44
Data exchange between Candy Planning and Primavera

Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Data exchange betweenCandy Planningand Primavera

Page 2: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Export Candy Planningto Primavera

Page 3: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

SitePlan programBefore a program is exported ensure that all the logic links, BOQ links, etc. are correct

Page 4: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

SitePlan program view

Export the programIn the program manager highlight the program to be exported. Select Tools > Export > Export a Primavera 6. … .XML

Page 5: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Which versions of Primavera’sXML can be exported ?

P6 Version

Release Date Import a Candy XML file?

17.7 Jul-2017 Not yet

16.2 Oct-2016Not yet

16.1 Apr-2016

15.2 2015Not yet

15.1 2015

8.4 2014 Yes

8.3 2013 Yes

8.2 2012 Yes

8.1 2011 Yes

7 2009 Yes

6.7 2009 Yes

6.2 2008 No longer supported

6.1 2007 No longer supported

5 2005 No longer supported

Page 6: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

SitePlan program view

Linked programIf the program is linked to the BOQ, choose to export amounts or not.** Only available for Primavera 6 release 7 export.

Page 7: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

SitePlan program view

Save XML fileSave the XML file in your destination of choice

Page 8: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Program• Start date and TimeNow date• Multiple calendars with holiday/workday exceptions• Summary headers as a work breakdown structure

Activities• Activity number & descriptions• Activity durations -- Start and End dates• Precedence Logic• Time now and actual dates (progress)

BOQ *• Net amount as a number per activity in a user defined column• Selling amount as a number per activity in a user defined column• Net amount per activity as a P6 resource• Selling amount per activity as a P6 resource

* Only available for Primavera 6 release 7

What gets exported ?

Page 9: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Activity types• Special activity types are exported as follow:

• Contract start = Mandatory start• Contract end = Mandatory end• Target start = Start on or before• Target end = Finish on or before• B type = Start on

• H type = Normal activity with universal calendar (7days) allocation• Tied (hammock) = normal activity

•(P6 hammock / level of effort links are different)• F type = As late as possible• V type = normal activity (P6 does not have such a type)• M type = normal activity (P6 does not have such a type)• K type = normal activity (P6 does not have such a type)

What gets exported ?

Page 10: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Activities• Remarks, notes and calculation sheets• Base program and snapshots• Special types i.e. T-types (SitePlan hammocks) • Codes i.e. zone, area, etc. • Time location data• Information and Long lead schedules data

Resources• No planning resources are exported• No estimating resources are exported

General• Only planning data mentioned in previous slides are exported. • No other planning data are exported• Only BOQ data mentioned in previous slides are exported.• No other estimating data are exported

What does not get exported ?

Page 11: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Activities• Remarks, notes and calculation sheets• Base program and snapshots• Special types i.e. T-types (SitePlan hammocks) • Codes i.e. zone, area, etc. • Time location data• Information and Long lead schedules data

Resources• No planning resources are exported• No estimating resources are exported

General• Only planning data mentioned in previous slides are exported. • No other planning data are exported• Only BOQ data mentioned in previous slides are exported.• No other estimating data are exported

What does not get exported ?

Page 12: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Import Candy Planning into Primavera

Page 13: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Import the XML into P6In the home screen of P6 select File > ImportChoose the option “Primavera PM – (XML)

Page 14: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Select the folder to import fromUse the dropdown menu to browse and select the XML file created by Candy

Page 15: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Choose the EPS to import toWith the file selected choose the import action “ Create New Project” and select where to import to

Page 16: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Modify import configuration You can select to modify the import configuration as required

Page 17: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Recommended import configuration The above is the recommended configurationEnsure that you have the applicable user rights to allow changes

Page 18: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Import completeOnce complete you can choose to view the log file with information about the import

Page 19: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

End resultOpen the project and check dates, calendars and calendar allocation as well as holiday exceptions

Page 20: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Logic differences between SitePlan and P6

A Start Lead in P6 is the number of days from the start of a predecessor to the start of the successor.

A Start Lead in SitePlan is the number of days of work done in the predecessor before the successor can start.

This will cause differences in results when there is progress out of sequence. The same applies to End Lags.

Primavera Project Planner and P6 are registered trademarks of Oracle Primavera Systems, Inc.

Page 21: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Recommended checks

Contract starts and ends; Target starts and ends are exported as constraints. Ensure that these constraints are set correctly in P6.

All calendars are exported, but check that the holidays and non-work days are set correctly in each calendar.

A (T)ied activity is linked differently than a Hammock in P6. One of the Tied activity’s links is discarded during the conversion process. These activities must be re-linked in P6 according to P6’s conventions.

Primavera Project Planner and P6 are registered trademarks of Oracle Primavera Systems, Inc.

Page 22: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Due to differences in calculation and the activity types between products the responsibility for validating the

results must lie with those providing the export file and those doing the

import.

Primavera Project Planner and P6 are registered trademarks of Oracle Primavera Systems, Inc.

Page 23: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Export a Primavera XML file for Candy Planning

Page 24: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Which versions of P6’s XML can be imported into Candy ?

P6 -Version

Release Date Import into Candy

17.7 Jul-2017 Yes

16.2 Oct-2016 Yes

16.1 Apr-2016 Yes

15.2 2015 Yes

15.1 2015 Yes

8.4 2014 Yes

8.3 2013 Yes

8.2 2012 Yes

8.1 2011 Yes

7 2009 Yes

6.7 2009 Yes

6.2 2008 Yes

6.1 2007 Yes

5 2005 Yes

Page 25: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Only P6.7 and later exports XML files

Primavera P6 programThe XML export described here will only work with Primavera P6 release 7 or later. Select Help > About Primavera P6… to get the release information.

Page 26: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Export the prgram

Export the programIn P6 open the program to export Select File > Export

Page 27: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

SitePlan program view

Export the programSelect >“Primavera PM – (XML)”.

Page 28: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

SitePlan program view

Export the programEnsure the correct program is exported.

Page 29: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Export the programBrowse and choose where you want to save the XML file. Select the box “Export all project level layouts” to produce a smaller zip file.

Page 30: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Import Primavera XML file into Candy Planning

Page 31: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

SitePlan program view

Import the XML into CandyIn the Program Manager select Tools > Import > General importer …. NOTE: First Unzip the P6 file, if received as a zip file.

Page 32: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

SitePlan program view

Select the XML to importBrowse for the unzipped XML and Open to start the import. (Remember to unzip the file first if received as a zip file.)

Page 33: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

SitePlan program view

Analysis displayAt the end of import process an analysis report will be displayed. If any conversion problems were encountered it will also be included in the report.

Page 34: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

SitePlan program view

Imported program in Program managerThe imported program will be added to the program manager. Select the program.

Page 35: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

SitePlan program view

Customise a view to include Import reference Add the import reference column to your document view to see the P6 activity Id for comparison.

Page 36: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

SitePlan program view

Calculate the programPress the Calculate button to calculate the imported program.

Page 37: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

SitePlan program view

Import completeOnce complete check & compare the calendar, holidays and activity dates.

Page 38: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Program• Start date and TimeNow / Data date• Only activity calendars used and allocated to activities are imported (including the holiday exceptions)• WBS layout is imported as level headings.

What gets imported into Candy from P6?

Page 39: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Activities• Activity Id = Import into the Import reference column in Candy• Activity descriptions• Activity durations -- Start and End dates• Precedence Logic (predecessors and successors)• Actual start , Actual finish and Remaining durations – not advisable as Primavera allows “funny” progress like actual dates after TimeNow / Data date or Actual finish dates with a remaining duration. Candy “ignores” this (with a message displayed after import)

What gets imported into Candy from P6?

Page 40: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Activities • Specialised activity types (other than task dependent) are

imported as normal activities (example “Level of effort, mile stones, etc.)

• No base program information.

Layouts• Only the WBS layout is imported – Imported as heading levels

in Candy.• Note only 9 tree levels of WBS layout are imported – NO

activity code layout or filtered layouts are imported.• No activity codes are imported.• No user defined columns are imported.

What does not get imported?

Page 41: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Resources• No Primavera resources or resource data like resource calendars

etc. are imported into Candy

General• Only planning data mentioned in previous slides are imported. • No other planning data are imported.

What does not get imported?

Page 42: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Logic differences between SitePlan and P6

A Start Lead in P6 is the number of days from the start of a predecessor to the start of the successor.

A Start Lead in SitePlan is the number of days of work done in the predecessor before the successor can start.

This will cause differences in results when there is progress out of sequence.

The same applies to End Lags.

Primavera Project Planner and P6 are registered trademarks of Oracle Primavera Systems, Inc.

Page 43: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Recommended checks

Contract starts and ends; Target starts and ends are exported as constraints. Ensure that these constraints are set correctly in P6.

All calendars are exported, but check that the holidays and non-work days are set correctly in each calendar.

A (T)ied activity is linked differently than a Hammock in P6. One of the Tied activity’s links is discarded during the conversion process. These activities must be re-linked in P6 according to P6’s conventions.

Primavera Project Planner and P6 are registered trademarks of Oracle Primavera Systems, Inc.

Page 44: Data exchange between Candy Planning and Primavera · 2020. 9. 3. · Which versions of Primavera’s XML can be exported ? P6 Version Release Date Import a Candy XML file? 17.7 Jul-2017

Due to differences in calculation and the activity types between products the responsibility for validating the

results must lie with those providing the export file and those doing the

import.

Primavera Project Planner and P6 are registered trademarks of Oracle Primavera Systems, Inc.