26 July Tower - 41 El Esraa Street, Lebanon Square, Mohandesein, Giza, Egypt - 12411
T: (+202)-33447421 | Fax (within Egypt): 33024807 | Fax (international): +202-37602357 www.gaco-eg.com [email protected]
Detailed Project List
Detailed Project List
1
Contents
Electromechanical………………………………………………………..……………..……..2
Specialized fire suppression systems ………………………………………………..17
HVAC energy saving & heat recovery systems ………………..….…………….24
Power generation……………………………………………………..………………………27
Detailed Project List
2
Electromechanical
This section includes mega HVAC projects, sprinkler systems, electrical works, plumbing works, central
kitchens, elevators and building management systems.
Commercial Press Web Printing Units
Cooling System Qalyoub
Project/Location
1987
Completion Year
Design & Build cooling system for printing press machine line Chill rolls & ink drums cooling system for web printing units. System has been in operation 20 hours/day from 1987 to present day. 25 years on from our original system’s commissioning date, a new order was planned for the client’s extension line. This order was cancelled after HEIDELBERG (Germany) representative reported that Gaco’s system (installed in 1987) could operate sufficiently for both the old and new lines. 360 TR total capacity Three water cooled chillers, condenser water pumps, chiller water pumps, cooling towers, controls & wiring, electrical switch board & cables, air separation system, balancing system.
System Description
Carrier Equipment
Al-Ahram Owner
Sabbour Consulting
Consultant
Detailed Project List
3
Machine line electrical power cables
Qalyoub printing press phase II
Project/Location
1988
Completion Year
All industrial power cables, bus bars, cable rack & steel piping for HEIDELBERG printing machine lines. All works were inspected by and handed over to HEIDELBERG (Germany) representative.
System Description
Al-Ahram, Heidelberg
Owner/Client
Machine line switchboards
Qalyoub printing press phase II
Project/Location
1989
Completion Year
2000 Ampere low tension switch boards for printing machine lines. All works were inspected by and handed over to HEIDELBERG (Germany) representative.
System Description
Al-Ahram, Heidelberg
Owner/Client
Detailed Project List
4
National Leather Factory
Basatin, Egypt
Project/Location
1989
Completion Year
HVAC system for factory and offices
System Description
Carrier
Equipment
National Leather Factory
Owner
Al-Ahram Main Building
Cairo
Project/Location
1990
Completion Year
Design & Supply
Central air conditioning system
750 TR 3 centrifugal chillers, air handling units, fan
coil units, induction unit pumps, cooling towers
System Description
Carrier
Equipment
Al-Ahram
Owner
Detailed Project List
5
Commercial Press Phase II
Qalyoub
Location
1992, 1994
Completion Year
Design & Build Central air conditioning for printing halls &
offices and industrial power cables.
1,800 TR 4 water cooled centrifugal chillers
21 AHUs up to 63000 CFM 4 condenser water pumps
4 chilled water pumps 2 cooling towers
Control & electrical switchboards Humidity control system
Energy recovery system for outside/return air
System Description
Carrier, Trane
Equipment
Al-Ahram
Owner
Sabbour Consulting
Consultant
Detailed Project List
6
Commercial Press II air conditioning Extension
Qalyoub
Project/Location
1995, 1996
Completion Year
Design & Build Central air conditioning for offices and storage areas.
450TR
12 AHUs 2 chilled water pumps
2 condenser water pumps 1 cooling tower control Air separator system &
humidity control system.
System Description
Trane
Equipment
Al-Ahram
Owner
Al Akhbar printing press
6th of October city
Project/Location
1995
Completion Year
HVAC system 1200TR
System Description
Carrier, ITT, Marley, Honeywell, Bell & Gosett
Equipment
Al Akhbar Owner
Sabbour Consulting
Consultant
Detailed Project List
7
Al-Ahram Admin Building
Cairo
Project/Location
1997 - 2001
Completion Year
Mechanical, electrical and plumbing works for phases B and C. - Central kitchens - Drinking water system - Sewage system - Elevators - Firefighting systems - Diesel generator - Control systems - HVAC system (1600TR)
System Description
Otis (France), Mather & Platt (France), Perkins
(UK), Honeywell, ITT, Bell & Gossett, Crane, Marley, Trane, McQuay, Carrier
Equipment
Al-Ahram
Owner
Sabbour Consulting
Consultant
Printing Press, Al-Galaa
Project/Location
1998
Completion Year
Design & Build HVAC system 1200TR
3 water cooled centrifugal chillers
System Description
Carrier, Trane , Crane , Marley , ITT, Bell & Gossett
Equipment
Al-Ahram
Owner
Detailed Project List
8
Printing area
6th of October city
Project/Location
1999, 2000
Completion Year
Mechanical and electrical works. HVAC for printing halls, mailing
rooms and commercial press offices.
3,300 TR 6 water cooled centrifugal chillers
36 AHUs 6 water pumps
5 cooling towers Control and wiring
Electrical switchboards and cables Water treatment system
Building management system with satellite monitoring in central Cairo.
System Description
Trane, Honeywell
Equipment
Al-Ahram
Owner
Sabbour Consulting
Consultant
Detailed Project List
9
Printing Press Extension
6th of October City
Project/Location
2001
Completion Year
Design & Build Central air conditioning for switch
board control room, internet room & zinc plate making room.
350TR
2 screw chillers pumps, cooling tower, insulation &
aluminum cladding
Controls & integrated building management system
System Description
Trane, Honeywell
Equipment
Al-Ahram
Owner
-
Main Contractor
Sabbour
Consultant
Detailed Project List
10
KATO Administration Building
Location
2003
Completion Year
Design & Build
180TR Air cooled chiller with 65 Trane FCU
System Description
Trane, ITT Pumps
Equipment
Kato
Owner
Qalyoub press Phase I Central air conditioning
Location
2004
Completion Year
Design & Build
1500TR HVAC system 3 centrifugal chillers
18 AHUs 6 pumps
Energy recovery system for fresh air
System Description
Carrier, Maquay, Bell & Gossett
Equipment
Al-Ahram
Owner
Detailed Project List
11
Canadian University Phase I
6th of October City
Location
2005 Completion Year
Partial Design & Build
1,680 TR HVAC system
Water cooled liquid chillers Firefighting (sprinkler) system
20 Firefighting boxes 86 cylinder INERGEN system
Elevators Standby diesel generator
System Description
Carrier, Mather & Platt, Ansul, Schindler,
Perkins
Equipment
Canadian University
Owner
Jet Main Contractor
Sabbour Consulting Consultant
Canadian University Phase II
6th of October City
Location
2006, 2007 Completion Year
Design & Build 1,120 TR HVAC system
Elevators
System Description
Carrier, Schindler
Equipment
Canadian University Owner
Jet Main Contractor
Detailed Project List
12
Interactive Studios Phase I
Cairo
Project/Location
2007
Completion Year
225 TR HVAC system 4 air cooled condensing units
4 AHUs 28 split units for VIP rooms
Sound silencers for filming studio
System Description
PETRA, Carrier
Equipment
ABC Owner
Sabbour Consulting Consultant
Interactive Studios Phase II
Cairo
Project/Location
2008
Completion Year
112.5 TR HVAC system 2 air cooled condensing units
2 AHUs Sound silencers for filming studio
System Description
PETRA
Equipment
ABC
Owner
Sabbour Consulting Consultant
Detailed Project List
13
Katameya Sporting
Cairo
Project/Location
2009
Completion Year
45 TR HVAC system Air cooled condensing units
5 AHUs 45 split units
System Description
Carrier, EGAT
Equipment
AL Ahly For Real Estate Development
Owner
Sabbour Consulting
Consultant
ABC Administration Building
Smart Village, Cairo
Project/Location
2009
Completion Year
78 TR HVAC system 9 AHUs with chilled water pipe lines &
air ducts
System Description
EGAT
Equipment
ABC
Owner
Sabbour Consulting
Consultant
Detailed Project List
14
Etisalat Misr New Building 5th Settlement New Cairo
Project/Location
2010
Completion Year
360 FCU with chilled water pipe lines and air ducts
8 fans with ductwork
System Description
SAIVER
Equipment
Etisalat Misr
Owner
Al Safwa Main Contractor
Akadima
Drug Factory & Research Center Obour City
Project/Location
2011
Completion Year
Central 500 TR HVAC system 2 air cooled chillers
12 AHUs 86 FCUs
3 chilled water pumps
System Description
SAIVER, Trane & Paco
Equipment
Akadima drug factory Owner
Contrade Main Contractor
Detailed Project List
15
Link Administration Building
Smart Village, Cairo
Project/Location
2012
Completion Year
60 TR HVAC system 5 AHUs with chilled water pipe lines
System Description
EGAT
Equipment
Link
Owner
Sabbour Consulting
Consultant
Limak Insaat Camp
Cairo International Airport
Project/Location
2013
Completion Year
117 split units
System Description
Galanz
Equipment
Limak Insaat
Owner
Detailed Project List
16
Platinum Club
New Cairo
Project/Location
2016
Completion Year
250 TR HVAC system 5 AHUs
12 DX units
System Description
Carrier, S&P fans
Equipment
Al Ahly For Real Estate Development
Owner
Contrade
Main Contractor
Sabbour Consulting
Consultant
Detailed Project List
17
Specialized Fire Suppression Systems
Al-Ahram New Building, Cairo
Location
2001
Completion Year
Design & Build
INERGEN Firefighting system 300 Cylinders
for computer, switch cabinet and transformer rooms.
System Description
Ansul
Equipment
Al-Ahram
Owner
Detailed Project List
18
Main printing press
Cairo
Location
2002
Completion Year
Design & Build
10 Ton LP CO2 local application fire system (alarm, detection, suppression)
System Description
Ansul / Tyco
Equipment
Al-Akhbar
Owner
Press complex & paper warehouse
of October City th6
Location
2003
Completion Year
Design & Build
76 Ton LP CO2 total flooding & local application fire system
(alarm, detection, suppression)
System Description
Ansul / Tyco
Equipment
Al-Ahram
Owner
Detailed Project List
19
Qalyoub Paper Warehouse
Location
2004
Completion Year
Design & Build
46 Ton LP CO2 total flooding fire system (alarm / detection / suppression)
System Description
Ansul / Tyco
Equipment
Al-Ahram
Owner
Amreya Paper Warehouse
Location
2005
Completion Year
Design & Build 42 Ton LP CO2 total flooding system
(alarm / detection / suppression)
System Description
Ansul / Tyco
Equipment
Al-Ahram
Owner
Detailed Project List
20
Qalyoub Printing Press Phase II
Location
2005
Completion Year
Design & Build
34 Ton LP CO2 system 130 cylinders INERGEN system
Alarm & detection system
System Description
Ansul / Tyco
Equipment
Al-Ahram
Owner
Canadian University Phase II
6th of October City
Location
2007
Completion Year
Design & Build 44 cylinder INERGEN system
System Description
Ansul
Equipment
Canadian University
Owner
Detailed Project List
21
Qalyoub Printing Press Phase I
Location
2008
Completion Year
Design & Build
480 cylinder INERGEN system
System Description
Ansul
Equipment
Al-Ahram
Owner
Agricultural Pump Station
Anshass
Location
2009
Completion Year
18 cylinder CO2 system
Alarm & detection system
System Description
Ansul, Honeywell, System Sensor
Equipment
Arab Engineers Association
Owner
Abd El Hakeem Mohamed Mansour Office
Consultant
Detailed Project List
22
Cairo Oil Refining Company
Location
2015
Completion Year
Alarm & detection system
System Description
Notifier, Honeywell
Equipment
Cairo Oil Refining Company (CORC)
Owner
CORC Refining Station, Tanta
Location
2016
Completion Year
77 cylinder CO2 system
Alarm & detection system
System Description
SIEX
Notifier Honeywell
Equipment
Cairo Oil Refining Company
Owner
Detailed Project List
23
PPC Storage and distribution station
El Tebeen, Cairo
Location
2016
Completion Year
Foam System
1200 Gallon bladder tank system 600 Gallon bladder tank system
Alarm & detection system
Testing and commissioning carried out by National Foam (USA) representative.
System Description
National Foam
Notifier, Honeywell MEDC
Equipment
Petroleum Pipelines Company (PPC)
Owner
Detailed Project List
24
HVAC Energy Saving & Heat Recovery Systems
Energy recovery system
Commercial Press Phase II Qalyoub
Project/Location
1994
Completion Year
Design & Build Energy recovery system for 1,350TR
HVAC system
Central air conditioning exhaust air was recovered for use in a 2-stage
evaporative cooling process. Energy savings were achieved by using this process to cool the system fresh air
intake.
System Description
SPEC-AIR
Equipment
Al-Ahram
Owner
Detailed Project List
25
Energy recovery system
Qalyoub Phase I central air conditioning
Location/project
2004
Completion Year
Design & Build
Energy recovery system for 1,500TR HVAC system
To solve the problem of heavy smell of
ink in the printing press, evaporative coolers were used on the fresh air
supply to increase fresh air percentage to 50% while keeping chiller loading
constant at 70%. Thus, solving the issue at minimal extra cost to the client.
System Description
SPEC-AIR
Equipment
Al-Ahram
Owner
Detailed Project List
26
United Sugar Company, Ain EL Sokhna, Egypt
Project/Location
2015
Completion Year
Design & Build
AC system for raw sugar melting stage 4 Evaporative Cooling systems
6 booster fans
System Description
AIR2O, Munters
Equipment
SAVOLA / United Sugar Company
Owner
--
Main Contractor
--
Consultant
Detailed Project List
27
Power Generation
6th of October printing press
Diesel Plant
Location/project
2000
Completion Year
Design & Build 5000 KVA standby generator
Two diesel engines 2500 KVA capacity with remote radiator, ATS,
synchronization, load banks etc.
Commissioning carried out by manufacturer representative (France).
System Description
Houvenaghel, 2HEnergy (France)
Equipment
Al-Ahram
Owner
Sabbour Consulting
Consultant
Detailed Project List
28
Canadian University Phase I
6th of October City
Location
2005
Completion Year
440KVA standby generator with ATS
System Description
Perkins (UK)
Equipment
Canadian University
Owner
Sabbour Consulting
Consultant
Al-Ahram Admin Building
Location
2001
Completion Year
1000KVA standby generator with ATS for phases B and C.
System Description
Perkins (UK)
Equipment
Al-Ahram
Owner
Sabbour Consulting
Consultant
Detailed Project List