Scale; 1/4” = 1’-0”
7
6 Permit Set
5 Const. Docs.
4 Permit Set
3 Const. Docs
2 Plan Check Set
1 Prelim. Devel.
No. Date Issue / Revision
OW
NE
R &
SIT
E L
OC
AT
ION
SC
M M
anag
emen
t, L
LC
. 1
086
S. L
inco
ln A
ve.
San
Ber
nar
din
o, C
A 9
2408
-220
5
Ing
ress
& e
gres
s pl
an
Bu
ildin
g #
A
(Par
tial)
Firs
t & S
econ
d F
loor
Pla
n
Project Number
Drawn by,
PL Jr., PL Sr. DATED
06/01/2017
A2.12
Sheet Title
Bldg. A Floor Plan
Travel Pathways
Liptak & Sons General Contractor
since 1974, Lic.#306670 6961 Adele Lane
Jurupa Valley, CA 92509 (951)312-5399
Designer; Philip A. Liptak
email;
80’-0”
36” Emergency Exit Door Only,
w/panic Hardware, typ.
Entrance, Lobby & Elevator,
est. 186 SF
5’ Corridor, est. 333 SF
4
2”
EXIT
63’
75’
73’
24’
11’+
DA
CP
FA
CP
AL
AR
M P
LAN
S,
FLO
OR
ZO
NE
MA
P..
.
SP
AR
E
HE
AD
S
RIS
ER
, pe
r C
od
es
Fire Control Room Door
KEEP CLEAR
Switch Gear 1,600 amp Panel,
Pending Engr. Calcs.
Break Area 433 SF
REF. MIC.
Control Room est. 1,265 SF
4’
4’
4’
4’
Sec
urity
Sys
tem
s
Mis
c. S
yste
ms
CC
TV
Mon
itorin
g S
cree
ns
30 x 72
30 x 72
Ser
vice
Doo
r AD
A S
ize
(sho
wn)
Elevator Equipment
ADA Restroom, est. 118 SF
CART
2’
2’
2’ Systems
Sys
tem
s
Panels Controls
Systems
42” DOOR
Mis
c. S
uppl
ies
2’
2’
2’
Sys
tem
s S
yste
ms
Sys
tem
s
Mis
c. S
uppl
ies
Mis
c. S
uppl
ies
(85’-0” Outside)
35’-0”
39’-0”
26’-0”
4’-0”
Double Entry
Doors w/ Key Pad
Access
4
2”
4
2”
42”
V VEG Room, est. 797 SF
42” DOOR
Sys
tem
s
CART
Mis
c. S
uppl
ies
EX
IT
N
Unit #2, 2nd. Floor Emergency Exit for Break & Control Room, Zone C, D & V (Staircase System)
EXIT
5’-0” (x) 10’-0” Landing
36” Emergency Exit Door Only,
w/panic Hardware, typ.
Unit #2, Main Entrance; Emergency Exit for
Restroom, Lobby, etc. (Staircase & Handrail System, per codes)
10’-0
”
5’-0
”
90 Deg.
90 Deg.
10’
34’
58’
8’-0”
C est. 1,797 SF
36’-6” (x) 49’-10”
D est. 1,855 SF
37’-6” (x) 49’-10”
36’-6”
49’-10”
37’-6”
60’
Arial 14 Text box
Note; Distance to outside the building 12
” C
MU
(H
eavy
Wal
l), N
.T.S
.
Note; All Ceilings to be 10’-0” Ht., typical of entire
1st. & 2nd. floors
25’-0”
28’-6”
16’-0”
16’
28’
32’
19’-0”
25’-0”
Scale; 1/4” = 1’-0”
7
6 Permit Set
5 Const. Docs.
4 Permit Set
3 Const. Docs
2 Plan Check Set
1 Prelim. Devel.
No. Date Issue / Revision
OW
NE
R &
SIT
E L
OC
AT
ION
SC
M M
anag
emen
t, L
LC
. 1
086
S. L
inco
ln A
ve.
San
Ber
nar
din
o, C
A 9
2408
-220
5
Project Number
Drawn by,
PL Jr., PL Sr. DATED
06/01/2017
A2.13
Sheet Title
Bldg. A Floor Plan
Travel Pathways
Liptak & Sons General Contractor
since 1974, Lic.#306670 6961 Adele Lane
Jurupa Valley, CA 92509 (951)312-5399
Designer; Philip A. Liptak
email;
2nd. Floor, Unit #2 Emergency Exit for Corridor, Zone A and Zone B
(Staircase, to sidewalk)
(65’-0” Outside CMU)
36’-5”
1,600 AMP
TRAN.
7’ Umbrella, pend-ing
4
4
23’-0”
Emergency Exit Only, w/panic Hardware
Entrance, Lobby & Elevator,
est. 186 SF
5’ Corridor, est. 333 SF
42”
4
2”
EX
IT
57’ 75’
11’+ 28’
Service Door
ADA (min.)
Ele
vato
r
Equ
ipm
ent
ADA Restroom, est. 118 SF
8’ Area
CART
Key Pad Access
Misc. Supplies
57’-0”
Proposed Transformer locations, behind block wall and bollards.
Pad for CO2 Tanks
N
EXIT
5’-0”
5’-0”
Unit #2, Main Entrance; Emergency Exit for Restroom, Lobby, etc. (Staircase & Handrail System, per codes)
10’-0”
5’-0”
1,600 AMP
TRAN.
A est. 1,997 SF
36’-6” (x) 55’-4”
B est. 1,797 SF
36’-6” (x) 49’-10”
36’-5”
49’-10”
C est. 1,797 SF
36’-6” (x) 49’-10”
Ing
ress
& e
gres
s pl
an
Bu
ildin
g #
A
(Par
tial)
Firs
t & S
econ
d F
loor
Pla
n
12” CMU (Heavy Wall), N.T.S.
Note; All Ceilings to be 10’-0” Ht., typical of entire
1st. & 2nd. floors
12’-10”
7’
7’
42’-0”
4 4
CO2 Tanks, per regulations Location subject to change
43’-6”
Building B Units 1 & 2
11,970 SF, each 4’
114’-0”
105’-0”
4’
WA L KWA Y
Sw
itch G
ear 1,600 am
p P
anel
KE
EP
CLE
AR
Break Area
275 SF
Entrance, Lobby & ADA
Elevator, est.
189 SF
23’-6”
34’-3” edge door
RE
F.
MIC
7
6 Permit Set
5 Const. Docs.
4 Permit Set
3 Const. Docs
2 Plan Check Set
1 Prelim. Devel.
No. Date Issue / Revision
OW
NE
R &
SIT
E L
OC
AT
ION
SC
M M
anag
emen
t, L
LC
. 1
086
S. L
inco
ln A
ve.
San
Ber
nar
din
o, C
A 9
2408
-220
5
Project Number
Drawn by,
PL Jr., PL Sr. DATED
06/01/2017
A2.20
Sheet Title
Bldg. B Floor Plan
Overview
Liptak & Sons General Contractor
since 1974, Lic.#306670 6961 Adele Lane
Jurupa Valley, CA 92509 (951)312-5399
Designer; Philip A. Liptak
email;
Control Room est. 1,160 SF
*Access Door
ADA (min.) Ele
vato
r R
oom
ADA Restroom, est. 112+
SF
4’ 4’ 4’ 4’ 4’
Irrigation Controls
Security Systems
Systems
CCTV Monitoring Screens
30 x 72
30 x 72
4’ Walkway
4
2” D
OO
R
42” DOOR
45’-8”
4
2”
DO
OR
45’-6”
4
2” D
OO
R CART
CART
CART
CART
RISER, per Codes
8’
KEYCARD ACCESS
Systems
CART
42” DOOR 42” DOOR
DACP
FACP
ALARM PLANS, FLOOR ZONE MAP...
SPARE HEADS
Misc. Supplies
Misc. Supplies
Misc. Supplies
Systems
Sys
tem
s S
yste
ms
System
s S
ystems
System
s S
ystems
Sys
tem
s S
yste
ms
Control Corridor 550 SF
ZONE (A), est. 1,940 SF
ZONE (B), est. 1,922 SF
ZONE (D), est. 2,005 SF
Fire Control Room Door
EXIT
2nd. Floor Emergency
Exit Staircase to
sidewalk.
EX
IT
Note; Size of restroom to change, pending Elevator details & specifications.
2nd. Floor No Fire Control
Room, only Riser
5’-0”
2nd. Floor Entrance Landing
Exit Staircase to sidewalk.
Reduced Scale; 0.175 = 1’-0”
WROUGHT IRON FENCE (x) 8’ ht., Per Codes...
17’-10”
MAIN ENTRANCE
2nd. Floor Emergency
Exit Staircase to sidewalk.
5’-8”
4’-0”
EX
IT
EX
IT
EXIT
EXIT
EX
IT
ZONE (C), est. 1,922 SF
N
10’-0”
4’-0” 5’-0”
-
A2.22
-
A2.22 -
A2.23
-
A2.23
4’-0”
5’-0”
10’-0”
Cul
tivat
ion
Fac
ility
’s
Od
or
Co
ntr
ol P
lan
- B
uild
ing
#B
O
vera
ll P
lan-
Firs
t & S
econ
d F
loor
CARBON FILTER UNIT typical of all cultivation rooms
12”
CM
U (
Hea
vy W
all),
N.T
.S.
49’-6”
10’-4”
51’-3” 37’-6”
29’-6”
ZONE (V) Veg Room, est. 1,284 SF
43’-3”
36” Exit 36” Exit
36” Exit
Egress to Front
Egress to Back Sides
Note; All Ceilings to be 10’-0” Ht., typical of entire
1st. & 2nd. floors E
gres
s to
Fro
nt
Egr
ess
to B
ack
Sid
es 42’-6”
7
6 Permit Set
5 Const. Docs.
4 Permit Set
3 Const. Docs
2 Plan Check Set
1 Prelim. Devel.
No. Date Issue / Revision
OW
NE
R &
SIT
E L
OC
AT
ION
SC
M M
anag
emen
t, L
LC
. 1
086
S. L
inco
ln A
ve.
San
Ber
nar
din
o, C
A 9
2408
-220
5
Ven
tilat
ion
Pla
n- L
ight
Indu
stria
l B
uild
ing
#B
E
xter
ior
Ele
vati
on
s
Project Number
Drawn by,
PL Jr., PL Sr. DATED
06/01/2017
A2.21
Sheet Title
Bldg. B Elevations
w/Ventilation
Liptak & Sons General Contractor
since 1974, Lic.#306670 6961 Adele Lane
Jurupa Valley, CA 92509 (951)312-5399
Designer; Philip A. Liptak
email;
SCALE: .10 = 1’-0”
SCALE: 1” = 10’-0”
East Elevation
North Elevation
South Elevation
West Elevation
CCTV Note; Actual location of CCTV Cameras subject to change.
See deferred security package for more details.
4’-0” Concrete Sidewalk
105’-0”
114’-0”
114’-0”
30’-0” Ht. CMU (Heavy Wall– 12” typ. ext.)
13’-0”
13’-0”
13’-0”
Landscaping Ideas; Desert Motif Plants (Deferred submittal)
Not all plants are reflected in exterior
elevations. See Site for more
information
Lighting, as req’d.
Lighting, as req’d.
Lighting, as req’d.
CCTV CCTV
CCTV
CCTV CCTV
CCTV
4’ Concrete pathway for Emergency exit doors
3’ Metal Doors w/Panic Hardware,
typical
Metal & Concrete Staircase, Catwalk
and Handrail system, (Deferred submittals) See Sht. A2.22, for
pathways and dimensions
4’ Concrete pathway for Emergency exit doors
PRIMARY DRIVE
10’ Set Back
4’ (min.) Concrete pathway & landing at bottom of staircase. Typical of all
for Emergency exit doors.
4’-0” Concrete Sidewalk
30’-0” Ht. (x) 12” CMU, typical
10’ Set Back
Block Wall
(2) 3’ Decorative Metal Entrance Doors,
typical of 2nd floor
Odor Control Biology
The purpose of this outline is to give greater understanding to the Ventilation Plan, and how we plan to control 99.9% of odor produced in the facility.
and to meet the requirements of ‘Measure O’, or of the current regulating body.
The primary/first stage of filtration of smell will be done through carbon filters. Carbon filtering is a method of filtering that uses a bed of activated carbon to
remove contaminants and impurities, using chemical adsorption. Each particle/granule of carbon provides a large surface area/pore structure,
allowing contaminants the maximum possible exposure to the active sites within the filter media. One pound (454 g) of activated carbon contains a surface area
of approximately 100 acres (~40 Hectares). Activated carbon works via a process called adsorption, whereby pollutant molecules in the fluid to be treated are trapped inside the pore structure of
the carbon substrate. Each production/cultivation room will have a carbon filter unit. Each room/zone
are air tight throughout the day cycle. The cultivation room will have a split HVAC system making it a closed loop system. During the day cycle when lights are on no outside air will circulate through the room. Once the night cycle
begins, the outside air damper will turn on allowing the intake of fresh air. The carbon filter dampers also turn on allowing a balance of airflow and the
ability to clean the air. Within the intake and outgoing air, we have implemented UV Air purification systems to be the final line of defense for
order leaving the facility as well and to kill off any bacteria entering the facility.
Germicidal UV air disinfection systems are very efficient in achieving high disinfection rates of biological contaminants (viruses, bacteria, yeasts and molds)
as well as reducing odors, promoting reactions to inactivate some chemicals and volatile organic compounds (VOCs).
Within other confines of the of the premise we have implemented constant flow carbon filters to clean any air that has escaped from the cultivation rooms due to the opening and closing of doors during working hours. UV ozone generators will be placed throughout the secure areas that control the cultivation rooms within
the facility. Through the use of these policies and procedures we will have the ability to
control 99.9% of all orders escaping the facility.
The Facility Manager, or Operator, to keep a written log of all such filter changes.
Ventilation Plan
All Cultivation (or) Grow Zones, to be equipped with; Carbon Filter Units
These blower style fans contain replaceable filters, that can be put on a regular schedule.
The Facility Manager (or) Operator, to keep a written log of all such Filter changes. Location and size of Unit (Deferred submittal)
are subject to change, pending Mechanical Engineer Review.
105’-0”
Lighting, as req’d.
Metal Staircase and Handrail system,
per codes
Adjacent Property
30’-0” Ht. CMU (Heavy Wall– 12” typ. exterior)
5’-0” ENTRANCE
10’ (x) 5’ Landing (See floor plan)
4’ (min.) Concrete pathway & landing at bottom of staircase. Typical of all for Emergency exit doors.
4’ (min.) Concrete pathway & landing at bottom of staircase. Typical of all for Emergency exit doors.
Off Set Landing (See floor plan)
Off Set Landing (See floor plan)
Off Set Landing (See floor plan)
5’-0”
105’-0”
7’
7’
42’-0”
CO2 TANK 4’ DIA
4’
Sw
itch G
ear 1,600 am
p P
anel
KE
EP
CLE
AR
Break Area 275 SF
Lobby & ADA
Elevator, est.
189 SF
RE
F.
MIC
.
Control Room est. 1,160 SF
*Access Door
Meets ADA (min.) Ele
vato
r R
oom
ADA Restroom,
est. 112+ SF
4’ 4’ 4’ 4’ 4’
Irrigation Controls
Security Systems
Systems
CCTV Monitoring Screens
30 x 72
30 x 72
4
2” D
OO
R
42” DOOR
4
2”
DO
OR
4
2” DO
OR
RISER, per Codes
KEYCARD ACCESS
Systems
DACP
FACP
ALARM PLANS, FLOOR ZONE MAP... SPARE
HEADS
Misc. Supplies
Misc. Supplies
Misc. Supplies
Systems
Sys
tem
s S
yste
ms
System
s S
ystems
Control Corridor
est. 550 SF
Fire Control Room Door
Note; Size of restroom to change, pending Elevator details & specifications.
7
6 Permit Set
5 Const. Docs.
4 Permit Set
3 Const. Docs
2 Plan Check Set
1 Prelim. Devel.
No. Date Issue / Revision
OW
NE
R &
SIT
E L
OC
AT
ION
SC
M M
anag
emen
t, L
LC
. 1
086
S. L
inco
ln A
ve.
San
Ber
nar
din
o, C
A 9
2408
-220
5
Project Number
Drawn by,
PL Jr., PL Sr. DATED
06/01/2017
A2.22
Sheet Title
Bldg. B Floor Plan
Travel Pathways
Liptak & Sons General Contractor
since 1974, Lic.#306670 6961 Adele Lane
Jurupa Valley, CA 92509 (951)312-5399
Designer; Philip A. Liptak
email;
Scale; 1/4” = 1’-0”
10’-4” 45’-6”
45’-8”
ZONE (V) Veg Room, est. 1,284 SF
ZONE (D), est. 2,005 SF 43’-7” (x) 45’-8” +/-
ZONE (A), est. 1,940 SF 42’-7” (x) 45’-6” +/-
MAIN ENTRANCE
40’-0”
30’-10”
CO2 TANK 4’ DIA
2
A-1
2
A-1
N
Ing
ress
& e
gres
s pl
an
Bu
ildin
g #
B
(Par
tial)
Firs
t & S
econ
d F
loor
Pla
n
18’ 27’
24’
37’
36” Exit
31’
60’
Egress to Back Sides
Egress to Front 60’ to front exit 67’
37’
60’
56’
75’
(75’ to back side exit)
43’-6”
29’-6”
Note; All Ceilings to be 10’-0” Ht., typical of entire
1st. & 2nd. floors
24’-6”
19’-3”
6’-0”
9’-10”
Building B Units 1 & 2
11,970 SF, each
7
6 Permit Set
5 Const. Docs.
4 Permit Set
3 Const. Docs
2 Plan Check Set
1 Prelim. Devel.
No. Date Issue / Revision
OW
NE
R &
SIT
E L
OC
AT
ION
SC
M M
anag
emen
t, L
LC
. 1
086
S. L
inco
ln A
ve.
San
Ber
nar
din
o, C
A 9
2408
-220
5
Project Number
Drawn by,
PL Jr., PL Sr. DATED
06/01/2017
A2.23
Sheet Title
Bldg. B Floor Plan
Travel Pathways
Liptak & Sons General Contractor
since 1974, Lic.#306670 6961 Adele Lane
Jurupa Valley, CA 92509 (951)312-5399
Designer; Philip A. Liptak
email;
Scale; 1/4” = 1’-0”
WROUGHT IRON FENCE (x) 8’ ht., Per Codes...
4’
105’-0”
4’
34’-3” edge door
42” DOOR
42” DOOR
Sys
tem
s
System
s S
ystems
System
s
Sys
tem
s S
yste
ms
ZONE (A), est. 1,940 SF
ZONE (B), est. 1,935 SF ZONE (C), est. 1,935 SF
ZONE (D), est. 2,005 SF
EXIT EXIT
N
Ing
ress
& e
gres
s pl
an
Bu
ildin
g #
B
(Par
tial)
Firs
t & S
econ
d F
loor
Pla
n
12” CMU (Heavy Wall), N.T.S.
Egress to Back Sides
Egress to Front
Egress to Back Sides
Egress to Front
50’
75’ to front exit
75’ to back side exit
51’-3”
50’
60’
36” Exit Only 36” Exit Only
70’ 70’
10’-4” 45’-6”
45’-8”
60’ t
o f
ron
t ex
it
37’-6”
Note; All Ceilings to be 10’-0” Ht., typical of entire
1st. & 2nd. floors