Design-Build at CDOT
Minnesota Design-Build Workshop
November 30, 2000
Design-Build at CDOT
Overview
• CDOT’s Definition
• CDOT’s Progress to Date
• CDOT’s Planned Use of Design-build
Design-Build at CDOT
Definition of Design-Build
• Single-Point Responsibility
• Performance Standards and Specifications
• Warranty/Long Term Maintenance
Design-Build at CDOT
Change from Tradition
• Selection Method
• Team Approach
• Owner’s Role
Design-Build at CDOT
Benefits
• Reduced Time
• Reduced Cost
• Higher Quality/Innovation
Design-Build at CDOT
Legislation
• 1999 Session
• Clear, Direct Authority
• Authorized “Rules”
Design-Build at CDOT
Design-Build Rules
• Industry and Agency Involvement
• Process for Progress
• Effective December 31, 1999
Design-Build at CDOT
Contract Documents
• Goals of Project
• Uniqueness of Projects
• Industry Involvement
Design-Build at CDOT
Flexibility vs. Defined
• Multiple Award Methods
• Changes to Team
• Warranty/Long Term Maintenance
Design-Build at CDOT
Two-Phase Selection
• Request for Qualifications
• Request for Proposals
• Best and Final Offer (BAFO)
Design-Build at CDOT
Other “Hot” Issues
• Stipends
• Conflict of Interest
• Subcontracting
Design-Build at CDOT
Controls on Process
• QC/QA
• Award Fees
• Chief Engineer’s Review Team
Design-Build at CDOT
Southeast Corridor Project
A Multi-Modal Transportation
Project Estimated to cost 1.4
Billion Dollars
Design-Build at CDOT
Highway Construction
• Reconstruct I 25 from Broadway to University
• Widen I 25 from University to Lincoln Avenue
Design-Build at CDOT
Highway Construction (Cont.)
• Widen I 225 from I 25 to Parker Road
Design-Build at CDOT
Light Rail Transit (LRT)
Construction
• West Side of I 25, Construct LRT from existing Broadway station to Lincoln Avenue
Design-Build at CDOT
LRT Construction (Cont.)
• In Median of I 225, Construct
LRT from I 25 to Parker Road
• Construct 13 LRT Stations
Design-Build at CDOT
Southeast Corridor Project
expected to be complete during 2008
Design-Build at CDOT
Summary
• Will happen!
• Thanks to Industry!
• Commitment to Cooperate!