    LANDMARK COMMISSION JULY 2, 2012

    FILE NUMBER: CA112-312(MD) PLANNER: Mark DotyLOCATION: 1309 Main Street DATE FILED: June 7, 2012STRUCTURE: Main & Contributing DISTRICT: Republic (Davis) BldgCOUNCIL DISTRICT:14 MAPSCO: 45-PZONING:PD-619 CENSUS TRACT: 0031.01

    APPLICANT: Wiedamark LLC

    REPRESENTATIVE: Mark Reed-Walkup

    OWNER: DAVIS METRO LP

    REQUEST:1) Install two flex strip, ten spot and ten flood lights at cupola.2) Install twelve flex strip lights at roof line cornice.3) Install 40 linear bar lights on the facade.4) Install four linear bar and two spot lights on central window facade.5) Install ten string lights on 4th floor ledge.6) Install two flex lights on decorative frieze.7) Install eight sconces (two per entrance) at doorways.

    BACKGROUND / HISTORY: None.

    ANALYSIS: The preservation criteria mentions that lighting should be appropriate andenhanced the structure, and with portions of the structure currently lighted, Staff feelsthe proposed lighting will be appropriate as well as energy efficient.

    STAFF RECOMMENDATION:1) Install two flex strip, ten spot and ten flood lights at cupola. Approve - Approve

    drawings and specifications dated 6/20/12 with the finding the proposed work isconsistent with the criteria for building site and landscaping and outdoor lightingin the preservation criteria Section 3.3, and it meets the standards in City CodeSection 51A-4.501(g)(6)(C)(i).

    2) Install twelve flex strip lights at roof line cornice. Approve - Approve drawingsand specifications dated 6/20/12 with the finding the proposed work is consistentwith the criteria for building site and landscaping and outdoor lighting in thepreservation criteria Section 3.3, and it meets the standards in City Code Section51A-4.501(g)(6)(C)(i).

    C 4-1

  • 7/31/2019 Davis Building Landmark Lighting

    2/36

    C 4-2

    3) Install 40 linear bar lights on the facade. Approve - Approve drawings andspecifications dated 6/20/12 with the finding the proposed work is consistent withthe criteria for building site and landscaping and outdoor lighting in thepreservation criteria Section 3.3, and it meets the standards in City Code Section51A-4.501(g)(6)(C)(i).

    4) Install four linear bar and two spot lights on central window facade. Approve -Approve drawings and specifications dated 6/20/12 with the finding the proposedwork is consistent with the criteria for building site and landscaping and outdoorlighting in the preservation criteria Section 3.3, and it meets the standards in CityCode Section 51A-4.501(g)(6)(C)(i).

    5) Install ten string lights on 4th floor ledge. Approve - Approve drawings andspecifications dated 6/20/12 with the finding the proposed work is consistent withthe criteria for building site and landscaping and outdoor lighting in thepreservation criteria Section 3.3, and it meets the standards in City Code Section51A-4.501(g)(6)(C)(i).

    6) Install two flex lights on decorative frieze. Approve - Approve drawings and

    specifications dated 6/20/12 with the finding the proposed work is consistent withthe criteria for building site and landscaping and outdoor lighting in thepreservation criteria Section 3.3, and it meets the standards in City Code Section51A-4.501(g)(6)(C)(i).

    7) Install eight sconces (two per entrance) at doorways. Approve - Approvedrawings and specifications dated 6/20/12 with the finding the proposed work isconsistent with the criteria for building site and landscaping and outdoor lightingin the preservation criteria Section 3.3, and it meets the standards in City CodeSection 51A-4.501(g)(6)(C)(i).

    TASK FORCE RECOMMENDATION:1) Install two flex strip, ten spot and ten flood lights at cupola. Approve - Original

    submittal approved as submitted.2) Install twelve flex strip lights at roof line cornice. Approve - Original submittal

    approved as submitted.3) Install 40 linear bar lights on the facade. Approve - Original submittal approved

    as submitted.4) Install four linear bar and two spot lights on central window facade. Approve -

    Original submittal approved as submitted.5) Install ten string lights on 4th floor ledge. Approve - Original submittal approved

    as submitted.6) Install two flex lights on decorative frieze. Approve - Original submittal

    approved as submitted.7) Install eight sconces (two per entrance) at doorways. Approve with conditions -

    The proposed sconces at the entries be submitted with mounting methods.

  • 7/31/2019 Davis Building Landmark Lighting

    3/36

    C 4-3

  • 7/31/2019 Davis Building Landmark Lighting

    4/36

    C 4-4

  • 7/31/2019 Davis Building Landmark Lighting

    5/36

    C 4-5

  • 7/31/2019 Davis Building Landmark Lighting

    6/36

    C 4-6

  • 7/31/2019 Davis Building Landmark Lighting

    7/36

    C 4-7

  • 7/31/2019 Davis Building Landmark Lighting

    8/36

    C 4-8

  • 7/31/2019 Davis Building Landmark Lighting

    9/36

    C 4-9

  • 7/31/2019 Davis Building Landmark Lighting

    10/36

    C 4-10

  • 7/31/2019 Davis Building Landmark Lighting

    11/36

    C 4-11

  • 7/31/2019 Davis Building Landmark Lighting

    12/36

    C 4-12

  • 7/31/2019 Davis Building Landmark Lighting

    13/36

    C 4-13

  • 7/31/2019 Davis Building Landmark Lighting

    14/36

    C 4-14

  • 7/31/2019 Davis Building Landmark Lighting

    15/36

    C 4-15

  • 7/31/2019 Davis Building Landmark Lighting

    16/36

    C 4-16

  • 7/31/2019 Davis Building Landmark Lighting

    17/36

    C 4-17

  • 7/31/2019 Davis Building Landmark Lighting

    18/36

    C 4-18

  • 7/31/2019 Davis Building Landmark Lighting

    19/36

    C 4-19

  • 7/31/2019 Davis Building Landmark Lighting

    20/36

    C 4-20

  • 7/31/2019 Davis Building Landmark Lighting

    21/36

    C 4-21

  • 7/31/2019 Davis Building Landmark Lighting

    22/36

    C 4-22

  • 7/31/2019 Davis Building Landmark Lighting

    23/36

    C 4-23

  • 7/31/2019 Davis Building Landmark Lighting

    24/36

    C 4-24

  • 7/31/2019 Davis Building Landmark Lighting

    25/36

    C 4-25

  • 7/31/2019 Davis Building Landmark Lighting

    26/36

    C 4-26

  • 7/31/2019 Davis Building Landmark Lighting

    27/36

    C 4-27

  • 7/31/2019 Davis Building Landmark Lighting

    28/36

    C 4-28

  • 7/31/2019 Davis Building Landmark Lighting

    29/36

    C 4-29

  • 7/31/2019 Davis Building Landmark Lighting

    30/36

    C 4-30

  • 7/31/2019 Davis Building Landmark Lighting

    31/36

    C 4-31

  • 7/31/2019 Davis Building Landmark Lighting

    32/36

    C 4-32

  • 7/31/2019 Davis Building Landmark Lighting

    33/36

    C 4-33

  • 7/31/2019 Davis Building Landmark Lighting

    34/36

    C 4-34

  • 7/31/2019 Davis Building Landmark Lighting

    35/36

    C 4-35

  • 7/31/2019 Davis Building Landmark Lighting

    36/36