100
100
150
150
200
200
200
200
200
250
250
250
TURBINE 6EASTING:480755.36
NORTHING:737220.36
TURBINE 7EASTING:481150.11NORTHING:737069.77
TURBINE 8EASTING:481494.07
NORTHING:737042.23
TURBINE 12EASTING:480438.12NORTHING:736431.48
TURBINE 11EASTING:480104.03
NORTHING:736597.97
TURBINE 13EASTING:480777.83NORTHING:736257.88
CH 1800
CH
2000
CH
2200
CH
2400
CH
2600
CH 2800
CH 3000
CH 0
CH 200
CH 400
CH 600
CH 800
CH 1000
CH 1186
CH 0
CH 200
CH 337
CH 0
CH 200
CH 334
ASSEMBLY AREA 1 (100x30)EASTING:480694.60
NORTHING:737093.28
260.
0
270.0
230.0
CC
C
CC
C
C
CC
C
EXISTING SLOPE TRIANGLE GREATER THAN 25°
PROPOSED ROAD 2
PROPOSED ROAD 2
PROPOSED ROAD 4
PROPOSED ROAD 5
PROPOSED ROAD 4
PROPOSED ROAD 6
TEKTUS Consultants LtdPO Box 80212 Green Bay
Auckland 0643 NZp. 09 827 1191
m. 021 1434 874www.tektus.nz
VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632
SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632
KAIMAI WIND FARMROTOKOHU ROAD, PAEROA
PRELIMINARY CIVIL ENGINEERINGDRAWINGS
A RESOURCE CONSENT JT 15.06.18
1. FOR INFORMATION PURPOSES ONLY.
2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.
3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.
4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.
15.06.18 JT JT
T15022 A
LEGENDEXISTING PARCEL BOUNDARY
JACKSON PROPERTY BOUNDARY
ROTOKOHU FARMS PROPERTY BOUNDARY
DENIZE BROTHERS PROPERTY BOUNDARY
HDC/MPDC TERRITORIAL BOUNDARY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
EXTENT OF EARTHWORK
PROPOSED TURBINE LOCATION
EXISTING TRANSPOWER NATIONALGRID LINES
PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY
EXISTING FENCE
INDICATIVE QUARRY SITE
INDICATIVE CLEANFILL SITE
EXISTING CULVERT
PROPOSED UPGRADED CULVERT
STREAM (WRC REGIONAL MAP)
PP
RESOURCE CONSENT
C
Q
250-3
1:5000
EROSION AND SEDIMENT CONTROLOVERVIEW DETAIL PLAN SHEET 3
16.10.18
ADDITIONAL PLAN FOR S92 RESPONSE LT 16.10.18
LT
25°
100
100
100
100
100
150
200
TURBINE 5EASTING:480403.82
NORTHING:737470.64
TURBINE 1EASTING:479448.01NORTHING:738587.37
TURBINE 4EASTING:480355.21
NORTHING:737986.09
TURBINE 2EASTING:479760.66NORTHING:738368.37
CH 3000
CH 3200
CH 3400
CH 3600
CH 3800
CH
4000
CH 4200
CH
4400
CH
4600
CH 48
00
CH 4967
TURBINE 3EASTING:480133.65NORTHING:738303.49
230.
0
230.0
C
C
C
C
C
EXISTING SLOPE TRIANGLE GREATER THAN 25°
PROPOSED ROAD 2
PROPOSED ROAD 2
TEKTUS Consultants LtdPO Box 80212 Green Bay
Auckland 0643 NZp. 09 827 1191
m. 021 1434 874www.tektus.nz
VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632
SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632
KAIMAI WIND FARMROTOKOHU ROAD, PAEROA
PRELIMINARY CIVIL ENGINEERINGDRAWINGS
A RESOURCE CONSENT JT 15.06.18
1. FOR INFORMATION PURPOSES ONLY.
2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.
3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.
4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.
15.06.18 JT JT
T15022 A
LEGENDEXISTING PARCEL BOUNDARY
JACKSON PROPERTY BOUNDARY
ROTOKOHU FARMS PROPERTY BOUNDARY
DENIZE BROTHERS PROPERTY BOUNDARY
HDC/MPDC TERRITORIAL BOUNDARY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
EXTENT OF EARTHWORK
PROPOSED TURBINE LOCATION
EXISTING TRANSPOWER NATIONALGRID LINES
PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY
EXISTING FENCE
INDICATIVE QUARRY SITE
INDICATIVE CLEANFILL SITE
EXISTING CULVERT
PROPOSED UPGRADED CULVERT
STREAM (WRC REGIONAL MAP)
PP
RESOURCE CONSENT
C
Q
250-4
1:5000
INDICATIVE TURNING AREA
EROSION AND SEDIMENT CONTROLOVERVIEW DETAIL PLAN SHEET 4
16.10.18
ADDITIONAL PLAN FOR S92 RESPONSE LT 16.10.18
LT
25°
250
300
350
350
200
250
TURBINE 20EASTING:484412.40NORTHING:736013.03
TURBINE 18EASTING:484027.58
NORTHING:736439.35
TURBINE 19EASTING:484423.16NORTHING:736382.64
CH 0
CH 200
CH 400
CH 600
CH 0
CH 200
CH 40
0
CH 60
0CH
624
CH
200
CH 329
CH 400
CH 600
CH 800
CH 1000
CH 1200
CH 1400
CH 1600
CH 1800
CH 2000
CH 2200 C
H 2400
CH 2600
C
C
EXISTING SLOPE TRIANGLE GREATER THAN 25°
PROPOSED ROAD 7
PROPOSED ROAD 8
PROPOSED ROAD 9
PROPOSED ROAD 10
PROPOSED ROAD 7
TEKTUS Consultants LtdPO Box 80212 Green Bay
Auckland 0643 NZp. 09 827 1191
m. 021 1434 874www.tektus.nz
VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632
SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632
KAIMAI WIND FARMROTOKOHU ROAD, PAEROA
PRELIMINARY CIVIL ENGINEERINGDRAWINGS
A RESOURCE CONSENT JT 15.06.18
1. FOR INFORMATION PURPOSES ONLY.
2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.
3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.
4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.
15.06.18 JT JT
T15022 A
LEGENDEXISTING PARCEL BOUNDARY
JACKSON PROPERTY BOUNDARY
ROTOKOHU FARMS PROPERTY BOUNDARY
DENIZE BROTHERS PROPERTY BOUNDARY
HDC/MPDC TERRITORIAL BOUNDARY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
EXTENT OF EARTHWORK
PROPOSED TURBINE LOCATION
EXISTING TRANSPOWER NATIONALGRID LINES
PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY
EXISTING FENCE
INDICATIVE QUARRY SITE
INDICATIVE CLEANFILL SITE
EXISTING CULVERT
PROPOSED UPGRADED CULVERT
STREAM (WRC REGIONAL MAP)
PP
RESOURCE CONSENT
C
Q
250-5
1:5000
EROSION AND SEDIMENT CONTROLOVERVIEW DETAIL PLAN SHEET 5
16.10.18
ADDITIONAL PLAN FOR S92 RESPONSE LT 16.10.18
LT
25°
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
350
350
400
450
TURBINE 20EASTING:484412.40NORTHING:736013.03
TURBINE 24EASTING:485345.86
NORTHING:735060.70
TURBINE 22EASTING:485205.70
NORTHING:735845.84
TURBINE 23EASTING:485388.88
NORTHING:735566.94
TURBINE 21EASTING:484943.93NORTHING:736153.72
CH 0
CH
200
CH 329
CH 0
CH 44
CH 2600
CH 2800
CH 3000
CH 3200
CH 3400
CH 3600
CH 3800
CH 4000
CH 4200
CH 4400
CH
4600
CH
4636
ASSEMBLY AREA 3 (100x30)EASTING:485093.05NORTHING:736109.06
CH 0CH 20
CH 40CH 60
CH 80CH 100
CH 120CH 140
CC
C
C
C
C
EXISTING SLOPE TRIANGLE GREATER THAN 25°
PROPOSED ROAD 7
PROPOSED ROAD 7
PROPOSED ROAD 7
PROPOSED ROAD 10
INDICATIVE SUBSTATIONPLATFORM
EXISTING TRANSPOWERNATIONAL GRID LINES
TEKTUS Consultants LtdPO Box 80212 Green Bay
Auckland 0643 NZp. 09 827 1191
m. 021 1434 874www.tektus.nz
VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632
SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632
KAIMAI WIND FARMROTOKOHU ROAD, PAEROA
PRELIMINARY CIVIL ENGINEERINGDRAWINGS
A RESOURCE CONSENT JT 15.06.18
1. FOR INFORMATION PURPOSES ONLY.
2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.
3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.
4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.
15.06.18 JT JT
T15022 A
LEGENDEXISTING PARCEL BOUNDARY
JACKSON PROPERTY BOUNDARY
ROTOKOHU FARMS PROPERTY BOUNDARY
DENIZE BROTHERS PROPERTY BOUNDARY
HDC/MPDC TERRITORIAL BOUNDARY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
EXTENT OF EARTHWORK
PROPOSED TURBINE LOCATION
EXISTING TRANSPOWER NATIONALGRID LINES
PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY
EXISTING FENCE
INDICATIVE QUARRY SITE
INDICATIVE CLEANFILL SITE
EXISTING CULVERT
PROPOSED UPGRADED CULVERT
STREAM (WRC REGIONAL MAP)
PP
RESOURCE CONSENT
C
Q
250-6
1:5000
PROPOSED ROAD 12
TRANSMISSION TOWERS TOBE LOCATED IN THIS AREA -FINAL LOCATION SUBJECT TODETAILED DESIGN
INDICATIVE TURNING AREA
INDICATIVE LOCATION FORPROPOSED 110kV LATTICETRANSMISSION TOWER
EROSION AND SEDIMENT CONTROLOVERVIEW DETAIL PLAN SHEET 6
16.10.18
ADDITIONAL PLAN FOR S92 RESPONSE LT 16.10.18
LT
25°
200
200
250
150
200
250
250
TURBINE 16EASTING:482608.80NORTHING:735269.84
ASSEMBLY AREA 2 (100x30)EASTING:483115.48NORTHING:735382.29
TURBINE 17EASTING:483065.27NORTHING:735308.18
CH 400
CH 600
CH 800
CH 1000
CH 1200
CH 1400
CH 1600
CH 1800
CH 0
CH 200CH 251
EXISTING SLOPE TRIANGLE GREATER THAN 25°
PROPOSED ROAD 8
PROPOSED ROAD 8
PROPOSED ROAD 11
TEKTUS Consultants LtdPO Box 80212 Green Bay
Auckland 0643 NZp. 09 827 1191
m. 021 1434 874www.tektus.nz
VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632
SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632
KAIMAI WIND FARMROTOKOHU ROAD, PAEROA
PRELIMINARY CIVIL ENGINEERINGDRAWINGS
A RESOURCE CONSENT JT 15.06.18
1. FOR INFORMATION PURPOSES ONLY.
2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.
3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.
4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.
15.06.18 JT JT
T15022 A
LEGENDEXISTING PARCEL BOUNDARY
JACKSON PROPERTY BOUNDARY
ROTOKOHU FARMS PROPERTY BOUNDARY
DENIZE BROTHERS PROPERTY BOUNDARY
HDC/MPDC TERRITORIAL BOUNDARY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
EXTENT OF EARTHWORK
PROPOSED TURBINE LOCATION
EXISTING TRANSPOWER NATIONALGRID LINES
PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY
EXISTING FENCE
INDICATIVE QUARRY SITE
INDICATIVE CLEANFILL SITE
EXISTING CULVERT
PROPOSED UPGRADED CULVERT
STREAM (WRC REGIONAL MAP)
PP
RESOURCE CONSENT
C
Q
250-7
1:5000
PROPOSED ROAD 11
EROSION AND SEDIMENT CONTROLOVERVIEW DETAIL PLAN SHEET 7
16.10.18
ADDITIONAL PLAN FOR S92 RESPONSE LT 16.10.18
LT
25°
WAITOKI STREAM
470
TURBINE 18EASTING:484027.58
NORTHING:736439.35
CH 1200
CH 1400
CH 1600
CH 1800
CH 200031
0 320 330
340 350
360
370
380380380
390
400
410
420
430
44045
0
460
360
370
380
390
400
410
420
310
310
310
320
320
320
330
340
350
360
370
380
FS
FS
FS
FS
FS
FS
FS
SSF LEGEND - SUPPLEMENTARYINDICATIVE CLEAN WATER/STREAM FLOWSINDICATIVE DIRTY WATER FLOWSPROPOSED SUPER SILT FENCEPROPOSED FILTER SOCKSPROPOSED DIRTY WATER DIVERSIONPROPOSED DECANTING EARTH BUNDPROPOSED SEDIMENT PITPROPOSED SEDIMENT DETENTION PONDPROPOSED GRASS BUFFER ZONEPROPOSED TURKEY NESTPROPOSED NON ERODIBLE BARRIER DAMINDICATIVE PUMPED FLOWINDICATIVE FLOW FROM PUMPINGEXISTING SLOPE TRIANGLE GREATER THAN 25°
SSF
FS
DWD
<
DEB
T
PROPOSED ROAD 7
TEKTUS Consultants LtdPO Box 80212 Green Bay
Auckland 0643 NZp. 09 827 1191
m. 021 1434 874www.tektus.nz
VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632
SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632
KAIMAI WIND FARMROTOKOHU ROAD, PAEROA
PRELIMINARY CIVIL ENGINEERINGDRAWINGS
A RESOURCE CONSENT JT 15.06.18
1. FOR INFORMATION PURPOSES ONLY.
2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.
3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.
4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.
15.06.18 JT JT
T15022 A
LEGENDEXISTING PARCEL BOUNDARY
JACKSON PROPERTY BOUNDARY
ROTOKOHU FARMS PROPERTY BOUNDARY
DENIZE BROTHERS PROPERTY BOUNDARY
HDC/MPDC TERRITORIAL BOUNDARY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
EXTENT OF EARTHWORK
PROPOSED TURBINE LOCATION
EXISTING TRANSPOWER NATIONALGRID LINES
PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY
EXISTING FENCE
INDICATIVE QUARRY SITE
INDICATIVE CLEANFILL SITE
EXISTING CULVERT
PROPOSED UPGRADED CULVERT
STREAM (WRC REGIONAL MAP)
PP
RESOURCE CONSENT
C
Q
251-1
1:2000
EROSION AND SEDIMENT CONTROLDETAIL SHEET 1 - ACCESS TRACKESTABLISHMENT - INDICATIVE ONLY
05.10.18
ADDITIONAL PLAN FOR S92 RESPONSE LT 05.10.18
LT
ANY CULVERTS IN HEADWATERSTREAMS REQUIRE DAM ANDPUMPING OF FLOWS.FILTER SOCKS DIVERT RUNOFF FROMTRACK AWAY FROM STREAM SYSTEMS
POTENTIAL TEMPORARYSTOCKPILE LOCATION
NOTES
1. STRIP TOPSOIL AND PLACE IN LOCATIONS WITH “INDEPENDENT” EROSION AND SEDIMENTCONTROL CAN BE ESTABLISHED
2. CUT AND COVER TO BE IMPLEMENTED WHERE AS CUT AND FILL OCCURS ALONG TRACKSURFACE IT IS STABILISED PROGRESSIVELY
3. CUT AND FILL BATTERS TO BE STABILISED WITH NATURAL ROCK MATERIAL OR MULCH ANDVEGETATED
4. BELOW FILL BATTERS FILTER SOCKS TO BE STRATEGICALLY PLACED AS NECESSARY
5. EARTHWORKS TO ADVANCE NO MORE THAN 24 HOURS IN FRONT OF THE STABILISED ROADSURFACE
6. SEDIMENT PITS TO BE ESTABLISHED TO COLLECT ROAD SURFACE RUNOFF AND DISCHARGEINTO GRASS ENVIRONMENT WHERE CONTOURS ALLOW
7. ALL CULVERTS TO BE INSTALLED IN DRY PERIOD AND ANY FLOWS TEMPORARILY DAMMEDAND PUMPED TO BELOW ACCESS TRACK WORKS
8. STOCK EXCLUSION TO OCCUR DURING EARTHWORKS ACTIVITY
9. ALL PRINCIPLES AS PER ESCP SECTION 5.0 TO APPLY
10.DETAILED SSESCP TO BE ESTABLISHED PRIOR TO ANY EARTHWORKS OCCURRING
11. WRC EROSION AND SEDIMENT CONTROL GUIDELINES TO APPLY
12.MONITORING TO OCCUR AS PER ESCP SECTION 11 WITH AN ADAPTIVE CONTINUOUSIMPROVEMENT APPROACH
220
230
230
230
230
240
240
240240240240240
CH 200
CH 400
CH 600
210
220
230
190
160
170
180
210
130
130
140
140
140
140
150
150
160
160
160
170
170
170
180
180
180
190
190
190
200
200
210210
210
220
230
240
200
21022
0230
240
DEB
TURBINE 10EASTING:481740.96
NORTHING:736237.78
SSF
SSF
SSFSS
F
DWD
DWD
DWD
DW
D
DW
DD
WD
LEGEND - SUPPLEMENTARYINDICATIVE CLEAN WATER/STREAM FLOWSINDICATIVE DIRTY WATER FLOWSPROPOSED SUPER SILT FENCEPROPOSED FILTER SOCKSPROPOSED DIRTY WATER DIVERSIONPROPOSED DECANTING EARTH BUNDPROPOSED SEDIMENT PITPROPOSED SEDIMENT DETENTION PONDPROPOSED GRASS BUFFER ZONEPROPOSED TURKEY NESTPROPOSED NON ERODIBLE BARRIER DAMINDICATIVE PUMPED FLOWINDICATIVE FLOW FROM PUMPINGEXISTING SLOPE TRIANGLE GREATER THAN 25°
SSF
FS
DWD
<
DEB
T
PROPOSED ROAD 3
TEKTUS Consultants LtdPO Box 80212 Green Bay
Auckland 0643 NZp. 09 827 1191
m. 021 1434 874www.tektus.nz
VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632
SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632
KAIMAI WIND FARMROTOKOHU ROAD, PAEROA
PRELIMINARY CIVIL ENGINEERINGDRAWINGS
A RESOURCE CONSENT JT 15.06.18
1. FOR INFORMATION PURPOSES ONLY.
2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.
3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.
4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.
15.06.18 JT JT
T15022 A
LEGENDEXISTING PARCEL BOUNDARY
JACKSON PROPERTY BOUNDARY
ROTOKOHU FARMS PROPERTY BOUNDARY
DENIZE BROTHERS PROPERTY BOUNDARY
HDC/MPDC TERRITORIAL BOUNDARY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
EXTENT OF EARTHWORK
PROPOSED TURBINE LOCATION
EXISTING TRANSPOWER NATIONALGRID LINES
PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY
EXISTING FENCE
INDICATIVE QUARRY SITE
INDICATIVE CLEANFILL SITE
EXISTING CULVERT
PROPOSED UPGRADED CULVERT
STREAM (WRC REGIONAL MAP)
PP
RESOURCE CONSENT
C
Q
251-2
1:2000 05.10.18
ADDITIONAL PLAN FOR S92 RESPONSE LT 05.10.18
LT
EROSION AND SEDIMENT CONTROLDETAIL SHEET 2 - QUARRY AND TURBINEESTABLISHMENT - INDICATIVE ONLY
ALL FLOWS FROM EARTHWORKSOVER GRASS BUFFER ZONE PRIOR TO
DECANTING EARTH BUND ANDDISCHARGE
NOTES
1. QUARRY LOCATIONS ARE INDICATIVE ONLY
2. QUARRY AND TURBINE 10 EROSION AND SEDIMENT CONTROL TO BE INTEGRATED
3. WORKS ARE WELL ISOLATED FROM STREAM SYSTEMS AND HAVE A SIGNIFICANT GRASSBUFFER ZONE BETWEEN WORKS AREA AND HEADWATER STREAMS IN VALLEY FLOOR
4. STRIP TOPSOIL WHERE NECESSARY AND PLACE IN LOCATIONSWITH “INDEPENDENT” EROSION AND SEDIMENT CONTROL CAN BE ESTABLISHED
5. WHERE EXPOSED AREAS ARE GREATER THAN 1500M2 THEN DECANTING EARTH BUNDS WILLBE ESTABLISHED
6. DECANTING EARTH BUND MAY BE UPGRADED TO A SEDIMENT RETENTION POND IFCATCHMENT AREA DETERMINES THIS
7. DECANTING EARTH BUND TO CAPTURE (THROUGH DIRTY WATER DIVERSIONS) QUARRY,TURBINE PLATFORM AND ACCESS ROAD
8. QUARRY OPERATION WILL OCCUR ON A QUARRY PLATFORM AND DISCHARGE VIA THEDECANTING EARTH BUND. ANY STOCKPILES WILL BE ON THE QUARRY FLOOR ORTRANSPORTED IMMEDIATELY TO END USE LOCATION.
9. TURBINE PLATFORM (AND ROAD ACCESS) IS STABILISED AS CUT OCCURS (ILLUSTRATED INSHEET 251-1)
10. STOCK EXCLUSION TO OCCUR DURING EARTHWORKS ACTIVITY
11. ALL PRINCIPLES AS PER ESCP SECTION 5.0 TO APPLY
12.DETAILED SSESCP TO BE ESTABLISHED PRIOR TO ANY EARTHWORKS OCCURRING
13. WRC EROSION AND SEDIMENT CONTROL GUIDELINES TO APPLY
14.MONITORING TO OCCUR AS PER ESCP SECTION 11 WITH AN ADAPTIVE CONTINUOUSIMPROVEMENT APPROACH
TOPSOIL STOCKPILE LOCATEDON FLAT CONTOUR
Q
Q
INDICATIVE QUARRY BOUNDARY
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
ROAD 7
ROAD 7
ROA
D 1
2
460
460
470
470
470
480
65.0
35.0
26.01.5
18.0
18.0 67.0
15.0
TURBINE 24EASTING:485345.86
NORTHING:735060.70
25.0
18.0
40.0
53.0
P
P
P
P
P
P
430
430
440
440
440 440
450
450
450
450
460
460
470
470
480
DWD
DWD
DWD
DWD
DW
D
DWD
DWD
DW
D
LEGEND - SUPPLEMENTARYINDICATIVE CLEAN WATER/STREAM FLOWSINDICATIVE DIRTY WATER FLOWSPROPOSED SUPER SILT FENCEPROPOSED FILTER SOCKSPROPOSED DIRTY WATER DIVERSIONPROPOSED DECANTING EARTH BUNDPROPOSED SEDIMENT PITPROPOSED SEDIMENT DETENTION PONDPROPOSED GRASS BUFFER ZONEPROPOSED TURKEY NESTPROPOSED NON ERODIBLE BARRIER DAMINDICATIVE PUMPED FLOWINDICATIVE FLOW FROM PUMPINGEXISTING SLOPE TRIANGLE GREATER THAN 25°
SSF
FS
DWD
<
DEB
T
PROPOSED ROAD 7
TEKTUS Consultants LtdPO Box 80212 Green Bay
Auckland 0643 NZp. 09 827 1191
m. 021 1434 874www.tektus.nz
VENTUS ENERGY (NZ) LTD10/215 ROSEDALE ROAD, ALBANYAUCKLAND 0632
SYNERGY POSITIONING SYSTEMS LTD3/52 ARRENWAY DRIVE, ALBANY,AUCKLAND 0632
KAIMAI WIND FARMROTOKOHU ROAD, PAEROA
PRELIMINARY CIVIL ENGINEERINGDRAWINGS
A RESOURCE CONSENT JT 15.06.18
1. FOR INFORMATION PURPOSES ONLY.
2. BOUNDARIES, CONTOURS AND OTHER BASEINFORMATION SHOWN IS INDICATIVE ONLY AND PRIMARILYINFORMED BY AERIAL LIDAR SURVEY BY SYNERGYPOSITIONING SYSTEMS LTD IN APRIL 2016.
3. COORDINATES SHOWN ARE IN TERMS OF MT EDEN 2000CIRCUIT AND LEVELS ARE RELATIVE TO THE AUCKLAND 1946VERTICAL DATUM.
4. THE PROPOSED ROAD ALIGNMENT, TURBINE PLATFORMS,AND OVERALL EARTHWORKS ARE BASED ON AN INDICATIVEROAD ALIGNMENT AND REMAIN SUBJECT TO DETAILEDDESIGN.
15.06.18 JT JT
T15022 A
LEGENDEXISTING PARCEL BOUNDARY
JACKSON PROPERTY BOUNDARY
ROTOKOHU FARMS PROPERTY BOUNDARY
DENIZE BROTHERS PROPERTY BOUNDARY
HDC/MPDC TERRITORIAL BOUNDARY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
EXTENT OF EARTHWORK
PROPOSED TURBINE LOCATION
EXISTING TRANSPOWER NATIONALGRID LINES
PROPOSED ROAD CENTER LINE ANDEDGE OF CARRIAGEWAY
EXISTING FENCE
INDICATIVE QUARRY SITE
INDICATIVE CLEANFILL SITE
EXISTING CULVERT
PROPOSED UPGRADED CULVERT
STREAM (WRC REGIONAL MAP)
PP
RESOURCE CONSENT
C
Q
251-3
1:1000 05.10.18
ADDITIONAL PLAN FOR S92 RESPONSE LT 05.10.18
LT
EROSION AND SEDIMENT CONTROLDETAIL SHEET 3 - SUBSTATION AND TURBINEESTABLISHMENT - INDICATIVE ONLY
INDICATIVE ONLY.TO BE PROGRESSIVELYSTABILISED
NOTES
1. SUBSTATION AND TURBINE 24 EROSION AND SEDIMENT CONTROL TO BE INTEGRATED
2. STRIP TOPSOIL WHERE NECESSARY AND PLACE IN LOCATIONSWITH “INDEPENDENT” EROSION AND SEDIMENT CONTROL CAN BE ESTABLISHED
3. SEDIMENT RETENTION POND TO BE ESTABLISHED WITH DIRTY WATER DIVERSION TAKINGFLOWS TO SRP
4. TURBINE IS ALL IN CUT MATERIAL AND WILL BE STABILISED AS CUT PROGRESSES
5. SUBSTATION PLATFORM WILL BE STABILISED ON COMPLETION
6. TOTAL WORKS AREA INCLUDING ACCESS ROAD AND ANCILLARY ACTIVITIES CAN ALLDISCHARGE TO SRP
7. FILL SITE AS SHOWN INDICATIVE ONLY AND WILL BE ESTABLISHED WITH MAXIMUM BATTERSLOPES OF 25DEGREES TO MINIMISE EROSION AND ALLOW FUTURE STOCK GRAZING
8. STOCK EXCLUSION TO OCCUR DURING EARTHWORKS ACTIVITY
9. ALL PRINCIPLES AS PER ESCP SECTION 5.0 TO APPLY
10.DETAILED SSESCP TO BE ESTABLISHED PRIOR TO ANY EARTHWORKS OCCURRING
11. WRC EROSION AND SEDIMENT CONTROL GUIDELINES TO APPLY
12. MONITORING TO OCCUR AS PER ESCP SECTION 11 WITH AN ADAPTIVE CONTINUOUSIMPROVEMENT APPROACH
FLOWS TO NORTH AWAYFROM EARTHWORKS
BATTER OF SUBSTATIONFILL TO BE VEGETATED
INDICATIVE LOCATIONOF SEDIMENT RETENTION
POND
C