITY JUSTIFICATION
Additionality justification of activities foreseen by the Programme to the baseline scenario and why the realization of this activities are considering unnecessary or impossible without use of JI mechanism
(not more than 1 page)
JI PoA additionality is justified:
On the programme level
On the level of each JPA type
Please, describe what arguments regarding the additionality are relevant to the proposed Programme:
There is no relevant obligatory decrees, which influence on the project implementation within Ukraine;
Political risk, risk of new technology implementation, other barriers;
Similar project has already obtained positive determination conclusion;
Other, please describe:
2.11 PROJECT GHG EMISSIONS REDUCTION
GHG emission reduction during the crediting period (2008-2012) in whole and by years
Please, provide the information on the GHG emission
reduction in the table form (in tonnes of СО2-eq.)
Year (according
to the crediting period)
GHG emissions in
project scenario (in tonnes of
CO2-equivalent)
GHG emissions in
baseline scenario (in tonnes of
CO2-equivalent)
GHG emission
reduction (in tonnes of
CO2-equivalent)
JPA №1
Year А
Year B
……….
Total
JPA №2
Year А
Year B
……….
Total
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 33
JPA № N
Year А
Year B
……….
Total
TOTAL under JI
PoA
Average annual GHG emission reduction during the crediting period (tonnes of CO2-equivalent)
Please, provide the information on the GHG emission
reduction in the table form (in tonnes of СО2-eq.)
Programmatic activity
Average annual GHG emission reduction (tonnes of СО2 eq.)
JPA №1
JPA №2
JPA №3
JPA №4
…
…
JPA №N
TOTAL under JI PoA
GHG emission reduction for the expected operational lifetime of the project (tonnes of CO2-equivalent)
Please, provide the information on the GHG emission
reduction in the table form (in tonnes of СО2-eq.)
Programmatic activity
Operational lifetime, years
GHG emission reduction during operational lifetime
(tonnes of СО2 eq.)
JPA №1
JPA №2
JPA №3
JPA №4
…
…
JPA №N
TOTAL under
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 34
JI PoA
The amount of ERUs, which is planned to be sold to the another country (representative of the foreign country), which would lead to the appropriate reduction of GHG in the National register (tonnes of CO2-equivalent)
3. MONITORING OF GHG EMISSION REDUCTIONS
Main activities that would be used for the monitoring of the anthropogenic emissions and/or absorption of greenhouses gases reduction within the boundaries of the project after the implementation of JI project
Please, provide the list of data and parameters, which should be monitored within project boundaries mentioning their units
Index Unit
JPA №1
Index 1
Index 2
…
Index N
JPA №2
Index 1
Index 2
…
Index N
…
JPA №M
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 35
4. FINANCIAL PROJECT INDICATORS (CONFIDENTIAL INFORMATION)
Total project costs (investment costs – thousand Euro or thousand UAH)
Structure of main capital investments
Please, provide the extended structure of the capital investments for the project realization, using the table sample below (add the lines if necessary)
Expenditures (indicate the date of calculation)
ths. UAH or ths. Euro
Project works
Main equipment costs
Additional equipment costs
Construction
Erection works
Operation and maintenance
Unforeseen costs
Obtaining of necessary permits
Other costs
TOTAL investment costs
Operational costs and their structure
Please, provide the extended structure of the operational costs for the project realization, using the table sample below (add the lines if necessary)
Expenditures (indicate the date of
calculation)
ths. UAH or ths.
Euro
….
…..
Verification of GHG emission
reductions
TOTAL operational costs
Relevant JI costs Please, provide the information regarding the relevant JI costs
Expenditure ths. UAH or ths. Euro
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 36
Preparation of PDD of JI project
Determination (single)
Verification (annual)
TOTAL
Preliminary structure of the project financing (own funds, crediting, etc.) and justification of reality of this structure (providing documented approvals if any)
Own funds (% of the total investments): ____ Crediting (% of the total investments): ____ Granting (%of the total investments): ____ Other (%of the total investments): ____
Expected ERU price, Euro/ton of СО2
equiv.
Expected annual income of the project (without income from ERUs selling)
Expected annual income from ERUs selling (Euro)
5 RISK FACTORS Risk factor that could lead to loss or review (towards decrease) of the prospective amount of ERUs at the crediting period and activities that will be directed on the decrease of risks.
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 37
6 SOCIO-ECONOMIC AND ENVIRONMENTAL BENEFITS
LOCAL BENEFITS
For instance, impact on the local air and water pollution, etc.
Provide information and explanation, that the JI PoA activity will not lead to the worsening of environment situation on the local level
GLOBAL BENEFITS
Describe if other global benefits than greenhousegas emission reductions can be attributed to the project
SOCIO-ECONOMIC ASPECTS
What social and economic effects can be attributed to the project and which would not have occurred in a comparable situation without present JI PoA?
About ¼ page
What are the possible direct effects (e.g. employment creation, provision of capital required, foreign exchange effects)?
About ¼ page
What are the possible other effects (e.g. training/education associated with the introduction of new processes, technologies and products and/or
the effects of a JI PoA on other industries)?
About ¼ page
UKRAINE CARBON MARKET FACILITATION PROGRAMME
Development of a legal framework for Programme of Activities in Ukraine
Page 38
ENVIRONMENTAL STRATEGY / PRIORITIES
A brief description of the JI PoA consistency with the environmental strategy and priorities of Ukraine.
About ¼ page
7 ADDITIONAL INFORMATION (OPTIONAL)
Information not foreseen by previous clauses which could help to determine the JI PoA as the one that could be implemented within the frameworks of JI mechanism
(For example, JI PoA contribution to the sustainable development)
Page 39
ANNEX 2 – JI POA DD FORM
JOINT IMPLEMENTATION PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM
CONTENTS
A. General description of the JI programme of activities (JI PoA).
B. Duration of the JI PoA.
C. Environmental impacts.
D. Stakeholders’ comments.
E. Baseline setting for each type of joint implementation programme activity (JPA).
F. Monitoring plan for each type of joint implementation programme activity (JPA).
G. Description of real projects of each type of JPAs under JI PoA.
ANNEXES
Annex 1: Contact information on JI PoA coordinating entity and participants
Annex 2: Information table on JPAs under the present JI PoA..
Annex 3: Baseline information.
Annex 4: Monitoring plan.
Page 40
SECTION A. GENERAL DESCRIPTION OF THE JI POA
A.1. Title of the JI PoA:
>> A.2. Description of the JI PoA:
>>
A.3. Coordinating entity and participants of JI PoA:
>>
A.4. Technical description of the JI PoA:
A.4.1. Location of the JI PoA:
>>
A.4.1.1. Host Party(ies):
>>
A.4.1.2. Geographical boundary:
>>
A.4.2. Description of each type of JPA:
>>
A.4.2.1. Technology(ies) to be employed, or measures, operations or actions to be implemented by each type of JPA:
>>
A.4.3. Eligibility criteria for inclusion of a JPA in the JI PoA:
>>
A.4.4. Brief explanation of how the anthropogenic emissions of greenhouse gases by sources are to be reduced by the proposed JI PoA.
>>>>
A.4.5. Operational plan for the JI PoA:
>>
A.5. JI PoA approval by the Parties involved:
>>
Page 41
SECTION B. DURATION OF THE JI POA / CREDITING PERIOD
B.1. Starting date of the JI PoA:
>>
B.2. Expected operational lifetime of the JI PoA:
>>
ID number of the JPA
Name of the JPA
Commissioning date, DD/ММ/YY
Date of inclusion of the JPA into JI PoA*, DD/ММ/YY
Expected operational lifetime of the JPA**, YY/ММ
Date till which the JPA is included into the JI PoA***, DD/ММ/YY
Expected operational lifetime of the JI PoA****, DD/ММ/YY
B.3. Length of the crediting period:
>>
ID of the JPA
Name of the JPA
Starting date of the crediting period*, DD/ММ/YY
Length of the crediting period**, YY/ММ
End date of the crediting period***, DD/ММ/YY
SECTION C. ENVIRONMENTAL IMPACTS
C.1. Documentation on the analysis of the environmental impacts of the project including transboundary impacts in accordance with procedures as determined by the host Party of the JI PoA (Ukraine):
>> C.2. If environmental impacts are considered significant by the Coordinating entity of the JI PoA and/or participants or host Party, please provide conclusions and all references to supporting documentation of an environmental impact assessment undertaken in accordance with the procedures as required by the host Party:
>>
Page 42
SECTION D. STAKEHOLDERS’ COMMENTS
D.1. Information on stakeholders’ comments on the JI PoA as appropriate:
>>
Page 43
SEC
TIO
N E
. B
ASE
LIN
E SE
TTIN
G F
OR
EA
CH
TY
PE
OF
JPA
:
E.1
. D
escr
ipti
on a
nd
just
ific
atio
n o
f th
e ba
selin
e ch
osen
for
eac
h t
ype
of J
PA
:
>>
E.2
. D
escr
ipti
on o
f h
ow t
he
anth
ropo
gen
ic e
mis
sion
of
gree
nh
ouse
gas
es b
y so
urc
es a
re r
edu
ced
belo
w t
hos
e th
at w
ould
hav
e oc
curr
ed in
th
e ab
sen
ce o
f th
e JI
PoA
(as
sess
men
t an
d ju
stif
icat
ion
of
JI P
oA a
ddit
ion
alit
y):
Е.3
. Fu
rth
er b
asel
ine
info
rmat
ion
, in
clu
din
g ba
selin
e se
ttin
g an
d th
e n
ame(
s) o
f th
e pe
rson
s/en
titi
es s
etti
ng
the
base
line:
>>
SEC
TIO
N F
. A
PP
LIC
ATI
ON
OF
MO
NIT
OR
ING
PLA
N F
OR
EA
CH
TY
PE
OF
JPA
F.1
. D
escr
ipti
on o
f m
onit
orin
g pl
an c
hos
en f
or e
ach
typ
e of
JP
A:
>>
For
each
fol
low
ing
type
of
JPA,
ple
ase
copy
and
pas
te t
able
s pr
ovid
ed f
urth
er in
par
agra
phs
F.1.
1- F
.3 a
nd a
dd t
he le
tter
indi
catin
g co
rres
pond
ing
type
of
JPA
(for
exa
mpl
e, f
or T
ype А
- F.
1.1.А,
F.1
.1.1
. А, f
or T
ype
B -
F.1.
1.B,
F.1
.1.1
. B e
tc.)
1.
Mon
itor
ing
plan
for
JP
A T
ype А
F.
1.1
.А
Opt
ion
1 –
Mon
itor
ing
of e
mis
sion
s in
th
e JP
A s
cen
ario
an
d th
e ba
selin
e sc
enar
io:
F.
1.1
.1. А
D
ata
to b
e co
llect
ed in
ord
er t
o m
onit
or e
mis
sion
s in
th
e JP
A a
nd
how
th
ese
data
will
be
ach
ieve
d:
Page 44
Type
А. M
easu
re 1
. – M
onit
orin
g pl
an А
1
ID (
plea
se u
se
num
bers
to
ease
cr
oss-
refe
renc
ing
to F
.2
Dat
a va
riabl
e So
urce
of
data
D
ata
unit
Mea
sure
d (m
),
calc
ulat
ed
(c),
es
timat
ed (
e)
Rec
ordi
ng
freq
uenc
y Pr
opor
tion
of
data
to
be
mon
itore
d
How
will
the
dat
a be
arc
hive
d (e
lect
roni
c/pa
per)
Com
men
t
…
…
…
…
…
…
…
…
…
Type
А. M
easu
re 2
. – M
onit
orin
g pl
an А
2
ID (
plea
se u
se
num
bers
to
ease
cr
oss-
refe
renc
ing
to F
.2
Dat
a va
riabl
e So
urce
of
data
D
ata
unit
Mea
sure
d (m
),
calc
ulat
ed
(c),
es
timat
ed (
e)
Rec
ordi
ng
freq
uenc
y Pr
opor
tion
of
data
to
be
mon
itore
d
How
will
the
dat
a be
arc
hive
d (e
lect
roni
c/pa
per)
Com
men
t
…
…
…
…
…
…
…
…
…
Type
А. M
easu
re N
. – M
onit
orin
g pl
an А
N
ID (
plea
se u
se
num
bers
to
ease
cr
oss-
refe
renc
ing
to F
.2
Dat
a va
riabl
e So
urce
of
data
D
ata
unit
Mea
sure
d (m
),
calc
ulat
ed
(c),
es
timat
ed (
e)
Rec
ordi
ng
freq
uenc
y Pr
opor
tion
of
data
to
be
mon
itore
d
How
will
the
dat
a be
arc
hive
d (e
lect
roni
c/pa
per)
Com
men
t
…
…
…
…
…
…
…
…
…
F.
1.1
.2.А
D
escr
ipti
on o
f fo
rmu
lae
use
d to
est
imat
e JP
A e
mis
sion
(fo
r ea
ch t
ype,
gas
, sou
rce;
em
issi
on u
nit
s of
C
O2
equ
ival
ent)
:
>>
Page 45
F.
1.1
.3.А
Rel
evan
t da
ta n
eces
sary
for
det
erm
inin
g th
e ba
selin
e of
an
thro
poge
nic
em
issi
ons
of G
HG
by
sou
rces
w
ith
in t
he
JPA
bou
nda
ry, a
nd
how
su
ch d
ata
will
be
colle
cted
an
d ar
chiv
ed:
ID (
plea
se u
se
num
bers
to
ease
cr
oss-
refe
renc
ing
to F
.2
Dat
a va
riabl
e So
urce
of
data
D
ata
unit
Mea
sure
d (m
),
calc
ulat
ed
(c),
es
timat
ed (
e)
Rec
ordi
ng
freq
uenc
y Pr
opor
tion
of
data
to
be
mon
itore
d
How
will
the
dat
a be
arc
hive
d (e
lect
roni
c/pa
per)
Com
men
t
F.
1.1
.4.А
D
escr
ipti
on o
f th
e fo
rmu
lae
use
d to
est
imat
e ba
selin
e em
issi
on (
for
each
gas
, sou
rce
etc.
; em
issi
ons
in
the
un
its
of C
O2
equ
ival
ent)
:
>>
F.
1.2
.А
Opt
ion
2 –
Dir
ect
mon
itor
ing
of e
mis
sion
red
uct
ion
fro
m J
PA
:
F.
1.2
.1.А
D
ata
to b
e co
llect
ed in
ord
er t
o m
onit
or e
mis
sion
red
uct
ion
fro
m e
ach
JP
A a
nd
how
th
ese
data
will
be
arch
ived
:
Type
А. M
easu
re 1
. – M
onit
orin
g pl
an А
1
ID (
plea
se u
se
num
bers
to
ease
cr
oss-
refe
renc
ing
to F
.2
Dat
a va
riabl
e So
urce
of
data
D
ata
unit
Mea
sure
d (m
),
calc
ulat
ed
(c),
est
imat
ed
(e)
Rec
ordi
ng
freq
uenc
y Pr
opor
tion
of
data
to
be
mon
itore
d
How
will
the
da
ta b
e ar
chiv
ed
(ele
ctro
nic/
pap
er)
Com
men
t
…
…
…
…
…
…
…
…
…
Type
А. M
easu
re 2
. – M
onit
orin
g pl
an А
2
Page 46
ID (
plea
se u
se
num
bers
to
ease
cr
oss-
refe
renc
ing
to F
.2
Dat
a va
riabl
e So
urce
of
data
D
ata
unit
Mea
sure
d (m
),
calc
ulat
ed
(c),
est
imat
ed
(e)
Rec
ordi
ng
freq
uenc
y Pr
opor
tion
of
data
to
be
mon
itore
d
How
will
the
da
ta b
e ar
chiv
ed
(ele
ctro
nic/
pap
er)
Com
men
t
…
…
…
…
…
…
…
…
…
Type
А. M
easu
re N
. – M
onit
orin
g pl
an А
N
ID (
plea
se u
se
num
bers
to
ease
cr
oss-
refe
renc
ing
to F
.2
Dat
a va
riabl
e So
urce
of
data
D
ata
unit
Mea
sure
d (m
),
calc
ulat
ed
(c),
est
imat
ed
(e)
Rec
ordi
ng
freq
uenc
y Pr
opor
tion
of
data
to
be
mon
itore
d
How
will
the
da
ta b
e ar
chiv
ed
(ele
ctro
nic/
pap
er)
Com
men
t
…
…
…
…
…
…
…
…
…
Type
B. M
easu
re 2
. – M
onit
orin
g pl
an B
2
ID (
plea
se u
se
num
bers
to
ease
cr
oss-
refe
renc
ing
to F
.2
Dat
a va
riabl
e So
urce
of
data
D
ata
unit
Mea
sure
d (m
),
calc
ulat
ed
(c),
est
imat
ed
(e)
Rec
ordi
ng
freq
uenc
y Pr
opor
tion
of
data
to
be
mon
itore
d
How
will
the
da
ta b
e ar
chiv
ed
(ele
ctro
nic/
pap
er)
Com
men
t
…
…
…
…
…
…
…
…
…
F.
1.2
.2. D
escr
ipti
on o
f fo
rmu
lae
use
d to
cal
cula
te e
mis
sion
red
uct
ion
fro
m e
ach
typ
e of
JP
A (
for
each
gas
, sou
rce
etc.
; em
issi
on/e
mis
sion
s re
duct
ion
in СО
2 eq
uiv
alen
t):
F.
1.3
.А
Trea
tmen
t of
leak
age
in t
he
mon
itor
ing
plan
:
Page 47
F.
1.3
.1.А
P
leas
e de
scri
be t
he
data
an
d in
form
atio
n t
hat
will
be
colle
cted
in o
rder
to
mon
itor
leak
age
effe
cts
of t
he
each
ty
pe o
f JP
A:
Type
А. M
easu
re 1
. – M
onit
orin
g pl
an А
1
ID (
plea
se u
se
num
bers
to
ease
cr
oss-
refe
renc
ing
to E
.5
Dat
a va
riabl
e So
urce
of
data
D
ata
unit
Mea
sure
d (m
),
calc
ulat
ed (
c),
estim
ated
(e)
Rec
ordi
ng
freq
uenc
y Pr
opor
tion
of
data
to
be
mon
itore
d
How
will
the
da
ta b
e ar
chiv
ed
(ele
ctro
nic/
pap
er)
Com
men
t
…
…
…
…
…
…
…
…
…
Type
А. M
easu
re 2
. – M
onit
orin
g pl
an А
2
ID (
plea
se u
se
num
bers
to
ease
cr
oss-
refe
renc
ing
to E
.5
Dat
a va
riabl
e So
urce
of
data
D
ata
unit
Mea
sure
d (m
),
calc
ulat
ed (
c),
estim
ated
(e)
Rec
ordi
ng
freq
uenc
y Pr
opor
tion
of
data
to
be
mon
itore
d
How
will
the
da
ta b
e ar
chiv
ed
(ele
ctro
nic/
pap
er)
Com
men
t
…
…
…
…
…
…
…
…
…
Type
А. M
easu
re N
. – M
onit
orin
g pl
an А
N
ID (
plea
se u
se
num
bers
to
ease
cr
oss-
refe
renc
ing
to E
.5
Dat
a va
riabl
e So
urce
of
data
D
ata
unit
Mea
sure
d (m
),
calc
ulat
ed (
c),
estim
ated
(e)
Rec
ordi
ng
freq
uenc
y Pr
opor
tion
of
data
to
be
mon
itore
d
How
will
the
da
ta b
e ar
chiv
ed
(ele
ctro
nic/
pap
er)
Com
men
t
…
…
…
…
…
…
…
…
…
Page 48
F.
1.3
.2.А
Des
crip
tion
of
form
ula
e u
sed
to e
stim
ate
leak
age
for
each
typ
e of
JP
A (
for
each
gas
, sou
rce
etc.
; em
issi
ons
in СО
2 eq
uiv
alen
t):
>>
F.
1.4
.А
Des
crip
tion
of
form
ula
e u
sed
to e
stim
ate
emis
sion
red
uct
ion
s fo
r ea
ch t
ype
of J
PA
(fo
r ea
ch g
as, s
ourc
e et
c.;
emis
sion
red
uct
ion
in u
nit
s of
СО
2 eq
uiv
alen
t):
>>
F.
1.5
.A
Wh
ere
appl
icab
le, i
n a
ccor
dan
ce w
ith
pro
cedu
res
as r
equ
ired
by
the
hos
t P
arty
(ie
s), i
nfo
rmat
ion
on
th
e co
llect
ion
an
d ar
chiv
ing
of in
form
atio
n o
n t
he
envi
ron
men
tal i
mpa
cts
of t
he
each
typ
e of
JP
A:
>>
F.2
.А
Qu
alit
y co
ntr
ol (
QC
) an
d qu
alit
y as
sura
nce
(Q
A)
proc
edu
res
un
dert
aken
for
dat
a m
onit
ored
:
Dat
a (in
dica
te t
able
an
d ID
num
ber)
U
ncer
tain
ty le
vel o
f da
ta
(hig
h/m
ediu
m/lo
w)
Expl
ain
QA/
QC
proc
edur
es p
lann
ed f
or t
hese
dat
a, o
r w
hy s
uch
proc
edur
es a
re n
ot
nece
ssar
y
F.3
.А
Nam
e of
per
son
(s)/
enti
ty(i
es)
esta
blis
hed
th
e m
onit
orin
g pl
an:
>>
For
each
fol
low
ing
type
of
JPA,
ple
ase
copy
and
pas
te t
able
pro
vide
d ab
ove
in t
he p
arag
raph
s F.
1.1-
F.3
and
add
the
lett
er in
dica
ting
corr
espo
ndin
g ty
pe o
f JP
A at
the
end
(fo
r ex
ampl
e, f
or T
ype А
- F.
1.1.А,
F.1
.1.1
. А, f
or T
ype
B B
- F.
1.1.
B, F
.1.1
.1. B
etc
.
Page 49
SECTION G. DESCRIPTION OF REAL JPA OF EACH TYPE COMPRISING JI POA
Please choose at least one project of each type of JPA and provide information according to paragraphs G1 – G7 for each type of project.
1. REAL PROJECT JPA TYPE A
G.1. Description of real project of JPA Type А:
G.2. Technical description of the project:
G.2.1. Location of the project:
G.2.1.1. Host Party(ies):
>>
G.2.1.2. Oblast/region/etc.:
>>
G.2.1.3. City/Town/Community etc.:
>>
G.2.1.4. Detail of physical location, including information allowing the unique identification of the project (max. 1 page):
>>
G.2.2. Technology(ies) to be employed , or measures, operations or actions to be implemented by the project:
G.2.3. Brief explanation of how the anthropogenic emissions of greenhouse gases by sources are to be reduced by the proposed JI project, including why the emission reduction would not occur in the absence of the proposed project:
G.2.4.1. Estimated amount of emission reduction over the crediting period:
Page 50
G. 3. Duration of the project / crediting period
G.3.1. Starting date of the project:
G.3.2. Expected operational lifetime of the project:
G.3.3. Length of the crediting period:
G.4. Baseline for the real project of JPA Type A:
>>
G.4.1 Description and justification of the baseline chosen for a real project of JPA Type A:
>>
G.5. Monitoring plan for real project of JPA Type A
>>
G.6. Estimation greenhouse gas emission reductions
>>
G.6.1. Estimated project emissions:
>>
G.6.2. Estimated leakage:
>>
G.6.3. The sum of G.6.1. and G.6.2.:
>>
G.6.4. Estimated baseline emissions:
>>
G.6.5. Difference between G.6.4. and G.6.3, representing the emission reductions of the project:
>>
G.6.6. Table providing values obtained when applying formulae above:
The results of the application of the formulae above shall be indicated using the following tabular format
Page 51
Year Estimated project emissions
(tonnes of СО2 equivalent)
Estimated leakage
(tonnes of СО2 equivalent)
Estimated baseline emissions
(tonnes of СО2 equivalent)
Estimated emission reduction
(tonnes of СО2 equivalent)
Year А
Year B
Year …
Total (tonnes of СО2 equivalent)
G.7. Environmental impacts
G.7.1. Documentation on the analysis of the environmental impacts of the project, including transboundary impacts, in accordance with procedures as determined by the host Party (Ukraine):
>>
G.7.2. If environmental impacts are considered significant by the project participants or the host Party, please provide conclusions and all references to supporting documentation of an environmental impact assessment undertaken in accordance with the procedures as required by the host Party:
>>
2. REAL PROJECT OF JPA TYPE B
Please copy headings and tables provided above in paragraphs G1-G7.
Page 52
ANNEX 1 – CONTACT INFORMATION
ON COORDINATING ENTITY AND PARTICIPANTS OF THE JI POA
Organisation:
Street/P.O.Box:
Building:
City:
Oblast/Region:
Postal code:
Country:
Phone:
Fax:
E-mail:
URL:
Represented by:
Title:
Salutation:
Last name:
Middle name:
First name:
Department:
Phone (direct):
Fax (direct):
Mobile:
Personal e-mail:
Page 53
AN
NEX
2 –
IN
FOR
MA
TIO
N T
AB
LE O
F JP
AS
UN
DER
TH
E P
RES
ENT
JI P
OA
*
Plea
se p
rovi
de b
rief
sum
mar
y of
tec
hnol
ogie
s /
mea
sure
s im
plem
ente
d un
der
the
give
n JP
A.
JPAs
incl
uded
in t
he J
I Po
A
JPA
No.
N
ame
of t
he
JPA
Type
of
the
JPA
Brie
f su
mm
ary
*
Geo
grap
hica
l re
fere
nce*
* N
ame
and
cont
act
deta
il of
the
per
son
resp
onsi
ble
for
the
oper
atio
n of
th
e JP
A***
Star
ting
date
Le
ngth
of
the
cr
editi
ng
perio
d
Des
crip
tion
of
the
base
line
sett
ing*
***
Des
crip
tion
of t
he
mon
itorin
g pl
an**
***
Estim
atio
n of
em
issi
on r
educ
tion,
to
nnes
of СО
2 eq
uiva
lent
/ann
um
1 2 3 …
Ty
pe А
1 2 3 …
Ty
pe B
1 2 3 …
Ty
pe …
Tota
l
Page 54
**
Plea
se in
dica
te in
whi
ch o
blas
ts, r
egio
ns, ci
ties,
tow
n et
c. t
he J
PA is
to
be im
plem
ente
d.
***
Pr
ovid
e na
me
and
cont
act
info
rmat
ion
(pos
tal a
ddre
ss, t
elep
hone
, e-m
ail)
of t
he p
erso
n re
spon
sibl
e.
****
Pl
ease
use
the
cro
ss-r
efer
enci
ng t
o th
e de
fined
bas
elin
es (
in s
ectio
n E.
3.)
that
are
def
ined
as
I, I
I et
c. F
or e
xam
ple,
B.A
.I. sh
all b
e us
ed f
or
Base
line
I fo
r JP
A Ty
pe A
.
****
* Pl
ease
use
cro
ss-r
efer
enci
ng t
o th
e m
onito
ring
plan
for
def
ined
tec
hnol
ogie
s /
mea
sure
s un
der
the
give
n JP
A (s
ee s
ectio
n F.
1.).
For
exa
mpl
e,
M.A
.1. s
hall
be u
sed
for
mon
itorin
g pl
an f
or M
easu
re 1
und
er J
PA T
ype
A.
Page 55
ANNEX 3 – ADDITIONAL BASELINE INFORMATION
Please provide table describing all major elements of baseline scenario for each JPA type and/or real projects of each JPA type (including variable values, parameters and data sources).
Please also provide additional useful documents/information.
ANNEX 4 – MONITORING PLAN
Please provide schemes, figures and/or tables that cover all major elements of monitoring plan for each JPA type and/or real projects of each JPA type (including variable values, parameters and data sources) and simplify understanding of monitoring plan execution.
Please also provide additional useful documents/information.
Page 56
III. Guidelines for completing the JI PoA DD Form
JOINT IMPLEMENTATION PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM
CONTENTS
A. General description of the JI programme of activities (JI PoA).
B. Duration of the JI PoA.
C. Environmental impacts.
D. Stakeholders’ comments.
E. Baseline setting for each type of joint implementation programme
activity (JPA).
F. Monitoring plan for each type of joint implementation programme
activity (JPA).
G. Description of real projects of each type of JPAs under JI PoA.
ANNEXES
Annex 1: Contact information on JI PoA coordinating entity and participants
Annex 2: Information table on JPAs under the present JI PoA.
Annex 3: Baseline information.
Annex 4: Monitoring plan.
Page 57
SECTION A. GENERAL DESCRIPTION OF THE JI POA
A.1. Title of the JI PoA:
>>
Please indicate: The title of the JI PoA; Sectoral scopes(2), to which the JI PoA pertains; The version number of the document; The date of the document.
A.2. Description of the JI PoA:
>>
Please include in the description the purpose of the JI PoA with a concise, summarizing
explanation (max. 1-2 pages) of the:
- Situation existing prior to the starting date of the JI PoA;
- Baseline scenario; and
- JI PoA scenario (expected outcome, including a technical description).
Please also briefly summarize the history of the JI PoA (incl. JI component).
A.3. Coordinating entity and participants of JI PoA:
>>
Please list Coordinating entity of the JI PoA, project participants and Parties involved in
this section and provide contact information in annex 1. Information shall be provided
in the following tabular format.
Party involved Legal entity JI PoA coordinating entity, project
participants
Party А {country} Legal entity А1 Legal entity А2 …………..
2 List of the sectoral scopes adopted by the JISC is available on the UNFCCC JI web‐site (
http://ji.unfccc.int/ ) in section “References’ (‘Procedures’).
Page 58
Party B {country} Legal entity B1 Legal entity B2 …….……
… …….……
A.4. Technical description of the JI PoA:
A.4.1. Location of the JI PoA:
>>
A.4.1.1. Host Party(ies):
>>
A.4.1.2. Geographical boundary:
>>
Please indicate physical coordinates of the JI PoA, including information on specific
aspects for JI PoA identification. List oblast (regions), rayons, cities, and towns etc.
where JI PoA will be implemented (max. 1 page).
A.4.2. Description of each type of JPA:
>>
A.4.2.1. Technology(ies) to be employed, or measures, operations
or actions to be implemented by each type of JPA:
>>
Describe technology(ies) to be employed, or measures, operations or actions to be
implemented by each type of JPA, including all required technical information and
implementation plan of each type of JPA. Information shall be provided using the
following tabular format.
Type of JPA* Name of technology/measure
included into real type of JPA
Please provide the brief
summary of each
Page 59
technology/measure (not more
than 5 lines for each
technology/measure)
Type А Technology/ measure А1 Technology/ measure А2 …………..
Type B Technology/ measure B1 Technology/ measure B2 …….……
Type … …….……
Type …
* Type of JPA is defined as a set of technologies/measures that are to be implemented
under given JPA (see SEIA Instruction #____, paragraph 3).
A.4.3. Eligibility criteria for inclusion of a JPA in the JI PoA:
>>
List criteria which JPA shall fulfill in order to be included into present JI PoA (max. 1
page).
1. New JPA shall correspond to one of JPA types defined in A.4.2.1.
2. ….
3.
A.4.4. Brief explanation of how the anthropogenic emissions of greenhouse
gases by sources are to be reduced by the proposed JI PoA.
>>>>
Please explain briefly how the anthropogenic greenhouse gas emission reductions are
to be achieved (max. length 0.5 page).
A.4.5. Operational plan for the JI PoA:
Page 60
>>>>
Please provide information on confirmation by all participants of JI PoA that his/her project as an individual JPA is included into JI PoA.
Describe how the Coordinating entity of JI PoA prevents double counting (for example, inclusion of new JPAs that have already been determined as a part of other JI PoA, bundle of small-scale JI projects or as individual JI projects). It is recommended to sign an agreement between project owners and Coordinating entity in which each owner confirms his participation in the JI PoA and guarantees that given project did not undergo determination being included into other JI PoA, bundle of small-scale JI projects or as individual JI project.
Please indicate name of the responsible person from the side of Coordinating entity of JI PoA and his/her contact information (telephone, email address etc.).
A.5. JI PoA approval by the Parties involved:
>>
Written JI PoA approvals by the Parties involved should be attached.
Page 61
SECTION B. DURATION OF THE JI POA / CREDITING PERIOD
B.1. Starting date of the JI PoA:
>>
Starting date of the JI PoA is defined as commissioning date of equipment under first
JPA.
B.2. Expected operational lifetime of the JI PoA:
>>
Provide information on expected operational lifetime of each JPA, which at the moment are included into the JI PoA and indicate the expected operational lifetime of the JI PoA.
Please provide information in the tabular form (if required insert additional rows):
ID number of the JPA
Name of the JPA
Commissioning date, DD/ММ/YY
Date of inclusion of the JPA into JI PoA*, DD/ММ/YY
Expected operational lifetime of the JPA**, YY/ММ
Date till which the JPA is included into the JI PoA***, DD/ММ/YY
Expected operational lifetime of the JI PoA****, DD/ММ/YY
* Date of inclusion of the JPA into the JI PoA is defined as date of issuance of Letter of approval from the SEIA regarding approval of further project’s development. In case of inclusion of additional JPAs into the JI PoA that has been already determined, date of the JPA inclusion into the JI PoA is defined as date of official approval of new version of JPAs table by the corresponding Order by SEIA according to paragraph 2.1. of the Instruction.
** Expected lifetime of equipment that is defined according to the manufacturer's certificate. In case there are several technologies/measures that are characterized by different lifetimes of equipment in the JI PoA, the total lifetime of the JI PoA is defined as the most short of such lifetime periods.
*** Date till which JPA is included into the JI PoA is defined starting from date of inclusion of the JPA into the JI PoA and lasts till the end date of equipment lifetime.
Page 62
**** Theoretically JI PoA lifetime is unlimited and is defined by the end date till which JPA with most long-lasting lifetime of equipment is included into given JI PoA.
B.3. Length of the crediting period:
>>
Please state length of the crediting period in years and months as well as its starting date.
Please provide information in the tabular form (if required insert additional rows):
ID of the JPA
Name of the JPA
Starting date of the crediting period*, DD/ММ/YY
Length of the crediting period**, YY/ММ
End date of the crediting period***, DD/ММ/YY
* Starting date of the crediting period is defined from the date of commissioning, even if the JPA was not officially registered by the SEIA under the JI PoA, but implementation of the project and monitoring were performed on the proper level. ERUs shall only be issued for a crediting period starting after the beginning of 2008.
** Length of the crediting period is defined as the subtraction of the end date of the crediting period and starting date of the crediting period.
***End of the crediting period is defined as the end of 2012. Crediting period for the JI PoA can be extended after 2012 subject to the approval of the International agreement on the JI project status after 2012 by the Conference of the Parties and corresponding approval by the host Party.
>>
SECTION C. ENVIRONMENTAL IMPACTS
C.1. Documentation on the analysis of the environmental impacts of the
project including transboundary impacts in accordance with procedures as
determined by the host Party of the JI PoA (Ukraine):
>>
Please provide documentation on the environmental impact assessment of each type of JPA according to procedures and requirements determined by Ukraine.
Page 63
C.2. If environmental impacts are considered significant by the Coordinating entity of the JI PoA and/or participants or host Party, please provide conclusions and all references to supporting documentation of an environmental impact assessment undertaken in accordance with the procedures as required by the host Party:
>>
Please provide description of measures foreseen for or each JPA type in order to mitigate negative environmental impacts.
>>
SECTION D. STAKEHOLDERS’ COMMENTS
D.1. Information on stakeholders’ comments on the JI PoA as appropriate:
>>
Opinions and letters that the Coordinating entity received from the core ministries, local authorities, non-governmental and other organizations during development of the JI PoA and making it publicly available shall be referred as the stakeholders’ comments.
In this section please provide brief summary of the comments’ content and mandatory attach:
- A list of stakeholders from whom comments on the JI PoA have been received;
Nature of comment, and
- Whether and how the comments have been addressed.
Brief summary of all comments and corresponding responses shall be attached to the final version of JI PoA design document.
Page 64
SEC
TIO
N E
. B
ASE
LIN
E SE
TTIN
G F
OR
EA
CH
TY
PE
OF
JPA
:
E.1
. D
escr
ipti
on a
nd
just
ific
atio
n o
f th
e ba
selin
e ch
osen
for
eac
h t
ype
of J
PA
:
>>
Ther
e ca
n be
sev
eral
bas
elin
e sc
enar
ios
for
each
typ
e of
JPA
. JI
PoA
Coor
dina
ting
entit
y sh
all d
escr
ibe
and
just
ify a
ll po
ssib
le b
asel
ine
scen
ario
s
for
each
typ
e of
JPA
. JI
PoA
(see
gui
delin
es a
nd e
xam
ples
bel
ow).
Base
line
scen
ario
sha
ll be
set
acc
ordi
ng t
o Ap
pend
ix B
of
JI G
uide
lines
and
the
gui
danc
e an
d cr
iteria
for
bas
elin
e se
ttin
g an
d m
onito
ring
deve
lope
d by
the
JIS
C.
Base
line
shal
l be
esta
blis
hed:
(i)
– on
a p
roje
ct-s
peci
fic b
asis
ref
errin
g to
par
ticul
ar t
ype
of J
PA a
nd/o
r us
ing
sect
oral
em
issi
on f
acto
r;
(ii)
– ta
king
acc
ount
of
unce
rtai
ntie
s an
d us
ing
cons
erva
tive
assu
mpt
ions
;
(iii)
– ta
king
into
acc
ount
rel
evan
t na
tiona
l and
/or
sect
oral
pol
icie
s an
d ci
rcum
stan
ces,
suc
h as
sec
tora
l ref
orm
initi
ativ
es, l
ocal
fue
l av
aila
bilit
y, p
ower
sec
tor
expa
nsio
n pl
ans,
and
the
sec
tora
l situ
atio
n in
the
pro
ject
sec
tor;
(iv)
– in
such
a w
ay e
mis
sion
red
uctio
n un
its (
ERU
s) c
anno
t be
ear
ned
for
decr
ease
in a
ctiv
ity le
vels
out
side
the
pro
ject
act
ivity
or
due
to
forc
e m
ajeu
re;
(v)
– in
a t
rans
pare
nt m
anne
r w
ith r
egar
d to
the
cho
ice
of a
ppro
ache
s, a
ssum
ptio
ns, m
etho
dolo
gies
, par
amet
ers,
dat
a so
urce
s an
d ke
y fa
ctor
s.
JI P
oA C
oord
inat
ing
entit
y sh
all j
ustif
y th
e ch
oice
of
all p
ossi
ble
base
lines
for
eac
h ty
pe o
f JP
A in
acc
orda
nce
with
tec
hnol
ogie
s/m
easu
res
incl
uded
in
to g
iven
typ
e.
Page 65
For
exam
ple,
in c
ase
of s
ubst
itutio
n of
hea
t-ge
nera
ting
equi
pmen
t op
erat
ing
on f
ossi
l fue
ls (
natu
ral g
as, c
oal,
liqui
d fu
el e
tc.)
ele
ctric
ity o
r ot
her
type
s of
fue
l with
equ
ipm
ent
that
is o
pera
ting
on t
he f
uels
with
low
er G
HG
em
issi
on f
acto
r, J
I Po
A Co
ordi
natin
g en
tity
shal
l jus
tify
all p
ossi
ble
base
line
scen
ario
s th
at c
an b
e ap
plie
d to
the
JI
PoA
at a
ll po
ssib
le im
plem
enta
tion
site
s.
For
inst
ance
, JI
PoA
fore
sees
mea
sure
s ai
med
at
incr
ease
of
ener
gy e
ffic
ienc
y in
the
res
iden
tial s
ecto
r in
all
regi
ons
of U
krai
ne a
nd s
ubst
itutio
n of
bo
ilers
tha
t ar
e op
erat
ing
on f
ossi
l fue
ls w
ith e
quip
men
t op
erat
ing
on b
iom
ass.
Hen
ce, d
epen
ding
on
the
regi
on, b
asel
ine
scen
ario
may
con
side
r us
e of
coa
l, na
tura
l gas
, liq
uid
fuel
or
elec
tric
ity. I
n th
is c
ase,
JI
PoA
Coor
dina
ting
entit
y sh
all d
escr
ibe
and
just
ify a
ll po
ssib
le f
our
base
line
scen
ario
s.
As a
ppro
pria
te J
I Po
A Co
ordi
natin
g en
tity
may
, but
not
obl
iged
to,
app
ly a
ppro
ved
clea
n de
velo
pmen
t m
echa
nism
(CD
M)
base
line
and
mon
itorin
g
met
hodo
logi
es.
Plea
se n
ote
that
thi
s se
ctio
n E
shal
l con
tain
all
key
elem
ents
of
the
base
line.
Ann
ex 3
(ba
selin
e in
form
atio
n) t
hat
shou
ld b
e pr
epar
ed in
par
alle
l to
com
plet
ing
the
rem
aind
er o
f th
is s
ectio
n sh
all c
onta
in a
sum
mar
y of
the
key
ele
men
ts in
the
tab
ular
for
m a
s w
ell a
s ad
ditio
nal s
uppo
rtin
g
docu
men
tatio
n/in
form
atio
n.
It is
rec
omm
ende
d to
pro
vide
info
rmat
ion
in a
tab
ular
for
m a
s pr
esen
ted
belo
w:
Type
of
JPA
Des
crip
tion
and
just
ifica
tion
of a
ll po
ssib
le b
asel
ines
exp
ecte
d ac
cord
ing
to t
he J
I Po
A
Type
А
Base
line А
I
Base
line А
II
……
Base
line А
N
Page 66
Type
B
Base
line
B I
Base
line
B II
……
Base
line
B М
…
Type
…
Exam
ple
of
Type
A
JPA
Type
A f
ores
ees
subs
titut
ion
of b
oile
r eq
uipm
ent
that
is o
pera
tion
on f
ossi
l fue
ls o
r el
ectr
icity
with
equ
ipm
ent
oper
atin
g on
biom
ass.
Base
line А І
– th
erm
al e
nerg
y ge
nera
tion
via
coal
com
bust
ion
Base
line А ІІ
– t
herm
al e
nerg
y ge
nera
tion
via
natu
ral g
as c
ombu
stio
n
Base
line А ІІІ
– th
erm
al e
nerg
y ge
nera
tion
via
liqui
d fu
el c
ombu
stio
n
Base
line А
IV –
the
rmal
ene
rgy
gene
ratio
n vi
a el
ectr
icity
con
sum
ptio
n
Page 67
E.
2.
Des
crip
tion
of
how
th
e an
thro
poge
nic
em
issi
on o
f gr
een
hou
se g
ases
by
sou
rces
are
red
uce
d be
low
th
ose
that
wou
ld h
ave
occu
rred
in t
he
abse
nce
of
the
JI P
oA (
asse
ssm
ent
and
just
ific
atio
n o
f JI
PoA
add
itio
nal
ity)
:
In o
rder
to
just
ify a
dditi
onal
ity t
he J
I Po
A sh
all f
ulfil
l at
leas
t on
e of
the
fol
low
ing
cond
ition
s:
а) t
he o
nly
cond
ition
for
the
pro
gram
me
to b
e im
plem
ente
d is
to
be r
ealiz
ed a
s JI
PoA
;
b) t
here
are
law
s/le
gisl
ativ
e ac
ts a
ppro
ved
in t
he c
ount
ry t
hat
are
aim
ed t
o pr
omot
e te
chno
logi
es a
nd m
easu
res
incl
uded
into
giv
en J
I Po
A,
thou
gh r
efer
red
legi
slat
ion
did
not
resu
lt in
the
bro
ad im
plem
enta
tion
of s
uch
mea
sure
s. R
ealiz
atio
n of
the
pro
pose
d pr
ogra
mm
e w
ill f
acili
tate
mor
e w
ides
prea
d im
plem
enta
tion
of t
echn
olog
ies/
mea
sure
s fo
rese
en b
y th
e JI
PoA
.
(max
. 2 p
ages
)
Е.3
. Fu
rth
er b
asel
ine
info
rmat
ion
, in
clu
din
g ba
selin
e se
ttin
g an
d th
e n
ame(
s) o
f th
e pe
rson
s/en
titi
es s
etti
ng
the
base
line:
>>
Plea
se p
rovi
de in
form
atio
n in
the
tab
ular
for
m a
s in
dica
ted
belo
w:
Type
of
Fu
rthe
r ba
selin
e in
form
atio
n
Page 68
JPA
Base
line
#
Dat
e of
the
bas
elin
e
sett
ing
Nam
e of
the
ent
ity s
ettin
g
the
base
line
Cont
act
pers
on s
ettin
g ba
selin
e
(e-m
ail,
tele
phon
e et
c.)
Type
А
Base
line А
I
Base
line А
II
……
Base
line А
N
Type
B
Base
line
B I
Base
line
B II
……
Base
line
B N
…
Type
…
Page 69
SEC
TIO
N F
. A
PP
LIC
ATI
ON
OF
MO
NIT
OR
ING
PLA
N F
OR
EA
CH
TY
PE
OF
JPA
GEN
ERAL
IN
FORM
ATIO
N
A m
onito
ring
plan
has
to
be e
stab
lishe
d in
acc
orda
nce
with
app
endi
x B
of t
he J
I G
uide
lines
and
fur
ther
gui
danc
e on
bas
elin
e se
ttin
g an
d m
onito
ring
deve
lope
d by
the
JIS
C or
cor
resp
ondi
ng d
ocum
ents
und
er t
he n
atio
nal J
I pr
oced
ure
(JI
Trac
k1).
As a
ppro
pria
te, J
I Po
A Co
ordi
natin
g en
tity
may
, but
not
obl
iged
to,
app
ly a
ppro
ved
CDM
bas
elin
e an
d m
onito
ring
met
hodo
logi
es.
The
mon
itorin
g pl
an n
eeds
to
prov
ide
deta
iled
info
rmat
ion
rela
ting
to t
he c
olle
ctio
n an
d ar
chiv
ing
of a
ll re
leva
nt d
ata
nece
ssar
y fo
r:
- es
timat
ing
and
mea
surin
g pr
ojec
t em
issi
ons
for
each
typ
e of
JPA
,
- de
term
inin
g ba
selin
e em
issi
ons
for
each
typ
e of
JPA
, and
- as
sess
ing
leak
age
effe
cts
for
each
typ
e of
JPA
.
The
mon
itorin
g pl
an s
houl
d re
flect
goo
d m
onito
ring
prac
tice
appr
opria
te t
o ea
ch t
ype
of J
PA/
proj
ect
type
.
If n
atio
nal o
r in
tern
atio
nal m
onito
ring
stan
dard
has
to
be a
pplie
d to
mon
itor
cert
ain
aspe
cts
of t
he p
roje
ct, p
leas
e id
entif
y th
is s
tand
ard
and
prov
ide
a re
fere
nce
as t
o w
here
a d
etai
led
desc
riptio
n of
the
sta
ndar
d ca
n be
fou
nd.
Proj
ect
part
icip
ants
sha
ll im
plem
ent
the
dete
rmin
ed m
onito
ring
plan
and
pro
vide
to
JI P
oA C
oord
inat
ing
entit
y da
ta in
acc
orda
nce
with
the
pla
n
thro
ugh
thei
r m
onito
ring
repo
rts.
Plea
se n
ote
that
dat
a m
onito
red
and
requ
ired
for
dete
rmin
atio
n ar
e to
be
kept
for
tw
o ye
ars
afte
r th
e la
st t
rans
fer
of E
RU
s fo
r th
e pr
ojec
t.
This
sec
tion
F sh
all p
rovi
de a
det
aile
d de
scrip
tion
of a
ll ke
y el
emen
ts o
f th
e m
onito
ring
plan
whi
ch is
to
be a
ttac
hed
in A
nnex
4.
Page 70
F.1
. D
escr
ipti
on o
f m
onit
orin
g pl
an c
hos
en f
or e
ach
typ
e of
JP
A:
>>
DES
CRIP
TIO
N O
F M
ON
ITO
RIN
G P
LAN
CH
OSE
N F
OR E
ACH
TYP
E O
F JP
A
Plea
se p
rovi
de a
det
aile
d de
scrip
tion
of t
he m
onito
ring
plan
for
eac
h ty
pe o
f JP
A us
ing
the
follo
win
g st
ep-w
ise
appr
oach
:
Step
1. I
ndic
atio
n an
d de
scrip
tion
of t
he a
ppro
ach
chos
en r
egar
ding
mon
itorin
g
Plea
se e
xplic
itly
indi
cate
whi
ch o
f th
e ap
proa
ches
reg
ardi
ng m
onito
ring
defin
ed in
the
JIS
C’s
guid
ance
on
crite
ria f
or b
asel
ine
sett
ing
and
mon
itorin
g,
is c
hose
n:
а) I
f an
app
rove
d CD
M b
asel
ine
and
mon
itorin
g m
etho
dolo
gy is
use
d, p
leas
e in
dica
te it
s tit
le a
nd r
efer
ence
num
ber,
as
wel
l as
its v
ersi
on, a
nd
desc
ribe
why
it is
app
licab
le.
In c
ase
of d
evia
tions
fro
m t
he a
pplie
d ap
prov
ed C
DM
bas
elin
e an
d m
onito
ring
met
hodo
logy
, ple
ase
prov
ide
a co
mpl
ete,
cle
ar a
nd t
rans
pare
nt
desc
riptio
n an
d ju
stifi
catio
n of
the
dev
iatio
ns. I
n do
ing
so, p
leas
e al
so p
rovi
de a
n an
alys
is o
f ho
w t
he p
ropo
sed
devi
atio
ns a
ffec
t th
e as
sum
ptio
ns,
form
ulae
, par
amet
ers,
dat
a so
urce
s an
d ke
y fa
ctor
s us
ed in
the
met
hodo
logy
, and
sta
te h
ow u
ncer
tain
ties
are
take
n in
to a
ccou
nt a
nd
cons
erva
tiven
ess
is s
afeg
uard
ed.
b) I
f a
JI s
peci
fic a
ppro
ach
rega
rdin
g m
onito
ring
is u
sed,
ple
ase
prov
ide
a de
taile
d th
eore
tical
des
crip
tion
in a
com
plet
e an
d tr
ansp
aren
t m
anne
r, a
s
wel
l as
a ju
stifi
catio
n re
ferr
ing
to t
he J
ISC’
s gu
idan
ce o
n cr
iteria
for
bas
elin
e se
ttin
g an
d m
onito
ring.
Ple
ase
incl
ude
in t
he d
escr
iptio
n al
l ass
umpt
ions
,
form
ulae
, par
amet
ers,
dat
a so
urce
s an
d ke
y fa
ctor
s, a
nd s
tate
how
unc
erta
intie
s ar
e ta
ken
into
acc
ount
and
con
serv
ativ
enes
s in
saf
egua
rded
.
Step
2 A
pplic
atio
n of
the
app
roac
h ch
osen
Plea
se a
pply
the
app
roac
h ou
tline
d in
ste
p 1
abov
e in
the
con
text
of
the
proj
ect.
In t
he s
ectio
ns b
elow
ple
ase
expl
icitl
y an
d cl
early
dis
tingu
ish:
Page 71
а) D
ata
and
para
met
ers
that
are
not
mon
itore
d th
roug
hout
the
cre
ditin
g pe
riod,
but
are
det
erm
ined
onl
y on
ce (
and
thus
rem
ain
fixed
thr
ough
out
the
cred
iting
per
iod)
, and
tha
t ar
e av
aila
ble
alre
ady
at t
he s
tage
of
dete
rmin
atio
n re
gard
ing
the
PDD
;
b) D
ata
and
para
met
ers
that
are
not
mon
itore
d th
roug
hout
the
cre
ditin
g pe
riod,
but
are
det
erm
ined
onl
y on
ce (
and
thus
rem
ain
fixed
thr
ough
out
the
cred
iting
per
iod)
, and
tha
t ar
e no
t al
read
y av
aila
ble
at t
he s
tage
of
dete
rmin
atio
n re
gard
ing
the
PDD
; an
d
c) D
ata
and
para
met
ers
that
are
mon
itore
d th
roug
hout
the
cre
ditin
g pe
riod.
For
each
fol
low
ing
type
of
JPA,
ple
ase
copy
and
pas
te t
able
s pr
ovid
ed f
urth
er in
par
agra
phs
F.1.
1- F
.3 a
nd a
dd t
he le
tter
indi
catin
g co
rres
pond
ing
type
of
JPA
(for
exa
mpl
e, f
or T
ype А
- F.
1.1.А,
F.1
.1.1
. А,
for
Typ
e B
- F.
1.1.
B, F
.1.1
.1. B
et
c.)
2.
Mon
itor
ing
plan
for
JP
A T
ype А
F.
1.1
.А
Opt
ion
1 –
Mon
itor
ing
of e
mis
sion
s in
th
e JP
A s
cen
ario
an
d th
e ba
selin
e sc
enar
io:
Plea
se s
tate
if t
his
sect
ion
is le
ft b
lank
on
purp
ose.
Thi
s se
ctio
n m
ight
be
left
bla
nk, f
or e
xam
ple,
in c
ase
of t
he p
roje
cts
on b
ioga
s co
llect
ion
and
burn
ing
on t
he f
lare
. In
such
cas
e th
e op
tion
2 is
to
be a
pplie
d, i.
e. t
he d
irect
mon
itorin
g of
GH
G e
mis
sion
red
uctio
n. I
n or
der
to r
ecei
ve d
etai
led
guid
elin
es t
he C
oord
inat
ing
entit
y m
ay, b
ut is
not
obl
iged
to,
app
ly a
ppro
ved
CDM
met
hodo
logy
.
F.
1.1
.1. А
D
ata
to b
e co
llect
ed in
ord
er t
o m
onit
or e
mis
sion
s in
th
e JP
A a
nd
how
th
ese
data
will
be
ach
ieve
d:
Plea
se d
escr
ibe
data
to
be c
olle
cted
and
how
the
y w
ill b
e ar
chiv
ed. D
escr
ibe
all p
aram
eter
s an
d da
ta n
eede
d fo
r es
timat
ion
of G
HG
em
issi
on
redu
ctio
n. I
n ca
se t
here
are
sev
eral
tec
hnol
ogie
s/m
easu
res
incl
uded
into
one
JPA
, ple
ase
desc
ribe
all v
aria
bles
, par
amet
ers,
and
dat
a fo
r ea
ch
tech
nolo
gy/m
easu
re t
hat
are
used
in o
rder
to
calc
ulat
e em
issi
on r
educ
tion.
For
inst
ance
, if
it is
for
esee
n in
the
indi
vidu
al h
ouse
to
chan
ge b
oile
r eq
uipm
ent
that
is o
pera
ting
on t
he f
ossi
l fue
ls t
o th
e eq
uipm
ent
oper
atin
g on
bio
mas
s, a
s w
ell a
s in
stal
l a w
ind
turb
ine
or p
hoto
volta
ic p
anel
, th
en it
Page 72
is r
equi
red
not
only
to
mea
sure
the
rmal
ene
rgy
prod
uced
fro
m b
iom
ass
by t
he b
oile
r, b
ut a
lso
amou
nt o
f el
ectr
icity
gen
erat
ed b
y th
e w
ind
turb
ine
or
phot
ovol
taic
pan
el. F
or e
ach
sepa
rate
cas
e th
e Co
ordi
natin
g en
tity
may
, but
is n
ot o
blig
ed t
o, a
pply
app
rove
d CD
M m
etho
dolo
gy f
or b
asel
ine
sett
ing
and
mon
itorin
g.
Plea
se in
sert
row
s in
the
tab
le if
nee
ded.
Type
А. M
easu
re 1
. – M
onit
orin
g pl
an А
1
ID (
plea
se u
se
num
bers
to e
ase
cros
s-re
fere
ncin
g
to F
.2)
Dat
a
varia
ble
Sour
ce o
f
data
Dat
a un
it M
easu
red
(m),
calc
ulat
ed
(c),
estim
ated
(e)
Rec
ordi
ng
freq
uenc
y
Prop
ortio
n of
data
to
be
mon
itore
d
How
will
the
dat
a
be a
rchi
ved
(ele
ctro
nic/
pape
r)
Com
men
t
…
…
…
…
…
…
…
…
…
Type
А. M
easu
re 2
. – M
onit
orin
g pl
an А
2
ID (
plea
se u
se
num
bers
to e
ase
cros
s-re
fere
ncin
g
to F
.2)
Dat
a
varia
ble
Sour
ce o
f
data
Dat
a un
it M
easu
red
(m),
calc
ulat
ed
(c),
Rec
ordi
ng
freq
uenc
y
Prop
ortio
n of
data
to
be
mon
itore
d
How
will
the
dat
a
be a
rchi
ved
(ele
ctro
nic/
pape
r)
Com
men
t
Page 73
estim
ated
(e)
…
…
…
…
…
…
…
…
…
Type
А. M
easu
re N
. – M
onit
orin
g pl
an А
N
ID (
plea
se u
se
num
bers
to e
ase
cros
s-re
fere
ncin
g
to F
.2)
Dat
a
varia
ble
Sour
ce o
f
data
Dat
a un
it M
easu
red
(m),
calc
ulat
ed
(c),
estim
ated
(e)
Rec
ordi
ng
freq
uenc
y
Prop
ortio
n of
data
to
be
mon
itore
d
How
will
the
dat
a
be a
rchi
ved
(ele
ctro
nic/
pape
r)
Com
men
t
…
…
…
…
…
…
…
…
…
F.
1.1
.2.А
D
escr
ipti
on o
f fo
rmu
lae
use
d to
est
imat
e JP
A e
mis
sion
(fo
r ea
ch t
ype,
gas
, sou
rce;
em
issi
on u
nit
s of
CO
2
equ
ival
ent)
:
>>
Form
ulae
sho
uld
be c
onsi
sten
t th
roug
hout
the
doc
umen
t.
Page 74
F.
1.1
.3.А
Rel
evan
t da
ta n
eces
sary
for
det
erm
inin
g th
e ba
selin
e of
an
thro
poge
nic
em
issi
ons
of G
HG
by
sou
rces
wit
hin
the
JPA
bou
nda
ry, a
nd
how
su
ch d
ata
will
be
colle
cted
an
d ar
chiv
ed:
Plea
se d
escr
ibe
how
dat
a w
ill b
e co
llect
ed a
nd a
rchi
ved.
Ins
ert
row
s in
the
tab
le if
nee
ded.
.
ID (
plea
se u
se
num
bers
to e
ase
cros
s-re
fere
ncin
g
to F
.2)
Dat
a
varia
ble
Sour
ce o
f
data
Dat
a un
it M
easu
red
(m),
calc
ulat
ed
(c),
estim
ated
(e)
Rec
ordi
ng
freq
uenc
y
Prop
ortio
n of
data
to
be
mon
itore
d
How
will
the
dat
a
be a
rchi
ved
(ele
ctro
nic/
pape
r)
Com
men
t
F.
1.1
.4.А
D
escr
ipti
on o
f th
e fo
rmu
lae
use
d to
est
imat
e ba
selin
e em
issi
on (
for
each
gas
, sou
rce
etc.
; em
issi
ons
in
the
un
its
of C
O2
equ
ival
ent)
:
>>
Form
ulae
sho
uld
be c
onsi
sten
t th
roug
hout
the
doc
umen
t.
Page 75
F.
1.2
.А
Opt
ion
2 –
Dir
ect
mon
itor
ing
of e
mis
sion
red
uct
ion
fro
m J
PA
:
>>
Plea
se s
tate
if t
his
sect
ion
is le
ft b
lank
on
purp
ose.
Thi
s se
ctio
n m
ight
be
left
bla
nk, f
or e
xam
ple,
in c
ase
of p
roje
cts
on b
ioga
s co
llect
ion
and
burn
ing
on t
he f
lare
.
F.1
.2.1
.А
Dat
a to
be
colle
cted
in o
rder
to
mon
itor
em
issi
on r
edu
ctio
n f
rom
eac
h J
PA
an
d h
ow t
hes
e da
ta w
ill b
e ar
chiv
ed:
Plea
se d
escr
ibe
how
dat
a w
ill b
e co
llect
ed a
nd m
onito
red.
>>
Type
А. M
easu
re 1
. – M
onit
orin
g pl
an А
1
ID (
plea
se u
se
num
bers
to e
ase
cros
s-re
fere
ncin
g
to F
.2)
Dat
a
varia
ble
Sour
ce o
f
data
Dat
a un
it M
easu
red
(m),
calc
ulat
ed
(c),
est
imat
ed
(e)
Rec
ordi
ng
freq
uenc
y
Prop
ortio
n of
data
to
be
mon
itore
d
How
will
the
data
be
arch
ived
(ele
ctro
nic/
pap
er)
Com
men
t
Page 76
…
…
…
…
…
…
…
…
…
Type
А. M
easu
re 2
. – M
onit
orin
g pl
an А
2
ID (
plea
se u
se
num
bers
to e
ase
cros
s-re
fere
ncin
g
to F
.2)
Dat
a
varia
ble
Sour
ce o
f
data
Dat
a un
it M
easu
red
(m),
calc
ulat
ed
(c),
est
imat
ed
(e)
Rec
ordi
ng
freq
uenc
y
Prop
ortio
n of
data
to
be
mon
itore
d
How
will
the
data
be
arch
ived
(ele
ctro
nic/
pap
er)
Com
men
t
…
…
…
…
…
…
…
…
…
Type
А. M
easu
re N
. – M
onit
orin
g pl
an А
N
ID (
plea
se u
se
num
bers
to e
ase
cros
s-re
fere
ncin
g
to F
.2)
Dat
a
varia
ble
Sour
ce o
f
data
Dat
a un
it M
easu
red
(m),
calc
ulat
ed
(c),
est
imat
ed
(e)
Rec
ordi
ng
freq
uenc
y
Prop
ortio
n of
data
to
be
mon
itore
d
How
will
the
data
be
arch
ived
(ele
ctro
nic/
pap
er)
Com
men
t
Page 77
…
…
…
…
…
…
…
…
…
F.
1.2
.2. D
escr
ipti
on o
f fo
rmu
lae
use
d to
cal
cula
te e
mis
sion
red
uct
ion
fro
m e
ach
typ
e of
JP
A (
for
each
gas
, sou
rce
etc.
;
emis
sion
/em
issi
ons
redu
ctio
n in
СО
2 eq
uiv
alen
t):
>>
Form
ulae
sho
uld
be c
onsi
sten
t th
roug
hout
the
doc
umen
t.
Page 78
F.
1.3
.А
Trea
tmen
t of
leak
age
in t
he
mon
itor
ing
plan
:
F.
1.3
.1.А
P
leas
e de
scri
be t
he
data
an
d in
form
atio
n t
hat
will
be
colle
cted
in o
rder
to
mon
itor
leak
age
effe
cts
of t
he
each
type
of
JPA
:
Leak
age
is g
reen
hous
e ga
s em
issi
ons
that
occ
ur d
ue t
o JP
A im
plem
enta
tion
out
of t
he p
roje
ct’s
bou
ndar
ies.
For
inst
ance
, in
orde
r to
del
iver
equi
pmen
t to
the
ass
embl
y si
te t
rans
port
atio
n se
rvic
es a
re n
eede
d, w
hich
is li
nked
with
use
of
liqui
d fu
els.
Thu
s it
is r
equi
red
to t
ake
into
acc
ount
gree
nhou
se g
as e
mis
sion
s du
e to
tra
nspo
rtat
ion
of e
quip
men
t to
the
ass
embl
y si
te.
Plea
se a
dd r
ows
to t
he t
able
as
need
ed. I
f no
t ap
plic
able
, ple
ase
stat
e so
.
Type
А. M
easu
re 1
. – M
onit
orin
g pl
an А
1
ID (
plea
se u
se
num
bers
to e
ase
cros
s-re
fere
ncin
g
to F
.2)
Dat
a
varia
ble
Sour
ce o
f
data
Dat
a un
it M
easu
red
(m),
calc
ulat
ed (
c),
estim
ated
(e)
Rec
ordi
ng
freq
uenc
y
Prop
ortio
n of
data
to
be
mon
itore
d
How
will
the
data
be
arch
ived
(ele
ctro
nic/
pap
er)
Com
men
t
Page 79
…
…
…
…
…
…
…
…
…
Type
А. M
easu
re 2
. – M
onit
orin
g pl
an А
2
ID (
plea
se u
se
num
bers
to e
ase
cros
s-re
fere
ncin
g
to F
.2)
Dat
a
varia
ble
Sour
ce o
f
data
Dat
a un
it M
easu
red
(m),
calc
ulat
ed (
c),
estim
ated
(e)
Rec
ordi
ng
freq
uenc
y
Prop
ortio
n of
data
to
be
mon
itore
d
How
will
the
data
be
arch
ived
(ele
ctro
nic/
pap
er)
Com
men
t
…
…
…
…
…
…
…
…
…
Type
А. M
easu
re N
. – M
onit
orin
g pl
an А
N
ID (
(ple
ase
use
num
bers
to e
ase
cros
s-re
fere
ncin
g
to F
.2)
Dat
a
varia
ble
Sour
ce o
f
data
Dat
a un
it M
easu
red
(m),
calc
ulat
ed (
c),
estim
ated
(e)
Rec
ordi
ng
freq
uenc
y
Prop
ortio
n of
data
to
be
mon
itore
d
How
will
the
data
be
arch
ived
(ele
ctro
nic/
pap
er)
Com
men
t
Page 80
…
…
…
…
…
…
…
…
…
F.
1.3
.2.А
Des
crip
tion
of
form
ula
e u
sed
to e
stim
ate
leak
age
for
each
typ
e of
JP
A (
for
each
gas
, sou
rce
etc.
; em
issi
ons
in СО
2 eq
uiv
alen
t):
>>
Form
ulae
sho
uld
be c
onsi
sten
t th
roug
hout
the
doc
umen
t.
F.
1.4
.А
Des
crip
tion
of
form
ula
e u
sed
to e
stim
ate
emis
sion
red
uct
ion
s fo
r ea
ch t
ype
of J
PA
(fo
r ea
ch g
as, s
ourc
e et
c.;
emis
sion
red
uct
ion
in u
nit
s of
СО
2 eq
uiv
alen
t):
>>
Form
ulae
sho
uld
be c
onsi
sten
t th
roug
hout
the
doc
umen
t.
Page 81
F.
1.5
.A
Wh
ere
appl
icab
le, i
n a
ccor
dan
ce w
ith
pro
cedu
res
as r
equ
ired
by
the
hos
t P
arty
(ie
s), i
nfo
rmat
ion
on
th
e
colle
ctio
n a
nd
arch
ivin
g of
info
rmat
ion
on
th
e en
viro
nm
enta
l im
pact
s of
th
e ea
ch t
ype
of J
PA
:
>>
Plea
se p
rovi
de in
form
atio
n on
the
col
lect
ion
and
arch
ivin
g of
the
info
rmat
ion
on t
he e
nviro
nmen
tal i
mpa
cts
of t
he p
roje
ct. P
leas
e pr
ovid
e re
fere
nce
to t
he r
elev
ant
host
Par
ty r
egul
atio
n(s)
. If
not
appl
icab
le, s
tate
so.
F.2
.А
Qu
alit
y co
ntr
ol (
QC
) an
d qu
alit
y as
sura
nce
(Q
A)
proc
edu
res
un
dert
aken
for
dat
a m
onit
ored
:
Plea
se r
efer
to
data
con
tain
ed in
sec
tion
D1,
as
appl
icab
le.
Dat
a (in
dica
te ta
ble
and
ID n
umbe
r)
Unc
erta
inty
leve
l of
data
(hig
h/m
ediu
m/lo
w)
Expl
ain
QA/
QC
proc
edur
es p
lann
ed f
or t
hese
dat
a, o
r w
hy s
uch
proc
edur
es a
re n
ot
nece
ssar
y
Page 82
F.3
.А
Nam
e of
per
son
(s)/
enti
ty(i
es)
esta
blis
hed
th
e m
onit
orin
g pl
an:
>>
For
each
follo
win
g ty
pe o
f JPA
, ple
ase
copy
and
pas
te ta
ble
prov
ided
abo
ve in
the
para
grap
hs F
.1.1
- F.
3 an
d ad
d th
e le
tter
indi
catin
g co
rres
pond
ing
type
of J
PA a
t the
end
(fo
r ex
ampl
e, fo
r Ty
pe А
- F
.1.1
.А, F
.1.1
.1. А
, for
Typ
e B
B -
F.1.
1.B,
F.1
.1.1
. B e
tc.
Page 83
SECTION G. DESCRIPTION OF REAL JPA OF EACH TYPE COMPRISING JI POA
Please choose at least one project of each type of JPA and provide information
according to paragraphs G1 – G7 for each type of project.
1. REAL PROJECT JPA TYPE A
G.1. Description of real project of JPA Type А:
Please describe key purpose of the real project for each type of JPA with brief
summary of the following points (max. 1-2 pages):
- Name of the project, type of JPA, to which mentioned project corresponds;
- Situation that was at the place before starting date of the project’s implementation
under the JI PoA;
- Baseline; and
- Project scenario (expected results, including technical description of the project).
Also please describe briefly the history of real projects’ development for each type of
JPA (including joint implementation component).
G.2. Technical description of the project:
G.2.1. Location of the project:
G.2.1.1. Host Party(ies):
>>
G.2.1.2. Oblast/region/etc.:
>>
G.2.1.3. City/Town/Community etc.:
>>
G.2.1.4. Detail of physical location, including information allowing the unique identification of the project (max. 1 page):
Page 84
>>
G.2.2. Technology(ies) to be employed , or measures, operations or actions to be implemented by the project:
Please describe the technology(ies) to be employed, or measures, operations or
actions to be implemented by the project, including all relevant technical data and the
implementation schedule.
G.2.3. Brief explanation of how the anthropogenic emissions of greenhouse gases by sources are to be reduced by the proposed JI project, including why the emission reduction would not occur in the absence of the proposed project:
Please explain briefly how anthropogenic greenhouse gas emission reductions are to be
achieved (details to be provided in section G4) and provide the estimate(s) of
anticipated total reductions in tonnes of CO2 equivalent as determined in section G6.
Max. length: one page.
G.2.4.1. Estimated amount of emission reduction over the crediting period:
Please indicate the length of the crediting period and provide estimates of total as well
as annual emission reductions in tonnes of CO2 equivalent. Information shall be
provided using the following tabular format.
Years
Length of the crediting period
Year Estimate of annual emission reductions in
tonnes of CO2 equivalent.
Page 85
Year А
Year B
Year …
Total estimated emission reductions over
the crediting period (tonnes СО2
equivalent)
Annual average of estimated emission
reductions over the crediting period
(tonnes СО2 equivalent)
G.3. Duration of the project / crediting period
G.3.1. Starting date of the project:
The starting date of JPA project is defined as the commissioning date of equipment
under the project.
Please note that ERUs shall only be issued for a crediting period starting after the
beginning of 2008.
G. 3. 2. Expected operational lifetime of the project:
Please state the expected operational lifetime of the project in years and months.
G.3.3. Length of the crediting period:
Page 86
Please state the length of the crediting period in years and month as well as its starting date.
Please note that ERUs shall only be issued for a crediting period starting after the beginning of 2008 and that the crediting period shall not extent beyond the operational lifetime of the project.
G.4. Baseline for the real project of JPA Type A:
G.4.1 Description and justification of the baseline chosen for a real project
of JPA Type A:
Please describe the baseline chosen for the project including all guidelines presented in
the paragraph Е1.
Please indicate project boundaries defined in the description of the baseline for the
project.
For detailed instructions please use the current version of the JI guidelines for baseline
setting and monitoring.
G.5. Monitoring plan for real project of JPA Type A
Please describe monitoring plan for the project taking in consideration all
recommendations and tables provided in the section F.
G.6. Estimated greenhouse gas emission reductions
Estimations shall be consistent throughout the document.
G.6.1. Estimated project emissions:
Page 87
Please provide estimates of anthropogenic emissions of GHG by sources of the project
within the project boundary (for each gas, source etc.; emissions in units of tonnes of
CO2 equivalent). Alternatively, please provide directly estimated GHG emission
reductions due to the project.
G.6.2. Estimated leakage:
Please provide estimates of any GHG leakage by sources of the project within
boundaries (for each gas, source etc.; emissions in tonnes of СО2 equivalent). If not
applicable, please state so.
G.6.3. The sum of G.6.1. and G.6.2.:
G.6.4. Estimated baseline emissions:
Estimates shall be given for each gas, source etc. (emissions in units of СО2
equivalent).
G.6.5. Difference between G.6.4. and G.6.3, representing the emission reductions of the project:
G.6.6. Table providing values obtained when applying formulae above:
The results of the application of the formulae above shall be indicated using the
following tabular format
Year Estimated
project
emissions
(tonnes of СО2
equivalent)
Estimated
leakage
(tonnes of СО2
equivalent)
Estimated
baseline
emissions
(tonnes of СО2
equivalent)
Estimated
emission
reduction
(tonnes of СО2
equivalent)
Year А
Year B
Page 88
Year …
Total (tonnes
of СО2
equivalent)
G.7. Environmental impacts
G.7.1. Documentation on the analysis of the environmental impacts of the
project, including transboundary impacts, in accordance with procedures as
determined by the host Party (Ukraine):
>>
Please provide environmental impact assessment
G.7.2. If environmental impacts are considered significant by the project participants or the host Party, please provide conclusions and all references to supporting documentation of an environmental impact assessment undertaken in accordance with the procedures as required by the host Party:
>>
Please provide description of the measures foreseen by the project in order to mitigate
possible negative environmental impact.
2. REAL PROJECT OF JPA TYPE B
Please copy and paste headings and tables provided in the sections G1-G7 above.
Page 89
ANNEX 1 – CONTACT INFORMATION
ON COORDINATING ENTITY AND PARTICIPANTS OF THE JI POA
Please fill in the following mandatory fields for each organization listed in the section А.3: organization, name of contact person, street, city, postal code, country, phone and fax or e-mail. Please copy and paste table as needed.
Organisation:
Street/P.O. Box:
Building:
City:
Oblast/Region:
Postal code:
Country:
Phone:
Fax:
E-mail:
URL:
Represented by:
Title:
Salutation:
Last name:
Middle name:
First name:
Page 90
Department:
Phone (direct):
Fax (direct):
Mobile:
Personal e-mail:
Page 91
AN
NEX
2 –
IN
FOR
MA
TIO
N T
AB
LE O
N J
PA
S U
ND
ER T
HE
PR
ESEN
T JI
PO
A
JPAs
incl
uded
in t
he J
I Po
A
JPA
No.
Nam
e
of t
he
JPA
Type
of
the
JPA
Brie
f
sum
mar
y
*
Geo
grap
hica
l
refe
renc
e**
Nam
e an
d
cont
act
deta
il
of t
he p
erso
n
resp
onsi
ble
for
the
oper
atio
n of
the
JPA*
**
Star
ting
date
Leng
th
of t
he
cred
iting
perio
d
Des
crip
tion
of
the
base
line
sett
ing*
***
Des
crip
tion
of t
he
mon
itorin
g
plan
****
*
Estim
atio
n of
emis
sion
red
uctio
n,
tonn
es o
f СО
2
equi
vale
nt/a
nnum
1 2 3 …
Ty
pe А
1 2 3 …
Ty
pe B
Page 92
*
Plea
se p
rovi
de b
rief
sum
mar
y of
tec
hnol
ogie
s /
mea
sure
s im
plem
ente
d un
der
the
give
n JP
A.
**
Plea
se in
dica
te in
whi
ch o
blas
ts, r
egio
ns, ci
ties,
tow
n et
c. t
he J
PA is
to
be im
plem
ente
d.
***
Pr
ovid
e na
me
and
cont
act
info
rmat
ion
(pos
tal a
ddre
ss, t
elep
hone
, e-m
ail)
of t
he p
erso
n re
spon
sibl
e.
****
Pl
ease
use
the
cro
ss-r
efer
enci
ng t
o th
e de
fined
bas
elin
es (
in s
ectio
n E.
3.)
that
are
def
ined
as
I, I
I et
c. F
or e
xam
ple,
B.A
.I. sh
all b
e us
ed f
or
Base
line
I fo
r JP
A Ty
pe A
.
****
* Pl
ease
use
cro
ss-r
efer
enci
ng t
o th
e m
onito
ring
plan
for
def
ined
tec
hnol
ogie
s /
mea
sure
s un
der
the
give
n JP
A (s
ee s
ectio
n F.
1.).
For
exa
mpl
e,
M.A
.1. s
hall
be u
sed
for
mon
itorin
g pl
an f
or M
easu
re 1
und
er J
PA T
ype
A.
1 2 3 …
Ty
pe …
Tota
l
Page 93
ANNEX 3 – BASELINE INFORMATION
a table containing the key elements of the baseline for each type of JPA and/or real projects of each type of JPA (including variables, parameters and data sources).
Please also attach supporting documentation / information.
ANNEX 4 – MONITORING PLAN
Please provide graphs, figures and/or tables containing the key elements of the monitoring plan for each type of JPA and/or real projects of each type of JPA (including variables, parameters and data sources) that will simplify understanding of the monitoring plan.
Please also attach supporting documentation / information.