EA for the Proposed STP
Dindigul Municipality Pure Enviro 108
ANNEXURE III
DESIGN CALCULATION
Present Sewage Flow : 13.65 MLD
= 569 m3/hr
Peak Factor : 2.25
Peak Flow : 30.71 MLD
= 1279.58 m3/hr
Design Characteristics:
BOD : 170 – 370 mg/l
Total Suspended Solids : 250 mg/l
Fecal Coliform : 5 x107 MPN/100ml
Total Sewage Characteristics:
pH : 5.5 – 9.0
BOD : ≤ 20 mg/l
COD : ≤ 250 mg/l
Oil & Grease : ≤ 5 mg/l
Total Suspended Solids : ≤ 30 mg/l
Nitrate Nitrogen (as NO3) : ≤ 5 mg/l
Ammonia Nitrogen (as N) : ≤ 50 mg/l
Total Phosphorous (as PO4) : ≤ 5 mg/l
Total Coliform : ≤ 1000 no/100 ml
EA for the Proposed STP
Dindigul Municipality Pure Enviro 109
Receiving Chamber – 1 No
Average Flow : 13.65 MLD
Design Flow (Considering Peak factor) : 30.71 = 1279.58 m3/hr
Detention Time : 120 sec
Volume Required : (1279.58 / (60 x 60)) x 120
= 42.65 m3
Provide receiving chamber of size : 6.0 m x 3.0 m x 2.5 m (SWD) + 0.5 (FB)
Provide Volume : 45 m3 > 42.65 m
3, OK
2. Coarse Screens – 2 Nos (1 Mechanical + 1 Manual) 1 Working + 1 Standby:
Design Flow : 30.71 MLD
= 1279.58 m3/hr
= 0.36 m3/sec
Design Velocity at peak flow : 0.6 m/sec
Clear Opening between bars : 25 mm
Size of Bars : 75 mm x 10 mm
Screen area required : 0.36 / 0.6 = 0.6 m2
Width of Channel provided : 1.0 m
Velocity through screens at peak flow : 1.2 m/sec
Clear Area : 0.6 / (1.2 x Sin 600) = 0.58 m2
Clear Opening between bars : 25 mm, 0.025m
No. of clear openings : 24
Dimension of bar : 75 mm x 10 mm
Width of channel : (24 x 25) + (25 x 10)
= 850 mm, 0.85m
Width Provided : 1000 mm
EA for the Proposed STP
Dindigul Municipality Pure Enviro 110
Provide a screen channel of size 1 m wide x 0.7 m (SWD) + 0.5 m (FB)
Check for Approach Velocity at Average Flow
Average Flow : 13.65 MLD = 0.158 m3/sec
Channel Area : 1 m wide x 0.7 m SWD = 0.7 m2
Velocity : 0.158 / 0.7 = 0.23 m/sec < 0.3 m/sec, ok.
3. Fine Screens – 2 Nos (1 Mechanical + 1 Manual) 1 working + 1 standby
Design Flow : 30.71 MLD
= 0.36 m3/sec
Design Velocity at ultimate flow : 0.6 m/sec
Area required at Ultimate flow : 0.36 / 0.6
= 0.6 m2
SWD provided : 0.7 m
Width of channel : 1.0 m
Velocity through screen : 1.2 m/sec
Clear Area : 0.36 / 1.2
= 0.3 m2
Angle of inclination : 400
Net inclined screen area required : 0.3 / (1.2 x Sin 400)
= 0.39 m2
SWD provided : 0.8 m
Net Clear width of channel : 0.39 m
Clear opening between bars : 6mm = 0.006 m
No. of clear openings : 0.39 / 0.006
= 65
No. of bars : = 66
Dimensions of bar : 75 mm x 10 mm
EA for the Proposed STP
Dindigul Municipality Pure Enviro 111
Width of channel : (65 x 6 + 66 x 10) / 1000
= 1m
Width provided : 1000mm
Provide a screen channel size 1m wide x 0.8m SWD + 0.5m free board
Check for Approach Velocity at Average Flow
Average Flow : 13.65 MLD
= 0.158 m3/sec
Channel Area : 1m wide x 0.8m SWD
: 0.8 m2
Velocity : 0.158/0.8
: 0.20 m/sec < 0.3m/sec
• Degritting tank 2 nos ( 1w + 1 s ):
Design Flow : 30.71 MLD
Surface loading rate : 960 m3/m2/d
Surface area : 30.71 x 1000/960
: 31.99 m2
Dimensions of the Tank : 5.4m X 5.7 m
Detention time : 60 sec
Volume required : (30.71 x 1000/24 x 3600) x 60
: 21.33 m3
Liquid depth required : 21.33 / 31.99
Hence provide a Degritting tank with mechanism to fit in RCC chamber of size
5.7 m x 5.7 m x 0.66m (SWD) + 0.5 m free board
5 Primary Clarifier ----- 1 no
Design flow : 13.65 MLD
Overflow Rate : 25 m3/m2/day
Clarifier area required : 13650/25
: 546 m2
Dia required : 26.4 m
EA for the Proposed STP
Dindigul Municipality Pure Enviro 112
Provided diameter : 27.0m
Clarifier Area provided : 572.3 m2
Retention time : 3 hrs
Volume required : 13650/24 x 3
: 1706.25 cum
SWD required : 1706.25/546 = 3.12, say 3 m
Provide secondary clarifier of 27m dia x 3m SWD + 0.5m free board
Check for overflow rate
Surface area : 546 m2
Overflow Rate : 13650/546
: 25 m3/.2m/day , OK
Check for Weir loading : 13650
-------------------------
3.1412 x 25
: 173.8 m3/day/m, <300
6 Aeration Tank...1 No
Design flow for each tank : 13.65 MLD = 569 m3/hr
: 0.158 m3/hr
Type of Aeration : Diffused Aeration System
Inlet BOD to Aeration Tank : 0.8 x 300
(20% BOD removal in Degritting tank is assumed associated with grit)
: 240 mg/l
Outlet BOD : 20 mg/l
Total BOD load removed : (240-20) x 13650
----------------------
1000
: 3003 kg/day
EA for the Proposed STP
Dindigul Municipality Pure Enviro 113
MLSS : 2800 mg/l
F/M Ratio : 0.4
Volume of the tank required : 13650 x220
--------------
2800 x 0.4
: 2681.25 m3
Size of the tank provided : 30m x 20m x 4.5m SWD + 0.5m FB
Volume provided : 2700 m3
Check for HRT : 2700/569
4.75 hrs, between 4 – 6 hrs,
• Air Blower -- 3 Nos(2w+1s)
Oxygen Requirement : 0.9 kg / kg BOD destroyed
BOD destroyed : 3003 kg/d
Oxygen required : 0.9 x 3003
: 2702.7 kg/d
Air required : 2702.7
-------------------------------------------
1.21 x 0.232 x 24 x 0.7 x 1 x (0.0625 x 4.5)
: 2037.62 m3/hr
OR
Air volume for mixing : 10 cum/min per 1000 cum of tank volume
Air requirement/compartment : 10/1000 x 2702.7
: 27.03 m3/min
: 1621.8 m3/hr
Capacity of each blower : Higher of (1) & (2),
i.e.,2037.62,say(2040/2)
: 1020 m3/hr
Provide 3 Nos (2+1) blower, each of capacity 1020 m3/hr at 0.6 kg/cm2
EA for the Proposed STP
Dindigul Municipality Pure Enviro 114
• Secondary Clarifier ----- 1 no
Design flow : 13.65 MLD
Overflow Rate : 25 m3/m2/day
Clarifier area required : 13650/25
: 546 m2
Dia required : 26.4 m
Provided diameter : 27.0m
Clarifier Area provided : 572.3 m2
Retention time : 3 hrs
Volume required : 13650/24 x 3
: 1706.25 cum
SWD required : 1706.25/546
: 3.12,say 3 m
Provide secondary clarifier of 27m dia x 3m SWD + 0.5m free board
Check for overflow rate
Surface area : 546 m2
Overflow Rate : 13650/546
: 25 m3/2m/day, OK
Check for Weir loading : 13650
-------------------------
3.1412 x 25
: 173.8 m3/day/m, <300
• Chlorine contact tank ---- 1 No
Flow : 13.65 MLD
Retention time : 30 min
Volume : (13650 x 30) / (24x60)
: 284.38 m3
EA for the Proposed STP
Dindigul Municipality Pure Enviro 115
Provide Chlorine contact tank of 12 m x 8 m x 3.0 m SWD + 0.5m free board
Provide Volume : 288 m3
Baffles shall be provided along length of the tank for better mixing
SLUDGE HANDLING SYSTEM:
A. Return Activated Sludge:
Total flow including recirculation : 1.5 x 13650 = 20475 m3/day
MLSS in Aeration Tank : 2800 mg/l
Solids in recirculated flow : ((2800/1000) x 20475)
: 57330 m3/day
Consistency of solids : 1%
Return Activated Sludge Quantity : 57330/10
: 5733 m3/day
: 238.88, say 240 m3/hr
B. Excess Secondary Sludge from Secondary Clarifier:
Quantity of waste activated sludge,Q w : V X / Oc Xs
MLSS concentration in Aeration Tank X : 2800 mg/L
MLSS concentration in waste activated sludge from secondary clarifier: 10000 mg/l
Sludge Retention Time, Qc : 6 day
Total Aeration Tank Volume V : 2700 m3
Qw : 2700 x 2800
---------------------
6 x 10000
: 126 m3/day
1 Sludge sump ---- 1 No
Total sludge to sludge sump : 126 m3/day
Size of the sump provided : 7m x 7m x 2.5 m SWD + 0.5 FB
EA for the Proposed STP
Dindigul Municipality Pure Enviro 116
Volume of the sump provided: 122.5 m3
b) Air Blowers for sludge Mixing ------ 2 nos (1w+1s)
Air volume for mixing : 10 m3/min per 1000 m3 of tank volume
Air requirment/compartment : (10 / 1000) x 122.5
: 1.225 cum/min
: 73.5 cum/hr
Provide 2 nos.(1+1) blower,each of capacity 73.5 m3/hr at 0.4 kg/cm2
• Thickener Feed Pumps ---- 2 nos (1w + 1s)
Type : Horizontal, Centrifugal
Capacity : 60 cu.m/hr
Head : 10m
4. Return Activated Sludge Pumps --- 2 nos(1w + 1s)
Type : Submersible, Non-clog impeller
Capacity : 15.0 cu.m/hr
Head : 10m
5 Sludge Thickener --- 1 no
Quantity of sludge : 126 m3/day
Solids concentration in : 1%
Total Solids : 10000/1000 x 126
Total solids in underflow : 1260 kg/day
Quantity of thickened sludge : 0.95 x 1260/36
: 33.25 cum/day
Thickener Overflow : 126 – 33.25
= 92.75 m3/ day
Solids Loading Rate : 50 kg/m2/day
Thickening Area required : 1260/50
: 25.2 m2
Thickener dia required : 5.67m
Thickener dia provided : 5.7m
Thickener dimension : 5.7m dia x 3m SWD + 0.5 m free board
• Centrifuge Feed Sump --- 1 No
Thickened sludge consistency : 3.6%
EA for the Proposed STP
Dindigul Municipality Pure Enviro 117
Quantity of thickened sludge : 33.25 m3/day
Retention time : 10 hrs
Volume of the sump required : 13.85 m3
Sump provided : 3.5m x 2m x 2.0m SWD + 0.5m free
board
7 Centrifuge Feed Pump --- 2 Nos (1w + 1s)
Type : Progressive cavity screw
Capacity : 10 m3/hr
Head : 15 mwc
• Centrifuge --- 2 Nos (1w+1s)
Type : Solid bowl type,co-current
Capacity : 10 m3/hr
Inlet consistency : 3.6%
Outlet consistency : 20%
• Supernatant Collection Sump - 1 No
Sludge flow to centrifuge : 33.25 cum/day
Solids in the centrifuge feed : 1260 kg/day
Solids in the under flow of centrifuge: 1197 kg/day
Centrifuge sludge underflow : 5.43 cum/day
Centrate floe from centrifuge : 33.25 – 5.43
: 27.82 m3/day
Total supernatant from thickener¢rifuge: 92.75 + 27.82
: 120.57 m3/day
Provide Supernatant collection sump of size 3.5 m x 3.5 m x 3m SWD + 0.5m free
board
b)Supernatant transfer pumps ----- 2 nos(1w+1s)
Type : Submersible, Non clog impeller
Capacity : 10 m3/hr
Head : 10m
Chemical Handling System
Polelectrolyte
Dosing Tank------ 2 Nos(1w+1s)
Polyelectrolyte at centrifuge : 1.5kg/ton of dry solids at centrifuge
Dry Solids at the centrifuge inlet : 1260 kg/d
: 1.26 ton/d
Polelectrolyte required : 1.26 x 1.5 = 1.89 kg/d
Solution Strength : 0.1%
EA for the Proposed STP
Dindigul Municipality Pure Enviro 118
Volume : 1.89 / (0.1 x 10-2
) = 1890 lit/day
provide 2 nos(1+1) HDPE tank, each of 2000 lit
Dosing pumps ----- 2 nos(1w+1s)
Type : Diaphram type
Capacity : 90 LPH
head : 40 MWC
Chlorinator------ 2 Nos (1w+1s)
Chlorine Dose : 10 mg/L as 100% Cl2
Chlorine Requirment : 10/1000 x 13650
: 136.5 kg/day
Chlorinator capacity provided : 6 kg/hr
Booster water pump----- 2 nos(1w+1s)
Type : Centrifugal, Horizontal
Capacity : 10 cum/hr
Head : 30 mwc
Quantity of chlorine provided : 6 x 24 kg/d
Chlorine concentration desired in the outlet : 1500 mg/l
: 1.5 kg/cum
Quantity of water required : 144 /1.5 = 96 cum/day
: 4 cum/hr = say 5 cum/hr
MISCELLANEOUS UNITS:
• Centrifuge Shed – 1 No Size of the room – 9 m x 6 m
• Chlorination and Toner Room – 1 No Size of the room – 6.0 m x 5.0 m x 3.6 m (TH)
� Administration and Laboratory building – 1 No
Size of the room – 10.0 m x 6.0 m x 3.6 m (TH)
� Motor Control Center (MCC) Room – 1 No
Size of the room – 6.0 m x 4.0 m x 3.6 m (TH)
EA
for
the P
ropose
d S
TP
Dindigu
l Mun
icipality
Pure Enviro
119
ANNEXURE IV