1
© 2016 International Masonry Institute WINDOW HEAD Detail 03.030.0601 9/8/16 Anchored stone veneer K E Y W O R D S Window head, Lintel, Veneer, Stone, Flashing, Drainage, Weeps, High-performing, 03.030.0601 K E Y N O T E S Stone veneer 03 Concrete masonry backup Horizontal joint reinforcement 02 31 Mortar dropping collection device 34 Air space: 2" recommended, 1" min. req'd by code 36 Reinforcement per structural design 37 Cavity insulation 41 Thru-wall flashing 51 Termination bar w/ cont. bead of sealant @ top 52 Drip edge: seal and adhere to lintel 54 Window assembly 81 Air/moisture/vapor barrier as req'd 61 Reinforced masonry lintel 97 Grout per structural design 22 Wall tie 32 Steel lintel angle 91 02 61 03 22 31 32 34 36 52 End dam 53 53 54 81 91 41 37 51 97 Window flashing 55 55

Detail 03.030.0601 9/8/16 WINDOW HEAD

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Detail 03.030.0601 9/8/16 WINDOW HEAD

© 2016 International Masonry Institute

WINDOW HEADDetail 03.030.0601 9/8/16

Anchored stone veneer

KEY WORDSWindow head, Lintel, Veneer, Stone, Flashing, Drainage, Weeps, High-performing, 03.030.0601

KEY NOTES

Stone veneer03

Concrete masonry backup

Horizontal joint reinforcement

02

31

Mortar dropping collection device34

Air space: 2" recommended, 1" min. req'd by code

36

Reinforcement per structural design

37

Cavity insulation41

Thru-wall flashing51Termination bar w/ cont. bead of sealant @ top

52

Drip edge: seal and adhere to lintel

54

Window assembly81

Air/moisture/vapor barrier as req'd

61

Reinforced masonry lintel97

Grout per structural design

22

Wall tie32

Steel lintel angle91

02

61

03

22

31

32

34

36

52

End dam53

53

54

81

91

41

37

51

97

Window flashing55

55