High Solids Loading for a DAFT Retrofit for Co-Thickening Operation Session 8 | Biosolids and Digestion David Newman, Richard Kelly, John Bratby | Brown and Caldwell Chris Hatch, Michael Patrick | City of Tacoma October 23 | 2012

David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

High Solids Loading for a DAFT Retrofit for Co-Thickening Operation

Session 8 | Biosolids and Digestion

David Newman, Richard Kelly, John Bratby | Brown and Caldwell Chris Hatch, Michael Patrick | City of Tacoma

October 23 | 2012

Page 2: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

Puget Sound and Tacoma, WA

Page 3: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

• 150 mgd peak daily primary treatment capacity

• 60 mgd secondary treatment capacity

• HPO AS secondary treatment • ATAD to TPAD biosolids

stabilization process

The Central Treatment Plant

Page 4: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

CTP Schematic

Page 5: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

Project Background

• City thickened primary sludge in primary clarifiers •  Fermentation in primaries •  Floating primary sludge •  Filament growth & bulking

• City stopped PS thickening in primaries •  “Thinner sludge” pumping •  Capacity issues in the digesters and

dewatering

5

Page 6: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

2007 CTP Optimization Study

6

Page 7: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

Capacity Limits at CTP (from 2007 optimization study)

7

 

30 31 32 33 34 35 36 37 38 39 40

Sec Clarifier SLR limit (note 3)

DAFT SLR limit (note 2)

Anaerobic digester hydrauliclimit

Belt filter press SLR limit (note1)

Belt filter press hydraulic limit(note 1)

HPO oxygen generatingcapacity - 1 skid (note 4)

Plant Capacity (mgd) (max month flow basis)

Capacity Constraints Current winter rated capacity is 38 mgd

33.3 mgd

33.2 mgd

33.1 mgd

Notes: 1. Limit with 4 presses operated during a 40 hour work week. 2. Limit with 3 DAFT units operating and co-thickening WAS and primary solids. 4 DAFT units provide capacity beyond 2027 3. Limit with 5 clarifiers operating with an SVI of 160, SRT of 2.5 days. Includes 20 percent derating factor. 4. Limit with 100% gas return to stage 1 from aerobic digester units. Extra capacity can be obtained if 50% is returned to stage 2.

20272010 2015 202520202007

33.6 mgd

35.4 mgd

37.6 mgd

Page 8: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

To increase capacity of the digesters and belt presses: • Re-institute PS thickening in primaries

•  Difficult to control •  Could cause filament problems

• Construct new separate PS thickening •  Space constrained for new process •  Expensive

• DAFTs could have spare capacity – upgrade for co-thickening

DAFTs at Tacoma

Options to Unlock Solids Stream Constraints

8

Page 9: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

CTP DAFTs Prior to Upgrades

• 4 rectangular DAFTs, 9’ x 45’

9

Waste Activated Sludge

Thickened Sludge to Digestion

Subnatant recycled to

HPOAS

Page 10: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

• Manufacturer’s limit was 40 lb/d/sf •  Topped out at 77 due to pump capacity limit • BC experience with co-thickening showed could likely

load these DAFTs higher

Tacoma and BC Stress Testing (2006) Showed Significant Capacity in DAFTs

10

Time Solids Loading

(lb/day)

SLR

(lb/d/sf)

Polymer Dose

(lb/ton)

Subnatant TSS

(mg/L)

Float Density

(TS%)

Solids Capture

(%) 9:15 17,786 47 4.0 16 3.95 99.8%

10:00 22,842 60 5.5 14 3.76 99.8%

10:25 22,158 58 5.7 13 4.17 99.8%

11:00 24,968 66 5.7 15 4.55 99.8%

12:00 29,239 77 2.5 30 3.45 99.5%

12:40 27,594 73 6.7 17 4.08 99.7%

Page 11: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

DAFT Capacity Gain

Unit Process

Design Capacity

Re-Rated Capacity

Capacity Increase

DAFTs 40 lb/dy/sf 80 lb/dy/sf 100%

•  Unlocking DAFT capacity: •  Allows for modification to co-thickening •  Primary sludge thickened before feeding to digester retrieves

digester capacity from 15 to 25 days SRT •  Unlocking digester capacity allows for potential addition of co-

digestion wastes for greater gas production

Page 12: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

The Potential Impact of Co-Thickening

• DAFT float at 6%

Page 13: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

Decision to Pursue Co-Thickening

• 4 rectangular DAFTs, 9’ x 45’

13

Waste Activated Sludge

Thickened Sludge to Digestion

Subnatant recycled to

HPOAS

Primary Sludge

Polymer

Page 14: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

Multiple modifications needed:

• Primary sludge conveyance • Air saturation system analysis,

upgrade as necessary • Polymer system improvements • Add odor control • Modify/upgrade underflow sludge

system • Upgrade thickened sludge pumps • Automate the system

Upgrade DAFTs for Co-Thickening

14

Page 15: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

Primary Sludge Conveyance Evaluation

• Alternatives 1. Re-use existing 8” line 2. New 6” through gallery 3. New 6” buried

• Recommendation – Alternative 2 •  Velocities too low in 8” •  Condition of unlined 8” line •  Buried line is more costly •  New PS feed lines: glass-lined

pipe w/ hot water flushing

Page 16: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

•  Tested air transfer efficiency using Bratometer •  Only 40% efficient

• Existing tanks and recirculation pumps couldn’t supply recommended 0.03 A:S ratio at design conditions

Saturator testing with Bratometer

Air Saturation System Testing

16

Page 17: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

• Recommended to replace air saturation tanks and recirculation pumps

• New Air Saturation Tanks •  Larger tanks by Westec •  Larger recirculation pumps

Design Modifications for A:S System

17

New Saturation Tanks

Page 18: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

•  Improve polymer injection system

•  Move injection point closer to DAFT inlet

•  Injection ring replaced injection quill.

Design Modifications for Polymer System

18

DAFT Polymer Metering Pumps

Page 19: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

• New Odor Control • New Thickened Sludge

Pumps •  Doubling load •  Had been rebuilding PC

pumps with increasing frequency

Additional Modifications for Upgraded System

19

New Thickened Sludge Pumps

Page 20: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

•  Improved Automation

•  Automatic safety features •  Sludge density meters (float

and underflow) •  Speed control of float

collection •  Automatic underflow sludge

pumping •  Automatic polymer trimming

Design: Automation of Upgraded System

20

Page 21: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

• Saturation Tank Improvements •  New discharge pressure control valve to reduce replacement

from wear •  Replaced air exhaust solenoid with slow-acting ball valve

O&M Saturation Tank Modifications

21

Exhaust PRV

Exhaust Solenoid

Page 22: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

• Saturation Tank Improvements

•  Added visual readouts for pressure and level

•  New RADAR level control device •  Replaced magnetic float

Operations and Maintenance Modifications

22

New RADAR Unit and visual readouts

Page 23: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

• Replaced bottom sludge collectors •  Increased underflow

• Removed abandoned gearboxes from float collectors

O&M Float and Underflow Modifications

23

Page 24: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

• Elevated grit content in DAFT underflow and saturation tank

• Grit Washer undersized •  System upgraded

• DAFT performance has improved since upgrades.

Grit System Improvements

24

Grit Classifier/Washer

Page 25: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

• Eliminated odor control covers/chemical scrubber •  Odors insignificant •  Improves visual inspection •  Manual control tied to surface

coverage of float

Operations and Maintenance Changes

25

Odor Control Covers on DAFT

Page 26: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

One Small Change…

Page 27: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

DAFT Solids Loading Performance

27

1 DAFT in Service 2 DAFT s in Service

Page 28: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

Thickening and Capture Performance

28

Page 29: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

0

2

4

6

8

10

12

14

16

18

20

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

May

-10

Aug-

10

Nov

-10

Feb-

11

May

-11

Aug-

11

Nov

-11

Feb-

12

May

-12

Pol

ymer

Dos

e [lb

Pol

y/dr

y to

n]

Solid

s Ca

ptur

e Ef

ficie

ncy

[%]

WAS only CaptureCothickening CaptureWAS only Polymer DoseCothickening Polymer Dose

Co-thickening Average Dose = 4.2

WS Only Average Dose = 4.9

Polymer Use

29

3.6

Page 30: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

Air to Solids Ratio

30

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

0.080

0.090

0.100

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

May

-10

Aug-

10

Nov

-10

Feb-

11

May

-11

Aug-

11

Nov

-11

Feb-

12

May

-12

Air

to S

olid

s (A

/S) R

atio

[m

L/m

g]

Solid

s Ca

ptur

e Ef

ficie

ncy

[%] WAS only Capture

Co-thickening CaptureWAS Only A-S RatioCo-Thickening A-S Ratio

Co-thickeningAverage A:S= 0.056

WAS OnlyAverage A:S = 0.029

Page 31: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

Parameter WAS Only 05/2010 – 03/2011

Co-thickening 04/2011 – 05/2012

Change

Influent Loading, lb/day 20,197 40,939 103%

DAFTs online 1 2 100%

Solids Loading Rate, lb/d/sf 47.9 48.3 1%

Capture, percent 96.0% 94.5% -2%

Float, percent 3.6% 4.5% 23%

Subnatant, mg/L 40 262 558%

A/S Ratio, mL/mg 0.029 0.056 96%

Polymer Dosage, lb/ton 4.9 4.2 -13%

DAFT Average Performance Summary

31

Page 32: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

•  Install second turbidity meter •  Indicator of excessive float build-up at far end of DAFT

• Extend the subnatant baffle wall to improve capture efficiency /prevent carryover of floatable solids.

• Relocate valves and solids density meters for improved maintenance access

• Additional process and operation training on co-thickening operation

Future Operations Improvements

32

Page 33: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

• Successful co-thickening operation at high SLRs •  SLR loadings average 50, up to 90 lb/d/sf •  Solids thickness controlled to 4.5%, but as high as 7% •  Solids capture rates >94%

• Polymer use remains low •  < 5 lb polymer/dry ton

• City changes have improved overall safety, reliability and operability

Conclusions

33

Page 34: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

Benefits

34

•  Two for the price of one

Increased Digester Capacity

Improved Secondary

Performance

DAFT Co-Thickening

Page 35: David Newman, Richard Kelly, John Bratby | Brown and ... · Project Background • City thickened primary sludge in primary clarifiers • Fermentation in primaries • Floating primary

• Operations and Maintenance staff at the City of Tacoma

•  Jim Fleming and Jeff McVicker for their help and support during design, startup, testing, and post construction input

•  The BC design team for their input to this paper

Acknowledgements