75
ESCAMBIA COUNTY CORRECTIONAL FACILITY Presented to the Selection Committee: Board of County Commissioners Escambia County, Florida Office of Purchasing Design/Build Services for PRESENTER: Bob Nanney

Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

ESCAMBIA COUNTYCORRECTIONAL FACILITY

Presented to the Selection Committee:Board of County CommissionersEscambia County, FloridaOffice of Purchasing

Design/Build Services for

PRESENTER: Bob Nanney

Page 2: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Presenters

Bob Nanney Caddell Vice President, Operations Project Role: Project Executive

Mike Dean LEED AP BD+C, CM-BIMCaddell Director, Virtual Design & Construction & Preconstruction Services Project Role: Preconstruction Director

Jay JonesCaddell Construction Executive Project Role: Construction Principal

Andrew Thomason Caddell Project Manager Project Role: Project Manager

Pete Johnson Caddell Project Superintendent General Superintendent

Shannon ClabornCornerstone Detention Executive VP Project Role: Detention Integrator

Rob FabbroWhitesell-Green President

Eddie Stewart Caddell President & CEO

Shane Lyle, RA, AIA, LEED AP BD+CGRW Vice President Project Role: Design Principal & Design Project Manager

Aaron Nickerson, RA, AIA, LEED GAGRW Project Role: Design Project Architect

Scott Emerson, RAGRW Project Role: Construction Administration Leader

Erica Floyd, PE Gulf Civil Engineering LLC Project Role: Civil & Environmental Engineer, Site Design

Win Bishop, PELBYD Project Role: Lead Structural Engineer

Doug Cage, PEGRW Mechanical Design Engineer Project Role: Lead Mechanical Engineer

Monty Maynard, PE, LEED AP BD+C GRW Vice President Project Role: Lead Electrical Engineer

Keith Summer, PEBuford Goff & Associates, Inc.Project Role: Lead Electronic Security Systems Engineer

David MusacchioDetention Design Specialist Project Role: Detention Hardware Specialist

Cesar Reyes AIA, LEED AP BD+CSTOA Architects Project Role: Sustainability Manager

Design Team Construction Team

PRESENTER: Bob Nanney

Page 3: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

AGENDATeam CompositionDesign Approach

Sustainability/Life CycleProject Management Plan

ScheduleCommunity Outreach

PRESENTER: Bob Nanney

Page 4: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

INTRODUCTION

PRESENTER: Bob Nanney

Introduction to the Team with• The relevant construction experience,

• The detention design expertise,

• The teaming & Design/Build experience, and

• The local presence

To successfully design and build the ECCF.

Open Forum for Questions

Page 5: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

TEAM COMPOSITION

Experience & Previous Work

Together

Key Construction Subcontractors

Commitment

Ready to Go

PRESENTER: Mike Dean

Page 6: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

D/B Federal Correctional Institution, Aliceville, AL • $196.8M• 665,800 SF

D/B U.S. Penitentiary, Yazoo City, MS• $182.9M• 780,000 SF

D/B U.S. Penitentiary, McCreary County, KY• $124M• 553,000 SF

Federal Correctional Institution, Manchester, KY• $61.8M• 450,000 SF

D/B Vocational Training Bldgs, Coffee Co. & Wheeler Co., GA• $4.2M• 13,000 SF

TEAM COMPOSITION

PRESENTER: Mike Dean

Aliceville FCI, Aliceville, AL D/B U.S. Penitentiary • Yazoo City, Mississippi

D/B U.S. Penitentiary McCreary County, KY Federal Correctional Institution • Manchester, KY

Coffee County Correctional Facility, Georgia Wheeler County Correctional Facility, Georgia

EXPERIENCE Previous Projects

Caddell and GRW

Page 7: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

TEAM COMPOSITION

PRESENTER: Mike Dean

Aliceville FCI, Aliceville, AL

Wheeler County Correctional Facility, Georgia

DBE: Bob Nanney - Project Executive Shane Lyle - Design PrincipalMike Dean - Preconstruction Director

Construction Team:Jay Jones - Construction Principal Shannon Claborn - Detention Integrator

Design Team: Shane Lyle - Design Project ManagerAaron Nickerson - Design Project Architect

Engineering Team: Win Bishop - Lead Structural EngineerDoug Cage - Lead Mechanical Engineer Monty Maynard - Lead Electrical EngineerKeith Summer - Lead Electronic Security Systems EngineerDavid Musacchio - Detention Hardware Specialist

80% of the Presenters Worked on this Project

ESTABLISHED TEAMCaddell and GRW

Page 8: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

ESTABLISHED TEAMCaddell and GRW

TEAM COMPOSITION

PRESENTER: Mike Dean

Wheeler County Correctional Facility, Georgia

DBE: Shane Lyle - Design PrincipalMike Dean - Preconstruction Director

Construction Team:Jay Jones - Construction Principal Pete Johnson - General SuperintendentShannon Claborn - Detention Integrator

Design Team: Shane Lyle - Design Project ManagerAaron Nickerson - Design Project Architect

Engineering Team: Win Bishop - Lead Structural EngineerDoug Cage - Lead Mechanical Engineer Monty Maynard - Lead Electrical EngineerKeith Summer - Lead Electronic Security Systems EngineerDavid Musacchio - Detention Hardware Specialist

D/B U.S. Penitentiary • Yazoo City, Mississippi

87% of the Presenters Worked on this Project

Page 9: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

ESTABLISHED TEAMCaddell and GRW

TEAM COMPOSITION

PRESENTER: Mike Dean

Wheeler County Correctional Facility, Georgia

DBE: Mike Dean - Preconstruction Director

Construction Team:Andrew Thomason – Project Superintendent

Design Team: Scott Emerson - Construction Administration Leader

Engineering Team: Doug Cage - Lead Mechanical Engineer Monty Maynard - Lead Electrical EngineerKeith Summer - Lead Electronic Security Systems EngineerDavid Musacchio - Detention Hardware Specialist

D/B U.S. Penitentiary McCreary County, KY

47% of the Presenters Worked on this Project

Page 10: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

KEY CONSTRUCTION SUBCONTRACTORS

Teaming Approach to Design/Build• Inclusion of local businesses as

appropriate• Selected based on resources and

experience• Brought on board early in the proposal

phase• Collaborative approach with design

disciplines• Weekly design meetings

TEAM COMPOSITION

PRESENTER: Mike Dean

SUBCONTRACTORS

A&B ElectricMeridian, MS

Bell SteelPensacola, FL

CornerstoneMadison, AL

Nash MechanicalWildwood, FL

Pensacola GlassPensacola, FL

Tindall CorporationMoss Point, MS

Page 11: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

LOCAL TEAM

PRESENTER: Mike Dean

Page 12: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Yazoo City

Tindall PrecastSubcontractors

Moss Point, MS Plant• Multiple plants around the Southeast can contribute• Prefabrication advantages• Fast erection• Previous multi-story projects like this with Caddell• Previous experience on detention facilities with this Team

TEAM COMPOSITION

PRESENTER: Mike Dean

AIT 5-Story Barracks Erection

Page 13: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

CornerstoneSubcontractors

Madison, AL• Largest Detention Contractor in the U.S.• Manufacturer of industry products• Security Electronics Integrator• Over 50 projects using steel cells• Many projects with this Team

TEAM COMPOSITION

PRESENTER: Mike Dean

Aliceville FCI, Aliceville, AL

Jackson County Mississippi

Page 14: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Bell SteelSubcontractors

Pensacola, FL• Structural and miscellaneous steel fabricator and erector• Very long term relationship with this Team and too many

projects to count• Very flexible fabricator

TEAM COMPOSITION

PRESENTER: Mike Dean

Nation Naval Aviation MuseumPensacola, FL

Naval Aviation Museum School AdditionPensacola, FL

Pensacola Christian College Sports CenterPensacola, FL

Navy Federal Credit UnionPensacola, FL

Page 15: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Nash Plumbing & MechanicalSubcontractors

Wildwood, FL• HVAC and Plumbing contractor• Highly experienced in Detention and Healthcare• Many design/build projects with this Team• Currently working in Pensacola market

TEAM COMPOSITION

PRESENTER: Mike Dean

Suwannee Correctional InstituteLive Oak, FL

Sumter County JailBushnell, FL

Sexual Violent PredatorsArcadia, FL

Federal Low-Medium Sec PrisonColeman FL

Page 16: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

A&B ElectricSubcontractors

Meridian, MS• Experienced in Full electrical scope including Security and

Fire Alarm• Previous work with this Team• Detention Facilities• Government and Military• Healthcare• Design/Build

TEAM COMPOSITION

PRESENTER: Mike Dean

Blackwater Correctional2,000 Bed Construction – Milton, FL

Jena Correctional1,000 Bed Expansion – Jena, FL

Walnut Grove1,500 Bed Correctional Facility

East Mississippi2,500 Bed Correctional Facility

Page 17: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Pensacola GlassSubcontractors

Pensacola, FL• Very large glass company• Previous work with this Team• Experience in Curtainwall, Blast and Ballistic glass systems

TEAM COMPOSITION

PRESENTER: Mike Dean

Page 18: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

DESIGN APPROACH

Maximum Value to the County

Stacking Diagrams

Adjacencies

Building Massing

Exterior Finish Selection

Site Design

Structural Decisions

Security Detention Systems

MEP Overview

GRW

PRESENTER: Shane Lyle

Page 19: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

MAXIMIZING VALUEto the County

Initial Charrette Inclusive and cooperative process giving all stakeholders a voice.

• Site layout and landscaping

• Building massing and aesthetics

• Programming adjustments

• Interior layout and operations

• Sustainability

• Mechanical and electrical systems

• Security detention

DESIGN APPROACH

PRESENTER: Shane Lyle

“GRW embraced the Partnering spirit during

Design Development, which allowed the Design/Build

Team and the FBOP to communicate efficiently and

effectively to achieve the design intent. Open communication, and

thoughtfulness in action when addressing challenges,

were instrumental in this project’s success.”

D. H. SimmonsFBOP Contracting Officer

D/B McCreary PenitentiaryCaddell/GRW

Page 20: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

MAXIMIZING VALUEto the County

Interim Design MeetingsDesign progress meetings on site (at least every 2 weeks)

• Identifying design adjustments that improve operations without compromising budget or schedule

• Tracking and resolving ongoing design issues and questions

• Transparent process, with open forum for discussion

• Documenting the sustainability and LEED decision-making process

DESIGN APPROACH

PRESENTER: Shane Lyle

Program

Design

Document

Page 21: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

PRESENTER: Shane Lyle

• Design Charrette(s)

• Schematic Design

• Grading/Drainage/Util Design

• Fndtns/Struc/Shell Design

• Schem Dsgn Review 11-12-17

• Schem Dsgn Aprvl 11-25-17

• Fndtns/Struc Review 12-27-17

• Fndtns/Struc Aprvl 1-10-18

• Arch/Engr Fit Out Rvw 2-16-18

• Arch/Engr Fit Out Aprvl 3-2-18

• FF&E Design Submittal 4-2-18

• Design Complete 4-17-18

Design TimelineCritical Milestones

Page 22: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

MAXIMIZING VALUEto the County

Building Information ModelDelivers value to the County:

• Tracking compliance with building program areas

• Identifying spatial interferences between various building components

• Visualization of design decisions

• Improving overall document coordination (QA/QC)

• Facilities management tool once the project is complete

DESIGN APPROACH

PRESENTER: Aaron Nickerson

Page 23: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

MAXIMIZING VALUE to the County

Building Information Model

PRESENTER: Aaron Nickerson

Page 24: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Proposed STACKING DIAGRAMSBuilding Stacking

Level 01• Intake• Public Administration• Housing Units 1A/1B• Food Service• Commissary• Laundry• Mechanical / support

Level 02• Health Services• Juvenile Housing/Support• Mechanical Equipment• Housing Units 1A/1B mezz

(not interconnected to Lvl 02)

Level 03• Housing Units 2A-2E• Private Administration

Level 04• Housing Units 3A-3E

Exploded Diagram

DESIGN APPROACH

PRESENTER: Shane Lyle

Page 25: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

STACKING DIAGRAM

Level 01 – Original Concept Drawing

Page 26: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

PROPOSED PLANLEVEL 01

• Intake

• Public Administration

• Housing Units 1A/1B

• Food Service

• Commissary

• Laundry

• Maintenance

• Mechanical

• Electrical

• Support

First Level

DESIGN APPROACH

PRESENTER: Shane Lyle

Page 27: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

STACKING DIAGRAM

Level 02 – Original Concept Drawing

Page 28: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

PROPOSED PLANLEVEL 02

• Health Services

• Juvenile Housing

• Mechanical Equipment

• Housing Units 1A/1B mezz(not inter-connected to Lvl 02)

• Housing Support

Second Level

DESIGN APPROACH

PRESENTER: Shane Lyle

Page 29: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

STACKING DIAGRAM

Level 03 – Original Concept Drawing

Page 30: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

PROPOSED PLANLEVEL 03

• Housing Units 2A-2E

• Housing Support

• Private Administration

Third Level

DESIGN APPROACH

PRESENTER: Shane Lyle

Page 31: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

STACKING DIAGRAM

Level 04 – Original Concept Drawing

Page 32: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

PROPOSED PLANLEVEL 04

• Housing Units 3A-3E

• Housing Support

Fourth Level

DESIGN APPROACH

PRESENTER: Shane Lyle

Page 33: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Building Massing

Building Massing – Original Criteria Documents

• Volume of SE quadrant is significantly reduced through re-stacking.

• Building footprint and overall program SF is not affected.

PRESENTER: Shane Lyle

Building Massing – Our Proposal Documents

Page 34: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL
Page 35: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Exterior Aesthetics and FinishesPrefinished Architectural Metal Panels

• Commercial appearance

• Masks heavy institutional construction

• Stays clean, easy to maintain

• Building aesthetic decisions can be adjusted without affecting structural design, for fast-track construction

Page 36: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

SITE DESIGN

• Access & Parking

• Stormwater design

• Street landscaping and buffering

DESIGN APPROACH

PRESENTER: Erica Floyd

Page 37: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

STRUCTURAL DESIGNDECISIONS

• Designed to meet schedule

• Intentionally avoided masonry and cast-in-place concrete

• Auger-cast pile foundation system

• Structural precast at Areas A and C with double-tee floors

• Structural steel frame at areas B and D

DESIGN APPROACH

PRESENTER: Win Bishop

Page 38: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

• Security Electronics Engineer

Buford Goff & Associates

• Detention and Operations Consultant

Musacchio & Associates

• Integrator

Cornerstone Detention

DESIGN APPROACH

PRESENTER: Keith Summer

Security Electronics Engineer

Detention and Operations Consultant

Security Electronics

and Detention Equipment Integrator

SECURITY ELECTRONICSIntegration of Systems

Page 39: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

DESIGN APPROACH

PRESENTER: Keith Summer

• Door control

• Card access

• Programmable logic controllers

• Intercom and paging

• Video Surveillance – IP based

• Touchscreen GUI

• Staff duress

• UPS

SECURITY ELECTRONICSIntegration of Systems

Page 40: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

SECURITY ELECTRONICSInterconnection and Transferof Existing

Coordination to avoid disruption of service

Page 41: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

PRESENTER: Shannon Claborn

STEEL CELLS

• Advantages to modularity• Two different steel cell types

• Modules – MSSI (Maximum Security Systems)• Wall Panels – Trussbilt (TrussWall)

• Differences and logic behind using two types• MSSI Cell Module shown here• Meets all Security and Sound Requirements• Tested and Certified by Independent Labs

DESIGN APPROACH

Page 42: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

STEEL CELLS

PRESENTER: Shannon Claborn

DESIGN APPROACH

• Meets all Security and Sound Requirements• Tested and Certified by Independent Labs

Page 43: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

• Jail Operations Expertise

• Security Door/Hardware Consulting

• Evaluation of Physical Barriers

• Assistance with Keying

• Onsite QA/QC of doors/hardware during construction

• Detention Systems Commissioning

DESIGN APPROACH

PRESENTER: David Musacchio

SECURITY DESIGN CONSULTANT

Page 44: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

DESIGN APPROACH

PRESENTER: Monty Maynard

Utility Interface

ELECTRICAL

Page 45: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

DESIGN APPROACH

PRESENTER: Monty Maynard

ELECTRICAL

Page 46: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

DESIGN APPROACH

PRESENTER: Monty Maynard

Power Distribution

Emergency Power

Lightning Protection

ELECTRICAL

Page 47: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

DESIGN APPROACH

PRESENTER: Monty Maynard

• Lighting

• Lighting controls

• 30% Energy Savings

ELECTRICAL

Page 48: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

DESIGN APPROACH

PRESENTER: Monty Maynard

• Communication Networks

• MATV

COMMUNICATIONS DESIGN

Page 49: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

DESIGN APPROACH

PRESENTER: Doug Cage

MECHANICALOverview

• Thermal Comfort• Energy Accountant (50 EUI)• System Sizing and Layout• Central Plant• Air-handling Systems• Plumbing Systems• Life Safety / Smoke Exhaust

Page 50: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

DESIGN APPROACH

PRESENTER: Doug Cage

Central Plant• Layout• Sized for Alternate #2• Highest Efficiency Chiller, Boiler & Pumping

Systems

MECHANICAL

Page 51: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

DESIGN APPROACH

PRESENTER: Doug Cage

• Variable Air Volume AHUs• Demand Controlled, Energy Recovery

Ventilation Throughout• 100% OA (Single Cell, Medical,

Juveniles)• Smoke Exhaust System Integration• Minimized Equipment in Inmate-

Accessible Areas

MECHANICALAir Systems

Page 52: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

DESIGN APPROACH

PRESENTER: Doug Cage

• Highest Efficiency Domestic Water Heating Systems

• Laundry Water Recycle• Maintenance, Access, and Control (Isolation)

MECHANICAL Plumbing Systems

Page 53: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

PRESENTER: Doug Cage

Life Cycle Costing / Energy Efficiency

50 EUIItems ExploredEnergy Recovery Ventilation – Yes

High Efficiency Cooling Towers – Yes

VAV Air Handling – Yes

Heat Recovery Chillers – No

Solar Water Heating – No

Page 54: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

LEED SCORE SHEET OVERVIEW

SUSTAINABILITY

PRESENTER: Cesar Reyes

Page 55: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

SUSTAINABILITYLeadership in Energy and Environmental Design (LEED)• Integrative process that must be managed during design, construction,

and post-occupancy

• LEED Implementation Plan will be customized for this project.

• 50 credits minimum required to achieve “Silver”

• Some of the credits being pursued include:

LEED Credit Distribution(56 Credits Identified)

Location and TransportationSustainable SitesWater EfficiencyEnergy and AtmosphereMaterials and ResourcesIndoor Environmental QualityInnovationRegional Priority

• High Priority Site

• Surrounding Density and Diverse Uses

• Access to Quality Transit

• Rainwater Management

• Heat Island Reduction

• Light Pollution Reduction

• Outdoor Water Use Reduction

• Indoor Water Use Reduction

• Cooling Tower Water Use

• Enhanced Commissioning

• Optimize Energy Performance

• Demand Response

• Low Emitting Materials

• Indoor Air Quality Assessment

• Construction Air Quality Mgmt Plan

• Regional Priority Credits

PRESENTER: Cesar Reyes

Page 56: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

PROJECT MANAGEMENT PLANWGI/CADDELL/GRW

• Project Controls / Management / Administration• Conflict Resolution• QA/QC

Page 57: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Project Controls/ Management/Construction Administration

PROJECT MANAGEMENT

PRESENTER: Jay Jones

Schedule Control

Cost Control

Safety

Quality Control

CRITICAL PROJECT EXECUTION ELEMENTS • Maintain a Schedule Driven Project Plan

without Sacrificing Quality • Ensuring Maximum Efficiency • Monitoring Project Quality to Enhance

Aesthetics and Function • Protecting Health and Safety of All Site

Personnel

Page 58: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Schedule Control

PROJECT MANAGEMENT

PRESENTER: Jay Jones

Page 59: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Cost Control

PROJECT MANAGEMENT

PRESENTER: Jay Jones

Page 60: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Conflict Resolution Techniques

PROJECT MANAGEMENT

PRESENTER: Jay Jones

Caddell is a two-time winner of the

National AGC Marvin M. Black Award

for Excellence in Partnering

Page 61: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Safety

PROJECT MANAGEMENT

PRESENTER: Andrew Thomason

Page 62: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Quality Control

PROJECT MANAGEMENT

PRESENTER: Andrew Thomason

Page 63: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Scott Emerson, RA │GRW ArchitectYEARS OF EXPERIENCE:With GRW: 13Total: 33EDUCATIONBachelor of ArchitectureVirginia Polytechnic Institute and State UniversityREGISTRATIONRegistered Architect: KYNational Council of Architectural Boards (NCARB) CertificationConstruction Documents Technologist (CDT)

PRESENTER: Shane Lyle

PROJECT MANAGEMENT

RELEVANT PROJECT EXPERIENCE

U.S. Penitentiary and Camp, Canaan, PA• $131 million • 647,632 SF

U.S. Penitentiary and Camp, McCreary County, KY• $124 million • 533,000 SF

Federal Correctional Institution and Camp, Glenville, WV• $106 million • 603,132 SF

Inmate Programming at Coffee and Wheeler Facilities, Alamo and Nicholls, GA• $4.2M• 13,000 SF

Page 64: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Construction AdministrationPROJECT MANAGEMENT

PRESENTER: Scott Emerson

Page 65: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

SCHEDULEWGI/CADDELL

Construction Milestones4D PresentationBIM Coordination in Support of the Schedule

PRESENTERS: Jay Jones & Mike Dean

Page 66: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

PRESENTER: Jay Jones

Critical Construction Milestones

Construction Start (Sitework) 10 Dec 2017 Building demolition Start Auger cast piles Start Precast erection Start Steel erection Building Dry-in Permanent power HVAC Air Connect to Existing Building Substantial Completion Security Electronics Testing and

Demonstration Final Completion 27 Dec 2019 Owner Training on Facility Operations &

Maintenance

Page 67: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL
Page 68: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

PRESENTER: Mike Dean

BIM Systems Coordination in Support of the Schedule

• Systems Clash Detection

• Constructability

• Shop Drawing Accuracy

• Prefabrication

• Installation Speed

• Effective Communication of Systems

• Field Verification of Systems

• As-Builts

• COBIE

• Facilities Management

Page 69: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

PERMITTING

Northwest Florida Water Management District (NWFWMD)

Environmental Resource Permitting (ERP)

Stormwater Individual Permit

Florida Department of Transportation (FDOT)

Driveway Connection Permit

Drainage Connection Permit

Utility Connection Permit

Emerald Coast Utilities Authority (ECUA)

Sewer System Extension and Single Service Connections (Water and Sewer)

Escambia County

Site Development Order and Demolition Permit

SCHEDULE

PRESENTER: Pete Johnson

Page 70: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

COMMUNITY OUTREACH

PRESENTER: Rob Fabbro

Local Labor Outreach Public Meetings/Involvement Volunteer Project

Page 71: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

LOCAL OUTREACH

• 30% of the contract ($40M) still available to be subcontracted to locals

• Major subs will maximize use of local vendors and local 2nd tier subs

• WGI/Caddell will hold another trade/labor fair to encourage local participation

COMMUNITY OUTREACH

PRESENTER: Rob Fabbro

Page 72: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

COMMUNITY OUTREACH

PRESENTER: Rob Fabbro

PUBLIC MEETINGSKeep the Community Informed

• Project Website

• Available positions posted

• Town Hall Meetings

• What to Expect: Traffic patterns, work hours, noise

Page 73: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

VOLUNTEER PROJECT

• Give our time and expertise to the neighborhood

• Neighborhood Committee to redevelop corner of Pace and Fairfield

• Engage a developer

• Perhaps moving Boys & Girls Club or Community Center as a permanent anchor

COMMUNITY OUTREACH

PRESENTER: Rob Fabbro

Page 74: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

WHY CHOOSE THIS TEAM?WGI/CADDELL and GRW

Larry M. Jacobs and Associates, Inc. (LMJ)

Buford Goff & Associates, Inc.

PRESENTER: Eddie Stewart

Page 75: Design/Build Services for ESCAMBIA COUNTY CORRECTIONAL

Thank you for this opportunity.