Rex D. Huffman Sr. Vice President Gibbs & Register, Inc. Design-Build Discussion Design Design - - Build Build Discussion Discussion FACERS Legislative Conference FACERS Legislative Conference November 30, 2005 November 30, 2005

DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Rex D. HuffmanSr. Vice President

Gibbs & Register, Inc.

Design-BuildDiscussion

DesignDesign--BuildBuildDiscussionDiscussion

FACERS Legislative ConferenceFACERS Legislative Conference

November 30, 2005November 30, 2005

Page 2: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

OutlineOutline– Definition– Project delivery comparisons– Advantages/disadvantages– Growth trends

• General• Highway/Bridge• Florida

– Selection process– Design-Build issues– Design-Build Institute of America (DBIA)– Open discussion

Page 3: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Program & Budget(By Owner or Architect)

Architect &

Engineer

Owner’s Representative (optional)

General Contractor

Subs &Suppliers

Owner

Conventional Conventional DesignDesign--BidBid--Construct ApproachConstruct Approach

Page 4: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Conventional Conventional DesignDesign--BidBid--Construct ApproachConstruct Approach

• The Owner retains an A/E to provide design and construction documents. The architect may also help develop program information prior to design. For public work, bids are received and the contract is awarded to the low qualified bidder. The architect administers the construction contract for the owner, alone or alongside an Owner’s representative

What is the conventional approach to building a project?What is the conventional approach to building a project?

The conventional approach is most often used when:The conventional approach is most often used when:

• The Owner is looking for low construction price based on competitive bidding and complete design criteria

• The schedule is not a high priority

• The Owner is willing and capable of managing the project

• A completely defined project scope is important in order to competitively bid the work and engage a general contractor

• The owner wants to separately and directly select architects and engineers

Page 5: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Conventional AdvantagesConventional Advantages

• Established and widely understood contractual relationships

• Cost control through a fixed (low bid) construction price

• Standard contractual forms

• Competitive bidding for construction (contractor pre-qualifications may be included)

• Owner can select architect, engineers and consultants

• Detailed construction criteria are set before bidding

• There are many contractors and architects familiar with this approach

Page 6: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Conventional Conventional DisadvantagesDisadvantages

• Longest project duration . . . typically

• High investment before a fixed cost is determined

• Owner’s time and risk due to owner involvement in project management

• Subcontractors (especially DBE’s) can have limited opportunities to win

Page 7: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

General Contractor(s)

Subs &Suppliers

Owner

Architect &

Engineer

AgencyCM

Agency Construction ManagementAgency Construction Management

Page 8: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Agency Construction ManagementAgency Construction Management

• As in the conventional approach, the Owner retains an architect and consultants to develop program information and to provide construction contract drawings. Early in design, the Owner then also retains a construction manager (CM). Selected based on qualifications, the CM has the following role:

• Design, cost and schedule advisor and construction inspector, similar to an owner’s representative or agent. Hence, the term “agency” construction manager. A separate general contractor would be selected.

• The Owner does not have the technical and management resources to manage the project.

• Management and balancing of cost, schedule and quality are important.

• Keeping the most project capital in the local economy is important.

What is Agency Construction Management?What is Agency Construction Management?

Agency Construction Management is most often used when:Agency Construction Management is most often used when:

Page 9: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Agency Construction Management Agency Construction Management AdvantagesAdvantages

• Qualified management and technical support for the Owner

• Competitive bidding for construction contractor - pre-qualifications may be included

• Cost control through a fixed (low bid) construction price

• Owner can select architect, engineers and consultants

• Detailed construction criteria are set before bidding

• Early construction input and value engineering can achieve cost savings

Page 10: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Agency Construction Management Agency Construction Management DisadvantagesDisadvantages

• High investment before a fixed cost is determined

• Agency CM does not guarantee project cost or schedule

• Owner’s risk due to involvement in project management

• Other disadvantages of conventional approach can apply

Page 11: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Program & Budget(By Owner or Architect)

Architect &

Engineer

ConstructionManager

Subs &Suppliers

Owner

Construction Management at RiskConstruction Management at Risk

Page 12: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Construction Management at RiskConstruction Management at Risk

• The Owner retains an A/E to provide design and construction documents. A Construction Manager is selected early in the design phase based upon qualifications. Once a GMP is agreed upon the CM is “At Risk” to deliver the project on time and for the GMP.

What is construction management at risk (as opposed to agency construction management)?What is construction management at risk (as opposed to agency construction management)?

Construction management is most often used when:Construction management is most often used when:

• The owner does not have the technical and management resources to manage the project

• Rapid delivery is important

• Early transfer of financial risk is important

• Management and balancing of cost, schedule and quality are important

• Keeping the most project capital in the local economy is important

• Projects are large and require special technical and management expertise

Page 13: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Construction Management at Risk Construction Management at Risk AdvantagesAdvantages

• Qualified management and technical support

• Early guarantee of project costs

• Early selection of the overall project team - the architect and construction manager

• Early construction input and value engineering of design can achieve cost savings

• Early construction start and completion - well suited for fast-track delivery

• Opportunity for local subcontractors, trades, suppliers, while retaining competitive bidding of construction work

• Opportunity to keep project dollars in the local economy

Page 14: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Construction Management at Risk Construction Management at Risk DisadvantagesDisadvantages

• Owner remains directly involved in project management and contract disputes

• Guaranteed price must include design and bidding contingencies

• Fewer qualified firms are experienced with this delivery method

Page 15: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Owner

Design CriteriaProfessional

Design-BuildContractor

Architect&

Engineer

Subs &Suppliers

DesignDesign--BuildBuild

Page 16: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--BuildBuild

• After project criteria are established, the Owner contracts with a single entity responsible for the project’s design and construction. Design-build proposals are submitted for consideration in response to RFP’s. The competing design-builders may or may not be pre-qualified. Selection criteria may include qualifications, design scheme and price. The design-builder may be a contractor/architect team, a single source firm or a joint venture.

What is design-build?What is design-build?

Design-build is most often used when:Design-build is most often used when:

• A single point of responsibility for the total project is important

• Rapid delivery is important

• Early transfer of project risk is important

• The Owner desires multiple approaches

Page 17: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--Build Build AdvantagesAdvantages

• Single source responsible for complete project delivery

• Clear, streamlined communications with Owner

• Early guarantee of project costs

• Lends itself to fast-track delivery

• Early team selection - continuity

• Construction input into design

• Reduced claims to owner

• Eliminates change orders due to design error, omission or interpretation disputes

Page 18: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--Build Build DisadvantagesDisadvantages

• Must select total project team as a package - rather than picking and choosing

• Traditional A/E “watchdog” role must be performed by Owner or Owner’s representative

• Critical design decisions must be finalized early in the project

• Design can be driven by special interests or capabilities of the design-builders

Page 19: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

ConstructionIndustry Institute

(CII) Study

ConstructionConstructionIndustry InstituteIndustry Institute

(CII) Study(CII) Study

Page 20: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

CII StudyCII Study

• 1997

• 350 projects

• D-B-B vs CM@R vs D-B

• “Rock Solid” statistical analysis

Page 21: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

3.37

2.17

4.83

0 1 2 3 4 5

Median Cost Growth (%)

CM@R

DB

DBB

Design and Construction Cost Growth

Source: CIISource: CII

Cost GrowthCost Growth

Page 22: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

8192

9091

5135

0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000

Square Feet / Month

CM@R

DB

DBB

Median Construction Speed

4712

6842

3250

0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000

Square Feet / Month

CM@R

DB

DBB

Median Design & Construction Speed

Source: CIISource: CII

Project SpeedProject Speed

Page 23: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

0

0

4.4

0 1 2 3 4 5

Median Design & Construction Schedule Growth (%)

CM@R

DB

DBB

Design and Construction Schedule Growth

Source: CIISource: CII

Schedule GrowthSchedule Growth

Page 24: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Quality - Turnover, Call Backs

8.17.97

0

2

4

6

8

10

DBB DB CM@R

High

Med

Low

Quality - Turnover, Operations & Maintenance

6.77.7

6.9

0

2

4

6

8

10

DBB DB CM@R

High

Med

Low

Source: CIISource: CII

QualityQuality

Page 25: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

OutlineOutline– Definition

– Project delivery comparisons

– Advantages/disadvantages

–– Growth trendsGrowth trends•• GeneralGeneral

•• Highway/BridgeHighway/Bridge

•• FloridaFlorida

– Selection process

– Design-Build issues

– Design-Build Institute of America (DBIA)

– Open discussion

Page 26: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Growthin

Design-Build

GrowthGrowthinin

DesignDesign--BuildBuild

Page 27: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Milestones in Recent Milestones in Recent DesignDesign--Build HistoryBuild History

• 1940’s Naval Facilities Engineering Command uses the Capehart and Wherry Housing Programs that employ design-build

• 1962 National Aeronautics and Space Administration (NASA) uses design-build

• 1968 Department of Housing and Urban Development starts use of forms of design-build

• 1969 Associated General Contractors (AGC) appoints “Turnkey Committee”

Page 28: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Milestones in RecentMilestones in RecentDesignDesign--Build History Build History (cont’d)

• 1972 Congress passes Qualifications-Based Selection (Brooks Act) for A/E Contracts

• 1975 AGC publishes first edition of Standard Agreement between Owner and Design-Builder

• 1978 The American Institute of Architects (AIA) adopts a policy permitting members to do design-build

• 1984 Competition in Contracting Act places competitive negotiation on par with competitive sealed bidding

• 1985 AIA publishes family of design-build documents

Page 29: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Milestones in RecentMilestones in RecentDesignDesign--Build History Build History (cont’d)

• 1986 Military Construction Authorization Act permits trial use of design-build; each branch is permitted to use design-build on three projects a year

• 1990 General Services Administration issues Design Criteria Project Guide

• 1991 AIA adopts policy acknowledging the use of design-build in the public sector

• 1991 UF/FDOT Design-Build Program

• 1993 Design-Build Institute of America established

Page 30: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Milestones in Recent Milestones in Recent DesignDesign--Build History Build History (cont’d)

• 1995 Engineers Joint Contract Documents Committee (EJCDC) issues design-build contracts

• 1996 Legislation (Davis Amendment) enacted permitting use of two-phase selection for federal design-build projects

• 1997 CII Study

• 2002 FHWA D-B Rules

Page 31: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

The Early Transportation ProjectsThe Early Transportation Projects(prior to 1995)(prior to 1995)

• Transportation Corridor Agency – CA

• FDOT Program

• Maine’s Bath – Woolwich Bridge

• LaCienga – CA

• FTA Demonstration Projects

• NYC DOT Bridges

Page 32: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--Build: Florida’s ExperienceBuild: Florida’s Experience

• In 1987, Legislature authorized the DOT to experiment in a $50 million “pilot” program.– Intended to speed up process to save time

– Visited GaDOT to obtain feedback

– Selected variety of projects

– University of Florida study findings

Page 33: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--Build: Florida’s ExperienceBuild: Florida’s Experience

• In 1995, Legislature further expanded the use of Design-Build Program.– Major Bridges (over $10 million)

– Buildings

– Rail Corridor Projects

Page 34: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--Build: Florida’s ExperienceBuild: Florida’s Experience

• In 1996, this authority was further expanded to include all project types as a part of the “innovative” practices package.– Annual monetary cap of $120 million set by the statute for

Innovative Contracting

– The intent of this legislation was to address time and $ overruns

– Included D-B “Minor,” No Excuse Bonuses, A+B, Lane Rentals, etc.

Page 35: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--Build: Florida’s ExperienceBuild: Florida’s Experience

• Post 9/11, Florida’s economy was floundering

• Governor Bush wanted to stimulate the economy by advancing $667 million dollars of work– With a condition, the work should hit the streets by July 2002

– 30 – 35 projects statewide

Page 36: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Highway/Bridge DesignHighway/Bridge Design--Build in FloridaBuild in Florida• FDOT

– I-4 over St. Johns River– Panasoffkee Creek Bridge Widening– Ringling Causeway Bridge Replacement– I-10 Escambia Bay Bridge Replacement– Numerous Rest Areas

• County– John Young Parkway – Orange County– Port of Miami Roads/Bridges – Dade County– I-4 Pedestrian Bridge – Seminole County

• City– Dale Earnhardt Bridge – City of Daytona Beach– I-95/Dunlawton Avenue Interchange – City of Port Orange– Southside/Merrill Road Bridge – Jacksonville Transportation Authority– Vineland Road Bridge – City of Orlando– Blue Print 2000 Projects – City of Tallahassee

Page 37: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Why the growth?Why the growth?

• Market driven demand

• Quality improvement

• Cost effective solutions

• Reduced litigation

• Better risk management

• Faster delivery

Page 38: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

1840

75

175

250

0

50

100

150

200

250

$ Billions

Increase of Design-Build Process from 1986 to 2005

1986 1992 1996 2000 2005

Source: Lawson Research International and E.N.R.Source: Lawson Research International and E.N.R.

Proof is in the NumbersProof is in the Numbers

Page 39: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Source: DesignSource: Design--Build Institute of America (DBIA)Build Institute of America (DBIA)

1986 1992 2000 20050%

10%

20%

30%

40%

50%

60%

70%

80%

90%

1985 1990 1995 2000 2005 2010 2015

Traditional

Design-Build

CM@Risk

Market Penetration ofMarket Penetration ofMajor Project Delivery SystemsMajor Project Delivery Systems

Page 40: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--Build National TrendsBuild National Trends

• Increasing use in public sector at all levels of government

• RFP’s include less design specifics, more oriented toward achieving performance objectives

• Selections place increasing value on qualifications over price

• Large design-build projects becoming more complex

Page 41: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--Build National TrendsBuild National Trends

• More industry sectors using design-build– Transportation/public utilities– K-12 educational facilities

• More owners see advantages of single contractual responsibility and a multidisciplinary team

• Part of more integrated solutions which include financing, operation, maintenance, and/or ownership

• More designers, particularly engineering firms, are placing themselves in an at-risk role by leading design-build teams

Page 42: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

OutlineOutline– Definition

– Project delivery comparisons

– Advantages/disadvantages

– Growth trends• General

• Highway/Bridge

• Florida

–– Selection processSelection process

– Design-Build issues

– Design-Build Institute of America (DBIA)

– Open discussion

Page 43: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Selection ProcessesSelection ProcessesSelection Processes

Page 44: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--Build Selection ProcessesBuild Selection Processes

• Competitive Selection– Technical and price based

• Negotiated Selection– Qualifications based

Primary approaches:

Page 45: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Competitive SelectionCompetitive Selection

• Owner’s project definition/needs analysis

• Request for Qualifications - RFQ

• Shortlist most qualified for the project

• Owner issues project criteria in Request for Proposal - RFP

• Technical and price proposals

• Interviews (optional)

• Owner selects Best Value Proposal

Page 46: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Best Value Selection OptionsBest Value Selection Options

• Meets criteria/low bid (equivalent design/low bid)

• Fixed price/best design

• Weighted criteria

• Adjusted low bid

Page 47: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Weighted CriteriaWeighted Criteria

Proposer Qualitative Score

(60 Max)

Price Proposal

Price Score (40 Max)

Total Score(100 Max)

Firm A 51 $1,629,000 37 88

Firm B 53 $1,546,000 39 92* Firm C 44 $1,510,000 40 84

*Award to Firm with the highest total score.*Award to Firm with the highest total score.*Award to Firm with the highest total score.

Page 48: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Adjusted Low BidAdjusted Low Bid

Proposer Qualitative Score Price Proposal Adjusted Price (100 Max)

Firm A 85 $1,000,000 $11,764.71 Firm B 95 $1,300,000 $13,684.21 Firm C 50 $800,000 $16,000.00

Note: The adjustment to the bid is for selection only.Note: The adjustment to the bid is for selection only.Note: The adjustment to the bid is for selection only.

Page 49: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Negotiated SelectionNegotiated Selection

• Owner’s project definition/needs analysis

• Request for qualifications

• Shortlist most qualified for the project

• Interviews

• Select best qualified team

(Qualifications Based Selection or Direct Selection)

Page 50: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

OutlineOutline– Definition

– Project delivery comparisons

– Advantages/disadvantages

– Growth trends• General

• Highway/Bridge

• Florida

– Selection process

–– DesignDesign--Build issuesBuild issues

– Design-Build Institute of America (DBIA)

– Open discussion

Page 51: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DESIGN-BUILD ISSUESDESIGNDESIGN--BUILD ISSUESBUILD ISSUES

Page 52: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--Build IssuesBuild Issues

• Percentage of Design – Provided & Required

• Stipends

• Warranty/Guarantee

• Geotechnical

• Right of Way

Design-Build is “not” assigning all risks to the contractor.

Page 53: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

-10% -5% 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70%

Usually Best Value or Qualifications-Based Procurement

Direct Design-Build-10% to 10%

Design CriteriaDesign-Build5% to 25%

PreliminaryDesign

Design-Build20% to 35%

Typically Low Bid-Based Procurement

Design Draw-Build35% Design or Greater

Pre-Design

Source: DBIASource: DBIA

Percentage of DesignPercentage of Design(As included in or required by Design-Build RFP)

Page 54: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Percentage of DesignPercentage of Design

• 30% design or more leads to price oriented selection

• Less design provided or required - more emphasis on technical/qualifications criteria or on design-builder’s proposed solution

• After initial experiences owners provide or require less design– Recognition of cost and time required to prepare design that may not be

ultimately constructed

• Experienced owners prefer more emphasis on qualifications

(As included in or required by Design-Build RFP)

Page 55: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Influence vs. Expenditure CurvesInfluence vs. Expenditure CurvesMUCH

INFLUENCE

RAPIDLY DECREASING INFLUENCE

LOWINFLUENCE

INFLUENCE

EXPENDITURES

INFLUENCEEX

PEN

DIT

URE

S

BUSINESS PLANNING

PRE-PROJECT PLANNING

EXECUTE PROJECT

OPERATE FACILITY

Design-Build Team on-board early allows best opportunity to achieve objectives

Page 56: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--Build IssuesBuild Issues

• Percentage of Design – Provided & Required

• Stipends

• Warranty/Guarantee

• Geotechnical

• Right of Way

Design-Build is “not” assigning all risks to the contractor.

Page 57: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DESIGN-BUILD INSTITUTE OF AMERICA

DESIGNDESIGN--BUILD INSTITUTE OF BUILD INSTITUTE OF AMERICAAMERICA

Page 58: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--Build Institute of America (DBIA)Build Institute of America (DBIA)

•MissionThe mission of the Design-Build Institute of America is:

• Achieve and maintain recognition as the industry center of expertise for design-build practice

• Lead the expansion of design-build utilization across all industries and markets

DBIA will pursue this mission in a manner that is inclusive of all project participants in integrated service delivery.

Page 59: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

DesignDesign--Build Institute of America (DBIA)Build Institute of America (DBIA)

• Programs/Committees

• Manual of Practice

• Membership

• Florida Chapter

Page 60: DesignDesign-Build Design-Build Discussion · • Rapid delivery is important • Early transfer of financial risk is important • Management and balancing of cost, schedule and

Open Discussion***

Questions ?

Open DiscussionOpen Discussion******

Questions ?Questions ?