Upload
anthony-j-reems
View
221
Download
0
Embed Size (px)
Citation preview
7/30/2019 Design to Build
1/13
Property Development
Business Plan, entitled
Design to Build
7/30/2019 Design to Build
2/13
1. Clearing
Equipment 2. Grading
3. Planting
+ Land alue ! "perations +
This company plans to serve big industry
Our team is deeply focused on creating prosperous estates
Here, is an Original Guide for Sustainable Development of
wood lots in the Pacific Northwest
7/30/2019 Design to Build
3/13
Planting
Staes
Pots
Trees
Clearing
!eller "uncher
Grapple Sidder
!orestry #ower
$og Processor
$oader
Trailers
%&cavator
Do'er
"reaer
Tamper
Grappler
(oc )rusher
Truc
Trailer
*uger
Grading
7/30/2019 Design to Build
4/13
#eller Bun$%er
)uts Trees near the base
Pics up the stems, then laysem down
Grapple &'idder
Drags the !allen Trees to
the road or curbside
*rranges the stacs
#orestry (o)er
)reates Paths for #achines
#ulches +egetation
(a$%ine #un$tion
7/30/2019 Design to Build
5/13
Logging
Pro$essor
Strips limbs off the tree
cuts stems to reuired length
Loader
Pics up the logs
*rranges them onto the trailer
*railer
Prepares Transport
- Sell the (ough )ut -
7/30/2019 Design to Build
6/13
Grading Land
%&cavator
Do'er
"reaer
Tamper
Grappler
(oc )rusher
Equipment
High .uality %uipment is essential forefficiently shaping the surface of land onvarious properties
/e will wor with vital commitments to
ensure the machines are running well
*ctions carried out by the Operators willstrive to satisfy a unified vision ofabundance
7/30/2019 Design to Build
7/13
(a$%ine
E$avator
+ersatile machine with aHydraulic or Pneumatic *rm
)arries attachments, aplethera of applications
Doer
#oves slowly with high Torue
Pushes the %arth, (ips into it
Brea'er
Splits Stone into pieces
#un$tion
7/30/2019 Design to Build
8/13
Grappler
Pics up material, arranges piles
!eeds stone to the crusher, or todump trucs
-o$' Crus%er
Splits stone into aggregate
*amperCompa$tor
Presses earth together
!orms the desired shape
#un$tion (a$%ine
7/30/2019 Design to Build
9/13
Grading is best done when the ground is soft
Digging allows developers to seperate roc from soil
The shape of the land can be ad0usted to suit the plantation best
Comments
Possibilities continue with the power of man in machine
Now we begin to prepare for, planting
7/30/2019 Design to Build
10/13
Planting
The location for planting a groveis critical for successful fruits
Select an environment withoptimal growing conditions
111111111111111
stae out the placement of eachtree
*fter the Tree $ocations havebeen selected, drill holes in theground with an *uger
Then !inally, Plant the !ruitTrees
7/30/2019 Design to Build
11/13
*rees
(aterials
&ta'es
Planters
2t is very important to select uality cultivars for theappropriate climate
Proven success must be recorded before a largeplantation is established
Start off with a low number, then slowly e&pand
Prune, Propagate3 Prune, Propagate
Prune, Propagate, Harvest
7/30/2019 Design to Build
12/13
Thus, this plan has outlined methods ofdeveloping a raw wood lot into an orchard
+alue through the estates will increase, whileoperating costs are subsidi'ed
)lear in the !all, Grade in the Spring, thenprepare to plant in the Summer
Busy Bees
7/30/2019 Design to Build
13/13
Glad you reviewed this documen
Please respond with interest
45617891:;4The strong oas of today arethe nuts that held their ground?
Prosperous "/0e$tives
*nthony @ (eems