11
1 EFET www.EFET.org Day ahead capacity Workshop Bonn 9 February European Federation of Energy Traders EFET position Adam Cooper EFET Gas Committee

Day ahead capacity Workshop Bonn 9 February

  • Upload
    buck

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

Day ahead capacity Workshop Bonn 9 February. European Federation of Energy Traders. EFET position Adam Cooper EFET Gas Committee. Outline. Background to proposals Initial proposals. Background to Proposals. Development of German virtual hubs ERT development of a ‘Choice market’ - PowerPoint PPT Presentation

Citation preview

Page 1: Day ahead capacity  Workshop Bonn 9 February

1EFETwww.EFET.org

Day ahead capacity

WorkshopBonn 9 February

European Federation of Energy Traders

EFET positionAdam Cooper EFET Gas

Committee

Page 2: Day ahead capacity  Workshop Bonn 9 February

2EFETwww.EFET.org

Page 3: Day ahead capacity  Workshop Bonn 9 February

3EFETwww.EFET.org

Page 4: Day ahead capacity  Workshop Bonn 9 February

4EFETwww.EFET.org

• Background to proposals

• Initial proposals

Outline

Page 5: Day ahead capacity  Workshop Bonn 9 February

5EFETwww.EFET.org

Background to Proposals

• Development of German virtual hubs

• ERT development of a ‘Choice market’

• Concern about how to participate

• Availability of capacity viewed as important for liquidity and hub

success

• Capacity access may reduce imbalance risk

• EFET developed ideas for a quickly implemented pilot solution

Page 6: Day ahead capacity  Workshop Bonn 9 February

6EFETwww.EFET.org

Initial Proposals

• Proposed a number of border points for firm and interruptible

capacity

• Sought a bundled entry-exit product to enhance hub to hub trading

• Allow voluntary capacity recycling from users

• Outlined timetable

• Considered revenue issues

Page 7: Day ahead capacity  Workshop Bonn 9 February

7EFETwww.EFET.org

Border Points

Location TSO Exit TSO Entry

Auction Capacity (MW)

Firm/ Interruptible

Bunde-Oude Statenzijl GTS BEB 300 Firm

Bunde-Oude Statenzijl BEB GTS 300 Firm

Bunde-Oude Statenzijl GTS EGT 300 Firm

Bunde-Oude Statenzijl EGT GTS 300 Firm

Emden EPT or –NPT terminal

Gassco EGT 300 Firm

Emden EPT or –NPT terminal

Gassco BEB 300 Firm

Emden EPT or –NPT terminal

Gassco GTS 300 Firm

Ellund Energinet BEB 300 Firm

Ellund BEB Energinet 300 Interruptible

Ellund Energinet EGT 300 Firm

Ellund EGT Energinet 300 Interruptible

Page 8: Day ahead capacity  Workshop Bonn 9 February

8EFETwww.EFET.org

• Any time before the auction up to 0900 invite shippers to

voluntarily offer any available capacity

• Before 0930 the operator publishes available capacity and its

nature

• Between 0930 and 1000 participants indicate volume and price

bids in Euro/MW

• Results before 1015

Timetable D-1

Page 9: Day ahead capacity  Workshop Bonn 9 February

9EFETwww.EFET.org

Nature of Auction

• Held early in the day to promote further trading activity

• No upper or lower price limits

• Could use a cleared price

• Same per unit revenues (could differ for firm and interruptible)

accrue to either the TSO or users offering capacity

• Half revenue to users placing only entry or exit

Page 10: Day ahead capacity  Workshop Bonn 9 February

10EFETwww.EFET.org

Implementation

• Sought implementation by 1 April 2007

• Auction through secure websites

• Use of a common platform to avoid system duplication

• Outcomes to provide lessons for auctions of other capacity

products

Page 11: Day ahead capacity  Workshop Bonn 9 February

11EFETwww.EFET.org

Thank you!