Design Assistance Program. A. Vance Pool Senior Director, National Resources Houston, TX. The Design Assistance Program (DAP). Underutilized An important tool in our parking lot conversion toolbox NRMCA will fund the first project for a state affiliate - PowerPoint PPT Presentation
Citation preview
Design Assistance Program
A. Vance Pool
Senior Director, National Resources
Houston, TX
WWW. NRMCA.ORG
The Design Assistance Program (DAP) Underutilized An important tool in our parking lot
conversion toolbox NRMCA will fund the first project for a state
affiliate Future projects NRMCA will fund one half of
the $200 to $750 projected cost in 2008
WWW. NRMCA.ORG
What is the Design Assistance Program NRMCA in conjunction with Ohio Concrete
will provide Design Suggestions that will include enough guidance to the project designer, contractor, or owner to allow them to design, specify, and/or build an economical and well designed project.
WWW. NRMCA.ORG
Who can submit a project for Design Services? NRMCA State Affiliates and regional or
national partner organizations are the only groups that can submit projects
Projects may be identified by State Affiliate members, design firms, contractors, etc.
The request for Design Services must come directly from an NRMCA State Affiliate
WWW. NRMCA.ORG
What will be included in the Design Suggestions provided? Scale CAD drawing with jointing plan Design details Alternatives for pervious pavement sections
(when applicable) Disclaimer stating that the Design Suggestions
are not every known fact about concrete pavement but complies with current industry standards. The final design is the responsibility of the engineer of record for the project.
WWW. NRMCA.ORG
What will be included in the Design Suggestions? A detailed transmittal letter which can include
some of the following Potential sources of project specifications Base Materials Potential LEED points Subgrade and drainage, for pavements with
and without detention (when applicable) Hydrological illustration for pervious concrete
projects (when applicable)
WWW. NRMCA.ORG
How fast will I receive Design Suggestions (Internal estimate)?
Projects of less than 100,000 square feet are usually returned to the State Affiliate within 5 business days. For larger projects, odd shaped pavements, or projects requiring hydrological illustrations may take up to 10 business days.
For the end user it is suggested we add a few days to ensure we under promise and over deliver)
For rush situations call Ohio Concrete
WWW. NRMCA.ORG
How much will the service cost? NMRCA State Affiliates will be expected to
share some of the cost for the design service which could be several hundred dollars per project.
Each affiliate should determine their process for quoting to end users and how they will manage their costs (likely to vary by afiliate)
WWW. NRMCA.ORG
How do I submit a project for Design Services? A project is submitted by completing the
application form and providing all the necessary information and files requested in the submittal checklist.
WWW. NRMCA.ORG
What feedback will I be expected to provide? NRMCA State Affiliates will be expected to provide
feedback about the process. This includes reporting of the final outcome to Ohio Concrete and the appropriate NRMCA National Resource Director.
If Projects are related to national accounts the NRMCA National Resource Director may be involved in the closing process based on many variables.
WWW. NRMCA.ORG
WWW. NRMCA.ORG
Areas under consideration for upgrading… Specifications Process Communications Ways to improve feedback form. Increased marketing of the service (to occur)
WWW. NRMCA.ORG
Actions to be taken in the short term…
NRMCA to send a note to state affiliates and RPGs to align expectations and educate on the process