Defence Construction Industry Briefing

Townsville

28 August 2018

Page 2: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

North Queensland Mid Term Refresh Program BriefingOverview and update on MTR

Adrian Power, Contract Manager, Capital Facilities and Infrastructure Branch and Simone Papp, Jones Lange LaSalle (JLL)

Agenda

Construction Industry BriefingOverview and update on the Australia-Singapore Military Training Initiative

Chris Birrer, First Assistant Secretary, Infrastructure Division

Overview of North Queensland Defence construction opportunities and Local Industry Capability Plans (LICP)

by Ese Rainey, Capital Facilities and Infrastructure Branch

1

3Defence contracting and compliance workshop

Learn key aspects of Defence subcontracts and compliance requirements

Alice Chen, Norton Rose Fullbright

2

SESSION ONE

SESSION TWO

SESSION THREE

Page 3: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

PLACEHOLDERMid-term refresh

Content not available

Page 4: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

ASMTI Overview

4

ASMTI

$2 billion

Strengthening Singapore

Partnerships

2

2

1

3

4

5

Delivering ADF Requirements

1

Training Area Development &

Enhancement3

Engaging Local

Communities

4

5

Developing Local Industry

Australia-Singapore Military Training Initiative

Chris Birrer

First Assistant Secretary, Infrastructure

Page 5: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

Purpose of the Initiative

North

QLD

At a mature state under the Initiative up to:

2 X 9 WEEK

2,300

14,000

Training windows each year.

Increased Training

Singapore troops will conduct training

Central

QLD

vehicles

Page 6: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

North

Queensland

GREENVALE

RAVENSWOOD

Townsville

A training area near Greenvale will meet Australian Defence Force’s and Singapore Armed Forces’ requirements, both now and into the future.

Defence is negotiating with willing sellers near Greenvale.

Sites near Ravenswood or Pentland will be considered should Greenvale prove not to be feasible as a Training Area.

North Queensland training area

PENTLAND

Page 7: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

North Queensland Construction of ASMTI facilities and infrastructure2019 -2020

Co

nstr

uctio

n

Early/mid 2019Procurement of early work contractor

Mid/Late 2019Early construction works for training area establishment such as fencing, enhanced access, and support areas

Late 2019 Procurement of a Managing Contractor

Early 2020Design and development activities for major construction works to commence

North Queensland training area construction

Page 8: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

174 packages of work have been awarded to local site contractors

Over $118 million awarded to local site

contractors

VALUE

Of the packages let to date, 76% were let to

local site contractors in Townsville

174 $118.6M 76%

LOCAL BUSINESSES

LOCAL PERCENTAGE

Local Industry

Defence has a strong track record when it comes to local industry participation in the North QLD

Data provided by Capital Facilities & Infrastructure Branch 2018

Overall Townsville project statistics

Page 9: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

Next Generation training facilities and infrastructure

ASMTI Opportunities

Page 10: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

Other Industry Opportunities

Future opportunities for local business

Page 11: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

Contact us

Website: defence.gov.au/initiatives/ASMTI Email: [email protected]

Page 12: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

Local Industry Capability Plans seek to maximise opportunities for local

businesses to contribute to major capital projects in their region.

Defence requires both head and managing contractors to include a Local Industry Capability Plan as part of their

tender.

Maximising opportunities for local industry

ASMTI Opportunities

Page 13: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

ASMTIFacilities Project

Total ASMTI Facilities

Investment $1.5 billion

Townsville Works

ASMTI Facilities Project will:

• provide additional military training areas for both the Australian Defence Force’s and Singaporean Armed Forces; and

• provide fit for facilities and the supporting infrastructure, required in order to meet future training capability needs.

ASMTI Facilities Project

Works included under the Comprehensive Strategic Partnership with Singapore.

Page 14: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

Project Manager/Contract

Administrator (PM/CA) awarded February 2018 to Aurecon Australasia

Pty Ltd

ASMTI Facilities Project Procurement Status.

Managing Contractor (MC) Two Stage NQLD:

Release mid/late 2019 (subject to land

acquisition)

Legal Advisor: Norton Rose Fulbright

Probity Advisor: Sparke Helmore Lawyers

ASMTI Facilities Project

Page 15: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

Managing Contractor (MC) form of Contract Delivery:

- Refer to the Defence Estate Quality Management System (DEQMS) webpage for details regarding the MC Contract

- Subcontractors will be engaged to undertake Reimbursable Trade Subcontracts under the selected MC

Potential construction works under the Initiative include:

- Camp accommodation, including all engineering services

- Urban operations and field training live fire facilities including targetrysystems

- Information and Communications Technology infrastructure

- Bulk logistics storage facilities- Medical facilities- Vehicle storage, maintenance and

wash facilities- Field toilets and waste management

facilities- Sealed and unsealed training area

roads, fire trails, vehicle parking hardstands

- Stormwater drainage infrastructure- Fences and signage

Typical Subcontractor Opportunities:

- Civil Infrastructure;

- Building Works;

- Electrical Services

- Communication Services;

- Mechanical Services; and

- Hydraulic & Gas Services.

ASMTI Facilities Project

Page 16: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

Mid-term Refresh Projects(Subject to Government approval)

Townsville Field Training Area $24 million

HMAS Cairns $22 million

RAAF Townsville $67 million

Total $115

million

NorthQLD

The three projects will:

• address significant compliance, functionality and amenity deficiencies; and

• provide fit for purpose facilities and the supporting infrastructure, required in order to meet both the Australian Defence Force’s current and future capability needs.

Mid-Term Refresh Projects

Page 17: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

$24 million

The Project will deliver:• a vehicle wash point;• upgrades to the existing Urban

Operations Training Facility (UOTF); and

• effective control of access to the Fanning Sector.

Townsville Field

Training Area

Townsville Field Training Area Mid Term Refresh

Page 18: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

Townsville Field Training Area Mid Term Refresh

Potential construction works under the

project include:

- Upgrade existing ring road for Urban

Operations Training Facility (UOTF)

- Development of Fanning Sector entry point

- New amenities and buildings for UOTF

- Upgrade vehicle wash point

- UOTF Containers

Vehicle Wash Point

UOTF

Fanning Sector entry point

Construction Anticipated:

Mid 2020 to late 2021

Page 19: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

$22 million

The Project will deliver:• engineering services, including

firefighting systems, sewerage, stormwater, fuel infrastructure and electrical infrastructure;

• Security upgrades;• living-in accommodation;• working accommodation and

amenities; and• base access control and car parking.

HMAS Cairns

HMAS Cairns Mid Term Refresh

Page 20: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

HMAS Cairns Mid Term Refresh

$22 million

Construction Apr 2020 – Oct 2021

Potential construction works under the project

include:

- Services works including; firefighting systems,

sewerage & stormwater, fuel infrastructure

- New Infrastructure including; office facilities,

abolitions, MHE & stores shelter, Base access

control

- Refurbishment – living in accommodation, air

conditioning replacement

Construction Anticipated:

Mid 2020 to late 2021

Page 21: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

$67 million

The Project will deliver:• engineering services, including

firefighting systems, sewerage, stormwater, fuel infrastructure, ICT and electrical infrastructure;

• additional transit accommodation; and

• refurbishment of working accommodation.

RAAF Townsville

RAAF Base Townsville Mid Term Refresh

Page 22: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

RAAF Base Townsville Mid Term Refresh

Potential construction works under the

project include:

- Services works including; potable water

systems, fuel and gas systems, electrical

systems

- New Infrastructure including; Dedicated fire

ring main, Transit accommodation block

- Refurbishment – working accommodation,

ICT capacity.

Construction Anticipated:

Mid 2020 to late 2021

Page 23: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

Managing Contractor (MC) form of Contract Delivery:

- Refer to the Defence Estate Quality Management System (DEQMS) webpage for details regarding the MC Contract

- Subcontractors will be engaged to undertake Reimbursable Trade Subcontracts under the selected MC

Procurement Activity: Two Stage –Managing Contractor registrations close – 27 September 2018

AusTender: AZ 6114 North Queensland Mid-Term Refresh Program (HMAS Cairns, RAAF Townsville, Townsville Field Training Area)

https://www.tenders.gov.au/?event=public.ATM.list

Mid-Term Refresh Projects

Page 24: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

$50 million

(Subject to Parliamentary

approval)

The Project will deliver:• aircraft shelters• aircraft tarmac parking spots• working accommodation • car parking • supply support building• minor demolition and replacement of

existing facilities

Additional Chinook Capability Project

Additional Chinook

Capability Project

Page 25: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

Tarmac Parking

Shelters

Car Parking

LAND 4502 – Chinook Shelters

Page 26: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

The Project was referred to the Parliamentary Standing Committee on Public Works on 23

August 2018

Public Hearing: October 2018

Statement of Evidence: https://www.aph.gov.au/Parliamentary_Business/Committees/Joint/Public_Works

Procurement Activity: Two Stage - Head Contract registrations close – 4 September 2018AusTender: AZ6112 https://www.tenders.gov.au/?event=public.ATM.list

Construction Anticipated:

Early/Mid 2019 to late 2020

LAND 4502 – Chinook Shelters

Page 27: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

$212 million

The Project seeks to create a hub model and will consolidate an existing 22 facilities into 13 centres that offer comprehensive health services.

The Project will deliver consistent and efficient health care facilities across Defence.

Joint Health Command Garrison

Health Facilities Project

Joint Health Command Garrison Health Facilities Project

Page 28: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

RAAF Base Townsville

Health Centre

The Project tabled in Parliament on 26 March 2018

Statement of Evidence: https://www.aph.gov.au/Parliamentary_Business/Committees/Joint/Public_Works/GarrisonHealth/Report_1

Procurement Activity: Two Stage -Head Contract release early 2019

Construction of a new facility including entry, administration, primary care, inpatient unit, pharmacy, physiotherapy, dental, general support, external works, airfield response and deployable health accommodation for No. 1 Expeditionary Health Squadron.

Construction Commence mid/late 2019

Joint Health Command Garrison Health Facilities Project

Page 29: Defence Construction Industry Briefing · HMAS Cairns Mid Term Refresh $22 million Construction Apr 2020 –Oct 2021 Potential construction works under the project include:-Services

PLACEHOLDERAlice NRF