Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Design of Temporary Excavation
and Lateral Support System
for the DSD Sheung Wan
Stormwater Pumping Station
By Eric Li - GCG (Asia)
Presented to the HKIE Geotechnical Division
18th June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Sheung Wan Stormwater Pumping Station (SWSPS)
2
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Project Set Up
� DSD Contract DC/2006/10
� Contract Sum : HK$ 78 million (approx)
� Designer : Drainage Services Department
(with GEO as in-house geotechnical consultant)
� Site Supervision : DSD Drainage Project Division
(with the engagement of an IGE)
� Contractor : China National Chemical Engineering Group
� ELS Designer : Geotechnical Consultant Group (Asia) Ltd.
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
43m
57m
Pile Cap Layout Plan
~ -5.9mPD
~ -7.1mPD
3
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
43m
Retaining Wall
Pile Cap / Base Slab
Typical North-South Section
~ +4.0mPD
~ -5.9mPD~ -7.1mPD
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Selection of Retaining Wall Type
Wall Types Considered:
• Diaphragm Wall
• Bored Pile Wall
• Pipe Pile Wall
• Sheet Pile Wall
• No wall (open cut)
Design Objectives:
• Approximate max. 10m deep excavation
• Effective control of settlement due to excavation and groundwater drawdown
4
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Reclamation and Seawall Dredging Plan
Approx. Location of Site
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Typical Cross Section
Vertical Seawall (Indicative) Approx. Extent of SWSPS
Victoria Harbour
5
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Pre-Contract Borehole Location Plan
Pre-Contract Ground investigation
• 2 series in 2002 & 2006 (32 holes)• Common sampling, field and laboratory tests• In situ vane & pressuremeter tests
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
North-South Geological Section
Sand Fill
Rock Fill
CDG
Marine Deposits
Alluvium
Fill
6
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
East-West Geological Section (away from Seawall)
Marine Deposits
Fill
CDG
Alluvium
Existing Salt Water PS
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Isopach of Soft Marine Clays
Seawall Cope Line
7
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Seawall Cope Line
Small sink hole at sea wall
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
5m3 sink hole
8
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
15m3 sink hole
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
-0.300
-0.200
-0.100
0.000
21
/8/0
6
31
/8/0
6
10
/9/0
6
20
/9/0
6
30
/9/0
6
10
/10
/06
Se
ttle
me
nt
(m)
SS1
SS2
SS3
SS4
Settlement near Seawall-0.300
-0.200
-0.100
0.000
21
/8/0
6
31
/8/0
6
10
/9/0
6
20
/9/0
6
30
/9/0
6
10
/10
/06
Se
ttle
me
nt
(m)
GS20
GS21
GS24
GS25
‘SS’ Markers on Seawall
‘GS’ Markers on Ground Adjacent to Seawall
9
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Design Considerations
� Reclamation Site
� Sensitive Structures nearby, i.e. WSD Pumping Station
� High water table, i.e. 1.2m below existing ground level
(+3.0mPD)
� Presence of thick layer of variable FILL
& soft MARINE DEPOSITS
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Design Methodology
� Drained and Undrained Conditions
� Lateral Stability
� Global Slope Stability
� Base Stability
� Hydraulic Stability
� Dewatering
� Ground Deformation / Settlement
� Structural Capacities
10
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Plot of SPT-N against Elevation
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Plot of Undrained Shear Strength (Cu) against Elevation
11
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Adopted Shoring Layout Plan
FSP IV Sheet Pile Walings & Struts(3 levels)
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Longitudinal Cross Section further from Seawall
12
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Longitudinal Cross Section nearest Seawall
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Transverse Cross Section
13
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Elevation of Wall D(Showing Grouting Ground Improvement)
Penetration (T.A.M.) Grout Jet Grout
Sheetpile (not shown for clarity)
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Fill
Marine DepositAlluvium
CDG
EastWestCulvert
Grout A
Grout B
Finite Element Analysis
(East-West Section)
14
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Wall Deflection (East-West Section)
East WallWest Wall
δmax = 60mm
δmax = 115mm
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Ground Settlement (East-West Section)
West WallEast Wall
δmax = 18mm
δmax = 82mm
15
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Wall Deflection (North-South Section)
South Wall North Wall
δmax = 102mm
δmax = 88mm
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Ground Settlement (North-South Section)
North WallSouth Wall
δmax = 53mm
δmax = 75mm
16
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Exaggeration scale: 30
Tilt = 1/650 Seawall
Fill (Sand)
Fill (Rock)
Seawater
Deformation of Seawall
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Slope Stability Analysis
(South Wall)
17
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Instrumentation Layout Plan
Principal Instrumentation :
- Ground settlement markers (SS, GS, SA)
- Inclinometers (IN, INX)
- Standpipe Piezometer (SP, PZ, PP)
- Building Tilt Marker
East Wall
West Wall
North Wall
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Outline Construction Programme for Key Activities
18
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Settlement against Time
-0.350
-0.300
-0.250
-0.200
-0.150
-0.100
-0.050
0.000
0.050
01-A
ug-06
01-S
ep-06
01-O
ct-06
01-N
ov-06
01-D
ec-06
01-Jan-07
01-F
eb-07
01-M
ar-07
01-A
pr-07
01-M
ay-07
01-Jun-07
01-Jul-07
01-A
ug-07
01-S
ep-07
01-O
ct-07
01-N
ov-07
01-D
ec-07
01-Jan-08
Date
Settlement (m
)
SS3 SS2 SS1 SS4
Settlement against Time
-0.600
-0.500
-0.400
-0.300
-0.200
-0.100
0.000
01-A
ug-06
01-S
ep-06
01-O
ct-06
01-N
ov-06
01-D
ec-06
01-Jan-07
01-Feb-07
01-M
ar-07
01-A
pr-07
01-M
ay-07
01-Jun-07
01-Jul-07
01-A
ug-07
01-S
ep-07
01-O
ct-07
01-N
ov-07
01-D
ec-07
01-Jan-08
Date
Settlement (m
)
GS23 GS24 GS20
Ground Settlement Time Plot behind North Wall (Seawall)
‘SS’ Markers on Seawall
‘GS’ Markers on Ground Adjacent to Seawall
ExcavationH-Piling, Sheetpiling, Ground Improvement Grouting
Pile Cap
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Settlement against Time
-0.500
-0.450
-0.400
-0.350
-0.300
-0.250
-0.200
-0.150
-0.100
-0.050
0.000
01
-Au
g-0
6
01
-Se
p-0
6
01
-Oc
t-0
6
01
-No
v-0
6
01
-De
c-0
6
01
-Ja
n-0
7
01
-Fe
b-0
7
01
-Ma
r-0
7
01
-Ap
r-0
7
01
-Ma
y-0
7
01
-Ju
n-0
7
01
-Ju
l-0
7
01
-Au
g-0
7
01
-Se
p-0
7
01
-Oc
t-0
7
01
-No
v-0
7
01
-De
c-0
7
01
-Ja
n-0
8
Date
Se
ttle
me
nt
(m)
GS31 GS34 GS28
Ground Settlement Time Plot behind East Wall
Excavation
H-Piling, Sheetpiling, Ground Improvement Grouting
Pile Cap
19
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Ground Deformation behind East Wall(due to excavation only)
GS28 (6.2m) GS31 (9.6m) GS34 (15.6m)
Inclinometer IN2 (1m)
Predicted δδδδmax = 115mm
Predicted δδδδmax = 82mm
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Settlement against Time
-0.070
-0.060
-0.050
-0.040
-0.030
-0.020
-0.010
0.000
0.010
01
-Au
g-0
6
15
-Au
g-0
6
29
-Au
g-0
6
12
-Se
p-0
6
26
-Se
p-0
6
10
-Oc
t-0
6
24
-Oc
t-0
6
07
-No
v-0
6
21
-No
v-0
6
05
-De
c-0
6
19
-De
c-0
6
02
-Ja
n-0
7
16
-Ja
n-0
7
30
-Ja
n-0
7
13
-Fe
b-0
7
27
-Fe
b-0
7
13
-Ma
r-0
7
27
-Ma
r-0
7
10
-Ap
r-0
7
24
-Ap
r-0
7
08
-Ma
y-0
7
22
-Ma
y-0
7
05
-Ju
n-0
7
19
-Ju
n-0
7
03
-Ju
l-0
7
17
-Ju
l-0
7
31
-Ju
l-0
7
14
-Au
g-0
7
28
-Au
g-0
7
11
-Se
p-0
7
25
-Se
p-0
7
09
-Oc
t-0
7
23
-Oc
t-0
7
06
-No
v-0
7
20
-No
v-0
7
04
-De
c-0
7
18
-De
c-0
7
01
-Ja
n-0
8
Date
Se
ttle
me
nt
(m)
SS13 SS9 SS10 SS14
Ground Settlement Time Plot behind West Wall
Predicted δδδδmax = 18mm
20
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
-18.0
-16.0
-14.0
-12.0
-10.0
-8.0
-6.0
-4.0
-2.0
0.0
2.0
4.0
0 5 10 15Displacement (mm)
Ele
va
tion
(m
PD
)"+" toward excavation
Ground Deformation behind West Wall(due to excavation only)
Inclinometer IN5 (1m)
Predicted δδδδmax = 60mm
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Jet grouting
• Jet grout cuts insitu soft clay and mixes that with injected cement
• Disturbed clay is displaced to surface in slurry form
• Jet nozzle is typically 1.4mm to 3mm dia.
• Applicable to more cohesive soils where T.A.M. grouting may not work
21
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Typical Set up of Jet Grouting
(Double Tube Method)
Temporary casing for drilling through fill.Withdrawn prior to jetting. (optional)
Jet Grout Zone
Soil Overburden
PVC tubing to assist spoil return. (optional)
Ref. : CNCEC
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
1. Set up rig 2. Drill to toe level 3. Test jetting
6. Jet grout completed. Withdraw grout string
5. Simultaneously withdrawal and rotation of grout string to next level4. Commence Jetting
Sequence of Jet Grouting Ref. : CNCEC
22
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Jet grout parameters
• Jet grout parameters adopted at SWSPS
Target grouted dia. = 1500 – 2000 mm
Grout pressure = 300 – 400 bars
Air pressure = 8 - 12 bars
Withdraw rate = 13 to 15 min/m
Rotation rate = 6 – 7 rev/step
• Target strength & stiffnessUCS = 600 kPa
Elastic modulus = 150 MPa
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
23
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
24
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Jet Grout Core Sample
25
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Hole S2Hole S5
Jet Grout Core Sample
(UCS: typically 7-10 MPa, sometimes >40 MPa)
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
T.A.M. Grout Core Sample
26
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
T.A.M. Grout Core Sample
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Sheetpiling (by push-in method)
• Suitable in area where vibration is undesirable
• With limited penetration depth
• Difficult to overcome obstruction
• Tend to be more costly
27
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Ref : Giken Seisakusho Co. Ltd
Sheetpiling by push-in method
At SWSPS
• Giken rig with special tool to overcome obstruction (up to 1m)
• Maximum 24m long sheet pile
• Limited to Type IV sheetpile
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Sheetpiling by push-in method
28
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Augering to assist penetration
29
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Drilling through Obstructions
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Cutter Head for Rock Obstructions
30
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Alignment out-of-line when encountering obstructions
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Groundwater leaking throughretaining wall
31
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Excavation in progress
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Disposal by barge
32
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Installing waling and strut
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Excavation completed
33
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Concreting in progress
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Concreting in progress (3 concrete pumps & 13 concrete trucks)
34
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Foundation Completed
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
園林景觀工程設計散石徑散石徑散石徑散石徑////太極區太極區太極區太極區散石徑散石徑散石徑散石徑////太極區太極區太極區太極區
遮雨蓬
長椅
小型廣場小型廣場小型廣場小型廣場小型廣場小型廣場小型廣場小型廣場
方形花園方形花園方形花園方形花園方形花園方形花園方形花園方形花園
觀賞園林觀賞園林觀賞園林觀賞園林觀賞園林觀賞園林觀賞園林觀賞園林
海濱長廊
海濱長廊
海濱長廊
海濱長廊
海濱長廊
海濱長廊
海濱長廊
海濱長廊
海濱長廊海濱長廊海濱長廊海濱長廊海濱長廊海濱長廊海濱長廊海濱長廊
綠化天台綠化天台綠化天台綠化天台綠化天台綠化天台綠化天台綠化天台
散石徑
裝飾性街燈Ref. : DSD
35
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Before Commencement After Completion
Ref. : DSD
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Summary
Issues to be considered in ELS design
• Site history
• Site characterization
• Design parameters (drained or undrained)
• Design objective and constraints
• Retaining wall installation effects
• Economy and construction programme
36
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Acknowledgement
• Drainage Services Department
• China National Chemical Engineering Corp
• Hyder Consulting Limited
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Thank You !