Ahmed HASSAN Technical career profile Senior Environmental Consultant / Project Manager August 16, 2015 Ahmed HASSAN Senior Environmental Consultant Professional Career Profile Preface This document was prepared and submitted on August 16, 2015 to present my technical career profile. The document is including several sections presenting several professional skills as shown in the following table of contents. Table of Contents Preface ....................................................................................................................................... 1 1.0 Summary ......................................................................................................................... 2 2.0 Personal Information ...................................................................................................... 2 3.0 Core Experience .............................................................................................................. 2 4.0 Sectors Experience & Exposure ....................................................................................... 3 5.0 Employment History ....................................................................................................... 3 6.0 Key Skills .......................................................................................................................... 5 7.0 Key Clients ....................................................................................................................... 5 8.0 Experience & Technical Skills .......................................................................................... 5 8.1 Qualification .................................................................................................................... 5 8.2 Technical Skills................................................................................................................. 6 8.3 Project Management Skills.............................................................................................. 6 8.4 Managerial & Leadership Skills ....................................................................................... 7 9.0 List of Executed Projects ................................................................................................. 7 Oil and gas projects ................................................................................................................... 7 Roadway Projects ...................................................................................................................... 8 Construction developmental projects ....................................................................................... 8 Power & Desalination Projects .................................................................................................. 9 Ports & Marine Projects ............................................................................................................ 9 Environmental Auditing Projects ............................................................................................... 9 10.0 Declaration ...................................................................................................................... 9 Page 1 of 9

Detailed Professional Profile (Ahmed HASSAN)

Embed Size (px)

Citation preview

Page 1: Detailed Professional Profile (Ahmed HASSAN)

Ahmed HASSAN Technical career profile Senior Environmental Consultant / Project Manager August 16, 2015

Ahmed HASSAN Senior Environmental Consultant Professional Career Profile Preface This document was prepared and submitted on August 16, 2015 to present my technical career profile. The document is including several sections presenting several professional skills as shown in the following table of contents.

Table of Contents

Preface ....................................................................................................................................... 1 1.0 Summary ......................................................................................................................... 2 2.0 Personal Information ...................................................................................................... 2 3.0 Core Experience .............................................................................................................. 2 4.0 Sectors Experience & Exposure ....................................................................................... 3 5.0 Employment History ....................................................................................................... 3 6.0 Key Skills .......................................................................................................................... 5 7.0 Key Clients ....................................................................................................................... 5 8.0 Experience & Technical Skills .......................................................................................... 5 8.1 Qualification .................................................................................................................... 5 8.2 Technical Skills ................................................................................................................. 6 8.3 Project Management Skills .............................................................................................. 6 8.4 Managerial & Leadership Skills ....................................................................................... 7 9.0 List of Executed Projects ................................................................................................. 7 Oil and gas projects ................................................................................................................... 7 Roadway Projects ...................................................................................................................... 8 Construction developmental projects ....................................................................................... 8 Power & Desalination Projects .................................................................................................. 9 Ports & Marine Projects ............................................................................................................ 9 Environmental Auditing Projects ............................................................................................... 9 10.0 Declaration ...................................................................................................................... 9

Page 1 of 9

Page 2: Detailed Professional Profile (Ahmed HASSAN)

Ahmed HASSAN Technical career profile Senior Environmental Consultant / Project Manager August 16, 2015

1.0 Summary Ahmed HASSAN is a senior environmental professional with more than Fourteen (14) years of experience in the field of industry, environmental consultancy, Regulatory compliance, Assessment, Permitting, Planning, Auditing, Monitoring and Management. 2.0 Personal Information Name Ahmed HASSAN Date of Birth January 2, 1978 Education - Bachelor of Science in Chemistry and Microbiology (1996 – 2000),

Zagazig University, Egypt. GPA 2.67 - Post Graduate Diploma of Applied Microbiology (2003). - Pre-Master of Marin Ecology (2015) - Mater Degree in Marine Ecology (going on, expected 2017)

Work Shops - Enhancement of EIA system in the Stat of Kuwait – Kuwait Environment Public Authority and World Bank

Training - Hydrodynamic Modeling Introduction - ISO 14001:2004 and ISO 18001:2007 (OHSAS) internal auditor;

- General Safe Work Practices – Site Orientation;

- Defensive Driving;

- Personal Protective Equipment (PPE);

- Incident Investigation and Reporting;

- Emergency Preparedness and Response; and

- Hydrogen Sulfide Awareness.

- Hazard Analysis: Hazard Identification and Control including Job Hazard Analysis and Job Safety for Supervisors down to Work Team Leader and Safety Representative.

Member Ship - Egyptian Syndicate Of Scientific Professions Nationality Egyptian Mobile +965 99145540 Email [email protected] 3.0 Core Experience

• Environmental Impact Assessment • Air quality assessment simulation and modeling studies • Noise assessment simulation and modeling studies • Environmental Baseline Studies • Phase I: Environmental Site Assessment • Phase II: Environmental Site Assessment • Environmental Management Planning

Page 2 of 9

Page 3: Detailed Professional Profile (Ahmed HASSAN)

Ahmed HASSAN Technical career profile Senior Environmental Consultant / Project Manager August 16, 2015

• Environmental Monitoring Planning • Environmental Auditing

4.0 Sectors Experience & Exposure • Onshore oil and gas development industry • Offshore oil and gas development industry • Environmental remediation projects of impacted areas • Industrial areas and zones • Power generation • Water desalination • Highways and roads • Mega construction projects • Coastal touristic and entertainment

5.0 Employment History

PROFESSIONAL EXPERIENCES/EMPLOYMENT HISTORY:

PERIOD: DESIGNATION EMPLOYER’S

NAME & ADDRESS DUTIES from To

1/2001 12/2002

Lab Specialist Obour Hospital – Egypt

Supervise/Perform lab operation duties including applying the quality standards and Environmental complying actions.

2 years

4/2004 8/2006

Chemist United Beverage – Kuwait

- Operation and Quality Control of water treatment plant.

- Apply Environmental Compliance actions. 2 years, 5 months

9/2006 9/2007

Chemist Ali Abdul Wahab – Kuwait - Business Development

1 year

1/2006 2/2010 Environmental Specialist

Al-Diwan United For General Trade & Contracting – HSE Dep. - Kuwait

- Environmental Impact Assessment

- Environmental Baseline Studies - Environmental Auditing

4 years, 2 months

5/2010 9/2013 Environmental Engineer

Wataniya Environmental Services Co.

- Environmental Impact Assessment

- Environmental Baseline Studies - Phase I: Environmental Site

3 years, 5 months

Page 3 of 9

Page 4: Detailed Professional Profile (Ahmed HASSAN)

Ahmed HASSAN Technical career profile Senior Environmental Consultant / Project Manager August 16, 2015

PROFESSIONAL EXPERIENCES/EMPLOYMENT HISTORY:

PERIOD: DESIGNATION EMPLOYER’S

NAME & ADDRESS DUTIES from To

Assessment - Phase II: Environmental Site

Assessment - Environmental Management

Planning - Environmental Monitoring

Planning - Environmental Auditing - Business Development

10/2013 Present

Senior Environmental Consultant / Project Manager

Kadhema Scientific Consultancy and Services - Kuwait

- Environmental Impact Assessment

- Environmental Baseline Studies - Phase I: Environmental Site

Assessment - Phase II: Environmental Site

Assessment - Environmental Management

Planning - Environmental Monitoring

Planning - Environmental Auditing - Prepare and submit technical

deliverables - Interprets environmental

regulations and ensure completion of projects in compliance with applicable environmental laws and regulations

- communicate with regulatory agencies

- Establishing environmental requirements and Terms of References and scope of works

- Setting and maintaining project schedules and budgets; Evaluate/Select/Procure/Managing the subcontractors.

Page 4 of 9

Page 5: Detailed Professional Profile (Ahmed HASSAN)

Ahmed HASSAN Technical career profile Senior Environmental Consultant / Project Manager August 16, 2015

6.0 Key Skills • Prepare and submit robust technical deliverables within pre-identified projects

execution schedules. • Systematic review of FEED and detailed designs to identify and address potential

environment impacts. • Interprets environmental regulations and ensure completion of projects in

compliance with applicable environmental laws and regulations. • Ability to effectively communicate with regulatory agencies and relevant

governmental entities. • Establishing environmental requirements and Terms of References and scope of

works. • Participate in short and long range planning. • Successful and efficient manage/execute of large environmental consultancy

contracts exceeding 2,000,000 US$. • Setting and maintaining project schedules and budgets;

Evaluate/Select/Procure/Managing the subcontractors. • Able to demonstrate environmental permitting based on knowledge of applicable

environmental regulations and permit requirements. • Noise Modeling (Software: Sound Plan). • Prepare and monitor Environmental Key Performance Indicators (eKPIs) • Works in business development activities and maintaining client relationships.

7.0 Key Clients Kuwait Oil Company (KOC), Kuwait National Petroleum Company, Kuwait Gulf Oil Company, ARAMCO Gulf Operations Company (AGOC), Saudi Arabian Chevron, WorleyParsons, AMEC, FLUOR, TECHNIP, GS Engineering & Construction (GS E&C), HALCRAW, URS, COWI, SAIPEM, SK E&C, HDEDC and other main EPC contractors. 8.0 Experience & Technical Skills This section was written to include separated sub-sections in order to present technical, management and commercial skills. The professional profile is including the following sections:-

1. Qualifications 2. Technical Skills 3. Project Management Skills 4. Managerial & Leadership Skills

8.1 Qualification

• University bachelor degree in science of Chemistry and Microbiology (Four years bachelor degree system).

• Post-Graduate Diploma in Applied Microbiology. • Master Degree in Marine Ecology (Going on; expected 2017/2018) • Course: ISO 9001, ISO 14001:2004 and ISO 18001:2007 (OHSAS) internal auditor. • ten (10) years of experience in environmental consultancy and services industry

including assessment, permitting, planning, monitoring and management. • Recent five (5) years in Supervision and leadership position. • Proficient in the use of basic and sophisticated software including MS Office and

Noise Modeling (self-learning). • Knowledge of local/some GCC regulations, and range of related conventions. • Excellent oral and written communication skills.

Page 5 of 9

Page 6: Detailed Professional Profile (Ahmed HASSAN)

Ahmed HASSAN Technical career profile Senior Environmental Consultant / Project Manager August 16, 2015

8.2 Technical Skills

• Submit robust technical deliverables within pre-identified projects execution schedules.

• Systematic review of FEED and detailed designs to identify and address potential environment impacts.

• Prepares, coordinates, and supervises the preparation/completion of technical environmental reports

• Interprets environmental regulations and ensure completion of projects in compliance with applicable environmental laws and regulations.

• Able to demonstrate environmental permitting based on knowledge of applicable environmental regulations and permit requirements.

• Ability to effectively engage regulatory agencies and relevant governmental entities. • Able to use technical and management experience to improve the environmental

performance of mega-projects in various sectors of industries. • Able to review and interpret environmental monitoring data and draw relevant

conclusions. • Establishing environmental requirements and Terms of References • Determines methods and solutions for complex engineering problems (in

cooperation with design team) and selects the most efficient and economical manner in meeting the objectives.

• Ensures compliance of design with all applicable standards and regulations. 8.3 Project Management Skills

• Successful and efficient Supervise/Execute of large environmental consultancy contracts exceeding 2,000,000 US$.

• Setting and maintaining project schedules and budgets; Evaluate/Select/Procure/Managing the subcontractors.

• Communicate with client representatives, deal with agencies and others engineering teams on the project.

• Assist clients and contractors in implementation and achieving best practice environmental processes involve creating effective systems for the monitoring and management of environmental aspects based on ISO14001 and EIA.

• Works cooperatively with project engineering, construction, and operations staff to complete project planning activities, assess and relay applicable environmental permit/approval requirements.

• Time management and follow-through skills, with the ability to simultaneously work on, manage, and prioritize multiple tasks/projects.

• Ability to handle sensitive and confidential information; work effectively under pressure, and exercise independent judgment and discretion in dealing with a variety of individuals and situations.

• Providing assistance and professional advice to engineering, project and construction management in identifying and complying with environmental requirements.

• Co-ordination with and providing technical assistance to other project assigned functional leads.

• Identify cost efficient methods for project execution • Manage the available resources and out resource as needed. • Successful negotiate/manage the subcontractors and expedite when required.

Page 6 of 9

Page 7: Detailed Professional Profile (Ahmed HASSAN)

Ahmed HASSAN Technical career profile Senior Environmental Consultant / Project Manager August 16, 2015

8.4 Managerial & Leadership Skills • Work closely with clients, focus on quality with the objective of satisfying the agreed

scope of work and project solutions, and respond flexibly to changing client and project needs and maintain regular liaison.

• Prepare and monitor Key Performance Indicators (KPIs) • Responsible for conducting or participating in yearly performance evaluations of

assigned staff. • Analyze RFP documents and prepare technical and commercial proposals for

environmental consultancy services. • Helps determine budget estimates and staffing requirements for the defined scope

and schedule. • Active in business development activities and maintaining client relationships. • Participate in short and long range planning.

9.0 List of Executed Projects Note: the following list represent the exposure and experience level as part of the team, does not represent my effort only.

NO PROJECT TITLE CLIENT / OWNER DURATION 1.0 Oil and gas projects

1.1 Consultancy Services for the Kuwait Oil Company (KOC) Marine Facilities Upgrading Project Kuwait Oil company 36 months

1.2 Replacement of Eight (8) Plate Heat Exchangers at Kuwait Oil Company (KOC) GC-04 Project Kuwait Oil company 4 months

1.3 Kuwait Oil Company (KOC) Soil Remediation of Contaminated features in SEK fields (Lot A) Kuwait Oil company 36 months

1.4 Environmental Law Audit and Environmental Site Assessment

Saudi Arabian Chevron and Kuwait Gulf Oil Company 24 months

1.5 North Wafra Developmental Program Environmental Impact Assessment (EIA) study Saudi Arabian Chevron Inc. 3 months

1.6 Environmental Consultancy Services for Kuwait Oil Company (KOC) major projects (3 years contract) Kuwait Oil company 36 months

1.7 EF/1852 – Lower Fars Heavy Oil Development Program Kuwait Oil company 5 months

1.8 EF/1761 Effluent Water Treatment & Injection Plant At North Kuwait Kuwait Oil company 2 months

1.9 EF/1855 construction of Ratqa C 72 MW substation and associated 132 KV Overhead Lines Kuwait Oil company 2 months

1.10 Replacement of Existing Heaters of Desalter Trains at GCs 2, 7, 9, 10 & 22 with Similar Capacity Heaters Kuwait Oil company 2 months

1.11 Dorra Oil Field Development Project (a marine milestone project)

WorleyParsons Europe Limited, ARAMCO Gulf Operations, Kuwaiti Gulf Oil Company

18 months

1.12 Elevated Substations In South East Kuwait Project Kuwait Oil company 4 months

1.13 Al-Khazan Disposal Project & Al-Khazan Injection Project

Saudi Arabian Chevron and Kuwait Gulf Oil Company 10 months

1.14 Environmental Impact Assessment (EIA) Study for the Fire Stations at North Kuwait, West Kuwait and Burgan Kuwait Oil company 2 months

1.15

Environmental Impact Assessment, environmental baseline study and air dispersion modeling for construction and operation of five new 48 inches crude oil Gravity Lines are taken from the New NTF Gravity Manifold and routed to the new North Pier Pumping & Metering Station (NPP&MS).

Kuwait Oil company 2 months

1.16 Environmental Impact Assessment & Environmental Kuwait Oil company 2 months

Page 7 of 9

Page 8: Detailed Professional Profile (Ahmed HASSAN)

Ahmed HASSAN Technical career profile Senior Environmental Consultant / Project Manager August 16, 2015

NO PROJECT TITLE CLIENT / OWNER DURATION Baseline Study including air monitoring, soil characterization and ground water characterization for Building new Booster Station BS 160 at SE Kuwait.

1.17

Building new Booster Station BS 160 at SE Kuwait Environmental Impact Assessment & Environmental Baseline Study including air monitoring, soil characterization and ground water characterization.

Kuwait Oil company 6 months

1.18 Contract No.: JO/SC300/EH11 Title: Preparation of Environmental Evaluation Report (EER) & Related Services

JOINT OPERATIONS – WAFRA 2 years

1.19 Oily Soil Remediation – LOT A HERA - KOC 2 Years 2.0 Roadway Projects

2.1 Environmental Impact Assessment (EIA) study for 6.5 Kuwait Ring Road (KRR) Project

Kuwait Ministry of Public Works 18 months

2.2

Environmental Protection for Contract No. RA/188 Construction, Completion and Maintenance of Interchanges on Main Highways - Fahaheel Expressway connecting to South of Subahiya and Mangaf Area (IC. 6) MPW (76A)

Kuwait Ministry of Public Works 25 months

2.3

Construction, Completion and Maintenance of Interchanges on Main Highways – 6th and 7th Ring Motorways Connecting to New Housing Area at West of Jleeb Al-Shuyoukh. RA/186

Kuwait Ministry of Public Works 39 months

2.4

Agreement No. EF/R/194. Environmental Impact Assessment (EIA) for the Study, Design and Construction Supervision for the Construction and Maintenance of the Regional Road North Part

Kuwait Ministry of Public Works 12 month

2.5

Contract No. RA/185 – Construction Completion and Maintenance of the Main Highways Jahra Motorway and Fifth Ring Motorway connecting to Jahra and South Doha Areas (IC 2, 8, 10), MPW (35, 34)

Kuwait Ministry of Public Works 16 month

2.6 SHEIKH JABER AL AHMAD AL SABAH BRIDGE (DOHA LINK) PROJECT

Kuwait Ministry of Public Works - GS 9 years-current

3.0 Construction developmental projects

3.1 Environmental Impact Assessment (EIA) study for the Proposed New University City for Kuwait University at Al-Shadadiyah

Kuwait University 4 months

3.2 Environmental Impact Assessment (EIA) study for the Kuwait University - Master plan Kuwait University 4 months

3.3 Environmental Impact Assessment (EIA) study and Consultancy Services for the Multi-Story Car Parks at the Ministry of Health Hospitals

Kuwait University 4 months

3.4 Environmental Impact Assessment (EIA) Study for the College of Education & Arts - Kuwait University Al-Shadadiyah

Kuwait University 4 months

3.5 Environmental Impact Assessment (EIA) study for the Housing City for Expatriates and Sewage Treatment Plant in Al-Shadadiyah

Kuwait Ministry of Public Works 4 months

3.6

Environmental Impact Assessment (EIA) Study for the Faculty of Engineering, College of Science, College of Women and College of Music & Theatrical Arts - Kuwait University

Kuwait University 4 months

3.7 Boubyan Seaport Project (Phase 1 – Stage 1) Coastal Boubyan Project Private Quarries Environmental Impact Assessment (EIA) Study

Galfar Engineering & Contracting Company (Formerly Shaheen Al-

4 months

Page 8 of 9

Page 9: Detailed Professional Profile (Ahmed HASSAN)

Ahmed HASSAN Technical career profile Senior Environmental Consultant / Project Manager August 16, 2015

NO PROJECT TITLE CLIENT / OWNER DURATION Ghanim)

3.8 Environmental Impact Assessment (EIA) Study for the New Yachts Clubs Project and Development of Egaila Beach Project

Soor Engineering Bureau 4 months

3.9

Environmental Impact Assessment (EIA) Study for the Supply, Installation, Commissioning, Operation, and Maintenance of Medical Waste Incinerator South of 7th Ring Road

Ministry of Health - State of Kuwait 4 months

3.10 Construction of New Al Tameer Complex in Ahmadi. Kuwait Oil Company 4 months 3.11 New Display Centre Construction & Exhibition Works. Kuwait oil Company 4 months 4.0 Infrastructure, Power & Desalination Projects

4.1 Environmental, Impact Assessment (EIA), Soil and Site Investigation Work for Al Khiran Power and Water Desalination Station

Kuwait Ministry of Electricity and Water 12 months

4.2

Environmental Impact Assessment (EIA) Study for the Shuwaikh RO Desalination Plant with Recarbonation System (30 MIGPD) – Contract No. MEW/C/3766-2007/2008

Kuwait Ministry of Electricity and Water 8 months

4.3 Environmental Impact Assessment Study Um Al-Hayman Wastewater Treatment Plant Project PTB - FICHTNER 8 months

5.0 Ports & Marine Projects

5.1 Environmental Consultancy & Services Work including Environmental Management Planning and reporting for Mubarak Al Kabeer Seaport Project (Phase 1 – Stage 1)

Kuwait Ministry of Public Works 26 months

5.2

Environmental Impact Assessment (EIA) Study for the Design, Execution, Completion and Maintenance of Boubyan Seaport Project (Phase 1, Stage 2) – The Seaport Works. Environmental Impact Assessment (EIA) for the Temp. Jetty and Dredging Works.

Kuwait Ministry of Public Works 2 months

5.3 Marine Facilities Upgrading Project. Kuwait Oil Company 18 months

5.4 SHEIKH JABER AL AHMAD AL SABAH BRIDGE (DOHA LINK) PROJECT

Kuwait Ministry of Public Works - GS 9 years-current

6.0 Environmental Auditing Projects

6.1 Conducting periodically environmental auditing and environmental commitment action planning for several industrial facilities at Shuiaba Industrial Area .

Public Authority for Industry, state of Kuwait 4 years

6.2 Environmental law auditing for Saudi Arabian Chevron facilities located in Mina Saud (Mina Al Zour) Saudi Arabian Chevron 4 months

6.3 Environmental law auditing for Wafra Joint Operations oil fields including all gathering centres, pipelines….etc.

Saudi Arabian Chevron and Kuwait Gulf Oil Company 4 months

10.0 Declaration I hereby declare that all the data provided in this document is correct. Ahmed HASAN Date: August 16, 2015

Page 9 of 9