26 July Tower - 41 El Esraa Street, Lebanon Square, Mohandesein, Giza, Egypt - 12411

T: (+202)-33447421 | Fax (within Egypt): 33024807 | Fax (international): +202-37602357 www.gaco-eg.com [email protected]

Detailed Project List

Page 2: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

1

Contents

Electromechanical………………………………………………………..……………..……..2

Specialized fire suppression systems ………………………………………………..17

HVAC energy saving & heat recovery systems ………………..….…………….24

Power generation……………………………………………………..………………………27

Page 3: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

2

Electromechanical

This section includes mega HVAC projects, sprinkler systems, electrical works, plumbing works, central

kitchens, elevators and building management systems.

Commercial Press Web Printing Units

Cooling System Qalyoub

Project/Location

1987

Completion Year

Design & Build cooling system for printing press machine line Chill rolls & ink drums cooling system for web printing units. System has been in operation 20 hours/day from 1987 to present day. 25 years on from our original system’s commissioning date, a new order was planned for the client’s extension line. This order was cancelled after HEIDELBERG (Germany) representative reported that Gaco’s system (installed in 1987) could operate sufficiently for both the old and new lines. 360 TR total capacity Three water cooled chillers, condenser water pumps, chiller water pumps, cooling towers, controls & wiring, electrical switch board & cables, air separation system, balancing system.

System Description

Carrier Equipment

Al-Ahram Owner

Sabbour Consulting

Consultant

Page 4: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

3

Machine line electrical power cables

Qalyoub printing press phase II

Project/Location

1988

Completion Year

All industrial power cables, bus bars, cable rack & steel piping for HEIDELBERG printing machine lines. All works were inspected by and handed over to HEIDELBERG (Germany) representative.

System Description

Al-Ahram, Heidelberg

Owner/Client

Machine line switchboards

Qalyoub printing press phase II

Project/Location

1989

Completion Year

2000 Ampere low tension switch boards for printing machine lines. All works were inspected by and handed over to HEIDELBERG (Germany) representative.

System Description

Al-Ahram, Heidelberg

Owner/Client

Page 5: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

4

National Leather Factory

Basatin, Egypt

Project/Location

1989

Completion Year

HVAC system for factory and offices

System Description

Carrier

Equipment

National Leather Factory

Owner

Al-Ahram Main Building

Cairo

Project/Location

1990

Completion Year

Design & Supply

Central air conditioning system

750 TR 3 centrifugal chillers, air handling units, fan

coil units, induction unit pumps, cooling towers

System Description

Carrier

Equipment

Al-Ahram

Owner

Page 6: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

5

Commercial Press Phase II

Qalyoub

Location

1992, 1994

Completion Year

Design & Build Central air conditioning for printing halls &

offices and industrial power cables.

1,800 TR 4 water cooled centrifugal chillers

21 AHUs up to 63000 CFM 4 condenser water pumps

4 chilled water pumps 2 cooling towers

Control & electrical switchboards Humidity control system

Energy recovery system for outside/return air

System Description

Carrier, Trane

Equipment

Al-Ahram

Owner

Sabbour Consulting

Consultant

Page 7: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

6

Commercial Press II air conditioning Extension

Qalyoub

Project/Location

1995, 1996

Completion Year

Design & Build Central air conditioning for offices and storage areas.

450TR

12 AHUs 2 chilled water pumps

2 condenser water pumps 1 cooling tower control Air separator system &

humidity control system.

System Description

Trane

Equipment

Al-Ahram

Owner

Al Akhbar printing press

6th of October city

Project/Location

1995

Completion Year

HVAC system 1200TR

System Description

Carrier, ITT, Marley, Honeywell, Bell & Gosett

Equipment

Al Akhbar Owner

Sabbour Consulting

Consultant

Page 8: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

7

Al-Ahram Admin Building

Cairo

Project/Location

1997 - 2001

Completion Year

Mechanical, electrical and plumbing works for phases B and C. - Central kitchens - Drinking water system - Sewage system - Elevators - Firefighting systems - Diesel generator - Control systems - HVAC system (1600TR)

System Description

Otis (France), Mather & Platt (France), Perkins

(UK), Honeywell, ITT, Bell & Gossett, Crane, Marley, Trane, McQuay, Carrier

Equipment

Al-Ahram

Owner

Sabbour Consulting

Consultant

Printing Press, Al-Galaa

Project/Location

1998

Completion Year

Design & Build HVAC system 1200TR

3 water cooled centrifugal chillers

System Description

Carrier, Trane , Crane , Marley , ITT, Bell & Gossett

Equipment

Al-Ahram

Owner

Page 9: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

8

Printing area

6th of October city

Project/Location

1999, 2000

Completion Year

Mechanical and electrical works. HVAC for printing halls, mailing

rooms and commercial press offices.

3,300 TR 6 water cooled centrifugal chillers

36 AHUs 6 water pumps

5 cooling towers Control and wiring

Electrical switchboards and cables Water treatment system

Building management system with satellite monitoring in central Cairo.

System Description

Trane, Honeywell

Equipment

Al-Ahram

Owner

Sabbour Consulting

Consultant

Page 10: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

9

Printing Press Extension

6th of October City

Project/Location

2001

Completion Year

Design & Build Central air conditioning for switch

board control room, internet room & zinc plate making room.

350TR

2 screw chillers pumps, cooling tower, insulation &

aluminum cladding

Controls & integrated building management system

System Description

Trane, Honeywell

Equipment

Al-Ahram

Owner

-

Main Contractor

Sabbour

Consultant

Page 11: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

10

KATO Administration Building

Location

2003

Completion Year

Design & Build

180TR Air cooled chiller with 65 Trane FCU

System Description

Trane, ITT Pumps

Equipment

Kato

Owner

Qalyoub press Phase I Central air conditioning

Location

2004

Completion Year

Design & Build

1500TR HVAC system 3 centrifugal chillers

18 AHUs 6 pumps

Energy recovery system for fresh air

System Description

Carrier, Maquay, Bell & Gossett

Equipment

Al-Ahram

Owner

Page 12: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

11

Canadian University Phase I

6th of October City

Location

2005 Completion Year

Partial Design & Build

1,680 TR HVAC system

Water cooled liquid chillers Firefighting (sprinkler) system

20 Firefighting boxes 86 cylinder INERGEN system

Elevators Standby diesel generator

System Description

Carrier, Mather & Platt, Ansul, Schindler,

Perkins

Equipment

Canadian University

Owner

Jet Main Contractor

Sabbour Consulting Consultant

Canadian University Phase II

6th of October City

Location

2006, 2007 Completion Year

Design & Build 1,120 TR HVAC system

Elevators

System Description

Carrier, Schindler

Equipment

Canadian University Owner

Jet Main Contractor

Page 13: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

12

Interactive Studios Phase I

Cairo

Project/Location

2007

Completion Year

225 TR HVAC system 4 air cooled condensing units

4 AHUs 28 split units for VIP rooms

Sound silencers for filming studio

System Description

PETRA, Carrier

Equipment

ABC Owner

Sabbour Consulting Consultant

Interactive Studios Phase II

Cairo

Project/Location

2008

Completion Year

112.5 TR HVAC system 2 air cooled condensing units

2 AHUs Sound silencers for filming studio

System Description

PETRA

Equipment

ABC

Owner

Sabbour Consulting Consultant

Page 14: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

13

Katameya Sporting

Cairo

Project/Location

2009

Completion Year

45 TR HVAC system Air cooled condensing units

5 AHUs 45 split units

System Description

Carrier, EGAT

Equipment

AL Ahly For Real Estate Development

Owner

Sabbour Consulting

Consultant

ABC Administration Building

Smart Village, Cairo

Project/Location

2009

Completion Year

78 TR HVAC system 9 AHUs with chilled water pipe lines &

air ducts

System Description

EGAT

Equipment

ABC

Owner

Sabbour Consulting

Consultant

Page 15: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

14

Etisalat Misr New Building 5th Settlement New Cairo

Project/Location

2010

Completion Year

360 FCU with chilled water pipe lines and air ducts

8 fans with ductwork

System Description

SAIVER

Equipment

Etisalat Misr

Owner

Al Safwa Main Contractor

Akadima

Drug Factory & Research Center Obour City

Project/Location

2011

Completion Year

Central 500 TR HVAC system 2 air cooled chillers

12 AHUs 86 FCUs

3 chilled water pumps

System Description

SAIVER, Trane & Paco

Equipment

Akadima drug factory Owner

Contrade Main Contractor

Page 16: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

15

Link Administration Building

Smart Village, Cairo

Project/Location

2012

Completion Year

60 TR HVAC system 5 AHUs with chilled water pipe lines

System Description

EGAT

Equipment

Link

Owner

Sabbour Consulting

Consultant

Limak Insaat Camp

Cairo International Airport

Project/Location

2013

Completion Year

117 split units

System Description

Galanz

Equipment

Limak Insaat

Owner

Page 17: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

16

Platinum Club

New Cairo

Project/Location

2016

Completion Year

250 TR HVAC system 5 AHUs

12 DX units

System Description

Carrier, S&P fans

Equipment

Al Ahly For Real Estate Development

Owner

Contrade

Main Contractor

Sabbour Consulting

Consultant

Page 18: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

17

Specialized Fire Suppression Systems

Al-Ahram New Building, Cairo

Location

2001

Completion Year

Design & Build

INERGEN Firefighting system 300 Cylinders

for computer, switch cabinet and transformer rooms.

System Description

Ansul

Equipment

Al-Ahram

Owner

Page 19: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

18

Main printing press

Cairo

Location

2002

Completion Year

Design & Build

10 Ton LP CO2 local application fire system (alarm, detection, suppression)

System Description

Ansul / Tyco

Equipment

Al-Akhbar

Owner

Press complex & paper warehouse

of October City th6

Location

2003

Completion Year

Design & Build

76 Ton LP CO2 total flooding & local application fire system

(alarm, detection, suppression)

System Description

Ansul / Tyco

Equipment

Al-Ahram

Owner

Page 20: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

19

Qalyoub Paper Warehouse

Location

2004

Completion Year

Design & Build

46 Ton LP CO2 total flooding fire system (alarm / detection / suppression)

System Description

Ansul / Tyco

Equipment

Al-Ahram

Owner

Amreya Paper Warehouse

Location

2005

Completion Year

Design & Build 42 Ton LP CO2 total flooding system

(alarm / detection / suppression)

System Description

Ansul / Tyco

Equipment

Al-Ahram

Owner

Page 21: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

20

Qalyoub Printing Press Phase II

Location

2005

Completion Year

Design & Build

34 Ton LP CO2 system 130 cylinders INERGEN system

Alarm & detection system

System Description

Ansul / Tyco

Equipment

Al-Ahram

Owner

Canadian University Phase II

6th of October City

Location

2007

Completion Year

Design & Build 44 cylinder INERGEN system

System Description

Ansul

Equipment

Canadian University

Owner

Page 22: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

21

Qalyoub Printing Press Phase I

Location

2008

Completion Year

Design & Build

480 cylinder INERGEN system

System Description

Ansul

Equipment

Al-Ahram

Owner

Agricultural Pump Station

Anshass

Location

2009

Completion Year

18 cylinder CO2 system

Alarm & detection system

System Description

Ansul, Honeywell, System Sensor

Equipment

Arab Engineers Association

Owner

Abd El Hakeem Mohamed Mansour Office

Consultant

Page 23: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

22

Cairo Oil Refining Company

Location

2015

Completion Year

Alarm & detection system

System Description

Notifier, Honeywell

Equipment

Cairo Oil Refining Company (CORC)

Owner

CORC Refining Station, Tanta

Location

2016

Completion Year

77 cylinder CO2 system

Alarm & detection system

System Description

SIEX

Notifier Honeywell

Equipment

Cairo Oil Refining Company

Owner

Page 24: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

23

PPC Storage and distribution station

El Tebeen, Cairo

Location

2016

Completion Year

Foam System

1200 Gallon bladder tank system 600 Gallon bladder tank system

Alarm & detection system

Testing and commissioning carried out by National Foam (USA) representative.

System Description

National Foam

Notifier, Honeywell MEDC

Equipment

Petroleum Pipelines Company (PPC)

Owner

Page 25: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

24

HVAC Energy Saving & Heat Recovery Systems

Energy recovery system

Commercial Press Phase II Qalyoub

Project/Location

1994

Completion Year

Design & Build Energy recovery system for 1,350TR

HVAC system

Central air conditioning exhaust air was recovered for use in a 2-stage

evaporative cooling process. Energy savings were achieved by using this process to cool the system fresh air

intake.

System Description

SPEC-AIR

Equipment

Al-Ahram

Owner

Page 26: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

25

Energy recovery system

Qalyoub Phase I central air conditioning

Location/project

2004

Completion Year

Design & Build

Energy recovery system for 1,500TR HVAC system

To solve the problem of heavy smell of

ink in the printing press, evaporative coolers were used on the fresh air

supply to increase fresh air percentage to 50% while keeping chiller loading

constant at 70%. Thus, solving the issue at minimal extra cost to the client.

System Description

SPEC-AIR

Equipment

Al-Ahram

Owner

Page 27: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

26

United Sugar Company, Ain EL Sokhna, Egypt

Project/Location

2015

Completion Year

Design & Build

AC system for raw sugar melting stage 4 Evaporative Cooling systems

6 booster fans

System Description

AIR2O, Munters

Equipment

SAVOLA / United Sugar Company

Owner

--

Main Contractor

--

Consultant

Page 28: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

27

Power Generation

6th of October printing press

Diesel Plant

Location/project

2000

Completion Year

Design & Build 5000 KVA standby generator

Two diesel engines 2500 KVA capacity with remote radiator, ATS,

synchronization, load banks etc.

Commissioning carried out by manufacturer representative (France).

System Description

Houvenaghel, 2HEnergy (France)

Equipment

Al-Ahram

Owner

Sabbour Consulting

Consultant

Page 29: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project

Detailed Project List

28

Canadian University Phase I

6th of October City

Location

2005

Completion Year

440KVA standby generator with ATS

System Description

Perkins (UK)

Equipment

Canadian University

Owner

Sabbour Consulting

Consultant

Al-Ahram Admin Building

Location

2001

Completion Year

1000KVA standby generator with ATS for phases B and C.

System Description

Perkins (UK)

Equipment

Al-Ahram

Owner

Sabbour Consulting

Consultant

Page 30: Detailed Project List - Amazon Web Services · Detailed Project List. ... Project/Location Completion Year 2008 112.5 TR HVAC system 2 air cooled condensing units ... Detailed Project