Dr Jennifer McCormick Superintendent of Public Instruction
DEPARTMENT OF EDUCATION 4~ To~tfJtjtnsectlideztsectucceltfd
March 2 201 7
Dr Diane Woodworth 613 E Purl St Goshen IN 46526
Dear Dr Woodworth
Thank you for your recent renewal application for a 1003(g) School Improvement Grant under the ESEA Congratulations Chamberlain Elementary Schools renewal application was accepted and SIG funds will continue for SY 201 7-2018
In accordance with your application and available funding you are being awarded $271 88500 for the 2017-2018 school year
School Im rovement Grants S377A00120015
Like other Title I monies the Title I sect 1003(g) School Improvement Grant award must be used to supplement the level of funds that in the absence of the Title I monies would be made available from non-federal sources for the education of the students at this school Improvement funds must be tracked separately from all other Title I Grants Local fiscal agents are to place improvement funds in a Title I account assigned for school improvement (this funding number must not be the same number as is used for the Title I Basic grant award) Because these are school improvement funds districts may not combine funds into one account and the amount awarded each school must be spent on improvement initiatives at that particular school
We look forward to continuing our work with your team this school year Please feel free to contact your IDOE SIG team representative or 1003gdoeingovif you have any questions
Sincerely
Nathan Williamson Director Office of Early Learning and Intervention Indiana Department of Education
cc Title I Program Administrator SIG Coordinator Principal
115 W Washington Street bull South Tower Suite 600 bull Indianapolis Indiana 46204
3172326610 bull wwwdoeingov
cc Title I Program Administrator SIG Coordinator Principal
_
-lndiana Departmentof ~ducationMAKJNGTHEM HAPPEN
Glenda Ritz NBCT lndfanaSuperintendert of Public Jnstn1ctnon
Cohort 5 -1003(g) School Improvement Grant (SIG) Sustainability Renewal Application
Part 1 Grantee Information
Chamberlain Elementary School 1829
Goshen Community Schools 2315
Kimberly E Branham kbranhamgoshenschoolsorg Mary Kay Longacre mklongacregoshenschoolsorg Dr Diane Woodworth dwoodworthgoshenschoolsorg
$27188500
Part 2 Grant Information
SIG Sustainability Renewal Application The purpose of this application is to help guide a schoolLEA to determine ways to sustain successful systems and programs
for a fourth year ofSIG funding and to create a plan of action to sustain school improvement activities that have been effective This application takes stakeholders
through discussion-based reflections considerations and then action steps to support a sustainability plan Sustainability is the ability of a program (SIG to maintain
its core beliefs and values and use them to guide program adaptations to changes and pressures over time -Sustainable School Improvement WestEd
Important Dates
Wednesday MemoNotification and SustainabilityRenewal Application sent to Cohort 5 SIG schools
11817 Thursday 12617 Year Four Webinar- Sustainability Renewal Application will be explained along with discussions around sustainability 1100 am -1200 Join the Meeting Here pm Call-in toll-free number 1-877-4221931 US)
Conference Code 891 004 4863
Tuesday 13117 Open call for Cohort 5 SIG Schools to address any additional questions 300 pm -400 pm Join the Meeting Here
call-in toll-free number 1-877-4221931 (US)
Conference Code 891 004 4863
Monday 21317 Due date for Cohort 5 SIG schools to submit their Sustainability Renewal Application via email to idoe1003gdoeingov
Monday 22017 SIG Sustainability Renewal Applications approval letters sent
Part 3 LEA and School Assurance and Waivers
The LEAEligible Entity must provide the following assurances in its application The LEAEligible Entity must be able to provide upon request evidence ofcompliance with each assurance
1 Establish and maintain fiscal control and fund accounting procedures as set forth in 34 CFR Part 7 and in applicable federal and state laws and regulations 2 The Title I School Improvement funds will be used only to supplement and not supplant federal state and local funds a school would otherwise receive 3 Prior written approval must be received from the Indiana Department of Education before implementing any project changes with respect to the purposes for which
the proposed funds are awarded 4 Retain all records of the financial transactions and accounts relating to the proposed project for a period of three years after termination of the grant agreement and
shall make such records available for inspection and audit as necessary s Provide ongoing technical assistance to schools identified for Title ISchool Improvement as they develop or revise their school improvement plan and throughout the
implementation of that plan 6 Coordinate the technical assistance that is provided to schools in Title ISchool Improvement Assistance to schools may be provided by district staff or external
consultants with experience and expertise in helping schools improve academic achievement 7 Expenditures contained in this Title I School Improvement Application accurately reflect the school improvement plan The plan addresses all required components
under No Child Left Behind 8 Assist the school in analyzing results from the state assessment system and other relevant examples of student work Technical assistance will be provided to school
staff to enable them to use data to identify and solve problems in curriculum and instruction to strengthen parental involvement and professional development and to fulfill other responsibilities that are defined in the school improvement plan
9 The district will help the school choose and sustain effective instructional strategies and methods and ensure that the school staff receives high quality professional development relevant to the implementation of instructional strategies The chosen strategies must be grounded in scientifically based research and address the specific instruction or other issues such as attendance or graduation rate that caused the school to be identified for school improvement
10 The Indiana Department of Education may as they deem necessary supervise evaluate and provide guidance and direction to the district and school in the management of the activities performed under this plan
11 The schools and district shall adhere to Indiana Department of Education reporting and evaluation requirements in a timely and accurate manner 12 The LEA certifies that it has verified the state and federal suspension and debarment status for all subcontractors receiving funds under the fund associated with this
application and shall be solely responsible for any recoupment penalties or costs that might arise from use of a suspended or debarred subcontractor The LEA shall immediately notify the State if any subcontractor becomes debarred or suspended and shall at the States request take all steps required by the State to terminate its contractual relationship with the subcontractor for work to be performed and supported by funding from the application
V)_)
- 13 -I 02--13 -17 Ocl 13~I
111
Part 4 Applitation Reflection
SIOT Activity Strengths Improvements Opportunities and Threats) Instructions
List schools primary strengths and areas of improvement from SY 16-17-forces or barriers working for and against SIG implementation or schools mission
e List schools key opportunities and threats from SY 16-17-political economic social technological demographic or legal trends that are or may impact schools ability to achieve SIG implementation or schools mission
OpportunitiesStrengths bull The NWEA Growth data would continue to increase as the RTI team and coach
e School wide data on state tests indicates continued upward trend of bull Community and cultural components in classrooms and with staff
continue to build plan process needs and place students in Tier 2 and lier 3 students showing typical and high growth research based interventions
bull Staff Professional Leaming Communities (PLC frequency duration and bull NWEAISTEP+ data can continue to show growth with ongoing PLC results have continually increased under the guidance of the Instructional collaboration time to build and refine curriculum instruction and assessment Guide (IG) and leadership team of learning standards
bull EL Education support learning and guidance will continue to have an impact are demonstrating capacity to produce high quality work provide and
bull Case Study and Expedition Planning is continuing to deepen and students the student engagement learning outcomes and student achievement This
receive feedback expertise of EL Education will help to drive and support use of data family involvement portfolio and student led learning in the future
numbers of participation in monthly family opportunities community bull Family and Community Involvement is increasing data indicates increased
bull Shared leadership opportunities through EL Education learning institutes will involvement in learning and academic domain showcase of learning build staff capacity and background knowledge to sustain El School Work events are highly attended and feedback to school indicates community Plan and credential framework buy in and support to our learning model and demonstration of student learningwork
e Chamberlain stafftransition rate has decreased It has changed from (2014) 83 staff stability to (2016) 966 staff stability
o Environment Facilities materials classrooms are now conducive to project basedinglliry_ learning
Areas for Improvement Threats bull Loss of student population due to the demographics of Goshen and current
differentiation for all student particularly The high population of English bull Continue to build curriculum and instructional opportunities to build in
political realities language Learners at Chamberlain Elementary bull loss of staff due to district budget cuts
bull Building of common assessments that can be used formatively to drive bull Loss of grant funded staff individualized instruction
Par15 Application Activities
Sustainability Framework Instructions Use the SIOT Activity above to help guide what SIG pieces will be sustained for SY 17-18
What needs to be sustained What evidence is available to show what is worth sustaining List programs projects or positions that are currently funded by SIG and use the questions below to help brainstorm what evidence supports your initiatives worth in sustaining
Maintain the 50 RTI coordinatorlead
position
RTI leadership Team and support of implementation of the RTI MTSS)
Data Utilization Grade Level PLCs meet weekly during common plan time and are valuingthe use of data It would be in the best interest of students to have one more year for a 50 position to further and enhance this process
Maintain a 100 IG) Instructional
GuideCoach position
Benchmark data is being utilized to determine students that are in need of RTI intervention weekly leadership meetings to process and make decisions based on student needs monitor and adjust the process and track data in strategic and useful ways
Multiple Rll Documents are maintained to track student data frequency duration of intervention screener data includes anecdotal notes
Number of students identified to be screened via NWEA results -126 students screened based on fall NWEA Reading
Teacher PD support data from 2015-2016
110PD Hours
Prior to 2016-17 school year we were lacking both a districtschool process for identifying students through a benchmark assessment as well as lacking materials needed to implement a quality RTI plan of action During the 2016-17 Chamberlain Elementary has been able to build develop implement and improve a process to identify students for Rll build goals provide strategicresearched based intervention monitor and adjust goals
NWEA is being utilized for the second year at GCS and Chamberlain Elementary The staff is increasing the abilityto process and utilize data more time is needed and this additional time will help us to increase student achievement at a higher level
The RTI leadership team and school leadership team have developed this process for data integration
The IG is one of 4 key leaders in the school that utilize expertise in upholding and guiding the work of the school goals and work plan Curriculum and instruction
communication of school wide and individual student data
Parents community members El Education Expeditionary Learning) school support team have noted the significant increase in our students ability to articulate their goals (including Crew Habits of Scholarship Goals Classroom Data goals and benchmark data goals) Students are able to articulate their current goals and next steps and the habits of scholarships needed to achieve goals
EL Education Mid Year and End of Year Review as well as TAP NIEr End of Year Review data indicates that Chamberlain use of data and strides to increase capacity and serve students through the RTI process are steps to increased overall student achievement and to take Chamberlain to the next level in terms of our school work plan and credentialing plan
As part of the IG role showcase of learning community experts
This position will continue to teach PD support teachers in PLC Curriculum common plan times and provide mentoring and coaching of current staff
The IG position has supported students by increasing the depth of learning experiences through curriculum and planning guidance to staff
The IG in an instrumental role on SLT (School Leadership Team) in coordination with the principal and other members of the SLTshehas coordinated student learning experiences designed and taught curriculum designed communicated with EL Education and School Designer carried out the work and student data goals in our School Work Plan Credential Plan and EL Core Practices EL Core Practices Link
- 80 min in PLC per week for grade level teachers
Student in all grade levels are learning in Case Study and Expedition
Community Expertise in student case study work data Number of Experts) K- (approx10-and at least 2 more ahead) 1-5 up to this point and 5 more this year) 2 -(5 up to this point and 5 more this year) 3-4 up to this point and 2 more ahead) 4-3 up to this point and 3 more ahead) 5-5 up to this point and 6 more ahead
Teacher Evaluationeffectiveness data has increased
2014-15 2015-16 Highly Effective 5 28 Effective 23 4
Needs Improv 1 0 Ineffective 0 0
TAPIDOE Score 55 55
Student ISTEP Ge__o_wth D_ata
Math FgtassPercentaie bullbull gt_ lt bull J
2014-2015 I 201s-2016
3rd Grade 4630
444th Grade 44
675th Grade 54
1middot ELAPass PertentagE
2014-2015 I 2015-2016
3rd Grade 49 55
While the teacher ability to build curriculum case studies and expeditions has increased dramatically the IG position is the point person for this work and the staff appreciates having access to such expertise in PLC Time PD time and through the course of the EL Education building years at Chamberlain The IG provides modeling co-teaching and mentoringcoaching
Specialists (music art technology physical education Ell teachers Special Education Teacher Counselor) being integrated into Expeditions plan and implementation has happened as a result of the guidance and support from the IG these specialists are feeling more integrated supported and valued than ever before
The IG has guided decision making ordering suggestions and local businesses connections for needed supplies anchor text PD books and other materials needed for Expedition Implementation The staff has appreciated this guidance and time that the IG has attended to this in order for them to place time resources on other more direct student impact initiatives and planning
The IG guide alongside the principal has developed and held parent information nights to build background knowledge inform show examples of student teacher progress and work as well being a resource to communicate with families
The IG has worked in collaboration with the school parent liaison (district funded position) to plan family nights showcase nights and to provide literature that the IG prepared and the parent liaison translates
Both the IG and the principal serve on localcommunity boards These positions take efforts and time to connect with community groups to work collaboratively to serve the needs of students families and learning experiences
SOS group of local churches and organizations meet 3 times a year at the school to communicate with leadership on how they can serve our students in the form of providing materials for back to school basic needs and the giving of time as field experts mentors and volunteers
EL Education (Expeditionary
Leaming) Network feeand
comprehensive corporate agreement
fees
The EL Network is supporting us in a
gradual decrease of these fees and we
increase sustainability in the El Core
Practices as a school The 17-18 contract
or perhaps a multi-year contract) will be purchased if
SIG funds allow will be able to build this
contract with more support
424th Grade 40
47455th Grade
Family Community Opportunity Attendance Data 2015-16Total for the year 1637 2016-17 Total for 1st semester 775
Showcase night Attendance by family and community 418 Implementation of instructional practices institute learning data practices learning strategies and monitoring and accountability with the El Network has impacted student in the following way
Implementation of CREW the culturalcharacter component of EL Education has impacted the following student data
Attendance Rate Data 2013-14 955 2014-15 952 2015-16 958 2016-17 962 ( as ofJan 2017)
Discipline Referral Data 2014-15 348 Referrals 2015-16 262 Referrals 216-17 102 Referrals ( as of Jan 1 2017)
ISTEP Data ISTEP ACCESS LINK
Support in building model of learning for Chamberlain from the contract services of EL Education School Designer As a support to the SLT (school leadership team) TIT (teaching and learning team-TAP) and CCT (Crew and Culture Team) the SD (School Designer) has been a guide for the work plan goals and implementation of EL Education Core Practices at Chamberlain Her Role has built sustainability and capacity in our students leadership teams teachers support staff district and parents
EL Education Institutes are built into the Network Fees we have gradually decreased this each year The attendance at these institutes has built confidence capacity leadership and ownership in our teacher and leadership crew Institute Attendance at EL Education Institutes 14-15 - 20 attendee slots 15-16 -30 staff plus 24 staff to Designing Learning Expeditions Milwaukee 16-17 -15 staff to Date Here is a brief list of some of the institutes that have been attended by staff
2016-17
EL Education Network is accessible for all stakeholders
El Education Network support School Designer Midwest Regional Director and Principal Colleagues have taken part in showcase nights parent information nights and
District Leadership and School Board Members have been engaged in the form of supporting attending events and requesting reports to the board on our progress
Parents have increasingly become comfortable coming to school participating in events providing support for academics at home
Community and district support for our launch of EL Education the data is indicating growth our student from all ability levels language levels and ethnicities
Newspaper and News coverage has been positive and have promoted positive outlook of GCS Corporation Chamberlain Elementary and public schools
Student Mobility Data bull Assessment Planning for High Local Churches Community Foundations (Percentage of turnover) Quality Work and Businesses are hearing of the impact of 2012-13 3367 bull Using Data to Improve Student this model of learning through media social 2013-14 2783 Achievement media invitations and attendance at 2014-15 2459 bull Meeting the Needs of ELLs showcase nights by word of mouth The 2015-16 2306 bull National Conference (Chicago) principal has been invited to speak at
2016-17 1649 (faculty + 1 member of SLT) Churches Community Groups (ie Kiwanis ( as of Feb 2017) bull Midwest Leadership Cohort Rotary Colleges) regarding the impact that
(Chicago) SL T) an inquiry based model for learning and the Teacher mobility has decreased emphasis on CREW and Culture of significantly over the last 2 years
bull Polaris Site visit- Crew focus Community in our school is having on our
teacher attendance has increased as a Staff has been able to utilize the El Network students parents and neighborhood result of feeling valued supported portal and center for student work as a way to
share connect and gain ideas from other schools and teachers in the El Education
201483 Teacher Retention
Network
2016966
Because of the Network support willingness and appreciation for TELL Survey Data indicates teachers
-Turnover has decreased ongoing professional development and -Shared leadership has increased growth on Teacher value and -Principal capacity has increased capacity PD opportunities - School Leader principal and SLT members)
have remained committed invested and PD Attendancehours increased leadership capacity has grown 2013 36 hours per teacher per year 2016 108 hours per teacher per year
PLC Collaboration Time 2013 45 minute per week 2016 90 minutes per week
Please refer above (in addition to the below please refer to the attendance by Chamberlain Teachers By supporting another year of instituteTraveltoJnstitutes
The attendance at these institutes has built section above) our students will be able benefit from confidence capacity leadership and Stakeholders desire a capable teaching staff the instructional impact as a result of ownership in our teacher and leadership crew is is well equipped to serve the needs of our increasing capacity in teaching staff students
It is a value to our staff members to be able to The selection of the institutes is driven attend institutes absent of personal financial In addition All factors that parents value by the following factors burden
- Student Data Needs The building of learning and professional
-middot--middot-- ~f_~1~~------ul =middot-------------------------
- Staff Learning Need development within the staff is geared at The above 2 stated needs drive the - Increasing Instruction building of the school goals and work - Expert Community Involvement plan Then a strategic process is - Support of Needs offamilies utilized to align the data needs with - Specific to Chamberlain Data needs the work plan goals the work plan goals drive the determination of what EL Education Regional National Institute Learning is needed to address these needs The institute learning is brought back to all staff PD and hence has an impact on all staff learning and student achievement
Please refer to the above section for the data that is a justification for sustaining this portion of our framework-for one more year as we build capacity ie teacher attendance rate teacher mobility decreasing survey date indicating teachers feeling increased capacity and value
NOTE EL Education institutes are typically build in a regional offering institute rates and lodging are respectful of schools limited budgets Chamberlain travel is built in an economical way that maximizes funds
Staff values uninterrupted time that does notFOCUS of Staff Learning Days Parents will be appreciative of not having toStaff Learning Days take them away from students in order tobull Data Utilization have guest teachers in classrooms teaching
Funding of Curriculum explore data as a tool for strategically Curriculum and Instructional students Parent have voices appreciating bullbull Development driving instruction forward and toRate for 3 days Total of our efforts to minimize instances of this
teaching staff retreat identify interventions and EL Education Credential Plan bull Goal Setting and Planning remediations that need to be
(summer 2017 18 learning days
By attending to this above listed staff addressed for students to be successful Community and families value having high needs student outcomes will be bull developing instructional plans for quality teachers on staff that are committed developed as a result of the work expeditions expanding improving and to learning outside
_________w1--~~middotbullbull_101laquon~lbullMtgt=-bull--------------------------------------------------------------------
revising existing curriculum Researched based instructional This type ofwork requires time and focus that methods curriculum development is difficult to do in small chunks of time When Sense of community is felt and voiced by practices and learning in the domain teachers are given larger windows of time to parents of being student centered and driven attend to these areas they are more efficient by data and effective in their work and the result is Network of churches and local businesses
better instruction for students are thankful to host summer learning in the By allocating summer learning time locations This helps with the networking of and compensating teachers for this Compensation for additional time when it school and community Many times they work we are impacting students by occurs outside of the school day is highly provide lunches and snacks to us and come
Decreasing time with a guestbull valued to thank the stafffor their commitment to teacher during the summer our students Allocating for grade levelbull collaboration and learning to StaffLeadership Team value the opportunity plan for student instructional to not have to take time away from the time in opportunities and curriculum the classroom with students By providing a Having time to utilize studentbull time for focused learning and development end of the year data to build allocates for the need to accomplish while not goals and instructional decision having guest teachers provide instruction making for upcoming standards targets and assessment building
Data Utilization Grade levels meet 3-4 times per month for 45 min to utilize data to informimpact student achievement
NWEA Data Hours Staff has the opportunity for afrac12 day of release time to process NWEA Data 3 times per year In addition grade levels utilize this data periodically in weekly PLC Data meetings
Student Learning Supplies Materials Students and staff have had the By having the opportunity for studentstaff to Our families have benefitted significantly by
opportunity to have access to supplies have financial support for building the having the supplies being utilized and the materials books resources consumablenon consumable needs of supply and inventory of materials technology apps and programs that ExpeditionsCase Study for a sustainable year becoming available to students during the have been a powerful piece to will significantly support the learning first 3 years of the SIG grant
~~~~===~ru1u1deg=-~tlmicro=uL)Cll~mf-bullrAltlltMHW==trade-~~II--middot-bull__________________
launching enhancing and diversifying learning expeditions case studies and student achievement
STEP Testing Access link
The staff amp leadership team opportunity for building the literacy library has helped with a strong foundation of materials that would not have happened on district funding alone Being able to build this foundation of materials for an additional year yet at a lesser amount will truly have an impact on sustainability
The IG position in coordination with the principal will be working with the teachers in the 17-18 school year to share leadership and learn how to apply for grants Donors Choose and other resources to fulfill future classroom and learning needs
In the coming years we will be utilizing other funding parent participation and looking to have local corporations that we are in communication with to support learning materials and to adopt classrooms
Part 6 Sustainability Plan
Instructions List below the SIG funded positions programs or structures that will be sustained the plan to sustain each piece the amount budgeted for each focus area and how you will track effectiveness I middotmiddotmiddot1
Maintain the 50 RTI bull Weekly RTI Leadership Team meeting planned agenda leading RTI Intervention data and student coordinatorlead of meeting achievement for those students in
position o RTI Coordinator Lead -Lisa Rose Martin (LRM) intervention via benchmark data bull Monitoring of implementation of the RTI Process per RTI law RTI process data screen goals and
district goals and implementation of leadership meetings results o Principal ~ Kim Branham (KB) Implementation check in 4 times a
bull Building Maintaining of RTI documentation running data and year of the RTI Process coordination of data steps
o RTI Coordinator Lead - LRM bull Supervision and guidance ofTitle One Instructor Team of
Interventionist (support staff) to screen students develop RTI Plans and monitor and adjust instruction track data
o RTI Coordinator Lead - LRM bull Monitor Supervision of Interventionist Trtle One Instructor
Team of Interventionist (support staff) o Assistant Principal - Erir1_ Has~ley EH)
Maintain a 1004 (IG bull Facilitate Coach and guide collaboration of curriculum work I $80JOOO Monitoring of the curriculum plans Instructional bull Develop Lead and Coach Professional Development implementation of instruction assessment GuideCoach bull Developing sustainable practices for resource acquisition expert building will be on an ongoing basis
position visits and fieldwork bull Support students and teachers in curriculum development Mid year and end of year accountability
revision instruction and implementation of EL Core Practices through EL Education School Review will be bull Specific feedback and support around ensuring high quality an accountability process for the work
teaching practices and high quality learning experiences for students Monitoring ofthe work plan and
bull Lead Leamer of the guiding principles and practices of EL credentialing plan is continual and weekly Education School Leadership Team (SLT) meetings will
o IG- Instructional Guide be the check in point o Lisa Vogt- School Designer monitoring guiding support) o Kim Branham - Principal (monitoring guiding support
EL Education bull Make arrangements and map out the details of the corporate $100000 In house and El Education Network (Expeditionary agreement monitoring of practices data and
Leaming) Network o Kim Branham- Principal credentialing steps will be attended to on an feeand o Lisa Vogt- EL Education School Designer ongoing basis via site visits data reigt_orts
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
cc Title I Program Administrator SIG Coordinator Principal
_
-lndiana Departmentof ~ducationMAKJNGTHEM HAPPEN
Glenda Ritz NBCT lndfanaSuperintendert of Public Jnstn1ctnon
Cohort 5 -1003(g) School Improvement Grant (SIG) Sustainability Renewal Application
Part 1 Grantee Information
Chamberlain Elementary School 1829
Goshen Community Schools 2315
Kimberly E Branham kbranhamgoshenschoolsorg Mary Kay Longacre mklongacregoshenschoolsorg Dr Diane Woodworth dwoodworthgoshenschoolsorg
$27188500
Part 2 Grant Information
SIG Sustainability Renewal Application The purpose of this application is to help guide a schoolLEA to determine ways to sustain successful systems and programs
for a fourth year ofSIG funding and to create a plan of action to sustain school improvement activities that have been effective This application takes stakeholders
through discussion-based reflections considerations and then action steps to support a sustainability plan Sustainability is the ability of a program (SIG to maintain
its core beliefs and values and use them to guide program adaptations to changes and pressures over time -Sustainable School Improvement WestEd
Important Dates
Wednesday MemoNotification and SustainabilityRenewal Application sent to Cohort 5 SIG schools
11817 Thursday 12617 Year Four Webinar- Sustainability Renewal Application will be explained along with discussions around sustainability 1100 am -1200 Join the Meeting Here pm Call-in toll-free number 1-877-4221931 US)
Conference Code 891 004 4863
Tuesday 13117 Open call for Cohort 5 SIG Schools to address any additional questions 300 pm -400 pm Join the Meeting Here
call-in toll-free number 1-877-4221931 (US)
Conference Code 891 004 4863
Monday 21317 Due date for Cohort 5 SIG schools to submit their Sustainability Renewal Application via email to idoe1003gdoeingov
Monday 22017 SIG Sustainability Renewal Applications approval letters sent
Part 3 LEA and School Assurance and Waivers
The LEAEligible Entity must provide the following assurances in its application The LEAEligible Entity must be able to provide upon request evidence ofcompliance with each assurance
1 Establish and maintain fiscal control and fund accounting procedures as set forth in 34 CFR Part 7 and in applicable federal and state laws and regulations 2 The Title I School Improvement funds will be used only to supplement and not supplant federal state and local funds a school would otherwise receive 3 Prior written approval must be received from the Indiana Department of Education before implementing any project changes with respect to the purposes for which
the proposed funds are awarded 4 Retain all records of the financial transactions and accounts relating to the proposed project for a period of three years after termination of the grant agreement and
shall make such records available for inspection and audit as necessary s Provide ongoing technical assistance to schools identified for Title ISchool Improvement as they develop or revise their school improvement plan and throughout the
implementation of that plan 6 Coordinate the technical assistance that is provided to schools in Title ISchool Improvement Assistance to schools may be provided by district staff or external
consultants with experience and expertise in helping schools improve academic achievement 7 Expenditures contained in this Title I School Improvement Application accurately reflect the school improvement plan The plan addresses all required components
under No Child Left Behind 8 Assist the school in analyzing results from the state assessment system and other relevant examples of student work Technical assistance will be provided to school
staff to enable them to use data to identify and solve problems in curriculum and instruction to strengthen parental involvement and professional development and to fulfill other responsibilities that are defined in the school improvement plan
9 The district will help the school choose and sustain effective instructional strategies and methods and ensure that the school staff receives high quality professional development relevant to the implementation of instructional strategies The chosen strategies must be grounded in scientifically based research and address the specific instruction or other issues such as attendance or graduation rate that caused the school to be identified for school improvement
10 The Indiana Department of Education may as they deem necessary supervise evaluate and provide guidance and direction to the district and school in the management of the activities performed under this plan
11 The schools and district shall adhere to Indiana Department of Education reporting and evaluation requirements in a timely and accurate manner 12 The LEA certifies that it has verified the state and federal suspension and debarment status for all subcontractors receiving funds under the fund associated with this
application and shall be solely responsible for any recoupment penalties or costs that might arise from use of a suspended or debarred subcontractor The LEA shall immediately notify the State if any subcontractor becomes debarred or suspended and shall at the States request take all steps required by the State to terminate its contractual relationship with the subcontractor for work to be performed and supported by funding from the application
V)_)
- 13 -I 02--13 -17 Ocl 13~I
111
Part 4 Applitation Reflection
SIOT Activity Strengths Improvements Opportunities and Threats) Instructions
List schools primary strengths and areas of improvement from SY 16-17-forces or barriers working for and against SIG implementation or schools mission
e List schools key opportunities and threats from SY 16-17-political economic social technological demographic or legal trends that are or may impact schools ability to achieve SIG implementation or schools mission
OpportunitiesStrengths bull The NWEA Growth data would continue to increase as the RTI team and coach
e School wide data on state tests indicates continued upward trend of bull Community and cultural components in classrooms and with staff
continue to build plan process needs and place students in Tier 2 and lier 3 students showing typical and high growth research based interventions
bull Staff Professional Leaming Communities (PLC frequency duration and bull NWEAISTEP+ data can continue to show growth with ongoing PLC results have continually increased under the guidance of the Instructional collaboration time to build and refine curriculum instruction and assessment Guide (IG) and leadership team of learning standards
bull EL Education support learning and guidance will continue to have an impact are demonstrating capacity to produce high quality work provide and
bull Case Study and Expedition Planning is continuing to deepen and students the student engagement learning outcomes and student achievement This
receive feedback expertise of EL Education will help to drive and support use of data family involvement portfolio and student led learning in the future
numbers of participation in monthly family opportunities community bull Family and Community Involvement is increasing data indicates increased
bull Shared leadership opportunities through EL Education learning institutes will involvement in learning and academic domain showcase of learning build staff capacity and background knowledge to sustain El School Work events are highly attended and feedback to school indicates community Plan and credential framework buy in and support to our learning model and demonstration of student learningwork
e Chamberlain stafftransition rate has decreased It has changed from (2014) 83 staff stability to (2016) 966 staff stability
o Environment Facilities materials classrooms are now conducive to project basedinglliry_ learning
Areas for Improvement Threats bull Loss of student population due to the demographics of Goshen and current
differentiation for all student particularly The high population of English bull Continue to build curriculum and instructional opportunities to build in
political realities language Learners at Chamberlain Elementary bull loss of staff due to district budget cuts
bull Building of common assessments that can be used formatively to drive bull Loss of grant funded staff individualized instruction
Par15 Application Activities
Sustainability Framework Instructions Use the SIOT Activity above to help guide what SIG pieces will be sustained for SY 17-18
What needs to be sustained What evidence is available to show what is worth sustaining List programs projects or positions that are currently funded by SIG and use the questions below to help brainstorm what evidence supports your initiatives worth in sustaining
Maintain the 50 RTI coordinatorlead
position
RTI leadership Team and support of implementation of the RTI MTSS)
Data Utilization Grade Level PLCs meet weekly during common plan time and are valuingthe use of data It would be in the best interest of students to have one more year for a 50 position to further and enhance this process
Maintain a 100 IG) Instructional
GuideCoach position
Benchmark data is being utilized to determine students that are in need of RTI intervention weekly leadership meetings to process and make decisions based on student needs monitor and adjust the process and track data in strategic and useful ways
Multiple Rll Documents are maintained to track student data frequency duration of intervention screener data includes anecdotal notes
Number of students identified to be screened via NWEA results -126 students screened based on fall NWEA Reading
Teacher PD support data from 2015-2016
110PD Hours
Prior to 2016-17 school year we were lacking both a districtschool process for identifying students through a benchmark assessment as well as lacking materials needed to implement a quality RTI plan of action During the 2016-17 Chamberlain Elementary has been able to build develop implement and improve a process to identify students for Rll build goals provide strategicresearched based intervention monitor and adjust goals
NWEA is being utilized for the second year at GCS and Chamberlain Elementary The staff is increasing the abilityto process and utilize data more time is needed and this additional time will help us to increase student achievement at a higher level
The RTI leadership team and school leadership team have developed this process for data integration
The IG is one of 4 key leaders in the school that utilize expertise in upholding and guiding the work of the school goals and work plan Curriculum and instruction
communication of school wide and individual student data
Parents community members El Education Expeditionary Learning) school support team have noted the significant increase in our students ability to articulate their goals (including Crew Habits of Scholarship Goals Classroom Data goals and benchmark data goals) Students are able to articulate their current goals and next steps and the habits of scholarships needed to achieve goals
EL Education Mid Year and End of Year Review as well as TAP NIEr End of Year Review data indicates that Chamberlain use of data and strides to increase capacity and serve students through the RTI process are steps to increased overall student achievement and to take Chamberlain to the next level in terms of our school work plan and credentialing plan
As part of the IG role showcase of learning community experts
This position will continue to teach PD support teachers in PLC Curriculum common plan times and provide mentoring and coaching of current staff
The IG position has supported students by increasing the depth of learning experiences through curriculum and planning guidance to staff
The IG in an instrumental role on SLT (School Leadership Team) in coordination with the principal and other members of the SLTshehas coordinated student learning experiences designed and taught curriculum designed communicated with EL Education and School Designer carried out the work and student data goals in our School Work Plan Credential Plan and EL Core Practices EL Core Practices Link
- 80 min in PLC per week for grade level teachers
Student in all grade levels are learning in Case Study and Expedition
Community Expertise in student case study work data Number of Experts) K- (approx10-and at least 2 more ahead) 1-5 up to this point and 5 more this year) 2 -(5 up to this point and 5 more this year) 3-4 up to this point and 2 more ahead) 4-3 up to this point and 3 more ahead) 5-5 up to this point and 6 more ahead
Teacher Evaluationeffectiveness data has increased
2014-15 2015-16 Highly Effective 5 28 Effective 23 4
Needs Improv 1 0 Ineffective 0 0
TAPIDOE Score 55 55
Student ISTEP Ge__o_wth D_ata
Math FgtassPercentaie bullbull gt_ lt bull J
2014-2015 I 201s-2016
3rd Grade 4630
444th Grade 44
675th Grade 54
1middot ELAPass PertentagE
2014-2015 I 2015-2016
3rd Grade 49 55
While the teacher ability to build curriculum case studies and expeditions has increased dramatically the IG position is the point person for this work and the staff appreciates having access to such expertise in PLC Time PD time and through the course of the EL Education building years at Chamberlain The IG provides modeling co-teaching and mentoringcoaching
Specialists (music art technology physical education Ell teachers Special Education Teacher Counselor) being integrated into Expeditions plan and implementation has happened as a result of the guidance and support from the IG these specialists are feeling more integrated supported and valued than ever before
The IG has guided decision making ordering suggestions and local businesses connections for needed supplies anchor text PD books and other materials needed for Expedition Implementation The staff has appreciated this guidance and time that the IG has attended to this in order for them to place time resources on other more direct student impact initiatives and planning
The IG guide alongside the principal has developed and held parent information nights to build background knowledge inform show examples of student teacher progress and work as well being a resource to communicate with families
The IG has worked in collaboration with the school parent liaison (district funded position) to plan family nights showcase nights and to provide literature that the IG prepared and the parent liaison translates
Both the IG and the principal serve on localcommunity boards These positions take efforts and time to connect with community groups to work collaboratively to serve the needs of students families and learning experiences
SOS group of local churches and organizations meet 3 times a year at the school to communicate with leadership on how they can serve our students in the form of providing materials for back to school basic needs and the giving of time as field experts mentors and volunteers
EL Education (Expeditionary
Leaming) Network feeand
comprehensive corporate agreement
fees
The EL Network is supporting us in a
gradual decrease of these fees and we
increase sustainability in the El Core
Practices as a school The 17-18 contract
or perhaps a multi-year contract) will be purchased if
SIG funds allow will be able to build this
contract with more support
424th Grade 40
47455th Grade
Family Community Opportunity Attendance Data 2015-16Total for the year 1637 2016-17 Total for 1st semester 775
Showcase night Attendance by family and community 418 Implementation of instructional practices institute learning data practices learning strategies and monitoring and accountability with the El Network has impacted student in the following way
Implementation of CREW the culturalcharacter component of EL Education has impacted the following student data
Attendance Rate Data 2013-14 955 2014-15 952 2015-16 958 2016-17 962 ( as ofJan 2017)
Discipline Referral Data 2014-15 348 Referrals 2015-16 262 Referrals 216-17 102 Referrals ( as of Jan 1 2017)
ISTEP Data ISTEP ACCESS LINK
Support in building model of learning for Chamberlain from the contract services of EL Education School Designer As a support to the SLT (school leadership team) TIT (teaching and learning team-TAP) and CCT (Crew and Culture Team) the SD (School Designer) has been a guide for the work plan goals and implementation of EL Education Core Practices at Chamberlain Her Role has built sustainability and capacity in our students leadership teams teachers support staff district and parents
EL Education Institutes are built into the Network Fees we have gradually decreased this each year The attendance at these institutes has built confidence capacity leadership and ownership in our teacher and leadership crew Institute Attendance at EL Education Institutes 14-15 - 20 attendee slots 15-16 -30 staff plus 24 staff to Designing Learning Expeditions Milwaukee 16-17 -15 staff to Date Here is a brief list of some of the institutes that have been attended by staff
2016-17
EL Education Network is accessible for all stakeholders
El Education Network support School Designer Midwest Regional Director and Principal Colleagues have taken part in showcase nights parent information nights and
District Leadership and School Board Members have been engaged in the form of supporting attending events and requesting reports to the board on our progress
Parents have increasingly become comfortable coming to school participating in events providing support for academics at home
Community and district support for our launch of EL Education the data is indicating growth our student from all ability levels language levels and ethnicities
Newspaper and News coverage has been positive and have promoted positive outlook of GCS Corporation Chamberlain Elementary and public schools
Student Mobility Data bull Assessment Planning for High Local Churches Community Foundations (Percentage of turnover) Quality Work and Businesses are hearing of the impact of 2012-13 3367 bull Using Data to Improve Student this model of learning through media social 2013-14 2783 Achievement media invitations and attendance at 2014-15 2459 bull Meeting the Needs of ELLs showcase nights by word of mouth The 2015-16 2306 bull National Conference (Chicago) principal has been invited to speak at
2016-17 1649 (faculty + 1 member of SLT) Churches Community Groups (ie Kiwanis ( as of Feb 2017) bull Midwest Leadership Cohort Rotary Colleges) regarding the impact that
(Chicago) SL T) an inquiry based model for learning and the Teacher mobility has decreased emphasis on CREW and Culture of significantly over the last 2 years
bull Polaris Site visit- Crew focus Community in our school is having on our
teacher attendance has increased as a Staff has been able to utilize the El Network students parents and neighborhood result of feeling valued supported portal and center for student work as a way to
share connect and gain ideas from other schools and teachers in the El Education
201483 Teacher Retention
Network
2016966
Because of the Network support willingness and appreciation for TELL Survey Data indicates teachers
-Turnover has decreased ongoing professional development and -Shared leadership has increased growth on Teacher value and -Principal capacity has increased capacity PD opportunities - School Leader principal and SLT members)
have remained committed invested and PD Attendancehours increased leadership capacity has grown 2013 36 hours per teacher per year 2016 108 hours per teacher per year
PLC Collaboration Time 2013 45 minute per week 2016 90 minutes per week
Please refer above (in addition to the below please refer to the attendance by Chamberlain Teachers By supporting another year of instituteTraveltoJnstitutes
The attendance at these institutes has built section above) our students will be able benefit from confidence capacity leadership and Stakeholders desire a capable teaching staff the instructional impact as a result of ownership in our teacher and leadership crew is is well equipped to serve the needs of our increasing capacity in teaching staff students
It is a value to our staff members to be able to The selection of the institutes is driven attend institutes absent of personal financial In addition All factors that parents value by the following factors burden
- Student Data Needs The building of learning and professional
-middot--middot-- ~f_~1~~------ul =middot-------------------------
- Staff Learning Need development within the staff is geared at The above 2 stated needs drive the - Increasing Instruction building of the school goals and work - Expert Community Involvement plan Then a strategic process is - Support of Needs offamilies utilized to align the data needs with - Specific to Chamberlain Data needs the work plan goals the work plan goals drive the determination of what EL Education Regional National Institute Learning is needed to address these needs The institute learning is brought back to all staff PD and hence has an impact on all staff learning and student achievement
Please refer to the above section for the data that is a justification for sustaining this portion of our framework-for one more year as we build capacity ie teacher attendance rate teacher mobility decreasing survey date indicating teachers feeling increased capacity and value
NOTE EL Education institutes are typically build in a regional offering institute rates and lodging are respectful of schools limited budgets Chamberlain travel is built in an economical way that maximizes funds
Staff values uninterrupted time that does notFOCUS of Staff Learning Days Parents will be appreciative of not having toStaff Learning Days take them away from students in order tobull Data Utilization have guest teachers in classrooms teaching
Funding of Curriculum explore data as a tool for strategically Curriculum and Instructional students Parent have voices appreciating bullbull Development driving instruction forward and toRate for 3 days Total of our efforts to minimize instances of this
teaching staff retreat identify interventions and EL Education Credential Plan bull Goal Setting and Planning remediations that need to be
(summer 2017 18 learning days
By attending to this above listed staff addressed for students to be successful Community and families value having high needs student outcomes will be bull developing instructional plans for quality teachers on staff that are committed developed as a result of the work expeditions expanding improving and to learning outside
_________w1--~~middotbullbull_101laquon~lbullMtgt=-bull--------------------------------------------------------------------
revising existing curriculum Researched based instructional This type ofwork requires time and focus that methods curriculum development is difficult to do in small chunks of time When Sense of community is felt and voiced by practices and learning in the domain teachers are given larger windows of time to parents of being student centered and driven attend to these areas they are more efficient by data and effective in their work and the result is Network of churches and local businesses
better instruction for students are thankful to host summer learning in the By allocating summer learning time locations This helps with the networking of and compensating teachers for this Compensation for additional time when it school and community Many times they work we are impacting students by occurs outside of the school day is highly provide lunches and snacks to us and come
Decreasing time with a guestbull valued to thank the stafffor their commitment to teacher during the summer our students Allocating for grade levelbull collaboration and learning to StaffLeadership Team value the opportunity plan for student instructional to not have to take time away from the time in opportunities and curriculum the classroom with students By providing a Having time to utilize studentbull time for focused learning and development end of the year data to build allocates for the need to accomplish while not goals and instructional decision having guest teachers provide instruction making for upcoming standards targets and assessment building
Data Utilization Grade levels meet 3-4 times per month for 45 min to utilize data to informimpact student achievement
NWEA Data Hours Staff has the opportunity for afrac12 day of release time to process NWEA Data 3 times per year In addition grade levels utilize this data periodically in weekly PLC Data meetings
Student Learning Supplies Materials Students and staff have had the By having the opportunity for studentstaff to Our families have benefitted significantly by
opportunity to have access to supplies have financial support for building the having the supplies being utilized and the materials books resources consumablenon consumable needs of supply and inventory of materials technology apps and programs that ExpeditionsCase Study for a sustainable year becoming available to students during the have been a powerful piece to will significantly support the learning first 3 years of the SIG grant
~~~~===~ru1u1deg=-~tlmicro=uL)Cll~mf-bullrAltlltMHW==trade-~~II--middot-bull__________________
launching enhancing and diversifying learning expeditions case studies and student achievement
STEP Testing Access link
The staff amp leadership team opportunity for building the literacy library has helped with a strong foundation of materials that would not have happened on district funding alone Being able to build this foundation of materials for an additional year yet at a lesser amount will truly have an impact on sustainability
The IG position in coordination with the principal will be working with the teachers in the 17-18 school year to share leadership and learn how to apply for grants Donors Choose and other resources to fulfill future classroom and learning needs
In the coming years we will be utilizing other funding parent participation and looking to have local corporations that we are in communication with to support learning materials and to adopt classrooms
Part 6 Sustainability Plan
Instructions List below the SIG funded positions programs or structures that will be sustained the plan to sustain each piece the amount budgeted for each focus area and how you will track effectiveness I middotmiddotmiddot1
Maintain the 50 RTI bull Weekly RTI Leadership Team meeting planned agenda leading RTI Intervention data and student coordinatorlead of meeting achievement for those students in
position o RTI Coordinator Lead -Lisa Rose Martin (LRM) intervention via benchmark data bull Monitoring of implementation of the RTI Process per RTI law RTI process data screen goals and
district goals and implementation of leadership meetings results o Principal ~ Kim Branham (KB) Implementation check in 4 times a
bull Building Maintaining of RTI documentation running data and year of the RTI Process coordination of data steps
o RTI Coordinator Lead - LRM bull Supervision and guidance ofTitle One Instructor Team of
Interventionist (support staff) to screen students develop RTI Plans and monitor and adjust instruction track data
o RTI Coordinator Lead - LRM bull Monitor Supervision of Interventionist Trtle One Instructor
Team of Interventionist (support staff) o Assistant Principal - Erir1_ Has~ley EH)
Maintain a 1004 (IG bull Facilitate Coach and guide collaboration of curriculum work I $80JOOO Monitoring of the curriculum plans Instructional bull Develop Lead and Coach Professional Development implementation of instruction assessment GuideCoach bull Developing sustainable practices for resource acquisition expert building will be on an ongoing basis
position visits and fieldwork bull Support students and teachers in curriculum development Mid year and end of year accountability
revision instruction and implementation of EL Core Practices through EL Education School Review will be bull Specific feedback and support around ensuring high quality an accountability process for the work
teaching practices and high quality learning experiences for students Monitoring ofthe work plan and
bull Lead Leamer of the guiding principles and practices of EL credentialing plan is continual and weekly Education School Leadership Team (SLT) meetings will
o IG- Instructional Guide be the check in point o Lisa Vogt- School Designer monitoring guiding support) o Kim Branham - Principal (monitoring guiding support
EL Education bull Make arrangements and map out the details of the corporate $100000 In house and El Education Network (Expeditionary agreement monitoring of practices data and
Leaming) Network o Kim Branham- Principal credentialing steps will be attended to on an feeand o Lisa Vogt- EL Education School Designer ongoing basis via site visits data reigt_orts
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
_
-lndiana Departmentof ~ducationMAKJNGTHEM HAPPEN
Glenda Ritz NBCT lndfanaSuperintendert of Public Jnstn1ctnon
Cohort 5 -1003(g) School Improvement Grant (SIG) Sustainability Renewal Application
Part 1 Grantee Information
Chamberlain Elementary School 1829
Goshen Community Schools 2315
Kimberly E Branham kbranhamgoshenschoolsorg Mary Kay Longacre mklongacregoshenschoolsorg Dr Diane Woodworth dwoodworthgoshenschoolsorg
$27188500
Part 2 Grant Information
SIG Sustainability Renewal Application The purpose of this application is to help guide a schoolLEA to determine ways to sustain successful systems and programs
for a fourth year ofSIG funding and to create a plan of action to sustain school improvement activities that have been effective This application takes stakeholders
through discussion-based reflections considerations and then action steps to support a sustainability plan Sustainability is the ability of a program (SIG to maintain
its core beliefs and values and use them to guide program adaptations to changes and pressures over time -Sustainable School Improvement WestEd
Important Dates
Wednesday MemoNotification and SustainabilityRenewal Application sent to Cohort 5 SIG schools
11817 Thursday 12617 Year Four Webinar- Sustainability Renewal Application will be explained along with discussions around sustainability 1100 am -1200 Join the Meeting Here pm Call-in toll-free number 1-877-4221931 US)
Conference Code 891 004 4863
Tuesday 13117 Open call for Cohort 5 SIG Schools to address any additional questions 300 pm -400 pm Join the Meeting Here
call-in toll-free number 1-877-4221931 (US)
Conference Code 891 004 4863
Monday 21317 Due date for Cohort 5 SIG schools to submit their Sustainability Renewal Application via email to idoe1003gdoeingov
Monday 22017 SIG Sustainability Renewal Applications approval letters sent
Part 3 LEA and School Assurance and Waivers
The LEAEligible Entity must provide the following assurances in its application The LEAEligible Entity must be able to provide upon request evidence ofcompliance with each assurance
1 Establish and maintain fiscal control and fund accounting procedures as set forth in 34 CFR Part 7 and in applicable federal and state laws and regulations 2 The Title I School Improvement funds will be used only to supplement and not supplant federal state and local funds a school would otherwise receive 3 Prior written approval must be received from the Indiana Department of Education before implementing any project changes with respect to the purposes for which
the proposed funds are awarded 4 Retain all records of the financial transactions and accounts relating to the proposed project for a period of three years after termination of the grant agreement and
shall make such records available for inspection and audit as necessary s Provide ongoing technical assistance to schools identified for Title ISchool Improvement as they develop or revise their school improvement plan and throughout the
implementation of that plan 6 Coordinate the technical assistance that is provided to schools in Title ISchool Improvement Assistance to schools may be provided by district staff or external
consultants with experience and expertise in helping schools improve academic achievement 7 Expenditures contained in this Title I School Improvement Application accurately reflect the school improvement plan The plan addresses all required components
under No Child Left Behind 8 Assist the school in analyzing results from the state assessment system and other relevant examples of student work Technical assistance will be provided to school
staff to enable them to use data to identify and solve problems in curriculum and instruction to strengthen parental involvement and professional development and to fulfill other responsibilities that are defined in the school improvement plan
9 The district will help the school choose and sustain effective instructional strategies and methods and ensure that the school staff receives high quality professional development relevant to the implementation of instructional strategies The chosen strategies must be grounded in scientifically based research and address the specific instruction or other issues such as attendance or graduation rate that caused the school to be identified for school improvement
10 The Indiana Department of Education may as they deem necessary supervise evaluate and provide guidance and direction to the district and school in the management of the activities performed under this plan
11 The schools and district shall adhere to Indiana Department of Education reporting and evaluation requirements in a timely and accurate manner 12 The LEA certifies that it has verified the state and federal suspension and debarment status for all subcontractors receiving funds under the fund associated with this
application and shall be solely responsible for any recoupment penalties or costs that might arise from use of a suspended or debarred subcontractor The LEA shall immediately notify the State if any subcontractor becomes debarred or suspended and shall at the States request take all steps required by the State to terminate its contractual relationship with the subcontractor for work to be performed and supported by funding from the application
V)_)
- 13 -I 02--13 -17 Ocl 13~I
111
Part 4 Applitation Reflection
SIOT Activity Strengths Improvements Opportunities and Threats) Instructions
List schools primary strengths and areas of improvement from SY 16-17-forces or barriers working for and against SIG implementation or schools mission
e List schools key opportunities and threats from SY 16-17-political economic social technological demographic or legal trends that are or may impact schools ability to achieve SIG implementation or schools mission
OpportunitiesStrengths bull The NWEA Growth data would continue to increase as the RTI team and coach
e School wide data on state tests indicates continued upward trend of bull Community and cultural components in classrooms and with staff
continue to build plan process needs and place students in Tier 2 and lier 3 students showing typical and high growth research based interventions
bull Staff Professional Leaming Communities (PLC frequency duration and bull NWEAISTEP+ data can continue to show growth with ongoing PLC results have continually increased under the guidance of the Instructional collaboration time to build and refine curriculum instruction and assessment Guide (IG) and leadership team of learning standards
bull EL Education support learning and guidance will continue to have an impact are demonstrating capacity to produce high quality work provide and
bull Case Study and Expedition Planning is continuing to deepen and students the student engagement learning outcomes and student achievement This
receive feedback expertise of EL Education will help to drive and support use of data family involvement portfolio and student led learning in the future
numbers of participation in monthly family opportunities community bull Family and Community Involvement is increasing data indicates increased
bull Shared leadership opportunities through EL Education learning institutes will involvement in learning and academic domain showcase of learning build staff capacity and background knowledge to sustain El School Work events are highly attended and feedback to school indicates community Plan and credential framework buy in and support to our learning model and demonstration of student learningwork
e Chamberlain stafftransition rate has decreased It has changed from (2014) 83 staff stability to (2016) 966 staff stability
o Environment Facilities materials classrooms are now conducive to project basedinglliry_ learning
Areas for Improvement Threats bull Loss of student population due to the demographics of Goshen and current
differentiation for all student particularly The high population of English bull Continue to build curriculum and instructional opportunities to build in
political realities language Learners at Chamberlain Elementary bull loss of staff due to district budget cuts
bull Building of common assessments that can be used formatively to drive bull Loss of grant funded staff individualized instruction
Par15 Application Activities
Sustainability Framework Instructions Use the SIOT Activity above to help guide what SIG pieces will be sustained for SY 17-18
What needs to be sustained What evidence is available to show what is worth sustaining List programs projects or positions that are currently funded by SIG and use the questions below to help brainstorm what evidence supports your initiatives worth in sustaining
Maintain the 50 RTI coordinatorlead
position
RTI leadership Team and support of implementation of the RTI MTSS)
Data Utilization Grade Level PLCs meet weekly during common plan time and are valuingthe use of data It would be in the best interest of students to have one more year for a 50 position to further and enhance this process
Maintain a 100 IG) Instructional
GuideCoach position
Benchmark data is being utilized to determine students that are in need of RTI intervention weekly leadership meetings to process and make decisions based on student needs monitor and adjust the process and track data in strategic and useful ways
Multiple Rll Documents are maintained to track student data frequency duration of intervention screener data includes anecdotal notes
Number of students identified to be screened via NWEA results -126 students screened based on fall NWEA Reading
Teacher PD support data from 2015-2016
110PD Hours
Prior to 2016-17 school year we were lacking both a districtschool process for identifying students through a benchmark assessment as well as lacking materials needed to implement a quality RTI plan of action During the 2016-17 Chamberlain Elementary has been able to build develop implement and improve a process to identify students for Rll build goals provide strategicresearched based intervention monitor and adjust goals
NWEA is being utilized for the second year at GCS and Chamberlain Elementary The staff is increasing the abilityto process and utilize data more time is needed and this additional time will help us to increase student achievement at a higher level
The RTI leadership team and school leadership team have developed this process for data integration
The IG is one of 4 key leaders in the school that utilize expertise in upholding and guiding the work of the school goals and work plan Curriculum and instruction
communication of school wide and individual student data
Parents community members El Education Expeditionary Learning) school support team have noted the significant increase in our students ability to articulate their goals (including Crew Habits of Scholarship Goals Classroom Data goals and benchmark data goals) Students are able to articulate their current goals and next steps and the habits of scholarships needed to achieve goals
EL Education Mid Year and End of Year Review as well as TAP NIEr End of Year Review data indicates that Chamberlain use of data and strides to increase capacity and serve students through the RTI process are steps to increased overall student achievement and to take Chamberlain to the next level in terms of our school work plan and credentialing plan
As part of the IG role showcase of learning community experts
This position will continue to teach PD support teachers in PLC Curriculum common plan times and provide mentoring and coaching of current staff
The IG position has supported students by increasing the depth of learning experiences through curriculum and planning guidance to staff
The IG in an instrumental role on SLT (School Leadership Team) in coordination with the principal and other members of the SLTshehas coordinated student learning experiences designed and taught curriculum designed communicated with EL Education and School Designer carried out the work and student data goals in our School Work Plan Credential Plan and EL Core Practices EL Core Practices Link
- 80 min in PLC per week for grade level teachers
Student in all grade levels are learning in Case Study and Expedition
Community Expertise in student case study work data Number of Experts) K- (approx10-and at least 2 more ahead) 1-5 up to this point and 5 more this year) 2 -(5 up to this point and 5 more this year) 3-4 up to this point and 2 more ahead) 4-3 up to this point and 3 more ahead) 5-5 up to this point and 6 more ahead
Teacher Evaluationeffectiveness data has increased
2014-15 2015-16 Highly Effective 5 28 Effective 23 4
Needs Improv 1 0 Ineffective 0 0
TAPIDOE Score 55 55
Student ISTEP Ge__o_wth D_ata
Math FgtassPercentaie bullbull gt_ lt bull J
2014-2015 I 201s-2016
3rd Grade 4630
444th Grade 44
675th Grade 54
1middot ELAPass PertentagE
2014-2015 I 2015-2016
3rd Grade 49 55
While the teacher ability to build curriculum case studies and expeditions has increased dramatically the IG position is the point person for this work and the staff appreciates having access to such expertise in PLC Time PD time and through the course of the EL Education building years at Chamberlain The IG provides modeling co-teaching and mentoringcoaching
Specialists (music art technology physical education Ell teachers Special Education Teacher Counselor) being integrated into Expeditions plan and implementation has happened as a result of the guidance and support from the IG these specialists are feeling more integrated supported and valued than ever before
The IG has guided decision making ordering suggestions and local businesses connections for needed supplies anchor text PD books and other materials needed for Expedition Implementation The staff has appreciated this guidance and time that the IG has attended to this in order for them to place time resources on other more direct student impact initiatives and planning
The IG guide alongside the principal has developed and held parent information nights to build background knowledge inform show examples of student teacher progress and work as well being a resource to communicate with families
The IG has worked in collaboration with the school parent liaison (district funded position) to plan family nights showcase nights and to provide literature that the IG prepared and the parent liaison translates
Both the IG and the principal serve on localcommunity boards These positions take efforts and time to connect with community groups to work collaboratively to serve the needs of students families and learning experiences
SOS group of local churches and organizations meet 3 times a year at the school to communicate with leadership on how they can serve our students in the form of providing materials for back to school basic needs and the giving of time as field experts mentors and volunteers
EL Education (Expeditionary
Leaming) Network feeand
comprehensive corporate agreement
fees
The EL Network is supporting us in a
gradual decrease of these fees and we
increase sustainability in the El Core
Practices as a school The 17-18 contract
or perhaps a multi-year contract) will be purchased if
SIG funds allow will be able to build this
contract with more support
424th Grade 40
47455th Grade
Family Community Opportunity Attendance Data 2015-16Total for the year 1637 2016-17 Total for 1st semester 775
Showcase night Attendance by family and community 418 Implementation of instructional practices institute learning data practices learning strategies and monitoring and accountability with the El Network has impacted student in the following way
Implementation of CREW the culturalcharacter component of EL Education has impacted the following student data
Attendance Rate Data 2013-14 955 2014-15 952 2015-16 958 2016-17 962 ( as ofJan 2017)
Discipline Referral Data 2014-15 348 Referrals 2015-16 262 Referrals 216-17 102 Referrals ( as of Jan 1 2017)
ISTEP Data ISTEP ACCESS LINK
Support in building model of learning for Chamberlain from the contract services of EL Education School Designer As a support to the SLT (school leadership team) TIT (teaching and learning team-TAP) and CCT (Crew and Culture Team) the SD (School Designer) has been a guide for the work plan goals and implementation of EL Education Core Practices at Chamberlain Her Role has built sustainability and capacity in our students leadership teams teachers support staff district and parents
EL Education Institutes are built into the Network Fees we have gradually decreased this each year The attendance at these institutes has built confidence capacity leadership and ownership in our teacher and leadership crew Institute Attendance at EL Education Institutes 14-15 - 20 attendee slots 15-16 -30 staff plus 24 staff to Designing Learning Expeditions Milwaukee 16-17 -15 staff to Date Here is a brief list of some of the institutes that have been attended by staff
2016-17
EL Education Network is accessible for all stakeholders
El Education Network support School Designer Midwest Regional Director and Principal Colleagues have taken part in showcase nights parent information nights and
District Leadership and School Board Members have been engaged in the form of supporting attending events and requesting reports to the board on our progress
Parents have increasingly become comfortable coming to school participating in events providing support for academics at home
Community and district support for our launch of EL Education the data is indicating growth our student from all ability levels language levels and ethnicities
Newspaper and News coverage has been positive and have promoted positive outlook of GCS Corporation Chamberlain Elementary and public schools
Student Mobility Data bull Assessment Planning for High Local Churches Community Foundations (Percentage of turnover) Quality Work and Businesses are hearing of the impact of 2012-13 3367 bull Using Data to Improve Student this model of learning through media social 2013-14 2783 Achievement media invitations and attendance at 2014-15 2459 bull Meeting the Needs of ELLs showcase nights by word of mouth The 2015-16 2306 bull National Conference (Chicago) principal has been invited to speak at
2016-17 1649 (faculty + 1 member of SLT) Churches Community Groups (ie Kiwanis ( as of Feb 2017) bull Midwest Leadership Cohort Rotary Colleges) regarding the impact that
(Chicago) SL T) an inquiry based model for learning and the Teacher mobility has decreased emphasis on CREW and Culture of significantly over the last 2 years
bull Polaris Site visit- Crew focus Community in our school is having on our
teacher attendance has increased as a Staff has been able to utilize the El Network students parents and neighborhood result of feeling valued supported portal and center for student work as a way to
share connect and gain ideas from other schools and teachers in the El Education
201483 Teacher Retention
Network
2016966
Because of the Network support willingness and appreciation for TELL Survey Data indicates teachers
-Turnover has decreased ongoing professional development and -Shared leadership has increased growth on Teacher value and -Principal capacity has increased capacity PD opportunities - School Leader principal and SLT members)
have remained committed invested and PD Attendancehours increased leadership capacity has grown 2013 36 hours per teacher per year 2016 108 hours per teacher per year
PLC Collaboration Time 2013 45 minute per week 2016 90 minutes per week
Please refer above (in addition to the below please refer to the attendance by Chamberlain Teachers By supporting another year of instituteTraveltoJnstitutes
The attendance at these institutes has built section above) our students will be able benefit from confidence capacity leadership and Stakeholders desire a capable teaching staff the instructional impact as a result of ownership in our teacher and leadership crew is is well equipped to serve the needs of our increasing capacity in teaching staff students
It is a value to our staff members to be able to The selection of the institutes is driven attend institutes absent of personal financial In addition All factors that parents value by the following factors burden
- Student Data Needs The building of learning and professional
-middot--middot-- ~f_~1~~------ul =middot-------------------------
- Staff Learning Need development within the staff is geared at The above 2 stated needs drive the - Increasing Instruction building of the school goals and work - Expert Community Involvement plan Then a strategic process is - Support of Needs offamilies utilized to align the data needs with - Specific to Chamberlain Data needs the work plan goals the work plan goals drive the determination of what EL Education Regional National Institute Learning is needed to address these needs The institute learning is brought back to all staff PD and hence has an impact on all staff learning and student achievement
Please refer to the above section for the data that is a justification for sustaining this portion of our framework-for one more year as we build capacity ie teacher attendance rate teacher mobility decreasing survey date indicating teachers feeling increased capacity and value
NOTE EL Education institutes are typically build in a regional offering institute rates and lodging are respectful of schools limited budgets Chamberlain travel is built in an economical way that maximizes funds
Staff values uninterrupted time that does notFOCUS of Staff Learning Days Parents will be appreciative of not having toStaff Learning Days take them away from students in order tobull Data Utilization have guest teachers in classrooms teaching
Funding of Curriculum explore data as a tool for strategically Curriculum and Instructional students Parent have voices appreciating bullbull Development driving instruction forward and toRate for 3 days Total of our efforts to minimize instances of this
teaching staff retreat identify interventions and EL Education Credential Plan bull Goal Setting and Planning remediations that need to be
(summer 2017 18 learning days
By attending to this above listed staff addressed for students to be successful Community and families value having high needs student outcomes will be bull developing instructional plans for quality teachers on staff that are committed developed as a result of the work expeditions expanding improving and to learning outside
_________w1--~~middotbullbull_101laquon~lbullMtgt=-bull--------------------------------------------------------------------
revising existing curriculum Researched based instructional This type ofwork requires time and focus that methods curriculum development is difficult to do in small chunks of time When Sense of community is felt and voiced by practices and learning in the domain teachers are given larger windows of time to parents of being student centered and driven attend to these areas they are more efficient by data and effective in their work and the result is Network of churches and local businesses
better instruction for students are thankful to host summer learning in the By allocating summer learning time locations This helps with the networking of and compensating teachers for this Compensation for additional time when it school and community Many times they work we are impacting students by occurs outside of the school day is highly provide lunches and snacks to us and come
Decreasing time with a guestbull valued to thank the stafffor their commitment to teacher during the summer our students Allocating for grade levelbull collaboration and learning to StaffLeadership Team value the opportunity plan for student instructional to not have to take time away from the time in opportunities and curriculum the classroom with students By providing a Having time to utilize studentbull time for focused learning and development end of the year data to build allocates for the need to accomplish while not goals and instructional decision having guest teachers provide instruction making for upcoming standards targets and assessment building
Data Utilization Grade levels meet 3-4 times per month for 45 min to utilize data to informimpact student achievement
NWEA Data Hours Staff has the opportunity for afrac12 day of release time to process NWEA Data 3 times per year In addition grade levels utilize this data periodically in weekly PLC Data meetings
Student Learning Supplies Materials Students and staff have had the By having the opportunity for studentstaff to Our families have benefitted significantly by
opportunity to have access to supplies have financial support for building the having the supplies being utilized and the materials books resources consumablenon consumable needs of supply and inventory of materials technology apps and programs that ExpeditionsCase Study for a sustainable year becoming available to students during the have been a powerful piece to will significantly support the learning first 3 years of the SIG grant
~~~~===~ru1u1deg=-~tlmicro=uL)Cll~mf-bullrAltlltMHW==trade-~~II--middot-bull__________________
launching enhancing and diversifying learning expeditions case studies and student achievement
STEP Testing Access link
The staff amp leadership team opportunity for building the literacy library has helped with a strong foundation of materials that would not have happened on district funding alone Being able to build this foundation of materials for an additional year yet at a lesser amount will truly have an impact on sustainability
The IG position in coordination with the principal will be working with the teachers in the 17-18 school year to share leadership and learn how to apply for grants Donors Choose and other resources to fulfill future classroom and learning needs
In the coming years we will be utilizing other funding parent participation and looking to have local corporations that we are in communication with to support learning materials and to adopt classrooms
Part 6 Sustainability Plan
Instructions List below the SIG funded positions programs or structures that will be sustained the plan to sustain each piece the amount budgeted for each focus area and how you will track effectiveness I middotmiddotmiddot1
Maintain the 50 RTI bull Weekly RTI Leadership Team meeting planned agenda leading RTI Intervention data and student coordinatorlead of meeting achievement for those students in
position o RTI Coordinator Lead -Lisa Rose Martin (LRM) intervention via benchmark data bull Monitoring of implementation of the RTI Process per RTI law RTI process data screen goals and
district goals and implementation of leadership meetings results o Principal ~ Kim Branham (KB) Implementation check in 4 times a
bull Building Maintaining of RTI documentation running data and year of the RTI Process coordination of data steps
o RTI Coordinator Lead - LRM bull Supervision and guidance ofTitle One Instructor Team of
Interventionist (support staff) to screen students develop RTI Plans and monitor and adjust instruction track data
o RTI Coordinator Lead - LRM bull Monitor Supervision of Interventionist Trtle One Instructor
Team of Interventionist (support staff) o Assistant Principal - Erir1_ Has~ley EH)
Maintain a 1004 (IG bull Facilitate Coach and guide collaboration of curriculum work I $80JOOO Monitoring of the curriculum plans Instructional bull Develop Lead and Coach Professional Development implementation of instruction assessment GuideCoach bull Developing sustainable practices for resource acquisition expert building will be on an ongoing basis
position visits and fieldwork bull Support students and teachers in curriculum development Mid year and end of year accountability
revision instruction and implementation of EL Core Practices through EL Education School Review will be bull Specific feedback and support around ensuring high quality an accountability process for the work
teaching practices and high quality learning experiences for students Monitoring ofthe work plan and
bull Lead Leamer of the guiding principles and practices of EL credentialing plan is continual and weekly Education School Leadership Team (SLT) meetings will
o IG- Instructional Guide be the check in point o Lisa Vogt- School Designer monitoring guiding support) o Kim Branham - Principal (monitoring guiding support
EL Education bull Make arrangements and map out the details of the corporate $100000 In house and El Education Network (Expeditionary agreement monitoring of practices data and
Leaming) Network o Kim Branham- Principal credentialing steps will be attended to on an feeand o Lisa Vogt- EL Education School Designer ongoing basis via site visits data reigt_orts
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
Conference Code 891 004 4863
Monday 21317 Due date for Cohort 5 SIG schools to submit their Sustainability Renewal Application via email to idoe1003gdoeingov
Monday 22017 SIG Sustainability Renewal Applications approval letters sent
Part 3 LEA and School Assurance and Waivers
The LEAEligible Entity must provide the following assurances in its application The LEAEligible Entity must be able to provide upon request evidence ofcompliance with each assurance
1 Establish and maintain fiscal control and fund accounting procedures as set forth in 34 CFR Part 7 and in applicable federal and state laws and regulations 2 The Title I School Improvement funds will be used only to supplement and not supplant federal state and local funds a school would otherwise receive 3 Prior written approval must be received from the Indiana Department of Education before implementing any project changes with respect to the purposes for which
the proposed funds are awarded 4 Retain all records of the financial transactions and accounts relating to the proposed project for a period of three years after termination of the grant agreement and
shall make such records available for inspection and audit as necessary s Provide ongoing technical assistance to schools identified for Title ISchool Improvement as they develop or revise their school improvement plan and throughout the
implementation of that plan 6 Coordinate the technical assistance that is provided to schools in Title ISchool Improvement Assistance to schools may be provided by district staff or external
consultants with experience and expertise in helping schools improve academic achievement 7 Expenditures contained in this Title I School Improvement Application accurately reflect the school improvement plan The plan addresses all required components
under No Child Left Behind 8 Assist the school in analyzing results from the state assessment system and other relevant examples of student work Technical assistance will be provided to school
staff to enable them to use data to identify and solve problems in curriculum and instruction to strengthen parental involvement and professional development and to fulfill other responsibilities that are defined in the school improvement plan
9 The district will help the school choose and sustain effective instructional strategies and methods and ensure that the school staff receives high quality professional development relevant to the implementation of instructional strategies The chosen strategies must be grounded in scientifically based research and address the specific instruction or other issues such as attendance or graduation rate that caused the school to be identified for school improvement
10 The Indiana Department of Education may as they deem necessary supervise evaluate and provide guidance and direction to the district and school in the management of the activities performed under this plan
11 The schools and district shall adhere to Indiana Department of Education reporting and evaluation requirements in a timely and accurate manner 12 The LEA certifies that it has verified the state and federal suspension and debarment status for all subcontractors receiving funds under the fund associated with this
application and shall be solely responsible for any recoupment penalties or costs that might arise from use of a suspended or debarred subcontractor The LEA shall immediately notify the State if any subcontractor becomes debarred or suspended and shall at the States request take all steps required by the State to terminate its contractual relationship with the subcontractor for work to be performed and supported by funding from the application
V)_)
- 13 -I 02--13 -17 Ocl 13~I
111
Part 4 Applitation Reflection
SIOT Activity Strengths Improvements Opportunities and Threats) Instructions
List schools primary strengths and areas of improvement from SY 16-17-forces or barriers working for and against SIG implementation or schools mission
e List schools key opportunities and threats from SY 16-17-political economic social technological demographic or legal trends that are or may impact schools ability to achieve SIG implementation or schools mission
OpportunitiesStrengths bull The NWEA Growth data would continue to increase as the RTI team and coach
e School wide data on state tests indicates continued upward trend of bull Community and cultural components in classrooms and with staff
continue to build plan process needs and place students in Tier 2 and lier 3 students showing typical and high growth research based interventions
bull Staff Professional Leaming Communities (PLC frequency duration and bull NWEAISTEP+ data can continue to show growth with ongoing PLC results have continually increased under the guidance of the Instructional collaboration time to build and refine curriculum instruction and assessment Guide (IG) and leadership team of learning standards
bull EL Education support learning and guidance will continue to have an impact are demonstrating capacity to produce high quality work provide and
bull Case Study and Expedition Planning is continuing to deepen and students the student engagement learning outcomes and student achievement This
receive feedback expertise of EL Education will help to drive and support use of data family involvement portfolio and student led learning in the future
numbers of participation in monthly family opportunities community bull Family and Community Involvement is increasing data indicates increased
bull Shared leadership opportunities through EL Education learning institutes will involvement in learning and academic domain showcase of learning build staff capacity and background knowledge to sustain El School Work events are highly attended and feedback to school indicates community Plan and credential framework buy in and support to our learning model and demonstration of student learningwork
e Chamberlain stafftransition rate has decreased It has changed from (2014) 83 staff stability to (2016) 966 staff stability
o Environment Facilities materials classrooms are now conducive to project basedinglliry_ learning
Areas for Improvement Threats bull Loss of student population due to the demographics of Goshen and current
differentiation for all student particularly The high population of English bull Continue to build curriculum and instructional opportunities to build in
political realities language Learners at Chamberlain Elementary bull loss of staff due to district budget cuts
bull Building of common assessments that can be used formatively to drive bull Loss of grant funded staff individualized instruction
Par15 Application Activities
Sustainability Framework Instructions Use the SIOT Activity above to help guide what SIG pieces will be sustained for SY 17-18
What needs to be sustained What evidence is available to show what is worth sustaining List programs projects or positions that are currently funded by SIG and use the questions below to help brainstorm what evidence supports your initiatives worth in sustaining
Maintain the 50 RTI coordinatorlead
position
RTI leadership Team and support of implementation of the RTI MTSS)
Data Utilization Grade Level PLCs meet weekly during common plan time and are valuingthe use of data It would be in the best interest of students to have one more year for a 50 position to further and enhance this process
Maintain a 100 IG) Instructional
GuideCoach position
Benchmark data is being utilized to determine students that are in need of RTI intervention weekly leadership meetings to process and make decisions based on student needs monitor and adjust the process and track data in strategic and useful ways
Multiple Rll Documents are maintained to track student data frequency duration of intervention screener data includes anecdotal notes
Number of students identified to be screened via NWEA results -126 students screened based on fall NWEA Reading
Teacher PD support data from 2015-2016
110PD Hours
Prior to 2016-17 school year we were lacking both a districtschool process for identifying students through a benchmark assessment as well as lacking materials needed to implement a quality RTI plan of action During the 2016-17 Chamberlain Elementary has been able to build develop implement and improve a process to identify students for Rll build goals provide strategicresearched based intervention monitor and adjust goals
NWEA is being utilized for the second year at GCS and Chamberlain Elementary The staff is increasing the abilityto process and utilize data more time is needed and this additional time will help us to increase student achievement at a higher level
The RTI leadership team and school leadership team have developed this process for data integration
The IG is one of 4 key leaders in the school that utilize expertise in upholding and guiding the work of the school goals and work plan Curriculum and instruction
communication of school wide and individual student data
Parents community members El Education Expeditionary Learning) school support team have noted the significant increase in our students ability to articulate their goals (including Crew Habits of Scholarship Goals Classroom Data goals and benchmark data goals) Students are able to articulate their current goals and next steps and the habits of scholarships needed to achieve goals
EL Education Mid Year and End of Year Review as well as TAP NIEr End of Year Review data indicates that Chamberlain use of data and strides to increase capacity and serve students through the RTI process are steps to increased overall student achievement and to take Chamberlain to the next level in terms of our school work plan and credentialing plan
As part of the IG role showcase of learning community experts
This position will continue to teach PD support teachers in PLC Curriculum common plan times and provide mentoring and coaching of current staff
The IG position has supported students by increasing the depth of learning experiences through curriculum and planning guidance to staff
The IG in an instrumental role on SLT (School Leadership Team) in coordination with the principal and other members of the SLTshehas coordinated student learning experiences designed and taught curriculum designed communicated with EL Education and School Designer carried out the work and student data goals in our School Work Plan Credential Plan and EL Core Practices EL Core Practices Link
- 80 min in PLC per week for grade level teachers
Student in all grade levels are learning in Case Study and Expedition
Community Expertise in student case study work data Number of Experts) K- (approx10-and at least 2 more ahead) 1-5 up to this point and 5 more this year) 2 -(5 up to this point and 5 more this year) 3-4 up to this point and 2 more ahead) 4-3 up to this point and 3 more ahead) 5-5 up to this point and 6 more ahead
Teacher Evaluationeffectiveness data has increased
2014-15 2015-16 Highly Effective 5 28 Effective 23 4
Needs Improv 1 0 Ineffective 0 0
TAPIDOE Score 55 55
Student ISTEP Ge__o_wth D_ata
Math FgtassPercentaie bullbull gt_ lt bull J
2014-2015 I 201s-2016
3rd Grade 4630
444th Grade 44
675th Grade 54
1middot ELAPass PertentagE
2014-2015 I 2015-2016
3rd Grade 49 55
While the teacher ability to build curriculum case studies and expeditions has increased dramatically the IG position is the point person for this work and the staff appreciates having access to such expertise in PLC Time PD time and through the course of the EL Education building years at Chamberlain The IG provides modeling co-teaching and mentoringcoaching
Specialists (music art technology physical education Ell teachers Special Education Teacher Counselor) being integrated into Expeditions plan and implementation has happened as a result of the guidance and support from the IG these specialists are feeling more integrated supported and valued than ever before
The IG has guided decision making ordering suggestions and local businesses connections for needed supplies anchor text PD books and other materials needed for Expedition Implementation The staff has appreciated this guidance and time that the IG has attended to this in order for them to place time resources on other more direct student impact initiatives and planning
The IG guide alongside the principal has developed and held parent information nights to build background knowledge inform show examples of student teacher progress and work as well being a resource to communicate with families
The IG has worked in collaboration with the school parent liaison (district funded position) to plan family nights showcase nights and to provide literature that the IG prepared and the parent liaison translates
Both the IG and the principal serve on localcommunity boards These positions take efforts and time to connect with community groups to work collaboratively to serve the needs of students families and learning experiences
SOS group of local churches and organizations meet 3 times a year at the school to communicate with leadership on how they can serve our students in the form of providing materials for back to school basic needs and the giving of time as field experts mentors and volunteers
EL Education (Expeditionary
Leaming) Network feeand
comprehensive corporate agreement
fees
The EL Network is supporting us in a
gradual decrease of these fees and we
increase sustainability in the El Core
Practices as a school The 17-18 contract
or perhaps a multi-year contract) will be purchased if
SIG funds allow will be able to build this
contract with more support
424th Grade 40
47455th Grade
Family Community Opportunity Attendance Data 2015-16Total for the year 1637 2016-17 Total for 1st semester 775
Showcase night Attendance by family and community 418 Implementation of instructional practices institute learning data practices learning strategies and monitoring and accountability with the El Network has impacted student in the following way
Implementation of CREW the culturalcharacter component of EL Education has impacted the following student data
Attendance Rate Data 2013-14 955 2014-15 952 2015-16 958 2016-17 962 ( as ofJan 2017)
Discipline Referral Data 2014-15 348 Referrals 2015-16 262 Referrals 216-17 102 Referrals ( as of Jan 1 2017)
ISTEP Data ISTEP ACCESS LINK
Support in building model of learning for Chamberlain from the contract services of EL Education School Designer As a support to the SLT (school leadership team) TIT (teaching and learning team-TAP) and CCT (Crew and Culture Team) the SD (School Designer) has been a guide for the work plan goals and implementation of EL Education Core Practices at Chamberlain Her Role has built sustainability and capacity in our students leadership teams teachers support staff district and parents
EL Education Institutes are built into the Network Fees we have gradually decreased this each year The attendance at these institutes has built confidence capacity leadership and ownership in our teacher and leadership crew Institute Attendance at EL Education Institutes 14-15 - 20 attendee slots 15-16 -30 staff plus 24 staff to Designing Learning Expeditions Milwaukee 16-17 -15 staff to Date Here is a brief list of some of the institutes that have been attended by staff
2016-17
EL Education Network is accessible for all stakeholders
El Education Network support School Designer Midwest Regional Director and Principal Colleagues have taken part in showcase nights parent information nights and
District Leadership and School Board Members have been engaged in the form of supporting attending events and requesting reports to the board on our progress
Parents have increasingly become comfortable coming to school participating in events providing support for academics at home
Community and district support for our launch of EL Education the data is indicating growth our student from all ability levels language levels and ethnicities
Newspaper and News coverage has been positive and have promoted positive outlook of GCS Corporation Chamberlain Elementary and public schools
Student Mobility Data bull Assessment Planning for High Local Churches Community Foundations (Percentage of turnover) Quality Work and Businesses are hearing of the impact of 2012-13 3367 bull Using Data to Improve Student this model of learning through media social 2013-14 2783 Achievement media invitations and attendance at 2014-15 2459 bull Meeting the Needs of ELLs showcase nights by word of mouth The 2015-16 2306 bull National Conference (Chicago) principal has been invited to speak at
2016-17 1649 (faculty + 1 member of SLT) Churches Community Groups (ie Kiwanis ( as of Feb 2017) bull Midwest Leadership Cohort Rotary Colleges) regarding the impact that
(Chicago) SL T) an inquiry based model for learning and the Teacher mobility has decreased emphasis on CREW and Culture of significantly over the last 2 years
bull Polaris Site visit- Crew focus Community in our school is having on our
teacher attendance has increased as a Staff has been able to utilize the El Network students parents and neighborhood result of feeling valued supported portal and center for student work as a way to
share connect and gain ideas from other schools and teachers in the El Education
201483 Teacher Retention
Network
2016966
Because of the Network support willingness and appreciation for TELL Survey Data indicates teachers
-Turnover has decreased ongoing professional development and -Shared leadership has increased growth on Teacher value and -Principal capacity has increased capacity PD opportunities - School Leader principal and SLT members)
have remained committed invested and PD Attendancehours increased leadership capacity has grown 2013 36 hours per teacher per year 2016 108 hours per teacher per year
PLC Collaboration Time 2013 45 minute per week 2016 90 minutes per week
Please refer above (in addition to the below please refer to the attendance by Chamberlain Teachers By supporting another year of instituteTraveltoJnstitutes
The attendance at these institutes has built section above) our students will be able benefit from confidence capacity leadership and Stakeholders desire a capable teaching staff the instructional impact as a result of ownership in our teacher and leadership crew is is well equipped to serve the needs of our increasing capacity in teaching staff students
It is a value to our staff members to be able to The selection of the institutes is driven attend institutes absent of personal financial In addition All factors that parents value by the following factors burden
- Student Data Needs The building of learning and professional
-middot--middot-- ~f_~1~~------ul =middot-------------------------
- Staff Learning Need development within the staff is geared at The above 2 stated needs drive the - Increasing Instruction building of the school goals and work - Expert Community Involvement plan Then a strategic process is - Support of Needs offamilies utilized to align the data needs with - Specific to Chamberlain Data needs the work plan goals the work plan goals drive the determination of what EL Education Regional National Institute Learning is needed to address these needs The institute learning is brought back to all staff PD and hence has an impact on all staff learning and student achievement
Please refer to the above section for the data that is a justification for sustaining this portion of our framework-for one more year as we build capacity ie teacher attendance rate teacher mobility decreasing survey date indicating teachers feeling increased capacity and value
NOTE EL Education institutes are typically build in a regional offering institute rates and lodging are respectful of schools limited budgets Chamberlain travel is built in an economical way that maximizes funds
Staff values uninterrupted time that does notFOCUS of Staff Learning Days Parents will be appreciative of not having toStaff Learning Days take them away from students in order tobull Data Utilization have guest teachers in classrooms teaching
Funding of Curriculum explore data as a tool for strategically Curriculum and Instructional students Parent have voices appreciating bullbull Development driving instruction forward and toRate for 3 days Total of our efforts to minimize instances of this
teaching staff retreat identify interventions and EL Education Credential Plan bull Goal Setting and Planning remediations that need to be
(summer 2017 18 learning days
By attending to this above listed staff addressed for students to be successful Community and families value having high needs student outcomes will be bull developing instructional plans for quality teachers on staff that are committed developed as a result of the work expeditions expanding improving and to learning outside
_________w1--~~middotbullbull_101laquon~lbullMtgt=-bull--------------------------------------------------------------------
revising existing curriculum Researched based instructional This type ofwork requires time and focus that methods curriculum development is difficult to do in small chunks of time When Sense of community is felt and voiced by practices and learning in the domain teachers are given larger windows of time to parents of being student centered and driven attend to these areas they are more efficient by data and effective in their work and the result is Network of churches and local businesses
better instruction for students are thankful to host summer learning in the By allocating summer learning time locations This helps with the networking of and compensating teachers for this Compensation for additional time when it school and community Many times they work we are impacting students by occurs outside of the school day is highly provide lunches and snacks to us and come
Decreasing time with a guestbull valued to thank the stafffor their commitment to teacher during the summer our students Allocating for grade levelbull collaboration and learning to StaffLeadership Team value the opportunity plan for student instructional to not have to take time away from the time in opportunities and curriculum the classroom with students By providing a Having time to utilize studentbull time for focused learning and development end of the year data to build allocates for the need to accomplish while not goals and instructional decision having guest teachers provide instruction making for upcoming standards targets and assessment building
Data Utilization Grade levels meet 3-4 times per month for 45 min to utilize data to informimpact student achievement
NWEA Data Hours Staff has the opportunity for afrac12 day of release time to process NWEA Data 3 times per year In addition grade levels utilize this data periodically in weekly PLC Data meetings
Student Learning Supplies Materials Students and staff have had the By having the opportunity for studentstaff to Our families have benefitted significantly by
opportunity to have access to supplies have financial support for building the having the supplies being utilized and the materials books resources consumablenon consumable needs of supply and inventory of materials technology apps and programs that ExpeditionsCase Study for a sustainable year becoming available to students during the have been a powerful piece to will significantly support the learning first 3 years of the SIG grant
~~~~===~ru1u1deg=-~tlmicro=uL)Cll~mf-bullrAltlltMHW==trade-~~II--middot-bull__________________
launching enhancing and diversifying learning expeditions case studies and student achievement
STEP Testing Access link
The staff amp leadership team opportunity for building the literacy library has helped with a strong foundation of materials that would not have happened on district funding alone Being able to build this foundation of materials for an additional year yet at a lesser amount will truly have an impact on sustainability
The IG position in coordination with the principal will be working with the teachers in the 17-18 school year to share leadership and learn how to apply for grants Donors Choose and other resources to fulfill future classroom and learning needs
In the coming years we will be utilizing other funding parent participation and looking to have local corporations that we are in communication with to support learning materials and to adopt classrooms
Part 6 Sustainability Plan
Instructions List below the SIG funded positions programs or structures that will be sustained the plan to sustain each piece the amount budgeted for each focus area and how you will track effectiveness I middotmiddotmiddot1
Maintain the 50 RTI bull Weekly RTI Leadership Team meeting planned agenda leading RTI Intervention data and student coordinatorlead of meeting achievement for those students in
position o RTI Coordinator Lead -Lisa Rose Martin (LRM) intervention via benchmark data bull Monitoring of implementation of the RTI Process per RTI law RTI process data screen goals and
district goals and implementation of leadership meetings results o Principal ~ Kim Branham (KB) Implementation check in 4 times a
bull Building Maintaining of RTI documentation running data and year of the RTI Process coordination of data steps
o RTI Coordinator Lead - LRM bull Supervision and guidance ofTitle One Instructor Team of
Interventionist (support staff) to screen students develop RTI Plans and monitor and adjust instruction track data
o RTI Coordinator Lead - LRM bull Monitor Supervision of Interventionist Trtle One Instructor
Team of Interventionist (support staff) o Assistant Principal - Erir1_ Has~ley EH)
Maintain a 1004 (IG bull Facilitate Coach and guide collaboration of curriculum work I $80JOOO Monitoring of the curriculum plans Instructional bull Develop Lead and Coach Professional Development implementation of instruction assessment GuideCoach bull Developing sustainable practices for resource acquisition expert building will be on an ongoing basis
position visits and fieldwork bull Support students and teachers in curriculum development Mid year and end of year accountability
revision instruction and implementation of EL Core Practices through EL Education School Review will be bull Specific feedback and support around ensuring high quality an accountability process for the work
teaching practices and high quality learning experiences for students Monitoring ofthe work plan and
bull Lead Leamer of the guiding principles and practices of EL credentialing plan is continual and weekly Education School Leadership Team (SLT) meetings will
o IG- Instructional Guide be the check in point o Lisa Vogt- School Designer monitoring guiding support) o Kim Branham - Principal (monitoring guiding support
EL Education bull Make arrangements and map out the details of the corporate $100000 In house and El Education Network (Expeditionary agreement monitoring of practices data and
Leaming) Network o Kim Branham- Principal credentialing steps will be attended to on an feeand o Lisa Vogt- EL Education School Designer ongoing basis via site visits data reigt_orts
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
111
Part 4 Applitation Reflection
SIOT Activity Strengths Improvements Opportunities and Threats) Instructions
List schools primary strengths and areas of improvement from SY 16-17-forces or barriers working for and against SIG implementation or schools mission
e List schools key opportunities and threats from SY 16-17-political economic social technological demographic or legal trends that are or may impact schools ability to achieve SIG implementation or schools mission
OpportunitiesStrengths bull The NWEA Growth data would continue to increase as the RTI team and coach
e School wide data on state tests indicates continued upward trend of bull Community and cultural components in classrooms and with staff
continue to build plan process needs and place students in Tier 2 and lier 3 students showing typical and high growth research based interventions
bull Staff Professional Leaming Communities (PLC frequency duration and bull NWEAISTEP+ data can continue to show growth with ongoing PLC results have continually increased under the guidance of the Instructional collaboration time to build and refine curriculum instruction and assessment Guide (IG) and leadership team of learning standards
bull EL Education support learning and guidance will continue to have an impact are demonstrating capacity to produce high quality work provide and
bull Case Study and Expedition Planning is continuing to deepen and students the student engagement learning outcomes and student achievement This
receive feedback expertise of EL Education will help to drive and support use of data family involvement portfolio and student led learning in the future
numbers of participation in monthly family opportunities community bull Family and Community Involvement is increasing data indicates increased
bull Shared leadership opportunities through EL Education learning institutes will involvement in learning and academic domain showcase of learning build staff capacity and background knowledge to sustain El School Work events are highly attended and feedback to school indicates community Plan and credential framework buy in and support to our learning model and demonstration of student learningwork
e Chamberlain stafftransition rate has decreased It has changed from (2014) 83 staff stability to (2016) 966 staff stability
o Environment Facilities materials classrooms are now conducive to project basedinglliry_ learning
Areas for Improvement Threats bull Loss of student population due to the demographics of Goshen and current
differentiation for all student particularly The high population of English bull Continue to build curriculum and instructional opportunities to build in
political realities language Learners at Chamberlain Elementary bull loss of staff due to district budget cuts
bull Building of common assessments that can be used formatively to drive bull Loss of grant funded staff individualized instruction
Par15 Application Activities
Sustainability Framework Instructions Use the SIOT Activity above to help guide what SIG pieces will be sustained for SY 17-18
What needs to be sustained What evidence is available to show what is worth sustaining List programs projects or positions that are currently funded by SIG and use the questions below to help brainstorm what evidence supports your initiatives worth in sustaining
Maintain the 50 RTI coordinatorlead
position
RTI leadership Team and support of implementation of the RTI MTSS)
Data Utilization Grade Level PLCs meet weekly during common plan time and are valuingthe use of data It would be in the best interest of students to have one more year for a 50 position to further and enhance this process
Maintain a 100 IG) Instructional
GuideCoach position
Benchmark data is being utilized to determine students that are in need of RTI intervention weekly leadership meetings to process and make decisions based on student needs monitor and adjust the process and track data in strategic and useful ways
Multiple Rll Documents are maintained to track student data frequency duration of intervention screener data includes anecdotal notes
Number of students identified to be screened via NWEA results -126 students screened based on fall NWEA Reading
Teacher PD support data from 2015-2016
110PD Hours
Prior to 2016-17 school year we were lacking both a districtschool process for identifying students through a benchmark assessment as well as lacking materials needed to implement a quality RTI plan of action During the 2016-17 Chamberlain Elementary has been able to build develop implement and improve a process to identify students for Rll build goals provide strategicresearched based intervention monitor and adjust goals
NWEA is being utilized for the second year at GCS and Chamberlain Elementary The staff is increasing the abilityto process and utilize data more time is needed and this additional time will help us to increase student achievement at a higher level
The RTI leadership team and school leadership team have developed this process for data integration
The IG is one of 4 key leaders in the school that utilize expertise in upholding and guiding the work of the school goals and work plan Curriculum and instruction
communication of school wide and individual student data
Parents community members El Education Expeditionary Learning) school support team have noted the significant increase in our students ability to articulate their goals (including Crew Habits of Scholarship Goals Classroom Data goals and benchmark data goals) Students are able to articulate their current goals and next steps and the habits of scholarships needed to achieve goals
EL Education Mid Year and End of Year Review as well as TAP NIEr End of Year Review data indicates that Chamberlain use of data and strides to increase capacity and serve students through the RTI process are steps to increased overall student achievement and to take Chamberlain to the next level in terms of our school work plan and credentialing plan
As part of the IG role showcase of learning community experts
This position will continue to teach PD support teachers in PLC Curriculum common plan times and provide mentoring and coaching of current staff
The IG position has supported students by increasing the depth of learning experiences through curriculum and planning guidance to staff
The IG in an instrumental role on SLT (School Leadership Team) in coordination with the principal and other members of the SLTshehas coordinated student learning experiences designed and taught curriculum designed communicated with EL Education and School Designer carried out the work and student data goals in our School Work Plan Credential Plan and EL Core Practices EL Core Practices Link
- 80 min in PLC per week for grade level teachers
Student in all grade levels are learning in Case Study and Expedition
Community Expertise in student case study work data Number of Experts) K- (approx10-and at least 2 more ahead) 1-5 up to this point and 5 more this year) 2 -(5 up to this point and 5 more this year) 3-4 up to this point and 2 more ahead) 4-3 up to this point and 3 more ahead) 5-5 up to this point and 6 more ahead
Teacher Evaluationeffectiveness data has increased
2014-15 2015-16 Highly Effective 5 28 Effective 23 4
Needs Improv 1 0 Ineffective 0 0
TAPIDOE Score 55 55
Student ISTEP Ge__o_wth D_ata
Math FgtassPercentaie bullbull gt_ lt bull J
2014-2015 I 201s-2016
3rd Grade 4630
444th Grade 44
675th Grade 54
1middot ELAPass PertentagE
2014-2015 I 2015-2016
3rd Grade 49 55
While the teacher ability to build curriculum case studies and expeditions has increased dramatically the IG position is the point person for this work and the staff appreciates having access to such expertise in PLC Time PD time and through the course of the EL Education building years at Chamberlain The IG provides modeling co-teaching and mentoringcoaching
Specialists (music art technology physical education Ell teachers Special Education Teacher Counselor) being integrated into Expeditions plan and implementation has happened as a result of the guidance and support from the IG these specialists are feeling more integrated supported and valued than ever before
The IG has guided decision making ordering suggestions and local businesses connections for needed supplies anchor text PD books and other materials needed for Expedition Implementation The staff has appreciated this guidance and time that the IG has attended to this in order for them to place time resources on other more direct student impact initiatives and planning
The IG guide alongside the principal has developed and held parent information nights to build background knowledge inform show examples of student teacher progress and work as well being a resource to communicate with families
The IG has worked in collaboration with the school parent liaison (district funded position) to plan family nights showcase nights and to provide literature that the IG prepared and the parent liaison translates
Both the IG and the principal serve on localcommunity boards These positions take efforts and time to connect with community groups to work collaboratively to serve the needs of students families and learning experiences
SOS group of local churches and organizations meet 3 times a year at the school to communicate with leadership on how they can serve our students in the form of providing materials for back to school basic needs and the giving of time as field experts mentors and volunteers
EL Education (Expeditionary
Leaming) Network feeand
comprehensive corporate agreement
fees
The EL Network is supporting us in a
gradual decrease of these fees and we
increase sustainability in the El Core
Practices as a school The 17-18 contract
or perhaps a multi-year contract) will be purchased if
SIG funds allow will be able to build this
contract with more support
424th Grade 40
47455th Grade
Family Community Opportunity Attendance Data 2015-16Total for the year 1637 2016-17 Total for 1st semester 775
Showcase night Attendance by family and community 418 Implementation of instructional practices institute learning data practices learning strategies and monitoring and accountability with the El Network has impacted student in the following way
Implementation of CREW the culturalcharacter component of EL Education has impacted the following student data
Attendance Rate Data 2013-14 955 2014-15 952 2015-16 958 2016-17 962 ( as ofJan 2017)
Discipline Referral Data 2014-15 348 Referrals 2015-16 262 Referrals 216-17 102 Referrals ( as of Jan 1 2017)
ISTEP Data ISTEP ACCESS LINK
Support in building model of learning for Chamberlain from the contract services of EL Education School Designer As a support to the SLT (school leadership team) TIT (teaching and learning team-TAP) and CCT (Crew and Culture Team) the SD (School Designer) has been a guide for the work plan goals and implementation of EL Education Core Practices at Chamberlain Her Role has built sustainability and capacity in our students leadership teams teachers support staff district and parents
EL Education Institutes are built into the Network Fees we have gradually decreased this each year The attendance at these institutes has built confidence capacity leadership and ownership in our teacher and leadership crew Institute Attendance at EL Education Institutes 14-15 - 20 attendee slots 15-16 -30 staff plus 24 staff to Designing Learning Expeditions Milwaukee 16-17 -15 staff to Date Here is a brief list of some of the institutes that have been attended by staff
2016-17
EL Education Network is accessible for all stakeholders
El Education Network support School Designer Midwest Regional Director and Principal Colleagues have taken part in showcase nights parent information nights and
District Leadership and School Board Members have been engaged in the form of supporting attending events and requesting reports to the board on our progress
Parents have increasingly become comfortable coming to school participating in events providing support for academics at home
Community and district support for our launch of EL Education the data is indicating growth our student from all ability levels language levels and ethnicities
Newspaper and News coverage has been positive and have promoted positive outlook of GCS Corporation Chamberlain Elementary and public schools
Student Mobility Data bull Assessment Planning for High Local Churches Community Foundations (Percentage of turnover) Quality Work and Businesses are hearing of the impact of 2012-13 3367 bull Using Data to Improve Student this model of learning through media social 2013-14 2783 Achievement media invitations and attendance at 2014-15 2459 bull Meeting the Needs of ELLs showcase nights by word of mouth The 2015-16 2306 bull National Conference (Chicago) principal has been invited to speak at
2016-17 1649 (faculty + 1 member of SLT) Churches Community Groups (ie Kiwanis ( as of Feb 2017) bull Midwest Leadership Cohort Rotary Colleges) regarding the impact that
(Chicago) SL T) an inquiry based model for learning and the Teacher mobility has decreased emphasis on CREW and Culture of significantly over the last 2 years
bull Polaris Site visit- Crew focus Community in our school is having on our
teacher attendance has increased as a Staff has been able to utilize the El Network students parents and neighborhood result of feeling valued supported portal and center for student work as a way to
share connect and gain ideas from other schools and teachers in the El Education
201483 Teacher Retention
Network
2016966
Because of the Network support willingness and appreciation for TELL Survey Data indicates teachers
-Turnover has decreased ongoing professional development and -Shared leadership has increased growth on Teacher value and -Principal capacity has increased capacity PD opportunities - School Leader principal and SLT members)
have remained committed invested and PD Attendancehours increased leadership capacity has grown 2013 36 hours per teacher per year 2016 108 hours per teacher per year
PLC Collaboration Time 2013 45 minute per week 2016 90 minutes per week
Please refer above (in addition to the below please refer to the attendance by Chamberlain Teachers By supporting another year of instituteTraveltoJnstitutes
The attendance at these institutes has built section above) our students will be able benefit from confidence capacity leadership and Stakeholders desire a capable teaching staff the instructional impact as a result of ownership in our teacher and leadership crew is is well equipped to serve the needs of our increasing capacity in teaching staff students
It is a value to our staff members to be able to The selection of the institutes is driven attend institutes absent of personal financial In addition All factors that parents value by the following factors burden
- Student Data Needs The building of learning and professional
-middot--middot-- ~f_~1~~------ul =middot-------------------------
- Staff Learning Need development within the staff is geared at The above 2 stated needs drive the - Increasing Instruction building of the school goals and work - Expert Community Involvement plan Then a strategic process is - Support of Needs offamilies utilized to align the data needs with - Specific to Chamberlain Data needs the work plan goals the work plan goals drive the determination of what EL Education Regional National Institute Learning is needed to address these needs The institute learning is brought back to all staff PD and hence has an impact on all staff learning and student achievement
Please refer to the above section for the data that is a justification for sustaining this portion of our framework-for one more year as we build capacity ie teacher attendance rate teacher mobility decreasing survey date indicating teachers feeling increased capacity and value
NOTE EL Education institutes are typically build in a regional offering institute rates and lodging are respectful of schools limited budgets Chamberlain travel is built in an economical way that maximizes funds
Staff values uninterrupted time that does notFOCUS of Staff Learning Days Parents will be appreciative of not having toStaff Learning Days take them away from students in order tobull Data Utilization have guest teachers in classrooms teaching
Funding of Curriculum explore data as a tool for strategically Curriculum and Instructional students Parent have voices appreciating bullbull Development driving instruction forward and toRate for 3 days Total of our efforts to minimize instances of this
teaching staff retreat identify interventions and EL Education Credential Plan bull Goal Setting and Planning remediations that need to be
(summer 2017 18 learning days
By attending to this above listed staff addressed for students to be successful Community and families value having high needs student outcomes will be bull developing instructional plans for quality teachers on staff that are committed developed as a result of the work expeditions expanding improving and to learning outside
_________w1--~~middotbullbull_101laquon~lbullMtgt=-bull--------------------------------------------------------------------
revising existing curriculum Researched based instructional This type ofwork requires time and focus that methods curriculum development is difficult to do in small chunks of time When Sense of community is felt and voiced by practices and learning in the domain teachers are given larger windows of time to parents of being student centered and driven attend to these areas they are more efficient by data and effective in their work and the result is Network of churches and local businesses
better instruction for students are thankful to host summer learning in the By allocating summer learning time locations This helps with the networking of and compensating teachers for this Compensation for additional time when it school and community Many times they work we are impacting students by occurs outside of the school day is highly provide lunches and snacks to us and come
Decreasing time with a guestbull valued to thank the stafffor their commitment to teacher during the summer our students Allocating for grade levelbull collaboration and learning to StaffLeadership Team value the opportunity plan for student instructional to not have to take time away from the time in opportunities and curriculum the classroom with students By providing a Having time to utilize studentbull time for focused learning and development end of the year data to build allocates for the need to accomplish while not goals and instructional decision having guest teachers provide instruction making for upcoming standards targets and assessment building
Data Utilization Grade levels meet 3-4 times per month for 45 min to utilize data to informimpact student achievement
NWEA Data Hours Staff has the opportunity for afrac12 day of release time to process NWEA Data 3 times per year In addition grade levels utilize this data periodically in weekly PLC Data meetings
Student Learning Supplies Materials Students and staff have had the By having the opportunity for studentstaff to Our families have benefitted significantly by
opportunity to have access to supplies have financial support for building the having the supplies being utilized and the materials books resources consumablenon consumable needs of supply and inventory of materials technology apps and programs that ExpeditionsCase Study for a sustainable year becoming available to students during the have been a powerful piece to will significantly support the learning first 3 years of the SIG grant
~~~~===~ru1u1deg=-~tlmicro=uL)Cll~mf-bullrAltlltMHW==trade-~~II--middot-bull__________________
launching enhancing and diversifying learning expeditions case studies and student achievement
STEP Testing Access link
The staff amp leadership team opportunity for building the literacy library has helped with a strong foundation of materials that would not have happened on district funding alone Being able to build this foundation of materials for an additional year yet at a lesser amount will truly have an impact on sustainability
The IG position in coordination with the principal will be working with the teachers in the 17-18 school year to share leadership and learn how to apply for grants Donors Choose and other resources to fulfill future classroom and learning needs
In the coming years we will be utilizing other funding parent participation and looking to have local corporations that we are in communication with to support learning materials and to adopt classrooms
Part 6 Sustainability Plan
Instructions List below the SIG funded positions programs or structures that will be sustained the plan to sustain each piece the amount budgeted for each focus area and how you will track effectiveness I middotmiddotmiddot1
Maintain the 50 RTI bull Weekly RTI Leadership Team meeting planned agenda leading RTI Intervention data and student coordinatorlead of meeting achievement for those students in
position o RTI Coordinator Lead -Lisa Rose Martin (LRM) intervention via benchmark data bull Monitoring of implementation of the RTI Process per RTI law RTI process data screen goals and
district goals and implementation of leadership meetings results o Principal ~ Kim Branham (KB) Implementation check in 4 times a
bull Building Maintaining of RTI documentation running data and year of the RTI Process coordination of data steps
o RTI Coordinator Lead - LRM bull Supervision and guidance ofTitle One Instructor Team of
Interventionist (support staff) to screen students develop RTI Plans and monitor and adjust instruction track data
o RTI Coordinator Lead - LRM bull Monitor Supervision of Interventionist Trtle One Instructor
Team of Interventionist (support staff) o Assistant Principal - Erir1_ Has~ley EH)
Maintain a 1004 (IG bull Facilitate Coach and guide collaboration of curriculum work I $80JOOO Monitoring of the curriculum plans Instructional bull Develop Lead and Coach Professional Development implementation of instruction assessment GuideCoach bull Developing sustainable practices for resource acquisition expert building will be on an ongoing basis
position visits and fieldwork bull Support students and teachers in curriculum development Mid year and end of year accountability
revision instruction and implementation of EL Core Practices through EL Education School Review will be bull Specific feedback and support around ensuring high quality an accountability process for the work
teaching practices and high quality learning experiences for students Monitoring ofthe work plan and
bull Lead Leamer of the guiding principles and practices of EL credentialing plan is continual and weekly Education School Leadership Team (SLT) meetings will
o IG- Instructional Guide be the check in point o Lisa Vogt- School Designer monitoring guiding support) o Kim Branham - Principal (monitoring guiding support
EL Education bull Make arrangements and map out the details of the corporate $100000 In house and El Education Network (Expeditionary agreement monitoring of practices data and
Leaming) Network o Kim Branham- Principal credentialing steps will be attended to on an feeand o Lisa Vogt- EL Education School Designer ongoing basis via site visits data reigt_orts
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
Par15 Application Activities
Sustainability Framework Instructions Use the SIOT Activity above to help guide what SIG pieces will be sustained for SY 17-18
What needs to be sustained What evidence is available to show what is worth sustaining List programs projects or positions that are currently funded by SIG and use the questions below to help brainstorm what evidence supports your initiatives worth in sustaining
Maintain the 50 RTI coordinatorlead
position
RTI leadership Team and support of implementation of the RTI MTSS)
Data Utilization Grade Level PLCs meet weekly during common plan time and are valuingthe use of data It would be in the best interest of students to have one more year for a 50 position to further and enhance this process
Maintain a 100 IG) Instructional
GuideCoach position
Benchmark data is being utilized to determine students that are in need of RTI intervention weekly leadership meetings to process and make decisions based on student needs monitor and adjust the process and track data in strategic and useful ways
Multiple Rll Documents are maintained to track student data frequency duration of intervention screener data includes anecdotal notes
Number of students identified to be screened via NWEA results -126 students screened based on fall NWEA Reading
Teacher PD support data from 2015-2016
110PD Hours
Prior to 2016-17 school year we were lacking both a districtschool process for identifying students through a benchmark assessment as well as lacking materials needed to implement a quality RTI plan of action During the 2016-17 Chamberlain Elementary has been able to build develop implement and improve a process to identify students for Rll build goals provide strategicresearched based intervention monitor and adjust goals
NWEA is being utilized for the second year at GCS and Chamberlain Elementary The staff is increasing the abilityto process and utilize data more time is needed and this additional time will help us to increase student achievement at a higher level
The RTI leadership team and school leadership team have developed this process for data integration
The IG is one of 4 key leaders in the school that utilize expertise in upholding and guiding the work of the school goals and work plan Curriculum and instruction
communication of school wide and individual student data
Parents community members El Education Expeditionary Learning) school support team have noted the significant increase in our students ability to articulate their goals (including Crew Habits of Scholarship Goals Classroom Data goals and benchmark data goals) Students are able to articulate their current goals and next steps and the habits of scholarships needed to achieve goals
EL Education Mid Year and End of Year Review as well as TAP NIEr End of Year Review data indicates that Chamberlain use of data and strides to increase capacity and serve students through the RTI process are steps to increased overall student achievement and to take Chamberlain to the next level in terms of our school work plan and credentialing plan
As part of the IG role showcase of learning community experts
This position will continue to teach PD support teachers in PLC Curriculum common plan times and provide mentoring and coaching of current staff
The IG position has supported students by increasing the depth of learning experiences through curriculum and planning guidance to staff
The IG in an instrumental role on SLT (School Leadership Team) in coordination with the principal and other members of the SLTshehas coordinated student learning experiences designed and taught curriculum designed communicated with EL Education and School Designer carried out the work and student data goals in our School Work Plan Credential Plan and EL Core Practices EL Core Practices Link
- 80 min in PLC per week for grade level teachers
Student in all grade levels are learning in Case Study and Expedition
Community Expertise in student case study work data Number of Experts) K- (approx10-and at least 2 more ahead) 1-5 up to this point and 5 more this year) 2 -(5 up to this point and 5 more this year) 3-4 up to this point and 2 more ahead) 4-3 up to this point and 3 more ahead) 5-5 up to this point and 6 more ahead
Teacher Evaluationeffectiveness data has increased
2014-15 2015-16 Highly Effective 5 28 Effective 23 4
Needs Improv 1 0 Ineffective 0 0
TAPIDOE Score 55 55
Student ISTEP Ge__o_wth D_ata
Math FgtassPercentaie bullbull gt_ lt bull J
2014-2015 I 201s-2016
3rd Grade 4630
444th Grade 44
675th Grade 54
1middot ELAPass PertentagE
2014-2015 I 2015-2016
3rd Grade 49 55
While the teacher ability to build curriculum case studies and expeditions has increased dramatically the IG position is the point person for this work and the staff appreciates having access to such expertise in PLC Time PD time and through the course of the EL Education building years at Chamberlain The IG provides modeling co-teaching and mentoringcoaching
Specialists (music art technology physical education Ell teachers Special Education Teacher Counselor) being integrated into Expeditions plan and implementation has happened as a result of the guidance and support from the IG these specialists are feeling more integrated supported and valued than ever before
The IG has guided decision making ordering suggestions and local businesses connections for needed supplies anchor text PD books and other materials needed for Expedition Implementation The staff has appreciated this guidance and time that the IG has attended to this in order for them to place time resources on other more direct student impact initiatives and planning
The IG guide alongside the principal has developed and held parent information nights to build background knowledge inform show examples of student teacher progress and work as well being a resource to communicate with families
The IG has worked in collaboration with the school parent liaison (district funded position) to plan family nights showcase nights and to provide literature that the IG prepared and the parent liaison translates
Both the IG and the principal serve on localcommunity boards These positions take efforts and time to connect with community groups to work collaboratively to serve the needs of students families and learning experiences
SOS group of local churches and organizations meet 3 times a year at the school to communicate with leadership on how they can serve our students in the form of providing materials for back to school basic needs and the giving of time as field experts mentors and volunteers
EL Education (Expeditionary
Leaming) Network feeand
comprehensive corporate agreement
fees
The EL Network is supporting us in a
gradual decrease of these fees and we
increase sustainability in the El Core
Practices as a school The 17-18 contract
or perhaps a multi-year contract) will be purchased if
SIG funds allow will be able to build this
contract with more support
424th Grade 40
47455th Grade
Family Community Opportunity Attendance Data 2015-16Total for the year 1637 2016-17 Total for 1st semester 775
Showcase night Attendance by family and community 418 Implementation of instructional practices institute learning data practices learning strategies and monitoring and accountability with the El Network has impacted student in the following way
Implementation of CREW the culturalcharacter component of EL Education has impacted the following student data
Attendance Rate Data 2013-14 955 2014-15 952 2015-16 958 2016-17 962 ( as ofJan 2017)
Discipline Referral Data 2014-15 348 Referrals 2015-16 262 Referrals 216-17 102 Referrals ( as of Jan 1 2017)
ISTEP Data ISTEP ACCESS LINK
Support in building model of learning for Chamberlain from the contract services of EL Education School Designer As a support to the SLT (school leadership team) TIT (teaching and learning team-TAP) and CCT (Crew and Culture Team) the SD (School Designer) has been a guide for the work plan goals and implementation of EL Education Core Practices at Chamberlain Her Role has built sustainability and capacity in our students leadership teams teachers support staff district and parents
EL Education Institutes are built into the Network Fees we have gradually decreased this each year The attendance at these institutes has built confidence capacity leadership and ownership in our teacher and leadership crew Institute Attendance at EL Education Institutes 14-15 - 20 attendee slots 15-16 -30 staff plus 24 staff to Designing Learning Expeditions Milwaukee 16-17 -15 staff to Date Here is a brief list of some of the institutes that have been attended by staff
2016-17
EL Education Network is accessible for all stakeholders
El Education Network support School Designer Midwest Regional Director and Principal Colleagues have taken part in showcase nights parent information nights and
District Leadership and School Board Members have been engaged in the form of supporting attending events and requesting reports to the board on our progress
Parents have increasingly become comfortable coming to school participating in events providing support for academics at home
Community and district support for our launch of EL Education the data is indicating growth our student from all ability levels language levels and ethnicities
Newspaper and News coverage has been positive and have promoted positive outlook of GCS Corporation Chamberlain Elementary and public schools
Student Mobility Data bull Assessment Planning for High Local Churches Community Foundations (Percentage of turnover) Quality Work and Businesses are hearing of the impact of 2012-13 3367 bull Using Data to Improve Student this model of learning through media social 2013-14 2783 Achievement media invitations and attendance at 2014-15 2459 bull Meeting the Needs of ELLs showcase nights by word of mouth The 2015-16 2306 bull National Conference (Chicago) principal has been invited to speak at
2016-17 1649 (faculty + 1 member of SLT) Churches Community Groups (ie Kiwanis ( as of Feb 2017) bull Midwest Leadership Cohort Rotary Colleges) regarding the impact that
(Chicago) SL T) an inquiry based model for learning and the Teacher mobility has decreased emphasis on CREW and Culture of significantly over the last 2 years
bull Polaris Site visit- Crew focus Community in our school is having on our
teacher attendance has increased as a Staff has been able to utilize the El Network students parents and neighborhood result of feeling valued supported portal and center for student work as a way to
share connect and gain ideas from other schools and teachers in the El Education
201483 Teacher Retention
Network
2016966
Because of the Network support willingness and appreciation for TELL Survey Data indicates teachers
-Turnover has decreased ongoing professional development and -Shared leadership has increased growth on Teacher value and -Principal capacity has increased capacity PD opportunities - School Leader principal and SLT members)
have remained committed invested and PD Attendancehours increased leadership capacity has grown 2013 36 hours per teacher per year 2016 108 hours per teacher per year
PLC Collaboration Time 2013 45 minute per week 2016 90 minutes per week
Please refer above (in addition to the below please refer to the attendance by Chamberlain Teachers By supporting another year of instituteTraveltoJnstitutes
The attendance at these institutes has built section above) our students will be able benefit from confidence capacity leadership and Stakeholders desire a capable teaching staff the instructional impact as a result of ownership in our teacher and leadership crew is is well equipped to serve the needs of our increasing capacity in teaching staff students
It is a value to our staff members to be able to The selection of the institutes is driven attend institutes absent of personal financial In addition All factors that parents value by the following factors burden
- Student Data Needs The building of learning and professional
-middot--middot-- ~f_~1~~------ul =middot-------------------------
- Staff Learning Need development within the staff is geared at The above 2 stated needs drive the - Increasing Instruction building of the school goals and work - Expert Community Involvement plan Then a strategic process is - Support of Needs offamilies utilized to align the data needs with - Specific to Chamberlain Data needs the work plan goals the work plan goals drive the determination of what EL Education Regional National Institute Learning is needed to address these needs The institute learning is brought back to all staff PD and hence has an impact on all staff learning and student achievement
Please refer to the above section for the data that is a justification for sustaining this portion of our framework-for one more year as we build capacity ie teacher attendance rate teacher mobility decreasing survey date indicating teachers feeling increased capacity and value
NOTE EL Education institutes are typically build in a regional offering institute rates and lodging are respectful of schools limited budgets Chamberlain travel is built in an economical way that maximizes funds
Staff values uninterrupted time that does notFOCUS of Staff Learning Days Parents will be appreciative of not having toStaff Learning Days take them away from students in order tobull Data Utilization have guest teachers in classrooms teaching
Funding of Curriculum explore data as a tool for strategically Curriculum and Instructional students Parent have voices appreciating bullbull Development driving instruction forward and toRate for 3 days Total of our efforts to minimize instances of this
teaching staff retreat identify interventions and EL Education Credential Plan bull Goal Setting and Planning remediations that need to be
(summer 2017 18 learning days
By attending to this above listed staff addressed for students to be successful Community and families value having high needs student outcomes will be bull developing instructional plans for quality teachers on staff that are committed developed as a result of the work expeditions expanding improving and to learning outside
_________w1--~~middotbullbull_101laquon~lbullMtgt=-bull--------------------------------------------------------------------
revising existing curriculum Researched based instructional This type ofwork requires time and focus that methods curriculum development is difficult to do in small chunks of time When Sense of community is felt and voiced by practices and learning in the domain teachers are given larger windows of time to parents of being student centered and driven attend to these areas they are more efficient by data and effective in their work and the result is Network of churches and local businesses
better instruction for students are thankful to host summer learning in the By allocating summer learning time locations This helps with the networking of and compensating teachers for this Compensation for additional time when it school and community Many times they work we are impacting students by occurs outside of the school day is highly provide lunches and snacks to us and come
Decreasing time with a guestbull valued to thank the stafffor their commitment to teacher during the summer our students Allocating for grade levelbull collaboration and learning to StaffLeadership Team value the opportunity plan for student instructional to not have to take time away from the time in opportunities and curriculum the classroom with students By providing a Having time to utilize studentbull time for focused learning and development end of the year data to build allocates for the need to accomplish while not goals and instructional decision having guest teachers provide instruction making for upcoming standards targets and assessment building
Data Utilization Grade levels meet 3-4 times per month for 45 min to utilize data to informimpact student achievement
NWEA Data Hours Staff has the opportunity for afrac12 day of release time to process NWEA Data 3 times per year In addition grade levels utilize this data periodically in weekly PLC Data meetings
Student Learning Supplies Materials Students and staff have had the By having the opportunity for studentstaff to Our families have benefitted significantly by
opportunity to have access to supplies have financial support for building the having the supplies being utilized and the materials books resources consumablenon consumable needs of supply and inventory of materials technology apps and programs that ExpeditionsCase Study for a sustainable year becoming available to students during the have been a powerful piece to will significantly support the learning first 3 years of the SIG grant
~~~~===~ru1u1deg=-~tlmicro=uL)Cll~mf-bullrAltlltMHW==trade-~~II--middot-bull__________________
launching enhancing and diversifying learning expeditions case studies and student achievement
STEP Testing Access link
The staff amp leadership team opportunity for building the literacy library has helped with a strong foundation of materials that would not have happened on district funding alone Being able to build this foundation of materials for an additional year yet at a lesser amount will truly have an impact on sustainability
The IG position in coordination with the principal will be working with the teachers in the 17-18 school year to share leadership and learn how to apply for grants Donors Choose and other resources to fulfill future classroom and learning needs
In the coming years we will be utilizing other funding parent participation and looking to have local corporations that we are in communication with to support learning materials and to adopt classrooms
Part 6 Sustainability Plan
Instructions List below the SIG funded positions programs or structures that will be sustained the plan to sustain each piece the amount budgeted for each focus area and how you will track effectiveness I middotmiddotmiddot1
Maintain the 50 RTI bull Weekly RTI Leadership Team meeting planned agenda leading RTI Intervention data and student coordinatorlead of meeting achievement for those students in
position o RTI Coordinator Lead -Lisa Rose Martin (LRM) intervention via benchmark data bull Monitoring of implementation of the RTI Process per RTI law RTI process data screen goals and
district goals and implementation of leadership meetings results o Principal ~ Kim Branham (KB) Implementation check in 4 times a
bull Building Maintaining of RTI documentation running data and year of the RTI Process coordination of data steps
o RTI Coordinator Lead - LRM bull Supervision and guidance ofTitle One Instructor Team of
Interventionist (support staff) to screen students develop RTI Plans and monitor and adjust instruction track data
o RTI Coordinator Lead - LRM bull Monitor Supervision of Interventionist Trtle One Instructor
Team of Interventionist (support staff) o Assistant Principal - Erir1_ Has~ley EH)
Maintain a 1004 (IG bull Facilitate Coach and guide collaboration of curriculum work I $80JOOO Monitoring of the curriculum plans Instructional bull Develop Lead and Coach Professional Development implementation of instruction assessment GuideCoach bull Developing sustainable practices for resource acquisition expert building will be on an ongoing basis
position visits and fieldwork bull Support students and teachers in curriculum development Mid year and end of year accountability
revision instruction and implementation of EL Core Practices through EL Education School Review will be bull Specific feedback and support around ensuring high quality an accountability process for the work
teaching practices and high quality learning experiences for students Monitoring ofthe work plan and
bull Lead Leamer of the guiding principles and practices of EL credentialing plan is continual and weekly Education School Leadership Team (SLT) meetings will
o IG- Instructional Guide be the check in point o Lisa Vogt- School Designer monitoring guiding support) o Kim Branham - Principal (monitoring guiding support
EL Education bull Make arrangements and map out the details of the corporate $100000 In house and El Education Network (Expeditionary agreement monitoring of practices data and
Leaming) Network o Kim Branham- Principal credentialing steps will be attended to on an feeand o Lisa Vogt- EL Education School Designer ongoing basis via site visits data reigt_orts
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
This position will continue to teach PD support teachers in PLC Curriculum common plan times and provide mentoring and coaching of current staff
The IG position has supported students by increasing the depth of learning experiences through curriculum and planning guidance to staff
The IG in an instrumental role on SLT (School Leadership Team) in coordination with the principal and other members of the SLTshehas coordinated student learning experiences designed and taught curriculum designed communicated with EL Education and School Designer carried out the work and student data goals in our School Work Plan Credential Plan and EL Core Practices EL Core Practices Link
- 80 min in PLC per week for grade level teachers
Student in all grade levels are learning in Case Study and Expedition
Community Expertise in student case study work data Number of Experts) K- (approx10-and at least 2 more ahead) 1-5 up to this point and 5 more this year) 2 -(5 up to this point and 5 more this year) 3-4 up to this point and 2 more ahead) 4-3 up to this point and 3 more ahead) 5-5 up to this point and 6 more ahead
Teacher Evaluationeffectiveness data has increased
2014-15 2015-16 Highly Effective 5 28 Effective 23 4
Needs Improv 1 0 Ineffective 0 0
TAPIDOE Score 55 55
Student ISTEP Ge__o_wth D_ata
Math FgtassPercentaie bullbull gt_ lt bull J
2014-2015 I 201s-2016
3rd Grade 4630
444th Grade 44
675th Grade 54
1middot ELAPass PertentagE
2014-2015 I 2015-2016
3rd Grade 49 55
While the teacher ability to build curriculum case studies and expeditions has increased dramatically the IG position is the point person for this work and the staff appreciates having access to such expertise in PLC Time PD time and through the course of the EL Education building years at Chamberlain The IG provides modeling co-teaching and mentoringcoaching
Specialists (music art technology physical education Ell teachers Special Education Teacher Counselor) being integrated into Expeditions plan and implementation has happened as a result of the guidance and support from the IG these specialists are feeling more integrated supported and valued than ever before
The IG has guided decision making ordering suggestions and local businesses connections for needed supplies anchor text PD books and other materials needed for Expedition Implementation The staff has appreciated this guidance and time that the IG has attended to this in order for them to place time resources on other more direct student impact initiatives and planning
The IG guide alongside the principal has developed and held parent information nights to build background knowledge inform show examples of student teacher progress and work as well being a resource to communicate with families
The IG has worked in collaboration with the school parent liaison (district funded position) to plan family nights showcase nights and to provide literature that the IG prepared and the parent liaison translates
Both the IG and the principal serve on localcommunity boards These positions take efforts and time to connect with community groups to work collaboratively to serve the needs of students families and learning experiences
SOS group of local churches and organizations meet 3 times a year at the school to communicate with leadership on how they can serve our students in the form of providing materials for back to school basic needs and the giving of time as field experts mentors and volunteers
EL Education (Expeditionary
Leaming) Network feeand
comprehensive corporate agreement
fees
The EL Network is supporting us in a
gradual decrease of these fees and we
increase sustainability in the El Core
Practices as a school The 17-18 contract
or perhaps a multi-year contract) will be purchased if
SIG funds allow will be able to build this
contract with more support
424th Grade 40
47455th Grade
Family Community Opportunity Attendance Data 2015-16Total for the year 1637 2016-17 Total for 1st semester 775
Showcase night Attendance by family and community 418 Implementation of instructional practices institute learning data practices learning strategies and monitoring and accountability with the El Network has impacted student in the following way
Implementation of CREW the culturalcharacter component of EL Education has impacted the following student data
Attendance Rate Data 2013-14 955 2014-15 952 2015-16 958 2016-17 962 ( as ofJan 2017)
Discipline Referral Data 2014-15 348 Referrals 2015-16 262 Referrals 216-17 102 Referrals ( as of Jan 1 2017)
ISTEP Data ISTEP ACCESS LINK
Support in building model of learning for Chamberlain from the contract services of EL Education School Designer As a support to the SLT (school leadership team) TIT (teaching and learning team-TAP) and CCT (Crew and Culture Team) the SD (School Designer) has been a guide for the work plan goals and implementation of EL Education Core Practices at Chamberlain Her Role has built sustainability and capacity in our students leadership teams teachers support staff district and parents
EL Education Institutes are built into the Network Fees we have gradually decreased this each year The attendance at these institutes has built confidence capacity leadership and ownership in our teacher and leadership crew Institute Attendance at EL Education Institutes 14-15 - 20 attendee slots 15-16 -30 staff plus 24 staff to Designing Learning Expeditions Milwaukee 16-17 -15 staff to Date Here is a brief list of some of the institutes that have been attended by staff
2016-17
EL Education Network is accessible for all stakeholders
El Education Network support School Designer Midwest Regional Director and Principal Colleagues have taken part in showcase nights parent information nights and
District Leadership and School Board Members have been engaged in the form of supporting attending events and requesting reports to the board on our progress
Parents have increasingly become comfortable coming to school participating in events providing support for academics at home
Community and district support for our launch of EL Education the data is indicating growth our student from all ability levels language levels and ethnicities
Newspaper and News coverage has been positive and have promoted positive outlook of GCS Corporation Chamberlain Elementary and public schools
Student Mobility Data bull Assessment Planning for High Local Churches Community Foundations (Percentage of turnover) Quality Work and Businesses are hearing of the impact of 2012-13 3367 bull Using Data to Improve Student this model of learning through media social 2013-14 2783 Achievement media invitations and attendance at 2014-15 2459 bull Meeting the Needs of ELLs showcase nights by word of mouth The 2015-16 2306 bull National Conference (Chicago) principal has been invited to speak at
2016-17 1649 (faculty + 1 member of SLT) Churches Community Groups (ie Kiwanis ( as of Feb 2017) bull Midwest Leadership Cohort Rotary Colleges) regarding the impact that
(Chicago) SL T) an inquiry based model for learning and the Teacher mobility has decreased emphasis on CREW and Culture of significantly over the last 2 years
bull Polaris Site visit- Crew focus Community in our school is having on our
teacher attendance has increased as a Staff has been able to utilize the El Network students parents and neighborhood result of feeling valued supported portal and center for student work as a way to
share connect and gain ideas from other schools and teachers in the El Education
201483 Teacher Retention
Network
2016966
Because of the Network support willingness and appreciation for TELL Survey Data indicates teachers
-Turnover has decreased ongoing professional development and -Shared leadership has increased growth on Teacher value and -Principal capacity has increased capacity PD opportunities - School Leader principal and SLT members)
have remained committed invested and PD Attendancehours increased leadership capacity has grown 2013 36 hours per teacher per year 2016 108 hours per teacher per year
PLC Collaboration Time 2013 45 minute per week 2016 90 minutes per week
Please refer above (in addition to the below please refer to the attendance by Chamberlain Teachers By supporting another year of instituteTraveltoJnstitutes
The attendance at these institutes has built section above) our students will be able benefit from confidence capacity leadership and Stakeholders desire a capable teaching staff the instructional impact as a result of ownership in our teacher and leadership crew is is well equipped to serve the needs of our increasing capacity in teaching staff students
It is a value to our staff members to be able to The selection of the institutes is driven attend institutes absent of personal financial In addition All factors that parents value by the following factors burden
- Student Data Needs The building of learning and professional
-middot--middot-- ~f_~1~~------ul =middot-------------------------
- Staff Learning Need development within the staff is geared at The above 2 stated needs drive the - Increasing Instruction building of the school goals and work - Expert Community Involvement plan Then a strategic process is - Support of Needs offamilies utilized to align the data needs with - Specific to Chamberlain Data needs the work plan goals the work plan goals drive the determination of what EL Education Regional National Institute Learning is needed to address these needs The institute learning is brought back to all staff PD and hence has an impact on all staff learning and student achievement
Please refer to the above section for the data that is a justification for sustaining this portion of our framework-for one more year as we build capacity ie teacher attendance rate teacher mobility decreasing survey date indicating teachers feeling increased capacity and value
NOTE EL Education institutes are typically build in a regional offering institute rates and lodging are respectful of schools limited budgets Chamberlain travel is built in an economical way that maximizes funds
Staff values uninterrupted time that does notFOCUS of Staff Learning Days Parents will be appreciative of not having toStaff Learning Days take them away from students in order tobull Data Utilization have guest teachers in classrooms teaching
Funding of Curriculum explore data as a tool for strategically Curriculum and Instructional students Parent have voices appreciating bullbull Development driving instruction forward and toRate for 3 days Total of our efforts to minimize instances of this
teaching staff retreat identify interventions and EL Education Credential Plan bull Goal Setting and Planning remediations that need to be
(summer 2017 18 learning days
By attending to this above listed staff addressed for students to be successful Community and families value having high needs student outcomes will be bull developing instructional plans for quality teachers on staff that are committed developed as a result of the work expeditions expanding improving and to learning outside
_________w1--~~middotbullbull_101laquon~lbullMtgt=-bull--------------------------------------------------------------------
revising existing curriculum Researched based instructional This type ofwork requires time and focus that methods curriculum development is difficult to do in small chunks of time When Sense of community is felt and voiced by practices and learning in the domain teachers are given larger windows of time to parents of being student centered and driven attend to these areas they are more efficient by data and effective in their work and the result is Network of churches and local businesses
better instruction for students are thankful to host summer learning in the By allocating summer learning time locations This helps with the networking of and compensating teachers for this Compensation for additional time when it school and community Many times they work we are impacting students by occurs outside of the school day is highly provide lunches and snacks to us and come
Decreasing time with a guestbull valued to thank the stafffor their commitment to teacher during the summer our students Allocating for grade levelbull collaboration and learning to StaffLeadership Team value the opportunity plan for student instructional to not have to take time away from the time in opportunities and curriculum the classroom with students By providing a Having time to utilize studentbull time for focused learning and development end of the year data to build allocates for the need to accomplish while not goals and instructional decision having guest teachers provide instruction making for upcoming standards targets and assessment building
Data Utilization Grade levels meet 3-4 times per month for 45 min to utilize data to informimpact student achievement
NWEA Data Hours Staff has the opportunity for afrac12 day of release time to process NWEA Data 3 times per year In addition grade levels utilize this data periodically in weekly PLC Data meetings
Student Learning Supplies Materials Students and staff have had the By having the opportunity for studentstaff to Our families have benefitted significantly by
opportunity to have access to supplies have financial support for building the having the supplies being utilized and the materials books resources consumablenon consumable needs of supply and inventory of materials technology apps and programs that ExpeditionsCase Study for a sustainable year becoming available to students during the have been a powerful piece to will significantly support the learning first 3 years of the SIG grant
~~~~===~ru1u1deg=-~tlmicro=uL)Cll~mf-bullrAltlltMHW==trade-~~II--middot-bull__________________
launching enhancing and diversifying learning expeditions case studies and student achievement
STEP Testing Access link
The staff amp leadership team opportunity for building the literacy library has helped with a strong foundation of materials that would not have happened on district funding alone Being able to build this foundation of materials for an additional year yet at a lesser amount will truly have an impact on sustainability
The IG position in coordination with the principal will be working with the teachers in the 17-18 school year to share leadership and learn how to apply for grants Donors Choose and other resources to fulfill future classroom and learning needs
In the coming years we will be utilizing other funding parent participation and looking to have local corporations that we are in communication with to support learning materials and to adopt classrooms
Part 6 Sustainability Plan
Instructions List below the SIG funded positions programs or structures that will be sustained the plan to sustain each piece the amount budgeted for each focus area and how you will track effectiveness I middotmiddotmiddot1
Maintain the 50 RTI bull Weekly RTI Leadership Team meeting planned agenda leading RTI Intervention data and student coordinatorlead of meeting achievement for those students in
position o RTI Coordinator Lead -Lisa Rose Martin (LRM) intervention via benchmark data bull Monitoring of implementation of the RTI Process per RTI law RTI process data screen goals and
district goals and implementation of leadership meetings results o Principal ~ Kim Branham (KB) Implementation check in 4 times a
bull Building Maintaining of RTI documentation running data and year of the RTI Process coordination of data steps
o RTI Coordinator Lead - LRM bull Supervision and guidance ofTitle One Instructor Team of
Interventionist (support staff) to screen students develop RTI Plans and monitor and adjust instruction track data
o RTI Coordinator Lead - LRM bull Monitor Supervision of Interventionist Trtle One Instructor
Team of Interventionist (support staff) o Assistant Principal - Erir1_ Has~ley EH)
Maintain a 1004 (IG bull Facilitate Coach and guide collaboration of curriculum work I $80JOOO Monitoring of the curriculum plans Instructional bull Develop Lead and Coach Professional Development implementation of instruction assessment GuideCoach bull Developing sustainable practices for resource acquisition expert building will be on an ongoing basis
position visits and fieldwork bull Support students and teachers in curriculum development Mid year and end of year accountability
revision instruction and implementation of EL Core Practices through EL Education School Review will be bull Specific feedback and support around ensuring high quality an accountability process for the work
teaching practices and high quality learning experiences for students Monitoring ofthe work plan and
bull Lead Leamer of the guiding principles and practices of EL credentialing plan is continual and weekly Education School Leadership Team (SLT) meetings will
o IG- Instructional Guide be the check in point o Lisa Vogt- School Designer monitoring guiding support) o Kim Branham - Principal (monitoring guiding support
EL Education bull Make arrangements and map out the details of the corporate $100000 In house and El Education Network (Expeditionary agreement monitoring of practices data and
Leaming) Network o Kim Branham- Principal credentialing steps will be attended to on an feeand o Lisa Vogt- EL Education School Designer ongoing basis via site visits data reigt_orts
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
EL Education (Expeditionary
Leaming) Network feeand
comprehensive corporate agreement
fees
The EL Network is supporting us in a
gradual decrease of these fees and we
increase sustainability in the El Core
Practices as a school The 17-18 contract
or perhaps a multi-year contract) will be purchased if
SIG funds allow will be able to build this
contract with more support
424th Grade 40
47455th Grade
Family Community Opportunity Attendance Data 2015-16Total for the year 1637 2016-17 Total for 1st semester 775
Showcase night Attendance by family and community 418 Implementation of instructional practices institute learning data practices learning strategies and monitoring and accountability with the El Network has impacted student in the following way
Implementation of CREW the culturalcharacter component of EL Education has impacted the following student data
Attendance Rate Data 2013-14 955 2014-15 952 2015-16 958 2016-17 962 ( as ofJan 2017)
Discipline Referral Data 2014-15 348 Referrals 2015-16 262 Referrals 216-17 102 Referrals ( as of Jan 1 2017)
ISTEP Data ISTEP ACCESS LINK
Support in building model of learning for Chamberlain from the contract services of EL Education School Designer As a support to the SLT (school leadership team) TIT (teaching and learning team-TAP) and CCT (Crew and Culture Team) the SD (School Designer) has been a guide for the work plan goals and implementation of EL Education Core Practices at Chamberlain Her Role has built sustainability and capacity in our students leadership teams teachers support staff district and parents
EL Education Institutes are built into the Network Fees we have gradually decreased this each year The attendance at these institutes has built confidence capacity leadership and ownership in our teacher and leadership crew Institute Attendance at EL Education Institutes 14-15 - 20 attendee slots 15-16 -30 staff plus 24 staff to Designing Learning Expeditions Milwaukee 16-17 -15 staff to Date Here is a brief list of some of the institutes that have been attended by staff
2016-17
EL Education Network is accessible for all stakeholders
El Education Network support School Designer Midwest Regional Director and Principal Colleagues have taken part in showcase nights parent information nights and
District Leadership and School Board Members have been engaged in the form of supporting attending events and requesting reports to the board on our progress
Parents have increasingly become comfortable coming to school participating in events providing support for academics at home
Community and district support for our launch of EL Education the data is indicating growth our student from all ability levels language levels and ethnicities
Newspaper and News coverage has been positive and have promoted positive outlook of GCS Corporation Chamberlain Elementary and public schools
Student Mobility Data bull Assessment Planning for High Local Churches Community Foundations (Percentage of turnover) Quality Work and Businesses are hearing of the impact of 2012-13 3367 bull Using Data to Improve Student this model of learning through media social 2013-14 2783 Achievement media invitations and attendance at 2014-15 2459 bull Meeting the Needs of ELLs showcase nights by word of mouth The 2015-16 2306 bull National Conference (Chicago) principal has been invited to speak at
2016-17 1649 (faculty + 1 member of SLT) Churches Community Groups (ie Kiwanis ( as of Feb 2017) bull Midwest Leadership Cohort Rotary Colleges) regarding the impact that
(Chicago) SL T) an inquiry based model for learning and the Teacher mobility has decreased emphasis on CREW and Culture of significantly over the last 2 years
bull Polaris Site visit- Crew focus Community in our school is having on our
teacher attendance has increased as a Staff has been able to utilize the El Network students parents and neighborhood result of feeling valued supported portal and center for student work as a way to
share connect and gain ideas from other schools and teachers in the El Education
201483 Teacher Retention
Network
2016966
Because of the Network support willingness and appreciation for TELL Survey Data indicates teachers
-Turnover has decreased ongoing professional development and -Shared leadership has increased growth on Teacher value and -Principal capacity has increased capacity PD opportunities - School Leader principal and SLT members)
have remained committed invested and PD Attendancehours increased leadership capacity has grown 2013 36 hours per teacher per year 2016 108 hours per teacher per year
PLC Collaboration Time 2013 45 minute per week 2016 90 minutes per week
Please refer above (in addition to the below please refer to the attendance by Chamberlain Teachers By supporting another year of instituteTraveltoJnstitutes
The attendance at these institutes has built section above) our students will be able benefit from confidence capacity leadership and Stakeholders desire a capable teaching staff the instructional impact as a result of ownership in our teacher and leadership crew is is well equipped to serve the needs of our increasing capacity in teaching staff students
It is a value to our staff members to be able to The selection of the institutes is driven attend institutes absent of personal financial In addition All factors that parents value by the following factors burden
- Student Data Needs The building of learning and professional
-middot--middot-- ~f_~1~~------ul =middot-------------------------
- Staff Learning Need development within the staff is geared at The above 2 stated needs drive the - Increasing Instruction building of the school goals and work - Expert Community Involvement plan Then a strategic process is - Support of Needs offamilies utilized to align the data needs with - Specific to Chamberlain Data needs the work plan goals the work plan goals drive the determination of what EL Education Regional National Institute Learning is needed to address these needs The institute learning is brought back to all staff PD and hence has an impact on all staff learning and student achievement
Please refer to the above section for the data that is a justification for sustaining this portion of our framework-for one more year as we build capacity ie teacher attendance rate teacher mobility decreasing survey date indicating teachers feeling increased capacity and value
NOTE EL Education institutes are typically build in a regional offering institute rates and lodging are respectful of schools limited budgets Chamberlain travel is built in an economical way that maximizes funds
Staff values uninterrupted time that does notFOCUS of Staff Learning Days Parents will be appreciative of not having toStaff Learning Days take them away from students in order tobull Data Utilization have guest teachers in classrooms teaching
Funding of Curriculum explore data as a tool for strategically Curriculum and Instructional students Parent have voices appreciating bullbull Development driving instruction forward and toRate for 3 days Total of our efforts to minimize instances of this
teaching staff retreat identify interventions and EL Education Credential Plan bull Goal Setting and Planning remediations that need to be
(summer 2017 18 learning days
By attending to this above listed staff addressed for students to be successful Community and families value having high needs student outcomes will be bull developing instructional plans for quality teachers on staff that are committed developed as a result of the work expeditions expanding improving and to learning outside
_________w1--~~middotbullbull_101laquon~lbullMtgt=-bull--------------------------------------------------------------------
revising existing curriculum Researched based instructional This type ofwork requires time and focus that methods curriculum development is difficult to do in small chunks of time When Sense of community is felt and voiced by practices and learning in the domain teachers are given larger windows of time to parents of being student centered and driven attend to these areas they are more efficient by data and effective in their work and the result is Network of churches and local businesses
better instruction for students are thankful to host summer learning in the By allocating summer learning time locations This helps with the networking of and compensating teachers for this Compensation for additional time when it school and community Many times they work we are impacting students by occurs outside of the school day is highly provide lunches and snacks to us and come
Decreasing time with a guestbull valued to thank the stafffor their commitment to teacher during the summer our students Allocating for grade levelbull collaboration and learning to StaffLeadership Team value the opportunity plan for student instructional to not have to take time away from the time in opportunities and curriculum the classroom with students By providing a Having time to utilize studentbull time for focused learning and development end of the year data to build allocates for the need to accomplish while not goals and instructional decision having guest teachers provide instruction making for upcoming standards targets and assessment building
Data Utilization Grade levels meet 3-4 times per month for 45 min to utilize data to informimpact student achievement
NWEA Data Hours Staff has the opportunity for afrac12 day of release time to process NWEA Data 3 times per year In addition grade levels utilize this data periodically in weekly PLC Data meetings
Student Learning Supplies Materials Students and staff have had the By having the opportunity for studentstaff to Our families have benefitted significantly by
opportunity to have access to supplies have financial support for building the having the supplies being utilized and the materials books resources consumablenon consumable needs of supply and inventory of materials technology apps and programs that ExpeditionsCase Study for a sustainable year becoming available to students during the have been a powerful piece to will significantly support the learning first 3 years of the SIG grant
~~~~===~ru1u1deg=-~tlmicro=uL)Cll~mf-bullrAltlltMHW==trade-~~II--middot-bull__________________
launching enhancing and diversifying learning expeditions case studies and student achievement
STEP Testing Access link
The staff amp leadership team opportunity for building the literacy library has helped with a strong foundation of materials that would not have happened on district funding alone Being able to build this foundation of materials for an additional year yet at a lesser amount will truly have an impact on sustainability
The IG position in coordination with the principal will be working with the teachers in the 17-18 school year to share leadership and learn how to apply for grants Donors Choose and other resources to fulfill future classroom and learning needs
In the coming years we will be utilizing other funding parent participation and looking to have local corporations that we are in communication with to support learning materials and to adopt classrooms
Part 6 Sustainability Plan
Instructions List below the SIG funded positions programs or structures that will be sustained the plan to sustain each piece the amount budgeted for each focus area and how you will track effectiveness I middotmiddotmiddot1
Maintain the 50 RTI bull Weekly RTI Leadership Team meeting planned agenda leading RTI Intervention data and student coordinatorlead of meeting achievement for those students in
position o RTI Coordinator Lead -Lisa Rose Martin (LRM) intervention via benchmark data bull Monitoring of implementation of the RTI Process per RTI law RTI process data screen goals and
district goals and implementation of leadership meetings results o Principal ~ Kim Branham (KB) Implementation check in 4 times a
bull Building Maintaining of RTI documentation running data and year of the RTI Process coordination of data steps
o RTI Coordinator Lead - LRM bull Supervision and guidance ofTitle One Instructor Team of
Interventionist (support staff) to screen students develop RTI Plans and monitor and adjust instruction track data
o RTI Coordinator Lead - LRM bull Monitor Supervision of Interventionist Trtle One Instructor
Team of Interventionist (support staff) o Assistant Principal - Erir1_ Has~ley EH)
Maintain a 1004 (IG bull Facilitate Coach and guide collaboration of curriculum work I $80JOOO Monitoring of the curriculum plans Instructional bull Develop Lead and Coach Professional Development implementation of instruction assessment GuideCoach bull Developing sustainable practices for resource acquisition expert building will be on an ongoing basis
position visits and fieldwork bull Support students and teachers in curriculum development Mid year and end of year accountability
revision instruction and implementation of EL Core Practices through EL Education School Review will be bull Specific feedback and support around ensuring high quality an accountability process for the work
teaching practices and high quality learning experiences for students Monitoring ofthe work plan and
bull Lead Leamer of the guiding principles and practices of EL credentialing plan is continual and weekly Education School Leadership Team (SLT) meetings will
o IG- Instructional Guide be the check in point o Lisa Vogt- School Designer monitoring guiding support) o Kim Branham - Principal (monitoring guiding support
EL Education bull Make arrangements and map out the details of the corporate $100000 In house and El Education Network (Expeditionary agreement monitoring of practices data and
Leaming) Network o Kim Branham- Principal credentialing steps will be attended to on an feeand o Lisa Vogt- EL Education School Designer ongoing basis via site visits data reigt_orts
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
Student Mobility Data bull Assessment Planning for High Local Churches Community Foundations (Percentage of turnover) Quality Work and Businesses are hearing of the impact of 2012-13 3367 bull Using Data to Improve Student this model of learning through media social 2013-14 2783 Achievement media invitations and attendance at 2014-15 2459 bull Meeting the Needs of ELLs showcase nights by word of mouth The 2015-16 2306 bull National Conference (Chicago) principal has been invited to speak at
2016-17 1649 (faculty + 1 member of SLT) Churches Community Groups (ie Kiwanis ( as of Feb 2017) bull Midwest Leadership Cohort Rotary Colleges) regarding the impact that
(Chicago) SL T) an inquiry based model for learning and the Teacher mobility has decreased emphasis on CREW and Culture of significantly over the last 2 years
bull Polaris Site visit- Crew focus Community in our school is having on our
teacher attendance has increased as a Staff has been able to utilize the El Network students parents and neighborhood result of feeling valued supported portal and center for student work as a way to
share connect and gain ideas from other schools and teachers in the El Education
201483 Teacher Retention
Network
2016966
Because of the Network support willingness and appreciation for TELL Survey Data indicates teachers
-Turnover has decreased ongoing professional development and -Shared leadership has increased growth on Teacher value and -Principal capacity has increased capacity PD opportunities - School Leader principal and SLT members)
have remained committed invested and PD Attendancehours increased leadership capacity has grown 2013 36 hours per teacher per year 2016 108 hours per teacher per year
PLC Collaboration Time 2013 45 minute per week 2016 90 minutes per week
Please refer above (in addition to the below please refer to the attendance by Chamberlain Teachers By supporting another year of instituteTraveltoJnstitutes
The attendance at these institutes has built section above) our students will be able benefit from confidence capacity leadership and Stakeholders desire a capable teaching staff the instructional impact as a result of ownership in our teacher and leadership crew is is well equipped to serve the needs of our increasing capacity in teaching staff students
It is a value to our staff members to be able to The selection of the institutes is driven attend institutes absent of personal financial In addition All factors that parents value by the following factors burden
- Student Data Needs The building of learning and professional
-middot--middot-- ~f_~1~~------ul =middot-------------------------
- Staff Learning Need development within the staff is geared at The above 2 stated needs drive the - Increasing Instruction building of the school goals and work - Expert Community Involvement plan Then a strategic process is - Support of Needs offamilies utilized to align the data needs with - Specific to Chamberlain Data needs the work plan goals the work plan goals drive the determination of what EL Education Regional National Institute Learning is needed to address these needs The institute learning is brought back to all staff PD and hence has an impact on all staff learning and student achievement
Please refer to the above section for the data that is a justification for sustaining this portion of our framework-for one more year as we build capacity ie teacher attendance rate teacher mobility decreasing survey date indicating teachers feeling increased capacity and value
NOTE EL Education institutes are typically build in a regional offering institute rates and lodging are respectful of schools limited budgets Chamberlain travel is built in an economical way that maximizes funds
Staff values uninterrupted time that does notFOCUS of Staff Learning Days Parents will be appreciative of not having toStaff Learning Days take them away from students in order tobull Data Utilization have guest teachers in classrooms teaching
Funding of Curriculum explore data as a tool for strategically Curriculum and Instructional students Parent have voices appreciating bullbull Development driving instruction forward and toRate for 3 days Total of our efforts to minimize instances of this
teaching staff retreat identify interventions and EL Education Credential Plan bull Goal Setting and Planning remediations that need to be
(summer 2017 18 learning days
By attending to this above listed staff addressed for students to be successful Community and families value having high needs student outcomes will be bull developing instructional plans for quality teachers on staff that are committed developed as a result of the work expeditions expanding improving and to learning outside
_________w1--~~middotbullbull_101laquon~lbullMtgt=-bull--------------------------------------------------------------------
revising existing curriculum Researched based instructional This type ofwork requires time and focus that methods curriculum development is difficult to do in small chunks of time When Sense of community is felt and voiced by practices and learning in the domain teachers are given larger windows of time to parents of being student centered and driven attend to these areas they are more efficient by data and effective in their work and the result is Network of churches and local businesses
better instruction for students are thankful to host summer learning in the By allocating summer learning time locations This helps with the networking of and compensating teachers for this Compensation for additional time when it school and community Many times they work we are impacting students by occurs outside of the school day is highly provide lunches and snacks to us and come
Decreasing time with a guestbull valued to thank the stafffor their commitment to teacher during the summer our students Allocating for grade levelbull collaboration and learning to StaffLeadership Team value the opportunity plan for student instructional to not have to take time away from the time in opportunities and curriculum the classroom with students By providing a Having time to utilize studentbull time for focused learning and development end of the year data to build allocates for the need to accomplish while not goals and instructional decision having guest teachers provide instruction making for upcoming standards targets and assessment building
Data Utilization Grade levels meet 3-4 times per month for 45 min to utilize data to informimpact student achievement
NWEA Data Hours Staff has the opportunity for afrac12 day of release time to process NWEA Data 3 times per year In addition grade levels utilize this data periodically in weekly PLC Data meetings
Student Learning Supplies Materials Students and staff have had the By having the opportunity for studentstaff to Our families have benefitted significantly by
opportunity to have access to supplies have financial support for building the having the supplies being utilized and the materials books resources consumablenon consumable needs of supply and inventory of materials technology apps and programs that ExpeditionsCase Study for a sustainable year becoming available to students during the have been a powerful piece to will significantly support the learning first 3 years of the SIG grant
~~~~===~ru1u1deg=-~tlmicro=uL)Cll~mf-bullrAltlltMHW==trade-~~II--middot-bull__________________
launching enhancing and diversifying learning expeditions case studies and student achievement
STEP Testing Access link
The staff amp leadership team opportunity for building the literacy library has helped with a strong foundation of materials that would not have happened on district funding alone Being able to build this foundation of materials for an additional year yet at a lesser amount will truly have an impact on sustainability
The IG position in coordination with the principal will be working with the teachers in the 17-18 school year to share leadership and learn how to apply for grants Donors Choose and other resources to fulfill future classroom and learning needs
In the coming years we will be utilizing other funding parent participation and looking to have local corporations that we are in communication with to support learning materials and to adopt classrooms
Part 6 Sustainability Plan
Instructions List below the SIG funded positions programs or structures that will be sustained the plan to sustain each piece the amount budgeted for each focus area and how you will track effectiveness I middotmiddotmiddot1
Maintain the 50 RTI bull Weekly RTI Leadership Team meeting planned agenda leading RTI Intervention data and student coordinatorlead of meeting achievement for those students in
position o RTI Coordinator Lead -Lisa Rose Martin (LRM) intervention via benchmark data bull Monitoring of implementation of the RTI Process per RTI law RTI process data screen goals and
district goals and implementation of leadership meetings results o Principal ~ Kim Branham (KB) Implementation check in 4 times a
bull Building Maintaining of RTI documentation running data and year of the RTI Process coordination of data steps
o RTI Coordinator Lead - LRM bull Supervision and guidance ofTitle One Instructor Team of
Interventionist (support staff) to screen students develop RTI Plans and monitor and adjust instruction track data
o RTI Coordinator Lead - LRM bull Monitor Supervision of Interventionist Trtle One Instructor
Team of Interventionist (support staff) o Assistant Principal - Erir1_ Has~ley EH)
Maintain a 1004 (IG bull Facilitate Coach and guide collaboration of curriculum work I $80JOOO Monitoring of the curriculum plans Instructional bull Develop Lead and Coach Professional Development implementation of instruction assessment GuideCoach bull Developing sustainable practices for resource acquisition expert building will be on an ongoing basis
position visits and fieldwork bull Support students and teachers in curriculum development Mid year and end of year accountability
revision instruction and implementation of EL Core Practices through EL Education School Review will be bull Specific feedback and support around ensuring high quality an accountability process for the work
teaching practices and high quality learning experiences for students Monitoring ofthe work plan and
bull Lead Leamer of the guiding principles and practices of EL credentialing plan is continual and weekly Education School Leadership Team (SLT) meetings will
o IG- Instructional Guide be the check in point o Lisa Vogt- School Designer monitoring guiding support) o Kim Branham - Principal (monitoring guiding support
EL Education bull Make arrangements and map out the details of the corporate $100000 In house and El Education Network (Expeditionary agreement monitoring of practices data and
Leaming) Network o Kim Branham- Principal credentialing steps will be attended to on an feeand o Lisa Vogt- EL Education School Designer ongoing basis via site visits data reigt_orts
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
- Staff Learning Need development within the staff is geared at The above 2 stated needs drive the - Increasing Instruction building of the school goals and work - Expert Community Involvement plan Then a strategic process is - Support of Needs offamilies utilized to align the data needs with - Specific to Chamberlain Data needs the work plan goals the work plan goals drive the determination of what EL Education Regional National Institute Learning is needed to address these needs The institute learning is brought back to all staff PD and hence has an impact on all staff learning and student achievement
Please refer to the above section for the data that is a justification for sustaining this portion of our framework-for one more year as we build capacity ie teacher attendance rate teacher mobility decreasing survey date indicating teachers feeling increased capacity and value
NOTE EL Education institutes are typically build in a regional offering institute rates and lodging are respectful of schools limited budgets Chamberlain travel is built in an economical way that maximizes funds
Staff values uninterrupted time that does notFOCUS of Staff Learning Days Parents will be appreciative of not having toStaff Learning Days take them away from students in order tobull Data Utilization have guest teachers in classrooms teaching
Funding of Curriculum explore data as a tool for strategically Curriculum and Instructional students Parent have voices appreciating bullbull Development driving instruction forward and toRate for 3 days Total of our efforts to minimize instances of this
teaching staff retreat identify interventions and EL Education Credential Plan bull Goal Setting and Planning remediations that need to be
(summer 2017 18 learning days
By attending to this above listed staff addressed for students to be successful Community and families value having high needs student outcomes will be bull developing instructional plans for quality teachers on staff that are committed developed as a result of the work expeditions expanding improving and to learning outside
_________w1--~~middotbullbull_101laquon~lbullMtgt=-bull--------------------------------------------------------------------
revising existing curriculum Researched based instructional This type ofwork requires time and focus that methods curriculum development is difficult to do in small chunks of time When Sense of community is felt and voiced by practices and learning in the domain teachers are given larger windows of time to parents of being student centered and driven attend to these areas they are more efficient by data and effective in their work and the result is Network of churches and local businesses
better instruction for students are thankful to host summer learning in the By allocating summer learning time locations This helps with the networking of and compensating teachers for this Compensation for additional time when it school and community Many times they work we are impacting students by occurs outside of the school day is highly provide lunches and snacks to us and come
Decreasing time with a guestbull valued to thank the stafffor their commitment to teacher during the summer our students Allocating for grade levelbull collaboration and learning to StaffLeadership Team value the opportunity plan for student instructional to not have to take time away from the time in opportunities and curriculum the classroom with students By providing a Having time to utilize studentbull time for focused learning and development end of the year data to build allocates for the need to accomplish while not goals and instructional decision having guest teachers provide instruction making for upcoming standards targets and assessment building
Data Utilization Grade levels meet 3-4 times per month for 45 min to utilize data to informimpact student achievement
NWEA Data Hours Staff has the opportunity for afrac12 day of release time to process NWEA Data 3 times per year In addition grade levels utilize this data periodically in weekly PLC Data meetings
Student Learning Supplies Materials Students and staff have had the By having the opportunity for studentstaff to Our families have benefitted significantly by
opportunity to have access to supplies have financial support for building the having the supplies being utilized and the materials books resources consumablenon consumable needs of supply and inventory of materials technology apps and programs that ExpeditionsCase Study for a sustainable year becoming available to students during the have been a powerful piece to will significantly support the learning first 3 years of the SIG grant
~~~~===~ru1u1deg=-~tlmicro=uL)Cll~mf-bullrAltlltMHW==trade-~~II--middot-bull__________________
launching enhancing and diversifying learning expeditions case studies and student achievement
STEP Testing Access link
The staff amp leadership team opportunity for building the literacy library has helped with a strong foundation of materials that would not have happened on district funding alone Being able to build this foundation of materials for an additional year yet at a lesser amount will truly have an impact on sustainability
The IG position in coordination with the principal will be working with the teachers in the 17-18 school year to share leadership and learn how to apply for grants Donors Choose and other resources to fulfill future classroom and learning needs
In the coming years we will be utilizing other funding parent participation and looking to have local corporations that we are in communication with to support learning materials and to adopt classrooms
Part 6 Sustainability Plan
Instructions List below the SIG funded positions programs or structures that will be sustained the plan to sustain each piece the amount budgeted for each focus area and how you will track effectiveness I middotmiddotmiddot1
Maintain the 50 RTI bull Weekly RTI Leadership Team meeting planned agenda leading RTI Intervention data and student coordinatorlead of meeting achievement for those students in
position o RTI Coordinator Lead -Lisa Rose Martin (LRM) intervention via benchmark data bull Monitoring of implementation of the RTI Process per RTI law RTI process data screen goals and
district goals and implementation of leadership meetings results o Principal ~ Kim Branham (KB) Implementation check in 4 times a
bull Building Maintaining of RTI documentation running data and year of the RTI Process coordination of data steps
o RTI Coordinator Lead - LRM bull Supervision and guidance ofTitle One Instructor Team of
Interventionist (support staff) to screen students develop RTI Plans and monitor and adjust instruction track data
o RTI Coordinator Lead - LRM bull Monitor Supervision of Interventionist Trtle One Instructor
Team of Interventionist (support staff) o Assistant Principal - Erir1_ Has~ley EH)
Maintain a 1004 (IG bull Facilitate Coach and guide collaboration of curriculum work I $80JOOO Monitoring of the curriculum plans Instructional bull Develop Lead and Coach Professional Development implementation of instruction assessment GuideCoach bull Developing sustainable practices for resource acquisition expert building will be on an ongoing basis
position visits and fieldwork bull Support students and teachers in curriculum development Mid year and end of year accountability
revision instruction and implementation of EL Core Practices through EL Education School Review will be bull Specific feedback and support around ensuring high quality an accountability process for the work
teaching practices and high quality learning experiences for students Monitoring ofthe work plan and
bull Lead Leamer of the guiding principles and practices of EL credentialing plan is continual and weekly Education School Leadership Team (SLT) meetings will
o IG- Instructional Guide be the check in point o Lisa Vogt- School Designer monitoring guiding support) o Kim Branham - Principal (monitoring guiding support
EL Education bull Make arrangements and map out the details of the corporate $100000 In house and El Education Network (Expeditionary agreement monitoring of practices data and
Leaming) Network o Kim Branham- Principal credentialing steps will be attended to on an feeand o Lisa Vogt- EL Education School Designer ongoing basis via site visits data reigt_orts
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
revising existing curriculum Researched based instructional This type ofwork requires time and focus that methods curriculum development is difficult to do in small chunks of time When Sense of community is felt and voiced by practices and learning in the domain teachers are given larger windows of time to parents of being student centered and driven attend to these areas they are more efficient by data and effective in their work and the result is Network of churches and local businesses
better instruction for students are thankful to host summer learning in the By allocating summer learning time locations This helps with the networking of and compensating teachers for this Compensation for additional time when it school and community Many times they work we are impacting students by occurs outside of the school day is highly provide lunches and snacks to us and come
Decreasing time with a guestbull valued to thank the stafffor their commitment to teacher during the summer our students Allocating for grade levelbull collaboration and learning to StaffLeadership Team value the opportunity plan for student instructional to not have to take time away from the time in opportunities and curriculum the classroom with students By providing a Having time to utilize studentbull time for focused learning and development end of the year data to build allocates for the need to accomplish while not goals and instructional decision having guest teachers provide instruction making for upcoming standards targets and assessment building
Data Utilization Grade levels meet 3-4 times per month for 45 min to utilize data to informimpact student achievement
NWEA Data Hours Staff has the opportunity for afrac12 day of release time to process NWEA Data 3 times per year In addition grade levels utilize this data periodically in weekly PLC Data meetings
Student Learning Supplies Materials Students and staff have had the By having the opportunity for studentstaff to Our families have benefitted significantly by
opportunity to have access to supplies have financial support for building the having the supplies being utilized and the materials books resources consumablenon consumable needs of supply and inventory of materials technology apps and programs that ExpeditionsCase Study for a sustainable year becoming available to students during the have been a powerful piece to will significantly support the learning first 3 years of the SIG grant
~~~~===~ru1u1deg=-~tlmicro=uL)Cll~mf-bullrAltlltMHW==trade-~~II--middot-bull__________________
launching enhancing and diversifying learning expeditions case studies and student achievement
STEP Testing Access link
The staff amp leadership team opportunity for building the literacy library has helped with a strong foundation of materials that would not have happened on district funding alone Being able to build this foundation of materials for an additional year yet at a lesser amount will truly have an impact on sustainability
The IG position in coordination with the principal will be working with the teachers in the 17-18 school year to share leadership and learn how to apply for grants Donors Choose and other resources to fulfill future classroom and learning needs
In the coming years we will be utilizing other funding parent participation and looking to have local corporations that we are in communication with to support learning materials and to adopt classrooms
Part 6 Sustainability Plan
Instructions List below the SIG funded positions programs or structures that will be sustained the plan to sustain each piece the amount budgeted for each focus area and how you will track effectiveness I middotmiddotmiddot1
Maintain the 50 RTI bull Weekly RTI Leadership Team meeting planned agenda leading RTI Intervention data and student coordinatorlead of meeting achievement for those students in
position o RTI Coordinator Lead -Lisa Rose Martin (LRM) intervention via benchmark data bull Monitoring of implementation of the RTI Process per RTI law RTI process data screen goals and
district goals and implementation of leadership meetings results o Principal ~ Kim Branham (KB) Implementation check in 4 times a
bull Building Maintaining of RTI documentation running data and year of the RTI Process coordination of data steps
o RTI Coordinator Lead - LRM bull Supervision and guidance ofTitle One Instructor Team of
Interventionist (support staff) to screen students develop RTI Plans and monitor and adjust instruction track data
o RTI Coordinator Lead - LRM bull Monitor Supervision of Interventionist Trtle One Instructor
Team of Interventionist (support staff) o Assistant Principal - Erir1_ Has~ley EH)
Maintain a 1004 (IG bull Facilitate Coach and guide collaboration of curriculum work I $80JOOO Monitoring of the curriculum plans Instructional bull Develop Lead and Coach Professional Development implementation of instruction assessment GuideCoach bull Developing sustainable practices for resource acquisition expert building will be on an ongoing basis
position visits and fieldwork bull Support students and teachers in curriculum development Mid year and end of year accountability
revision instruction and implementation of EL Core Practices through EL Education School Review will be bull Specific feedback and support around ensuring high quality an accountability process for the work
teaching practices and high quality learning experiences for students Monitoring ofthe work plan and
bull Lead Leamer of the guiding principles and practices of EL credentialing plan is continual and weekly Education School Leadership Team (SLT) meetings will
o IG- Instructional Guide be the check in point o Lisa Vogt- School Designer monitoring guiding support) o Kim Branham - Principal (monitoring guiding support
EL Education bull Make arrangements and map out the details of the corporate $100000 In house and El Education Network (Expeditionary agreement monitoring of practices data and
Leaming) Network o Kim Branham- Principal credentialing steps will be attended to on an feeand o Lisa Vogt- EL Education School Designer ongoing basis via site visits data reigt_orts
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
launching enhancing and diversifying learning expeditions case studies and student achievement
STEP Testing Access link
The staff amp leadership team opportunity for building the literacy library has helped with a strong foundation of materials that would not have happened on district funding alone Being able to build this foundation of materials for an additional year yet at a lesser amount will truly have an impact on sustainability
The IG position in coordination with the principal will be working with the teachers in the 17-18 school year to share leadership and learn how to apply for grants Donors Choose and other resources to fulfill future classroom and learning needs
In the coming years we will be utilizing other funding parent participation and looking to have local corporations that we are in communication with to support learning materials and to adopt classrooms
Part 6 Sustainability Plan
Instructions List below the SIG funded positions programs or structures that will be sustained the plan to sustain each piece the amount budgeted for each focus area and how you will track effectiveness I middotmiddotmiddot1
Maintain the 50 RTI bull Weekly RTI Leadership Team meeting planned agenda leading RTI Intervention data and student coordinatorlead of meeting achievement for those students in
position o RTI Coordinator Lead -Lisa Rose Martin (LRM) intervention via benchmark data bull Monitoring of implementation of the RTI Process per RTI law RTI process data screen goals and
district goals and implementation of leadership meetings results o Principal ~ Kim Branham (KB) Implementation check in 4 times a
bull Building Maintaining of RTI documentation running data and year of the RTI Process coordination of data steps
o RTI Coordinator Lead - LRM bull Supervision and guidance ofTitle One Instructor Team of
Interventionist (support staff) to screen students develop RTI Plans and monitor and adjust instruction track data
o RTI Coordinator Lead - LRM bull Monitor Supervision of Interventionist Trtle One Instructor
Team of Interventionist (support staff) o Assistant Principal - Erir1_ Has~ley EH)
Maintain a 1004 (IG bull Facilitate Coach and guide collaboration of curriculum work I $80JOOO Monitoring of the curriculum plans Instructional bull Develop Lead and Coach Professional Development implementation of instruction assessment GuideCoach bull Developing sustainable practices for resource acquisition expert building will be on an ongoing basis
position visits and fieldwork bull Support students and teachers in curriculum development Mid year and end of year accountability
revision instruction and implementation of EL Core Practices through EL Education School Review will be bull Specific feedback and support around ensuring high quality an accountability process for the work
teaching practices and high quality learning experiences for students Monitoring ofthe work plan and
bull Lead Leamer of the guiding principles and practices of EL credentialing plan is continual and weekly Education School Leadership Team (SLT) meetings will
o IG- Instructional Guide be the check in point o Lisa Vogt- School Designer monitoring guiding support) o Kim Branham - Principal (monitoring guiding support
EL Education bull Make arrangements and map out the details of the corporate $100000 In house and El Education Network (Expeditionary agreement monitoring of practices data and
Leaming) Network o Kim Branham- Principal credentialing steps will be attended to on an feeand o Lisa Vogt- EL Education School Designer ongoing basis via site visits data reigt_orts
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
Part 6 Sustainability Plan
Instructions List below the SIG funded positions programs or structures that will be sustained the plan to sustain each piece the amount budgeted for each focus area and how you will track effectiveness I middotmiddotmiddot1
Maintain the 50 RTI bull Weekly RTI Leadership Team meeting planned agenda leading RTI Intervention data and student coordinatorlead of meeting achievement for those students in
position o RTI Coordinator Lead -Lisa Rose Martin (LRM) intervention via benchmark data bull Monitoring of implementation of the RTI Process per RTI law RTI process data screen goals and
district goals and implementation of leadership meetings results o Principal ~ Kim Branham (KB) Implementation check in 4 times a
bull Building Maintaining of RTI documentation running data and year of the RTI Process coordination of data steps
o RTI Coordinator Lead - LRM bull Supervision and guidance ofTitle One Instructor Team of
Interventionist (support staff) to screen students develop RTI Plans and monitor and adjust instruction track data
o RTI Coordinator Lead - LRM bull Monitor Supervision of Interventionist Trtle One Instructor
Team of Interventionist (support staff) o Assistant Principal - Erir1_ Has~ley EH)
Maintain a 1004 (IG bull Facilitate Coach and guide collaboration of curriculum work I $80JOOO Monitoring of the curriculum plans Instructional bull Develop Lead and Coach Professional Development implementation of instruction assessment GuideCoach bull Developing sustainable practices for resource acquisition expert building will be on an ongoing basis
position visits and fieldwork bull Support students and teachers in curriculum development Mid year and end of year accountability
revision instruction and implementation of EL Core Practices through EL Education School Review will be bull Specific feedback and support around ensuring high quality an accountability process for the work
teaching practices and high quality learning experiences for students Monitoring ofthe work plan and
bull Lead Leamer of the guiding principles and practices of EL credentialing plan is continual and weekly Education School Leadership Team (SLT) meetings will
o IG- Instructional Guide be the check in point o Lisa Vogt- School Designer monitoring guiding support) o Kim Branham - Principal (monitoring guiding support
EL Education bull Make arrangements and map out the details of the corporate $100000 In house and El Education Network (Expeditionary agreement monitoring of practices data and
Leaming) Network o Kim Branham- Principal credentialing steps will be attended to on an feeand o Lisa Vogt- EL Education School Designer ongoing basis via site visits data reigt_orts
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
comprehensive corporate agreement
to implement two year renewal
Traveltolnstitutes
0 Mary Kay Longacre- Director of Grants and Assessments Building of school work plan steps to credentialingbull
0 School Leadership Team
bull Strategic Selection of Institutes to fit the student data needs select attendee candidates for institutes
0 Leadership Team 0 Lisa Vogt- School Designer
Participate and Attend Staff PDbull 0 All Staff 0 Leadership Team
Utilize student data to make decisions of strategy and bull instructional work
0 Leadership Team 0 Lisa Vogt- School Designer 0 Teachers - Data Work
Fiscally responsible decision making on travel plans bull accommodations and arrangements will take place
0 Monitoring of this MK Longacre - Director of Grants and bull Assessments Kim Branham - Principal bull
$25000
and reflection
EL Education Reports are will be accessible
Institutes and travel choices will be monitored to account for location of institutes appropriate travel methods and rooming situations while at institutions to make greatest use of available funds
Staff Learning Days
Student Leaming Supplies Materials
Planning and delivery of professional learning and planning bull 0 School Leadership Team
Attendance of staff learning days bull 0 All Staff
Accountability evidence of learning and development bull 0 Time effort log signed by staff in attendance and
co-signed by Principal
Strategic and Intentional selection of materials that align to thebull needs ofExpeditionCase Study
0 IG-Sarah Metzler -to guide facilitate the selection of materials and the ordering process
0 Teachers select materials that align to learning targets 0 Kim Branham Principal Monitoring of materials via
needswants 0 MaryKay Longacre Director of Grants
facilitationsupport guidance of funding
$15000
$15000
Curriculum plans and revisions will be accessible for all
Student data will be impacted and tracked based on the outcomes of the learning and application of the work
NWEA 1mP Classroom Assessment Assessment in Daily Instruction Practices
raquotl-UJs__ ltmiddot --middotmiddotna -_- middot I ca7m=al=n-lt--ois-~---bullW1 =bull - middot r_ Imiddot ~ Y-r~-1 middot _ 11middot---------SOgt
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
Part7 Budget
Instructions Complete the following budget worksheet
Account I Expenditure I Salary Benefits Prof IRentals IOther General I Property I Transfer
Number Account Service Purchase Supplies Cert Noncert Cert Noncert Services
11000 Instruction $15000 $15000
21000 Support Services-Student
I$95473 I I$36412 I I$100000 I I$2500022100 I Improvement I I I I s2s6sss of Instruction Professional Development)
22900 IOthei-Support Services
25191 IR~ Revenue
26000 Operation and Maintenance
27000 Transportation
33000 I Community Service Operations
60100 IT~rs (interfund)
Column Totals $95473 $36412 $100000 $25000 $15000 I I I s21188s
Total Cost $27188500
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
bull Fee for Corporate Agreement Including institute slots school designer days support services access to EL Education Support Website EL Commons) Network Fees
bull Fees for communi( experts t_o su_iport leaming Expeditions
bull Accommodations and travel fees for Regional and National Institutes
middot 1 middot 1Mt~J1~t~~~i~ltitoyt~~n~N~1~tippJ~i~~l~l~~[rilim$J bullbull1
bull Lisa Rose Martin 50 RTI leadCoach bull Sarah Metzler 100 Instructional Guide (IG) Coach bull Stipends for additional work days (30 teachers for 4 days)
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 1
Greetings
We have been setting up some new internal monitoring systems to help us align
spending within a grant to the grant application As we were putting these systems into
place we were delayed in asking for reimbursement A reimbursement of $19990988
has been submitted for the March 1st reimbursement date We anticipate submitting
reimbursements on a monthly basis moving forward Our ultimate desire is to make
sure that our expenses are matching the grant as it was submitted We look forward to
continuing our partnership with the IDOE and appreciate the opportunity to obtain this
renewal
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham
Goshen Community Schools 613 East Purl Street Goshen IN 46526-4044 Phone (574) 533-8631 Fax (574) 533-2505 wwwgoshenschoolsorg
Superintendent Dr Diane B Woodworth
Assistant SuperintendentshyElementary Education Dr Alan Metcalfe
Assistant SuperintendentshySeconday Education Dr Angela Piazza
Assistant SuperintendentshyHuman Resources amp Professional Development Mrs Tamra K Ummel Ed S
Director ofFinance Mr Jerry D Hawkins
EL Director Mrs Karen Blaha
Facilities Director Mr Tom Boomershine
Food Service Director Mrs Sherry Faulkner
Director ofGrants amp Assessments Mrs Mary Kay Longacre
Director of Curriculum amp Instruction Mrs Tracey Noe
Transportation Coordinator Mrs Shelly Sharkey
Technology Director Mr David M Snyder
Assistant HR Director amp Health Services Coordinator Mrs Susan Stiffney
GOSHEN COMMUNITY SCHOOLS Inspiring Innovation Empowering Potential Enriching Our World
February 27 2017
To Nathan Williamson and Rachael Havey
From Kimberly Branham and Mary Kay Longacre
RE 1003(g) renewal explanation for Item 2
Our sustainability plan for moving forward beyond 2017-18 1003g funding is based on
our school need for a continued network and corporate agreement with EL Education
This funding would be through Goshen Community Schools or potentially through
other funding yet would not be necessary to continue our sustainability plans for
several years to come The principal is working continually and collaboratively with
EL Education on sustainability plans Including long range plans both in the form of a
work plan credentialing plan and financial plan with a scope and sequence for
multiple years
Beyond the 17-18 school year Chamberlain will have the internal capacity to sustain
the EL Education Model for learning and the 3 components of student achievement
based on the structures and professional development in the 1003g grant years Next
year the focus of the Instructional Guide position will be to revise the Leaming
Expeditions and to build the differentiation for the ELL Students this will be gradually
released to other personnel in the coming years Supplies and materials will be obtained
via other sources that the school and district have discussed Additional funding
potential would be from other grants partnerships with local corporations or potential
funding via EL Education Grant Department Further details of this plan can be
articulated by Kimberly Branham