Deep Exploration TechnologiesCoiled Tubing Drilling
DEEPCORE
DRILLING PLUS WORKSHOP
Program 1 Leader: Soren Soe
Drilling
IP and Role of Service Providers
Mining Companies
Drilling Equipment Manufacturers/
Technology Service Providers
R&D Providers
Resea
rch
Research & Technology Transfer
Comm
ercialise
Drilling equipment manufacturers & service
providers offer a natural route to commercialisation
Mining companies and geological surveys are
the end users
IP Creation
DETCRC
IP Licencing
IP Utilization
Scoping Project Outputs
Questionnaire + Workshop:• Geologists• Drillers• Researchers
MISSIONVISION
CT
Dri
llin
g
Lab
-at-
Rig
TM
Dow
nh
ole
Sen
sing
MINERAL SYSTEMSDRILLING
Coiled Tubing Drill Rig
Autonomous Sonde
Lab-at-RigTM
Project 1.1 - Coiled Tubing Drill rig-
Vision• To develop and adapt transformational drilling technologies.
• Coiled tubing rig for greenfields mineral exploration drilling at a cost of $50/metre to a depth of 500 metres and weighing less than 10 tonnes with ancillary safety and environmental benefits
Mission
Tough but doable
Program 1 in Context with Program 2 and 3
• 2-3 hours move in and rig up time
• Penetration rates: up to100m/hr in soft, predictable sedimentary rocks.
• CTD offers improved cost, safety, and environmental impact in mineral exploration
• Key challenges for mineral exploration include: • Hard rock drilling with a Low weight-on-bit• Coil durability• Efficient Micro in-hole tooling• Micro borehole sensing and sampling
Coiled Tubing Drilling for Minex
Coiled Tubing Drilling in MINEX
DET CRC Drilling Research
Project 1.1: Key Outcomes Cutting the rock - high RPM
First Drilling with Turbine at Brukunga
New Full-face Bit design
New Bit matrix with Improved wear resistance
8000 RPM Turbine drilling
Close cooperation with Turbine manufacture(s) for next generation Turbine and a new Turbine is on the market
Chasing consisting ROP of +500 mm/min in Granite rock in the LAB
Project 1.1: Key Outcomes Cutting the Rock with Percussive water hammer:
“New’ Bit150 meters drilled.Gauge worn 0.16 mm
“Old” Bit35 meters drilled. Gauge worn out
New Bit design(s) with Improved wear resistance
Chasing consistent ROP +1000 mm/min in the field
DET CRC - Vanadium Hammer barrel reduced deviation to a 1/3
Project 1.1: Key Outcomes Coiled Tubing Drill Rig
Coiled Tubing Rig:
The Coiled Tubing rig mounted with steel Coil drilled to a depth of 150 metres with water hammer in 8 hours. (325mm/min average)
The Coiled Tubing rig mounted with Flexible H-Coil drilled to a maximum depth of 145 metres with water hammer in several intervals.
Percussive drill cuttings circulated to the SRU
CT rig Version 1Steel Coil
CT rig Version 2Flexible Coil
Coiled Tubing
Our First Prototypes of Composite Coiled Tubing has been manufacturedDrilling with Composite Coiled Tubing commenced
December 2014 – May 2015
November 2014
February 2015
March - April 2015
March 2015
Benchmarking & Validation
Project 1.1: Key Outcomes Flexible Coiled Tubing - H-Coil
Future Coiled Tubing Rig
May 2016 delivery timeframe
Steel Rig H-Coil Retro Fit H-Coil Rig
Down-Hole Force-Torque Sub
The DET CRC down-hole force-torque sub measure weight-on-bit, torque and internal fluid pressure.
Additional sensors could be integrated into future iterations of the tool.
The sub communicates with an interface unit on the surface over an armoured cable within the tubing of the Coiled Tubing Drill Rig.
Slimmest down-hole force-torque sub in the world.
Hole stability, Water cleaning & Cuttings transport
Full-scale trials at Brukunga collecting cuttings. CFD models “Tuned” to match flow loop observations
Project 1.1: Key Outcomes Sample returns/ drilling fluids/Hole stability
Percussive CT-drilled hole. Dry section. 360° Photo
Percussive CT-drilled hole. Wet section
Percussive CT-drilled hole wet section Clay wash out
Printed Core
Standard SRU’s will under most conditions remove 90% of cuttings in the drilling fluids. We are currently achieving 99.9% cuttings removal.
Hole stability, Water cleaning & Cuttings transport
Lab-at-RigTM Geochemistry and Mineralogy
Drill hole
GeologicalLogging
GeotechLogging
Core yardpetrophysics
SplitCore
SamplePrep Assay
WirelineLogging
Comminution
Disparate data streams
daysd
ays
we
eks weeks
months
months
days toweeks
days
weeks
Currentworkflow
DET CRC workflow
Productivity!!
All Underpinned by knowledge of the host rocks and mineral system!
1 day
Broad sulphide zones
Sulphide veinlets
Increasing scaleDown hole S/Ti value
large
scale fe atures
small sca
le features
med
ium scale
features
S/T
i fro
m p
XR
F o
f d
rillin
g p
owde
rs
Wavelet transform
Rea
l ti
me
Re
al t
ime
Same day
Same day
Whereto drillnext?
Source: Advertiser Newspaper, 9 December 2014
Mineral Systems Drilling ProgramGeological Survey of SA: mid 2015
• following 2014’s GA/GSV Victorian drilling
• key step in planning – design – manufacture – lab testing – Brukunga DRTF testing – field testing technology
• ~16 holes/~7 km to map mineral system under cover
• principally Wireless Sub, Lab-at-RigTM (incl. LAR Fluids), AutoSondeTM (possibly AutoShuttle), VSPs & Real-Time Drill Site
Mineral Systems Drilling withGeological Survey of SA: mid 2015
• ~16 holes/7 km to map mineral system under cover
• applying DET CRC’s new technologies
South Australia
152
4
Mt Cu-eq