DATA SUMMARY REPORT4 D o
Hudson River ProjectSampling and Analysis Program
1991 Thompson Island Pool Total SuspendedSolids Study
General Electric CompanyCorporate Environmental ProgramsAlbany, New York
May 1993
OBRIENGGEREENGINEERS, INC.
320658
DATA SUMMARY REPORT
HUDSON RIVER PROJECTSAMPLING AND ANALYSIS PROGRAM
1991 THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDY
GENERAL ELECTRIC COMPANYCORPORATE ENVIRONMENTAL PROGRAMS
ALBANY, NEW YORK
MAY 1993
O'BRIEN & GERE ENGINEERS, INC.5000 BRITTONFIELD PARKWAYSYRACUSE, NEW YORK 13221
320659
TABLE OF CONTENTS
Page
SECTION 1 - INTRODUCTION 1
1.01 Background 11.02 Program Objectives 1
SECTION 2 - METHODS 2
2.01 Sampling Locations 22.02 Sample Collection Procedures 22.03 Quality Assurance/Quality Control Sample Collection 4
SECTION 3 - DATA PRODUCTION AND REPORTING 6
3.01 OBG Laboratories, Inc. 6
SECTION 4 - SAMPLING AND ANALYSIS RESULTS 8
4.01 Sampling and Analysis Results 8
REFERENCES
TABLES
1 Sample Collection Schedule2 Data Summary
FIGURES
1 Automatic Sampler Locations
APPENDICES (Separately Bound)
Appendix A - OBG Laboratories, Inc. TSS ResultsVol. 1: April - May 1991Vol. 2: September - October 1991Vol. 3: November 1991
Appendix B - Field Logs
O'Brien & Gere Engineers, Inc. May 26,1993
320660
SECTION 1 • INTRODUCTION
1.01 Background
This data summary report presents results of the 1991 Thompson Island Pool
Total Suspended Solids Study (TIPTSSS) conducted by O'Brien & Gere Engineers,
Inc. This work was prompted by the PCB Reassessment Remedial Investigation and
Feasibility Study (RRI/FS) being performed on the upper Hudson River by the U.S.
Environmental Protection Agency (USEPA). The work being performed by USEPA
in conjunction with the Hudson River RRI/FS is described in their Phase 1 Report
(USEPA, 1991) and the Final Phase 2 Work Plan and Sampling Plan (USEPA,
1992). The TIPTSSS consisted of water column sampling and analysis for total
suspended solids (TSS). This study was performed in accordance with the Quality
Assurance Project Plan (QAPP; O'Brien & Gere, 1993) prepared for this project and
included the installation and operation of automatic samplers at selected locations
within the Thompson Island Pool.
1.02 Program Objectives
The objective of the TIPTSSS was to provide data to assist in the evaluation
of the origin and fate of suspended solids within the Thompson Island Pool. To meet
these objectives, TSS and hydrological data were collected from the upper Hudson
River under several hydraulic loading conditions. Elevated flow rates may induce
scouring of the river bed, leading to resuspension of sediments. The TIPTSSS was
therefore conducted during two potentially high flow periods. These periods included
April - May, and September - November, 1991.
O'Brien & Gere Engineers, Inc. 1 May 26,1993
320661
SECTION 2 - METHODS
2.01 Sampling Locations
In order to evaluate the origin and fate of suspended solids within the
Thompson Island Pool, samples were collected from one upstream and one
downstream location in the Thompson Island Pool in April and May 1991. These
locations included the northern tip of Rogers Island in Ft. Edward (upstream end of
the Thompson Island Pool), and the western wing wall of the Thompson Island Dam
(downstream end of Thompson Island Pool). During September, October, and
November of 1991, samples were collected at three locations in the Thompson Island
Pool, including the northern tip of Rogers Island, the western wing wall of the
Thompson Island Dam, and a third location on the east shore of the river
approximately one mile upstream of the Thompson Island Dam (McDonald
property). This location was upstream of the Moses Kill, a major tributary to the
Thompson Island Pool, and downstream of Snook Kill. This location was sampled
in order to evaluate the contribution of Moses Kill on suspended solids in the
Thompson Island Pool. A sample collection schedule is presented on Table 1.
Sampling locations are illustrated on Figure 1.
2.02 Sample Collection Procedures
Samples were collected at each site with a battery operated Manning
automatic sampler. The samplers were secured at each location in locked, insulated
shelters. The sampler intake tubing was suspended at mid-depth (approximate due
to water level fluctuations) in the water column inside a protective PVC pipe casing.
O'Biien & Gere Engineers, Inc. 2 May 26, 1993
320662
Each sampler was programmed to collect a discrete sample every six hours. The
automatic samplers were serviced three times per week during April and May, and
twice per week during September, October, and November. The automatic sampler
operational sequence was as follows:
• initial set-up by O'Brien & Gere personnel (ampler programmed to
collect 1 sample every 6 hours for maximum of 6 days),
• sampling cycle begins (sampler purge cycle - compressed air forced
back through sampler intake tubing to remove residual water),
• sample collection cycle (sample drawn through intake tubing under
vacuum to central dispensing vessel),
• sampler purge cycle (compressed air forced back through sampler
intake tubing to remove residual water),
• sample dispensing (water flows by gravity from central dispensing
vessel to 1 of 24 internal containment vessels),
• cycle ends (internal dispensing arm advances to next internal contain-
ment vessel),
• sampler serviced by O'Brien & Gere personnel every 2-4 days, and
• samples transferred to containers for transport to laboratory (sampler
program re,aet).
Occasionally, the water level fell below the automatic sampler intake tubing. The
automatic samplers were unable to collect samples until the sampler intake tubing
was re-submerged. Sub-freezing conditions experienced in November, 1991 alsoX—-V
disrupted automatic sampler operation.
O'Brien & Gere Engineers, Inc. 3 May 26,1993
320663
When the automatic samplers were serviced, the samples were placed in
appropriate containers, chilled to 4°C, and transported to the analytical laboratory
for TSS analysis. Each sample was assigned a unique sample designation, identifying
sample location, date, and time. Chain of custody procedures and container
specifications presented in the QAPP (O'Brien & Gere, 1993) were followed. Field
logs are illustrated in Appendix B.
2.03 Quality Assurance/Quality Control Sample Collection
Quality assurance/quality control (QA/QC) samples were collected on a
routine basis during the TIPTSSS in accordance with the QAPP (O'Brien & Gere,
1993). These samples included the collection of equipment blank samples and blind
duplicate samples at a frequency of five percent (one blank and one blind duplicate
for every twenty samples). Equipment blank samples were prepared in the field by
rinsing an automatic sampler container with distilled water and collecting the rinsate
in a TSS sample container. Blind duplicate samples were prepared by dividing a
discrete aliquot into two samples. One of these samples was identified as described
in Section 2.02 and submitted to the laboratory. The blind duplicate sample was
submitted to the laboratory without indication to the laboratory of where or when
the sample was collected. The results of the QA/QC analyses are included in
Appendix A and are summarized as follows:
O'Brien & Gere Engineers, Inc. 4 May 26,1993
320664
QA/QCSamples
BlankBlind
Duplicate*«
Numberof
Samples
5370
Mean *(mg/L)
261%
StandardDeviation
253%
Maximum
10170%
Minimum
<10%
»*
Less than detectable concentrations averaged as one-half detection limit.
Blind duplicate results presented as relative percent difference between paired
samples.
Blank sample concentrations ranged from less than detectable to 10 mg/L.
Variability between blind duplicate concentrations and paired sample concentrations
ranged from 0 to 170 relative percent difference, with the mean relative percent
difference at 61. These results are not unusual for total suspended solids analyses;
suspended solids are not typically evenly distributed throughout the water column.
Based on these results, it is concluded that the data generated in this study is
acceptable for qualitative and quantitative purposes.
O'Brien & Gere Engineers, Inc. May 26,1993
320665
SECTION 3 - DATA PRODUCTION AND REPORTING
3.01 OBG Laboratories. Inc.
OBG Laboratories, Inc. was responsible for performing TSS analysis on
approximately 1,319 water samples. These samples were analyzed for total
suspended solids in accordance with USEPA method 160.1 (USEPA, 1983). Upon
completion of the analyses, OBG Laboratories generated a series of data reports
entitled Laboratory Report, General Electric Company, Thompson Island Pool Total
Suspended Solids Program, Hudson River, N.Y. These data reports were prepared
consistent with New York State Department of Environmental Conservation
Analytical Services Protocol (NYSDEC ASP) Category B reporting requirements.
These data reports are presented as Appendix A, The organization of Appendix A
is presented in the Table of Contents of this report. The data packages contain the
following components:
• title page,
• sign-off sheet,
• table of contents,
• case narrative,
• sample result form,
• chain of custody forms,
• sample log-in sheet,
• internal sample control record (internal sample tracking sheet),
• duplicate summary table,
• method blank summary table,
O'Brien & Gere Engineers, Inc. 6 May 26,1993
320666
sample raw data,
standards summary tables, and
standards/QC sample (blanks, duplicates) raw data.
O'Brien & Gere Engineers, Inc. 7 May 26,1993
320667
SECTION 4 - SAMPLING AND ANALYSIS RESULTS
4.01 Sampling and Analysis Results
The TIPTSSS involved the collection and analysis of water column samples
from three locations within the Thompson Island Pool region of the upper Hudson
River. The analysis of these samples provided data for TSS concentrations in the
water column of the upper Hudson River at specific locations. These data are
summarized on Table 2. Original laboratory data, including supporting documenta-
tion have been assembled into Appendix A according to the organization presented
in the Table of Contents of this report.
O'Brien & Gere Engineers, Inc. g May 26,1993
320668
REFERENCES
New York State Department of Environmental Conservation. 1983. SampleCollection Manual. December 1983.
O'Brien & Gere Engineers, Inc. 1993. Quality Assurance Project Plan. Hudson RiverProject; 1991-1992 Sampling and Analysis Program. Prepared for General ElectricCompany Corporate Environmental Programs, Albany, NY. May 1993.
U.S. Environmental Protection Agency. 1983. Methods for Chemical Analysis ofWater and Wastes. USEPA-600/4-79-020. Revised 1983.
U.S. Environmental Protection Agency. 1991. Phase 1 Report - Interim Characteriza-tion and Evaluation. Hudson River PCB Reassessment RI/FS. Prepared by TarnsConsultants, Inc. and Gradient Corporation for Region n. New York, NY.
U.S. Environmental Protection Agency. 1992. Final Phase 2 Work Plan andSampling Plan. Hudson River PCB Reassessment RI/FS. Prepared by TarnsConsultants, Inc. and Gradient Corporation for Region II. New York, NY.
O'Brien & Gere Engineers, Inc. 9 May 26,1993
320669
Tables
O BRIEN 5 GEREENGINEERS, INC.
320670
Page 1 of 1
TABLE 1
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYSAMPLE COLLECTION SCHEDULE
Rogers Island
Thompson Island Dam
Rogers Island
Thompson Island Dam
McDonald Property
Approximate!:;;*R"iver--MM-:i:::?
194.4
188.5
194.3
188.5
189.7
: . Time Fr^rne: | ;
4/10/91 -5/31/91
9/16/91 -11/21/91
Sample Collection i
Every 6 hours,7 days per week
Every 6 hours,7 days per week
Laboratory Analysis
Total Suspended Solids
Total Suspended Solids
O'Brien & Gere Engineers, Inc. 13-May-93
320671
Page 1 of 13
TABLE 2
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYDATA SUMMARY
10-Apr-9111 -Apr-9111 -Apr-9111 -Apr-9111 -Apr-9112-Apr-9112-Apr-9112-Apr-9112-Apr-9113-Apr-9113-Apr-9113-Apr-9113-Apr-9114-Apr-9114-Apr-9114-Apr-9114_Apr-9115-Apr-9115-Apr-9115-Apr-9115-Apr-9116-Apr-9116-Apr-9116-Apr-9116-Apr-9117-Apr-9117-Apr-9117-Apr-9119-Apr-9120-Apr-9120-Apr-9120-Apr-9120-Apr-9121 -Apr-9121 -Apr-9121 -Apr-9121 -Apr-91
liililllfillllil18:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:00
Pllllllslaoiaillill487864376454657778214
<112321
<12352
<162
<11
||||Jsilrii|DaW||||i37675776
<1<1
55
<1<1
228896
<12
<11112322112
1743
330170
|:l!;:|lirfpliiillili|lNANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANA
* - Sampler failure due to low water or cold temperatures
O'Brien & Gere Engineers, Inc.320672
l3-May-93
Page 2 of 13
TABLE 2
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYDATA SUMMARY
lliiliiijlplllll:::':-::: :-:-: -:-:: -:::::' **l!sri::::;:vX::;;::::::::::::::::
22-Apr-9122-Apr-9122-Apr-9122-Apr-9123-Apr-9123-Apr-9123-Apr-9123-Apr-9124-Apr-9124-Apr-9124-Apr-9124-Apr-9125-Apr-9125-Apr-9125-Apr-9125-Apr-9126-Apr-9126-Apr-9126-Apr-9126-Apr-9126-Apr-9127-Apr-9127-Apr-9127-Apr-9127-Apr-9128-Apr-9128-Apr-9128-Apr-9128-Apr-9129-Apr-9129-Apr-9129-Apr-9129-Apr-9130-Apr-9130-Apr-9130-Apr-9130-Apr-91
0:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0012:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:00
Ig lllflp gerSllllif
A<1<1<1<1
331164445
<165165
<1<1
12
<13145434
<11332
iili icimpsojitlil
T\4626241124111316149
13109
10559225113
261343
<12
<1321235
lllfMJD;pjri#<t||||
NANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANA
* - Sampler failure due to low water or cold temperatures
O'Brien & Gere Engineers, Inc.
320673
13-May-93
Page 3 of 13
TABLE 2
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYDATA SUMMARY
Itlllllflfllllllll^'fff::^;y:fMSI\&y::;y:y:fyvy&
01 -May-9101 -May-9101 -May-9101 -May-9102-May-9102-May-9102-May-9102-May-9103-May-9103-May-9103-May-9103-May-9104-May-9104-May-9104-May-9104-May-9105-May-9105-May-9105-May-9105-May-9106-May-9106-May-9106-May-9106-May-9107-May-9107-May-9107-May-9107-May-91OS-May-9108-May-9108-May-9108-May-9108-May-9109-May-9109-May-9109-May-9109-May-91
::: :o::;::::::;:-'::::::::':'::'::::::: •::::::::/:: :: :': \'-.'-:'\'-:''''-:'-:-: •:•:'•:•:.;.:.;.•.;.;.;.-. :-;.;•:•:•:-:••«;••• ••• . • . - •• . • -• . • . • . • ••••:•>:•:•:•'-: :•"•:•:
lllllil!) !BM:';l;sl
0:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:0018:000:006:00
12:0018:00
li Illilift ^t| |l*ppge;rj|||||Illllliifiliiiii
344334356
1271
<1<1
4<1
2<1
113352455577
<1111454
:||:;|i||l||!:P PP|||:iiIlilsllHilPhlli
1043456
13858
12<1
54
10464228355987966
111245564
flll pponaldifllililllpililill
NANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANA
- Sampler failure due to low water or cold temperatures
320674
O'Brien & Gere Engineers, Inc.
Page 4 of 13
TABLE 2
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYDATA SUMMARY
10-May-9110-May-9110-May-9110-May-9110-May-9111 -May-9111 -May-9111 -May-9111 -May-91!2-May-9112-May-9112-May-9112-May-9113-May-9113-May-9113-May-9113-May-9114-May-9114-May-9114-May-9114-May-9115-May-9115-May-9115-May-9115-May-9115-May-9116-May-9116-May-9116-May-9116-May-9117-May-9117-May-9117-May-9117-May-9117-May-9118-May-9l18-May-91
llllilllijlfiplllil
0:006:00
12:0012:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:0018:000:006:00
12:0018:000:006:00
12:0012:0018:000:006:00
: ls;:s Ml ii SSi i |iJl iir£SI*£M^ I:F:: ••:::;:i;JiB6geihSllS;«:
• '• ' :-:-, - ':'- ••--••' :;:x:x .->f:.>x::::-:-;v>-;^x:.o;:'x-:
555834245
<12
<1<1<1
1323434658
33371110109
16978534
:;i|l||pi;ji| S6ri|:;:ll:;;;:-::': ^ i:::::i:-:: :-: i:;i:;; :^: ::-:::::::;:::::::::::::::i;i:;:JsIand;Damif!i;
534
246
742113231137
10171273526
123625197698657
1477
1803943
:;:;;|l|:MCD;diiatdj:ft:!:;;|Illlllilipliriplili
NANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANA
- Sampler failure due to low water or cold temperatures
O'Brien & Gere Engineers, Inc.
320675
13-May-93
Page 5 of 13
TABLE 2
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYDATA SUMMARY
18-May-9118-May-9119-May-91!9-May-91!9-May-91l9-May-9120-May-9120-May-9120-May-9120-May-9121 -May-9121 -May-9121 -May-9121 -May-9122-May-9122-May-9122-May-9122-May-9122-May-9123-May-9123-May-9123-May-9123-May-9124-May-9124-May-9124-May-9124-May-9125-May-9125-May-9125-May-9125-May-9126-May-9126-May-9126-May-9126-May-9127-May-9127-May-91
llllllill'ifil'll llf
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
:r - ; : v:'::: ii p. :fp:ssfjeen(c^m: )ri: ::; ?. :7£ ; :: : • ; :
9*
*
*
*
97
1255376
165*
*
97
107
10148*
*
*
913665
114*
*
2
f |;|T iS| iS jr)|||;: 1l|:iil|li |;;Dliri!;ll|;l
12150602621543427221424
916203066124
2151
55
126
224*
*
*
24243125
100995250
:;il:| c:p:a dj|;::::|illtlltliprlilllll
NANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANANA
* - Sampler failure due to low water or cold temperatures
O'Brien & Gere Engineers, Inc.320676
13-May-93
Page 6 of 13
TABLE 2
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYDATA SUMMARY
27-May-9127-May-9128-May-9128-May-9128-May-9128-May-9129-May-9129-May-9129-May-9129-May-9130-May-9130-May-9130-May-9130-May-9131 -May-9131 -May-9131 -May-9116-Sep-9116-Sep-9116-Sep-9116-Sep-9117-Sep-9117-Sep-9117-Sep-9117-Sep-9118-Sep-911'8-Se~-9118-Sep-9118-Sep-9119-Sep-9119-Sep-9119-Sep-9119-Sep-9120-Sep-9120-Sep-9120-Sep-9120-Sep-91
ipillllpiip- l
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:00
: : :.',::::, ; miimm^SGonmtmsi^ r l. '.,, .: , ::.:- ; l^•^Rpg&$ii^i':ii::::i;;;::;::;i;|J krid|ii|sl
*
*
677
1010
ft
*
5<1
541355
<111
<12237
10106648
1032313
l| :' THprnpson::f?:;':!lHilliafliWfei
343457824552
*
1302145
2006*
* .
*
*
*
<123332
<1<1<1<1<1
413
1043434
:i:::::s;';^McDonap:?li;?:::^^^fop^iiiji
NANANANANANANANANANANANANANANANANA
34112221357665552
<113
* - Sampler failure due to low water or cold temperatures
O'Brien & Gere Engineers, Inc.
320677
13-May-93
Page 7 of 13
TABLE 2
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYDATA SUMMARY
21-Sep-9121-Sep-9121-Sep-9121-Sep-9122-Sep-9122-Sep-9122-Sep-9122-Sep-9123-Sep-9123-Sep-9123-Sep-9123-Sep-9124-Sep-9124-Sep-9124-Sep-9124-Sep-9125-Sep-9125-Sep-9125-Sep-9125-Sep-9126-Sep-9126-Sep-9126-Sep-9126-Sep-9127-Sep-9127-Sep-9127-Sep-9127-Sep-9128-Sep-9128-Sep-9128-Sep-9128-Sep-9129-Sep-9129-Sep-9129-Sep-9129-Sep-9130-Sep-91
liiilijffiitilli.•.--•.•.•.•.•.•.-.•.•.•.•.-.•.•. .-.-. . . .•.-.•.•.-.-.•.;.; ; ;.;.; ..•- •-•,>•.;.>:•'.•:•:•:•:•: •x^:-:-:-:-:-:-:- :•:•:•: :•:•:•:•:•:•.->;•:•.•"•:•'• •: :•••:•'•:•.-:
0:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:00
^ 4} iiJllirai:fi||i pgir$tii||,:;::::::>?::p:J:J!3latidll|Pi:I|
35478776845414599*
*
*
*
*
11657
19101349588969
iilllilh itipspftiiiii:!lllf Siffliiilaririilll
343232
<12123655443456
1411322779665677576
MtiKsiiiiiiiillll j[iii|iliii2223656755*
*
..* :
* ;
*
*
*
*
*
*
*
*
8454
108432776553
* - Sampler failure due to low water or cold temperatures
O'Brien&Gere Engineers Inc.
320678
13-May-93
Page 8 of 13
TABLE 2
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYDATA SUMMARY
30-Sep-9130-Sep-9130-Sep-9101-Oct-9101-Oct-9101-Oct-9101-Oct-9102-Oct-9102-Oct-9102-Oct-9102-Oct-9103-Oct-9103-Oct-9103-Oct-9103-Oct-9104-Oct-9104-Oct-9104-Oct-9104-Oct-9105-Oct-9105-Oct-9105-Oct-9105-Oct-9106-Oct-9106-Oct-9106-Oct-9106-Oct-9107-Oct-9107-Oct-9107-Oct-9107-Oct-9108-Oct-9108-Oct-9108-Oct-9108-Oct-9109-Oct-9109-Oct-91
liIilil!Bllll:*;-i'-;:l::
6:0012:0018:000:006:0012:0018:000:006:0012:0018:000:006:0012:0018:000:006:0012:0018:000:006:0012:0018:000:006:0012:0018:000:006:0012:0018:000:006:0012:0018:000:006:00
;.: ;: :: : • •:• :: 2 i TSS iconc; :(mg7L) : .; .: : : : ;: :: : . : ;.. ..:,?:•.;:: :;: .:;;:;l;;Rge|g||.;fif;;':\t! i(Iifiil|liil
9565323617103133775443101193582518101967548
::i|?fT itpJ3Sbnt:;:|:s)l li-illlnililm1! :; !
9<1211
<1<1<1<137
<1332231246334981312611
<111132
:;;::r;:::p6Dbrialcl:i;:-:;sl::"':'::';;:::1pMptrJll!:::l
422433122684744444765564221615151022233234
* - Sampler failure due to low water or cold temperatures
O'Brien & Gere Engineers, Inc.
320679
13-May-93
Page 9 of 13
TABLE 2
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYDATA SUMMARY
09-Oct-9109-Oct-9110-Oct-9110-Oct-9110-Oct-9110-Oct-9111-Oct-9111-Oct-9111-Oct-9111-Oct-9112-Oct-9112-Oct-9112-Oct-9112-OC1-9113-Oct-9113-OC1-9113-Oct-9113-Oct-9114-Oct-9114-Oct-9114-Oct-9114-Oct-9115-Oct-9115-Oct-9115-Oct-9115-Oct-9116-Oct-9116-Oct-9116-Oct-9116-Oct-9117-Oct-9117-Oct-9117-Oct-9117-Oct-9118-Oct-9118-Oct-9118-Oct-91
Wi$M$?:$ii^vif':X^!&wmmm*?mwttm12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:00
f- x;;:; ;:• s : •; !: Si ? |llll|g:i:::if ;: i TSS GbhC^mg/L) yf^^w^ :v~ ?: ;;x *?; * f ; ;j
•..• •••'•'•[' :::Rogers;;|::::;:x;:-s
899821
<154336456986
1293388559
107
11171884
11115
32311
<112113411243712121
10453394278687
McDonald ;
4445656324244353222743424576558685658
* - Sampler failure due to low water or cold temperatures
O'Brien & Gere Engineers, Inc.
320680
l3-May-93
Page 10 of 13
TABLE 2
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYDATA SUMMARY
18-Oct-9119-Oct-9119-Oct-9119-Oct-9119-Oct-9120-Oct-9120-Oct-9120-Oct-9120-Oct-9121-Oct-9121-Oct-9121-Oct-9121-Oct-9122-Oct-9122-Oct-9122-Oct-9122-Oct-9123-Oct-9123-OCI-9123-Oct-9123-Oct-9124-Oct-9124-Oct-9124-Oct-9124-Oct-9125-Oct-9125-Oct-9125-Oct-9125-Oct-9126-Oct-9126-Oct-9126-Oct-9126-Oct-9127-Oct-9127-Oct-9127-Oct-9127-Oct-91
:>:>;X; o>yv:o:vv;>o:'x-:::::'-:::;:-.::::::::':':-;':::'::::::::
18:000:006:0012:0018:000:006:0012:0018:000:006:0012:0018:000:006:0012:0018:000:006:0012:0018:000:006:0012:0018:000:006:0012:0018:000:006:0012:0018:000:006:0012:0018:00
lilliiilill
121212171514181828101816139101617899163415121327119
11101071213131015
•:::::::::':-:::'':'::':-::'':::::;:::::::::: ''••••:::;:::::::'::!:.:!:'::::::::::::':::::::;:::::;:|O|OJ"ijrli::j3"|'rt".':;::':v:;"::::
277126685
<1465746766964551
<11
<11111125654
<11087
118710119933
<14525854648641231410428555
* - Sampler failure due to low water or cold temperatures
O'Brien & Gere Engineers, Inc.
320681
13-May-93
Page 11 of 13
TABLE 2
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYDATA SUMMARY
lllllllllillllllll28-Oct-9128-Oct-9128-Oct-9128-Oct-9129-Oct-9129-Oct-9129-Oct-9129-Oct-9130-Oct-9130-Oct-9130-Oct-9130-Oct-9131-Oct-9131-Oct-9131-Oct-9131-Oct-91Oi-Nov-91Oi-Nov-91Oi-Nov-91Ol-Nov-9102-Nov-9102-NOV-9102-NOV-9102-NOV-9103-Nov-91OS-Nov-9103-Nov-91OS-Nov-9104-NOV-9104-NOV-9104-Nov-9104-NOV-91OS-Nov-9105-NOV-91OS-Nov-91OS-Nov-9106-Nov-91
Illlillililllllll
0:006:00
12:0018:00
0:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:00
0:006:00
12:0018:00
0:006:00
12:0018:00
0:006:00
12:0018:00
0:006:00
12:0018:000:00
171511131118101214118
13105
1187263667677
165
148456
128
2114
9071362351314523252012412832231819252029273216201517111277
10275A
A
A
1591443446577
101066679657884768
10107311455
- Sampler failure due to low water or cold temperatures.
O'Brien & Gere Engineers, Inc.
320682
13-May-93
Page 12 of 13
TABLE 2
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYDATA SUMMARY
06-NOV-9106-Nov-91OG-Nov-9107-NOV-9107-NOV-9107-Nov-9107-NOV-91OS-Nov-91OS-Nov-91OS-Nov-9108-Nov-9109-Nov-9109-NOV-9109-NOV-9109-NOV-91IO-Nov-91IO-Nov-9110-Nov-91IO-Nov-9111_Nov-9111-NOV-9111-NOV-9111-NOV-9112-NOV-9112-NOV-9112-NOV-9112-NOV-9113-Nov-9113-NOV-9113-NOV-9113-NOV-9114-NOV-9114-NOV-9114-NOV-9114-NOV-9115_Nov-9115-NOV-91
IIilllliKi'tJ£lill?l?i
6:0012:0018:00
0:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
fllllliifilililll107
1513209
265688
15803614288
26523034
810138
121514111213755879
IliliiiillSi lllillffsiiiiiipliiiift
***********************A
*
*
*
*
*
*
*
*
*
110902552
;ilt|MQp:6fi6tdi;:|ifS;!llii»i i ll|:i
1<1111*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
1548
1066886
14663547
* - Sampler failure due to low water or cold temperatures
320683
O'Brien & Gere Engineers, Inc.
Page 13 of 13
TABLE 2
GENERAL ELECTRIC COMPANYHUDSON RIVER PROJECT
1991 SAMPLING AND ANALYSIS PROGRAM
THOMPSON ISLAND POOL TOTAL SUSPENDED SOLIDS STUDYDATA SUMMARY
15-NOV-9115-NOV-9116-Nov-9116-NOV-9116-NOV-9116-NOV-9117-NOV-9117-NOV-9117-NOV-9117-NOV-9118-NOV-9118-NOV-9118-NOV-9118-NOV-9119-NOV-9119-NOV-9119-NOV-9119-NOV-9120-Nov-9120-NOV-9120-NOV-9120-NOV-9121-NOV-9121-NOV-91
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
12:0018:000:006:00
i;iJI::tll:llillliliilPS
1096
1367767667
16555423334
153
23332723
100202142182013168
1114141010143625112210
56786
139
14774*
334244222633
* - Sampler failure due to low water or cold temperatures.
O'Brien & Gere Engineers, Inc.
320684
13-May-93
Figures
/•—v
OBm EN G GEREENGINEERS, INC.
320685
•:*9Vm
__, , •-•^
, SCALE FACTOR 1=1
a-
-THOWSON ISLAND DAM
•FORT EDWARD DM1 tOUT)
K i
O 50
00
3-HS
O >O -H
—I O
o en
m3D
1=W V
-8sr
! f£ n