DATE: June 25, 2020 TO: Prospective Proposers RE: Addendum #1 to the Proposal Documents for
TJC Welcome Center & Office Building Renovations Tyler Junior College
Tyler, Texas
NOTICE TO PROPOSERS: This Addendum forms a part of the Contract Documents and modifies the original proposal documents dated June 8, 2020 as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Proposer to disqualification. This Addendum consists of 2 pages & 3 attachments:
Architectural 1 page (8-1/2” x 11”) & 1 sheet (11”x17”) Pre-bid Sign-in Sheet 2 pages (8 ½ x 11”) MEP 3 pages (8 ½”x11”) & 2 sheets (30”x42”)
Item 1: See attached sign-in sheet from mandatory Pre-Bid Meeting. Item 2: Assume that all asbestos materials have been removed from both buildings. Refer to spec Section 02 4111 if suspicious materials are encountered.
SPECIFICATIONS
Item 3: Section 01 2000 - Allowance, Alternates & Payment Procedures 1.4 Allowances; K. Allowance Schedule: Add the following: 4. Site perimeter fencing Allowance: Allow a lump sum of $2,100 for approximately 588 linear feet of 6’-0” temporary construction fencing.
Item 4: Section 01 2000 - Allowance, Alternates & Payment Procedures
1.6 Alternates; C. Schedule: Revise Alternate #5 to read ‘Not Used’ in lieu of ‘Paint existing concrete paving at building ‘A’.
6-25-2020
DRAWINGS Item 5: Sheet A0 - Building Code Analysis
1) Applicable Building Code is the 2015 International Existing Building Code in lieu of the 2015 International Building Code. This project is a Level 3 Alteration.
2) Energy Code: Section 908 - Energy Conservation of the 2015 IEBC states that Level 3 Alterations are “... permitted without requiring the entire building or structure to comply with the energy requirements of the IECC …”
Item 6: Sheet A1.0/01 Demolition Site Plan – Base Bid & Alternate #1 Demolition keyed note on the south side of Building ‘A’ to be Note #01 in lieu of #16. Item 7: Sheet A2.0/02 & Keyed Note #29
Clarification: The intent of the spray foam insulation is to prevent air infiltration & close off gaps between the bond beam, roof joist & roof deck at the cmu addition on the north side of Building ‘A’.
Item 8: Sheet A2.0/05, 06, 07 & 08 Building ‘A’ Elevations
Clarifications: 1) The intent of the note “Paint existing canopy & soffit” is to prep the existing fiberglass
canopy for new paint, including the removal of the remaining plastic lettering from the old bookstore.
2) On the north elevation, the existing painted face brick requires prep & new paint similar to the painted cmu.
3) The note “Existing ptd. cmu. Prep for new paint” also applies to the painted cmu on the east elevation.
Item 9: Sheet A2.1/04 Roof Plan Alternate #1 & 05 Section Detail Revise roofing note as follows:
Single-ply roofing system on ¾” insulation board on 1/8” tapered insulation board on minimum 1 ½” rigid insulation on existing deck. Field verify existing deck has an existing slope of 1/8” per foot for a total slope of ¼” per foot.
End
June 25, 2020
ADDENDUM NUMBER ONE ITEMS FOR
TJC WELCOME CENTER AND OFFICE BUILDING RENOVATIONS TYLER JUNIOR COLLEGE EMA PROJECT NO. 1 140 1257 001
ENGINEER: EMA – Engineering & Consulting 328 South Broadway Tyler, Texas 75702
This addendum forms a part of the Contract Documents and modifies the original Construction Documents dated June 8, 2020 as noted below. Careful note of this Addendum shall be taken by all parties of interest so that proper allowance isa made in all computations, estimates and Contracts. This Addendum supersedes all previous Specifications and Instructions pertaining to these items.
This Addendum consists of 3 pages and 2 attachments.
MECHANICAL
GENERAL
1. General Contractor to include an allowance of $13,050.00 for EMCS performedby KVM Controls. Contact Kenneth Marks 903.360.6690.
DRAWINGS
Sheet MH1.1 A. Refer to Sheet MH1.1
1. Mark D return grille outside of office A105 shall have drywall adapter.
ELECTRICAL
DRAWINGS
Sheet EP1.1 A. Refer to Sheet EP1.1
1. Omit requirement for power of circulation pump in Janitor A102
Z:\Harris Craig\TYLER JUNIOR COLLEGE\1 140 1257 001 WELCOME CENTER\ADDENDA 1 140 1257 001\NO 1\ADDENDUM 1 - TJC Welcome Center.docx EMA REGISTRATION NO. F-893
Sheet EP1.2 A. Refer to Sheet EP1.2
1. Plan Note 8 in B108 should read Note 6.2. Plan Note 9 in B108 shall be for suspended water heater above mop sink.3. Relocate power for projector in B111 to East wall for owner furnished TV and
Bracket. Coordinate rough-in height with owner.
Sheet EP8.1 A. Refer to Sheet EP8.1
1. To both panelboard schedules LA and LB: Service shall state “120/240V 1PH3W” instead of current “120/208V 1PH 3W”.
LIGHTING
DRAWINGS
Sheet EL1.1 A. Refer to Sheet EL1.1
1. Omit exit sign in A1012
PLUMBING
DRAWINGS
Sheet PL1.1 A. Refer to Sheet PL1.1
1. Remove and cap existing exterior hose bibb east of Building “A”. Refer toattached sheet.
Sheet PL1.2 A. Refer to Sheet PL1.2
1. Cut off valves added to cold and hot water piping. Refer to attached sheet.2. Piping routed to mop sink in Custodian Room B108. Refer to attached sheet.
TECHNOLOGY
DRAWINGS
Sheet ET1.1 A. Refer to Building “A”
1. Omit ceiling moutned J-Box in A106.
END OF ADDENDUM ITEMS
Z:\Harris Craig\TYLER JUNIOR COLLEGE\1 140 1257 001 WELCOME CENTER\ADDENDA 1 140 1257 001\NO 1\ADDENDUM 1 - TJC Welcome Center.docx EMA REGISTRATION NO. F-893
THIS ADDENDUM CONTAINS ATTACHMENTS
NUMBER OF ATTACHMENTS: (02)
1. Sheet PL1.1 – FIRST LEVEL – PLUMBING FLOOR PLAN2. Sheet PL1.2 – FIRST LEVEL – PLUMBING FLOOR PLAN
B1
A1
F1
G1
H1
3/4"
4W
1"
4C
3/4"
1H
1/2"
2W
1/2"
2H
1"
1C
6
PL1.1
3/4"
1H
1"
1C
1/2"
3W
1"
3W
3/4"
4W
1/2"
3H
4"
1S
3"
7S
3/4"
1W
3"
1S
4"
7S
6S
6S
VTR
VTR
VTR
D1
D1
D2
CO
B1
A1
1/2" CW
2" V
4" SS
2" V
1-1/4" V
4" SS
1/2" CW
1-1/2 SS
VTR
PROJECTNO:
REVISION:
DATE:
:SHEETNUMBER
DRAWING:
TJC WELCOME CENTER& OFFICE BUILDINGRENOVATIONSTYLER JUNIOR COLLEGE1232 E. 5TH ST.
2020-24 06-08-2020
TYLER, TEXAS 75701
AND NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND
WORKING SYSTEM.
SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE
CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOB
CONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING
Tyler | Austin | Houston | DFW | El PasoTBPE Firm Registration No. F-893www.EMAengineer.comPhone: 1 . 800 . 933 . 0538
EMA Engineering & Consulting
1530 E. GRANDE BLVD., TYLER, TX 757039 0 3 . 5 3 4 . 0 9 9 5 w w w . h c a r c h . c o m
ADDENDUM #1
1
PLUMBING - DEMOLITION FLOOR PLAN - BUILDING 'A'
1/4"=1'-0"
PL1.1
2
PLUMBING - FLOOR PLAN - BUILDING 'A'
1/4"=1'-0"
SANITARY SEWER BELOW BUILDING.
SANITARY SEWER BELOW GRADE.
TWO-WAY EXTERIOR CLEAN-OUT.
ONE-WAY EXTERIOR CLEAN-OUT.
ONE-WAY INTERIOR CLEAN-OUT.
WALL CLEAN-OUT.
SANITARY SEWER TIE-IN TO EXISTING.
SANITARY SEWER DOWN IN WALL/CHASE.
COLD WATER ABOVE CEILING.
COLD WATER DOWN IN WALL/CHASE.
COLD WATER TIE-IN TO EXISTING.
COLD WATER IN WALL/CHASE.
HOT WATER SUPPLY ABOVE CEILING.
HOT WATER DOWN IN WALL/CHASE.
HOT WATER UP IN WALL/CHASE.
CONDENSATE DRAIN ABOVE GRADE.
CONDENSATE TIE-IN TO UNIT / AIR HANDLER WITH P-TRAP.
CONDENSATE DRAIN CLEAN-OUT.
CONDENSATE DRAIN DOWN TO CONDENSATE PIT/MOP
SINK.
1W
2W
3W
1S
1H
1C
2C
3C
4C
2H
2S
3S
4S
5S
6S
7S
8S
DOMESTIC COLD WATER
PLAN NOTES
SANITARY SEWER
PLAN NOTES
DOMESTIC HOT WATER
PLAN NOTES
CONDENSATE PIPING
PLAN NOTES
1. PLUMBING CONTRACTOR SHALL REFER TO
ARCHITECTURAL PLANS FOR A.D.A. PLUMBING FIXTURE
AND STANDARD MOUNTING HEIGHTS.
2. PLUMBING CONTRACTOR TO COORDINATE ALL PIPING
ROUTING ABOVE WITH MECHANICAL AND ELECTRICAL
CONTRACTORS BEFORE INSTALLING.
3. ALL VALVES SHALL BE INSTALLED NO HIGHER THAN 2'-0"
ABOVE THE CEILING. ACCESS DOORS TO BE INSTALLED
AT ALL HARD CEILING LOCATIONS.
4. ALL PIPING PENETRATIONS SHALL BE SLEEVED.
COMPLETELY GROUT AROUND OUTSIDE OF SLEEVE AND
FILL SLEEVE VOID AROUND PIPE WITH FIBERFRAX
FYRE-PUTTY.
5. AT ALL DISSIMILAR METAL CONNECTIONS, PROVIDE AND
INSTALL DIELECTRIC UNIONS IMMEDIATELY TO MINIMIZE
USE OF GALVANIZED PIPE MATERIAL.
6. PLUMBING CONTRACTOR SHALL COORDINATE WITH THE
MECHANICAL CONTRACTOR MOUNTING HEIGHTS OF ALL
AIR HANDLERS TO GUARANTEE POSITIVE DRAINAGE OF
ALL CONDENSATE DRAINS (1/8" PER FT. SLOPE -
MINIMUM).
7. MECHANICAL CONTRACTOR TO PROVIDE TO THE
PLUMBING CONTRACTOR THE RECOMMENDED AC
MANUFACTURERS' DATA FOR CONDENSATE TRAPS PER
EACH TYPE OF UNIT.
8. PLUMBING CONTRACTOR TO PROVIDE TRAP GUARDS TO
ALL FLOOR DRAINS AND OPEN SITE DRAINS.
9. DO NOT INSTALL PLUMBING VENTS WITHIN 10'-0" OF ANY
ROOFTOP UNITS OR FRESH AIR UNITS / INTAKES.
COORDINATE WITH MECHANICAL CONTRACTOR.
10. MOUNT A.D.A. FLUSH CONTROLS TO WIDE SIDE OF STALL.
11. ALL CONCEALED EXISTING PIPING SHOWN IS BASED ON
EXISTING M.E.P. DRAWINGS. FIELD VERIFY AS
NECESSARY.
12. PLUMBING CONTRACTOR TO COORDINATE ROUTING OF
ANY NEW SEWER PIPING UNDER EXISTING BUILDINGS
WITH STRUCTURAL ENGINEER TO AVOID PIERS.
PLUMBING GENERAL NOTES
M1
REFRIGERATOR / ICE MAKER
UTILITY BOX
GUY GRAY
MIB1HAAB
COLD MOUNT CONTROLS AT A.D.A. HEIGHT, 1/2" SUPPLY
B1
COUNTERTOP (ADULT)
LAVATORY - A.D.A.
AMERICAN STANDARD
1203004
TEMP/COLD T&S BRASS B-0892 FAUCET (4" CENTERS), 0.5 GPM, P-TRAP, GRID DRAIN, SUPPLIES W/ STOPS,
WATTS CA-411 CARRIER, TRUEBRO LAV-GUARD, BRADLEY S59-4000A TMV
DESCRIPTIONMARK
PLUMBING FIXTURE SCHEDULE
SUPPLYMANUFACTURER & NO. ELEC. DATA ACCESSORIES
REMOVE EXISTING PLUMBING FIXTURE, FAUCET, SUPPLIES,
CARRIER, FLOOR DRAIN, ETC. CAP SERVICE LINES IN A
CONCEALED LOCATION.
EXISTING 1" COLD WATER STUB UP TO REMAIN FOR
FUTURE TIE IN.
1. CONTRACTOR TO VISIT SITE AND BE FAMILIAR WITH
BUILDING MECHANICAL AND ELECTRICAL LAYOUTS.
2. ALL MATERIAL, EQUIPMENT, DUCTS, PIPE, ETC. TO BE
REMOVED SHALL BE DISPOSED OF OFF SITE IN A LEGAL
AND LAWFUL MANNER.
3. CAP ANY UNUSED PIPE AT FLOOR, WALL, OR CEILING.
REMOVE MATERIAL NOT BEING REUSED.
4. IF ASBESTOS IS FOUND, CONTACT OWNER IMMEDIATELY.
DO NOT WORK IN ANY AREA SUSPECTED TO CONTAIN
ASBESTOS.
5. ALL EXISTING EQUIPMENT SHOWN IN APPROXIMATE
LOCATION. ALL EXISTING CONCEALED PIPING SHOWN IS
BASED ON THE MOST RECENT EXISTING M.E.P. AND CIVIL
DRAWINGS AVAILABLE. FIELD VERIFY.
6. TAKE CARE NOT TO DESTROY INSULATION VALUE TO ANY
WATER PIPING BEING REUSED. REPAIR AS NECESSARY.
7. CONTRACTOR TO VERIFY LOCATION OF ALL UTILITIES AND
RELOCATE AS REQUIRED BY NEW CONSTRUCTION.
D1
D2
PLUMBING DEMOLITION
GENERAL NOTES
PLUMBING DEMOLITION
PLAN NOTES
A1
TANK TYPE (ADULT)
WATER CLOSET - A.D.A.
AMERICAN STANDARD
2467.100
COLD 1.1 GPF, BOLT CAPS (2), REFER TO ARCHITECTURAL PLANS FOR MOUNTING HEIGHT
PRESSURE ASSISTED TANK
D1
FLOOR DRAIN WADE
1103STD6
N/A 6" TOP SIZE, 3" DISCHARGE, TRAP GUARD
J1
CIRCULATING
PUMP
BELL & GOSSETT
SERIES #100
N/A 120 V.
1/12 H.P.
F1
20 GALLON ELECTRIC
WATER HEATER
A. O. SMITH
DEL-20
COLD 120 V., 1Ø
1500 W.
TEMPERATURE AND PRESSURE RELIEF VALVE, SINGLE ELEMENT, WATTS EXPANSION TANK
REMARKS
WASTE
2"4"
VENT
2"
2"
1-1/4"
3"
3"
1-1/2"
H.W.
4"-
C.W.
1/2"
3"
1-1/4"
3"
-
1/2"
1/2"
1/2"
1/2"
TRAP SIZE
1.1 GALLON FLUSH
ALL FLOOR DRAINS TO HAVE TRAP GUARDS
FLOOR TYPE
MINIMUM FIXTURE CONNECTION SCHEDULE
FLOOR DRAIN
JANITOR SINK
WATER CLOSET
NAME OF FIXTURE
LAVATORY
H1
EXTERIOR
HOSE BIBB
WOODFORD
B67
COLD VACUUM BREAKER, RECESSED IN LOCK BOX, VERIFY WALL THICKNESS
G1
MOP SINK FIAT
MSB-2424
HOT/COLD T&S BRASS B-0658 FAUCET, B-0618-01 30" HOSE, B-0653 MOP HANGER,
STAINLESS STEEL BACKSPLASH
-
G2
CONFERENCE ROOM
SINK - A.D.A.
AMERICAN STANDARD
22SB.6252283S.075
TEMP/COLD 6" DEEP BASIN, T&S BRASS B-0892 FAUCET (4" CENTERS), 0.5 GPM, P-TRAP, SUPPLIES W/ STOPS,
OFFSET TAILPIECE, TMV EQUAL TO LEONARD 270 LF
2C 2C
4W
3H
CHECK
VALVE
TEMPERATURE AND PRESSURE
RELIEF VALVE. DO NOT REDUCE
VALVE / PIPE SIZE.
WATER HEATER
(W/ DISCONNECT)
CIRCULATING PUMP
(PROVIDE MEANS OF
DISCONNECT PER N.E.C.)
ROUTE TEMPERATURE
AND PRESSURE
RELIEF DRAIN TO
FLOOR DRAIN/ FLOOR
SINK OR MOP SINK.
UNION (TYPICAL)
DOUBLE NUT
FULL PORT
QUARTER TURN
BALL VALVE
UNI-STRUT HARNESS
6'-6" MAXIMUM BASE HEIGHT ABOVE FINISHED
FLOOR
1/2" ALL THREAD
IF PIPING IS RUN IN WALLS, THEN STUB-OUT
FROM WALL WITH CHROME ESCUTCHEON.
3.
1.
NOTES:
PIPING INSULATION TO COVER ALL UNIONS,
VALVE BONNETS, AND FITTINGS. MITER ALL
TERMINATION POINTS OF INSULATION. GLUE
AND MASTIC ALL INSULATION JOINTS. ALL
A.S.M.E. WATER HEATERS SHALL BE INSTALLED
WITH A.S.M.E. EXPANSION TANKS.
2.
HOT WATER
RETURN
UNION
DRAIN
DOWN
PROVIDE DI-ELECTRIC
CONNECTIONS AT ALL WATER
HEATER CONNECTIONS
THERMOMETER
THERMOMETER WELL
HOT WATER SUPPLY
WA
TE
R H
EA
TE
R
DIA
ME
TE
R
1/2" THREADED
RODS (4)
VERIFY WATER
HEATER
DIAMETER
HARNESS DETAIL
VE
RIF
Y
3"
3"
UNISTRUT TEE
ROUTE DRAIN LINE TO
FLOOR DRAIN/ FLOOR
SINK OR MOP SINK
SENSOR AND PRESSURE SENSOR.
EMCS CONTRACTOR TO FURNISH TEMPERATURE
PLUMBING CONTRACTOR TO INSTALL.
STOP AT 110° F (ADJUSTABLE).
SET TO START PUMP LESS THAN 110 °F-
TEMPERATURE SENSOR
T
P
PRESSURE SENSOR
(ADJUSTABLE)
OF MOST REMOTE PLUMBING FIXTURE)
(INSTALL IN HOT WATER LOOP DOWNSTREAM
3
ELECTRIC SUSPENDED WATER HEATER WITH CIRCULATOR
N.T.S. (PER IECC 2015 C404)
DOUBLE NUTJOIST
ANGLE SUPPORT BOLTED TO
TOP CHORD OF JOIST (SIZE
BASED ON SPAN AND WATER
HEATER SIZE)
CHECK VALVECOLD WATER SUPPLY
FULL PORT
QUARTER TURN
BALL VALVE
UNION
HANGER
HANGER ROD
1'-0"
SADDLE
(SEE SPEC.)
SHEET METAL
PIPE INSULATION
N.T.S.
PIPE SUPPORT DETAIL
4
BELOW FOOTING.
ROUTE PIPE
FINISHED FLOOR
FOOTING
BOTTOM OF
STRUCTURAL FOOTING
3'-0"
N.T.S.
PIPE ROUTING AT FOOTINGS
5
D
8"8"
2D 2D
FINISHED FLOORFINISHED FLOOR
SAND
SAND
P.I. OF THE SOIL FRACTION PASSING THE NO. 40 SIEVE SHALL NOT BE GREATER THAN 5.
DOES NOT FORM A MUCK OR MUD WHEN WET. THE GRADATION SHALL BE SUCH THAT A MINIMUM OF 95% IS RETAINED ON A #100 SIEVE. THE
NOTE: SAND FOR EMBEDMENT SHALL BE A FREE FLOWING MATERIAL WHICH CONTAINS NO CLAY, IS REASONABLY FREE FROM ORGANIC MATERIAL AND
12" 12"
N.T.S.
SANITARY SEWER TRENCH
7
3C
N.T.S.
RISER 1
6
D1
1
F1
B1
A1
H1
G2
M1
3S
4"
2S
J1
G1
1"
1C
1"
1W
3/4"
1H
3/4"
1H
3/4"
1W
6S
CO
ND
1"
4C
1"
3W
CO
ND
CO
ND
CO
ND
CO
ND
3C
3C
COND COND COND
1"
1C
1/2"
1C
1/2"
1C
1/2"
1C
1/2"
1C
1/2"
1C
1/2"
1C
1/2"
1C
1/2"
1C
3/4"
2H
1/2"
1H
3/4"
3H
1/2"
1W
3/4"
1H
1/2"
1W
1-1/2"
1S
7S
VTR
VTR
VTR
VTR
1/2"
1C
1/2"
1W
1/2"
1H
11
1
1
1
D1
D1
D2
PROJECTNO:
REVISION:
DATE:
:SHEETNUMBER
DRAWING:
TJC WELCOME CENTER& OFFICE BUILDINGRENOVATIONSTYLER JUNIOR COLLEGE1232 E. 5TH ST.
2020-24 06-08-2020
TYLER, TEXAS 75701
AND NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND
WORKING SYSTEM.
SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE
CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOB
CONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING
Tyler | Austin | Houston | DFW | El PasoTBPE Firm Registration No. F-893www.EMAengineer.comPhone: 1 . 800 . 933 . 0538
EMA Engineering & Consulting
1530 E. GRANDE BLVD., TYLER, TX 757039 0 3 . 5 3 4 . 0 9 9 5 w w w . h c a r c h . c o m
ADDENDUM #1
1
PLUMBING - DEMOLITION FLOOR PLAN - BUILDING 'B'
1/4"=1'-0"
PL1.2
2
PLUMBING - FLOOR PLAN - BUILDING 'B'
1/4"=1'-0"
REMOVE EXISTING PLUMBING FIXTURE, FAUCET, SUPPLIES,
CARRIER, FLOOR DRAIN, ETC. CAP SERVICE LINES IN A
CONCEALED LOCATION.
EXISTING 1" COLD WATER STUB UP TO REMAIN FOR
FUTURE TIE IN.
1. CONTRACTOR TO VISIT SITE AND BE FAMILIAR WITH
BUILDING MECHANICAL AND ELECTRICAL LAYOUTS.
2. ALL MATERIAL, EQUIPMENT, DUCTS, PIPE, ETC. TO BE
REMOVED SHALL BE DISPOSED OF OFF SITE IN A LEGAL
AND LAWFUL MANNER.
3. CAP ANY UNUSED PIPE AT FLOOR, WALL, OR CEILING.
REMOVE MATERIAL NOT BEING REUSED.
4. IF ASBESTOS IS FOUND, CONTACT OWNER IMMEDIATELY.
DO NOT WORK IN ANY AREA SUSPECTED TO CONTAIN
ASBESTOS.
5. ALL EXISTING EQUIPMENT SHOWN IN APPROXIMATE
LOCATION. ALL EXISTING CONCEALED PIPING SHOWN IS
BASED ON THE MOST RECENT EXISTING M.E.P. AND CIVIL
DRAWINGS AVAILABLE. FIELD VERIFY.
6. TAKE CARE NOT TO DESTROY INSULATION VALUE TO ANY
WATER PIPING BEING REUSED. REPAIR AS NECESSARY.
7. CONTRACTOR TO VERIFY LOCATION OF ALL UTILITIES AND
RELOCATE AS REQUIRED BY NEW CONSTRUCTION.
D1
D2
PLUMBING DEMOLITION
GENERAL NOTES
PLUMBING DEMOLITION
PLAN NOTES
SANITARY SEWER BELOW BUILDING.
SANITARY SEWER BELOW GRADE.
TWO-WAY EXTERIOR CLEAN-OUT.
ONE-WAY EXTERIOR CLEAN-OUT.
ONE-WAY INTERIOR CLEAN-OUT.
WALL CLEAN-OUT.
SANITARY SEWER TIE-IN TO EXISTING.
SANITARY SEWER DOWN IN WALL/CHASE.
COLD WATER ABOVE CEILING.
COLD WATER DOWN IN WALL/CHASE.
COLD WATER TIE-IN TO EXISTING.
HOT WATER SUPPLY ABOVE CEILING.
HOT WATER DOWN IN WALL/CHASE.
HOT WATER UP IN WALL/CHASE.
CONDENSATE DRAIN ABOVE CEILING.
CONDENSATE TIE-IN TO UNIT / AIR HANDLER WITH P-TRAP.
CONDENSATE DRAIN CLEAN-OUT.
CONDENSATE DRAIN DOWN TO CONDENSATE PIT/MOP
SINK.
1W
2W
3W
1S
1H
1C
2C
3C
4C
2H
2S
3S
4S
5S
6S
7S
8S
DOMESTIC COLD WATER
PLAN NOTES
SANITARY SEWER
PLAN NOTES
DOMESTIC HOT WATER
PLAN NOTES
CONDENSATE PIPING
PLAN NOTES
1. PLUMBING CONTRACTOR SHALL REFER TO
ARCHITECTURAL PLANS FOR A.D.A. PLUMBING FIXTURE
AND STANDARD MOUNTING HEIGHTS.
2. PLUMBING CONTRACTOR TO COORDINATE ALL PIPING
ROUTING ABOVE WITH MECHANICAL AND ELECTRICAL
CONTRACTORS BEFORE INSTALLING.
3. ALL VALVES SHALL BE INSTALLED NO HIGHER THAN 2'-0"
ABOVE THE CEILING. ACCESS DOORS TO BE INSTALLED
AT ALL HARD CEILING LOCATIONS.
4. ALL PIPING PENETRATIONS SHALL BE SLEEVED.
COMPLETELY GROUT AROUND OUTSIDE OF SLEEVE AND
FILL SLEEVE VOID AROUND PIPE WITH FIBERFRAX
FYRE-PUTTY.
5. AT ALL DISSIMILAR METAL CONNECTIONS, PROVIDE AND
INSTALL DIELECTRIC UNIONS IMMEDIATELY TO MINIMIZE
USE OF GALVANIZED PIPE MATERIAL.
6. PLUMBING CONTRACTOR SHALL COORDINATE WITH THE
MECHANICAL CONTRACTOR MOUNTING HEIGHTS OF ALL
AIR HANDLERS TO GUARANTEE POSITIVE DRAINAGE OF
ALL CONDENSATE DRAINS (1/8" PER FT. SLOPE -
MINIMUM).
7. MECHANICAL CONTRACTOR TO PROVIDE TO THE
PLUMBING CONTRACTOR THE RECOMMENDED AC
MANUFACTURERS' DATA FOR CONDENSATE TRAPS PER
EACH TYPE OF UNIT.
8. PLUMBING CONTRACTOR TO PROVIDE TRAP GUARDS TO
ALL FLOOR DRAINS AND OPEN SITE DRAINS.
9. DO NOT INSTALL PLUMBING VENTS WITHIN 10'-0" OF ANY
ROOFTOP UNITS OR FRESH AIR UNITS / INTAKES.
COORDINATE WITH MECHANICAL CONTRACTOR.
10. MOUNT A.D.A. FLUSH CONTROLS TO WIDE SIDE OF STALL.
11. ALL CONCEALED EXISTING PIPING SHOWN IS BASED ON
EXISTING M.E.P. DRAWINGS. FIELD VERIFY AS
NECESSARY.
12. PLUMBING CONTRACTOR TO COORDINATE ROUTING OF
ANY NEW SEWER PIPING UNDER EXISTING BUILDINGS
WITH STRUCTURAL ENGINEER TO AVOID PIERS.
PLUMBING GENERAL NOTES
SOIL
UNDISTURBED
FILL GRAVEL 4" FROM BOTTOM
OF CONDENSATE DRAIN INVERT.
CONDENSATE THROUGH SIDE
WITH GLUED ADAPTER
BUILDING WALL
CONDENSATE DRAIN
CLAMP
UNION
O.C. X 4 ROWS.
WITH 2" HOLES 1'-0"
PVC SECTION OF PIPE
15" DIAMETER X 4'-0"
4'-0"
P.V.C. CAP (UNGLUED)
TEE & CLEANOUT PLUG
8
CONDENSATE PIT DETAIL
N.T.S.
PIPE/CONDUIT
PLASTIC
3M FIRE BARRIER
RC-1 RESTRICTING
COLLAR OR PPD
3M FIRE BARRIER
GYPSUM WALLBOARD
1 OR 2 HOUR FIRE RATED
FS-195+ WRAP/STRIP
OF UL 1479 AND ASTM E 814
MUST MEET THE REQUIREMENTS
N.T.S.
ONE AND TWO HOUR WALL PENETRATION DETAIL FOR P.V.C. PIPE
9
STEEL SLEEVE
PIPE INSULATION
PIPE
.
CP 25WB+ CAULK
3M FIRE BARRIER
ASSEMBLY
GYPSUM WALLBOARD
1 OR 2 HOUR
PACKING MATERIAL
BACKER ROD
OF UL 1479 AND ASTM E 814
N.T.S.
ONE AND TWO HOUR WALL PENETRATION DETAIL FOR INSULATED PIPE
4
(NO-HUB WITH
ACCESS COVER AND FRAME
FINISHED WALL SURFACE
THREADED CLEANOUT PLUG
(BRASS PLUG WITH MACHINE
FLOOR
TEST TEE
WALL CLEANOUT
(PAINT ORANGE)
DO NOT LOCATE
ACCESS COVER)BEHIND STUDS
8" MAX
SCREW REQUIRED)
VENT
SEALED
PER SPECS
PENETRATION
N.T.S.
WALL CLEANOUT
5
ALL THREAD ROD
AND CLEVIS
HANGER
CLEANOUT COVER
SUPPORT CABLE
CLOSED CELL
INSULATION
CLEANOUT
COVER
FIBERGLASS
INSULATION
AND CONDENSATE
DRAIN
RIGID INSULATION
UNDER CLEVIS
HANGER
6" M
IN
IM
UM
N.T.S.
CONDENSATE CLEANOUT DETAIL
6
(COLD) CHROME PLATED
TUBING SUPPLY
(COLD)
ANGLE STOP
P-TRAP
8"
8"
(HOT)
ANGLE STOP
(HOT) CHROME PLATED
TUBING SUPPLY
(TEMPERED/COLD)
lAVATORY/FAUCET
FINISHED FLOOR
(MAX.18")
(TEMPERED) STAINLESS
STEEL BRAIDED SUPPLY
ROUTE BEHIND BASIN
BOWL TO HIDE
THERMOSTATIC
MIXING VALVE
RUBBER BLOCK
SPACER
WALL
BRAIDED SUPPLY
THERMOSTATIC MIXING VALVE WITH BRACKET
WALL SCREW
AND ANCHOR
THERMOSTATIC MIXING VALVE MUST HAVE BRACKET FOR MOUNTING TO WALL.1
NOTES:
2 PROVIDE RUBBER SPACER BETWEEN WALL AND TMV.
3 WALL ANCHOR SYSTEM MUST BE USED.
4 STAINLESS STEEL SUPPLY LINES MUST BE KEPT TO MINIMUM LENGTH.
(MAX.12")
(COLD) STAINLESS
STEEL BRAIDED SUPPLY
LONG SWEEPING
ELBOW
N.T.S.
TEMPERED & COLD SUPPLY LAVATORY DETAIL
3
END OF LINE TWO WAY
IN-LINE
TWO WAY CLEANOUT FITTINGS NOT ALLOWED
LONG
SWEEP
FITTING
14"X14"X5" PAD
14"X14"X5" PAD
CAST IRON FERRULE WITH COUNTER SUNK
BRASS CLEANOUT PLUG-TYPICAL
GRADE
VA
RIE
S
7
EXTERIOR CLEANOUT DETAIL
N.T.S.
FITTING
SWEEP
LONG
14"X14"X5" PAD
FITTING
SWEEP
LONG
NOTE: ALL PADS TO BE CONCRETE WITH CHAMFERED EDGES
14"X14"X5" PAD
ELBOW
SWEEP
LONG
3H