Exhibit 3
Deliverable Document Review Plan
New York State
Office for People With Developmental Disabilities
Division of Service Delivery
Electronic Health Record Project
March, 2017
OPWDD EHR 2017 Deliverable Document
Review Plan
Page i
Table Of Contents
1. INTRODUCTION ......................................................................................................................................... 3
1.1 DOCUMENT PURPOSE ....................................................................................................................................... 3
2. DELIVERABLE QUALITY ACTIVITIES ................................................................................................ 3
2.1 EVALUATION OF PROJECT DELIVERABLE DOCUMENTATION ............................................................................ 3 2.2 SUBMISSION AND EVALUATION PROCESS ........................................................................................................ 3
3. DELIVERABLE EVALUATION CRITERIA ........................................................................................... 7
3.1 GENERAL DELIVERABLE EVALUATION CRITERIA (GDE) ................................................................................. 7 3.2 BACKUP AND DISASTER RECOVERY PLAN EVALUATION CRITERIA (DCA) ..................................................... 8 3.3 DATA CONVERSION AUDITING EVALUATION CRITERIA (DCA) ....................................................................... 9 3.4 DATA MIGRATION PLAN EVALUATION CRITERIA (DMP) ................................................................................ 9 3.5 DESIGN EVALUATION CRITERIA (DES) .......................................................................................................... 10 3.6 HOSTING PLAN EVALUATION CRITERIA (HSE) .............................................................................................. 12 3.7 IMPLEMENTATION PLAN EVALUATION CRITERIA (IPE) ................................................................................. 12 3.8 PROJECT PLAN EVALUATION CRITERIA (PPE) ............................................................................................... 13 3.9 RELEASE MANAGEMENT PLANS EVALUATION CRITERIA (RPE) .................................................................... 16 3.10 REQUIREMENTS MANAGEMENT PLAN EVALUATION CRITERIA (RMP) .......................................................... 17 3.11 REQUIREMENTS EVALUATION CRITERIA (RE) ............................................................................................... 17 3.12 REQUIREMENTS TRACEABILITY MATRIX EVALUATION CRITERIA (RTM) ..................................................... 18 3.13 SITE AND SYSTEM SECURITY PLAN EVALUATION CRITERIA (SSSP) .............................................................. 18 3.14 SYSTEM VALIDATION EVALUATION CRITERIA (SVE) .................................................................................... 19 3.15 TEST AUDITING (TA) ..................................................................................................................................... 19 3.16 TEST PLAN EVALUATION CRITERIA (TPE) ..................................................................................................... 20 3.17 TEST STRATEGY EVALUATION CRITERIA (TSTR) .......................................................................................... 20 3.18 TEST CASE EVALUATION CRITERIA (TCSE) .................................................................................................. 20 3.19 TEST SCRIPT EVALUATION CRITERIA (TSE) .................................................................................................. 21 3.20 TEST RESULTS EVALUATION CRITERIA (TRE) ............................................................................................... 22 3.21 TRAINING PLAN EVALUATION CRITERIA (TRPE) .......................................................................................... 22
APPENDIX 1 EXECUTIVE SUMMARY ............................................................................................................... 25
APPENDIX 1 DETAILED FINDINGS ................................................................................................................... 25
APPENDIX 1 SATISFIED FINDINGS ................................................................................................................... 26
Table Of Tables
Table 1, EHR Deliverable Document Expectations and Evaluation Criteria ................................................................ 4 Table 2, General Deliverable Evaluation Criteria .......................................................................................................... 7 Table 3, Backup and Disaster Recovery Plan Evaluation Criteria ................................................................................. 8 Table 4, Data Conversion Auditing Evaluation Criteria ................................................................................................ 9 Table 5, Data Migration Plan Evaluation Criteria ......................................................................................................... 9 Table 6, Design Evaluation Criteria ............................................................................................................................ 10 Table 7, Hosting Plan Evaluation Criteria ................................................................................................................... 12 Table 8, Implementation Plan Evaluation Criteria....................................................................................................... 12 Table 9, Project Plan Evaluation Criteria .................................................................................................................... 13 Table 10, Release Management Plans Evaluation Criteria .......................................................................................... 16 Table 11, Requirements Management Plan Evaluation Criteria .................................................................................. 17 Table 12, Requirements Evaluation Criteria ................................................................................................................ 17 Table 13, Requirements Traceability Matrix Evaluation Criteria ................................................................................ 18 Table 14, Site and System Security Plan Evaluation Criteria ...................................................................................... 18 Table 15, System Validation Evaluation Criteria ........................................................................................................ 19
OPWDD Deliverable Document
Review Plan
Table 16, Test Auditing Evaluation Criteria ................................................................................................................ 19 Table 17, Test Plan Evaluation Criteria ....................................................................................................................... 20 Table 18, Test Strategy Evaluation Criteria ................................................................................................................. 20 Table 19, Test Case Evaluation Criteria ...................................................................................................................... 20 Table 20, Test Script Evaluation Criteria .................................................................................................................... 21 Table 21, Test Results Evaluation Criteria .................................................................................................................. 22 Table 22, Training Plan Evaluation Criteria ................................................................................................................ 22
OPWDD EHR Deliverable Review Report
3
1. INTRODUCTION
1.1 Document Purpose
This document describes the deliverable documentation review process and evaluation criteria that
the OPWDD will utilize when evaluating the selected Bidder deliverable documentation for the
Office for People with Developmental Disabilities (OPWDD) Electronic Health Record (EHR)
project.
2. DELIVERABLE QUALITY ACTIVITIES
2.1 Evaluation of Project Deliverable Documentation
The evaluation of project deliverable documentation monitors the project deliverables throughout
development to verify that the documents are of acceptable quality and are complete and correct.
Clear and sufficient documentation of all project activities is necessary for many reasons but
mainly to justify payment and to ensure all of the features listed as within the scope of the project
in the established contract are fully implemented and operate successfully. Table 1, EHR
Deliverable Document Expectations and Evaluation Criteria identifies:
The major project deliverables and associated documentation that will be evaluated for
satisfactory quality level.
The quality standards, expectations, and evaluation criteria established for the project
deliverable. Included are any organizational standards that need to be followed.
Specific Evaluation Criteria are listed in Section 3, DELIVERABLE EVALUATION
CRITERIA
2.2 Submission and Evaluation Process
Outlined below is the process that will be followed to review and accept required deliverable
documents.
1. The deliverable document review process starts when the selected Bidder submits a
Deliverable Document for review. We strongly encourage the selected Bidder to submit
early drafts or document outlines to the OPWDD for informal review prior to completing
the formal submission. The OPWDD will then provide informal comments on the
deliverable document back to the selected Bidder. The intent is to ensure that all
stakeholder expectations are aligned as to the purpose and content of the document to be
submitted, before effort is expended that takes the document development in an unexpected
direction. The informal review process may consist of one-on-one phone calls and/or larger
group discussion. Any unresolved issues will be escalated as defined in the communication
plan. This informal submission/review process can have as many cycles as necessary in
order to prepare the deliverable document for fomal submission.
2. Once the document is ready for formal review, the selected Bidder will formaly submit the
deliverable document and the Deliverable Acceptance Form by uploading it to the OPWDD
EHR Project Sharepoint site and notifying the project team via email. The Deliverable
OPWDD EHR Deliverable Review Report
4
Acceptance Form is available as Appendix G - Deliverable Acceptance Form available on
the EHR RFP 2017 web site.
3. The OPWDD will perform an initial document review, determine if the document is
technically and structurally complete, and then notify reviewers that the deliverable
document is ready for their subject matter experts detail review. The OPWDD will collect
and document any and all findings in a Deliverable Document Review Report (see
Attachment 1), place it into the OPWDD EHR Project Sharepoint site, and notify the
project team via email. The Deliverable Acceptance Form will also be updated to indicate
the level of acceptance (typically Unacceptable, Conditionally Acceptable, or Approved)
and placed on the OPWDD EHR Project Sharepoint site.
4. If the level of acceptance for the document is indicated as being Unacceptable or
Conditionally Acceptable, the selected Bidder will need to satisfactorily address all
findings outlined in the Deliverable Document Review Report and resubmit within 5
business days for review, following the process described above. If, after three (3) review
cycles, there are remaining unresolved findings and the document remains in an
Unacceptable or Conditionally Acceptable status, the issue will be raised to the OPWDD
Project Executive Leadership for determination on how to proceed.
Table 1, EHR Deliverable Document Expectations and Evaluation Criteria
Project
Deliverable Description Evaluation Criteria
Deliverable
Expectation
Documents
(DED)
The DED (one for each deliverable document)
outlines the expectations for each deliverable
document identified herein.
• General Deliverable Evaluation Criteria
Initial Startup
Schedule
Provided within 24 hours of contract signing
and details all activities to be undertaken
during the Project Initiation and Planning
phase.
• General Deliverable Evaluation Criteria
Project
Implementation
Plan
A narrative work plan clearly describing the
approach to this project, state specifically how
deliverables, including the optional financial
and billing modules, will be achieved by the
Bidder.
• General Deliverable Evaluation Criteria
• Project Plan Evaluation Criteria
Detailed Project
Schedule
A Schedule of major activities and milestones. • General Deliverable Evaluation Criteria
Weekly Status
Report Format
Draft outline of the weekly status report. • General Deliverable Evaluation Criteria
Project
Management Plan
A comprehensive set of plans to manage the
project from inception until project
termination.
• General Deliverable Evaluation Criteria
• Project Plan Evaluation Criteria
• Requirements Management Plan
Evaluation Criteria
• Requirements Traceability Matrix
Evaluation CriteriaE
Detailed MS
Project Plan and
Schedule
MS Project Plan with a WBS of level 5. • General Deliverable Evaluation Criteria
• Project Plan Evaluation Criteria
Communication
Plan
Plan for managing communications, including
a project org chart.
• General Deliverable Evaluation Criteria
• Project Plan Evaluation Criteria
OPWDD EHR Deliverable Review Report
5
Project
Deliverable Description Evaluation Criteria
Risk Management
Plan
Vendor plan for managing risk. • General Deliverable Evaluation Criteria
• Project Plan Evaluation Criteria
Issue
Management Plan
Vendor plan for managing issues. • General Deliverable Evaluation Criteria
• Project Plan Evaluation Criteria
Action Item
Management Plan
Vendor plan for managing action items. • General Deliverable Evaluation Criteria
• Project Plan Evaluation Criteria
Requirements
Management Plan
Vendor plan for managing requirements. • General Deliverable Evaluation Criteria
• Project Plan Evaluation Criteria
Change
Management Plan
Vendor plan for managing change requests,. • General Deliverable Evaluation Criteria
• Project Plan Evaluation Criteria
Quality
Management Plan
Vendor plan for managing and maintaining
quality.
• General Deliverable Evaluation Criteria
• Project Plan Evaluation Criteria
Staffing Plan Detailed vendor staffing plan. • General Deliverable Evaluation Criteria
• Project Plan Evaluation Criteria
Requirement
Traceability
Matrix (RTM)
Matrix for tracing requirements from the RFP
through design and final UAT testing.
• General Deliverable Evaluation Criteria
• Requirements Traceability Matrix
Evaluation Criteria
Gap Analysis Analysis of the requirements not implemented
in the core COTS product, which will require
further development activities.
• General Deliverable Evaluation Criteria
Design
Specification
Document
Defines the functional implementation of each
requirement.
• General Deliverable Evaluation Criteria
• Design Evaluation Criteria
Technical
Specification
Document
Defines the end to end system technical
architecture and specifications.
• General Deliverable Evaluation Criteria
Security Plan The Vendor’s comprehensive plan for meeting
all project security requirements.
• General Deliverable Evaluation Criteria
• Site and System Security Plan Evaluation
Criteria
• Backup and Disaster Plan Evaluation
Criteria
System Security
Consensus
Document
Contains all information relevant to the
system’s Certification & Accreditation.
Defines and consolidates the system’s security
architecture, security policies, risk assessments,
and security tests.
• General Deliverable Evaluation Criteria
• Site and System Security Plan Evaluation
Criteria
• Backup and Disaster Plan Evaluation
Criteria
Disaster Recovery
Plan
Plan to restore operability and protect data in
the event of extended interruption of services.
• General Deliverable Evaluation Criteria
• Site and System Security Plan Evaluation
Criteria
• Backup and Disaster Plan Evaluation
Criteria
Data Migration
Plan
Describes the detailed strategies and
approaches for converting, migrating, and
validating data.
• General Deliverable Evaluation Criteria
• Data Migration Plan Evaluation Criteria
Data Migration
Reports
(Exception
Reports)
Report on errors and exceptions in the data
migration process
• General Deliverable Evaluation Criteria
• Data Migration Plan Evaluation Criteria
Data Mapping Comprehensive mapping of data elements
between the existing and to-be systems.
• General Deliverable Evaluation Criteria
• Data Migration Plan Evaluation Criteria
OPWDD EHR Deliverable Review Report
6
Project
Deliverable Description Evaluation Criteria
Data Dictionary Describes the contents, format, and structure of
the new database, and the relationship between
its elements.
• General Deliverable Evaluation Criteria
• Data Migration Plan Evaluation Criteria
Test Strategy Vendor strategy for all phases of system
testing.
• General Deliverable Evaluation Criteria
• Test Strategy Evaluation Criteria
Test Plan Vendor plan for implementing the test strategy. • General Deliverable Evaluation Criteria
• Test Plan Evaluation Criteria
Test Cases The set of conditions, variables, assumptions,
criteria, and expected results for system testing
of all functional requirements.
• General Deliverable Evaluation Criteria
• Test Case Evaluation Criteria
Test Scripts Procedures to be followed in order to perform
specific requirement tests.
• General Deliverable Evaluation Criteria
• Test Script Evaluation Criteria
Test Results Outcomes for each test script performed. • General Deliverable Evaluation Criteria
• Test Results Evaluation Criteria
Bug
Fix/Remediation
Plan
Vendor plan for managing exceptions
encountered during testing.
• General Deliverable Evaluation Criteria
• Test Results Evaluation Criteria
Release
Management Plan
Vendor plan for managing subsequent software
upgrades and release notes.
• General Deliverable Evaluation Criteria
• Release Management Plan Evaluation
Criteria
Help Desk Plan Detailed vendor plan for implementing the
Help Desk requirements.
• General Deliverable Evaluation Criteria
Training Plan Detailed vendor plan for implementing the
Training requirements.
• General Deliverable Evaluation Criteria
• Training Plan Evaluation Criteria
Training Schedule Detailed schedule for implementing the
Training Plan.
• General Deliverable Evaluation Criteria
• Training Plan Evaluation Criteria
Training Materials User Guides, Training Videos, Training
Guides, etc.
• General Deliverable Evaluation Criteria
• Training Plan Evaluation Criteria
Security
documentation
and artifacts as
requested
Documentation and artifacts demonstrating
compliance with security requirements,
including HIPAA, HITECH, FedRAMP,
MARS-E, and compliance with NYS
Information Security Policies and Standards.
• General Deliverable Evaluation Criteria
• Site and System Security Plan Evaluation
Criteria
• Backup and Disaster Plan Evaluation
Criteria
OPWDD EHR Deliverable Review Report
7
3. DELIVERABLE EVALUATION CRITERIA
3.1 General Deliverable Evaluation Criteria (GDE)
Table 2, General Deliverable Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
GDE-1 Does the deliverable/document conform to the appropriate, applicable, and/or required
deliverable/documentation standards and required or recommended deliverable/document
formats, including:
A cover page that includes:
o Document Name
o Document Version
o Document Date
o Vendor Name
o Governing deliverable requirements addressed within
A document revision history
A Table of Contents
Page numbering on each page that includes the total number of pages in the document.
Reference to applicable source documents (contract, RFP, other project deliverables, etc.)
For multiple files, does the main document list the component files and their purpose
GDE-2 Is the deliverable/document internally consistent? Criteria for evaluating internal consistency
include:
1. Are all statements compatible?
2. Is the document style consistent?
3. Does each given term have the same meaning throughout?
4. Are given item(s) or concept(s) referred to by the same name or description throughout?
5. Is the level of detail and presentation style the same throughout?
GDE-3 Is the document consistent with external documents that it references? Criteria for evaluating
external consistency include:
1. Are all statements compatible?
2. Is the document style consistent across documents?
3. Does each given term have the same meaning across documents?
4. Are given item(s) or concept(s) referred to by the same name or description across
documents?
5. Is the level of detail and presentation style the same across documents, taking into account
inherent differences in the document types?
GDE-4 Is the document understandable? Criteria for evaluating understandability include:
1. Does the document follow generally accepted rules of spelling, grammar, capitalization,
punctuation, symbols, and notation?
2. Are all non-standard terms, phrases, acronyms, and abbreviations defined?
3. Is the document level of complexity appropriate for the intended audience?
4. Is the material being presented such that it can be interpreted in only one way?
OPWDD EHR Deliverable Review Report
8
Criteria ID Deliverable Evaluation Criteria
GDE-5 Is the document technically adequate? Criteria for evaluating the technical adequacy include:
1. Is the overall approach sound?
2. Does the document violate known facts or principles?
3. Is the technical approach consistent with approaches or best practices known to be
successful on other similar projects?
4. Is the technical approach well researched or based on proven prototypes?
5. Does the document appear well thought out, not thrown together?
6. Does the technical approach make sense both technically and practically?
GDE-6 Is the document complete?
At every stage of document development, all required sections and section headers should be
present. Completeness of paragraph content depends upon when the required information is, or
should be, known. Criteria that may apply, depending on the document, include:
1. Is the document delivery schedule identified? (Pilot, Draft, Release 1, etc.)
2. Is the intent and purpose of the document identified?
3. Is the appropriate document audience identified?
4. Are all appropriate sections of the document present for the delivery and addressed in
adequate detail?
5. Are all required sections and section headers present, regardless of delivery timing?
6. Is an acronym list and glossary included and complete?
7. Does the document indicate the appropriate reviews and approvals?
GDE-7 Does the document contain appropriate content for the intended audience?
GDE-8 Is the document in alignment with established project management and deliverable objectives?
GDE-9 Is the document traceable to indicated documents?
1. Is the deliverable in agreement with any predecessor documents?
2. Does the document fully implement the applicable stipulations of a predecessor document?
3. All material in a subsequent or lower-level document has its basis in the predecessor
document, that is, no untraceable material has been introduced?
GDE-10 Is the document internally traceable?
1. Are all of the sections of the document in agreement with other sections?
2. Does each referenced section contain the information or otherwise fully implement the
applicable stipulations indicated in the reference?
3. Is all of the material in lower-level or detailed sections of the document based on the
predecessor sections, that is, no untraceable material have been introduced?
GDE-11 Is the deliverable/document on schedule?
1. Does the delivery of the deliverable/document conform to the current project schedule?
2. If the delivery of the deliverable document does not conform to the current project
schedule, and the delivery is late, has a valid reason been provided?
3. If the delivery of the deliverable document does not conform to the current project
schedule, and the delivery is late, does the late delivery indicate a risk to the overall project
schedule and deadlines?
3.2 Backup and Disaster Recovery Plan Evaluation Criteria (DCA)
Table 3, Backup and Disaster Recovery Plan Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
BDR-01 Does the plan and procedure provide existing or the to be developed disaster recovery strategies
for the solution?
OPWDD EHR Deliverable Review Report
9
Criteria ID Deliverable Evaluation Criteria
BDR-02 Do the backup and recovery strategies identify the following:
The location of the solution?
Identify regularly scheduled backups of the solution from all devices? Frequency?
Identify that backups are stored with the same level of security as the original data.
Provide an application recovery time objective for each component of the solution.
BDR-03 Does the plan provide existing or the to be developed data backup and recovery strategies?
BDR-04 Do the data backup and recovery strategies identify the following:
The location of the solution data?
Identify regularly scheduled backups of the solution data from all devices?
Identify that backups are stored with the same level of security as the original data.
Provide a data recovery point objective for data loss.
3.3 Data Conversion Auditing Evaluation Criteria (DCA)
Table 4, Data Conversion Auditing Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
DCA-01 Did the migration result in the expected number of new objects as a result of the automated or
manual migration processes?
DCA-02 Have all data migration errors been resolved?
DCA-03 Has a random inspection of the migrated data been performed that resulted in no identified
migration data errors?
3.4 Data Migration Plan Evaluation Criteria (DMP)
Table 5, Data Migration Plan Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
DMP-01 Does the data migration plan identify the scope of the data migration?
DMP-02 Does the data migration plan identify the data migration requirements?
DMP-03 Does the data migration plan identify the data sources that will need to be migrated and the data
structure for each?
DMP-04 Does the data migration plan identify the one time data migration efforts and the data migration
efforts that need to be repeated periodically?
DMP-05 For the periodic data migrations, does the plan identify how the data migration rules/logic/code
will be mainatained?
DMP-06 Does the data migration plan identify any required data transformations?
DMP-07 Does the data migration plan identify if it is necessary to have the source and the destination
databases running simultaneously?
DMP-08 Does the data migration plan identify any connectivity issues that will be involved in migrating
the data?
DMP-09 Does the data migration plan identify any downtime that will be required during the migration?
DMP-10 Does the data migration plan identify any additional hardware or software required to perform the
migration?
DMP-11 Does the data migration plan identify the data migration testing and acceptance criteria?
DMP-12 Does the data migration plan identify the capture and migration process?
DMP-13 Does the data migration plan categorize the total number of database objects, and identify the
number of objects that can be converted and migrated automatically and those that will need to be
migrated manually?
OPWDD EHR Deliverable Review Report
10
Criteria ID Deliverable Evaluation Criteria
DMP-14 Does the data migration plan identify how data migration errors will be handled for:
Data that did not migrate successfully
Stored procedures, views, and triggers that did not parse
Syntax that requires manual intervention
Database objects that were not created successfully
DMP-15 Does the data migration plan identify the approach/testing for verifying the resultant migrated
data’s correctness?
DMP-16 Does the data migration plan identify how long the data migration will take and how long it will
take to rectify errors.
DMP-17 Does the data migration plan identify a recovery plan with recovery options for each stage of the
migration?
DMP-18 Does the data migration plan identify any training requirements that will be needed?
DMP-19 Does the data migration plan identify any migration deliverables?
3.5 Design Evaluation Criteria (DES)
Table 6, Design Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
DES-01 Are all functional requirements allocated to a section of the design?
DES-02 Are all of the future state business process workflows implemented in the design?
DES-03 Are all of the approved Fit Gap recommendations implemented in the design?
DES-04 Are the designs consistent?
DES-05 Are the designs complete?
DES-06 Do the designs properly address the development standards?
DES-07 Does the design specification provide clear design objectives and goals for project?
DES-08 Does the design specification provide well established design criteria and stated product design
specifications?
DES-09 Does the design specification present alternative designs that were considered?
DES-10 Does the design specification document use of established design methodologies?
DES-11 Does the design specification adequately describe all of the key features?
DES-12 Does the design specification clearly and accurately describe any design constraints?
DES-13 Does the design specification identify and describe analysis cases, including rationale for each,
including any design constraints
DES-14 Is the design presented in the document feasible?
1. Can the design be implemented given the state of the art, schedule and resource constraints,
available tools and techniques, and other factors affecting the project?
2. Can the design be implemented given dependencies on other project activities?
DES-15 Does the design indicate use of appropriate requirement, design, or coding techniques?
DES-16 Does the design indicate the appropriate level of detail?
Architecture Evaluation
DES-21 Availability: Is the system availability discussed? Does the design address how the system will
satisfy the required up time? This can be addressed in terms of:
Failover
Transaction Manager
Stateless Design
DES-22 Conceptual Integrity: Is the system conceptual integrity discussed? Is there an underlying
theme or vision that unifies the design of the system at all levels.
OPWDD EHR Deliverable Review Report
11
Criteria ID Deliverable Evaluation Criteria
DES-23 Debug-Ability /Monitoring: Is the system debug-ability /monitoring discussed? Will the system
provide easy and efficient debugging, registration of abnormal behavior, and real-time
monitoring?
DES-24 Ease of Administration: Is the ease of administration discussed? This discussion can include the
infrastructure, tools, and staff of administrators and technicians needed to maintain the health of
the application.
DES-25 Ease of Deployment: Is the ease of deployment discussed?
DES-26 Efficiency: Is the system efficiency discussed? Does the description discuss the use of the
resources available for execution of software, and how this impacts response times, throughput
and storage consumption?
DES-27 Extensibility: Is the system extensibility discussed. Will the system allow new feature
implementation/replacement of components with improved versions and the removal of unwanted
or unnecessary features or components?
DES-28 Functionality: Is the system functionality discussed: Does the system seem to enable users to
perform the work for which it was intended?
DES-29 Interoperability: Is the system interoperability discussed? This can include discussion of
interaction with other sub-subsystem, or well defined access to externally-visible functionality
and data structures, or interactions with other run-time environments.
DES-30 Maintainability: Is the system maintainability discussed? This can include a discussion on
problem fixing, repairing a software system after errors occur, etc.
DES-31 Modifiability: Is the system modifiability discussed? Will the system provide the ability to make
changes to the system quickly and cost effectively? This can be addressed in terms of:
Client-server (separation of concerns) – provide a collection of services from a central
process and allow other processes to use the services.
Independence of interface from implementation – allow substitution of different
implementations for the same functionality.
Separation – separate data and functions?
Encoding – meta-data and language interpreters that provide a mechanism for interpreting
data and simplify modifications to parameters of the data.
Run-time discovery – no hard-coded connection strings, queue names, etc.
DES-32 Performance: Is the system performance discussed? Does the time required to respond to stimuli
(events) or the number of events processed in an interval of time satisfy the system requirements?
This can be discussed in terms of:
Connection pooling
Load balancing
Distributed processing
Caching
Transaction Concurrency
Replication of data
DES-33 Portability: Is the system portability discussed? Does the system have the ability to run under
different computing environments?
DES-34 Reliability: Is system reliability addressed, including identifying how the system will keep
operating over time in the context of application and system errors and in situations of unexpected
or incorrect usage (to perform in a predictable manner)?
DES-35 Scalability: Is the system scalability discussed? Does the system support continuous growth to
meet user demand and business complexity?
OPWDD EHR Deliverable Review Report
12
Criteria ID Deliverable Evaluation Criteria
DES-36 Security: Is the system security architecture discussed? Does the architecture provide the ability
to resist unauthorized attempts at usage and denial of service? This can be addressed in terms of:
Authorization
Authentication
Auditing
Integrity
Confidentiality
Denial of Service
Data isolation
DES-37 Testability: Is the system testability discussed? How well can the system be tested?
DES-38 Usability: Is the system usability discussed? This should include a discussion on how easy is it to
use.
3.6 Hosting Plan Evaluation Criteria (HSE)
Table 7, Hosting Plan Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
HSE-1 Does the hosting plan describe how the hosting services that will be provided will satisfy the
Hosting Services specified in the OPWDD EHR RFP.
HSE-2 Does the hosting plan describe how the operational services that will be provided will satisfy the
Hosting Services specified in the OPWDD EHR RFP.
HSE-3 Does the hosting plan describe how the maintenance services that will be provided will satisfy the
Hosting Services specified in the OPWDD EHR RFP.
HSE-4 Does the Monthly Service Level Report indicate adequate and appropriate:
Response Time statistics?
Scheduled Maintenance Occurrences?
System Utilization measures?
Service Downtimes?
Downtime Detailed Reports?
HSE-5 Does the hosting plan describe the backup and disaster recovery processes?
HSE-6 Does the hosting plan describe the site security?
HSE-7 Does the hosting plan describe the system security?
3.7 Implementation Plan Evaluation Criteria (IPE) Bidders are required to provide a narrative work plan clearly describing their approach to this project. The Bidder
must state specifically how deliverables, including the optional financial and billing modules, will be achieved by
the Bidder. This work plan should address:
Table 8, Implementation Plan Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
IPE-1 The Bidder’s approach to managing the system implementation and integration work. It is
expected that the successful Bidder will assign an overall project manager for this engagement.
IPE-2 A description of the requirements management process that the Bidder plans to use during
system implementation.
IPE-3 The approach to risk management and what the Bidder considers to be the key risks to the
success of this implementation and how these risks should be addressed.
IPE-4 A description of any proprietary tools, techniques or technologies that the bidding firm uses for
such implementation work.
OPWDD EHR Deliverable Review Report
13
Criteria ID Deliverable Evaluation Criteria
IPE-5 A description of the Bidder’s staffing level that is anticipated to accomplish the work including
the level of onsite presence.
IPE-6 A description on the use of subcontractors if applicable.
IPE-7 A listing of roles the Bidder expects from State personnel to be involved in the implementation
and description on how these State personnel will be incorporated into the project team.
IPE-8 An outline of the project organization structure which depicts the key individuals and areas of
responsibility.
IPE-9 A plan on how all the parties involved in the implementation and integration effort will be
coordinated.
IPE-10 The timeframe after contract signing that the Bidders’ resources can begin the project and the
implementation start.
IPE-11 The timeline for project tasks, milestones and deliverables that will allow for system rollout in
the timeframe specified by OPWDD.
IPE-12 A. A description of your Project development life cycle and milestones.
IPE-13 B. The work plan for managing the system implementation and integration work.
IPE-14 C. A description of the requirements management process that the Bidder plans to use
during the implementation of the EHR system.
IPE-15 D. A plan for converting data into the Bidder’s EHR System to populate the individual’s
care coordination record as outlined in section 3 of this RFP.
IPE-16 E. The approach to risk management and what you consider to be the key risks to the
success of this implementation and how these risks will be addressed and managed.
IPE-17 F. A method for status reporting and periodic status meetings.
IPE-18 G. The quality assurance measures and the plan that will be utilized to monitor the project
and address issues, both foreseen and unforeseen.
IPE-19 H. A description of all work anticipated in implementing the scope of services, including a
time frame for implementing project components.
IPE-20 I. A project plan identifying activities required for implementation, key milestones and
the implementation timeframe.
IPE-21 J. A description of any proprietary tools, techniques or technologies that the Bidder’s firm
uses for such implementation work.
IPE-22 K A project organization structure and a plan on how all the parties involved in the
implementation and integration effort will be coordinated. This structure and plan should
include:
A description of the Bidder’s staffing level that is anticipated to accomplish the work including
any onsite requirements.
A description on the Bidder’s use of subcontractors if applicable.
A listing of roles the Bidder would expect from State personnel to be involved in the
implementation and description on how these personnel will be incorporated into the project
team.
L. For each project component, identify the title of staff that will be involved and an estimate of
staff time to complete the component.
3.8 Project Plan Evaluation Criteria (PPE)
Table 9, Project Plan Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
PPE-1 Does the Project Plan identify a Work Breakdown Structure (WBS), or where it is located?
OPWDD EHR Deliverable Review Report
14
Criteria ID Deliverable Evaluation Criteria
PPE-2 Does the Project Plan identify a Project Schedule, or where it is located?
PPE-3 Does the Project Plan identify a Quality Management Plan, or where it is located?
PPE-4 Does the Project Plan identify a Risk Management Plan, or where it is located?
PPE-5 Does the Project Plan identify a Change Management Plan, or where it is located?
PPE-6 Does the Project Plan identify an Acceptance Management Plan, or where it is located?
PPE-7 Does the Project Plan identify an Issue Management and Escalation Plan, or where it is located?
PPE-8 Does the Project Plan identify a Communication Plan, or where it is located?
PPE-9 Does the Project Plan identify an Implementation/Transition (including migration plans) Plan, or
where it is located?
PPE-10 Does the Project Plan identify a Training Plan, or where it is located?
Work Breakdown Structure
PPE-21 Is the WBS broken down starting at the top level tasks?
PPE-22 Is the WBS managed using standard project management software?
PPE-23 Does the WBS identify all tasks on the project?
PPE-24 Does the WBS present meaningful project information at the summary task level?
PPE-25 Do the work packages add up to the summary task?
PPE-26 Is each summary task and work package named for the product that is produced?
PPE-27 Does each summary task and work package produce a product?
PPE-28 Are identified tasks manageable? (greater than 8 hours and less than 80 hours is recommended)
PPE-29 Are the project management activities included in the WBS?
Project Schedule
PPE-41 Is the Project Schedule broken down starting at the top level tasks?
PPE-42 Is the Project Schedule managed using standard project management software?
PPE-43 Does the Project Schedule identify all tasks on the project?
PPE-44 Does the Project Schedule present meaningful project information at the summary task level?
PPE-45 Do the work packages add up to the summary task?
PPE-46 Is each summary task and work package named for the product that is produced?
PPE-47 Does each summary task and work package produce a product?
PPE-48 Are identified tasks manageable? (greater than 8 hours and less than 80 hours is recommended)
PPE-49 Are the project management activities included in the Project Schedule?
PPE-50 Is the Project Schedule maintained and updated during the project at agreed to intervals?
Quality Management Plan
PPE-61 Does the Quality Management Plan identify the project quality management process?
PPE-62 Does the Quality Management Plan identify names and titles of the persons who will have
oversight responsibilities for quality reviews?
PPE-63 Does the identification of the persons with oversight responsibilities, together with the project
organizational chart, provide reasonable assurance that the quality review process will be
objective, unbiased, and accurate?
PPE-64 Does the Quality Management Plan describe the general process for the selection of quality
reviewers?
PPE-65 Does the Quality Management Plan describe the general process for the selection of reviewers
provide reasonable assurance that objective and unbiased individuals will be select to complete
the reviews?
PPE-66 Does the Quality Management Plan describe how the quality reviews will be planned in order to
review as much of the project material as is reasonable?
OPWDD EHR Deliverable Review Report
15
Criteria ID Deliverable Evaluation Criteria
PPE-67 Does the Quality Management Plan describe how the quality reviews will be held and what
project material will be reviewed?
PPE-68 Does the Quality Management Plan define any standards that the project material will be
reviewed against?
PPE-69 Does the Quality Management Plan describe the general process for maintaining project
information during the review process?
PPE-70 Does the Quality Management Plan process for maintaining project information provide
reasonable assurance that the integrity of the information will be maintained throughout the
project?
PPE-71 Does the Quality Management Plan describe how documents, results, analyses, and all other
materials related to quality reviews will be stored and maintained, including privacy and
program integrity?
PPE-72 Does the Quality Management Plan describe how quality review information will be reported?
Risk Management Plan
RISK-01 Does the Risk Management Plan identify how the risk management activities will be conducted
for the project?
RISK-02 Does the Risk Management Plan identify how risks will be identified and what characteristics
will be documented?
RISK-03 Does the Risk Management Plan identify how risks will be prioritized for futher analysis or
action by assessing and combining their probability of occurrence and impact? (Qualitative Risk
Aanalysis)
RISK-04 Does the Risk Management Plan identify how risks will be numerically analyzed to determine
the effect of identified risks on overall project objectives? (Quantitative Risk Analysis)
RISK-05 Does the Risk Management Plan identify the process of developing options and actions to
enhance opportunities and reduce threats to project objectives?
RISK-06 Does the Risk Management Plan identify how risks will be controlled, including implementing
risk response plans, tracking of identified risks, monitoring residual risks, identifying new risks,
and evaluating the risk process throughout the project.
RISK-07 Does the Risk Management Plan identify the project risk management process?
RISK-08 Does the Risk Management Plan identify the risk identification process?
RISK-09 Does the Risk Management Plan identify how risks will be evaluated?
RISK-10 Does the Risk Management Plan identify how the likelihood of the risks will be estimated?
RISK-11 Does the Risk Management Plan identify how expected severity of impact from the risks will be
determined?
RISK-12 Does the Risk Management Plan identify how a mitigation strategy that minimizes the likelihood
and/or severity of the risks will be determined?
RISK-13 Does the Risk Management Plan identify how risks will be managed? Will a risk register be
utilized?
Change Management Plan
PPE-101 Does the Change Management Plan identify the project change management process?
PPE-102 Does the Change Management Plan identify a change process that ensures that, if a change is
made, it is done in the most efficient way possible, following the established procedures and
ensuring the quality and continuity of the system?
PPE-103 Does the Change Management Plan identify how changes will be identified?
PPE-104 Does the Change Management Plan identify how changes will be properly recorded, classified
and documented?
PPE-105 Does the Change Management Plan identify the change review and approval process?
OPWDD EHR Deliverable Review Report
16
Criteria ID Deliverable Evaluation Criteria
PPE-106 Does the Change Management Plan identify how changes will be planned, implemented and
tested?
PPE-107 Does the Change Management Plan identify mitigation/backout plans for all changes?
PPE-108 Does the Change Management Plan identify emergency change procedures?
Acceptance Management Plan
PPE-121 Does the Acceptance Management Plan identify the project acceptance management process?
PPE-122 Does the Acceptance Management Plan identify the user acceptance testing roles and
responsibilities?
PPE-123 Does the Acceptance Management Plan identify the acceptance testing strategy?
PPE-124 Does the Acceptance Management Plan identify the acceptance testing scenarios?
PPE-125 Does the Acceptance Management Plan identify the assumptions, constraints, and dependencies?
PPE-126 Does the Acceptance Management Plan identify how acceptance testing issues will be recorded,
managed, resolved, and closed?
PPE-127 Does the Acceptance Management Plan identify the acceptance test schedule?
PPE-128 Does the Acceptance Management Plan identify the acceptance procedure(s)?
Issue Management Plan
PPE-141 Does the Issue Management Plan identify the project issue management roles and
responsibilities?
Does the Issue Management Plan identify the project issue identification process, including the
identification criteria?
Does the Issue Management Plan identify the project issue management process?
PPE-142 Does the Issue Management Plan identify the project issueresolution process?
PPE-143 Does the Issue Management Plan identify the project issue escalation process?
Communication Plan
PPE-161 Does the Communication Plan identify the project communication process?
PPE-162 Does the Communication Plan identify the project communication roles and responsibilities?
PPE-163 Does the Communication Plan identify the communication technology planned for use?
PPE-164 Does the Communication Plan identify contact information for all project participants?
PPE-165 Does the Communication Plan identify the project information distribution methods?
PPE-166 Does the Communication Plan identify sample communications templates?
PPE-167 Does the Communication Plan identify sample report templates?
PPE-168 Does the Communication Plan identify the vendor organization chart?
3.9 Release Management Plans Evaluation Criteria (RPE)
Table 10, Release Management Plans Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
RPE-01 Does the solution release management plan include a description of the solution environment that
the software will be released to?
RPE-02 Does the solution release management plan include a pilot deployment to a production like
environment?
RPE-03 Does the solution release management plan include a pilot deployment that consists of rolling the
software out to a selected group of users for testing?
RPE-04 Does the solution release management plan include a pilot deployment that includes training for
the pilot test group?
OPWDD EHR Deliverable Review Report
17
Criteria ID Deliverable Evaluation Criteria
RPE-05 Does the solution release management plan include a pilot deployment that includes a rollback
plan and the guidelines for implementing a rollback?
RPE-06 Is the content of the solution release management plan consistent with the rest of the solution
documentation?
RPE-07 Does the solution release management plan define the release criteria that the solution must meet
in order to be considered ready for release?
RPE-08 Are all of the release criteria 1) Specific, 2) Measurable, 3) Attainable, 4) Relevant, and 5)
Trackable?
3.10 Requirements Management Plan Evaluation Criteria (RMP)
Table 11, Requirements Management Plan Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
RMP-01 Does the Requirements Management Plan identify the project requirements management process?
RMP-02 Does the Requirements Management Plan indicate that each requirement will be uniquely
identified?
RMP-03 Does the Requirements Management Plan indicate that each requirement will be a single thought
or statement?
RMP-04 Does the Requirements Management Plan identify a change process that ensures that, if a change
is made, it is done in the most efficient way possible, following the established procedures and
ensuring the quality and continuity of the system?
RMP-05 Does the Requirements Management Plan identify how changes will be identified?
RMP-06 Does the Requirements Management Plan identify how changes will be properly recorded,
classified and documented?
RMP-07 Does the Requirements Management Plan identify the requirements change review and approval
process?
RMP-08 Does the Requirements Management Plan identify how changes will be planned, implemented
and tested?
3.11 Requirements Evaluation Criteria (RE)
Table 12, Requirements Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
Organization and Completeness
RE-1 Is each requirement within the scope of the project?
RE-2 Are all internal cross-references to other requirements correct?
RE-3 Are all requirements written at a consistent and appropriate level of detail?
RE-4 Do the requirements provide an adequate basis for design?
RE-5 Is the implementation priority of each requirement included?
RE-6 Are all external hardware, software, and communication interfaces defined?
RE-7 Have algorithms intrinsic to the functional requirements been defined?
RE-8 Does the requirement document include all of the known customer or system needs?
RE-9 Is any necessary information missing from a requirement? If so, is it identified as TBD?
RE-10 Is the expected behavior documented for all anticipated error conditions?
Correctness
RE-11 Do any requirements conflict with or duplicate other requirements?
RE-12 Is each requirement written in clear, concise, unambiguous language?
OPWDD EHR Deliverable Review Report
18
Criteria ID Deliverable Evaluation Criteria
RE-13 Is each requirement verifiable by testing, demonstration, review, or analysis?
RE-14 Is each requirement free from content and grammatical errors?
RE-15 Can all of the requirements be implemented within known constraints?
RE-16 Are any specified error messages unique and meaningful?
Quality Attributes
RE-17 Are all performance objectives properly specified?
RE-18 Are all security and safety considerations properly specified?
RE-19 Are other pertinent quality attribute goals explicitly documented and quantified, with the
acceptable tradeoffs specified?
Traceability
RE-20 Is each requirement uniquely and correctly identified?
RE-21 Are all internal cross-references to other requirements correct?
RE-22 Is each software functional requirement traceable to a higher-level requirement (e.g., system
requirement, use case)?
Special Issues
RE-23 Are all requirements actually requirements, not design or implementation solutions?
RE-24 Are the time-critical functions identified, and timing criteria specified for them?
RE-25 Have internationalization issues been adequately addressed?
RE-26 Is there only be one requirement per paragraph? Unique requirements should not be stacked
together.
RE-27 Do the requirements limit their specification to "what" is required, and avoid stating "how" to do
the job?
RE-28 Is the meaning of each requirement easily understood and easy to read?
RE-29 Are the requirements complete? Incomplete lists with "etc.", "and/or", and "TBD" must not be
used.
RE-30 Within the requirements, does every pronoun, ("it" or "its") have an explicit and unmistakable
reference?
RE-31 Is each requirement verifiable by testing, demonstration, review, or analysis?
RE-32 Does each requirement refrain from use of non-quantifiable measures such as flexible, modular,
efficient, adequate, and fast?
3.12 Requirements Traceability Matrix Evaluation Criteria (RTM)
Table 13, Requirements Traceability Matrix Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
RTM-1 Does the RTM include all source requirements?
RTM-2 Does the RTM include all derived requirements?
RTM-3 Do all requirements have their source indicated? (Backward Trace)
RTM-4 Are all requirements allocated to system solution(s)/components or other deliverables? (Forward
Trace)
RTM-5 Is the RTM updated appropriately after each requirements change?
3.13 Site and System Security Plan Evaluation Criteria (SSSP)
Table 14, Site and System Security Plan Evaluation Criteria
OPWDD EHR Deliverable Review Report
19
Criteria ID Deliverable Evaluation Criteria
SSSP-1 Does the plan describe what security controls are in place at each level (physical, hardware,
operating system, virtual machine, system software, application software), so that a risk
assessment can be performed to assess the risk to the system and data.
SSSP-2 Is the document based on the FedRAMP System Security Plan (SSP) Template available at
https://www.fedramp.gov/resources/templates-3/ ?
SSSP-3 Does the plan indicate that the vendor regularly assesses and testes their security controls?
SSSP-4 For each control defined in the SSSP, does the plan provide the following information:
• Control ID
• Summary of Control
• Responsible Role
• Parameters for the control
• Implementation Status:
– Implemented
– Partially implemented
– Planned
– Alternative implementation
– Not applicable
• Control Origination :
– Service Provider Corporate
– Service Provider System Specific
– Service Provider Hybrid (Corporate and System Specific)
– Configured by Application vendor
– Provided by Application vendor
3.14 System Validation Evaluation Criteria (SVE)
Table 15, System Validation Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
SVE-1 Have all integration tests been executed successfully?
SVE-2 Has the data migration completed successfully?
SVE-3 Have all system acceptance tests been executed successfully?
SVE-4 Have all discovered software problems been documented and resolved?
SVE-5 Have all software changes been appropriately identified?
SVE-6 Have all software changes been appropriately documented?
SVE-7 Have all software changes been appropriately tested?
SVE-8 Have all system acceptance test results been reviewed and accepted?
SVE-9 Have all encountered system errors been evaluated and accepted?
SVE-10 Have the Final Test Results been evaluated and accepted?
SVE-11 Have all data errors been resolved?
3.15 Test Auditing (TA)
Table 16, Test Auditing Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
TAE-1 Were all tests reviewed prior to execution?
TAE-2 Did all tests pass satisfactorily?
TAE-3 Was all test data adequate for the testing?
OPWDD EHR Deliverable Review Report
20
Criteria ID Deliverable Evaluation Criteria
TAE-4 Were any encountered defects tracked accordingly?
TAE-5 Were any followup tests run successfully?
3.16 Test Plan Evaluation Criteria (TPE)
The Test Plan Evaluation Criteria will measure how well a test plan performs its functions. A test
plan is good to the extent that it satisfies these criteria. Exactly how good is “good enough”
depends on situational factors and judgments.
Table 17, Test Plan Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
TPE-1 Does the test plan effectively serve its intended functions?
TPE-2 Is the test plan accurate with respect to any statements of fact?
TPE-3 Does the test plan make efficient use of available resources?
TPE-4 Does the test plan tolerate reasonable change and unpredictability in the project?
TPE-5 Is the test plan self-consistent and sufficiently unambiguous?
TPE-6 Is the test plan concise, maintainable, and helpfully organized?
TPE-7 Does the test plan meet externally imposed requirements?
TPE-8 Does the test plan indicate and support an effective test planning process?
TPE-9 Does the test plan indicate a testing process that is within the capability of the organization that
must perform the planning, testing, and reporting?
TPE-10 Are the testing methods clearly described and appropriate?
TPE-11 Do the test methods verify the design?
TPE-12 Does the test plan indicate how performance testing will be performed?
TPE-13 Does the test plan indicate how data migration testing will be performed?
TPE-14 Does the test plan indicate how acceptance testing will be performed?
TPE-15 Does the test plan indicate how usability and accessibility testing will be performed?
TPE-16 For Change Orders, the Test Plan will set forth the kind, type, volume considerations and number
of tests to be performed for acceptance of the Change Order.
3.17 Test Strategy Evaluation Criteria (TSTR)
Table 18, Test Strategy Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
TSTR-01 Does the Test Strategy identify the requirements and tests that have been allocated for each
release of the solution?
TSTR -02 Does the Test Strategy provide a cross reference of the System Requirements to Test Cases to
Test Scripts for each solution release?
TSTR -03 Does the Test Strategy provide a guide for the design of Test Cases and Test Scripts by stating the
general purpose of the testing. The statement of coverage strategy can be a simple as, "Verify all
performance requirements" or "Execute every line of code."
TSTR -04 Does the Test Strategy provide guidance for failed test scripts and how they should be addressed
(schedule additional testing, relax test criteria, schedule test case for the next release, etc.)
3.18 Test Case Evaluation Criteria (TCSE)
Table 19, Test Case Evaluation Criteria
OPWDD EHR Deliverable Review Report
21
Criteria ID Deliverable Evaluation Criteria
TCSE-01 Do the test cases describe test cases, including test objective?
TCSE-02 Do the test cases describe software and hardware components evaluated by the test case?
TCSE-03 Do the test cases describe the test environment?
TCSE-04 Do the test cases identify the requirements being tested?
TCSE-05 Do the test cases define the appropriate user roles applicable to the test?
TCSE-06 Do the test cases describe general test conditions?
TCSE-07 Do the test cases describe required pre-conditions, including required previous successful tests?
TCSE-08 Do the test cases describe expected post conditions?
TCSE-09 Do the test cases include test cases for all expected system functions?
TCSE-10 Are the test methods clearly described and appropriate?
TCSE-11 Do the test methods verify the design?
3.19 Test Script Evaluation Criteria (TSE)
Table 20, Test Script Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
Acceptance Test Script Evaluation Criteria
TSE-01 Do the acceptance test scripts describe the test, including the test objective?
TSE-02 Do the acceptance test scripts describe the software and hardware components evaluated by the
test case?
TSE-03 Do the acceptance test scripts describe the test environment?
TSE-04 Do the acceptance test scripts identify the requirements being tested?
TSE-05 Do the acceptance test scripts define the appropriate user roles applicable to the test?
TSE-06 Do the acceptance test scripts describe the general test conditions?
TSE-07 Do the acceptance test scripts define the required pre-conditions, including required previous
successful tests?
TSE-08 Do the acceptance test scripts define the expected post conditions?
TSE-09 Do the acceptance test scripts include tests for all expected system functions?
TSE-10 Are the acceptance test scripts clearly described and appropriate?
TSE-11 Do the acceptance test scripts verify the design?
Performance Test Script Evaluation Criteria
TSE-21 Do the performance test scripts test the performance requirements as stated in the RFP?
TSE-22 Do the performance test scripts indicate that they will be executed in a production or production-
like environment?
TSE-23 Do the performance test scripts include the test objective?
TSE-24 Do the performance test scripts describe software and hardware components evaluated by the
test case?
TSE-25 Do the performance test scripts describe the test environment?
TSE-26 Do the performance test scripts define the appropriate user roles applicable to the test?
TSE-27 Do the performance test scripts describe general test conditions?
TSE-28 Do the performance test scripts describe required pre-conditions, including required previous
successful tests?
TSE-29 Do the performance test scripts describe expected post conditions?
TSE-30 Are the performance test scripts clearly described and appropriate?
OPWDD EHR Deliverable Review Report
22
3.20 Test Results Evaluation Criteria (TRE)
Table 21, Test Results Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
TRE-1 Do the Testing Results clearly describe the results?
TRE-2 Do the Testing Results clearly describe how to interpret the results?
TRE-3 Do the Testing Results clearly describe how to determine the perceived validity of the results?
TRE-4 Do the Testing Results clearly state the results and conclusions? The results should be
quantitative where possible and include applicable statistical analyses (mean, standard deviation,
etc.)
3.21 Training Plan Evaluation Criteria (TRPE)
Table 22, Training Plan Evaluation Criteria
Criteria ID Deliverable Evaluation Criteria
TRPE-1 How a train the trainer approach will be incorporated into the training plan.
TRPE-2 The types of additional training being proposed by job function including the method in which
training is offered (i.e.; computer or web-based training, face to face classroom style training
with an instructor, one to one training, or self-study). Bidders should be mindful that
employees within the OPWDD system have a range of technological skills which could range
from limited knowledge and experience with computers to proficient in the use of technology.
Training will need to meet these varying abilities;
TRPE-3 The duration of each class;
TRPE-4 The number of classes that will be offered and/or the number of participants included in each
training;
TRPE-5 How often the training will be offered (as needed, or on a set calendar schedule);
TRPE-6 The recommended number of people that should attend training;
TRPE-7 Identification of who will provide the proposed product training to each discipline;
TRPE-8 A description of ongoing training programs and how such training will be accessed;
TRPE-9 The extent that the Bidder provides a “Help Desk” or technical support to end users;
TRPE-10 A description of how training materials will be made available and accessible.
TRPE-11 Describe the extent to which on-line training modules are provided.
TRPE-12 Describe the use of the “train the trainer” approach.
TRPE-13 The types of training being proposed by job function.
TRPE-14 The manner in which the “train the trainer” training, as well as any other training, will be
presented (i.e., classroom style with an instructor, one-on-one, computer-based training, self-
study, etc.).
TRPE-15 Describe how often training sessions will be offered.
TRPE-16 Describe ownership of training materials and the extent that training materials are available on
an ongoing basis.
TRPE-17 Describe the form and format of training materials.
TRPE-18 The duration of each “train the trainer” class.
TRPE-19 The location of the training (Note: OPWDD requires that training be offered at a minimum of
six locations. See Section titled Training Plan located in Section 3 of this RFP).
TRPE-20 How often training is offered (as needed, or on a set calendar schedule).
TRPE-21 The number of classes or training courses that will be offered.
TRPE-22 The recommended number of people that should attend training.
TRPE-23 Who provides the proposed product training and expectations of OPWDD employees.
OPWDD EHR Deliverable Review Report
23
Criteria ID Deliverable Evaluation Criteria
TRPE-24 A description of ongoing training programs.
TRPE-25 The extent that the Bidder’s Help Desk support is available to end users.
TRPE-26 Extent to which training materials address OPWDD customizations.
TRPE-27 Proposal for Optional Training Deliverable to provide training to all end users without
leveraging state staff. This is an optional deliverable. Bidders should describe any training
options they can offer in addition to the train-the-trainer approach. The cost evaluation
(Attachment 5) should provide a cost for training using the train-the-trainer model and a
separate cost for any additional training modalities that are available.
TRPE-28 Does the Training Plan identify the project training process?
TRPE-29 Does the Training Plan identify the project training roles and responsibilities?
TRPE-30 Does the Training Plan identify the project training requirements, pre-requisites, assumptions,
and constraints?
TRPE-31 Does the Training Plan identify the project training schedule?
TRPE-32 Does the Training Plan identify the project training agenda?
TRPE-33 Does the Training Plan identify the role based training plan that identifies how the training
will be delivered for each identified role?
TRPE-34 Does the Training Plan identify the required training resources, any required preparation
for performing training, and any training materials that will be used (handouts,
workbooks, etc.)?
TRPE-35 Does the Training Plan identify the process for evaluating the training and the process that will
be followed to improve the training?
OPWDD EHR Deliverable Review Report
24
Attachment 1:
Deliverable Document Review Report Template
Deliverable Document Review Report
Deliverable Identifier and Name(s):
TBD
Deliverable Document Version: TBD
Actual Date of Delivery: TBD
for the
OPWDD Electronic Health Record Project
Date of Review
Summary of Findings
Recommended Action
File(s) Reviewed
Revision History
Date Version Author(s) Description
OPWDD EHR Deliverable Review Report
Deliverable ID: TBD
25
APPENDIX 1 EXECUTIVE SUMMARY
This document presents the findings associated with the review of the EHR Deliverable defined on
the cover page.
Acronyms and terminology used within this document are consistent with the acronyms and
terminology used on the EHR project. Definitions of acronyms and terms can be found in project
glossaries and acronym lists.
APPENDIX 1 DETAILED FINDINGS
The findings of all reviewers are listed in the following Table 1, Detailed Findings.
The column titled “Class” contains a value assigned to the severity level of the finding which
indicates the classification column has the following meaning:
Class 1 – Minor Severity Error (e.g., spelling, grammar, formatting).
Class 2 – Modest Severity Error (e.g., inconsistent terminology, vague or confusing
statements).
Class 3 – Significant Discrepancy (e.g., missing content, functionality not as expected,
processes not as expected) – may be raised to program management level for resolution.
Class 4 – Major Discrepancy (e.g., scope dispute, missing functional requirements, major
deviation from expectations) – raise to senior director or sponsor level for resolution.
The findings have two means of location, the deliverable document “Section Number” and “Page
Number”.
The “Source” column indicates the source of the finding.
The findings have a unique Finding # assigned as the findings were compiled – no order of priority
is implied by this #. The findings are numbered consecutively.
OPWDD EHR Deliverable Review Report
Deliverable ID: TBD
26
Table 1, Detailed Findings
Finding
#
Class Section Page7 Source Status Description
TBD
APPENDIX 1 SATISFIED FINDINGS
Previous findings that have been satisfied are listed in the following Table 2, Satisfied Findings:
.
Table 2, Satisfied Findings
Finding
#
Class Section Page Source Status Description
TBD