David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
CF Overview & Status
•Design Status
•CMGC Status
•Latest VE Decisions
•CF Total Estimated Cost
•Beneficial Occupancy Dates
•CF Organization
•Summary
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Design Status
√ Title I - completed May 04
√ Interim services by JE between Title I/Title II – completed at the start of Title II
√ Final Tunneling Memorandum and Geotechnical Investigation Report completed Jan 05
√ Geotechnical Baseline Report (GBR) awarded April 05 to HatchMott MacDonald
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Design Status – cont’d
√ Title II AE Design Kickoff March 29-30√ 30% design review was performed in Aug-Sept 05
Meeting was held at JE Cypress facility to review sum total of <1,000 comments from the various disciplines
100% civil design delivered Oct 26, 05Road-work for North Access Road/Survey Tower Road
Open excavation at EBD/FEE/NEH
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Design Status – cont’d
60% design review scheduled for Oct 28 (will likely be delayed ~ 3 weeks as a result of recent VE decisions)
100% design review Jan 18, 05
Progress drawings for design reviews are available at http://www-ssrl.slac.stanford.edu/lcls/cf/
When performing design reviews…A commitment for a timely review and response back to JE is necessary
system mgrs
citizen committees
various groups and departments, i.e. CEF, ES&H, SU
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Design Status – cont’d
30% construction cost estimate delivered by JE Oct 4, 05 ($74.3M)
Title I Estimate $50.2MDCN process was followed for all design changes to include estimated hard cost
Valued at ~$3.5M
30% independent cost estimate delivered by WDWC Oct 7, 05 ($66.4M)
Title I Estimate $72M
Reconciliation report needs to be completed
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
CMGC Status
Approved!SO DOEChicago DOEWashington DOE
Awarded to Turner Construction (TC) Oct 17, 05
Phase I - $.6MPhase II - $12MIncentive Fee - $.55M
Safety Schedule
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
CM/GC Phase 1 EffortPhase 1 – preconstruction activities to include:
Provide effective overlap period and oversight of effort during Title IIEstimates during Title II CPM ScheduleIdentify lead-time for critical itemsDesign coordination
Constructability reviews Value Engineering reviews
Site investigation
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
CM/GC Phase 1 Effort – cont’d
Develop construction bid packagesDevelop list and contact potential biddersDevelop prequalification criteriaSolicit bidsRecommend award to SLAC for approval of subcontractorAward contract to subcontractors
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
CM/GC Phase 1 Effort – cont’d
Develop Project Management Plan (PMP)Construction Management Plan – outlines project scope, organization, and specific approach to accomplish projectProject Safety Plan – project specific identifying job hazards, safety performance and individuals responsible for project safetyProcurement Plan – identifies systems, methods and procedures for solicitation to subcontractorsQuality Control and Assurance Plan – method of controlling time, cost and quality of various management tasks specific to the project
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
CM/GC Phase 2 EffortPhase 2 – CM/GC shall provide all materials, labor, and services required to construct the Project
All general conditions including field personnel, office staff, temporary offices, temporary construction, safety implementation, construction equipment, coordination of all subs, project administration, construction waste management, commissioning
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
CMGC Status – cont’d
Held Kick-off meeting Oct 19, 05Delivered cost estimates from both JE and WDWCAE Design scheduleOther data was relayed i.e. weekly Owner/Architect/Contractor (OAC) meetings, etcCritical message
Safety First!Cost estimate for CLOC Construction sequencing, particularly the demolition of FFTBCivil work
North Access RoadOpen cut
Schedule of preparation of procurement packages for constructionRemaining Phase II work
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
JE Est
WDWC Est
Cost Estimates
Largest variance!
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Title II JE Cost Summary by CSI
Title I Est $50M
Title II Est $74.4M
Variance $24.1M↑
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Title II JE Cost Summary by CSI
Mechanical $8M (TI) vs $13.4M (TII) delta of $5.4M↑
Site-work $4.2M (TI) vs $7.4 (TII) delta of $3.2M↑
Electrical $5.8M (TI) vs $12.8 (TII) delta of $7M↑
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Title II JE Cost Summary by Area
Areas with most significant increase:
•UH $4.3M →$10.9M •NEH $6.4M →$9.6M•CUP $395K →$2.8M•XRT $3.8M →$5.7M•FEH $6M →$10.7M•CLOC $12.9M →$21.3M
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Title II Breakdown by Structure (with Area)
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Cost Estimate
Delta results in reduction in scope of various items
To date $11M worth of scope has been reduced
Total value of items continue to fall short of remaining in the box by ~$3.6M
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
VE Scope Reductions - Tunneling
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
•T2 – shorten xrt 60’ and access tunnel 40’
•T3a – enlarge access tunnel to 19’
•T5a/b – square off transition tunnel, shift FEH 60’ to the west (T2)
•T6 – cut/cover FEH (not approved)
XRT/FEH Tunnel Floor Plan
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Architectural, Site, Finishes
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Architectural, Site, Finishes – cont’d
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
A01 – Delete masonry veneer
NEH – Service Yard Entrance
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
A15 – Reduce glazing
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
A07 – 3rd floor shell only, no interior build out
CLOC Floor Plan 3rd Floor
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
A12 – Eliminate Conf Ctr
Conf Center Floor Plan
Conf Center Elevation
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Architectural, Site, Finishes – cont’d
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
G08 – use pan form concrete
NEH Cross Section
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
G10 – reduce size of basement level shaft
NEH Floor Plan – Basement Level
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Architectural, Site, Finishes – cont’d
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
S06 – replace screen wall at CUP service yard w/ 8’ mesh fence
Site Plan
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
S03 – reduce excavated bowl
S04 – reduce retaining walls
Site Plan - CLOC
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Mechanical Scope Reductions
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Mechanical Scope Reductions – cont’d
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Mechanical Scope Reductions – cont’d
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
M13 – place baseline UH design with alt plan
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Mechanical Scope Reductions – cont’d
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Electrical Scope Reductions
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Electrical Scope Reductions – cont’d
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Summary of Scope Reductions
Tunneling - $.847M
Architectural, Structural, General - $4.484M
Mechanical - $3.782M
Electrical - $1.762M
Running Total = ~$11MAll cost reductions have been approved by Systems Managers and Project Office.
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
BTH
UNDULATOR HALL
ELECTRON BEAM DUMP & FEE
NEAR EXPERIMENTAL HALL AND CENTRAL LABS & OFFICE
X-RAY TRANSPORT & DIAGNOSTICS TUNNEL
FAR EXPERIMENTAL HALL (redesign)
LCLS CF RenderingAt grade in RSY
Cut & Cover
Location ofPep Ring Rd
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
19% 4%
77%1.9.1 System Management & Integration
1.9.2 Title 1 & Title 2 Conventional Facilities
1.9.3 Construction-T3 Conventional Facilities
CF Cost Estimate – Aug 05
Total CF Cost = $80.6M
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Beneficial Occupancy Dates (L3 and L4)
Sector 20
3/31/06
MMF
4/3/06
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
CF Staff FY 06-08
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
SummaryOpen Issues…
Prepare for upcoming Lehman visit on Nov 17, 05Demonstrate readiness for CD-3 Review (7-9 February 2006)Title II 60% design review coming shortly (?)Geotechnical Baseline Report (GBR) in process, due in parallel with design by outside separate consultantIndependent Seismic Peer Reviewer on-board and working with JE (Forell/Elsesser Engineers, Inc.)S20 and MMF to complete construction in the next 120 calendar days by XL Construction
Changes will delay BO date
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
Summary – cont’dTurner Construction (TC) to begin full steam ahead
Conduct cost estimate and major planning, conduct VE and constructability reviews, project schedule and develop bid packagesPossible advancement Phase II effort
RSY North Access Road [1]Memo was sent SSO requesting approval to commence this activity
Open-cut of NEH area [1] ?Utility investigation?
Title III Construction for RSY – CLOC by TC (03/06)MEP Technical Review will be required within the next 4 weeksResolution to additional near future de-scope items
David Saenz
FAC Review CF Design, Cost and Schedule Maturity [email protected]
Oct 27, 2005
End of presentation