RFP 1609 Item 4 | On Call - Project Development Services, Greenfield District | 1 INDOT 1609 | Item 4 September 27, 2016 Knows INDOT Standards and Procedures and is commied to the Open Roads iniave. Understands INDOT’s constrained budgets and will strive to meet or beat INDOT’s budgetary goals. Will provide a biddable, construcble project with fast and efficient delivery. We have a team in place that can meet all of the District’s requirements for any size assignment, whether it is a Preservaon or an Expansion project. The DLZ Team will focus on delivering a quality project on me and under budget that meets INDOT’s stringent requirements. We have established an excellent working relaonship with the Greenfield District on projects large and small. Thank you for this opportunity to express our interest in this project. We are eager to get to work for the Greenfield District. We will work for you on these projects using simple, smart soluons, to minimize impacts, lower costs, stretch your budget, and most importantly, delivering your projects on me. Respecully submied, DLZ INDIANA, LLC Gary K. Fisk, PE Haseeb A. Ghumman, PE, PTOE Vice President Transportaon Department Manager Dear Selecon Commiee: Please accept our leer of interest for providing project development services for the Greenfield District. Our team is fully prepared to work with INDOT to fulfill each aspect of the required elements of this project in a manner that provides INDOT with the highest quality services at the greatest level of efficiency and with complete accountability. DLZ is commied to INDOT’s Vision of maintaining and preserving the exisng infrastructure along with on me & within budget project delivery. We are commied to serving as an extension of INDOT’s staff and in delivering a quality product. The DLZ Team members are currently, and have acvely, provided engineering services to INDOT Districts and the Central Office through mulple on call project development contracts. Project Manager Haseeb A. Ghumman will be supported by experienced specialists that will serve as Deputy Project Managers. DLZ values our long-standing relaonship with INDOT, having served the Department for over 60 years. We are ready to begin work immediately upon noce to proceed. DLZ has an INDOT annual contracng capacity exceeding $85 million. With staff located in close proximity to any project within the Greenfield District, we can respond quickly and provide high quality services on budget and within the project schedule. The Team: Will communicate with INDOT’s Project Manager and other INDOT staff to work towards successful compleon of each project assignment. Project Goals 1 2 3 4 5

Dear Selection ommittee: Project Goals 1 2 3 4 5

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Dear Selection ommittee: Project Goals 1 2 3 4 5

RFP 1609 Item 4 | On Call - Project Development Services, Greenfield District | 1

INDOT 1609 | Item 4

September 27, 2016

Knows INDOT Standards and Procedures and is committed to the Open Roads initiative.

Understands INDOT’s constrained budgets and will strive to meet or beat INDOT’s budgetary goals.

Will provide a biddable, constructible project with fast and efficient delivery.

We have a team in place that can meet all of the District’s requirements for any size assignment, whether it is a Preservation or an Expansion project. The DLZ Team will focus on delivering a quality project on time and under budget that meets INDOT’s stringent requirements. We have established an excellent working relationship with the Greenfield District on projects large and small. Thank you for this opportunity to express our interest in this project. We are eager to get to work for the Greenfield District. We will work for you on these projects using simple, smart solutions, to minimize impacts, lower costs, stretch your budget, and most importantly, delivering your projects on time. Respectfully submitted, DLZ INDIANA, LLC Gary K. Fisk, PE Haseeb A. Ghumman, PE, PTOE Vice President Transportation Department Manager

Dear Selection Committee: Please accept our letter of interest for providing project development services for the Greenfield District. Our team is fully prepared to work with INDOT to fulfill each aspect of the required elements of this project in a manner that provides INDOT with the highest quality services at the greatest level of efficiency and with complete accountability.

DLZ is committed to INDOT’s Vision of maintaining and preserving the existing infrastructure along with on time & within budget project delivery. We are committed to serving as an extension of INDOT’s staff and in delivering a quality product.

The DLZ Team members are currently, and have actively, provided engineering services to INDOT Districts and the Central Office through multiple on call project development contracts. Project Manager Haseeb A. Ghumman will be supported by experienced specialists that will serve as Deputy Project Managers. DLZ values our long-standing relationship with INDOT, having served the Department for over 60 years. We are ready to begin work immediately upon notice to proceed.

DLZ has an INDOT annual contracting capacity exceeding $85 million. With staff located in close proximity to any project within the Greenfield District, we can respond quickly and provide high quality services on budget and within the project schedule. The Team: Will communicate with INDOT’s Project Manager and other INDOT staff to

work towards successful completion of each project assignment.

Project Goals

1

2

3

4

5

Page 2: Dear Selection ommittee: Project Goals 1 2 3 4 5

RFP 1609 Item 4 | On Call - Project Development Services, Greenfield District | 2

is an Indiana certified minority-owned business

enterprise (MBE) with five Indiana offices located in Indianapolis, Fort Wayne, South Bend, Munster, and Burns Harbor. DLZ provides quality professional engineering and architectural services, and in 2016, we celebrate our 100th anniversary with almost 600 employees at 20 office locations in seven states.

Responsible Office DLZ Indiana, LLC 157 East Maryland Street Indianapolis, Indiana 46204 Phone: 317.633.4120

Authorized Negotiator Gary K. Fisk, PE, Vice President Cell: 574.315.1773 Email: [email protected]

Ch

art Title

123

DLZ Staff Hours Available - 91%

Current INDOT Annual Backlog Hours - 8%

Annual Labor for this Project - 1%

DLZ HAS AMPLE

STAFFING CAPACITY

DLZ has attended INDOT’s presentations on Open Roads and understands the importance of this new program. A key factor of this initiative is delivering projects with 90% of the programmed funds by safely reducing design elements, where possible, such as using minimum design standards rather than desirable values. In an effort to meet the Open Roads goals, DLZ has actively implemented the new Open Roads philosophy on our current projects. DLZ has attended Open Roads review meetings in the Fort Wayne, Seymour, and Greenfield Districts. As a result of these meetings, over $1,000,000 in cost savings has been realized. We have also implemented Open Roads concepts into a total of 15 LaPorte and Seymour District projects to carry forward through design, which has resulted in approximately $3,500,000 in cost savings for these projects as well.

DLZ Indiana, LLC (Prime) 5.2, 5.6, 6.1, 7.1, 8.2, 9.2, 10.1, 11.1, 12.2

82%

SJCA P.C. (DBE) 6.1, 8.2, 9.2, 10.1, 11.1,12.2

10%

Infrastructure Engineering, Inc. (DBE) 8.2, 9.2, 10.1

5%

H&H Associates, LLC (DBE) 5.10

If Required

NS Services, LLC (DBE) 5.2, 5.9

If Required

Earth Exploration, Inc. 7.1

2%

Dodd Title Corporation (DBE) 12.2

1%

Blood Hound, Inc. SUE

As Needed

Page 3: Dear Selection ommittee: Project Goals 1 2 3 4 5

RFP 1609 Item 4 | On Call - Project Development Services, Greenfield District | 3

First and foremost, the right project scope must be established. Even for projects such as small structure replacement or intersection improvements, it is essential to have a project vision that guides the decisions that are made. The scope document provides a very clear definition of the factors that are critical to the project’s success. Alternatives will be screened and the screening process will be documented for the project record. This will also support environmental documentation going forward. The project scope, addressing the purpose and need—no more and no less, forms the basis of the Project Management Plan (PMP). After company-wide implementation in 2015, all DLZ projects have a project management plan. This is DLZ’s recognition that a PM needs to have

Preservation Projects

Resurfacing

Crack Sealing

Chip Sealing

Pothole Repair

Joint Repair

Drainage Repair

Inspection

Cleaning

Deck Overlay

Substructure

Repair

Superstructure

Repair

Inspection

Cleaning

Repairs

tools at the ready to organize the project and keep it moving forward. No matter the size of the project, each carries its engineering and management challenges that require attention at all levels of detail.

—Commissioner Karl Browning in a speech to ASCE in Indianapolis, January 23, 2015

Page 4: Dear Selection ommittee: Project Goals 1 2 3 4 5

RFP 1609 Item 4 | On Call - Project Development Services, Greenfield District | 4

Project Manager Haseeb Ghumman will develop a communications plan that will

give the right information to the right people involved in the project. Key decision makers must be kept informed so that when decisions are needed the project can stay on schedule. Communication will include simple and effective reporting that documents the project status and predicts compliance with project schedules. All parties will know that the project is tracking for delivery on time and on budget.

The Open Roads principle of using sound engineering judgment illustrates the need

for a team that embodies the combination of two traits: Experience and Creativity. Experience comes from many years of working in the highway industry. Creativity comes with an open-minded approach to our work and a willingness to look beyond a standardized set of solutions. The DLZ Team offers such a staff: Haseeb Ghumman (20 years) Gary Fisk (35 years) Phil Ellet (41 years) David Henkle (36 years) Jason Stone (22 years) Rajiv Huria (21 years) DLZ understands that the cost of utilizing experienced staff needs to be balanced with budgetary constraints, and thus Haseeb Ghumman also has efficient and economical production staff on hand and ready to work, that will deliver the project cost effectively.

DLZ has a history meeting challenging

schedules. For example, working over

the winter in the snow, our survey crews

delivered a large surveying assignment

from the Fort Wayne District within four

months for the I-69 Union Chapel and

DuPont Road Interchanges, using laser

technology.

COMMUNICATION PLAN

Clearlycommunicate

through meeting minutes/ summaries

and time-critical action items.

Schedule and facilitate meetings for all stakeholders,

including progress.

Establish andconfirm expectations and goals early in the planning and design

processes.

Returnphone calls the

same business day or within 24 hours.

INDOT Bridges/Structures Table of Experience in

Last 5 Years Thin Overlays……………………………………………...7 LMC Overlays…………………………………………….19 Small Structures………………………………………….9 Deck Replacements…………………………………….9 Superstructure Replacements.…………………...7 Structure Replacements……………………………..8

RELEVANT INDOT EXPERIENCE

OVER 50 BRIDGES!

DLZ is committed to delivering unrivaled customer service throughout each stage

of any project assignment. While we recognize that most successful projects include excellent design quality, it is rapid responsiveness and great communication between the project manager, design team, stakeholders, and INDOT that will demonstrate just what a trustworthy partner we are! Our goal on any project is to make sure that we provide consulting services that lead to “no surprises” and develop “best fit” solutions when unforeseen events arise in order to get your projects to a successful letting. Our staff fully understands the technical and procedural requirements of this contract and will be able to provide INDOT with sound recommendations on key project decisions. Communication and the ability and available capacity to manage the development of concurrent projects are key to providing the “best fit” solution when faced with a schedule altering “surprise”.

Page 5: Dear Selection ommittee: Project Goals 1 2 3 4 5

RFP 1609 Item 4 | On Call - Project Development Services, Greenfield District | 5

DLZ knows that INDOT projects are not developed in a vacuum, and that many parties, both from within INDOT and external to the Agency, contribute knowledge and expertise to get the project done. Haseeb’s experience with projects has taught him the importance of getting the needed input from discipline experts and stakeholders. Part of the consultant’s job is to make sure that decisions are properly documented, transparent and defendable. The Team’s experience with INDOT projects means they know that approvals and decisions can take time, and these timeframes must be built into project schedules.

Attitude At DLZ we have great Project

Managers. To become a Project Manager at DLZ, one must have a can-do, never-give-up attitude that is more of a personality trait than a skill. DLZ’s Project Managers also have a great capacity and desire to learn, and they thrive in this business because every project offers new challenges. No single person knows everything - it is the ability to strategically sort through the clutter and find the best route to completion that makes our PMs successful at delivering projects on time and within budgets.

These three activities are time and again the schedule drivers on a project. The DLZ Team has capacity in every anticipated activity on this on-call contract. DLZ maintains six INDOT-certified utility coordinators who can be tapped to facilitate the process. We know that a network of overhead and underground utilities exist in every project area and understand that avoidance is the primary objective. DLZ is well versed in all utility coordination communication protocols identified in INDOT’s utility coordination manual, but also goes beyond the manual to work intensively with designers to solve potential problems before they arise. DLZ has included a SUE subcontractor on the team to utilize when higher risk utilities pose unknown conditions.

Solving Right of Way Challenges DLZ has found ways to acquire right of way from parcels with complex right of way issues. On our SR 135 project in Greenwood, the roadway widening required additional right of way along the Dye’s Walk Country Club and an adjacent cemetery. This area was made even more challenging with a stream that crossed SR 135 and then ran along the Golf Course. Acquiring the parcels required coordination between the Golf Course, the Church, INDOT and DLZ. Ultimately, the best solution that reduced impacts to the Golf Course required relocation of its main entrance and the addition of a retaining wall to reduce right of way and stream impacts. The proposed solution helped secure the Golf Course and Church parcels.

Page 6: Dear Selection ommittee: Project Goals 1 2 3 4 5

RFP 1609 Item 4 | On Call - Project Development Services, Greenfield District | 6

As a Department Manager, Haseeb is responsible for managing the Transportation Department for the Indianapolis office. Haseeb is responsible for overseeing design and daily coordination of all transportation projects which include roadway, and bridge and traffic projects. He is responsible for project scheduling, staffing, budgeting and ensuring quality control measures are followed. Haseeb has spent his entire career providing transportation engineering

services to public and private agencies. He has extensive experience in project management of roadway, bridge and traffic projects of varying size and complexity. Haseeb understands and appreciates that INDOT’s Preservation Projects may require a quick turnaround, with design and construction sometimes occurring within the same calendar year. At the same time, if an Expansion Project is assigned, Haseeb understands that INDOT’s goal is not to over-design the proposed improvements; rather, it is to use the Open Roads/Practical Design concept by starting with the minimum required design and adjusting the level of effort to meet INDOT’s scope. Haseeb’s project approach is centered on keeping the INDOT Project Manager informed throughout the project while directly leading the DLZ Team. Haseeb will be the direct liaison between DLZ and the INDOT Greenfield District.

Sr 37 Reconstruction, Fishers. Styline Road Reconstruction, Huntingburg. 22nd Street Reconstruction, Elwood. Tapp Road and Rockport Road Intersection Improvements, Bloomington. Taylor Road Roadway Reconstruction and Widening Design, Columbus. Roundabout Design, CR 200E and Main Street, Danville. Bicycle/Pedestrian Crossing treatment Study, Columbus. Traffic Signal Timing – On-Call Services, Indianapolis. US-40 Reconstruction, Brazil. 116th Street and Hazel Dell Parkway Intersection, Carmel. 3 Roundabouts along Gray Road, Carmel. Numerous Indianapolis DPW Resurfacing Projects. Various Bridge Rehab and Replacement Projects for Wayne, Putnam, Pike,

Hamilton, Boone and Bartholomew Counties.

Page 7: Dear Selection ommittee: Project Goals 1 2 3 4 5

RFP 1609 Item 4 | On Call - Project Development Services, Greenfield District | 7

* Brief resume included

Quality Management Cristine M. Klika, PE (Road)

Michael A. Kummeth, PE (Bridge) Phil Ellet, PE (Constructability Review)*

Project Principal Gary K. Fisk, PE

Indiana Department of Transportation

2.1 Traffic Data Collection (If Required)

2.2 Traffic Forecasting (If Required) 3.2 Complex Traffic Capacity and Operations

Analysis (If Required) 4.1 Traffic Safety Analysis (If Required)

Haseeb A. Ghumman, PE, PTOE* Jeffrey R. Swenson, PE, PTOE*

Charles Teuer, PE, PTOE Qasim Asghar

5.2 Environmental Documents Preparation -

CE Jason A. Stone*

Daniel J. Stevens Isaac Miller

5.5 Wetland Mitigation (If Required)

5.6 Waterway Permits Jonathan E. LaTurner, PE

John F. Marino, PE

5.8 Noise Analysis and Abatement Design Steven J. Winters

5.9 Archaeological Investigations (If

Required) NS Services, LLC (DBE)

5.10 Historical/Architectural Investigations (If

Required) H&H Associates, LLC (DBE)

6.1 Topographic Survey

Steve Jones, LS Alan B. Cleveland, LS

Brian Kinney SJCA, P.C. (DBE)

7.1 Geotechnical Engineering

Victoria Person, PE Tim A. Hampshire, PE Earth Exploration, Inc.

8.2 Complex Roadway Design

Alan D. Mize* Faisal Saleem, PE Mathieu Doyle, PE

Jordan Hennessy, EI Chris Poland

Dustin Quincy, PE (IEI) SJCA, P.C. (DBE)

9.2 Level 2 Bridge Design

David Henkle, PE* Michael A. Kummeth, PE

Rajiv K. Huria, PE (SJCA) Infrastructure Engineering, Inc. (DBE)

10.1 Traffic Signal Design

Haseeb A. Ghumman, PE, PTOE* Jeffrey R. Swenson, PE, PTOE*

Infrastructure Engineering, Inc. (DBE)

10.3 Complex Roadway Sign Design (If Required)

Jeffrey R. Swenson, PE, PTOE* Qasim Asghar

10.4 Lighting Design (If Required)

Jeffrey R. Swenson, PE, PTOE* Joan Zbin, PE

11.1 Right of Way Plan Development

Steven A. Jones, LS Rob P. Hathaway, LS Alan B. Cleveland, LS

Samuel E. Wolfe, PE, PS SJCA, P.C. (DBE)

12.2 Title Research

Dodd Title Corporation (DBE) SJCA, P.C. (DBE)

Utility Coordination (INDOT CERTIFIED)

Alan D. Mize* Blood Hound, Inc. (for SUE, as needed)

Preliminary Engineering/Alternative Analysis

(If Required) Haseeb A. Ghumman, PE, PTOE*

David Henkle, PE* Jeffrey R. Swenson, PE, PTOE*

Faisal Saleem, PE Phil Ellet, PE

Construction Phase Services (If Required)

Haseeb A. Ghumman, PE, PTOE* David Henkle, PE*

Jeffrey R. Swenson, PE, PTOE* Faisal Saleem, PE

Roadway Deputy Project Managers Faisal Saleem, PE*

Dustin Quincy, PE (IEI)*

Traffic Deputy Project Manager Jeffrey R. Swenson, PE, PTOE*

Bridge Deputy Project Managers David Henkle, PE*

Rajiv K. Huria, PE (SJCA)

Page 8: Dear Selection ommittee: Project Goals 1 2 3 4 5

RFP 1609 Item 4 | On Call - Project Development Services, Greenfield District | 8

Jason has 22 years of experience in the preparation of NEPA compliance documents

including, Environmental Impact Statements (EIS), Environmental Assessments/Findings of No Significant Impact (EA/FONSI), Categorical Exclusions (CE) and numerous Section 106/Section 4(f) Analyses, primarily for federal and state transportation projects. In addition, Jason has managed interagency coordination and review processes, performed resource inventories, impact assessments, and prepared numerous environmental permit documents.

Mr. Henkle is a strategic and operational senior engineering manager with more than 34 years

experience; achieving extraordinary results in more than $5B design/build operations. His specialized experience includes project operations, business development, construction management, complex bridge design, and flood control reconstruction. Mr. Henkle’s span of expertise encompasses strategic logistics planning, design/build projects and contract oversight.

Phil worked at INDOT for over 41 years in various positions in the civil/construction engineering

field. As an INDOT Area Engineer for 14 years, Phil performed constructability reviews of design plans, set completion date of contracts, performed FHWA oversight on LPA Projects and provided scope of work for district developed resurfacing projects. Phil can serve as a technical resource, assist our team by providing guidance and using his INDOT experience to help review constructability, and help propose solutions to difficult problems.

Jeff has more than 28 years of experience in

traffic engineering, design, construction, and implementation of traffic engineering projects. His responsibilities include traffic signal design and traffic signal systems/interconnect design, optimization of traffic signal timings, on-site implementation of traffic signal and traffic signal systems operational timing plans, engineering and technical support to signal operations and maintenance personnel, roadway lighting design, and preparation of construction bid documents.

Alan has more than 31 years of experience in the Transportation Engineering field. As a design consultant

for more than 25 years, he has been responsible for the design and management of road design projects including both local and federal aid city and county roadway projects, state routes, and interstates. Mr. Mize manages multiple projects ranging from rural county road preventive maintenance resurfacing projects (ARRA Stimulus funds) to INDOT urban added travel lanes projects with design fees in excess of one million dollars and construction costs over 20 million dollars.

Page 9: Dear Selection ommittee: Project Goals 1 2 3 4 5

RFP 1609 Item 4 | On Call - Project Development Services, Greenfield District | 9

DLZ provided design services for the pavement resurfacing, pavement repair, curb reconstruction, sidewalk reconstruction and design of sidewalk curb ramps for the following streets:

DLZ was retained by the City of Huntingburg, Indiana to prepare bridge design and roadway design construction plans for the reconstruction and extension of Styline Drive. The project provides a new alternate route to bypass the Norfolk Southern Railroad crossing on U.S. 231. The route will begin on Styline Drive at S.R. 64 and proceed north and east to 14th Street at Chestnut Street and will include the construction of a new railroad bridge overpass over the Norfolk Southern Railroad, all within the City limits of Huntingburg, Dubois County, Indiana. Styline Drive is a local road that serves as the main access point to the industrial area on the west side of Huntingburg and connects S.R. 64 to 12th Street. The reconstruction and extension of Styline Drive from S.R. 64 to 14th Street is approximately 0.9 miles in length. The new alignment of Styline Drive including the overpass bridge comprises over half of the project length (0.5 miles). Proposed improvements to Styline Drive include: new bridge construction on new alignment over Norfolk Southern and over 12th Street; construction of retaining walls at the railroad overpass; reconstruction of Industrial Park Drive access to 12th Street; removal of the Styline Drive at-grade railroad crossing at Industrial Park Drive; construction of a 10 foot wide multi-purpose asphalt trail along the east and south side of Styline Drive; and the installation of an Advanced Automated Warning Sign located on southbound U.S. 231 to alert motorists of the alternate route to avoid delays due to trains crossing U.S. 231. A complete new enclosed storm sewer system is also included in the design.

PRACTICAL DESIGN – COST SAVINGS DLZ has coordinated with INDOT’s hydraulics to replace the 72” pipe culvert with a 54” pipe and reduce the length of the pipe by installing it at a lesser skew, without impacting the downstream flow. Potential Savings = $51,900.00

Revised the inlet spacing by increasing the allowable spread from 6’ (4’ into the travel lane plus 2’ of gutter) to 8’ (½ the travel lane (6’) plus 2’ gutter). Potential Savings = $ 146,400.00

Reduced multi-use asphalt trail from 10’ width to 8’ width including the reduction of the overall bridge width by 2’. Potential Savings = $ 56,700.00

Overall construction cost savings -

$ 255,000.00

Page 10: Dear Selection ommittee: Project Goals 1 2 3 4 5

RFP 1609 Item 4 | On Call - Project Development Services, Greenfield District | 10

A dangerous curve along Smith Road and Rogers Road has been the site of several car accidents. These two rural roads are connected by a curve that forms a 90-degree bend. The crash rate at this curve is estimated to be 3.5 crashes per million entering vehicles. The roadway was redesigned to meet current INDOT standards and required sight distances. The design provided a 12-foot wide lane with 6-foot wide shoulders in each direction. The existing horizontal curve was realigned to lengthen and increase the radius of the curve to meet sight distance requirements. In addition to the horizontal realignment, the existing vertical alignment was reconstructed to correct vertical sight deficiencies.

DLZ was retained by the Indiana Department of Transportation to prepare roadway design and construction plans for roadway replacement improvements along U.S. 40 and S.R. 340, all within the City limits of Brazil, Clay County, Indiana. Improvements to U.S. 40 included a complete storm sewer system for this 3-mile roadway section. Two separate outlet locations were available in an area that is heavily impacted by local flooding. The roadway consisted of generally a 5 lane section with a Two Way Left Turn Lane (TWLTL) and barrier curb with sidewalk abutting the back of curb, or sidewalk separated by a grass buffer strip. Significant design effort has been required to reduce the impact of the project to the existing adjacent buildings and properties. Detailed design cross slopes were implemented through the historic downtown area to match existing building fronts.

DLZ is currently performing the design to construct a modern roundabout at this existing four-way stop controlled intersection. The project involved traffic forecasting and operational analyses to determine roundabout lane requirements for the Horizon year. The geometrics studies consisted of investigating limited vertical sight distance on the east leg along with minimizing any impacts to the golf course on the southeast quadrant. The roundabout is being designed to accommodate dual lane entries and exits to accommodate future traffic growth due to the proposed interchange along US-31 to the west. Other key design elements to this project include: drainage design, a new detention basin and modification to an existing basin, overhead utility relocations, avoidance of the City’s critical watermain transmission line, landscaping, lighting, right-of-way, multi-use trails and maintenance of traffic.

BEFORE AFTER

Page 11: Dear Selection ommittee: Project Goals 1 2 3 4 5

RFP 1609 Item 4 | On Call - Project Development Services, Greenfield District | 11

DLZ was retained by the Indiana Department of Transportation to prepare roadway design and construction plans for roadway added travel lanes along SR 261 in Warrick County, Indiana. SR 261 was an Urban Minor Arterial from SR-66 to Fuquay Road (1.33 miles) and a Rural Major Collector from Fuquay Road to Jenner Road/CR 150 S. (1.72 miles). The SR-261 added travel lane project extended from 525’ south of SR 66 to 415’ north of Jenner Road. The total project length was 3.05 miles. The proposed roadway consisted generally of a 5-lane section with a Two Way Left Turn Lane (TWLTL) and curb & gutter from SR 66 to Fuquay Road and a 3-lane section with a TWLTL with 8’ shoulders and ditches from Fuquay Road to Jenner Road.

The original scope of work called for

these twin bridges to have a superstructure replacement. After reviewing the existing structures, it became apparent that this work was not required and only some minor maintenance was needed. The estimated savings was approximately $2.5 million in construction cost and approximately $200,000 in design costs.

This structure was scheduled for a deck

replacement and no other structural work. The existing structure has an open joint along the centerline. During the inspection, severe rust was observed along the beams adjacent to the open joint. After further inspection, it was determined that although the beams were still adequate, the bearings and bolts along these beams would need to be replaced. By adding this work to the design plans now, it avoided a significant change order during construction.

DLZ provided engineering design, right-of-way engineering and acquisition, and environmental document services for the replacement of the SR 3 bridge over Hog Creek. The new bridge is a single 117 foot span consisting of 48” x 49” hybrid bulb-T’s in tangent horizontal alignments. Roadway reconstruction of SR 3 included 390 feet north and 390 feet south of the bridge. Environmental services included completion of a Level 2 Categorical Exclusion Environmental Study (CE) to satisfy state and federal environmental documentation requirements. Environmental services also included Section 106 coordination and documentation for INDOT/FHWA approval of a finding of No Historic Properties Affected.

Beam Deterioration Under Open Joint

Crack at Beam End

Page 12: Dear Selection ommittee: Project Goals 1 2 3 4 5

RFP 1609 Item 4 | On Call - Project Development Services, Greenfield District | 12

Assignments on this on call contract include: SR 48 over Ripley Creek, Ripley County US 31 over Hutto Creek, Scott County US 31 over Muscatatuck River Overflow, Scott

County US 50 over Back Creek, Lawrence County Walnut Street Ramp at SR 37, Monroe County SR 62 over Tributary of Indian-Kentuck Creek,

Jefferson County US 31 over Sugar Creek, Johnson County SR 356 over Woods Fork Creek, Scott County SR 1X over Ramsey Creek, Franklin County SR 3 over Stucker Creek, Scott County SR 3 over Hog Creek, Scott County

SR 62 / Tributary of Indian-Kentuck Creek

Walnut Street Ramp at SR 37 SR 261 Widening, Warrick County SR 56/US 150 Reconstruction, Orange County SR 135 Added Travel Lanes, Johnson County SR 11/Old Dam 43, Harrison County US 40 Reconstruction, Brazil US 6 Added Travel Lanes, Porter & Lake Counties I-69 Reconstruction, Allen County

US 41 over Beahm Ditch Small Structure Replacement US 24 over Beahm Ditch Small Structure Replacement SR 250 Small Structure Replacement over Tributary of Hough Creek US 231 Lafayette, Tippecanoe County

US 52 (EB) over CSX (Crawfordsville District) US 52 over NS (2 Bridges) (Crawfordsville District) I-69 over Beckett’s Run (Fort Wayne District) SR 56 over Lost River (Vincennes District)

DLZ recently completed a complex road relocation design for US 33 in Goshen. This project had challenges in all disciplines of roadway design: tight geometrics, unusual property acquisitions and relocations, railroad involvement, impacts to local streets and very aggressive timelines. DLZ

implemented weekly coordination meetings to keep everyone informed and to generate ideas for keeping the project on its fast-track schedule. These meetings were well received by District, Central Office and cited as a key to meeting the demanding letting schedule. The project was bid $3.5 million under budget.

US 27 Dr. Martin Luther King Jr. Memorial Bridge-DLZ took an innovative approach in this design by working with both INDOT and the City of Fort Wayne to combine functional bridge design with architectural elements that reduced overall construction costs by over $2M.