DEMT Seminar and Final DEMT Seminar and Final MeetingMeeting
DEMT Activities in CambodiaDEMT Activities in Cambodia
Heng KunleangDeputy Director
Energy Development DepartmentMinistry of Industry, Mines and Energy
Vientiane, Lao PDR 19-20 June, 2006
ContentContent
Project ObjectivesProject Objectives
DEMT Activities in CambodiaDEMT Activities in Cambodia
REE Survey for Subsidized PCsREE Survey for Subsidized PCs
DEMT Activities PlanningDEMT Activities Planning
DEMT Benefits for REFDEMT Benefits for REF
ConclusionConclusion
RecommendationRecommendation
Project ObjectivesProject Objectives
To help improve access to higher quality To help improve access to higher quality and more reliable energy services to and more reliable energy services to
rural populationsrural populations
DEMT Activities in CambodiaDEMT Activities in Cambodia
The DEMT projectThe DEMT project was officially kicked-off on May was officially kicked-off on May 19, 2005, Phnom Penh that was attended by 13 19, 2005, Phnom Penh that was attended by 13 participants.participants.REE Management Survey-July 2005:REE Management Survey-July 2005: To determine To determine various aspects of their technical and various aspects of their technical and management capacity and processes.management capacity and processes.Specification Review Workshop-July 2005:Specification Review Workshop-July 2005: To To ensure that the tools developed indeed be ensure that the tools developed indeed be appropriate and effective. appropriate and effective. Training of TrainersTraining of Trainers on 5-7 April, 2006 on 5-7 April, 2006REEs TrainingREEs Training on 5-10 June, 2006 on 5-10 June, 2006REE SurveyREE Survey for Subsidized PCs for Subsidized PCs
REE Survey for Subsidized PCs REE Survey for Subsidized PCs Objectives of SurveyObjectives of Survey
Determine level of REE’s computer use Determine level of REE’s computer use and abilityand ability
Investigate the variance and Investigate the variance and characteristics of how REEs manage characteristics of how REEs manage their businesstheir business
Determine the REEs’ priorities for Determine the REEs’ priorities for assistance with management issues assistance with management issues
Method of SurveyMethod of Survey
Designed survey of 11 questions, 1 Designed survey of 11 questions, 1 pages pages
MIME and EAC posted it to all 40 REEs MIME and EAC posted it to all 40 REEs with an explanatory cover-letter (late with an explanatory cover-letter (late May 2006)May 2006)
MIME conducted interviews, following MIME conducted interviews, following the survey form with the REE (early June the survey form with the REE (early June 2006)2006)
Sample Size = 36Sample Size = 36
Result SummaryResult Summary
General interest in assistance to General interest in assistance to improve REE management, and open to improve REE management, and open to software tools.software tools.
100 % of REEs were interested to issue 100 % of REEs were interested to issue software and subsidised PCs. software and subsidised PCs.
DEMT Activities PlanningDEMT Activities PlanningSupply of PCs to TraineesSupply of PCs to Trainees
Desktop PC in Cambodia = around $500 (new, including printer, at least able to run ACCESS 2003 )Strategy: Differentiate Subsidise 100 Euro for 30 REEs.
Proposed Process:MIME gets 3 quotes for supply of 30 PCs meeting specifications (including warranty and service) AND arranges the payment scheme
MIME makes PC offer for REE (limited numbers) in invitation letter and arrange the modality of subsidy.
Each REE signs an agreement to use PC for DEMT purposes, and be available for audit by MIME/EAC staff at any time, and must repay subsidy if any problem
Back-up, Support and MonitoringBack-up, Support and Monitoring
Installation and Set-up Installation and Set-up (just for some trainees as needed): (just for some trainees as needed): They can do themselves, and call if needed to MIME. EAC They can do themselves, and call if needed to MIME. EAC can help and support in the field (free of charge) can help and support in the field (free of charge)
Telephone ‘Help Line’ for REEs to call for help Telephone ‘Help Line’ for REEs to call for help
Visits to each REE sites to provide help and monitoringVisits to each REE sites to provide help and monitoring
Keep record of all problems encountered, calls, visits, Keep record of all problems encountered, calls, visits, small survey on use of the softwaresmall survey on use of the software
DEMT Activities Planning (Con’d)DEMT Activities Planning (Con’d)
DEMT Benefits for REFDEMT Benefits for REF
REF aims to encourage entrepreneurs to REF aims to encourage entrepreneurs to establish new electricity services to establish new electricity services to remote villagesremote villagesRenewable energies promoted (SHS, Renewable energies promoted (SHS, Hydro, Biomass)Hydro, Biomass)DEMT Software will help entrepreneurs to DEMT Software will help entrepreneurs to manage businesses efficientlymanage businesses efficientlyDEMT Project partners agreed that PV DEMT Project partners agreed that PV Manager software be shared with Manager software be shared with Cambodia for the future use of potential Cambodia for the future use of potential REES under the REF.REES under the REF.
ConclusionConclusion
DEMT will contribute towards strengthening the rural DEMT will contribute towards strengthening the rural electrification action in terms of its management electrification action in terms of its management tools offered.tools offered.
DEMT approaches and Mini-grid software will provide DEMT approaches and Mini-grid software will provide to REEs to improve quality of energy service to rural to REEs to improve quality of energy service to rural population.population.
The selected REEs have gained knowledge and skills The selected REEs have gained knowledge and skills by using Mini-grid Tools. by using Mini-grid Tools.
RecommendationRecommendation
DEMT software package was corrected and DEMT software package was corrected and checked for proper operation before checked for proper operation before offering to all REEs.offering to all REEs.
Schedule setting of REE performance Schedule setting of REE performance improvement in the pilot location to improvement in the pilot location to maintain the project sustainability.maintain the project sustainability.
The concerned institutions involved in The concerned institutions involved in rural electrification should work closer with rural electrification should work closer with MIME.MIME.