DETAILED SPECIFICATION 1. FOUNDATION Footings for Columns Earth work : 3’,5” x 3’,5” x 5’ feet Depth below present Virgin ground level = 5’feet Sand filling 6” height PCC 1:4:8 for a minimum of 4” height over the sand Layer. Mat size 3’3’’ x 3’3’’ using 10mm dia Rods = 6” c/c spacing Both directions. RCC Mix 1:2:4 for a minimum height of 1’3” over Mat. Column sizes 1’x 9’’ using 12mm dia rods 4Nos,10mm rods 2 Nos stirrups 8mm C /c 8” 1.a. Plinth Beam at present Groun Level 1’6” height x width 9” using 12mm dia rods 6 Nos., Stirrups using 8mm dia. Spacing 9’ Above Plinth Beam, brick-work in Chamber Bricks upto Floor level. Basement level 4 ½ feet above the ground level.for 5,6’’ feet basement level extra cost will charge per SQFT cost Rs,21/- 2. RCC BELT BEAM AT FLOOR LEVEL Size 4 ½” x 9” Concrete thickness : 4 ½” Width = 9” RCC 1:2:4 mix using 8mm 4 Nos as main rods and 6mm dia MS Rod for stirrups with 9’ spacing. 3. SAND FILLING IN THE BASEMENT

detail specification G, santha kumar (2)

Embed Size (px)

Citation preview

Page 1: detail specification G, santha kumar (2)

DETAILED SPECIFICATION

1. FOUNDATION

Footings for Columns Earth work : 3’,5” x 3’,5” x 5’ feetDepth below present Virgin ground level = 5’feetSand filling 6” heightPCC 1:4:8 for a minimum of 4” height over the sand Layer. Mat size 3’3’’ x 3’3’’ using 10mm dia Rods = 6” c/c spacing Both directions. RCC Mix 1:2:4 for a minimum height of 1’3” over Mat.Column sizes 1’x 9’’ using 12mm dia rods 4Nos,10mm rods 2 Nos stirrups 8mm C /c 8”

1.a. Plinth Beam at present Groun Level

1’6” height x width 9” using 12mm dia rods 6 Nos., Stirrups using 8mm dia. Spacing 9’ Above Plinth Beam, brick-work in Chamber Bricks upto Floor level.

Basement level 4 ½ feet above the ground level.for 5,6’’ feet basement level extra cost will charge per SQFT cost Rs,21/-

2. RCC BELT BEAM AT FLOOR LEVEL

Size 4 ½” x 9”Concrete thickness : 4 ½” Width = 9”RCC 1:2:4 mix using 8mm 4 Nos as main rods and 6mm dia MS

Rod for stirrups with 9’ spacing.

3. SAND FILLING IN THE BASEMENT

Filling in basement using loss soil, by very good consolidation. After 1’feet depth river sand will be filled in the basement.

3.a. PCC 1:4:8

PCC at 1:4:8 over the sand-fill after consolidation, Minimum height 4 ½” thickness.

4. SUPER STRUCTURE

Using Chamber brick for the masonry Brick-work with Cement:sand mix 1:6 mix Main Walls 9’ Thick. Roof Height is 10 feet .

Page 2: detail specification G, santha kumar (2)

5. RCC Continuous LINTEL SUNSHADE AND LOFT

Lintel : breadth 9” x 4½” thick using 10 mm dia 4 Nos with 6mm dia MS Stirrups ,

RCC Mix: 1:2:4 Sunshade : 2 feet wide from the face of the wall. Using 8mm dia as main road spacing 6”6mm dia MS as distribution spacing 6”

6. ROOF SLAB

Roof beam should be consider at the stage Room size 16 x16 = Main 12mm x 10mm spacing c/c 6”Other rooms 11 x 11 =10mm x 8 mm spacing c/c 6”Concrete thickness 4.5 “ using concrete 1:2:4 mix

7. WOOD WORK

Main Door – Ghana Teak Wood,Fist Quality door sizes - 3’,.5” x 7’feetOther Doors – Teak Wood Second Quality door sizes - 3’ x7’feetWindows – Teak Wood Second Quality sizes -5’ x 4’ feetBath and Toilet P.V.C. Doors sizes 2.5” x 7’ feet

8. Steel Fabrications

Front and Back side grill gate. Square sections. Window Grills = Square rods

9. PLASTERING

Wall 1:5 CM Mix - for 12 mm thick Ceiling 1:3 CM Mix - for 10 mm thick

10. FLOORING

Tiles cost per sq.ft Rs. 50/- only Tile Cost.

11. TOILET ARRANGEMENT

Only one Indian type IWC, White colour, Only one Western Type + Low Level Flushing-Tank, . Walls of all bath and toilet to be finished with glazed tiles {colour selection at the time of purchase, tile cost per sq.ft Rs.30/- {Contractor’s Scope} Bath Walls tiles 7 ft. height and Toilet 5 ft height, Flooring with Grip (Non Slip) Ceramic tiles.

Page 3: detail specification G, santha kumar (2)

12. PLUMBING

Toilets : Provision of pipeline for cold water. Two taps. One Angle Shower, Ordinary one tap near closet, one tap for wash basin.

Kitchen : One tap in SinkDining : One tap for wash basin,

13. KITCHEN

Kitchen table with Granite, Kitchen sink in S S Above the kitchen table 2ft height glazed tiles will be covered . only for 10 feet,

14. ELECTRICAL

Using STD ISI Cables for the complete wiring. Switches, sockets, plug sockets, ceiling rose and light holders all are ISI make , 5 points / 100 sq.ft will be provided by the contractor. Concealed wiring 20mm PVC {ISI pipes will be used.} Switch board shall be concealed type and top shall be of hylam finish. Modular Switches, Owner Scope. If any extra points needed will be charged per point cost Rs. 250/- AC and Circuit Breaker additional charge. For AC 1500/- for circuit Breaker 3500/- EB serives and monthly bill should pay by owners scope

15. STAIR CASE

Will be provided as shown in the drawing using 12mm dia as main rod. Spacing 6” c/c 8mm dia distribution spacing 6” c/c.

16. CUPBOARD

Cupboard should be provided in bed rooms, pooja, and With kuddpa stone.

17. WATER TANK

Over head tank will be provided on to 4’ x 4 over the height of parapet wall.

18. SEPTIC TANK

Septic tank with bricks, size 6’ 6” x 9’ 6” x 8’ 0” (over all dimension)Sewage drain pipe connection with PVC {4” dia}

Page 4: detail specification G, santha kumar (2)

19. PORTICO ;Flooring Erocon tiles cost of Rs – 45/-.

20. COMPOUND WALL

Foundation pile 5 ft depth. RODS 8 mm 4 Nos. Stirrups 6 mm Spacing 9”BEAM 1’ x 9” rod 10 mm Stirrups 6 mm Spacing 9”Wall Height 5 ft above ground level, wall thickness -single brick 4.5”.Pillar at every 8 feet.

21. PAINTING

For Wood main door and windows Touch-Wood finish. For inner wall 2 coats of putty and emulsionFor outer wall one coat white wash with white cementFor Grills Enamel paint.

22. QUALITY OF MATERIAL USED

Cement - Ramco or SankarBrick - Chamber Steel - STD ISI, TMT ,Electrical Cable - STD ISIPaint - STD ISI

23. RATE

Ground Floor per Sq.ft - Rs. 1,100/-Portico per Sq.ft - Rs. 850/-Stair case inner with wood or ss hand rails cost - Rs. ?Septic tank cost - Rs.25,000/-Bore and Motor cost - Rs.25,000/-

Stair case Rcc cost outer - Rs.25,000/- Compound Wall cost per R.ft - Rs.850/-Weathering Course per Sq.ft - Rs.45/-First floor per Sq.ft - Rs. 1000/-

Balcony area per sqft - Rs. 750/-

Page 5: detail specification G, santha kumar (2)

MODE OF PAYMENT

Advance payment before commencement of all works. 25% - upto Basement level20% - upto Lintel level25% - upto Roof level20% - Plastering / Electrical / Plumbing8% - Colour Washing / Painting2% - After Completion