20
DEFINING THE POTENTIAL DEVELOPING THE OPPORTUNITIES DELIVERING THE OUTCOMES ASX:KIN - www.kinmining.com.au

DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

DEFININGTHE POTENTIAL

DEVELOPING THE OPPORTUNITIES

DELIVERINGTHE OUTCOMES

ASX:KIN - www.kinmining.com.au

Page 2: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

DisclaimerThis presentation is not a prospectus nor an offer for securities in any jurisdiction nor a securities recommendation. The information in thispresentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions inconnection with any acquisition of securities, investors should rely on their own examination of Kin Mining NL and consult their own legal,business and/or financial advisers.

The information contained in this presentation has been prepared in good faith by Kin Mining NL, however no representation or warrantyexpressed or implied is made as to the accuracy, correctness, completeness or adequacy of any statements, estimates, opinions or otherinformation contained in this presentation. To the maximum extent permitted by law, Kin Mining NL, its directors, officers, employees andagents disclaim liability for any loss or damage which may be suffered by any person through the use or reliance on anything contained in oromitted from this presentation.

Certain information in this presentation refers to the intentions of Kin Mining NL, but these are not intended to be forecasts, forward lookingstatements or statements about future matters for the purposes of the Corporations Act or any other applicable law. The occurrence ofevents in the future are subject to risks, uncertainties and other factors that may cause Kin Mining NL’s actual results, performance orachievements to differ from those referred to in this presentation. Accordingly, Kin Mining NL, its directors, officers, employees and agents donot give any assurance or guarantee that the occurrence of the events referred to in the presentation will actually occur as contemplated

Competent Persons StatementThe information contained in this report relates to information compiled or reviewed by Mr. Paul Maher who is a member of the (AusIMM) and Mr. Simon Buswell-Smith who is aMember of the Australian Institute of Geoscientists (MAIG), both are employees of the company and fairly represent this information. Mr. Maher and Mr. Buswell-Smith have sufficientexperience of relevance to the styles of mineralisation and the types of deposit under consideration, and to the activities undertaken to qualify as Competent Persons as defined in the2012 edition of the “JORC Australian code for reporting of Exploration Results, Mineral Resources and Ore Reserves”. Both consent to the inclusion in this report of the matters basedon information in the form and context in which it appears.

2

Page 3: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

Corporate Snapshot

ASX Code KINIssued Shares 90,482,891Unlisted Options 13,955,000Share Price * $ 0.27Market Cap * ~ 25MCash $1,289,000 – (30.6.16)

* As at 29th July 2016

Corporate Summary

53%

25%

13%

6%

3%

Shareholders

Retail Investors

Directors

High Net Worths

Mining Partners

Institutional

3

Directors and ManagementTerry Grammer Non-Executive ChairmanDon Harper Chief Executive OfficerTrevor Dixon Executive DirectorFritz Fitton Technical DirectorJoe Graziano Director/Company Secretary

Page 4: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

4

Kin Mining NL – Who are We?

Our Strategy

Potential

Opportunities

Outcomes

Our Assets

• Total Land Holding of 545sq km

• JORC Resources of 722,300 oz Au

• Untapped Underground Potential

• Infrastructure in place at Leonora

• Holding in a well known Gold Region

DESDEMONA

Leonora

REDCASTLE

MURRIN MURRIN

RAESIDE134koz Au (ASX:KIN)

MT FLORA

RANDWICK

IRON KING

King of the Hills3.8Moz

(ASX:SAR)

MERTONDALE395koz Au (ASX:KIN)

Harbour Lights1Moz (ASX:SBM)

Tower Hill1Moz (ASX:SBM)

Sons of Gwalia7Moz (ASX:SBM)

CARDINIA193koz Au (ASX:KIN)

Mt Morgan’s & Westralia 3Moz

(ASX:DCN)

Page 5: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

5

Transition From Explorer to Producer 722,300oz

• Over 70% of the 722,300 oz total Resource

classified as Indicated (JORC 2012)

• Scoping study indicates a revenue of over $460M

using a conservative A$1500 gold price

• Pre-Feasibility Study Commenced

Page 6: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

Positive Scoping Study Outcome for the LGP

6

Key Financial Parameter Base Case A$1500 oz A$1700 oz

NPV (A$M) $56.3 $105.5

Revenue (A$M) $461.6 $523.13

Operating Costs (A$M) $318.9 $318.9

Free Cashflow (A$M) $142.7 $204.3

Capital Costs (A$M) $55.0 $55.0

EBITD (A$M) $87.7 $149.3

C1 Cash Cost (A$/oz) $1,010 $1,010

AISC (A$/oz) $1,185 $1,185

IRR (%) 30% 48%

Payback (months) 45 30

* All key parameters based on scoping study inputs and Whittle pit shells and are indicative only

Page 7: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

Kin Mining NL Development

• Acquisition of the Leonora Gold Project provided the Company with a head start against peers with 722,300 oz of JORC 2012 Resources

Plan to become a gold producing company within the next three years

Scoping Study demonstrates a

economically viable project with

substantial upside

Kin has commenced with a Feasibility

study, with a favourable outcome

expected

Fast track to production with outstanding early-

stage mining opportunity identified

for start-up open pits at Lewis

Kin intend to be a gold producer

within three years

• Scoping Study demonstrates a base case development scenario of open cut mines delivering 1Mtpa at 1.7g/t average gold grade to a standalone CIL plant over a 6 year mine life.

7

Page 8: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

Current Schedule 2016(1st Half)

2016(2nd Half)

2017(1stHalf)

2017(2nd Half)

2018(1st Half)

2018(2nd Half)

2019(1st Half)

2019(2nd Half)

Scoping Study CompleteDemonstrated a base case scenario of an open cut mine delivering 1Mtpa at 1.7g/t average gold grade to a standalone CIL plant over a 6 year mine life

Lewis Trial MineOperation

Approvals granted. Mining commenced in April

Toll Treatment

Gold Pour

Prefeasibility Study Commenced Positive PFS secure fundingMove to FS

Feasibility Study Secure funding for plant build

Approvals

Construction

Operations Commence Mining

First GoldPour

Kin Mining NL Development Leonora Gold Project-Current Schedule

8

Page 9: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

LEONORA

GOLD

PROJECT 2019

Mertondale 5.59Mt @ 2.2g/t

Bruno-Lewis-Kyte 3.40Mt @ 1.3g/t

Helens & Rangoon 1.27Mt @ 1.3g/t

Raeside 1.57Mt @ 2.6g/t

(Mineral Resources 722,300 ozs)

Helen’s North, Helen’s South, Black Chief, Gambier Lass

Murrin Murrin, Kingfisher, Hobby, Triangle,

Nevertire, Pelsart, Mertondale Targets T1-T5, Cook

Paradise, Paradise North, Annapurna

Mt Flora, Iron King, Anzac, Eagle, Flamingo and Pelican, Webster’s Find

Group C Targets - Tonto (T6-T8), Mertondale 5 (T9), Quicksilver (T10)

Mert’s Reward South (T11), Mertondale Shear Zone (T12)

Gwalia South, Redcastle, Coronation Well, Randwick, Kismet, Golden Dolerite

Group D Targets - Mertondale East (T13), Egret, Charcoal West

ProductionScoping Study complete PFS commenced, Production 2019underground and open cut scenarios

Resources JORC 2012Open along strike and at depthLeonora Gold Project 11.825Mt @ 1.9g/t Au

Geochemical AnomaliesAnomalous gold-in-soil resultsand some significant drill results

Advanced ProjectsTargets with some drilling however mineralisation is not closed off, scope to advance projects to resource status

TargetsStructural and MagneticAnomalies, AnomalousRock chip sampling

9

Active Project Portfolio Advancing to Production

Page 10: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

395,000oz of Gold Along the Mertondale Shear Zone… and Growing

10

• Core Asset for the Pre-feasibility Study

• Potential to grow Resources along Shear Zone

TONTO

39,000oz @1.8g/t Au

49,000oz @1.8g/t Au

60,000oz @1.9g/t Au

110,000oz @2.2g/t Au

91,000oz @2.6g/t Au

46,000oz @3.0g/t Au

Mertondale Project

• Multiple open cut Resources creates a flexible mine plan

TONTO

MERT 3/4

MERTS REWARD

QUICKSILVER

TONTO

ECLIPSE

MERT 5

1 km

MERT 3/4

Mineralisation Outside Current Resource

Resource Optimisation (blue shell)

Page 11: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

51m @ 5.62 g/t Au

8m @ 3.50 g/t Au

2m @ 8.60 g/t Au

21m @ 5.68 g/t Au

18m @ 3.97 g/t Au

1m @ 20.68 g/t Au

1m @ 31.09 g/t Au

25m @ 2.82 g/t Au

15m @ 4.54 g/t Au

5m @ 12.60 g/t Au

13m @ 3.43 g/t Au

3m @ 5.78 g/t Au

5m @ 6.90 g/t Au

20m @ 2.30 g/t Au

3m @ 6.51 g/t Au

3m @ 6.00 g/t Au

5m @ 4.47 g/t Au

2m @ 6.78 g/t Au

7m @ 8.59 g/t Au

6m @ 11.40 g/t Au7m @ 16.18 g/t Au

Underground Potential Defined at Tonto

1111

Page 12: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

Defined Along the Mertondale Shear Zone

0.6m @1.95 g/t Au 0.6m @0.50 g/t Au

0.6m @0.54 g/t Au

Long Section looking west from Merton’s Reward through to Mertondale 3/4 (1.8km) highlighting the mineralisedsystem with existing underground workings (orange + yellow), open pits (light brown), high grade mineralisation

(+5g/t Au in magenta) and high ranked targets (T1-T5).

Merton’s Reward Underground Mine

Mertondale 3/4

12

Page 13: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

Merton’s Reward Maiden Drilling Delivered

5m @ 8.0g/t Au incl 1m @ 24.7g/t Au MR15RC002 29m @ 1.4g/t Au incl 10m @ 1.7g/t Au and 7m @ 1.8g/t Au MR15RC003 27m @ 2.7g/t Au incl 2m @ 16.5g/t and 5m @ 5.5g/t Au MR16RC004 15m @ 1.8g/t Au incl 5m @ 3.8g/t Au MR16RC005 1m @ 16.7g/t Au and 1m 8.1g/t Au MR16RC006 1m @ 10.7g/t Au MR16RC008 9m @ 2.2g/t Au incl 4m @ 3.7g/t Au and 7m @ 1.9g/t Au incl 1m @ 7.5g/t Au MR16RC010 22m @ 2.7g/t Au incl 8m @ 4.7g/t Au MR16RC011 6m @ 1.6g/t Au incl 1m @ 5.8g/t Au and 6m @ 2.5g/t Au incl 1m @ 9.5g/t Au MR16RC014 6m @ 3.0g/t Au incl 1m @ 9.1g/t Au MR16RC019 23m @ 2.1g/t Au incl 2m @ 8.7g/t Au MR16RC020 5m @ 2.3g/t Au incl 2m @ 4.4g/t Au MR16RC021

A$1500 Pit Optimisation

100mbs

200mbs

13

Page 14: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

Merton’s Reward Maiden Drilling Delivered

14

MR15RC003 4m @ 2.36g/t Au including 1m @6.56g/t Au

MT15RC001 5m @ 5.47g/t AuIncluding 2m @ 11.95g/t Au

And 6m @ 1.91g/t Au

MR15RC003 29m @ 1.35g/tAuIncluding 10m @ 1.73 and

7m @ 1.83g/t Aug/t Au

MR15RC001 25m @ 0.54g/t AuIncluding 4m @ 1.65g/t Au

MR15RC002 5m @ 7.99g/t AuIncluding 1m @ 24.70g/t Au

T2 Target

Merton’s RewardExtension

Recent drill intersections sit outside current Resource model and have delivered gold mineralisation below and along strike of the current Mertondale Resource

MR15RC003 29m @ 1.35g/t Au incl10m @ 1.73g/t Au and 7m @ 1.83g/t Au

Page 15: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

• Large portion of mineralisation sits below current open pit Resource at Mertondale 3

• Recent drilling confirms mineralisation persists at depth

• Mineralisation is concentrated within and at the margins of a distinct felsic porphyry

• Focus of potential underground development

15

MT15RC0016m @ 1.91g/t Au

MT15RC001 5m @ 5.47g/t Au incl 2m @ 11.95g/t Au

Mertondale 3Underground Potential Beginning to Grow

Southern end of Open Cut Pit

Page 16: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

Mining at Lewis Open Pit Cardinia

HIGHLIGHTS :

• Outstanding early-stage mining opportunity identified with low cost start-up open pits at Lewis, within the larger +130,000oz Bruno-Lewis Resource.

• Kin extracted the first ore from the Lewis Open Pit in early July

• First parcel of ore to be delivered to Lakewood processing facility in coming weeks

16

Page 17: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

• Gwalia Shear Zone hosts Multiple World Class Gold Deposits

• Kin Mining’s Gwalia Shear Zone coverage is now 26 strike kilometers commencing immediately south of the Sons of Gwalia mine

• Multiple gold targets identified along the newly acquired Gwalia South corridor

• Gold hosting geology and structural sequence continues through into Kin’s tenure

17

Desdemona Project Camp Scale TargetsUnlocking the Potential along the World Class Gwalia Shear Zone

CWA728 12m @3.57g/t Au

CWC779 4m @ 15.15g/t Au

HWA03078m @ 22.48g/t Au

Kailis 50koz

Harbour Lights 1Moz

Tower Hill 1Moz

Sons of Gwalia 7Moz

Gwalia South Prospect ???oz

CWA500 10m @ 0.94g/t Au Incl2m @ 2.04g/t Au EOH

Page 18: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

Gwalia South Camp Scale Target

18

• 2.5km south of Sons of Gwalia (7Moz) Mine

• Same geological sequence

• Same structural regime that is found at multiple Million ounce deposits

• Poorly tested due to predominately vertical shallow aircore drilling by previous owners

• 1600m Stage 1 drill programme is planned to commence in 2016

• Drilling planned near historic Annapurna Prospect CWC7794m @ 15.15g/t Au

CWC779 4m @ 15.15g/t Au

From 170m

Stage 1Drill Areas

Page 19: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

• Kin Mining are on the path to an early cash flow.

• Outstanding tenement package within the prolific Leonora region.

• Strong board and management with track record of making

discoveries and running successful mining operations.

• Acquisition of the Leonora Gold Project provides an outstanding,

low risk pathway to production:

• Near-term production opportunity at Cardinia - Lewis

• Scoping Study complete PFS commenced

• Numerous exciting exploration opportunities within broader project

portfolio.

• Highly leveraged to growth through acquisition and exploration

success – market cap of ~$25 Million (@ 0.27 cents).

19

Why Invest in Kin Mining?Quality team. Quality projects. Clear Pathway to Production and Growth

Page 20: DEFINING THE POTENTIAL - KIN Mining€¦ · presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in

Phone: (08) 9242 2227Email: [email protected]

www.kinmining.com.au

Define …. Develop …. Deliver

Thank You

Kin Mining NL Office342 Scarborough Beach RoadOsborne Park, WA 6017

Mailing AddressPO Box 565Mount Hawthorn, WA 6915

20