Saving Lives and Supporting Development for Cambodia Removing Threats, Returning Hopes And Building A Prosperous Future DEMINING TOOL BOXES’ INTEGRATION After having examined the sources of problems in demining operations, the Cambodian Mine Action Center (CMAC), in Order to strengthen, improve work effectiveness, speed up the operations, quality and quantity of CMAC Mine Action Tools, the concept of Integration Demining Tool Box has been established, and capturing all their own standard operating procedures in- cluding the additional guidelines which are being in hand to integrate Mine Detection Dog Team (MDD) with the Brush Cutter (BC) and Mobile Platoon (MPL) or the other Mobile Teams. Demining Tool Boxes’ Integration Structure The Operational Process for Demining Tools’ Integration: One minefield manager is absolutely assigned to manage and responsible for the minefield site where is ongoing clearance when the operation is needed to integrate in that minefield, for good governance in both of command and control as well as the management with respecting to regulations, roles and high responsibilities during the operation and follow on Demining Tool Box Integration Organization Chart. Within this situation, the Brush Cutter works must deploy to start cutting vegetation in the minefield first at least for 3 days to 1 week in advance for opening lanes and creating boxes for the MDD Teams. Minefield Manag- er Brush Cutter Team Mobile Platoon Mine Detection Dog Team Other Mobile Demining Teams

DEMINING TOOL BOXES’ INTEGRATION · Tool Box Integration Organization Chart. Within this situation, the Brush Cutter works must deploy to start cutting vegetation in the minefield

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DEMINING TOOL BOXES’ INTEGRATION · Tool Box Integration Organization Chart. Within this situation, the Brush Cutter works must deploy to start cutting vegetation in the minefield

Saving Lives and Supporting Development for Cambodia

Removing Threats, Returning Hopes And Building A Prosperous Future

DEMINING TOOL BOXES’ INTEGRATION After having examined the sources of problems in demining operations, the Cambodian Mine Action Center (CMAC), in Order

to strengthen, improve work effectiveness, speed up the operations, quality and quantity of CMAC Mine Action Tools, the

concept of Integration Demining Tool Box has been established, and capturing all their own standard operating procedures in-

cluding the additional guidelines which are being in hand to integrate Mine Detection Dog Team (MDD) with the Brush

Cutter (BC) and Mobile Platoon (MPL) or the other Mobile Teams.

Demining Tool Boxes’ Integration Structure

The Operational Process for Demining Tools’ Integration: One minefield manager is absolutely assigned to manage and responsible for the minefield site where is ongoing clearance

when the operation is needed to integrate in that minefield, for good governance in both of command and control as well as

the management with respecting to regulations, roles and high responsibilities during the operation and follow on Demining

Tool Box Integration Organization Chart.

Within this situation, the Brush Cutter works must deploy to start cutting vegetation in the minefield first at least for 3 days

to 1 week in advance for opening lanes and creating boxes for the MDD Teams.

Minefield Manag-

er

Brush Cutter Team

Mobile Platoon

Mine Detection Dog Team

Other Mobile Demining Teams

Page 2: DEMINING TOOL BOXES’ INTEGRATION · Tool Box Integration Organization Chart. Within this situation, the Brush Cutter works must deploy to start cutting vegetation in the minefield

CMAC Building , Duong Ngeap Street, Phoum Kork Chombak, Sangkat Chamchao GaKarsuIm:ak;/ vifIDYg egob/ PUmieKakcMbk;/ sgáat;ecamecA/ x½NÐdegáa

Khan Dongkor, Phnom Penh, Cambodia, P.O Box 116, email: [email protected] raCFanIPñMeBj km<úCa/ RbGb;sMbuRt 116 email: [email protected]

Tel: 855-23-995437/8/9, Fax: 855-23-360096, 855-23-367096 TUrs½BÞ³855-23-995437¼8¼9/ TUrsar³855-23-360096/ 855-23 367096 www.cmac.gov.kh www.cmac.gov.kh

or Mobile Platoons, and then the MDD or MPL will be deployed for demining operation after cutting vegetation.

The Brush Cutters, MDD and other platoons must apply the same procedure.

The Expected Output from Demining Tools’ Integration: 1 BC: Landmine clearance at least 5-6 hectares /month integration with MPL or MDD.

1 MPL: Landmine clearance at least 3.5 – 5.5 hectares per month integration with BC.

1 MDD Team: Landmine clearance at least 3 – 5 hectares per month integration with BC.

Mine Field Criteria for Demining Tools’ Integration: - Minefields with heavy-long grasses, heavy bushes, thick crowed bamboo clump and thick jungle, Hard soil,

rocky soil, lateritic soil, un-flooded land, sloppy ground, un-sink soil and/or area where has no the big

rocks.

- High or low density of landmines and all types of UXOs (no limitation),

The advantage from Demining Tools’ Integration: Possible to conduct landmine operation for all minefield criteria’s.

Increasing operational speed, higher productivities, save time and cost reduction.