82
AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE DAM (NJO0299)t DELAWA-ETC(U) JUN 81 R J MCOERMOTT. J E BRIBBIN DACW61-?9-C-O011 UNCLASSIFIED DAEN/NAP-53842/NJO02"-81/ N. 'm'hmhh..-.DB EEEEElllllEihE EEEIIIIIIIIII I hlllEEllllllI --- uEElllllEE *IIIIIIIIIIIm

DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE DAM (NJO0299)t DELAWA-ETC(U)JUN 81 R J MCOERMOTT. J E BRIBBIN DACW61-?9-C-O011

UNCLASSIFIED DAEN/NAP-53842/NJO02"-81/ N.'m'hmhh..-.DBEEEEElllllEihEEEEIIIIIIIIIII hlllEEllllllI---uEElllllEE*IIIIIIIIIIIm

Page 2: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

3- -Ilk,

-77~ 1 0 &,~ a~A

W.""z

Page 3: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

SECURITY CLASSIFICATION OF THIS PAGE ( Dale Entered)

READ rNSTRUCTIONSREPORT DOCUMENTATION PAGE BEFORE COMPLETING FORM

I REPORT NUMBER 12 A GOVT ACCESSION NO. 3. RECIPIENT'S CATALOG NUMBER

DAEN/NAP-53842/NJ00299-81/06 ________________

4 TITLE (aMd Subllfe) S. TYPE OF REPORT & PERIOD COVERED

Phase I Inspection ReportNational Dam Safety Program FINALCrystal Lake Dam, NJ00299 6. PERFORMINGORG. REPORT NUMBER

Burlington County, NJ7. AUTHOR(@) S. CONTRACT OR GRANT NUMBER(&)

McDermott, Richard J., P.E. DACW61-79-C-O01l /Gribbin, John E., P.E.

S. PERFORMING ORGANIZATION NAME AND ADDRESS to. PROGRAM ELEMENT PROJECT. TASK

Storch Engineering AREA & WORK UNIT NUMBERS

220 Ridgedale

Florham Park, N.J. 07932

I CONTROLLING OFFICE NAME AND ADDREIS 12. REPORT DATENJ Department of EnvironmentaI Protection June, 1981Division of Water Resources1 . NUMEROFPAGESP.O. Box CN029 50Trenton, NJ 08625 50

14. MONITORING AGENCY NAME a AODRESS(If dliftnmt htmo Controlling Office) IS. SECURITY CLASS. (of this report)U.S. Army Engineer District, PhiladelphiaCustom House, 2d & Chestnut Streets UnclassifiedPhiladelphia, PA 19106 ISa. DECLASSIFICATION/ DOWNGRADING

SCHEDULE

16 DISTRIBUTION STATEMENT (of 'm1. ReP r)

Approved for public release; distribution unlimited.

17. DISTRIBUTION STATEMENT (of the abstract etted in Block 20, If dife"Ot bft Report)

IS. SUPPLEMENTARY NOTES

Copies are obtainable from National Technical Information Service,Springfield, Virginia 22151.

19. KEY WOROS (Continue on rever side It neceeeary and Identify by block number)

Dams National Dam Safety ProgramEmbankments Crystal Lake Dam, NJVisual Inspection RiprapStructural Analysis Outlet works

20 AwRACT c disoevs a1 s i ,lnep y diselot7i by block numv6sr)This report cites results of a technical investigation as to the dam's adequacy.The inspection and evaluation of the dam is as prescribed by the National DamInspection Act, Public Law 92-367. The technical investigation includes visualinspection, review of available design and construction records, and preliminarystructural and hydraulic and hydrologic calculations, as applicable. Anassessment of the dam's general cotdition is included in the report.

DD , 1 3 MT1o. OF I Mov 41 Is Oum BOLEI

SECUI"TY CLASSIF

ICATIO N

OF THIS PAGE (When De* Snoted)

Page 4: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

S9CUmyyV CLAW IVICATIO41 OF THIS PAGKCfb Do at.Btre.I.

SIECURITY CLASSIFICATION OF THIS PAGE(Whw,, Dots Rntet.")

Page 5: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

NOTICE

THIS DOCUMENT HAS BEEN REPRODUCED

FROM THE BEST COPY FURNISHED US BY

THE SPONSORING AGENCY. ALTHOUGH IT

IS RECOGNIZED THAT CERTAIN PORTIONSARE ILLEGIBLE, IT IS BEING RELEASED

IN THE INTEREST OF MAKING AVAILABLE

AS MUCH INFORMATION AS POSSIBLE.

//V

Page 6: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

Acce '0 n For -

DEPARTMENT OF THE ARMY Al GAIPHILADELPHIA DISTRICT. CORPS OF ENGI'NEERS Ir

CUSTOM HOUSE- 2 D 8& CHESTNUT STREET S . <1r

PHILADELPHIA PENNSYLVANIA 19106 t._

I .,! i ! By i.

:10tI,!1 01D f'W\/[fl !

DIS"I'V1ICN UNLIMIT-ED.

1ILC1iS-(i Lilt, Pids&.' I 11' - Li l 'L.P.. L i4i (,rv-.t~i 1.71k, iy,: III 1 ar I th uLcl

CounIty, NeW ;erSey %;ilLI. 11:12; bA-121i ~rJ)1 Ar.'LI I1ilLIi JIL~I'. I i/ .Li i' (i 1111C .'

lnsp. tii~ %ct, P1.li1c jA. L-h A hl it aIis-Sllcl d:, -*ind It Ii I:, 'I V('V 1; *ilt iiUl1)t (' I tilit' Us' hrl

Based an v sual inspuILt i~ll, IVilai1 r-iCcrlds , calcuLt IIi1o ;an" 1 astope--at iona I per tur-ua:.ce, ,rvs tal Lak( Damn, iniiall) I iSt(er as a uIgh hazliardIpotent ial t(rue ture, biit roduced Lo a s t,nt[ ira: nt lavarti jjotet La LSrc oas . resul It i this tV1Sp2ctLoL0l is judgs'd to IHe in Food uve:rai 1 condition anditilt :I-;lii wdy i; coilsider ed a(Itquate. To 'InSure adIleqsuo , thlt rtructt Ht',

Lilt, fol ~wing ac Liolu , asl a! minitium, irt, I 01 1 eL t .lled

a. Iluio 1(lJi'juI, ac(tionls slioujd be jinttlalkI within ux months Irm: the

d-it t' of arp..oval kit tn i' reporl:

()Tilt outlet works stiou d hw i.ves t ,-a ted wiLli re S -'Ct totjper~it ionla I aiJf-tijcv aind, it Iii' ss.Ir, L-).W ' pI'opk' wr'trdt ju11

CLhIlditi0-1,

(2)Rus ted 011~ burf Ocv, dr u in pi pt :;hol1iid t1 h re p1 i no v 8'' rupc)r i .1101-Olik pipe.

the bridge shoulId be prope.rk -; sL~hii i td

(4) 1). , ro~ih i'iprIip oil riik cy.I n :111d dc'.'t ' i ac- o

umbankment SIotu Id be U.- pa iret:oh Wi'. ' ,:t1 i'i I\%

(5 l t o ! i:, inomvtid- ,I "' (; il-s wkli b

rum~wed

Page 7: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

Nw , Ii , - N-

Hon1or a t, iv b rnd;,r 't'. i~'i-o

Th. Iiio ct 0011(1 5 ~l d !c'ui O 111 y 1, I-- L 1.)11 i t W I Lit zan

ei le tLiv. w a r i i C1 s ) stL:i 1 ot ioo ~to I be L akt:i i III- trll:(i iIMilojMjzeoO wflsLrep i t, e~ ct ol ill t.'il C :1L Lilt, (I1 !IIWit iI I~ L i0 a

f ro i k-e da t k of a pprova i L[ I iIs r portL

C . 'Elie owneCr shoud 10 '.v- I op wr i t t Oi opvra tL ill', o( (',, 11, A 1c Oili C

mailitenaticc pl an 11c tn sure CLws et ot 01cth daill witkii )[t 001,al tr as tilh-

Lut- (If approval ot 1his re-pnrt

A copy of the report is he in,, 1turnij~luo tO -ir. Dirk k-. liot Laaui , NoI, Jk rseyDepartment olt iov irotimenLal I 1rotecot: io, .1t e cS i~hO IL 'Litte .t I ILL coILIact.

rthsprogrcu. ki to iI Ij~ iaso o dt 1 s I Lt r , a copy willalIso bec sent. L, Conrgressimin Smithi ot Llit Foot Lt Di: Lt. Li~rti:provis ion of tie Frokoml OL t r::a L on Act-, tile ins p)Vt tiW 1'( [1): L~ 1 1 be

sjecL to relc-i bL tCi t ic, t uponi r uqot it, t ~ Li i\ Et t'iIi

this letter.

Add itijonal 1 opie,, of thiis rt polrt may bco ULtz i ned I 1.1o Llie ittnITehoiaI

Inlocumation Services (NT. 5) , Spriltieldi, Virtj fini 221o1 at,. ra',sonab 1lkcost. Please a! low, fou to Six wueks iru'l the ate ci t 1.'1 tk Lt1 fr Ir L\ ISto have Copies of tile res)ort L iIa

An imapor tant aspI c t o t Lbl 0am in spou t i i1'r Ograii wi ll be, Lii le 1 rp l1ie11tJLi Oilof the reconnllend,-iLio00 mids as a reSUIL )I~ Liic io1S;:eL Li oh. Wt.z c co0r d i I iy[r e que!5 t thItat: we b e i d v I s od o f pr o no sed a c ' i ) nis t aai e n b~ LiI btt tOiLI

implement, our reclr- iicndatjons.

1 mci NNi"I'i R. 1,1S ,RAs stated M1:ijor , Corps ol Ejii, nucrs

Act ilU, i.COTI1unodor mid1( Di1st rit IL hiq ilee r

Copies furnishied:Mr. Dirk C. flofman, I D~. eputy OirectorDivision of Water Reto'I1rCL-

N.J. Dept. of Enviromlifeotn i Protec LionP.O. Box CN029Trenton, NJ Ob625

Mr. John O'Dowd, Actinii Ci LUiibureau of Flood Plain RegulationDivision of Water ResourcesN.J. Dept. of Environmental P'rottCLioP.O. Box CN029Tirenton, NJ 08ut25

Page 8: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

k; \ Y., A 11 IL'h E )- ~ ~

t, R b .i ENG I N r,)-L 01 - 1, k S'EN ' hI L LA 1 L;

T L td' I ~i~ I J 1,A -.I iu - '' N t'' Siic ; E1: 1 ' ILit r I) I i , oil , '

to Li! , t at, L I Nt2W J e r.- i>2. La S t I- , 't'l- L'tlit-'I % I I. Ai F l.

Ele'iplWI 0)1 P!trict, PtiiLU L'Ca ;. L~ in -I : UI <"' o. .n. .41

.t i Litt- N.. hhL iiaL 1W:In; I!Isjli c I , Ac , 1)iJ 1n 1 ~ '1 -

k-ys-.y ,,L-i ,ik c I'ai I H LIt L I i I', I i . Lo c .; a - ,i It hai ai 0 (1 .I i I : L 1. Lot ,

rtLduceu t ' LI 1 ii I.-alLIiclt p-teMW ' LI t r -lC Lu rL - t 1 I L

I ".-jI L"C LI I iS Ji ,Ci'n to bo' ill 1L)o'i L 'i n. Lu I L L~ Ii k~illS 'i LA-tS, Iw

cOlls LJt rod( aId'ua tu. Tou olsuri' 3(l'tjtlL\ o L tO tri nic Lii. rt t' it f

a~ LI1 a a nliii-ilii, are rc.C..i.Li. a;

". 'ILI he I i 10 1 i . at- Li oils SIoi ILL - 11 1i t~ 1; IL -,] W I ti l i X I f i CiiIn I Vu o :Ljint:

Jan k, .Pprtval oiIt th is re pur L

pe r at Ionad I aacquac) a)nd , i t riece-ssary , rk:s t.'red to prupvr- u~~tLond iCudI( LI LOU.

k) Ru ,I CNIP surt act, diLIli pi i- :;~ii 1 hu r ?'. t, u,, 1), pr' j'i I itit,

(3) Er os i0on o t tho eLi,hankneOLI a d j A 2 k-!It LUth U'UiiL I iga 1 i s Ut1

Life OriL~ge SiLOuI. be proper1 stabi].izei.

:,) De t e r1ora t.i ng r 11 itLp o i t i1' L 5t. l m ai ini (,w fiit vLOU t,-U

e,band~knii-L I i r u id b e r kpa r -. wher,'LcCSL'

(5) Al i rekns iid mivr..:' .'I .' at .?;If tit tL ~ iI litI slioiu :'k.a

b . ITit- iOwnfle -diu k;lo 2 0 ~ all 4M! -I., . 1W 'Ili L' '. *Ll h I' WI* LI tii

Ri1 lu iiLt,. (IOiIS L Fezil I I I~t . l OL Ill Ci 'l . ,L Lhi IiS L t.Ii -> I ), iiIL iLI

f l i lt- OVat ol approvai t' I; L.i. l

C . fh e o)wn-r shut il 0 141) wr 1t L~ Ij.'I t 1 tilt', i ;.i!.k .1 j..LL Ii.C

ma tLienatLct: T)aL) to ensucc- fkt he sa t) u! I i,- ii i 1i L i 1L \'11i 1 L'ii Lit

KENNElh R. MUSL.Major, Corps ut Eng ineers

Act Ling ConiLU.'ndcr iiw Oti )Lst rIC t K gILueer

DXI E: '/ 7

Page 9: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

PHASE I REPORT

NATIONAL DAM SAFETY REPORT

Name of Dam: Crystal Lake Dam, I.D. NJ00299

State Located: New Jersey

County Located: Burlington

Drainage Basin: Delaware River

Stream: Tributary to Delaware River

Date of Inspection: January 6, 1981

Assessment of General Condition of Dam

Based on visual inspection, past operational performence and Phase I

engineering analyses, Crystal Lake Dam is assessed as being in good

overall condition.

Based on investigations of the downstream flood plain made in connection

with this report, it is recommended that the hazard potential classifica-

tion be downgraded from high to significant hazard.

The spillway is capable of passing the designated spillway design flood

(100-year storm) without an overtopping of the dam and, therefore, is

assessed as being adequate.

The owner should, in the near future, develop an emergency action plan

together with an effective warning system outlining actions to be taken

by the operator to minimize downstream effects of an emergency at the

dam.

In addition, it is recommended that the following remedial measures be

undertaken by the owner in the near future.

1) The outlet works should be investigated with respect to operational

adequacy and, if necessary, restored to proper operational

condition.

i,

Page 10: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

2) Rusted CMP surface drain pipe should be replaced by proper

inlet and pipe.

3) Erosion of the embankment adjacent to the upstream wingwalls

of the bridge should be properly stabilized.

4) Deteriorating riprap on the upstream and downstream faces of

embankment should be repaired where necessary.

5) All trees and adverse vegetation on the embankment should be

removed.

In the future, the owner of the dam should develop written operating

procedures and a periodic maintenance plan to ensure the safety of the

dam.

/

Richard J. McDermott, P.E.

E rJohn E. Gribbin, P.E.

ii

= ., L

Page 11: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

"I ID,

Orw

Page 12: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

TABLE OF CONTENTS

ASSESSMENT OF GENERAL CONDITION OF DAM

OVERVIEW PHOTO iii

TABLE OF CONTENTS iv

PREFACE vi

SECTION 1 - PROJECT INFORMATION

1.1 General

1.2 Description of Project

1.3 Pertinent Data

SECTION 2 - ENGINEERING DATA 7

2.1 Design

2.2 Construction

2.3 Operation

2.4 Evaluation

SECTION 3 - VISUAL INSPECTION 9

3.1 Findings

SECTION 4 - OPERATIONAL PROCEDURES 12

4.1 Procedures

4.2 Maintenance of Dam

4.3 Maintenance of Operating Facilities

4.4 Description of Warning System

4.5 Evaluation

iv

Page 13: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

TABLE OF CONTENTS (cont.)

Page

SECTION 5 - HYDRAULIC/HYDROLOGIC 14

5.1 Evaluation of Features

SECTION 6 - STRUCTURAL STABILITY 16

6.1 Evaluation of Structural Stability

SECTION 7 - ASSESSMENT AND RECOMMENDATIONS 18

7.1 Dam Assessment

7.2 Recommendations

PLATES

1 KEY MAP

2 VICINTIY MAP

3 SOIL MAP

4 GENERAL PLAN

5 SECTIONS

6 PHOTO LOCATION PLAN

APPENDICES

1 Check List - Visual Inspection

Check List - Engineering Data

2 Photographs

3 Engineering Data

4 Hydraulic/Hydrologic Computations

5 Bibliography

V

Page 14: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

PREFACE

This report is prepared under guidance contained in the Recommended

Guidelines for Safety Inspection of Dams, for Phase I Investigations.

Copies of these guidelines may be obtained from the Office of Chief of

Engineers, Washington, D.C. 20314. The purpose of a Phase I Investigation

is to identify expeditiously those dams which may pose hazards to human

life or property. The assessment of the general condition of the dam is

based upon available data and visual inspections. Detailed investigation,

and analyses involving topographic mapping, subsurface investigations,

testing, and detailed computational evaluations are beyond the scope of

a Phase I investigation; however, the investigation is intended to

identify any need for such studies.

In reviewing this report, it should be realized that the reported condition

of the dam is based on observations of field conditions at the time of

inspection along with data available to the inspection team. It is

important to note that the condition of dam depends on numerous and

constantly changing internal and external conditions, and is evolutionary

in nature. It would be incorrect to assume that the present condition

of the dam will continue to represent the condition of the dam at some

point in the future. Only through continued care and inspection can

there be any chance that the unsafe conditions be detected.

Phase I inspections are not intended to provide detailed hydraulic and

hydrologic analyses. In accordance with the established Guidelines, the

Spillway Test flood is based on the estimated "Probable Maximum Flood"

for the region (greatest reasonably possible storm runoff), or fractions

thereof. The test flood provides a measure of relative spillway capacity

and serves as an aid in determining the need for more detailed hydraulic

and hydrologic studies, considering the size of the dam, its general

condition and the downstream damage potential.

vi

Page 15: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

PHASE I INSPECTION REPORT

NATIONAL DAM SAFETY PROGRAM

CRYSTAL LAKE DAM, I.D. NJ00299

SECTION 1: PROJECT INFORMATION

1.1 General

a. Authority

Public Law 92-367, August 8, 1972, authorized the Secretary of

the Army, through the Corps of Engineers, to initiate a National

Program of Dam Inspections throughout the United States. The

Division of Water Resources of the New Jersey Department of

Environmental Protection (NJDEP) in cooperation with the

Philadelphia District of the Corps of Engineers has been

assigned the responsibility of supervising the inspection of

dams within the State of New Jersey. Storch Engineers has

been retained by the NJDEP to inspect and report on a selected

group of these dams. The NJDEP is under agreement with the

Philadelphia District of the Corps of Engineers.

b. Purpose of Inspection

The visual inspection of Crystal Lake Dam was made on January 6,

1981. The purpose of the inspection was to make a general

assessment of the structural integrity and operational adequacy

of the dam structure and its appurtenances.

Page 16: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

1.2 Description of Project

a. Description

The dam consists of an earth embankment supporting N.J. Highway

Route 130. The spillway structure consists of a horseshoe-shaped

concrete and steel interlocking sheet pile weir located on the

upstream side of the embankment. At the center of the embankment

a concrete bridge forms the spillway discharge channel.

The outlet works consists of a gated 2' x 2' sluice which

transversely penetrates the center of the concrete spillway

structure.

The crest of the dam is stabilized by the paved roadway of

Route 130 and a heavy stand of grass. Portions of the upstream

and downstream sides of the embankment near the bridge are

stabilized by concrete and bituminous pavement.

The elevation of the spillway crest is 5.7, National Geodetic

Vertical Datum (N.G.V.D.) while that of the crest of dam is

13.2. The elevation of the invert of the outlet works is 2.7

while that of the channel bed is 0.3. The overall length of

the dam is 500 feet and its height is 12.9 feet. The top

width of the dam is 75 feet and the side slopes are 2 horizontal

to 1 vertical.

b. Location

Crystal Lake Dam is located in the Townships of Bordentown and

Mansfield, Burlington County, New Jersey. It impounds a

recreational lake located adjacent to Route 130. Principal

access to the dam is Route 130 which traverses the crest.

Discharge from the spillway of the dam flows into a tributary

of the Delaware River.

2

Page 17: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

c. Size and Hazard Classification

The dam is classified in accordance with criteria presented in

"Recommended Guidelines for Safety Inspection of Dams" published

by the U.S. Army Corps of Engineers. Size categories consist

of Small, Intermediate and Large while hazard categories are

designated as Low, Significant and High.

Size Classification: Crystal Lake Dam is classified as "Small"

size since its maximum storage volume is 441 acre-feet (which

is less than 1000 acre-feet) and its height is 12.9 feet

(which is less than 40 feet).

Hazard Classification: Visual inspection of the downstream

flood plain of the dam indicates that failure of the dam could

damage the roadway of NJ Route 130 which traverses the crest

of the embankment and the railroad embankment located 200 feet

from the dam. However, the size of embankment and anticipated

high tailwater during a storm equivalent to the SDF reduces

the probability of a breach. Accordingly, Crystal Lake Dam is

classified as "Significant" hazard.

d. Ownership

Crystal Lake Dam is owned and operated by the State of New

Jersey, Department of Transportation, 1035 Parkway Avenue,

Trenton, N.J. 08625. The impoundment, Crystal Lake, is owned

by the Realty Transfer Co., 1 Elizabeth Plaza, Elizabeth, N.J.

07207.

e. Purpose of Dam

The purpose of the dam is the impoundment of a private recrea-

tional lake facility.

3

Page 18: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

f. Design and Construction History

Reportedly, the present concrete horseshoe spillway structure

at Crystal Lake Dam was constructed around 1940, replacing the

old timber stoplog spillway. This spillway modification was

initiated because of the flood of August 23, 1938 which overtopped

the road embankment. The work was accomplished by the New

Jersey State Highway Department.

Reportedly, no records or plans for the construction of the

original dam are on file.

Dam Application No. 337 was issued to the New Jersey State

Highway Department by the State Water Policy Commission on

October 18, 1939 for the construction of a new spillway.

g. Normal Operational Procedures

The dam and appurtenances are maintained by the New Jersey

Department of Transportation Maintenance Division. There is

no fixed schedulc of maintenance; repairs are made as the need

arises.

The outlet works has been used to drain the lake for lake

maintenance purposes, usually on request from the owner of the

impoundment. It is not known when the lake was last lowered.

1.3 Pertinent Data

a. Drainage area 3.81 square miles

b. Discharge at Damsite

Maximum flood at damsite July 23, 1938 (Roadway

overtopped) Inflow

quantity unknown.

4

Page 19: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

Outlet works at pool elevation 20 c.f.s.

Spillway capacity at top of dam 1350 c.f.s.

c. Elevation (N.G.V.D.)

Top of Dam 13.2

Maximum pool-design surcharge 13.2

Recreation pool 5.7

Spillway crest 5.7

Stream bed at centerline of dam 0.3

Maximum tailwater 15 (Estimated)

(Normal tailwater

varies with tidal

fluctuations.)

d. Reservoir

Length of maximum pool 4000 fcet (Estimated)

Length of recreation pool 2400 feet (Scaled)

e. Storage (Acre-feet)

Recreation pool 50

Design surcharge 441 HTop of dam 441

f. Reservoir Surface (acres)

Top of dam 78.3 (Estimated)

Maximum Pool Design - design surcharge 90.0 (Estimated)

Recreation Pool 27.6

g. Dam

Type Earthfill

Length 500 feet

5

Page 20: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

Height 12.9 feet

Sideslopes - Upstream 2 horiz. to 1 vert.

- Downstream 2 horiz. to 1 vert.

Zoning Unknown

Impervious core Unknown

Cutoff Unknown

Grout curtain Unknown

h. Diversion and Regulating Tunnel N.A.

i. Spillway

Type Concrete Weir

Length of weir 36.0 feet

Crest elevation 5.7

Gates N.A.

Upstream channel N.A.

Downstream channel 12.5' x 8.8' Bridge Opening

j. Regulating Outlet

2' x 2' low-level outlet sluice controlled by slide gate

6

Page 21: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

SECTION 2: ENGINEERING DATA

2.1 Design

No plans or calculations pertaining to the original construction ofthe dam could be obtained. Drawings and calcuations prepared in or

about 1938 relating to the construction of the present spillway

structure which shown plans of the spillway and appurtenant structures

are available in the files of the NJDEP, Division of Water Resources.

Design flood peak flow was computed to be 783 c.f.s. based on the

Central Jersey Curve. Hydraulic analysis indicated that the spillway

and bridge could pass 894 c.f.s. with a free board of 2 feet.

2.2 Construction.

No data or reports pertaining to the original construction of the

dam are available. Construction data or reports are limited to a

final acceptance report, dated June 24, 1944 for the construction

of the present spillway structure.

2.3 Operation

Reportedly, informal maintenance reports are on file with the NJDOT

Maintenance Division pertaining to spillway and bridge. No data

pertaining to operations are available.

2.4 Evaluation

a. Availability

Available engineering data is limited to that which is on file

with the NJDEP and NJDOT. These files contain plans and

calculations relating to the present spillway structure and

appurtenances.

7

Page 22: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

b. Adequacy

Available engineering data pertaining to Crystal Lake Dam is

of limited assistance to the performance of a Phase I evaluation.

A list of absent information is included in paragraph 7.1.b.

c. Validity

The available hydraulic analyses appear to be valid with

respect to engineering practice generally accepted in 1938.

However, they are not valid according to analytic procedures

developed by the Corps of Engineers for the present inspection

and assessment program.

Although spillway discharge rates are in close agreement with

values computed in connection with this Phase I Report, the

design flood used in 1938 is not in conformance with the

presently utilized SDF.

8

Page 23: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

SECTION 3: VISUAL INSPECTION

3.1 Findings

a. General

The inspection of Crystal Lake Dam was performed on January 8,

1981 by staff members of Storch Engineers. A copy of the

visual inspection check list is contained in Appendix 1. The

following procedures were employed for the inspection:

1) The embankment of the dam, appurtenant structures and

adjacent areas were examined.

2) The embankment and accessible appurtenant structures were

measured and key elevations determined by surveyor's

level.

3) The embankment, appurtenant structures and adjacent areas

were photographed.

b. Dam

The roadway pavement was in satisfactory condition and the

grass growth in the median and shoulder areas was thick.

Steel guide rails extending for the entire length of the dam

on both sides of the roadway appeared to be in satisfactory

condition.

The upstream face of the dam was slightly irregular and generally

covered with weeds, bushes and trees ranging in caliper from 2

inches to 8 inches. The upstream side of the embankment

adjacent to both wingwalls of the bridge structure was stabilized

with asphalt which appeared to be in satisfactory condition,

however, some erosion was observed just beyond the limit of

the asphalt. In addition, there was evidence of some riprap

on the upstream face of the dam, but it appeared to be inadequate.

9 iIa

Page 24: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

4

The downstream face of the dam appeared to be more regularly

graded than the upstream face, and was covered with weeds,

some bare spots and many small trees that had been cut off

approximately 1 foot above the ground line. The areas adjacent

to both sides of the bridge were stabilized by concrete debris

that appeared to have been hand placed as riprap. To the left

and right of the riprap were two concrete flumes that stabilized

the soil and allowed surface water to run off the roadway and

into the downstream stilling basin. Some concrete riprap at

the toe of the dam on the right side of the bridge appeared to

be dislodged. The concrete debris forming the riprap appeared

to have been grouted in place. On the left side of the bridge

the pieces of concrete were not grouted but simply hand placed.

c. Appurtenant Structures

The spillway crest was in the shape of a broad crested weir

and was formed by two parallel rows of interlocking steel

sheet piling. The sheet piling appeared to be sound and in

generally satisfactory condition. The sheet piling extended

from within the embankment on the left side, around the horse-

shoe to within the embankment on the right side. The concrete

spillway discharges onio a concrete apron which joins the

downstream channel formed by the bridge opening.

The concrete railings on both the upstream and downstream

headwalls for the bridge appeared to be in satisfactory condition.

The downstream wingwalls appeared to be generally sound with

the top, or cap, of the right wingwall cracked and spalled at

its downstream end. The left wingwall appeared to be in

satisfactory condition.

The wingwalls and the concrete surfaces on the upstream end of

the bridge appeared, generally, to be in satisfactory condition.

There were a few hairline cracks with a small amount of exudation

present on the upstream wingwalls and on the concrete surfaces

of the bridge abutments.

10

Page 25: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

Two corrugated metal pipes were observed protruding from the

embankment immediately to the left of the spillway on the

upstream side. The smaller of the two did not appear to have

an observable intake end and could possible be a toe drain.

The larger of the two was in poor condition, being significantlyrusted with some of the surface rusted through and with no

observable inlet structure on the road. An additional corrugated

metal pipe was observed on the right side about 10 feet from

the spillway and appeared to be in satisfactory condition.

The low level outlet sluice gate mechanism was not operated at

the time of inspection and appeared rusty but intact.

d. Reservoir Area

The impoundment of the dam is 2400 feet long with a width

varying from 300 feet to 600 feet. The lake shores are thickly

wooded with shore slopes of approximately 40 percent on the

left side and more moderate slopes of 5 percent to 10 percent

on the right side.

e. Downstream Channel

The spillway discharges into a tributary of the Delaware

River.

Approximately 200 feet downstream from the dam there is a

railroad constructed on an embankment running approximately

parallel to the dam. There is a bridge opening in the embank-

ment through which the downstream channel flows. Between the

dam and the railroad embankment there is a large pool forming

a stilling basin for the dam. Beyond or downstream from the

railroad embankment the downstream channel is a broad, sluggish

stream, wooded along the banks with an industrial yard on its

right side.

11"

Page 26: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

SECTION 4: OPERATIONAL PROCEDURES

4.1 Procedures

The level of water in Crystal Lake is regulated by discharge over

the concrete spillway. Reportedly, the outlet works of the dam is

not currently used to drain the lake or to augment the discharge

capacity of the spillway. It is not known when the lake was last

drawn down.

The tailwater elevation normally varies in accordance with tidal

fluctuations.

4.2 Maintenance of the Dam

Reportedly, maintenance is performed on an "as needed" basis. The

NJDOT Maintenance Department maintains the shoulder of the roadway

on the crest of the dam and reportedly does not maintain the upstream

or downstream embankments of the dam.

4.3 Maintenance of Operating Facilities

It is not known if the operating mechanism for the outlet works

currently functions properly. Reportedly, the outlet is not currently

maintained.

4.4. Description of Warning System

Reportedly, no warning system is currently in use for the dam.

4.5 Evaluation of Operational Adequacy

The operation of the dam has been successful to the extent that the

dam reportedly has not been overtopped since the construction of

the new spillway in 1940. Reportedly, the dam (roadway) was overtopped

during the flood of July 23, 1938.

12

Page 27: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

Although maintenance has been adequate in some areas, some aspects

of dam maintenance have not been satisfactorily performed, including

the following:

1) Outlet works facilities not maintained.

2) Spalled concrete and cracks on wingwalls not repaired.

3) Trees on upstream face of embankment not removed.

4) Eroded areas adjacent to upstream end of bridge not stabilized.

5) Deteriorated pipes protruding from upstream face not repaired

or replaced.

6) Dislodged concrete riprap on upstream face not replaced.

13

Page 28: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

SECTION 5: HYDRAULIC/HYDROLOGIC

5.1 Evaluation of.Features

a. Design Data

The quantity of storm water runoff that the spillway should be

able to handle is based on the size and hazard classification

of the dam. This runoff quantity called the spillway design

flood (SDF) is described in terms of return frequency or

probable maximum flood (PMF) depending on the extent of the

dam's size and potential hazard. According to the

"Recommended Guidelines for Safety Inspection of Dams" published

by the U.S. Amy Corps of Engineers, the SDF for Crystal Lake

Dam falls in a range of 100-year frequency to 1/2 PMF. In

this case, the low end of the range, 100-year frequency is

chosen since the factors used to select size and hazard classi-

fication are on the low side of their respective ranges.

The SDF peak computed for Crystal Lake Dam is 2613 c.f.s.

This value is derived from the PMF flood hydrograph computed

by the use of the HEC-1-DAM Flood Hydrograph Computer Program

using the Soil Conservation Service triangular unit hydrograph

with curvilinear transformation. Hydrologic computations and

computer output are contained in Appendix 4.

The spillway discharge rates were computed by the use of a

weir formula appropriate for the configuration of the spillway

structure. The total spillway discharge with lake level equal

to the top of the dam was computed to be 1350 c.f.s. The SDF

was routed through the dam by use of the HEC-1-DAM computer

program using the modified Puls Method. In routing the SDF,

it was found that the dam crest would not be overtopped with

0.2 foot of freeboard remaining. Accordingly, the subject

spillway is assessed as being adequate in accordance with

criteria developed by the U.S. Army Corps of Engineers.

14

Page 29: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

b. Experience Data

Reportedly, the dam has not been overtopped since its new

spillway construction in 1940, but was overtopped during the

flood of July 23, 1938.

Also, Condition 10 of the permit to reconstruct the spillway,

issued in 1939, stated: "Applicant recognizes that spillway

will be drowned out by larger floods in Delaware River."

c. Visual Observation

No evidence was found at the time of inspection that would

indicate that the dam had been overtopped.

d. Overtopping Potential

According to the hydraulic and hydrologic analyses, a storm of

intensity equivalent to the SDF will pass through the spillway

with a minimum freeboard of 0.2 foot.

e. Drawdown Data

Drawdown of the lake is accomplished by opening the low level

sluice gate. Total time for drawdown is estimated to be 28

hours. (See Appendix 4.) However, the amount of drawdown

depends on tidal influenced fluctuations of the tailwater.

15

Page 30: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

SECTION 6: STRUCTURAL STABILITY

6.1 Evaluation of Structural Stability

a. Visual Observations

The dam appeared, at the time of inspection to be outwardly

structurally sound with no evidence of embankment cracks or

distress. The erosion that was observed near the upstream

wingwall on the left side of the spillway and the hairline

cracks observed in the bridge structure does not appear to be

an indication of distress in the dam.

b. Generalized Soils Description

The generalized soils description of the site consists of a

discontinuous mantle of unconsolidated, stratified alluvial

deposits, composed of silty sand and gravel overlying stratified

deposits mostly of marine origin. The marine deposits are

composed of clay with varying amounts of silt and sand. Depth

to bedrock is greater than 100 feet.

c. Design and Construction Data

Analysis of structural stability and construction data for the

embankment are not available.

d. Operating Records

No operating records are available for the dam. The water

level of Crystal Lake is not mon,,ed.

16

Page 31: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

II I

e. Post-Construction Changes

Reportedly, post-construction changes have been limited to the

construction of the new spillway and outlet works in 1940

which are on file with the NJDEP and NJDOT.

f. Seismic Stability

Crystal Lake Dam is located in Seismic Zone 1 as defined in

"Recommended Guidelines for Safety Inspection of Dams" which

is a zone of very low seismic activity. Experience indicates

that dams in Seismic Zone 1 will have adequate stability under

seismic loading conditions if they have adequate stability

under static loading conditions. Crystal Lake Dam appeared to

be stable at the time of inspection.

17

Who.

Page 32: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

SECTION 7: ASSESSMENT AND RECOMMENDATIONS

7.1 Dam Assessment

a. Safety

Based on hydraulic and hydrologic analyses outlined in Section

5 and Appendix 4, the spillway of Crystal Lake Dam is assessed

as being adequate. The spillway is able to pass the SDFwithout an overtopping of the dam.

The embankment appeared, at the time of inspection, to be

generally outwardly stable. Observed minor erosion and hairline

cracks in the bridge structure are not considered evidence of

dam instability.

b. Adequacy of Information

Information sources for this report include 1) field inspections,2) USGS quadrangle, 3) consultation with personnel of the

Realty Transfer Company and 4) consultation and information on

file with the NJDEP and NJDOT. The information obtained is

sufficient to allow a Phase I assessment as outlined in "Recom-

mended Guidelines for Safety Inspection of Dams."

Some of the absent data are as follows:

1. Description of fill material for embankment.

2. Soils report for the site.

3. Design report.

c. Necessity for Additional Data/Evaluation

Although some data pertaining to Crystal Lake Dam are not

available, additional data are not considered imperative for

this Phase I evaluation.

18

Page 33: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

7.2 Recommendations

a. Remedial Measures

Based on hydraulic and hydrologic analyses outlined in paragraph

5.1.a, the spillway is considered to be adequate.

The owner should, in the near future, develop an emergency

action plan together with an effective warning system outlining

actions to be taken by the operator to minimize downstream

effects of an emergency at the dam.

In addition, it is recommended that the following remedial

measures be undertaken by the owner in the near future.

1) The outlet works should be investigated with respect

to operational adequacy and, if necessary, restored

to proper operational condition.

2) Rusted CMP surface drain pipe should be replaced by

proper inlet and pipe.

3) Erosion of the embankment adjacent to the upstream

wingwalls of the bridge should be properly stabilized.

4) Deteriorating riprap on the upstream and downstream

faces of embankment should be repaired where necessary.

5) All trees and adverse vegetation on the embankment

should be removed.

b. Maintenance

In the future, the owner of the dam should develop written

operating procedures and a periodic maintenance plan to ensure

the safety of the dam.

19

Page 34: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

PLATES

,,

Page 35: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

NUNPLATE I

FLORI4M PARK NEW ERSEY EY MA

DIIOFWTRRSUCCRYSTAL LAKE DAM MNOT

TRENTON, EWNJERSE

& C'- - --

Page 36: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

I-O

2-'-

-c we ~ ~'7 /T

--SLE MLL

STOCHSC ENGIEER 1NCTO AN0VLAIO FDMFLORHM PA(, NW JEREY VCIRiY MA

DI.SO OF .... WAEeEORErCYTLLK A

N.J.DEP. O ENI.PROeacTon

TRETO, NWeSEYd

Page 37: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

AM.

M-67 Straifid deosis ofmarne oigi

.CRYSTAL LAKE DAMPAE

.4r

M-2

FLORH PAK, NW JESEY.SOILMAP

N.J. DEPT OF EN1.4RTE T O

TRENTN NEW JER A -4Map~ ~ 6 ofNw ese reaedb JVewsnd.Kuel10-92revise byHB.KMml191an . onsn190

-7~ PLAT 3-79STORCH~~~~~~~60' ENIER NPETO N VLUTO FDM

Lo, A,-4 goA,. NAM 2ESE.49oL M

•f .- g .'6

Page 38: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

2001

Con-cre/e/n kvo// C~O

1-141177,e iLV-

C orncrete Cur-6 Do

--- 2L0'c7,c5 5.5 ICU-e

Concrete Culr6 Ccre

-Y7

6Bofh7 Sides o6o'ir Gae

overall _Ler,9 jh

CRYSTAL LA

Page 39: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

601

Concrete I/V/'Cbvo/ C/-Cre/e /c//7 Co.,

CO.-SCj---- 7e 54j,- 7 ce5 ,Crest 01-'of.

II I/ I JI ___0 0 0 _______

Curre

6f0O55 4'ed/u1, ______

2 Zone7,s A/B.

Concrete cur6

I o n M h ni s __________e_______//_

6or7 cre/e ~"

Crest of Concrete Si//Avof0'sotac

, e iA2 9 M echa n u d ~

II en/h of _orn =_"851__._.--__

PLATE 45TAL LAKE I DIVISION OF WATER RESOURCES

STORCH ENGINEERS I jN.J. DEPT OF ENVIR. PROTECTIONFLORHAM PARK, NEW JERSEY TRENTON, NEW JERSEY

INSPECTION AND EVALUATION OF DAMS

GENERAL PLANCRYSTAL LAKE DAM

ID NJ 00299 ] SCALE: NOT TO SCALE

DATE: FEB.1981

Page 40: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

517L

SPILL

.TYPI

Page 41: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

74 7'6-71-s){o-7 7 .41 ,,7 hv

/

SPILLWAY SECTION

, 7-r-'5/q oF z2 -

TYPICAL DAM SECTION

r PLATE 5

STOC NGNEES I VISION OF WATER RESOURCESSTORC ENGIEERS N.J. DEPT OF ENVIR. PROTECTION

FLORHAM PARK, NEW JERSEY TRENTON, NEW JERSEY

INSPECTION AND EVALUATION OF DAMSSECTIONS

CRYSTAL LAKE DAM L

L.D NJ. 00299 TSCALE: NOT TO SCALEI DATEI FEB 1981SSN

iLRA AXNWJRE TRNTN NEW JERSmEY

Page 42: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

2J &"__ ___

5 95

oncrete Curb '

- -. ----------- -

69-'7 ;~d&, A i IJ 6af

' I'I I

Concr-ete Curb /

0__,,_____er-oi ' L. n / _

~CRYSTAL LAKE

,-- '" '-- /

/,'o !l t,> _/ .- ,_,,<.?,-..j, DC

Stehe\

Page 43: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

60'

" Cor e iCre5t ofDOrn

- € \

2 -7 e-6

!~C /7 o blB Crete Cur6- ----------_ _ _ _ _

Cr-et of Concrete 6S0ilelivoq

aote 0,Ven7/'n7 ReCbOni151m C7,ide Rail

Z- &,I~g//740 fed/urn

TAL LAKE PLATE 6

STORC ENGNEER DIVISION OF WATER RESOURCESSTORH ENINE RS IN.J. DEPT OF ENVIR. PROTECTION

FLORHAM PARK, NEW JERSEY TRENTON, NEW JERSEY

INSPECTION AND EVALUATION OF DAMS

PHOTO LOCATION PLANCRYSTAL LAKE DAM

I D NJ. 00299 7]SCALE; NOT TO SCALEF B

DATE: PLATE98AL LAEDVSO F AE EORE

Page 44: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

APPENDIX 1

Check List - Visual Inspection

Check List - Engineering Data

Page 45: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

4J

u

L) c

00

4~) "

4.)

aad

o 0

o44n

CLC

a LO)

4 1

00

0a

4.) -0

4.4)

4.~4J

0 4-

*'* 01. t

C &,X

o toU -~ Om

Page 46: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

a-0

-J

ClC

.- .4.

LL -0 c

S0 CL

L) (L)La. L.. * ( 0

4-

-o: -0

Cl-

0L~LnC 0

In 0)

0)

4E E

>- 0- 0-

41 0 04 ) - -

4 - S- 4

0 4-S- 4- 0

4-3 a) -- >

4-U S.InaIA D 0or; 4- (uQ).

W.-I0S. )co 40CD4- -) 0) 0A 4-

C.) -0 ULr< Cu o a ~-3-

<- 4 0(- E x L 00

X:J LLC cE -0 A

-a a). *0 C ) >cu S. E0 >.) S-

o0 04--aC CL) 0 0 CA S.-04-)) C0S a

4- ~ 0 4CS- 4- 4-) 4A

ro4- a)0 to :3.A>ll 0 4-.) 0) 0L)nS

: 0) 4- S.. CL>->-a a0) * ) ) -0- )

00)u 0 0 0V)>

-0--0- 4 L0) CJ () 00>CUr_ C-)C aL 0 0 -0ro 0 ro0.0. -0CC

CL U4- (aU '0 -C)

g-.~- i. LiiLL-<Co UJ c

L< CL

U., -

Li.DCL)

I-c1 LiJLii C) <. -

</ <D V)c

Page 47: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

4-' --4-' 41 0303Wr_ to 01-lcu > t ..-o 0 *4-

r_ CL- C-

CD o0 0)3

0- 4J -0 4 1 -CC o (03Ln 1)

N 0 D000- CI- -0Li)0 45I

4L) U to

4-' -0 S- E- m.1a

cc~~ t - 0-L

40 E - t

00

4--3

E mC >, s-

4--

C)E 0 t sO- ajE 0E S- _0CL-t to aa)00(a

St.-W 4-) >)

4-~i) C'---- 0.-o -- to

S- M S- CL -LLJ 4--) -to 0-0 (1Eto 4- r; 04jtot

C33 C)()(

a.) 03 4-) - -- 1-aS 0--4-3 a -O 1-- 4-'

< - tn a) 03-' t 03 >4 00 - S.- 4- - to

-> Uo -0'4-

4J W O S- = ) - O-t o

-0 *to a) C- ro S- 0w3 r_ 3- C n 3uD 0 r_

> >Ln0-0 a) 0 m- a)0S- 4J 03 0) -0 Q 4-) c~

030D0 > u Li) *-0Li)0Li) 003 - -to CL a)3x1--0 -0 mO 3 a-4- :34-) .00 0 4-i to (o E-00 (U 4-'E C_ =fa (

C(at- -0 0 003 0)S- 00 0 0.0 4--- N S 0 1V

L. .- 4- - 4-) -*4J o o4-) 0 00 S- S-u 1n - cCCL 0 C 43 00- .- 03-

CL .. 0-0 3:

LL-

o~~~ LjL 4/

0l>- r 4 L.)

oo C) t/)

tcn =1-a u C

>C 1Lii CLDL - j

W -j JLJ .- E*LJLi <~- C)EC

.U C Ocro 0.Li')i X:) (fl LU) 4V) tn Li V >

Page 48: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

$wow

LLU

LiJ

(DE

-o-

C,, 0- E

0 (0 4-)

C>)

L. roC

I- Li .0 m

0 4

S--

-o in-c a~>

I > 4-S) 0V 4

-o 0.. (v 4.)

I- wi 4- -cm in 4-j( 0-00c-

&- .0 0 :.C c(U 0 0 00E a) 4-

0 0(a=4V) )DS- 0

LL.

-~ LAi Lii LAJ

C -JU~ I oJ

Page 49: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

C~ S-0 a

44-)

a) -4-

C).

U.-.IM -0

00 L)

4J-o

0 0-

LU~ rW a

U -- ' -

s- E)

(.0 4- 4A. )

Cl

Gr)a 4-

(UI > 4V)

CA. >) 0

4-) 0C WaV) OeU 0

co4) 4z -1,4 cn uCo n UL o a -

S- - o u - a~)

C 4 a

m.u (0 - - CL-.4- 0- a) 4-) -

=J S- Ca).C

>. a~u')4-'

4-4 toOn ~0U 4-to 0 ro

S tn (D ~cn uCL

to CA- 4- 0 -fA CL- CU ac

LLJ.

LLJ cz

5-- 0)l U'

U.- a)IrO 0')

LA-J

o u

Page 50: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

MI.

C)

L)J

'4--

C

I- )

~~ M*

4-) O

E E

0 S

E 4J

00) a) 0)) CC rcCC :0 0 0

0 n

U-

LLJ.

LLi

V)) U)

-D 0a LLiCD 03 LC

Page 51: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

LI

LIi

C)

0 a

- 4-)

S-

S0-=-cEu

.c S-

-)o 0 Q

co -oe 4-

L/) 0

00

S.- -) 0

In 0-

S-O -o

(a4 CL 0)0 a0

4-~f 0

C)C

rO2.-' -j0C) C

Li..J0L 0

0O LI- M

-i LAJ(/7 V)i V) c

Page 52: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

LLI

C-1Lii

C)C

Cc C

Qo)-o- (1)

(0 0)-0 r ) -

S- " 0tS C0 4--)

4-)C 0)C-

=ecf 4- 4-

c 1)f >)-'-- -F- 4-

0)C eaM ( -

(>00)W0 --- LA 44- - 3:Q) C -3 4-o0L 4) X - - 4-) 4o 0 a) a) 4)~w~

0 L E0-0 EC: M 3Ctn *-4z rJ 4-

CO) ai00 ) - r-aC) ) M-

-0- E=-4- '4-) 0 4--)

r-0 0 S- -

- S.. 4 M 0 roC04 )z a)4-

(U (aO S- f4-)O 0)0 . r~o -"

0U4)f 0 cu

cm 0-0S- of

IL.

2= 3 ) 0U

=-, ULL

V) Cii Lii =-000 c

Page 53: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

Ul)

r-rli0)

,a

S-

4-)o

4*- C)

N4

L LJI-- e- -

4- 4- 4- 4-- La 4-La

V) -- 0 CaL(/) 0) C) Cl CC

m C)

L)~V LaV)aa

CD 4i -j m L

C..)V C- 9C-99 1 r

.93

-~j >.- V)

(DC C

mI a- 0i> rCLn La C3- 3

-~~~~~ -0

Page 54: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

ww

43 M, O

LU (a-> aj > >

4-) 4- 4-) 4-)4)0 0 0

0>

U--00

Li)~V V)~0Lc~t i

C) m

0 ~ 0 Li cV)LJ

V)- - -1 Mi w0J l:Lii U-) LU 0) I'- C

C> 0L CL> nL CO

Page 55: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

LU

-)

4-

0

LU -

cl)

r--

4-4-

4- -

4--o0 0 4-

4- 03

CL -

(at - 4-)

-0 >

c- 0o

oo 0

0- 4-

C.. (U-3 0.) - S.

-r 0 -4-)L w, (

0 4-

C>C

CD CDof CL 0

Ln CD L

:I ) I-)) r

oI -- Z)U LI

CDC)VI . - V)AC

- - w V CLL C cmU CD 0A CAL) =0 CD

Co C) C:) 0.. LL

Page 56: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

APPENDIX 2

Photographs

Page 57: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

PHOTO 1

SPILLWAY -LOOKING FROM RIGHT

PHOTO 2

SPILLWAY -LOOKING FROM LEFT

CRYSTAL LAKE DAM6 JANUARY 1981

Page 58: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

PHOTO 3

UPSTREAM END OF BRIDGE

PHOTO 4

DOWNSTREAM END OF BRIDGE

CRYSTAL LAKE DAM6 JANUARY 1981

Page 59: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

At

PHOTO 5

UPSTREAM FACE OF DAM

PHOTO 6

DOWNSTREAM FACE OF DAM

CRYSTAL LAKE DAM6 JANUARY 1981

Page 60: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

PHOTO 7

BITUMINOUS SLOPE PROTECTION ADJACENTTO RIGHT, UPSTREAM END OF BRIDGE

..•1

PHOTO 8

BITUMINOUS SLOPE PROTECTION ADJACENTTO LEFT, UPSTREAM END OF BRIDGE.

CORRUGATED METAL DRAINS IN FOREGROUND

CRYSTAL LAKE DAM6 JANUARY1981

Page 61: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

PHOTO 9

CONCRETE SLOPE PROTECTION ADJACENTTO RIGHT, DOWNSTREAM END OF BRIDGE

PHOTO 10

C~ONCRETE SLOPE PROTECTION ADJACENT TO LEfT,DOWNSTREAM END Of BRIDGE

Page 62: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

APPENDIX 3

Engineering Data

Page 63: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

CHECK LIST

HYDROLOGIC AND HYDRAULIC DATA

ENGINEERING DATA

DRAINAGE AREA CHARACTERISTICS: Farmland and Wooded -

ELEVATION TOP NORMAL POOL (STORAGE CAPACITY): 5.70 (50 acre-feet)

ELEVATION TOP FLOOD CONTROL POOL (STORAGE CAPACITY): N!A

ELEVATION MAXIMUM DESIGN POOL: 13.2

ELEVATION TOP DAM: 13.2

SPILLWAY CREST: Uncontrolled Weir

a. Elevation 5.7

b. Type Broad Crested Weir (Horseshoe Shape)

c. Width 2.5 feet

d. Length 36.0 feet

e. Location Spillover Upstream Side of Dam

f. Number and Type of Gates N.A.

OUTLET WORKS: 2' x 2' Gated Sluice

a. Type Submerged Orifice

b. Location "Center of Spillway Weir

c. Entrance Invert 2.7

d. Exit Invert 2.7

e. Emergency Draindown Facilities: Open Gate

HYDOMETEOROLOGICAL GAGES: None

a. Type N/A

b. Location N/A

c. Records N/A

MAXIMUM NON-DAMAGING DISCHARGE:

(Lake Stage Equal to Top of Dam) 1350 c.f.s.

" ' . ... . . . . .. .. .. . .. l l ... ... ' . .. . . . .. . ... .... A

Page 64: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

APPENDIX 4

Hydraulic/Hydrologic Computations

Page 65: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

STORCH ENGINEERS Sheet of /

Project 112?2 -06 CRY TAIL LAeE OA' t- Made By I "# Date S~/ -c

-Chkd By J D at f 5/2/6

__ __ _ __ _ __ _ __ _ __ _ __ _ __ _ __ _ __ __ _ __ _ __ _ __ _ __ I__ _ __ _ __ _ __ _

A/YD~oLo6ic AN4LZY&S _____

___~ -B TE 7YSAOF 41)-fG'P- 4ILTl £e~o

1/S/A/6 77/F- ZC E/15(7W"L) /T/7- CeP VI/Lg/~e

T14Ns FDRiAr7-/cy\./ I

22&AAG Ak-EA 3,00/ sCt~

IN F/L712A T1OA( DA r4___ _______

//V/JYAV //VF)L 724772 T/_ O A 9c~e I

ClOM.c TA/T IA/Pit/ TPA T/ ONA/ / ((IC/Ci /'Aou

- - --.- .- --

Page 66: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

STORCH ENGINEERS Set2o 2Project 1132- 06 CZYSFAL L-4kl AtAI Made By Yeli Dale 3-12 '<P

_______________________________Chkd By J Dafe

t~tY 0 FCOA/CEN e-41O Y

OyEe4VD FQDA);

/e-# 4, o 7__

* - /~! /7I A~~/1 P /4=-- ( ' , =. ~ [ .

6FVe. le 0.2o5-

SCd-' 52~

ft-4 -6

. __Th -;p c=~oc,~~,r'~, ~~

Tr

7k 1,3+ fo, yC 2

Page 67: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

STORCH ENGINEERS Sheet Y of /0

Project 132 -0 CP i§TAL L_ /C--A PA /ti Made By -7,'/q Date 2 /2 ",,/_chd By JG Date 3/Z3181

'22 v

-I -/9(Z) I

i /;- i _ __

Tc- .7

FoP_ CoIMTEe I/VPT

b4G //-/E .Q 0.6

Z,7 /1'-:6-

C. . . . . ..

Page 68: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

STORCH ENGINEERS Sheet . of /0

Project Made Byaa Ote 2 74.b'I

Chckd By, Dle 3,/2.A a

i o

J-0

24-- _ __o_c ,e6

pj-& _ _ ______

_ _ _ __ . . .. 3 . L .. . ... .. ... . . . . . ... .. . . . ..

2-< . L&,_! _ __ _ _

. . . . .. .. . -_ - _ _ 3_ . . . , 1 . ... . . . . . . . .

. . .. . . _.. .. .. . .. . . 0, ->

l~:5

Page 69: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

ST ORCH ENGINIEERS Sheet 'G of /0

Project 112- 06 C RYST1AL LA ~E DAIY -Made By li 11" Date -3 -/12- 0

Chkd By D Da fe //d

A/ 'E 1/ C, EL' 4REj7,4E *Acrej,

19.3 0

57 27 G

2o.o /2

~5

//EC -/-DA C 01IPa 7Z-k PROG4,41-1 A/IL

OE 11FL 0 SZOM465 04P/IC/r ___?

7Iel FRI U 46

Page 70: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

STORCH ENGINEERS sheet. of .Project /132 06 C2YSF744 ZAe1 DA" -Made By 7,.I'3 Date 2 2'

_______________________________Chkd By -16: Date 3/2!Z/6/

___ TINE SP1aJAYAT_TlE_ C2Yg'TALLA/CE ,4-1 IS' A CO/V-

____ CPTtrF 0 &VEeFL OA) ~2oAZ1 CRE~rEO AE1, 1,11T

___ _A Ce6:9T 5E~57,E Dhf -lEFC/

CIe-l- ek, v,

_____ ~~ ekvfq, c----- - ------- -____

L CI

1opo1%Iw4 eekv. /3.2. 6.7--.--

-------------- Y- e--- In---

2.2'~ e/~'.0.3 Al

Page 71: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

STORCH ENGINEERS Sheet 7 of /0

Project 1192 - 06 CRYSTA. ZAI- T DA H -Made By Date S -12 -S'

_________________________________Chid By ~6 Date _3/234/l

____DISC/IA6E- CAL CCILA TON za-

ZWE H___7,/4 OE W/1-Z 2E CAZ C U L 4TzED _Fp2- OH s _Z /

CPR&S; r 5491/ 57 rF~ 7-4/P 7o 7e6- RD77c/1

OF= TMEl SP/CE AT Ez- , / I sr ur.,A6_?T:P1qL4

C - 4'-in' , l'c,4op e

___ ___ ___ ___ ___ ___/1' -_ /l head co __ 2N'

A/ND FLOH tLjt-V4' /2.0 _FEET 7-_441 AR0VF 4'S/Mc BO)(

C, 1/LW29T /A/Z&T CO/V TOL M11OI-/OGAPI]

Cc-c/- 6oy /2,5S' X' -PP' C7=9'

'9TAc9 D I/S CHiAe E rA 8UZT/O0A/ __

__ _Q _

_______ 5.7 0 0 _- -

__ _7.0 /,3 2.66 /4'2.0 1 412,0

0 2-.3- 2.e 9 357.-0 37.9.- 3Ai16 7/3.0 7o. o -/.0

/Or. 4.3~.Z 065E0- 513f.0. q~f.o 0

//,0c 53 .3.32 _145e. 0 1052,0 /052, 0

/.2,0 11X'7,0 14J7,O0/3.2 1367.o 136010

- /6.0 /5,,/6 o, 0

Page 72: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

STORCH ENGINEERS Sheet.---.-_ of /0

Project 1132- 06 CRYSTAL MAK"E A'1/'1 Made By Z,' Date .- /2-c/

_Chkd B J Date 3/23/8/___________ ____ sP/LL- Y W_-. - - _

7~SAGE Q>/SCM/-2GC CUJ VE"

- - -

7,0 142 _ '__f, 0 367 ,

___,_I_ 71,3 __ _ ____,:-___...

-- "!,0 /'_2 __0 1052

/2,0 /17- ___ .... _ /3. Z /350 __ _ _ _____ _ _ _ _ _

u/5/. 0 I50

/6, o /60 ___1__ /

10 -

oc- o "

--------------- ___-------- ------_-------- -

.4Ii I -- I

- - - - -- oo2~

.. .. - V c/'P.7[

Page 73: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

STORCH ENGINEERS SeetZ of /0

Project //32 -06 (f /STZAL 4L/4' D)AI t- Made By 17H Date 1~ 2 -,'/

_________________________Chcd By J6 Date3/3/

______-T/E DPAA'DQI-A/ MIS~i4Q~/hLL BE CAL CWA-rED

FOR & SiYARP- ED6ED_ ( HEPD ORIF)ICE2/lIT1

DEF rERNrA/T _,rE ,ueFics_ jLsvzFYT'/o/__

~~ ~5.7 - __ _

C. 0.6 .7 _

kL& cce he'? ais

4, 2.O~~~7A 1 0.T4 O6~ 32.2x 2 x 2,0 o4 ei-~V 1~

-7A *7 270 cA

Page 74: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

STCRCH ENGINEERS Sheet 10.. of /0

Project 1122 -06 cRY.SrAL IAAe DAlI _Made By 7i"'a Date -47cP

____________________________________Chkd By __ Date____

_____~a y4 P /h' I,

______ ~or h, 2,0'-_ _ _ _

---27.0 -!5.0----3----

Page 75: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

HEC - 1 - DAM PRINTOUT

Overtopping Analysis

Page 76: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

iAn NAiTOfA L--P A M'-AFETY-RDOlGR AN-A2 CRYSTAL LAKE 11AMP NEW JERSEYA3 100 YEAR STORM ROUTING

p1 5

J I I ,

K 0 LAKE 1Ki INFLOW HYDROGRAPH TO CRYSTAL LAKE 11AM

o 9601 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.01901 v I y V.U1Y u.u1Y V.U1Y u.ulY U.u1y I0t"-F----.0T9---- 0-017-.01901 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.01901 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019-- 070 19' -- 0-D19--1 090;01 0 0;19-- 01?9;10 ---. -038 -- 0;038

01 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.03801 0.083 0.083 0.083 0.083 0.163 0.163 0.163 0.163 0.750 0.750

uTV.7-s-v .75v v.16,.5 u va. Q.163 v.vu o08 V7083VOS8301 0.083 0.083 0.083 0.083 0.018 .03*s 0:01B 0.038 0.038 0.03801 0.038 0.038 0.038 0.038 0.038 0.038

W2 2.4

X -1.0 -0.05 2.0K I DAM -

KI ROUTE DISCHARGE THROUGH 1AM

Y I 1

Y1 1 -5.7 -1Y4 5.7 6.0 7.0 8.0 9.1 10.0 11.0 12.0 13.2 14.0Y4 15.0 16.0Y) 0 1t 14; 3Z7 713 Y38 1Vt2 1187 13bo 1450Y5 1550 1650$A 0 27.6 57.4 122.6 185.5

-S$E 0.4 5.7 100 2,7--30.0

S$ 5.7

SD' 13.2 2.7 1.5 478-- c---U0 1 0.5 I .0 5.7 13.2

K 99

Page 77: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

* tv

* 6J1- I r z ro

La.

0 C4 -

Le 0 0-' -C 1 ;:cI-L CD oi ~ 0 C

LJC~~ CJ'GU

4.-- Lr Li 0 -* : cLJ Z L i w Lo ~

Co L .~ Z0 Le 0If~ x 0 I, Xi- i Iw C - . Z 1 ~ ~ C

to0 (- Zj0V) if-~ fe c rLZz v~ z. Z- T-ccC. ICC o

ClLi w -gD x~. - O w r o

z - JL Ltf0 M 0Li 0*n CLI C L I--

cr, rgn CD c u Q

z~ -)0 J 0 Li 0I -

w co

a. j~ xle 0

zto

* IQ:

4J;

Page 78: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

c LP0 I

0 .0o fp

0 - -.- - :--J0 0 0 ''

rrz I- c

= rI a~ L.-0 -1 0 JO ) A

0 0 -0 wr0 ID 1XE r 1 1.-.x - cC 0L C - oC

weO

30

ED 0 0 '0

D - 0 00 :0 i

In .4.

00 C> 0 0 N

S .00c 0

IL L;

Li.

p C LJ

Page 79: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

1 21' '0

C-

r C

coI C01

00 L)0

kn~ C

LaU - ~ .

c LaO L i u- N,., 00 C'

f-- W C.iWr- to C4

I. fn

co :c -C

w0 L

C,

tj r.O?'

.C -D LaI

,> I ILzI ~ LIcc ~ 4

-0i C. I lJ

Cl

0 C6C-Cc- F

0Z

0 C ,

C.0

Page 80: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

APPENDIX 5

Bi bl iography

Page 81: DAM SAFETY PROGRAM. CRYSTAL LAKE …AD-AlOO 406 NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON F/6 13/13 NATIONAL DAM SAFETY PROGRAM. CRYSTAL LAKE (NJO0299)t DELAWA-ETC(U) JUN

1. "Recommended Guidelines for Safety Inspection of Dams," Department

of the Army, Office of the Chief of Engineers, Washington, D.C. 20314.

2. Design of Small Dams, Second Edition, United States Department of

the Interior, Bureau of Reclamation, United State Government

Printing Office, Washington, D.C., 1973.

3. Holman, William W. and Jumikis, Alfreds R., Engineering Soil

Survey of New Jersey, Report No. 20, Burlington County, RutgersUniversity, New Brunswick, N.J., 1955.

4. "Geologic Map of New Jersey," prepared by J. Volney Lewis and

Henry B. Kummel, dated 1910-1912, revised by H.B. Kummel, 1931 and

M. Johnson, 1950.

5. Chow, Ven Te., Ed., Handbook of Applied Hydrology, McGraw-Hill

Book Company, 1964.

6. Herr, Lester A., Hydraulic Charts for the Selection of Highway Culverts,U.S. Department of Transportation, Federal Highway Administration, 1965.

7. Safety of Small Dams, Proceedings of the Engineering Foundation

Conference, American Society of Civil Engineers, 1974.

8. King, Horace Williams and Brater, Ernest F., Handbook of Hydraulics,

Fifth Edition, McGraw-Hill Book Company, 1963.

9. Urban Hydrology for Small Watersheds, Technical Release No. 55,

Engineering Division, Soil Conservation Service, U.S. Department

of Agriculture, January 1975.