30
Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05) HELD ON 21.07.2014 @ GIFT CL OFFICE, GANDHINAGAR BIDDER Page 1 of 9 GIFTCL Details of issues raised by the bidders and clarifications are given below: Sr. No. ISSUE RAISED REFERENCE CLARIFICATION BY GIFTCL 1. Ref. Drawings. Please provide Building drawings, showing building plans, elevations and sections. Please Refer Drawings Attached as Annexure. 1 in Addendum 1. Only for reference regarding dimensions of the buildings. 2. Can we get soft copy (PDF) of the tender document? (this is to enable ease in study and finding specific details). Tender Conditions Shall Prevail. 3. Approved List Please provide Approved make list. Tender Conditions Shall Prevail. 4. Part B Area Can we get Building wise area for all three buildings? Please Refer Drawings Attached as Annexure. 1 in Addendum 1. Only for reference regarding dimensions of the buildings. 5. Project Duration 75 days duration is too less. Can we propose our time frame? Please Refer Addendum 1. 6. Performance test For such a tight scheduled project, testing may need further more time. Is Performance lab testing required? If Yes, which are the approved labs? For which items the tests are to be considered? Tender Conditions Shall Prevail. (Information regarding Approved Labs would be shared after contractor selection.) 7. Structural Glazing BOQ item says structural glazing, please confirm which system to propose: To be proposed by the bidder as per design carried out.

Design, Supply, Fabrication and Erection of Glass … · Can we get soft copy ... Design, Supply, Fabrication and Erection of Glass Façade works for various Plant ... request you

Embed Size (px)

Citation preview

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05) HELD ON 21.07.2014 @ GIFT CL

OFFICE, GANDHINAGAR

BIDDER Page 1 of 9 GIFTCL

Details of issues raised by the bidders and clarifications are given below:

Sr. No. ISSUE RAISED REFERENCE CLARIFICATION BY GIFTCL

1.

Ref. Drawings. Please provide Building drawings, showing building plans, elevations and sections.

Please Refer Drawings Attached as Annexure. 1 in Addendum 1. Only for

reference regarding dimensions of the buildings.

2. Can we get soft copy (PDF) of the tender document? (this is to enable ease in study and finding specific details).

Tender Conditions Shall Prevail.

3. Approved List Please provide Approved make list.

Tender Conditions Shall Prevail.

4.

Part B Area Can we get Building wise area for all three buildings?

Please Refer Drawings Attached as Annexure. 1 in Addendum 1. Only for

reference regarding dimensions of the buildings.

5. Project Duration 75 days duration is too less. Can we propose our time frame?

Please Refer Addendum 1.

6.

Performance test For such a tight scheduled project, testing may need further more time. Is Performance lab testing required? If Yes, which are the approved labs? For which items the tests are to be considered?

Tender Conditions Shall Prevail. (Information regarding Approved Labs would

be shared after contractor selection.)

7.

Structural Glazing BOQ item says structural glazing, please confirm which system to propose:

To be proposed by the bidder as per design

carried out.

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05) HELD ON 21.07.2014 @ GIFT CL

OFFICE, GANDHINAGAR

BIDDER Page 2 of 9 GIFTCL

Details of issues raised by the bidders and clarifications are given below:

Sr. No. ISSUE RAISED REFERENCE CLARIFICATION BY GIFTCL

• Unitised • Semi-unitised • 2 sided Structural glazing and 2 sided capping

(Refer Clause no. 4.6.1 of technical specification, which says capping on 2 sides)

8.

Please provide areas separately to work out average rate: • Vision DGU glass • Spandrel SGU glass with Spandrel • Openable panels - Size and quantity.

Refer the Architectural view and drawings in Annexure. 1 in Addendum 1.

9.

Suspended glazing

• Please provide approved make for spider glazing.

• Please re-confirm the glass thickness and specification. (6 mm glass is not advisable for suspended glazing).

Refer Annexure. 2 Revised BOQ in Addendum 1

10. ACP Is ACPof FR or NON-FR grade.?

Refer Annexure. 2 Revised BOQ in Addendum 1

11. What is the Size of Box louver? Aluminium Louvers Refer Annexure. 2 Revised BOQ in Addendum 1

12. Also please provide the C/C distance between vertical louver tubes.

Aluminium Louvers 2500 mm

13. As per the discussion during Pre-bid meeting, it was stated that MS member will be required to support the louvers. What will be the

Aluminium Louvers Fixing detail to be proposed by bidder

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05) HELD ON 21.07.2014 @ GIFT CL

OFFICE, GANDHINAGAR

BIDDER Page 3 of 9 GIFTCL

Details of issues raised by the bidders and clarifications are given below:

Sr. No. ISSUE RAISED REFERENCE CLARIFICATION BY GIFTCL

fixing to those MS members?

14. In the BOQ the coating is mentioned as powder coating but with 15 microns. Is it Anodised or Powder coated? (if Powder coated the thickness will be more).

Aluminium Louvers Refer Annexure. 2 Revised BOQ in Addendum 1

15. We request to provide 10% advance Advance Tender Conditions Shall Prevail.

16. Further payment term break-up not defined. Kindly provide break-up for the same (or can we propose our payment terms?)

Tender Conditions Shall Prevail.

17. It is mentioned 10% shall be provided as performance bond. Can this be changed to 5%? Can the same be release after completion?

Performance Security Tender Conditions Shall Prevail.

18. Are any milestones defined? Liquidated Damages Tender Conditions Shall Prevail.

19.

Technical Eligibility criteria ( as section 1 clause no.3)of 12000 sq. mt job with 60% DGU and 40% of ACP.we request to consider the same eligibity criteria of façade with 12000 sq.mt with ACP , single glass , aluminium fins, laminated glass and spider glass instead of only DGU and ACP. In Gujarat as there is very slow trend of High rise business centre it is not possible to have large façade that too with DGU , It will be very unfair to consider only DGU and not single glass , frameless glass , laminated glass , the design criteria does not have major difference in putting DGU and single glass. Hence we request to consider the façade of minimum 12000 sq. mt but with single glass, acp, laminated glass, spider fitting and glass glazing.

Tender Conditions Shall Prevail.

20. Performance security: Request to make it 5% of total value in place of 10%. (as per section 1. clause 34) and same should be release at the end of project completion.

Tender Conditions Shall Prevail.

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05) HELD ON 21.07.2014 @ GIFT CL

OFFICE, GANDHINAGAR

BIDDER Page 4 of 9 GIFTCL

Details of issues raised by the bidders and clarifications are given below:

Sr. No. ISSUE RAISED REFERENCE CLARIFICATION BY GIFTCL

21.

Soft copy and hard copy of complete Structural / RCC / Brick work Plan, elevation of all sides, sections etc required related to facade work of all the building viz. STP Control Building, DCS Building, UT Viewing Gallery, EPS Building as requested in pre-bid. Further please indicate sizes of the doors required to be considered in 12mm clear glass in all building and which all hardware/system required to be considered. Lastly door will be measured in which BOQ item.

Please Refer Drawings Attached as Annexure. 1 in Addendum 1. Only for

reference regarding dimensions of the buildings.

22.

As the MS Structure of UT Viewing of skylight is being taken care by GIFT, request you to kindly pass relevant drawing (Soft as well as Hard Copy) as we need to incorporate our design with your existing structure.

Please Refer Drawings Attached as Annexure. 1 in Addendum 1. Only for

reference regarding dimensions of the buildings.

23. Kind guide who will take care of the Guarantee of the glass, acp as the same will be purchase from the specified manufacturer as per your specification. Is it for 10 years or for 20 years.

Bidder has to take the undertaking for the Guarantee of glass and ACP which has to be

for 10 years

24.

What is the time allocated for mobilization of manpower / material at site?

Tender Conditions Shall Prevail. Refer Clause 5.4 SCC Page 151 of 408

“Within 15 days from the date of issuing Notice to

Commence”

25.

Work to include preparing & finishing junctions with concrete, masonry, aluminium including use of flashing if any******* Kindly clarify what all activity that we need to conduct in civil as the same is always out of the scope of facade contractor.

Page No. 403, Part A-A, S.No. 1 Tender Conditions Shall Prevail.

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05) HELD ON 21.07.2014 @ GIFT CL

OFFICE, GANDHINAGAR

BIDDER Page 5 of 9 GIFTCL

Details of issues raised by the bidders and clarifications are given below:

Sr. No. ISSUE RAISED REFERENCE CLARIFICATION BY GIFTCL

26. Including the cost of painting to match the color of glass*******Kindly specify which type of painting and on which area. What is the total quantity?

Page No. 403, Part A-A, S.No. 1(ii) Tender Conditions Shall Prevail.

27. Aluminium fins / ribs of required size as shown in the drawing*******Kindly specify drawing no. as the same is not located in the tender document.

Page No. 403, Part A-A, S.No. 1(iv) Tender Conditions Shall Prevail.

28.

Preparing & finishing junctions with concrete, glass, providing flashing and waterproof sealing*******Kindly clarify what all activity that we need to conduct in civil as the same is always out of the scope of facade contractor

Page No. 403, Part A-A, S.No. 2 Tender Conditions Shall Prevail.

29.

Suspended glazing system with tension rod system and imported SS spider fitting with ss pipe, ss bracket with 6mm toughened glass*******Kindly clarify area of Spider Glazing as the same is never recommended on 6mm glass. Also what will be the grade of SS which is required to be installed? Any specific make of the hardware.

Page No. 403, Part A-A, S.No. 2

Refer Annexure. 2 Revised BOQ in Addendum 1

30.

Required fire stops, water drains and gutters and fixing junctions with concrete, stone, timber, aluminium, glass etc*******Kindly provide us the drawing of the water drain/gutters as considered in your RCC drawing.

Page No. 404, Part A-B, S.No. 1

Please Refer Drawings Attached as Annexure. 1 in Addendum 1. Only for

reference regarding dimensions of the buildings.

31. ACP with FR Code (If Required) *******Kindly clarify do we need to consider FR only

Page No. 404, Part A-B, S.No. 1

Refer Annexure. 2 Revised BOQ in Addendum 1

32. *******Kindly specify till what height louver is required to be installed. Further which kind of support required for louver as at site no RCC column/beam located above terrace level.

Page No. 404, Part A-C, S.No. 1

Please Refer Drawings Attached as Annexure. 1 in Addendum 1. Only for

reference regarding dimensions of the

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05) HELD ON 21.07.2014 @ GIFT CL

OFFICE, GANDHINAGAR

BIDDER Page 6 of 9 GIFTCL

Details of issues raised by the bidders and clarifications are given below:

Sr. No. ISSUE RAISED REFERENCE CLARIFICATION BY GIFTCL

buildings.

33.

Work to include preparing & finishing junctions with concrete, masonry, aluminium including use of flashing if any*******Kindly clarify what all activity that we need to conduct in civil as the same is always out of the scope of facade contractor.

Page No. 405, Part B-A, S.No. 1

Tender Conditions Shall Prevail

34. Including the cost of painting to match the color of glass*******Kindly specify which type of painting and on which area. What is the total quantity.

Page No. 405, Part B-A, S.No. 1(ii) Tender Conditions Shall Prevail.

35.

Aluminium fins / ribs of required size as shown in the drawing*******Kindly specify drawing no. as the same is not located in the tender document

Page No. 405, Part B-A, S.No. 1(iv)

Please Refer Drawings Attached as Annexure. 1 in Addendum 1. Only for

reference regarding dimensions of the buildings.

36.

Preparing & finishing junctions with concrete, glass, providing flashing and waterproof sealing *******Kindly clarify what all activity that we need to conduct in civil as the same is always out of the scope of facade contractor.

Page No. 405, Part B-A, S.No. 2 Tender Conditions Shall Prevail

37.

Suspended glazing system with tension rod system and imported SS spider fitting with ss pipe, ss bracket with 6mm toughened glass*******Kindly clarify area of Spider Glazing as the same is never recommended on 6mm glass. Also what will be the grade of SS which is required to be installed. Any specific make of the hardware.

Page No. 405, Part B-A, S.No. 2 Tender Conditions Shall Prevail

Refer Annexure. 2 Revised BOQ in Addendum 1

38. Required fire stops, water drains and gutters and fixing junctions with concrete, stone, timber, aluminium, glass etc*******Kindly

Page No. 406, Part B-B, S.No. 1

Tender Conditions Shall Prevail.

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05) HELD ON 21.07.2014 @ GIFT CL

OFFICE, GANDHINAGAR

BIDDER Page 7 of 9 GIFTCL

Details of issues raised by the bidders and clarifications are given below:

Sr. No. ISSUE RAISED REFERENCE CLARIFICATION BY GIFTCL

provide us the drawing of the water drain/gutters as considered in your RCC drawing. Also kindly clarify what all activity that we need to conduct in civil, interior as the same is always out of the scope of facade contractor

39.

*******Kindly specify till what height louver is required to be installed as the same is not located from the pictures as provided. Further which kind of support required for louver if the same is required to be install

Page No. 406, Part B-C, S.No. 1

Please Refer Drawings Attached as Annexure. 1 in Addendum 1. Only for

reference regarding dimensions of the buildings.

40.

Dimensions / Distance / Levels mentioned in the bid documents are indicative. *******Kindly Specify which Dimensions / Distance / Levels as the same is not in tender document

Page No. 15, S.No. 6.3 Please Refer Drawings Attached as Annexure. 1 in Addendum 1. Only for

reference regarding dimensions of the buildings.

41. Kindly clarify electricity and water will be provided by GIFT in all the location viz STP Control Building, DCS Building, UT Viewing Gallery, EPS Building separately at single point

Page No. 18, S.No. 12.3 Tender Conditions Shall Prevail.

42.

Discount during evaluation of analysis is always based on the total quantity as mentioned in Part A and Part B complete. How can the evaluation be considered separated. LOI required to be considered as single for complete quantum. Please confirm.

Page No. 31, S.No. 30.2 Tender Conditions Shall Prevail.

43.

Contractor shall strictly comply with the condition of the environment clearance granted by state level environment impact assessment authority ********Kindly specify what all points required to be considered as the same should be out of our scope of work

Page No. 54, S.No. 8.1

Tender Conditions Shall Prevail.

44. Kindly clarify which all types of light, sign glow what will be the Page No. 58, S.No. 19.1 Tender Conditions Shall Prevail.

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05) HELD ON 21.07.2014 @ GIFT CL

OFFICE, GANDHINAGAR

BIDDER Page 8 of 9 GIFTCL

Details of issues raised by the bidders and clarifications are given below:

Sr. No. ISSUE RAISED REFERENCE CLARIFICATION BY GIFTCL

quantity required to be considered during execution.

45. Kindly clarify what is the time period required to be considered for getting the CAR policy

Page No. 61, S.No. 21 Tender Conditions Shall Prevail.

46.

Kindly specify percentage of taxation (WCT, Service tax, Labour cess etc..) required to be considered in our rates as the base for evaluating the tender document is on the quoted work executed rates

Page No. 104, S.No. 73 Tender Conditions Shall Prevail.

47. Kindly clarify what is the time period considered by GIFT for getting the performance test done as further activity can only be started after getting approval

Page No. 325, Appendix C

Within the Time completion period of the project

48. Deduction for Royalty on material used********Kindly clarify as the same should not be in our scope of work

Page No. 333 Tender Conditions Shall Prevail.

49. Kindly clarify which all type of approval is required to be considered.

Page No. 176 All relevant approval related to this Tender

50.

Kindly clarify what all material related to BMU, Lighting protection tabs etc required to be considered

Page No. 185, S.No. g S.No. 2.4.1 (g) - Submission of all components of BMU, lighting protector as

required. Tender Conditions Shall Prevail

51. Kindly clarify spare Quantity in respect to sqm required to be considered

Page No. 245, S.No. 10.2.5

Spare quantity in sq. m has to be calculated by bidder

52. Kindly clarify lighting protection is in whose scope of work Page No. 258, S.No.

2.6.18 S.No. 2.6.18 - Lightning Protection of façade work is in the scope of façade

agency.

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05) HELD ON 21.07.2014 @ GIFT CL

OFFICE, GANDHINAGAR

BIDDER Page 9 of 9 GIFTCL

Details of issues raised by the bidders and clarifications are given below:

Sr. No. ISSUE RAISED REFERENCE CLARIFICATION BY GIFTCL

Tender Conditions Shall Prevail

53. Applicable Service tax would be extra Page No. 164, S.No. 45.2(A-3)

Tender Conditions Shall Prevail.

54. UT Viewing Gallery skylight glass generally required to be considered as laminated. Please confirm.

Laminated to be considered.

55. 12mm thk Argon Gas indicated wherein in specification Page No. 207 it says 12mm air gas gap. Kindly clarify

Page No. 403 & 405 Argon Gas. Refer Annexure. 2 Revised BOQ in

Addendum 1

56. Kindly confirm if the ARE-1 form can be issued by GIFT against the purchase of major material.

No. Tender Conditions Shall Prevail.

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05)

BIDDER Page 1 of 1 GIFTCL

Addendum-1

Addendums /Amendments For Design, Supply, Fabrication and Erection of Glass Façade works for various

Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05) Sr. No. Clause No. Original (Instead of) Amendment/Addendum (Read As)

1. ADD Bid Drawings Annexure-1

2. Section-11 BOQ Annexure-2 BOQ

3. Clause 1.2 ITB

The Contractor is required to complete the Works within 75 days (Including monsoon period and holidays observed by the Employer) from the date of issue of the Notice to commence.

The Contractor is required to complete the Works within 90 days (Including monsoon period and holidays observed by the Employer) from the date of issue of the Notice to commence.

4. Appendix to Bid Time for Completion of Works

Within 75 days from the date of issuance of the notice to commence.

Within 90 days from the date of issuance of the notice to commence.

5. Format - 4: Current Contract Commitments/Works in Progress

Value of Balance Work in Hand for 75 days Value of Balance Work in Hand for 90 days

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05)

GIFTCL Page 1 of 1 CONTRACTOR

Annexure -1

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05)

GIFTCL Page 1 of 1 CONTRACTOR

DCS

General Notes:1. Do not scale the drawing2. Only written dimensions and UTM coordinate reference provided

to be followed.3. Any discrepancies in the drawing/s should be brought to the notice

of relevant authority.4.Drawings duly signed and stamped by GIFTCL only shall be

considered valid for implementation purpose

Backward LinkageDwg No.

Key MapGujarat International Finance Tec-City Company Ltd .3rd Floor, 'A' Wing, Khanij Bhavan, Nr. University Ground, 132 ft Ring Road, Vastrapur,Ahmedabad -380052, India GUJARAT INTERNATIONAL

FINANCE TEC-CITY

Disclaimer-

Checked By: Approved By:

Date Date

Forward LinkageDwg No.

Employer : UID

of Com

ponents

HVAC - CONTRACTOR

ETA HOUSE, B-13, SECTOR-63,NOIDA-201301 (U.P.) INDIA

FIRST FLOOR PLANChecked By:Prepared By: Approved By: DateRevision No. Description

Consultant:

CONSULTING ENGINEERS LIMITEDMUMBAI

EDC/ETA/DCP/AR/503

PLANT ROOM BUILDING FOR "Q" BLOCK

HVAC - CONTRACTOR

PRO

DU

CED

BY

AN

AU

TOD

ESK

ED

UC

ATI

ON

AL

PRO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR

OD

UC

ED B

Y AN

AU

TOD

ESK ED

UC

ATIO

NA

L PRO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

FOR TENDER PURPOSE O

NLY

General Notes:1. Do not scale the drawing2. Only written dimensions and UTM coordinate reference provided

to be followed.3. Any discrepancies in the drawing/s should be brought to the notice

of relevant authority.4.Drawings duly signed and stamped by GIFTCL only shall be

considered valid for implementation purpose

Backward LinkageDwg No.

Checked By:Prepared By: Approved By: DateRevision No. Description

Key MapGujarat International Finance Tec-City Company Ltd .3rd Floor, 'A' Wing, Khanij Bhavan, Nr. University Ground, 132 ft Ring Road, Vastrapur,Ahmedabad -380052, India GUJARAT INTERNATIONAL

FINANCE TEC-CITY

Disclaimer-

Checked By: Approved By:

Date Date

Forward LinkageDwg No.

Employer : UID

of Com

ponents

HVAC - CONTRACTOR

ETA HOUSE, B-13, SECTOR-63,NOIDA-201301 (U.P.) INDIA

GROUND FLOOR PLAN

EDC/ETA/DCP/AR/502

ConsultantConsultant:

CONSULTING ENGINEERS LIMITEDMUMBAI

PLANT ROOM BUILDING FOR "Q" BLOCKHVAC - CONTRACTOR

SHEET 1 OF 2

0.00M LEVEL PLAN

PRO

DU

CED

BY

AN

AU

TOD

ESK

ED

UC

ATI

ON

AL

PRO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR

OD

UC

ED B

Y AN

AU

TOD

ESK ED

UC

ATIO

NA

L PRO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

FOR TENDER PURPOSE O

NLY

General Notes:1. Do not scale the drawing2. Only written dimensions and UTM coordinate reference provided

to be followed.3. Any discrepancies in the drawing/s should be brought to the notice

of relevant authority.4.Drawings duly signed and stamped by GIFTCL only shall be

considered valid for implementation purpose

Backward LinkageDwg No.

Checked By:Prepared By: Approved By: DateRevision No. Description

Key MapGujarat International Finance Tec-City Company Ltd .3rd Floor, 'A' Wing, Khanij Bhavan, Nr. University Ground, 132 ft Ring Road, Vastrapur,Ahmedabad -380052, India GUJARAT INTERNATIONAL

FINANCE TEC-CITY

Disclaimer-

Checked By: Approved By:

Date Date

Forward LinkageDwg No.

Employer : UID

of Com

ponents

HVAC - CONTRACTOR

ETA HOUSE, B-13, SECTOR-63,NOIDA-201301 (U.P.) INDIA

ROOF PLAN

EDC/ETA/DCP/AR/502

ConsultantConsultant:

CONSULTING ENGINEERS LIMITEDMUMBAI

PLANT ROOM BUILDING FOR "Q" BLOCKHVAC - CONTRACTOR

PRO

DU

CED

BY

AN

AU

TOD

ESK

ED

UC

ATI

ON

AL

PRO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY A

N A

UTO

DESK

EDU

CA

TION

AL PR

OD

UC

T

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

FOR TENDER PURPOSE O

NLY

General Notes:1. Do not scale the drawing2. Only written dimensions and UTM coordinate reference provided

to be followed.3. Any discrepancies in the drawing/s should be brought to the notice

of relevant authority.4.Drawings duly signed and stamped by GIFTCL only shall be

considered valid for implementation purpose

Backward LinkageDwg No.

Checked By:Prepared By: Approved By: DateRevision No. Description

Key MapGujarat International Finance Tec-City Company Ltd.3rd Floor, 'A' Wing, Khanij Bhavan, Nr. University Ground, 132 ft Ring Road, Vastrapur,Ahmedabad -380052, India GUJARAT INTERNATIONAL

FINANCE TEC-CITY

Disclaimer-

Checked By: Approved By:

Date Date

Forward LinkageDwg No.

Employer : UID

of Com

ponents

HVAC - CONTRACTOR

ETA HOUSE, B-13, SECTOR-63,NOIDA-201301 (U.P.) INDIA

GROUND FLOOR PLAN

EDC/ETA/DCP/AR/502

ConsultantConsultant:

CONSULTING ENGINEERS LIMITEDMUMBAI

PLANT ROOM BUILDING FOR "Q" BLOCKHVAC - CONTRACTOR

SHEET 1 OF 2

0.00M LEVEL PLAN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY

AN

AU

TOD

ESK

ED

UC

ATI

ON

AL

PRO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY A

N A

UTO

DESK

EDU

CA

TION

AL PR

OD

UC

T

FOR TENDER PURPOSE O

NLY

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05)

GIFTCL Page 1 of 1 CONTRACTOR

EPS

GROUND FLOOR PLAN

6330 6330 5100 6350 5100 5100 5100

4600

1170

0

FUTURE PROVISION FOR SWITCHGEAR

DG SET/ SWITCHGEAR ROOM

1245

0

3000

7100

UP

1800

ENTRY

CostumerServiceCentre

Bill PaymentCentre

39410

32003200

5900

900

18010

12350

ELECTRICAL TRENCH

375

375 20

00

2000

5000

350 THK.FIREWALL

52005200

VIEWINGGALLERY ABOVE

SHAFT FORDRAINAGE

SHAFT FORDRAINAGE

3375

2950

5000

3000

4950

3000

3850

5850

1550 1550

3850

4000

FIRST FLOOR PLAN

6330 6330 5100 6350 5100 5100 5100

1170

012

450

UP

1800

Male

Female

Toilet

2000

Pantry

Dinning Area

Pantry

Dinning Area

OFFICE AREA

OFFICE AREA

375

375

39410

4600

7100 Male

Female

Toilet

VIEWING GALLARY

SLAB SHALL BE SUNKBY 400 MM

SLAB SHALL BE SUNKBY 400 MM

DN

2350

REFER SEPARATEDETAIL

5000

5900

GALLARY

4000

Electrical DB & Cutout

LEGEND

UN UNLESS NOTEDDIAEL ELEVATIONMM MILLIMETRETOS TOP OF SLAB

EMERGENCY POWERGENERATION

BUILDING

LOCATION PLAN

Note:1. Do not scale the drawing2. Only written dimensions and UTM coordinate reference provided to be followed.3. Any discrepancies in the drawing/s should be brought to the notice of GIFTCL

Architect before implementation

Proof Consultant(Name and address)

ConsultantBackward LinkageDwg No.

Forward LinkageDwg No.

Chkd By:Prepd By: Appr By: DateRevision No.

Key MapGujarat International Finance Tec-City Company Ltd.3rd Floor, 'A' Wing, Khanij Bhavan, Nr. University Ground, 132 ft Ring Road, Vastrapur, Ahmedabad -380052, India

GUJARAT INTERNATIONALFINANCE TEC-CITY

Disclaimer-

UID of Components

Checked By: Approved By:

Date Date

Date

CONSULTING ENGINEERS LIMITEDMUMBAI

Revision No. Description3.12.2013Vilas D Deepak K NJT

FOR TENDER PURPOSE O

NLY

TERRACE FLOOR PLAN

6330 6330 5100 6350 5100 5100 5100

1170

012

450

1800

375

375

3941046

0071

00

DN

TERRACE FLOOR

RWP RWP

6800

2800

200 thk.x1100 ht. PARAPET WALL(TYPICAL)

TERRACE AT FIRST FLOOR

LEGEND

UN UNLESS NOTEDDIAEL ELEVATIONMM MILLIMETRETOS TOP OF SLAB

EMERGENCY POWERGENERATION

BUILDING

LOCATION PLAN

600

4200

4200

1100

3500

3000

1200

SECTION B-B

SECTION A-A

4200

4200

1100

Note:1. Do not scale the drawing2. Only written dimensions and UTM coordinate reference provided to be followed.3. Any discrepancies in the drawing/s should be brought to the notice of GIFTCL

Architect before implementation

Proof Consultant(Name and address)

ConsultantBackward LinkageDwg No.

Forward LinkageDwg No.

Chkd By:Prepd By: Appr By: DateRevision No.

Key MapGujarat International Finance Tec-City Company Ltd.3rd Floor, 'A' Wing, Khanij Bhavan, Nr. University Ground, 132 ft Ring Road, Vastrapur, Ahmedabad -380052, India

GUJARAT INTERNATIONALFINANCE TEC-CITY

Disclaimer-

UID of Components

Checked By: Approved By:

Date Date

Date

CONSULTING ENGINEERS LIMITEDMUMBAI

Revision No. Description3.12.2013Vilas D Deepak K NJT

FOR TENDER PURPOSE O

NLY

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05)

GIFTCL Page 1 of 1 CONTRACTOR

STP-MCC

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

I

J

K

L

A

B

C

D

E

F

G

H

I

J

K

L

General Notes:1. Do not scale the drawing2. Only written dimensions and UTM coordinate reference provided

to be followed.3. Any discrepancies in the drawing/s should be brought to the notice

of relevant authority.4.Drawings duly signed and stamped by GIFTCL only shall be

considered valid for implementation purpose

ConsultantBackward LinkageDwg No.

CheckedBy:

PreparedBy:

ApprovedBy:

DateRevisionNo. 00

Description

Key MapGujarat International Finance Tec-City Company Ltd.3rd Floor, 'A' Wing, Khanij Bhavan, Nr. University Ground, 132 ft Ring Road, Vastrapur,Ahmedabad -380052, India GUJARAT INTERNATIONAL

FINANCE TEC-CITY

Drawing Title

Contract No.

Issuedfor

0 2Drawing Subtitle

(Information/Tender/Construction)

INF TDR CNSDisclaimer- This drawing belongs of GIFTCL and should not beused or produced anywhere without its permission.

Drawing Number North

Approved By:

CheckedBy:

ApprovedBy:

Date Date

Date

Checked By:

Forward LinkageDwg No.

Scale

Approved By:

Checked By: Employer : UID

of Com

ponents

EG.: GIFT/VL/Location/Dwg type/Sr. No.

CONSULTING ENGINEERS LIMITEDMUMBAI

FOR APPROVAL1:5009.04.14

GIFT/ENG/WT/WC/2011-03

GIFT-VL-PSTP-ELEC-DWG-012

XXX

XXX

RT MP SSS 24.04.13

SSS

DASXXX

XXX

DD.MM.YYYYDD.MM.YYYY

XXXXXX

0

N

ExistingRoad

HFL57.00m

LOCATION

N

PWWTP2.2MLD

X = 261977.645

Y = 2563401.772

X = 261971.967

Y = 2563369.400

X = 261930.480Y = 2563391.554

X = 261936.175Y = 2563423.916

PRO

POSE

DR

OA

D

ProposedAreaformaterialstorage(20m X20m)

OFPACKAGEWASTEWATERTREATMENTPLANT

CA

PA

CIT

OR

BA

NK

S

MC

C P

AN

EL

01 REVISED & REDRAWN AS PER CLIENT COMMENT. RT MP SSS 01.03.14

SSS02 MPREVISED & REDRAWN AS PER CLIENT COMMENT. RT 09.04.14

FOR TENDER PURPOSE O

NLY

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05)

GIFTCL Page 1 of 1 CONTRACTOR

Utility Tunnel

CONSULTING ENGINEERS LIMITEDMUMBAI

FOR TENDER PURPOSE O

NLY

CONSULTING ENGINEERS LIMITEDMUMBAI

FOR TENDER PURPOSE O

NLY

Design, Supply, Fabrication and Erection of Glass Façade works for various Plant Buildings in GIFT CITY (Bid Reference No: GIFT/ENG/BW/WC/2014/05)

GIFTCL Page 1 of 1 CONTRACTOR

Annexure -2 BOQ

Sr. No Item Description Unit Quantity Rate in INR. Amount in INR.A Glazing Work

1 Designing, providing, fabricating and installing Structural glazingsystem (inclusive of vision, spandrel and openable panels) with backstructure framing arrangement, as per approved design (based onconcept architectural elevation drawings), Anodised Aluminiummembers like muliions, etc. in approved shade, including requiredstainless steel fitting and fixtures, required hot dip galvanised / nonferrous metal anchor fasteners, jointing and sealing with approvedcompatible silicon sealant (Dow Corning or equivalent approved),required fire stop, sheaves. Work to include preparing and finishing ofjunctions with concrete, masonry, aluminium including use of flashing if any as approved by the Engineer in charge etc. all complete.

Further include, required designing as per IS 875-2000 loading,preparation of shop drawings and getting approval from the structuralconsultants for designing and architectural & installation fromArchitect, taking actual site measurements and modifying andcoordinating with site and fabrication yard; giving waterproofing testetc. all confirming to international standards and to the entiresatisfaction of the Engineer in charge. Further the system installed andtested shall be guaranteed for 10 years in approved proforma onstamp paper of appropriate value.

i) Vision panel of DGU with 6mm toughened Glass of SKN 265 of SaintGloban or Eclipse advantage bronze of Pilkington Glass India PVT.Ltd or Bronze Brook of AIS. + 12mm thick argon gas + 6mm thick heatstrengthen high performance clear glass.

ii) including Spandrel panel with 6mm thick heat strengthen glass of SKN265 of Saint Globan or Eclipse advantage bronze of Pilkington GlassIndia PVT. Ltd or Bronze Brook of AIS and GI sheet fabricated in aTray form duly filled with glass wool of required density of approvedmake with one side tissue and the other side with aluminum foil tapedfixed with GI framework by SS 304L grade screws and the peripherygap between the GI Sheet frame & Aluminum framework shall besealed by approved silicon weather sealant including the cost ofpainting to match the color of glass.

iii) including Openable panels

iv) including Providing, fabricating and fixing approved anodisedAluminium fins/ribs of required size as shown in the drawings includingrequired stainless steel fitting and fixtures, jointing and sealing withapproved compatible silicon sealant (Dow Corning or equivalentapproved) etc. complete all height, lead & lift as per entire satisfactionof the Engineer in charge.

2 Designing, providing, fabricating and installing suspended glazingsystem (Confirming to IS for Structural loads and Australian /Singapore / International Codes for suspended Glazing) with tensionrod system and imported SS 304L grade spider fitting with SS 304Lgrade pipes, SS 304L grade brackets , conforming to Architecturalelevations and Structural intent drawings, required anchor hot dippedGI / non-ferrous metal fasteners, jointing and sealing with approvedsilicon sealant, preparing and finishing junctions with concrete, glass,providing flashing and waterproof sealing as approved by the Engineerin Charge etc. all complete as per specifications. Further includerequired preparing of shop drawings and getting approval from theArchitect, taking actual site measurements and modify and coordinatewith site and fabrication yard in coordination of the engineer;performing mockup and field test for air and water infiltration etc. allconfirming to Indian and international standards. Further the systeminstalled and tested shall be guaranteed for 10 years in approvedproforma on stamp paper of appropriate value.

i) With 6mm Toughened Glass of bronze or equivalent shade of ST 267of Saint Globan,Eclipse advantage bronze of Pilkington Glass IndiaPVT. Ltd and Bronze Brook of AIS.

ii) With 12mm Toughened Glass of bronze or equivalent shade of ST267 of Saint Globan,Eclipse advantage bronze of Pilkington GlassIndia PVT. Ltd and Bronze Brook of AIS. Sq.m 40.00

B CLADDING WORK

DESIGN, SUPPLY, FABRICATION AND ERECTION OF GLASS FAÇADE WORK ON VARIOUS PLANT BUILDINGS TO MAINTAIN COMPATIBILITY WITH VARIOUS SURROUNDING BUILDINGS IN GIFT CITY.

PART A - District Cooling System Plant Building

Cost of Glazing Work (A) in INR.=

Sq.m 1,342.00

Sq.m 319.00

Sr. No Item Description Unit Quantity Rate in INR. Amount in INR.

DESIGN, SUPPLY, FABRICATION AND ERECTION OF GLASS FAÇADE WORK ON VARIOUS PLANT BUILDINGS TO MAINTAIN COMPATIBILITY WITH VARIOUS SURROUNDING BUILDINGS IN GIFT CITY.

PART A - District Cooling System Plant Building

1 Designing, providing, fabricating and installing cladding of 4mm thick(0.5mm + 3mm + 0.5mm) aluminium composite panels with FR core ofapproved make, for sizes and panels (based on concept architecturalelevation drawings) including required fixtures and fittings of stainlesssteel (SS 304L grade), anchor fasteners, jointing and sealing with M/s.Dow Corning silicon sealant, required fire stops, water drains andgutters and finishing junctions with concrete, stone, timber, aluminium,glass etc. all complete. Further include required preparation of shopdrawings with structural calculations and getting approval from theArchitect and structural consultants, providing samples, mockups,taking actual site measurements and modifying and coordinating withsite and fabrication yard, all conforming to international standards etc.complete to the approval of Engineer in charge. Further the systeminstalled and tested shall be guaranteed for 10 years in approvedproforma on stamp paper of appropriate value.

Sq.m 3,580.00

C Aluminium Louvers1 Design, supply and install Box type aluminium louvers of (100mm X

50mm) section aluminium extruded profiles with support grid work ofanodised aluminium extruded profile of designed section tubes .Complete with aluminium brackets of alloy 6065 T6 / MS hot dippedgalvanised brackets, SS 304L grade anchor bolts and fasteners. Thesystem shall be design to accommodate the building movements,thermal expansion and seismic movements. The quote rate includesall design, engineering & shop drawing

Sq.m 1,690.00

TOTAL in INR.=

Cost of CLADDING WORK (B) in INR.=

Cost Aluminium Louver (C) in INR. =

Sr. No Item Description Unit Quantity Rate in INR. Amount in INR.A Glazing Work

1 Designing, providing, fabricating and installing Structural glazingsystem (inclusive of vision, spandrel and openable panels) with backstructure framing arrangement, as per approved design (based onconcept architectural elevation drawings), Anodised Aluminiummembers like muliions, etc. in approved shade, including requiredstainless steel fitting and fixtures, required hot dip galvanised / nonferrous metal anchor fasteners, jointing and sealing with approvedcompatible silicon sealant (Dow Corning or equivalent approved),required fire stop, sheaves. Work to include preparing and finishing ofjunctions with concrete, masonry, aluminium including use of flashing ifany as approved by the Engineer in charge etc. all complete.

Further include, required designing as per IS 875-2000 loading,preparation of shop drawings and getting approval from the structuralconsultants for designing and architectural & installation from Architect,taking actual site measurements and modifying and coordinating withsite and fabrication yard; giving waterproofing test etc. all confirming tointernational standards and to the entire satisfaction of the Engineer incharge. Further the system installed and tested shall be guaranteed for10 years in approved proforma on stamp paper of appropriate value.

i) Vision panel of DGU with 6mm toughened Glass of SKN 265 of SaintGloban or Eclipse advantage bronze of Pilkington Glass India PVT. Ltdor Bronze Brook of AIS. + 12mm thick argon gas + 6mm thick heatstrengthen high performance clear glass.

ii) including Spandrel panel with 6mm thick heat strengthen glass of SKN265 of Saint Globan or Eclipse advantage bronze of Pilkington GlassIndia PVT. Ltd or Bronze Brook of AIS and GI sheet fabricated in a Trayform duly filled with glass wool of required density of approved makewith one side tissue and the other side with aluminum foil taped fixedwith GI framework by SS 304L grade screws and the periphery gapbetween the GI Sheet frame & Aluminum framework shall be sealed byapproved silicon weather sealant including the cost of painting to matchthe color of glass.

iii) including Openable panels

iv) including Providing, fabricating and fixing approved anodisedAluminium fins/ribs of required size as shown in the drawings includingrequired stainless steel fitting and fixtures, jointing and sealing withapproved compatible silicon sealant (Dow Corning or equivalentapproved) etc. complete all height, lead & lift as per entire satisfactionof the Engineer in charge.

2 Designing, providing, fabricating and installing suspended glazingsystem (Confirming to IS for Structural loads and Australian / Singapore/ International Codes for suspended Glazing) with tension rod systemand imported SS 304L grade spider fitting with SS 304L grade pipes,SS 304L grade brackets , conforming to Architectural elevations andStructural intent drawings, required anchor hot dipped GI / non-ferrousmetal fasteners, jointing and sealing with approved silicon sealant,preparing and finishing junctions with concrete, glass, providingflashing and waterproof sealing as approved by the Engineer in Chargeetc. all complete as per specifications. Further include requiredpreparing of shop drawings and getting approval from the Architect,taking actual site measurements and modify and coordinate with siteand fabrication yard in coordination of the engineer; performing mockupand field test for air and water infiltration etc. all confirming to Indian andinternational standards. Further the system installed and tested shall beguaranteed for 10 years in approved proforma on stamp paper ofappropriate value.

i) With 6mm Toughened Glass of bronze or equivalent shade of ST 267of Saint Globan,Eclipse advantage bronze of Pilkington Glass IndiaPVT. Ltd and Bronze Brook of AIS.

B CLADDING WORK

DESIGN, SUPPLY, FABRICATION AND ERECTION OF GLASS FAÇADE WORK ON VARIOUS PLANT BUILDINGS TO MAINTAIN COMPATIBILITY WITH VARIOUS SURROUNDING BUILDINGS IN GIFT CITY.

PART -B 1) Emergency Power Supply Control Building, 2) Sewage Treatment Plant- Control Room,3) Utility Tunnel - View Gallery.

Cost of Glazing Work (A) in INR.=

Sq.m 2,206.00

Sq.m 715.60

Sr. No Item Description Unit Quantity Rate in INR. Amount in INR.

DESIGN, SUPPLY, FABRICATION AND ERECTION OF GLASS FAÇADE WORK ON VARIOUS PLANT BUILDINGS TO MAINTAIN COMPATIBILITY WITH VARIOUS SURROUNDING BUILDINGS IN GIFT CITY.

PART -B 1) Emergency Power Supply Control Building, 2) Sewage Treatment Plant- Control Room,3) Utility Tunnel - View Gallery.

1 Designing, providing, fabricating and installing cladding of 4mm thick(0.5mm + 3mm + 0.5mm) aluminium composite panels with FR core ofapproved make, for sizes and panels (based on concept architecturalelevation drawings) including required fixtures and fittings of stainlesssteel (SS 304L grade), anchor fasteners, jointing and sealing with M/s.Dow Corning silicon sealant, required fire stops, water drains andgutters and finishing junctions with concrete, stone, timber, aluminium,glass etc. all complete. Further include required preparation of shopdrawings with structural calculations and getting approval from theArchitect and structural consultants, providing samples, mockups,taking actual site measurements and modifying and coordinating withsite and fabrication yard, all conforming to international standards etc.complete to the approval of Engineer in charge. Further the systeminstalled and tested shall be guaranteed for 10 years in approvedproforma on stamp paper of appropriate value.

Sq.m 360.00

C Aluminium Louvers1 Design, supply and install Box type aluminium louvers of (100mm X

50mm) section aluminium extruded profiles with support grid work ofanodised aluminium extruded profile of designed section tubes .Complete with aluminium brackets of alloy 6065 T6 / MS hot dippedgalvanised brackets, SS 304L grade anchor bolts and fasteners. Thesystem shall be design to accommodate the building movements,thermal expansion and seismic movements. The quote rate includes alldesign, engineering & shop drawing

Sq.m 190.00

TOTAL in INR.=

Cost of CLADDING WORK (B) in INR.=

Cost Aluminium Louver (C) in INR. =

Sr.No Item Description Amount in INR.1 PART A - District Cooling System Plant Building

2 PART B - 1) Emergency Power Supply Control Building, 2) Sewage Treatment Plant-Control Room, 3) Utility Tunnel - View Gallery.

Total Cost in INR.=

DESIGN, SUPPLY, FABRICATION AND ERECTION OF GLASS FAÇADE WORK ON VARIOUS PLANT BUILDINGS TO MAINTAIN COMPATIBILITY WITH VARIOUS SURROUNDING BUILDINGS

IN GIFT CITY.Construction of Control Room Building and Equipment foundation and other allied works for Emergency Power

Supply SystemSUMMARY