32
DEPARTMENT OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL: REGIONAL COORDINATION 13 JUNE 2013 BUILDING THE NEW DPW: FEEDBACK ON THE TURNAROUND STRATEGY AND SEVEN YEAR PLAN

DEPARTMENT OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL: REGIONAL COORDINATION 13 JUNE 2013

  • Upload
    kylar

  • View
    45

  • Download
    1

Embed Size (px)

DESCRIPTION

DEPARTMENT OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL: REGIONAL COORDINATION 13 JUNE 2013. BUILDING THE NEW DPW: FEEDBACK ON THE TURNAROUND STRATEGY AND SEVEN YEAR PLAN. Contents of this presentation. Executive Summary - PowerPoint PPT Presentation

Citation preview

Page 1: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

DEPARTMENT OF PUBLIC WORKS

PRESENTATION TO THE SACPCMP

BUTCHER MATUTLE

DEPUTY DIRECTOR-GENERAL: REGIONAL COORDINATION

13 JUNE 2013

BUILDING THE NEW DPW:

FEEDBACK ON THE

TURNAROUND STRATEGY

AND SEVEN YEAR PLAN

Page 2: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Contents of this presentation

1. Executive Summary

2. Context for the Turnaround Strategy and 7-year plan

3. Strategic Priorities and alignment with MTSF, NDP, SPP, APP

4. High-Level approach and timeline

5. Project structure and resourcing

6. Change Management and organisational ownership

7. Risk management and stakeholder relations

8. Project plans

9. Budget

2

This presentation provides only a brief overview of the turnaround strategy and 7-year plan. It has been compiled using excerpts from the comprehensive documents.

Page 3: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Executive Summary

Page 4: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Executive Summary (1)

4

1. Driven by eight consecutive years of under-performance, evidenced by progressively

worse audits, the DPW launched a turnaround project in 2012. The project aims to

restore the department to organisational health across all perspectives.

2. Prior attempts at change have proved unsuccessful, largely owing to leadership

instability and ineffective change management, resulting in a lack of ownership by the

organisation. 

3. The change required is significant and touches on all areas of the organisation as well

as the way in which it does business. 

4. The project has been structured in 3 phases, the first of which focusses on

stabilisation. This is crucial to establish a stable base for subsequent far-reaching

changes. This phase is already under way and runs until 1 April 2014.

Page 5: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Executive Summary (2)

5

5. In tandem with the Stabilisation Phase, a long-term view of the DPW is being

developed. This process has already started and has structural implications.

6. The long-term view of the DPW will focus on the effective delivery of its core mandate,

ensuring that both scope and capacity exist to respond to the requirements of the NDP

and national infrastructure roll-out in terms of construction projects, job creation and

skills development, as well as harnessing the significant property portfolio of the state

for economic development. 

7. The project is championed by the Director-General and supported by the Business

Improvement Unit. BIU resources are mostly internal with external experts recruited-in

to provide assistance and support as necessary. Where external resources are used,

active skills transfer to DPW resources has been agreed. 

Page 6: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Executive Summary (3)

6

8. Ownership of each of the 23 projects is vested in the organisation rather than in the

project team. This ownership has been formalised and linked to the individual

performance contracts of those concerned. 

9. Significant additional support is provided by other Departments including National

Treasury’s Technical Assistance Unit (TAU), DPSA and SARS. We are also working

closely with client Departments across the various projects.

Page 7: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Context for the Turnaround Strategy and Seven-Year Plan

Page 8: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Context for the Turnaround Strategy and 7-year Plan (1)

8

The issues and challenges facing the DPW are not new and the need for significant change was identified as early as 2000. Despite numerous

attempts, little traction was gained in a large and dysfunctional organisation.

Page 9: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Context for the Turnaround Strategy and 7-year Plan (2)

9

The key reasons for failure of previous attempts can be summarised as follows:

1. High levels of staff turnover – including Leadership – leading to a lack of continuity

2. Inconsistency of buy-in, understanding and commitment – poor change management

3. Lack of implementation capability and capacity

4. Internal power plays and bureaucracy

5. Culture and attitude do not support or encourage change – organisational inertia

6. Objectives over-optimistic and undermined by inadequate resourcing and lack of

systems support

7. Change fatigue

It is vital that the scope be clear, objectives are realistically achievable and the processes adopted are pragmatic for the turnaround project to have the best

possible chance of success.

Page 10: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Strategic Priorities and Alignment

Page 11: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Strategic Priorities and Alignment (1)

11

1. It is vitally important that any turnaround efforts should support not only the

DPW’s own organisational performance but also National priorities.

2. To this end, we mapped the proposed turnaround projects against the MTSF,

NDP, APP and SPP goals and objectives.

Page 12: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

The MTSF (2009-2014) aims to set the country on a higher and sustainable trajectory of economic growth

1. Infrastructure development will drive this process.

2. This is to be accompanied by an expanded and more diversified economic base, with

unemployment, poverty and income inequality being reduced. Economic growth and

development, including the creation of decent work and investment in quality education

and skills development, are at the centre of government’s programme.

3. In this context, the thrust of the Department of Public Works’ Annual Performance Plan is

based on the priorities set out in the MTSF, the manner in which national and

international dynamics may influence the achievement of these priorities, and the

mechanisms required to plan, measure, monitor and evaluate implementation and

progress in these priority areas.

12

There is a high degree of correlation between the DPW goals and those of the MTSF.

12

Page 13: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

These goals are also very similar to those articulated in our existing Strategic Plan

1. To provide strategic leadership in effective and efficient immovable asset

management and in the delivery of infrastructure programmes

2. To contribute to the building of a developmental state and a comprehensive rural

development framework through state assets

3. To ensure improved service delivery in all DPW programmes to meet clients’

expectations and leverage stakeholder relations

4. To promote an enabling environment for the creation of both short and sustainable

work opportunities, so as to contribute to the national goal of job creation and poverty

alleviation

5. To ensure transformation and regulation of the construction and property industries to

ensure economic growth and development

6. To ensure effective corporate governance and sound resource management

13

Page 14: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

The DPW is fully-committed to supporting the NDP

• The NDP is at the centre of our National strategic thrusts. It is a wide-ranging plan for

reform that includes most of the organs of state. The DPW is fully-committed to

supporting the NDP and the correlation between our strategic focus areas and the

goals of the NDP is high.

• Within the DPW, the Office of the DG, through the BIU, is tasked with delivering the

turnaround of the DPW. The overarching goal of the Turnaround Project is to

return the DPW to a state of competence in the delivery of its mandate.

• Our turnaround is a critical element of our strategy, not an indulgence or a peripheral

project. If we do not address the problems identified we will not improve. It directly

affects all of us and requires active participation. With this in mind, support for the NDP

will be through the various branches of the DPW rather than via the Turnaround

Project.

14

Page 15: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

While National priorities drive the DPW’s strategic goals, the DPW goals, in turn, drive the turnaround project’s focus areas

15

The turnaround project consists of 23 discrete projects. Our key focus in the short-term,

however, has been on taking control of six key areas:

1. Developing a complete and credible register of state immovable assets

2. Conducting a comprehensive audit of Leases and the establishment of a Lease

Management Framework.

3. Ensuring progressively improving audit outcomes for the DPW with particular attention

to processes, systems and controls and better supply chain management

4. Actively reducing fraud and corruption in the DPW

5. Meeting the needs of our Prestige clients

6. Operationalising the Property Management Trading Entity (PMTE) in terms of the

DPW’s mandate.

These projects are necessarily underpinned by improvements in processes, systems and structures across the Department.

Page 16: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

High-Level Approach and Timeline

Page 17: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

High-level approach and timeline (1)

17

We have launched 23 separate projects under the Turnaround umbrella.While many of these have a short lifespan limited to the Stabilisation Phase,

others will continue for several years.

Page 18: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

High-level approach and timeline (2)

18

STABILISATION:o Improved compliance of asset registero Improved GIAMA complianceo Systems support in placeo Re-engineered lease processeso Optimal organisation design finalised (OFA)o 23 x Stabilisation project phases completedo Long-term DPW turnaround plan finalisedo Unqualified audit with emphasis

EFFICIENCY ENHANCEMENT:o Majority of assets complianto Expanded asset registero Effective property management trading accounto Technology-based organisationo Fully-implemented new organisation designo Public Works Act in placeo Unqualified audit

SUSTAINABILITY & GROWTH:o 95%+ of assets complianto 100% of leases complianto Listed PFMA property management trading entityo Municipal assets on asset registero Expansion to Provincial supporto Sustainable and professional organisation

STABILISATION2012 - 2014

EFFICIENCY ENHANCEMENT

2014 - 2019

SUSTAINABILITY AND GROWTH

2019 +

TRAN

SFO

RMAT

ION

AN

D CH

ANGE

MAN

AGEM

ENT

Page 19: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Change Management and Organisational Ownership

Page 20: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Change Management and Organisational Ownership (1)

20

There are a few key considerations worth noting before embarking on a significant

change project. Large and complex projects that require significant change often fail

because of

 

1. A lack of understanding of the broader context and how it impacts the organisation

2. A lack of understanding of the changes contemplated

3. Insufficient communication

4. Poorly defined change roles and / or processes

5. Relationships which lack a strong foundation or commitment

6. A directive rather than a consultative approach

Page 21: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Change Management and Organisational Ownership (2)

21

With the above in mind, it is vital that the following elements are integrated into our change

strategy:

1. Early attention to the organisational issues raised and Quick Wins identified.

2. Regular, simple and clear communication to the DPW staff regarding the scope, ambit

and objectives of the change project

3. Constant reference to stakeholders and ensuring that their communications needs are

being met

4. A clear plan, effectively implemented by a project team with sufficient capacity and

capability

5. Clear executive ownership and championing of the change

 

Organisational issues that need to be actively managed have already been identified via

roadshows, Ministerial visits and a workshop with Regional Managers and CFOs.

Page 22: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Change Management and Organisational Ownership (3)

22

1. The BIU Change Management team is now up to its full complement of five resources:

Prof Paruk, Jacob Mamobolo, Vuyo Bavuma, Sibusiso Zondi and Fikile Hugo under

the direct control of the Head of the BIU, Dhaya Govender.

2. Leadership interventions are planned to enhance the understanding of change

management within the leadership levels of the DPW.

3. Project champions have formally taken ownership of the 23 projects

4. Change readiness assessments are in the planning stage.

5. A change plan has been formulated and tabled.

6. Regional issues are receiving attention. Branch Regional Coordination established.

Page 23: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Risk Management and Stakeholder Relations

Page 24: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Our project risk profile has improved. Organisational inertia and compliance remain key issues, however, and cannot be underestimated.

24

Project Risks1. Failure of stabilisation2. Phase 2 failure3. Lack of stakeholder buy-in4. Reputational damage of

failure5. Lack of senior management

buy-in6. Insufficient project resource

capacity7. Industrial action8. Lack of technical support

capacity9. Disinformation and leaks of

classified information10. Lack of organisational

capacity (vacancies)11. Risk of retribution12. Organisational non-

compliance / non-cooperation

13. Inability to break organisational bad habits

Highly unlikely Possible Almost CertainUnlikely Likely

Very High

Medium

Minor

Negligible

High

Impa

ct

Probability

23

14

56

7

8

11

10

9

12 13

Risks related to organisational inertia and compliance are highlighted in yellow.

Project risks may be summarised into three key categories: Compliance, Capacity and Support

Page 25: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

As an integral part of the development of our strategy, we identified the stakeholders involved in the contemplated change.

25

Stakeholders include both internal and external constituencies and are listed as the following (those highlighted in red text have yet to be effectively included):

Minister, DM, DGDPW leadershipNational TreasuryUnionsCabinetDPSAAGPortfolio CommitteeStaffIndustryClient DepartmentsMediaEntitiesProject TeamGeneral Public

 While there may be many other stakeholders our view is that the above are the most important, or influential, in the change process.

Page 26: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Project Plans

Page 27: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Project Plans (1)

27

1. The following 2 slides present a draft representation of the likely duration of the 23

projects.

2. For the purposes of the graphic, we have adopted 3 colour codes:

1. Red = Stabilisation / fix the basics

2. Orange = Process enhancement / improve on the basics or extend the scope

3. Green = Maintain and apply continuous improvement principles

Page 28: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Project Plans (2)

28

2012 2013 2014 2015 2016 2017 2018 2019 +

1 Asset Register

2 Leases

3 Clean audit of DPW and PMTE

4 Regional Operations

5 Anti-Fraud & Corruption

6.a Re-opening of workshop

6.b Building of skills in DPW

7 SCM Review

8 Governance and Performance

9Compliance Review and Enforcement

10Bills for Parliament and policies (PMTE)

11Tshwane Inner City Regeneration

12 Change Management

Page 29: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Project Plans (3)

29

2012 2013 2014 2015 2016 2017 2018 2019 +

13 Key Account Management

14 Prestige Clients

15 IT Platform

17 IDIP

18 PMTE

19 SIP 13

20IDT (Independent Development Trust)

21 EPWP

22SDIP (Service Delivery Improvement Project)

23 OFA

Page 30: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Budget

Page 31: DEPARTMENT  OF PUBLIC WORKS PRESENTATION TO THE SACPCMP BUTCHER MATUTLE DEPUTY DIRECTOR-GENERAL:  REGIONAL COORDINATION   13 JUNE 2013

Turnaround Budget to 2015/16

National Treasury approved project funding in the following annual amounts:

2012/13 – R202 610 000 2013/14 – R357 547 000 2014/15 – R279 363 000 2015/16 – R200 601 000

The above funding is reflected in the agreed 2012/13 MTEF.

Additional funding may be required for technology systems and infrastructure. Systems and funding requirements will be developed in consultation with National Treasury.

We have also asked National Treasury to approve roll-overs for several projects (IAR, Leases, Clean Audit) that started later than planned owing to protracted negotiations with Service Providers.

31