Decommissioning North Sea ConferenceChevron Decommissioning ProjectGulf of Thailand - 2017
1
Tanggu HQ in Tianjin 120km from Beijing
COOEC OVERVIEW
COOEC
Financial
COSL
CNOOC Limited
CNOOC EnerTech
Refinery & Marketing
Gas & Power
Services Contractors
• Offshore Oil Engineering Co. (COOEC) was established in Bohai Bay in China
40 years ago.
• One of the largest EPCI contractors for Oil and Gas Engineering in the Asia
Pacific region.
• Headquarters in Tanggu region of Tianjin City.
• Employing 8000 people.
SAUDI ARABIA
ABU DHABI
QATAR
Branch/Representative Office Planned
Established Representative Office
HONGKONG
THAILAND
BRUNEI
SINGAPORE INDONESIA
AUSTRALIA
GROUP ORGANISATION
SCOTLAND
USA
MEXICO
CANADA
NIGERIA
ARGENTINA
BRAZIL
2
IN THE PAST 40 YEARS, COOEC HAS INVESTED SIGNIFICANTLY IN THE FUTURE OF THE ORGANISATION.
• 18 Decommissioning Projects Complete
• 2 Decommissioning Projects Ongoing
• 9 Decommissioning R&D Projects Complete
• 1 Decommissioning R&D Project Ongoing
• 5 Decommissioning Studies Complete
• 2 Decommissioning Studies Ongoing
COOEC OVERVIEW
TECHNICAL RESEARCH & DEVELOPMENT,STUDY EXPERIENCE & AWARDS
• In 2018, the PDMA “Outstanding Cooperate Innovator Award” was received by COOEC in recognition of their excellent performance of remarkable innovation and the sustainable development within the energy industry.
3
COOEC OVERVIEW
COOEC owns 22 diverse marine vessels, including shallow and deep-water pipe-lay vessels, HLVs, deep-water multi-purpose installation vessels, trenching
vessels, self-propelled semi-submersible transportation vessel capable of carrying 50,000t, to support a full range of offshore construction operations.
• Concept Study & Design
• Pre-survey & Inspection
• Engineering Design
• Topside and Pipeline Cleaning and Flushing
• Removal of offshore facilities includes Topside, Jacket, FPSO,
SPM, Pipeline, Cable, Subsea Structures etc.
• Sea-fastening and Transportation
• Site Clearance and Post-survey
• On-shore Dismantling
• Engineering
• Project Management & Procurement
• Offshore Transportation
• Jacket Launching
• Jacket & Topside Lifting
• Topside Float-over
• SURF Installation
• IRM
• Platform, FPSO & Module Build
• Decommissioning
MARINE AND TECHNICAL SERVICES
4
COOEC DECOMMISSIONING
DECOMMISSIONING TRACK RECORD
5
No. Project Date Types
1 LH11-1 SPM/FPSO Maintenance 2006-2007 SPM/FPSO
2 Boxi change route Pipeline Recovery & Replacement 2008 Pipeline
3 PY30-1 Gas Field Topsides Decommissioning 2010 Platform
4 CFD 1-6 Oil Field Structure Decommissioning 2011 Platform
5 BZ25-1 Oil Field SPM Decommissioning 2012 SPM
6 BZ13-1 - Qk191 Oil Field Gas Pipeline Recovery & Replacement 2013 Pipeline
7 Jidong Oil Field Platform Decommissioning 2013 Platform
8 BZ26-3 Oil Field WHPA to BZ26-2WHPA Gas Pipeline Recovery & Replacement 2014 Pipeline
9 JZ21-1 Oil Field WHPA&JZ20-2SW Platform Decommissioning 2014 Platform
10 CFD Oil Field SPM Decommissioning 2015 SPM
11 BZ25-1S Oil Field Pipeline Recovery & Replacement 2015 Pipeline
12 Pinghu Oil Field Subsea Pipeline Section Recovery & Replacement 2015 Pipeline
13 BZ25-1 Oil Field CEP to SPM subsea Pipeline Recovery & Replacement 2015 Pipeline
14 Penglai19-3 Oil Field RUP-D Injection Pipeline Recovery & Replacement 2016 Pipeline
15 BZ25-1 New Retired SPM Decommissioning Project 2017 SPM
16 Chevron Thailand Platform Decommissioning Project 2017 Platform
COOEC GULF OF THAILAND
OVERVIEW
6
COOEC GULF OF THAILAND
PLATFORMS
7
Pre-Construction Preparation Yard
Platform Destination Yard
FUWLFUWM
YAWAJKWBTotal Distance
390 Miles
Location:
Gulf of Thailand
Distance between platforms located mid-way between pre-construction & preparation yard and disposal yard:
390 miles
Mode of Transportation:
Tugs and Barges
Heavy Lift Vessel:
Lan Jiang
COOEC GULF OF THAILAND
LOCATION
8
ITEMS DESCIPTION
Classification ABS/CCS
Year Built 2001
Port Of Registry Tianjin, China
Loa (Length Overall) 157.5m
B (Breadth Moulded) 48.0m
D (Depth Moulded) 12.5m
Lifting Capability 3800 MT
Quarters 278 persons
Winch 12×200kN, 345/700/1465rpm
Anchor Wire 12×ø76mm×2,200m
Anchor Type 12×11.7Te, MK5
COOEC GULF OF THAILAND
HEAVY LIFT VESSEL LAN JIANG
The Lan Jiang is one of 4 heavy lift vessels owned and operated by COOEC - a highly capable and versatile vessel, with a substantial heavy lift track record.
9
The Challenge
• Compressed Project Preparation and Execution Schedule
The Actions
• Securing company owned vessels and equipment
• Production of an experienced and dedicated decommissioning project execution team
• Adopt a previous fit-for-purpose approach
• Call upon existing contractor relationships
The Lessons
• Ensure decommissioning team is well placed and prepared to react to accelerated Client schedule
• Nominate core personnel to ensure consistency throughout entire project
• Build a strong network of local contractors and suppliers
• Nominate local focal point or point of contact for network, thus in simplifying communications
Preparation work
Cargo barge alongside HLV
Anchoring
COOEC GULF OF THAILAND
CHALLENGES AND LESSONS LEARNED SCHEDULE
10
Leg Cutting
Lifting
Rigging up
The Challenge
• Simplification of the vessel compliance process
The Actions
• Ensure fit-for-purpose vessels, carry out modifications and upgrades
• Adjustment from ‘Greenfield’ or ‘Brownfield’ project mind set to Decommissioning mind set
• Adherence to Company Global Marine Assurance requirements
The Lessons
• Early engagement with Company Global Marine Assurance Department
• Provide workshops to aid evolution from ‘Greenfield’ to ‘Decommissioning’ mindset
• Engagement with local Marine authority on receipt of ITT
• Ensure relationship with classification society at a local level
• Build partnership with local marine consultancy
COOEC GULF OF THAILAND
CHALLENGES AND LESSONS LEARNED TECHNICAL
11
The Challenge
• Uncertainty of the local rules, regulations and approval processes
The Actions
• Ensure flexibility of offshore execution window and thus primary vessel
• Suggest secondary back-up vessel, should schedule shift dramatically
• Support Company in the regulation approval process
The Lessons
• Early engagement with governance/regulation body
• Raise interface with Company environmental department and local authority
• Ensure relationship with local environmental subcontractor is in place on receipt of ITT
Cargo Barge Loading
Sea Fastening
Post Removal Installation
COOEC GULF OF THAILAND
CHALLENGES AND LESSONS LEARNED LOCAL RULES AND REGULATIONS
12
The Challenge
• Safe Execution of Project given lack of Information provided on facilities, structures and interfaced components
The Actions
• Contingency plan to address unforeseeable events
• Sufficient training and pre-task briefings to entire project team
• Additional HAZID and HAZOP reviews
The Lessons
• Early engagement with Client, especially on technical matters
• Access to critical technical information prior to contract award
• Site survey prior to contract award
• Additional hazard reviews, workshops and project briefings for all personnel
• Early engagement with subcontractors
Cargo Barge Transportation - Day
Cargo Barge Transportation - Night
COOEC GULF OF THAILAND
CHALLENGES AND LESSONS LEARNED HEALTH AND SAFETY
13
DESCRIPTION MAN HOURS
Total 68,504
Fatality 0
Lost Time Injury ( LTI ) 0
Restricted Workday Case ( RWC ) 0
Medical Treatment Case ( MTC ) 0
First Aid Case ( FAC ) 0
Property Damage Case (PDC) 0
Occupational Health & Hygiene 0
Environment Pollution Incident 0
Near Miss Case (NMC) 1
COOEC awarded Chevrons Highest Safety Award in 2017
COOEC GULF OF THAILAND
HEALTH AND SAFETY STATISTICS AND AWARD
14
High Quality Performance
Engineering and Project Management
Continuously Improving HSE performance
Cost Effective EPCI Solutions
Competitive Advantage• Competitive Cost
• Attractive Commercial Options
• Yard Capabilities
• Powerful Marine Fleet
• Strong Project Management Team
• EPCi Solution Provider
COOEC STRENGTHS
A COST EFFECTIVE END TO END SOLUTION
OFFERING BOTH TURNKEY EPCi AND FULLY INTEGRATED DECOMMISSIONING SOLUTIONS
Strategic Markets and Strengths• Platform and Floater EPCi
• SURF facilities EPCi
• Large Topsides, Modules and Modularised Plant Fabrication
• Onshore Terminals, Jetties, Skid Packages, E&I Products, Subsea Products
• Brownfield and Construction Services
• Fixed platform, FPSO, SURF Decommissioning Services
15
Thank you!“The ability to simplify means to eliminate the unnecessary so that the necessary can speak” – Hans Hoffman