Types of Drilling Structures

Conventional Rotary Rig for drilling on Land

Alternate Drilling Structures

Structures for deep Water or Arctic Drilling

Hydrogen Sulfide and RULE 36

Page 3: Dasar Dasar Teknik Pemboran

Standard Derrick - Engines close to derrick - Mechanical Transmission

Page 4: Dasar Dasar Teknik Pemboran

700 hp ENGINE

COMPOUND 700 hp ENGINE

700 hp ENGINE

Page 5: Dasar Dasar Teknik Pemboran

Drilling Structures:

Conventional Land RigJack-up RigDrillshipSemisubmersibleJacket PlatformGravel Island Ice IslandGuyed TowerTension Leg PlatformSpar Platform

Page 6: Dasar Dasar Teknik Pemboran

Pile-founded steel jacket platform

Cost increases rapidly with depth

Bending moments

Natural Frequency

Mud Line

Page 7: Dasar Dasar Teknik Pemboran

Buoyed tower concept of 1970

~100 sec nat.frequency(waves ~ 6-10 sec)

Pivot at bottom(problem)

Page 8: Dasar Dasar Teknik Pemboran

Principal features of the Lena guyed tower

200 TON CLUMP WEIGHTS

FAIRLEAD

19831,000 ftof water

Page 9: Dasar Dasar Teknik Pemboran

Arctic drilling structure - Ice Island

High ice forcesWeak soildShallow water

~1,000 ft dia.

Page 10: Dasar Dasar Teknik Pemboran
Page 11: Dasar Dasar Teknik Pemboran
Page 12: Dasar Dasar Teknik Pemboran

Spar Platform in Transit

Page 13: Dasar Dasar Teknik Pemboran

Spar Platform Installed

Page 14: Dasar Dasar Teknik Pemboran

Lesson 2

Drilling Systems

Drilling Rigs

Drilling a Well

Definitions

Page 15: Dasar Dasar Teknik Pemboran

l

l

Use?

Page 16: Dasar Dasar Teknik Pemboran

Fig. 1.33 Schematic of Rotary System

Page 17: Dasar Dasar Teknik Pemboran

Fig. 1.34 Cutaway View of Swivel

ROTATING* Seals* Bearings

Page 18: Dasar Dasar Teknik Pemboran

Fig. 1.38 Cutaway View and

Dimensions for Example Tool Joint

PINBOX

TJShoulder

Page 19: Dasar Dasar Teknik Pemboran

Fig. 1.39 Stabilizer

* Keeps pipe in center of hole

* Aids in drilling straight hole

* Prolongs bit life

Page 20: Dasar Dasar Teknik Pemboran

Fig. 1.41 Kick Detection During Drilling

Operations

1

2

3

KICK

GAIN IN PITVOLUME EQUAL

TO KICK VOLUME

Page 21: Dasar Dasar Teknik Pemboran

Fig. 1.46 Remote Control

Panel for operating Blowout

Preventers CHOKE

What to do if KICK occurs?

Page 22: Dasar Dasar Teknik Pemboran

Fig. 1.44 Annular Blowout Preventer

DPTJDCOH

Press

Page 23: Dasar Dasar Teknik Pemboran

Ram Blowout Preventer

Page 24: Dasar Dasar Teknik Pemboran

Ram Blowout Preventer - cont’d

SHEAR / BLINDRAM ASSEMBLY

Page 25: Dasar Dasar Teknik Pemboran

Fig. 1.48 Rotating Blowout Preventer

Page 26: Dasar Dasar Teknik Pemboran

Fig. 1.51 High-

Pressure Circulating System for

Well Control

Operations

Keep BHP const.

Kick

Page 27: Dasar Dasar Teknik Pemboran

Fig. 1.56 Subsurface

Well Monitoring

System

MWD

Page 28: Dasar Dasar Teknik Pemboran

Fig. 1.57 Spread Mooring Systems

OFFSHORE DRILLING

Page 29: Dasar Dasar Teknik Pemboran

Fig. 1.58 Schematic of Equipment for Marine

Drilling

Page 30: Dasar Dasar Teknik Pemboran

Lesson 3

Hole Problems

Page 31: Dasar Dasar Teknik Pemboran

Lesson 5 - Hole Problems

Lost Circulation Stuck Pipe

• Keyseat- Crooked Hole• Differential Sticking• Mechanical Sticking

Junk in Hole Kicks and Blowouts Crooked Hole

Page 32: Dasar Dasar Teknik Pemboran

Hole Problems - Lost Circulation

Flow out < Flow in (e.g 400 < 500)

Drop in Mud Pit Volume

Blowout

Indication:

Page 33: Dasar Dasar Teknik Pemboran

Hole Problems- Lost Circulation

Poor Drilling Fluid Characteristics

Induced Fracturing of Formation From Rapid Pipe Movement

Causes:

High Formation Permeability (e.g. fractures)

Low Formation Pore Pressure

Page 34: Dasar Dasar Teknik Pemboran

Hole Problems- Lost Circulation

Costly Mud Makeup

Loss of Production

Fire

Loss of Permit to Drill

Results:

Page 35: Dasar Dasar Teknik Pemboran

Hole Problems- Lost Circulation

Preventive Measures:

Crew Education

Good Mud Program

Study Wells in Area

…to be prepared

Page 36: Dasar Dasar Teknik Pemboran

Hole Problems- Lost Circulation

Use Lost Circulation Material as Mud Additive (fibrous or granular)

Drill Through Troublesome Interval and Case Off

Decrease Mud Weight

Decrease Circulation Rate

Remedial Measures:

Page 37: Dasar Dasar Teknik Pemboran

Hole Problems - Stuck Pipe(drill pipe, drill collars, casing)

Indication:

Cannot Pick Up Pipe (Venezuela case)

Causes:

Cave - ins

Keyseat - Crooked Hole

Page 38: Dasar Dasar Teknik Pemboran

Hole Problems - Stuck Pipe

Differential Pressure Sticking

Filter Cake

Deposited AFTER Circulation Stops

- While Still on Bottom

Causes, cont’d:

Page 39: Dasar Dasar Teknik Pemboran

Hole Problems - Stuck Pipe

Results:

Fishing Operations

Back off, POH, RIG w/fishing string

Loss of Hole

or at least part of the hole

Page 40: Dasar Dasar Teknik Pemboran

Hole Problems - Stuck Pipe

Use Minimum Mud Weight Required to Control Formation Pressures.

Use Special Drill Collars (spiral)

Use Centralizers on Casing

Periodically Establish Circulation while Running Casing or Drillpipe in Deep Hole

Preventive Measures:

Page 41: Dasar Dasar Teknik Pemboran

Hole Problems - Stuck Pipe

Erode Mud Filter Cake - at High Fluid Velocity (speed up pumps)

Spot Special Fluid; Oil, Acid Reduce Mud Weight as Far as Possible Rotate Pipe - Keep Moving Pipe

Remedial Measures:

If Circulation Can Be Established:

Page 42: Dasar Dasar Teknik Pemboran

Hole Problems - Stuck Pipe

If Circulation Cannot Be Established:

Cut Pipe or Unscrew Joint - and Fish

Remedial Measures:

Page 43: Dasar Dasar Teknik Pemboran

KEYSEAT

Page 44: Dasar Dasar Teknik Pemboran

P1

P2

P1 >> P2

Page 45: Dasar Dasar Teknik Pemboran

Thick Filter Cake

Thin Filter Cake

F = N

N = P A

F = P A

How is filter cake formed?

Pipe Stuck in Wall Cake

Page 46: Dasar Dasar Teknik Pemboran

Hole Problems - Junk in Hole

Bit Parts Missing

Items from Surface Dropped into Hole

Erratic Torque

Indication:

Page 47: Dasar Dasar Teknik Pemboran

Hole Problems - Junk in Hole

Cause:

Negligence of Crew

Result:

Fishing Operation

Page 48: Dasar Dasar Teknik Pemboran

Hole Problems - Junk in Hole

Crew Education

Preventive Measure:

Remedial Measures:

Run Junk Basket

Run Basket with Collapsible Teeth (“Poor Boy” Basket)

Run Magnet

Page 49: Dasar Dasar Teknik Pemboran

Hole Problems - Blowout(oil, gas or water)

Returns to Surface after Circulation is Stopped (KICK!)

Well Out of Control - Big Problem!

Lost Circulation . . .

Indication:

Page 50: Dasar Dasar Teknik Pemboran

Hole Problems - Blowout (oil, gas or water) [surface or underground]

Causes:

Loss of Hydrostatic Head due to Lost Circulation

Poor drilling Fluid

Swabbing Effect while Pulling Drillpipe

Insufficient Mud Weight

Page 51: Dasar Dasar Teknik Pemboran

Hole Problems - Blowout

Results:

Possible Loss of Life and Property

Legal and Financial Problems

Page 52: Dasar Dasar Teknik Pemboran

Hole Problems - Blowout

Crew Education

Be Alert

Blowout Control Equipment on RIG including Pit Volume Indicators

Preventive Measures:

Page 53: Dasar Dasar Teknik Pemboran

Hole Problems - Blowout

Remedial Action:

If on Bottom:

Use proper Mud Weight

Add Lost Circulation Materials

In Extreme Case of Blowout:

May Have to Directionally Drill a Relief Well

Page 54: Dasar Dasar Teknik Pemboran

Hole Problems - Crooked Hole

Periodic Directional Surveys

Stuck Drill String

Casing Problems

Indication:

Page 55: Dasar Dasar Teknik Pemboran

Hole Problems - Crooked Hole

Causes:

Too much Weight on Bit

Dipping Formation

Anisotropic Formation

Too Small Drill Collars

No Stabilizers

Page 56: Dasar Dasar Teknik Pemboran

Hole Problems - Crooked Hole

Results:

Uneven Spacing (on bottom)

Legal Problems

Production Problems

Cementing Problems

Page 57: Dasar Dasar Teknik Pemboran

Hole Problems - Crooked Hole

Avoid Buckling of Drill Pipe by using sufficient number of

drill collars Use “Oversize” Drill Collars Use Reamers and Stabilizers Start the Hole Vertically

Preventive Action:

Page 58: Dasar Dasar Teknik Pemboran

Hole Problems - Crooked Hole

Plug Back and Sidetrack

Use Whipstock

Use Reamers in 3 Locations

Remedial Action: