NOCOME TRUST- NAVAKIAGA ORPHANAGE CARE HOMECell : 9047281743 Web: nocometrust.com [email protected] , Ph: 91-4368-226714 Cell:9047281743 Page 1 Dear Donors, An urgent and critical need has come up in Navakiraga Orphanage Care Home for the 100 children and 50 elders. In the past 9 years, over 500 children have stayed with us and they are successfully rehabilitated. Those children who are still living with us are pursuing primary and Higher education. These children are separated according to their gender. The boys are staying in temporary building just 7 kms away from our main building and the girls are accommodated in our main building. Over 100 elders sheltered in our Home were reintegrated with their relatives after considerable stay with us and over 50 elders were peacefully reached divine abode. We buried them with due respect and last rites. Those elders who are still living with us have been provided temporary shelter just 7 kms away from our main building. For the past 9 years, we are running this Orphanage care Home in rented building. Our support for this effort has mainly been coming from local donors which is barely enough to feed them and meet their basic needs. This made us difficult to find adequate resources to set aside to build well furnished Home for children and elders. Now the situation has worsened after the landlord has served us notice to evict us within short period. We are in dire situation to seek funds and build Home. I would like to make use of 2 acres of land which was bequeathed by our parents. I have a plan to build an extensive building to accommodate maximum number of children and elders in an integrated campus. This will help our inmates to get maximum attention in terms of shelter, health and education. Moreover, there would not be any need to turn down prospective requests. Detailed plan and estimates have been annexed herewith. Hence, I appeal to your generous hearted to donate profusely to our project. Your support will help our inmates be relieved from untold emotional distress and secure the feeling of permanence. P. Sakthivel Founder Managing Trustee Navakiraga Orphanage Care Home

Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 1

Dear Donors,

An urgent and critical need has come up in Navakiraga Orphanage Care Home for the 100

children and 50 elders.

In the past 9 years, over 500 children have stayed with us and they are successfully

rehabilitated. Those children who are still living with us are pursuing primary and Higher

education. These children are separated according to their gender. The boys are staying in

temporary building just 7 kms away from our main building and the girls are accommodated in

our main building.

Over 100 elders sheltered in our Home were reintegrated with their relatives after considerable

stay with us and over 50 elders were peacefully reached divine abode. We buried them with due

respect and last rites. Those elders who are still living with us have been provided temporary

shelter just 7 kms away from our main building.

For the past 9 years, we are running this Orphanage care Home in rented building. Our support

for this effort has mainly been coming from local donors which is barely enough to feed them

and meet their basic needs. This made us difficult to find adequate resources to set aside to

build well furnished Home for children and elders.

Now the situation has worsened after the landlord has served us notice to evict us within short

period. We are in dire situation to seek funds and build Home.

I would like to make use of 2 acres of land which was bequeathed by our parents. I have a plan

to build an extensive building to accommodate maximum number of children and elders in an

integrated campus. This will help our inmates to get maximum attention in terms of shelter,

health and education. Moreover, there would not be any need to turn down prospective

requests. Detailed plan and estimates have been annexed herewith.

Hence, I appeal to your generous hearted to donate profusely to our project. Your support will

help our inmates be relieved from untold emotional distress and secure the feeling of

permanence.

P. Sakthivel Founder Managing Trustee Navakiraga Orphanage Care Home

Page 2: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 2

INTRODUCTION Navakiraga Orphanage Home is a charitable Trust, which was established in order to help some of the most vulnerable and needy children and aged people. We have been running this Home for the past 9 years. We have provided shelter for about 500 children and 200 elders. Many of them are successfully rehabilitated and integrated into mainstream. Presently as many as 100 children and 50 elders are staying in our Home. PROBLEM STATEMENT

The elders who are staying with us are decrepit and they are housed in a temporary shelter which is about 7 kms away from main Home. The condition is same as boy’s shelter.

PROJECT PROPOSAL

Our main Home is a rental building and 100 years old. This Home is in dilapidated condition. As per Government direction, we segregated the children and elders into separate Homes. About 30 girl children are housed in the above said main Home. The landlord has served notice to evict us from this Home within short period. We are in precarious situation as to shelter these Children.

The boys are located in temporary shelter which is about 7 kms away from main Home. The boys Home has no basic facilities like toilets and rooms. This is just a hall and roofed in asbestos sheet with so many holes. During rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress.

Since we are running this Home from local support, we barely find resources to feed them and provide minimum basic needs. Our Homes are situated in three different locations. This makes us difficult to provide food to the inmates and monitor them effectively. We are not able to provide any facilities to the inmates. The landlords are not allowing us to modify any of the structure.

Page 3: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 3

PROBLEM STATEMENT…….

Donors are finding it very difficult to visit our Homes as they are located in three different locations. This puts great hardship in raising funds for foods and for basic needs. Most of the funds we receive from donors are spent on rent which leave us with very little amount for spending on important items.

All of our children are school going but we could not provide good environment for doing Homework and exam preparation. This causes children to do poor performances in schools. Since they could not find any place to play, they are mentally stressed and physically weak. They often fall prone to opportunistic infections.

Page 4: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 4

PROJECT DESCRIPTION

We have proposed to construct a new integrated Home for children and elders. For this purpose, the founder P. Sakthivel has donated about 2 acres of land to Trust. This land was bequeathed to him by his parents for this noble cause. Location of this site is Varitchikudi.

This proposed integrated building will have 4 blocks. One block will have 16 rooms. Each room will be measured 20’ X 20’ and each room will have 5 beds, shelf and personal computer. Common Toilets and Bathrooms will be provided in block. Common area will be provided for prayer and assembly within this block. Separate blocks for boys and girls will be constructed. The blocks which are dedicated for orphanage will accommodate 90 boys and 90 girls each. The entire building will be built with future provision of adding floors to each block.

The proposed integrated building will have separate block for elders. Each room will have attached toilet and bathroom. In order to receive visitors for elders, each individual room will have separate lounge. This will ensure privacy as well as homely environment for elders.

Another block will be dedicated for accommodating destitute women and utility rooms. This block will have store room, common kitchen, class rooms and short stay rooms for women. Common Toilets and bathrooms will be constructed.

Page 5: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 5

PROJECT DESCRIPTION….

A pond is dug within this area. Along the banks, trees will

be planted and sit outs will be provided for relaxation.

Meditation Hall will be constructed within this campus.

Separate playground for boys and girls will be provided. This playground will enable children to practice Volleyball, Tennis, and Basket Ball etc.

The proposed integrated building will have round the clock security room. Register will be maintained to note all the in-bound and out-bound movements. Visitors to this Home will be entered in this register with details like in-time, out-time and purpose of visit. Closed circuit Television camera will be setup to record all the internal movements. Each block will have warden room to manage inmates effectively.

Transport facility will be provided to pickup children from

Home to schools and drop them back to Home. As many as 5

multi utility vehicles will be deployed for this purpose.

A Mini medical clinic will be setup to treat minor ailments. A trained staff will be appointed for this purpose.

Fully fledged Library will be setup within this building. All important books that are needed will be stacked and a trained staff will be appointed to suggest books to promote reading habits among students.

Page 6: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 6

PROJECT DESCRIPTION …. AND OBJECTIVES

OBJECTIVES

To provide conducive and clean environment for all inmates

To accommodate more number of eligible inmates

To ensure physical as well as mental well being of all inmates

To enable destitute women with elementary skills to help them to be self dependent and self reliant.

To enable children to learn extra talents and life skills

To ensure complete transparency and accountability

To engage donors in constructive manner like spending time within campus for a day and monitor all activities

For administrative purpose, office will be accommodated inside this building. The office will have departments such as Fund Raising, Accounts, Donors relationship service, catering etc. Adequate staff will be appointed to ensure smooth functioning of the Home.

Page 7: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 7

BENEFICIARIES

Children under 18 years who have lost one or both their parents

Children who are physically challenged and none to take care

Street children

Children who have parents but unable to provide basic services

Sexually abused children and nowhere to shelter

Elders who are abandoned by their families

Elders who are terminally sick and abandoned by their families

Elders who are physically challenged and none to take care

Women who are widows and abandoned

Women who are left alone by husband

Women who are ex sex workers and abandoned by community

HIV/AIDS Positive women, Cancer Patients

Page 8: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 8

THE IMPLEMENTERS

The Board of directors and the project Administers are the key implementers of

the projects. The donors will play a vital role/part in the project establishment.

BOARD OF DIRECTORS Sl.No NAME POSITION CONTACT

1. P. SAKTHIVEL FOUNDER 9047281743

2. S. SELVABHUSANI SECRETARY 9843297399

3. P. SURESH TREASURER 9843092422

PROJECT ADMINISTRATORS

Sl.No NAME CONTACT

1. S. Murugan 8220491139

2. N. Jayaraman 9944359178

3. K. Selvanathan 9884948442

4. Gunasekaran 9443672303

5. PuratchiVendhan 9944775862

6. R. Senthamizhan 9659475048

7. R. Raja 9442698962

8. V. Valli 9786711922

9. S. Meera 8344359328

Page 9: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 9

NGO PROFILE

Name of the Organization Navakiraga Orphanage Care Home - Nocome Trust

Address 18, ThenkaraiStreet,Vadamattam Road, Kottucherry. Karaikal-609609

Telephone (04368-266714)

Mobile 9047281743

E-mail [email protected],[email protected]

Web: www.nocometrust.com

Contact Person: P. Sakthivel (9047281743)

Legal Status: Registered under Indian Trust Act

Establishment Date: 07/02/2005

Registration No: Reg. No.29/B-4/2005

FCRA & Date Reg. No: 285150011& 17/06/2013

PAN AAATN 7676H

12A& 80G Cert if ied under sect ion 12A R/w Sect ion 12AA (1) (b ) ( i ) of the

Income Tax Act.1961. Cert i f icate No: 7162E(30)/2005/CIT -

I I/TRY

Approved under Sect ion 80G (5) (VI) o f the Income Tax Act ,

1961. Approval No: 7162E(30)/2005/CIT - I I/TRY Juvenile and Justice Act Register ed under the pr ovis ions of Sect ion 34(3) of the

Juveni le Just ice ( Car e and Protect ion of Chi ldren ) Act , 2000

and Amendm ent Act , 2006 as Ch i ld Care Inst i tut ion (

Orphanage) for Boys and Gir ls in the age group of 6 -18 years . Banker State Bank of India, KaraikalA/C No : 10956280600

Auditor S. SanthanaGopalan& Co Charted Accountant

Account Operation Founder & Managing Trustee ( P. Sakthivel) Secretary (S. Selvabushani) jointly operated

Area/Sector of Activities Orphanage Home, Old age Home and Short stay Home for Destitute Women

Vision To prom ote ab i l i ty amon g

orphaned/abandoned/underpr iv i leged ch i ldren , senior c it izens

within and outs ide the support system, by educat ing, gu id in g

and g iv ing them the love and care which they deser ve. We act

as a trans it ion for these ch i ldren to lead a l i fe with complete

soc ia l d ign ity and a lso make them ab le to help the soc iety in

return. Mission To continue do ing our work with soc ia l responsib i l ity , so that

we can restore the br ight futur e of these innocent l ives .

Working Area Kovilpathu(Kara ika l) , Kottucherr y(kara ika l)

Page 10: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 10

WORK PLAN OF THE PROJECT

The intent of this Construction Work Plan is to present the general sequence of pre-

construction and construction activities which are planned to take place at the proposed site

AyyanarKoil Street, Gandhi Nagar, Varichikudi. In addition, this plan summarizes the proposed

methodology for performing various phases of the work. It describes possible equipment and

personnel to be used, general sequencing of the work activities, the use of the site for staging,

stockpiling and other activities, and security. This work plan has been prepared in coordination

with Certified Architect.

Site preparation work and digging bore wells.

Mobilization of necessary labour, materials, equipment and tools.

Construction of Blocks for orphans.

Construction of common kitchen, utility rooms

Construction of office, library,mini medical clinic

Recruiting supporting staff

Purchasing Multi utility vehicle, Books, security cameras, sports items, medicines etc

Page 11: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 11

ABSTRACT OF COST FOR THE PROPOSED CONSTRUCTION OF ORPRANE CARE HOME AT R.S NO: ,

VARICHIKUDY SOUTH VILLAGE , KOTTUCHERRY COMMUNE.

ESTIMATE AMOUNT: Rs.1,04,00,000/-

SL.

NO.

DESCRIPTION OF WORK QTY. RATE PER AMOUNT

1 Earthwork excavation in foundation trenches, including

dressing of sides and ramming of bottoms, getting out the

excavated soil.

477.00 250.00 Cum 1,19,250.00

2 Providing and laying the P.C.C1:5:10 including

consolidation, curing, etc., using approved 40 mm blue

metal and cm 1:5

110.00 4,000.00 Cum 4,40,000.00

3 - A

3 - B

Supplying and filling with clean coarse and neat river sand

including watering consolidation, etc.,

Supplying and filling with clean coarse and neat pit sand

including watering consolidation, etc.,

103.00

533.00

1,200.00

800.00

Cum

Cum

1,23,600.00

4,26,400.00

4 Providing and laying the R.C.C1:2:4 in roof slabs grade

beams, lintels, etc., including consolidation, curing

centering and shuttering, etc., but excluding the cost of

steel and its fabrication, etc.,

299.00 7,000.00 Cum 20,93,000.00

5

Cutting, bending and placing the RTS and MS bars of

various dia, including binding the inter-section with

annealed wire.

35,880.00 65.00 Kg 23,32,200.00

6 Brickwork in CM1:6 using best available country bricks of

standard size 9”x4-1/2”x3 including pointing, scaffolding,

curing, etc.,

290.00 5,000.00 Cum 14,50,000.00

Page 12: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 12

7 Supplying and fixing the best available country wood

doors, windows and ventilators, etc., including all

materials, fittings and carpentry charges, etc.,

133.00 4,000.00 Sqm 5,32,000.00

8 Ceiling plastering with 12 mm thick using CM1:3 curing

scaffolding, etc.,

649.00 200.00

Sqm 1,29,800.00

9 Providing and laying the Marble flooring including

consolidation, etc.,

649.00 400.00 Sqm 2,59,600.00

10 Plastering the walls with 12 mm thick using Cm 1:5

including curing, scaffolding, etc.,

1,392.00 200.00 Sqm 2,78,400.00

11

Centering and shuttering including shuttering propping

etc., and removal of parns for foundation, footings, bases

of columns etc., mass concrete and precise shelves. and

removal of forms for lintels, beams plinth beams girders

bressumers and cantilevers

2,667.00

400.00

Sqm

10,66,800.00

Page 13: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 13

OWNER ENGINEER

12 Providing and laying the weathering course using brick

jelly lime concrete 1:2 including, etc.,

68.00 5,000.00 Cum 3,40,000.00

13 Providing and laying the pressed tiles over the weathering

course using CM 1:5 including curing and finished the

joints with red-oxide, etc.,

671.00 500.00 Sqm

3,35,000.00

14 Painting the wood work with two coats using best

available Nerolac paint including all materials and labour

charges, etc.,

313.00 400.00 Sqm 1,25,200.00

15

16

17

18

White washing one or two coats over complete plastered

area using available Distemper including curing,

scaffolding, etc.,

Colour washing two coats with best available Distemper

including curing, scaffolding, etc.,

Provision for providing the Electrical and Water supply

arrangements to the building

Provision for providing the sanitary and septic tank

arrangements to the building

2,041.00

1,392.00

-

-

25.00

30.00

-

-

Sqm

Sqm

-

51,025.00

41,760.00

1,80,000.00

-

51,025.00

TOTAL 1,04,00,000.00

( RUPEES ONE CORE AND FOUR LAKHS ONLY )

Page 14: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 14

DETAILED ESTIMATE

1. Earthwork excavation in foundation trenches including dressing of sides and ramming of bottoms, getting out the excavated

soil and disposal of surplus excavated soil.

SL.

NO

DESCRIPTION OF WORK NOS LENGTH BREADTH DEPTH QUANTITY

1 FOR COLUMN 1x52 1.50 1.50 1.75 245.70

2

FOR GRADE BEAM

Sundries

1x26

1x26

1x4

1x2

1.50

7.43

36.19

1.80

1.50

0.60

0.45

1.50

1.75

0.60

0.60

0.60

102.38

69.54

39.09

19.54

0.75

477.00 Cum

2. Providing and laying the P.C.C 1:5:10 including consolidation, curing,etc., using approved 40 mm blue metal and CM 1:5.

SL.

NO

DESCRIPTION OF WORK NOS LENGTH BREADTH DEPTH QUANTITY

1 UNDER COLUMN

1x52 1.80 1.50

6.10

6.10

6.10

6.10

6.10

0.15

0.15

0.15

0.15

0.15

0.15

21.06

5.58

5.58

5.58

5.58

5.58

2 UNDER FLOORING

Room - 1

Room - 2

Room - 3

Room - 4

1x1

1x1

1x1

1x1

6.10

6.10

6.10

6.10

Page 15: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 15

Room - 5

Room - 6

Room - 7

Staircase

Hall

Toilet

Passage

Corridor

Sundries

1x1

1x1

1x1

1x2

1x1

2x4

1x2

1x2

6.10

6.10

6.10

6.10

6.10

2.99

6.10

1.77

6.10

6.10

3.00

18.76

1.20

1.20

38.72

0.15

0.15

0.15

0.15

0.15

0.15

0.15

5.58

5.58

5.49

17.17

4.13

2.20

20.56

0.15

110.00 Cum

3 - A Supplying and filling with clean coarse and neat river sand including watering, consolidation, etc.,

SL.

NO

DESCRIPTION OF WORK NOS LENGTH BREADTH DEPTH QUANTITY

1

2

UNDER COLUMN

UNDER FLOORING

Room - 1

Room - 2

Room - 3

Room - 4

Room - 5

Room - 6

Room - 7

Staircase

Hall

Toilet

1x52

1x1

1x1

1x1

1x1

1x1

1x1

1x1

1x2

1x1

2x4

1.80

6.10

6.10

6.10

6.10

6.10

6.10

6.10

6.10

6.10

2.99

1.50

6.10

6.10

6.10

6.10

6.10

6.10

6.10

3.00

18.76

1.20

0.10

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

14.04

5.58

5.58

5.58

5.58

5.58

5.58

5.58

5.49

17.17

4.13

Page 16: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 16

Passage

Corridor

Sundries

1x2

1x2

6.10

1.77

1.20

38.72

0.15

0.17

2.20

20.56

0.15

103.00 Cum

3 - B Supplying and filling with clean coarse and neat pit sand including watering, consolidation, etc.,

SL.

NO

DESCRIPTION OF WORK NOS LENGTH BREADTH DEPTH QUANTITY

UNDER FLOORING

Room - 1

Room - 2

Room - 3

Room - 4

Room - 5

Room - 6

Room - 7

Staircase

Hall

Toilet

Passage

Corridor

Sundries

1x1

1x1

1x1

1x1

1x1

1x1

1x1

1x2

1x1

2x4

1x2

1x2

6.10

6.10

6.10

6.10

6.10

6.10

6.10

6.10

6.10

2.99

6.10

1.77

6.10

6.10

6.10

6.10

6.10

6.10

6.10

3.00

18.76

1.20

1.20

38.72

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

33.49

33.49

33.49

33.49

33.49

33.49

33.49

33.94

102.99

25.83

13.18

123.36

0.27

533.00 Cum

Page 17: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 17

4. Providing and laying the RCC 1:2:4 in roof slabs grade beams, lintels, etc., including consolidation, curing, and shuttering, etc.,

but excluding the cost of steel and its fabrication, etc.

SL.

NO

DESCRIPTION OF WORK NOS. LENGTH BREADTH DEPTH QUANTITY

1 COLUM FOOTING

1x52

1x52

1x52

1x52

1.20

1.73/2

1.20

1.43/2

1.20

1.43/2

1.20

1.43/2

0.30

0.45

0.30

0.45

28.08

14.47

11.23

5.98

2 COLUMN 1x52

1x26

1x8

0.23

0.23

0.23

0.45

0.23

0.45

6.65

6.65

3.65

35.79

9.15

3.02

3 GRADE BEAM

1x26

1x4

1x2

7.43

36.19

36.19

0.23

0.23

0.23

0.45

0.45

0.45

19.99

14.98

7.49

4

5

6

LINTEL BEAM

ROOF BEAM

ROOF SLAB

1x21

1x4

1x1

1x26

1x4

1x2

1x2

1x2

7.43

36.19

6.10

7.43

36.19

36.19

20.56

8.56

0.23

0.23

0.12

0.23

0.23

0.23

0.23

39.18

0.23

0.23

0.15

0.45

0.45

0.30

0.30

0.12

8.25

7.66

0.44

19.99

14.98

4.99

2.88

80.49

Page 18: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 18

7

8

HEAD ROOM ROOF SLAB

SUNSHADE

Sundries

1x2

1x1

8.56

33.20

3.46

0.60

0.12

0.10

7.11

1.99

0.04

299.00 Cum

5. Cutting, bending and placing the RTS and MS Bars of various dia including bending the intersection with annealed wire.

SL.

NO

DESCRIPTION OF WORK NOS. LENGTH BREADTH DEPTH QUANTITY

1x1 299.00 x 120.00 Kgs/Cum 3 5,880.00 Kgs

6. Brick work in CM 1:6 using best available Country brick of standard size 9”x4 ½”x3” including pointing, scaffolding,etc.

SL.

NO

DESCRIPTION OF WORK NOS. LENGTH BREADTH DEPTH QUANTITY

1

2

Walls all around including the parapet wall.

Head room

Cross wall

1x2

1x2

1x2

1x10

1x4

1x2

83.70

39.73

19.00

5.66

6.10

2.64

0.23

0.23

0.23

0.23

0.23

0.23

5.22

1.20

2.97

4.12

1.20

1.20

200.98

21.93

25.96

53.63

6.73

1.46

Page 19: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 19

7. Supplying and fixing the best available country wood doors, windows and ventilators, etc., including all materials, fittings and

Carpentry charges, etc.

SL.

NO

DESCRIPTION OF WORK NOS. LENGTH BREADTH DEPTH QUANTITY

Door – D

Window – W

Ventilator – V

Sundries

1x24

1x42

1x8

1.20

1.20

0.90

-

-

-

2.10

1.35

0.60

60.48

68.04

4.32

0.16

133.00 Sqm

DEDUCTION

Door – D

Window – W

Ventilator – V

Jalli - J

Sundries

1x4

1x2

1x24

1x42

1x8

1x2

6.10

2.64

1.20

1.20

0.90

1.20

0.12

0.12

0.23

0.23

0.23

0.23

2.97

2.97

2.10

1.35

0.60

1.35

8.70

1.88

13.91

15.65

0.99

0.75

0.03

290.00 Cum

Page 20: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 20

8. Ceiling plastering with 12mm thick using CM 1:3 including curing, scaffolding, etc.

SL.

NO

DESCRIPTION OF WORK NOS LENGTH BREADTH DEPTH QUANTITY

Room 1 to Room 7

Hall

Corridor

Toilet

Passage

Staircase

Headroom

Sundries

1x7

1x1

1x2

1x8

1x2

1x2

1x2

6.10

6.10

2.00

2.99

6.10

6.10

6.10

6.10

18.76

39.18

1.20

1.20

3.00

3.00

-

-

-

-

-

-

-

260.47

114.44

156.72

28.70

14.64

36.60

36.60

0.83

649.00 Sqm

9. Providing and laying the Marble flooring including consolidation, finishing etc.

SL.

NO

DESCRIPTION OF WORK NOS. LENGTH BREADTH DEPTH QUANTITY

1 MARBLE FLOORING 1x1 As per Item No. 8 649.00 Sqm

Page 21: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 21

10. Plastering the walls with 12 mm thick using CM 1:5 including curing, scaffolding, etc.

SL.

NO

DESCRIPTION OF WORK NOS. LENGTH BREADTH DEPTH QUANTITY

1

2

3

4

EXTERIOR SURFACE

INTERIOR SURFACE

Room 1 to Room 7

Hall

Staircase

Toilet

Passage

Sundries

PARAPET WALL INNER SURFACE

PARAPET WALL TOP SURFACE

1x0

1x7

1x1

1x2

1x8

1x2

1x1

1x1

91.48

24.40

49.72

18.20

8.38

14.60

88.76

92.36

-

-

-

-

-

-

-

-

6.02

3.65

3.65

3.65

3.65

3.65

1.05

0.23

101.42

623.42

181.48

131.86

244.70

106.58

93.20

21.24

Page 22: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 22

DEDUCTION ON BOTH SIDES

Door – D

Window – W

Ventilator – V

Sundries

ADD FOR SIDES AND SOFFITS ETC.,

Door – D

Window – W

Ventilator – V

Sundries

2x24

2x42

2x8

1x24

1x42

1x8

1.20

1.20

0.90

6.00

5.10

3.00

-

-

-

-

-

-

-

2.10

1.35

0.60

0.13

0.13

0.13

20.16

136.08

8.64

20.59

27.85

3.12

0.42

1,392.00 sqm

11. Centering and shuttering including shuttering propping etc., and removal of parns for foundation,

footings, bases of columns etc., mass concrete and precise shelves. and removal of forms for lintels, beams plinth

beams girders bressumers and cantilevers

SL.

NO

DESCRIPTION OF WORK NOS. LENGTH BREADTH DEPTH QUANTITY

1 COLUMN FOOTING 1x52 5.40

-

0.30

84.24

2 COLUMN 1x52

1x26

1x8

1.36

0.92

1.36

-

-

-

6.65

6.65

3.65

470.29

159.07

39.71

Page 23: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 23

3

4

5

6

7

8

GRADE BEAM

LINTEL BEAM

ROOF BEAM

ROOF SLAB

HEAD ROOM ROOF SLAB

SUNSHADE

Sundries

1x26

1x4

1x2

1x26

1x4

1x2

1x26

1x4

1x2

1x2

1x2

1x2

1x1

7.43

36.19

36.19

7.43

36.19

36.19

7.43

36.19

36.19

20.86

8.56

8.56

33.20

-

-

-

-

-

-

-

-

-

-

-

-

-

1.13

1.13

1.13

0.69

0.69

0.69

1.13

1.13

0.83

0.83

39.18

3.46

0.60

218.29

163.58

81.79

107.66

99.88

16.84

218.29

163.58

60.08

34.63

670.76

59.24

19.92

0.85

2,667.00 Sqm

Page 24: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 24

12. Providing and laying the weathering course using brick jelly concrete 1:2 including curing, scaffolding, etc.

SL.

NO

DESCRIPTION OF WORK NOS.

LENGTH

BREADTH DEPTH QUANTITY

1

ROOF SLAB

Sundries

1x2

8.56

39.18

0.10

67.08

0.92

68.00 Cum

13. Providing and laying the pressed tiles over the weathering course using CM 1:5 including curing and finishing the joints with

red-oxide, etc.

SL.

NO

DESCRIPTION OF WORK NOS. LENGTH BREADTH DEPTH QUANTITY

1

ROOF SLAB

Sundries

1x1

8.56

39.18

-

670.76

0.24

671.00 Sqm

14. Painting the wood works with two coats using best available Nerolac paint including all materials and labour charges, etc.

SL.

NO

DESCRIPTION OF WORK NOS. LENGTH BREADTH DEPTH QUANTITY

1x1 133.00 x 2.35

(Wooden Area X Co-Efficient)

312.55

0.45

313.00 Sqm

Page 25: Dear Donors, - GlobalGivingDuring rainy season, the entire shed will be soaked with rain water. This causes children to undergo mental stress. Since we are running this Home from local

N O C O M E T R U S T - N A V A K I A G A O R P H A N A G E C A R E H O M E C e l l : 9 0 4 7 2 8 1 7 4 3 W e b : n o c o m e t r u s t . c o m E M a i l n a v a k i r a h a o r p h a n a g e @ y a h o o . c o m , P h : 9 1 - 4 3 6 8 - 2 2 6 7 1 4 C e l l : 9 0 4 7 2 8 1 7 4 3

Page 25

15. White washing one or two coats complete plastered area using available Distemper including curing, scaffolding, etc.

SL.

NO

DESCRIPTION OF WORK NOS. LENGTH BREADTH DEPTH QUANTITY

1 1x1 As per Item No. 8 & 10 2,041.00 Sqm

16.Colour washing one or two coats with best available Distemper including curing, scaffolding, et

SL.

NO

DESCRIPTION OF WORK NOS. LENGTH BREADTH DEPTH QUANTITY

1 1x1 As per Item No. 10 1,392.00 Sqm

17. Provision for providing the Electrical and Water supply arrangements to the building L.S.

18. Provision for providing the Sanitary and Septic tank arrangements to the building L.S

ENGINEER