143
1 Locksley Business Park, Montgomery Road, Belfast, BT6 9UP Tel: +44 (0)28 9070 6000 Fax: +44 (0)28 9070 6050 Email: [email protected] Website: www.wyg.com WYG Environmental and Planning (Northern Ireland) Limited. Registered in Northern Ireland: Number NI050736 Registered Office: 1 Locksley Business Park, Montgomery Road, Belfast, BT6 9UP Dale Farm, Pennybridge Factory Site Protection and Monitoring Plan A111058 Dale Farm 30 October 2018 Prepared by WYG Environmental and Planning (Northern Ireland) Limited.

Dale Farm, Pennybridge Factory Site Protection and

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

1 Locksley Business Park, Montgomery Road, Belfast, BT6 9UP Tel: +44 (0)28 9070 6000 Fax: +44 (0)28 9070 6050

Email: [email protected] Website: www.wyg.com WYG Environmental and Planning (Northern Ireland) Limited. Registered in Northern Ireland: Number NI050736

Registered Office: 1 Locksley Business Park, Montgomery Road, Belfast, BT6 9UP

Dale Farm, Pennybridge Factory

Site Protection and Monitoring Plan

A111058

Dale Farm

30 October 2018

Prepared by WYG Environmental and Planning (Northern Ireland)

Limited.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

A110058 30 October 2018 www.wyg.com creative minds safe hands

Document control

Document: Site Protection and Monitoring Plan (SPMP)

Project: Dale Farm, Pennybridge Factory

Client: Dale Farm

Job Number: A111058

File Origin: G:\Projects\A111\A111058\P-03 Execution\11 EP\01 Reports\03 Draft Report

Revision: Issue 1 – Draft for Client Comment

Date: 24/10/2018

Prepared by:

Shona Symon / Mark Poole

Checked by:

Mark Poole

Approved By:

-

Description of revision: Issued to Dale Farm for review and supply of additional information

Revision: Issue 2 - Final

Date: 30/10/2018

Prepared by:

Shona Symon / Mark Poole

Checked by:

Mark Poole

Approved By:

Mark Poole

Description of revision:

Revision:

Date:

Prepared by:

Checked by:

Approved By:

Description of revision:

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

A110058 30 October 2018 www.wyg.com creative minds safe hands

Contents.

1.0 Introduction .......................................................................................................... 4

2.0 Site Information ..................................................................................................... 5

2.1 Site Location .............................................................................................................. 5

2.2 Details of Installation .................................................................................................. 6

2.2.1 Fuel Inventory for the Site ................................................................................. 6

2.2.2 Chemical Inventory for the Site .......................................................................... 7

2.3 Site Conceptual Model ...............................................................................................10

2.3.1 Uncertainties and Assumptions in CSM ..............................................................11

3.0 CEMP Objectives .................................................................................................. 12

4.0 Environmental Monitoring Plan .............................................................................. 13

4.1 Objectives of the Monitoring Programme ....................................................................13

4.1.1 Objectives of the Environmental Monitoring Programme .....................................13

4.1.2 Objectives of the Infrastructure Monitoring Programme ......................................13

4.2 Environmental Monitoring Infrastructure .....................................................................14

4.2.1 Discharge Monitoring Infrastructure ..................................................................14

4.2.2 Groundwater Monitoring Infrastructure..............................................................14

4.2.3 Soil Testing......................................................................................................14

4.2.4 Procedure for the Inspection and Maintenance of Environmental Monitoring

Infrastructure ..................................................................................................15

4.3 Environmental Monitoring Schedule ............................................................................15

4.3.1 Discharge ........................................................................................................15

4.4 Summary Sampling Protocols .....................................................................................16

4.4.1 Discharge to Surface Water ..............................................................................17

4.4.2 Groundwater ...................................................................................................17

4.4.3 Soil .................................................................................................................17

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

A110058 30 October 2018 www.wyg.com creative minds safe hands

Laboratory Accreditation / Quality Assurance and Quality Control ...........................................17

4.4.4 Laboratory Accreditation ...................................................................................17

4.4.5 Quality Control .................................................................................................17

4.5 Sampling Personnel ...................................................................................................18

4.6 Infrastructure Monitoring Programme .........................................................................18

4.6.1 Personnel ........................................................................................................19

5.0 Assessment and Reporting Procedures ................................................................... 20

5.1 Assessment Procedure ...............................................................................................20

5.2 Reporting Procedure ..................................................................................................20

5.3 Recording and Data Management ...............................................................................20

6.0 Planned Preventative Maintenance Programme ....................................................... 21

7.0 Figures................................................................................................................ 22

Figure 1 Site Layout and Monitoring Location Plan ..........................................................23

Figure 2 Site Drainage Plan ............................................................................................24

8.0 Appendices .......................................................................................................... 25

Appendix A: Dale Farm Environmental Monitoring, Inspection, and Reporting Procedure .........26

Appendix B: Previous SPMP (2014) ......................................................................................27

Appendix C: Site Investigation Reports .................................................................................28

Appendix D: Dale Farm Quality Assurance ............................................................................29

Appendix E: Laboratory Accreditation ...................................................................................30

Appendix F: Data Recording Sheets .....................................................................................31

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 4

1.0 Introduction

WYG Environment & Planning Ltd (WYG) was commissioned by Dale Farm in October 2018 to prepare

an updated Site Protection and Monitoring Programme (SPMP) for its milk and juice manufacturing

processing facility - Pennybridge (the ‘installation’).

The Site is regulated under the Pollution Prevention and Control (Industrial Emissions) Regulations

(Northern Ireland) 2013 (the PPC Regulations). The original Environmental Permit (EP) for the Site

was issued on 01 July 2006, Reference P0093/05A. The EP was varied on 01 August 2011 and as a

result is now reference P00093/05A/V1.

The previous SPMP review was prepared in July 2016 by way of a review of the Site Condition Report

in pursuance of Condition 4.1.7 of IPPC Permit reference P0093/05A.

This SPMP has been prepared in accordance with the Northern Ireland Environment Agency Guidance

H7 – Guidance on the Protection of Land Under the PPC Regime: Application Site Reporting and Site

Protection and Monitoring Programme - Site Report Guidance and template for applicants and

operators – Version 1, dated March 2004.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 5

2.0 Site Information

2.1 Site Location

The Site is located within an industrial setting approximately 1.6km south east of Ballymena town

centre and can be accessed via the Larne Road or the Limavady Road off Ballee Road East, dual

carriageway. The site is centred at grid reference 311663 401811.

Inset 1 Site Location Plan

The Site is surrounded to the north by light industrial and commercial units, to the east by

Pennybridge Industrial Estate along with several light industrial and commercial units, to the west

by scrub land and recreational facilities, and to the south by scrub land and residential properties. A

fuel station and heating oil supplier is located approximately 10m from the eastern boundary of the

Site.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 6

2.2 Details of Installation

The site layout is presented on Figure 1 which shows the Permit boundary and main operational

areas. Most of the Site footprint is covered by buildings and hardstanding (concrete/bitmac/asphalt)

that appeared to be in good condition during the site visit on 19th October 2018. A section of ground

around the perimeter of the factory to the north west, west and south west is scrub land which is

being managed for potential ecological development.

Raw materials typically stored at the site are presented on Table 2.1.

Table 2.1 Raw Materials and Liquid Product Storage Details

Material Location Quantity and Storage Details

Delivery Details

Milk

Intake/Reception Area in the central

portion of the Site (raw milk)

4No. 100,000L raw Storage Silos

Pumped via above ground pipework

Rear of technical

building in eastern portion of the site (processed milk)

3No. 1 ×10,0000L and 2 × 10,000L storage Pumped via above

ground pipework

Intake/Reception

Area in the central portion of the Site (processed milk)

2No. 40,000L Storage Silos

Pumped via above ground pipework

Juice Concentrate Western portion of

the site adjacent to DAF plant area

6No. 1,000L IBC Delivered to site in IBC

2.2.1 Fuel Inventory for the Site

Fuels are stored in purpose built secure storage areas located across the installation area. Table 2.2

details the main fuels stored on Site and their respective storage locations.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 7

Table 2.2 Fuel Inventory for the Site

Material Location Quantity and Storage Details Delivery Details

Liquefied

petroleum Gas

(LPG)

North of the site 1No. 1200L tank Fill point and above

ground pipework

Diesel

Adjacent to the

boiler house in the

north of the Site

1No. 10,000 L plastic (35 sec gas oil)

tank which has aboveground

pipework extending to the generator

in 110% brick bund with external

bund fill points fitted with catch trays

Fill point and above

ground pipework

Adjacent to

generator

1000l day tank for the emergency

generator

Fill point and above

ground pipework

North west of the

Dry Goods Store 1No. 1,000L plastic bunded tank

Tank is directly filled

from delivery tanker

Waste oil Service area 1000l tank Filled manually

Hydraulic,

lubricating, and

transformer oil

Within a plant room

in the service area

close to the boiler

house

205 L steel barrels, or 20 to 25 L

plastic drums. The barrels are stored

on portable plastic bunds and either

pumped or manually transported to

the required locations

Delivered in

manufacturer containers

oils and greases

Within the

workshop in the

service area

<5L drums stored on concrete floor Delivered in

manufacturer containers

2.2.2 Chemical Inventory for the Site

The two main chemical storage areas are located to the west of the main factory. One area is located

adjacent to the mains water tank and the other adjacent to the DAF plant.

These compounds contain a variety of chemicals in 1,000 litre IBCs, 25kg plastic bags on pallets, 20-

41kg plastic drums. Any spillages that do occur in the chemical compound are pumped direct to the

ETP for treatment prior to discharge. Table 2.3 details the main chemicals stored on Site and their

respective storage locations.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 8

Table 2.3 Chemical Inventory

Material Location Quantity and Storage

Details Delivery Details

Cleaning in Place (CIP)

detergent (sodium

hydroxide)

CIP area located in

northern portion of the

site

10,000 litres capacity Bulk delivery

CIP acid (nitric and

phosphoric acid)

Within the main

chemical compound and

between two finished

milk silos beside the

intake area.

Stored in powder form

in 25 kg bags or 41 kg

plastic drums.

4 No. 1000L IBC’s

Delivered in

manufacturer packaging

Acid sterilant (peracetic

acid)

Within the glass bottling

hall next to the

salt/water softener.

Small quantities at

strategic locations

around the plant

2No. 1000l IBC’s

Delivered in

manufacturer containers

/ packaging

Multi-purpose cleaning

solution for manual

cleaning (alkaline)

Within the secure

chemical compound

situated adjacent to the

mains water tank. The

compound floor is

concrete hard standing.

Generally stored on

portable plastic bunded

tanks (Intermediate Bulk

Containers “IBCs”) or in

20 or 25 L plastic drums

on pallets.

Delivered in

manufacturer containers

/ packaging

Disinfectant spray

Within the main

chemical compound in

the central portion of

the site

50L

Delivered in

manufacturer containers

/ packaging

High foaming liquid

detergent

Within the main

chemical compound in

the central portion of

the site

800L in 25L drums

Delivered in

manufacturer containers

/ packaging

Line lubrication (ionic

and synthetic) oils

Within the main

chemical compound in

the central portion of

the site

40L Delivered in

manufacturer containers

/ packaging

Welding/cutting/soldering Within the engineering 1 No. 52kg Tank Delivered in

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 9

gases compound in the

southern portion of the

site

manufacturer containers

/ packaging

Refrigerant (ammonia,

R404)

Services block (between

the boiler house and

fitter workshop).

1 No. 52kg Tanks Delivered to Site in 52

kg tanks

Engineering cleaning

solvents

Within the main

chemical compound in

the central portion of

the site

Generally stored on

portable plastic bunded

tanks (Intermediate Bulk

Containers “IBCs”) or in

20 or 25 L plastic drums

on pallets.

Delivered in

manufacturer containers

/ packaging

Hot melt glue (small

quantities)

Dry Goods Store located

in the southern portion

of the site

40Kg

Delivered in

manufacturer containers

/ packaging

Printing ink (small

quantities)

Dry Goods Store located

in the southern portion

of the site

100L Delivered in

manufacturer containers

/ packaging

Granular water softener

salt

Boiler House in Northern

portion of the site

1m3 pallet packaged in

25kg bags

Delivered in

manufacturer containers

/ packaging

Sodium hypochlorite

Within the main

chemical compound in

the central portion of

the site

25L drum typical

quantities 20No. drums

Delivered in

manufacturer containers

/ packaging

Corrosion and scale

inhibitors, and biocides

(treatment of cooling and

boiler water)

Boiler House in Northern

portion of the site 200L

DAF Chemicals (Sodium

hydroxide, Sulphuric

Acid, Polyelectrolyte and

flocculent (PAC)

DAF plant in eastern

portion of the site. 4No. 1000L IBC’s

Delivered in

manufacturer containers

/ packaging

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 10

2.3 Site Conceptual Model

This section provides a summary of the original Site Conceptual Model.

Table 2.3 Original Site Conceptual Model

Aspect Details

Geology

Made Ground – Made Ground is expected across much of the site due to

historic site development activities.

Drift – Glaciofluvial sands, gravels and boulders

Solid – Lower Basalt Formation

Hydrogeology

Site underlain by a locally important aquifer with limited abstraction potential and

moderate to low hydraulic conductivity. However, the soils have a high leaching potential.

The overlying sands and gravels may not provide significant protection to the underlying

aquifer.

Groundwater was encountered in 1No borehole during drilling by Glover Site Investigations

in September 2009. The borehole (BH01) is located beneath the main building onsite and

water was encountered at 2.3mbgl within glaciofluvial deposits

Surface Water Features

The Site is located within the catchment of the Deerfin Burn, which drains to the Braid

River. The Deerfin Burn flows in a westerly direction approximately 75m to the north and

75m west of the Pennybridge site. The Deerfin Burn flows in a westerly direction before

joining the Braid River which in turn flows into the River Main before flowing into Lough

Neagh.

The Deerfin Burn has a chemical classification of moderate to high and a biological

classification of moderate to good

Ecological Receptors No ecologically sensitive areas within 500m of the site.

Summary of Receptors

(Pathways)

Land (spills and leaks to ground);

Locally important aquifer (leaching from soils, and percolation through

permeable ground);

Deerfin Burn

Activities Identified

with Reasonable

Possibility of Future

Pollution Occurring

Delivery and storage of milk;

Storage of cream, buttermilk and skimmed milk

Delivery and storage of Concentrated Juice Products

Delivery of bulk caustic

Delivery use and storage of diesel

Storage of waste oil

Potential leakage from the sludge into the hardstanding and surface drainage

areas during transfer for disposal

Potential leakage from the effluent drainage system

Land Pollution History

& Main Pollution

Incidents

Agricultural use

The current records for pollution incident reporting at the Site indicate that there have

been no incidents

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 11

Contamination

Identified in Previous

Investigations

GLOVERS SITE INVESTIGATIONS (2009)

Glover Site Investigations completed an intrusive investigation at the Site in September

2009. Seven boreholes were sunk with one installation. Three small disturbed soil samples

were taken and sent for laboratory analysis. All soil sample results were recorded below

relevant published human health screening criteria for commercial land use. Eluate results

(from the Waste Acceptance Criteria (WAC) tests) have been compared to published water

quality standards (either surface water or drinking water, whichever is lowest) and all

results were found to be below the screening levels. The full Site investigation report is

provided at Appendix B.

CAUSEWAY GEOTECH (2014)

An intrusive investigation was carried out by Causeway Geotech in September 2014 in the

location of the newly constructed DAF plant. 4No. disturbed soil samples were submitted

for laboratory analysis (one from each borehole). All soil sample results were recorded

below relevant published human health screening criteria for commercial land use. Eluate

results (WAC tests) have been compared to published water quality standards (either

surface water or drinking water, whichever is most conservative). The sample from BH03,

at a depth of 0.5 m, contains copper and nickel that leaches at concentrations marginally

greater than the water quality standards (copper: 0.0062 mg/l compared to the 0.06 mg/l

standard; and nickel 0.00235 mg/l compared to the 0.002 mg/l standard). These

concentrations are unlikely to be a concern. All other concentrations are lower than the

water quality standards. The full Site investigation report is provided at Appendix B.

WYG (2016)

A groundwater ‘grab’ sample was collected from an on-site borewell located adjacent tm

the Chemical storage area (Drawing 2) on 25 May 2016 for analysis to facilitate the SCR

update. No information is held on the installation details or date of installation for this

borehole other than that it was installed in 2010 as part of a groundwater abstraction

assessment.

The groundwater sample was analysed for a range of potential contaminants including

metals, speciated total petroleum hydrocarbons, speciated polycyclic aromatic

hydrocarbons, cyanide and pH. All results were recorded below UK DWS / relevant

guidance limits excluding several Poly Aromatic Hydrocarbons (Phenanthrene,

Fluoranthene, Pyrene, Benzo(a)anthracene, Chrysene and Benzo(bk)fluoranthene) which

were present in small quantities. These contaminants are associated with petroleum-based

products and potentially originate from fuel. The full lab report is found at Appendix B.

2.3.1 Uncertainties and Assumptions in CSM

The following uncertainties and assumptions are implicit in the CSM described:

• Thickness and composition of shallow ground conditions across the site are unknown. It is

assumed that much of the developed portions of the site are underlain by Made Ground which

is further underlain by Boulder Clay. A geotechnical site investigation was carried out by

Causeway Geotech in 2014. The site investigation information is limited to the footprint of the

DAF plant located in the eastern portion of the site. In the eastern portion of the site, firm to

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 12

stiff clay was encountered from approximately 0.2mbgl. Boreholes were terminated between

2.4 and 2.6mbgl is suspected weathered bedrock;

• The depth to groundwater is not known across the site, although no water strikes were

encountered during the Causeway Geotech site investigation;

• Pollution incidents may have occurred from before the current factory existed.

3.0 CEMP Objectives

The objectives of this report are:

• To design a monitoring programme for the installation to:

o Monitor the effectiveness of the pollution prevention infrastructure and provide early

warning of any release of polluting substances to the environment;

o Monitor the effectiveness of the pollution prevention infrastructure and provide early

warning of any release of polluting substances to ground or groundwater;

o To collect data on the condition of the ground at the installation to assist in the permit

surrender process;

• To review and if necessary amend the inspection, testing and maintenance programme for

pollution prevention infrastructure at the installation to ensure their continued integrity.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 13

4.0 Environmental Monitoring Plan

4.1 Objectives of the Monitoring Programme

4.1.1 Objectives of the Environmental Monitoring Programme

The objectives of monitoring discharge, groundwater, air, and soil at the installation are as follows:

• To monitor the effectiveness of infrastructure and management procedures and provide a

warning of loss of contaminants;

• To assist at Permit Surrender by;

o Determining the movement of pollutants off the site via discharge at the installation;

o Determining the movement of pollutants within groundwater in the vicinity of the

effluent treatment plant at the installation;

o Determine land quality at the installation to assist in the permit surrender process,

and;

o Providing data on long term trends.

4.1.2 Objectives of the Infrastructure Monitoring Programme

The purpose of the infrastructure monitoring programme is to demonstrate the effectiveness of

pollution prevention measures at the site throughout the life of the permit.

Historical samples have been taken from the environmental monitoring infrastructure which includes

discharge monitoring points from which samples are collected prior to being discharged to the River

Maine.

The existing discharge monitoring infrastructure within the permitted area is suitable for both the

requirements of the SPMP and the monitoring requirements of the PPC Permit.

The substances that may potentially pollute the groundwater are expected to be detectible in the

proposed groundwater monitoring boreholes.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 14

4.2 Environmental Monitoring Infrastructure

4.2.1 Discharge Monitoring Infrastructure

Figure 1 shows the location of the discharge monitoring points at the installation in relation to the

location of the sources of contamination at the site. A site drainage plan has been presented on

Figure 2.

Discharge monitoring point detail is summarised on Table 4.1.

Table 4.1 Discharge Monitoring Locations

Monitoring

Location Ref Sample Location

Approximate Grid

Reference (eastings,

northings)

W1 Storm water discharge to unnamed tributary of the Deerfin Burn 311538, 401941

W2 Storm water runoff from lorry park to unnamed tributary of the

Deerfin Burn 311524, 401827

W3 Storm discharge from service area to unnamed tributary of Deerfin

burn 311524, 401827

W5 Storm discharge from technical centre area to unnamed tributary

of Deerfin burn 311668, 401812

S1 Discharge to Sewer 311543, 401818

4.2.2 Groundwater Monitoring Infrastructure

There are currently no shallow groundwater monitoring boreholes available for sampling at the site.

It is proposed that shallow groundwater monitoring boreholes will be included in the works package

for future geotechnical site investigations at the site.

4.2.3 Soil Testing

At present it is not proposed to undertake any on-going soil monitoring as part of the SPMP. Soil

samples will be retrieved and analysed during site investigations at the site in the future.

Soil samples will be analysed for the following parameters -

• Total petroleum hydrocarbons

• Heavy fuel oil, diesel range organics

• PAH, PTE’s and nitrogen compounds

• TN, NO3, NH4 and pH

These will form the baseline data for the site.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 15

4.2.4 Procedure for the Inspection and Maintenance of Environmental Monitoring

Infrastructure

Discharge

Storm Drains - A visual inspection of the drainage system will be carried out quarterly. Any drains,

which are reported to be damaged, or not free flowing will be cleaned, and further inspection

completed if necessary.

Hard standing - A visual inspection of the external yard will be carried out monthly. Any flooring

which is reported to be in a poor condition will be repaired.

Chemical bunds - Various areas around the site as identified in the ASR, these will be checked

monthly.

Interceptor - Checked once per quarter.

4.3 Environmental Monitoring Schedule

4.3.1 Discharge

Discharge is routinely monitored at the site at multiple discharge locations at the site. Discharge

monitoring locations are presented on Figure 1. The discharge monitoring frequency has been

presented on Table 4.3, and the parameters to be analysed at each location, and their respective

consented limits, are presented on Table 4.4.

Table 4.3 Discharge Water Monitoring Frequency

Release Point Parameter PPC Requirement Dale Farm Procedure

W1, W2, W3 &

W5

pH Quarterly spot sample Monthly spot sample

Suspended Solids Quarterly spot sample Monthly spot sample

BOD Quarterly spot sample Monthly spot sample

VOG Weekly spot sample Weekly spot sample

Temperature Weekly spot sample Weekly spot sample

S1

pH Monthly spot sample Monthly spot sample

COD Monthly spot sample Monthly spot sample

Suspended Solids Monthly spot sample Monthly spot sample

Temperature Daily Daily

Daily Maximum Volume Daily Daily

Note: COD – Chemical Oxygen Demand. BOD – Biological Oxygen Demand. VOG - Visible Oil and Grease

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 16

Table 4.4 Consent limits for permitted discharge locations

Release Point Parameter Value

W1, W2, W3 & W5

pH 6-9

Suspended Solids 50 mg/l

BOD 50 mg/l

VOG None

Temperature 25oC

S1

pH 5 - 10

COD 4,000 mg/l

Suspended Solids 800 mg/l

Temperature 45oC

Daily Maximum Volume 550m3

Note: COD – Chemical Oxygen Demand. SS – Suspended Solids. BOD – Biological Oxygen Demand. VOG = Visible Oil

and Grease

An emergency monitoring plan will be enacted following:

• An incident at the installation resulting in an emission to land;

• Pollution identified from environmental monitoring during the operation of the installation or

increasing from reference data levels; or,

• If reference data shows pollution that is not attributed to non-permitted sources.

The emergency monitoring plan will include an increased frequency of monitoring to facilitate

identifying the source and extent of any pollution and to determine whether remediation is required

under the PPC Regulations.

4.4 Summary Sampling Protocols

This section provides a summary of the sampling protocols in place at the site, which have also been

presented in the original SPMP prepared for the site. A full copy of the site Environmental Monitoring

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 17

Procedures have been provided at Appendix A, and a copy of the original SPMP prepared for the site

has been presented at Appendix B.

4.4.1 Discharge to Surface Water

Surface water will be collected from the points presented on Figure 1. Each sample will be collected

directly from the sampling point using clean sampling vessels provided by the laboratory.

4.4.2 Groundwater

Since groundwater monitoring locations are currently unavailable at the site, a groundwater sampling

procedure will be incorporated into the Environmental Monitoring Procedures document when

appropriate.

4.4.3 Soil

When soil sampling takes place, soil samples will be collected by a qualified experienced site

investigation engineer. All samples will be collected as un-disturbed samples from a window sample

tube. The samples will be logged and stored as appropriate prior to being sent for analysis at an

accredited lab.

Laboratory Accreditation / Quality Assurance and Quality Control

4.4.4 Laboratory Accreditation

All laboratory analysis should be completed at a UKAS (or equivalent) accredited laboratory. The

current supplier to Dromona is McQuillan Envirocare Ltd. A copy of the laboratory accreditation has

been provided at Appendix E. It is noted that the accreditation status of McQuillan Envriocare is

renewed annually on the 4th September. Up to date accreditation certificates should requested

annually post 4th September annually for as long as McQuillan Envirocare supply analytical services

to Dale Farm.

4.4.5 Quality Control

Under the conditions of laboratory accreditation, accredited laboratories have robust quality

assurance and quality control procedures.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 18

4.5 Sampling Personnel

Personnel responsible for sampling, maintenance and inspection will be trained in environmental

monitoring to an appropriate level to ensure compliance with the quality assurance and quality control

plan. A copy of Dale Farm’s ISO14001 QA certificate has been provided at Appendix D.

4.6 Infrastructure Monitoring Programme

In addition to laboratory analysis of surface water samples, routine inspections are carried on

infrastructure at the site which is considered to present potential sources of pollution. Site

infrastructure monitoring locations and data recording procedures are presented on Table 4.7.

Table 4.7 Infrastructure Monitoring Schedule

Feature Inspection Detail

Diesel fuel delivery Checks are made at each delivery, all suppliers are trained in procedures and visual checks are

made before, during and after transfer of diesel. Tank bunds will be inspected every month

Diesel fuel storage Tank bunds will be checked each month, level gauges are fitted

Delivery of bulk

milk products

Bulk products will only be transferred when personnel are present and a spill kit available. The

tanker will be inspected prior to filling or despatch.

Despatch of bulk

milk products

Bulk products will only be transferred when personnel are present and a spill kit available. The

tanker will be inspected prior to filling or despatch.

Effluent treatment

plant tanks

A visual inspection of the tanks will be carried out monthly. Any tanks which is reported to be

in a poor condition will be repaired

Trade effluent

drains

A visual inspection of the drainage system will be carried out quarterly. Any drains, which is

reported to be damaged, or not free flowing will be cleaned, and further inspection completed

if necessary.

Storm drains A visual inspection of the drainage system will be carried out quarterly. Any drains, which are

reported to be damaged, or not free flowing will be cleaned, and further inspection completed

if necessary.

Internal flooring A visual inspection of the internal flooring will be carried out monthly. Any flooring which is

reported to be in a poor condition will be repaired

hardstanding A visual inspection of the external yard will be carried out monthly. Any flooring which is

reported to be in a poor condition will be repaired

Chemical bunds Various areas around the site as identified in the ASR, these will be checked monthly

Milk storage Milk is stored in 10 external tanks, 5 raw milk and 5processed milk. The tanks are visually

inspected prior to filling, all tanks have high level alarms and are checked annually

Waste oil storage The waste oil storage is located in the oil store and is on hard standing, the tank is manually

filled and inspected on a monthly basis

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 19

4.6.1 Personnel

Personnel responsible for the inspection, testing and maintenance of pollution prevention

infrastructure are trained to an appropriate level to ensure compliance with the Infrastructure

Monitoring. Personnel training records are stored on a training matrix maintained by HR.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 20

5.0 Assessment and Reporting Procedures

5.1 Assessment Procedure

The Pennybridge Assessment Procedure has been presented at Appendix A. In summary, checklists

for the inspection and recording of fixed bunds, hard surfacing in relevant areas and maintenance

will be kept on site. The inspections will be primarily visual to identify any signs of corrosion, cracks

or other damage. Should any damage be identified that could affect the integrity of the bunds this

will be checked through water testing. Damaged hard standing will be sealed and repaired.

The effluent drainage system will be visually checked every 3 months to ensure manholes are clear

and free flowing. The system will be maintained in good working order. Manual inspection of the

storm drains will be made every month. Any suspected leaks would be investigated, and remedial

action taken as necessary. The site drainage plan will be maintained, and any changes made to the

drainage system incorporated.

5.2 Reporting Procedure

Summaries of the monitoring data will be sent to the NIEA on the 31st of January each year in an

Annual Report which includes the results of the data assessment, and any recommendations for

amendments to the Monitoring Programme.

5.3 Recording and Data Management

Inspection and assessment records of all of the above will be maintained and stored on site.

Records of the infrastructure monitoring will be retained at the installation for a minimum period of

3 years. The SPMP will be maintained with regular reviews completed at least every 2yrs. The results

of the review and any proposed changes will be discussed with the regulator.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 21

6.0 Planned Preventative Maintenance Programme

A Planned Preventative Maintenance Programme (PPM) is in place at the Site. The PPM programme

is computerised and is in place to ensure that all associated maintenance is recorded and completed

at a frequency appropriate for maintenance and inspection to prevent leaks, spillages and

breakdowns. There is a register of materials storage locations as part of the materials handling

procedure which is maintained by the Environmental Manager. The results of all inspections are

recorded in the installation log book.

The original ASCR stated that there is no EMS on site as yet, however the Site has implemented an

Environmental Management System (EMS) to the external standard BS EN ISO 14001. A copy of the

certification is provided at Appendix D.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 22

7.0 Figures

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 23

Figure 1 Site Layout and Monitoring Location Plan

PENNYBRIDGE SITE CONTAMINATION REPORT (SCR)UPDATE

DALE FARM LTD

CONSULTANT

DESIGN

PREPARED

REVIEW

APPROVED

YYYY-MM-DD

TITLE

PROJECT No. Rev.

PROJECT

CLIENT

Path

: \\b

fs1-

s-m

ain0

1\C

ADD

_GIS

_GR

APH

ICS\

Dal

e Fa

rm\P

enny

brid

ge\9

9_PR

OJE

CTS

\145

1434

0349

_SC

R U

pdat

e\00

01_S

CR

Dra

win

gs\0

2_PR

OD

UC

TIO

N\D

WG

\ |

File

Nam

e: 1

4514

3403

49-0

002-

HS-

0002

.dw

g

025

mm

IF T

HIS

MEA

SUR

EMEN

T D

OES

NO

T M

ATC

H W

HAT

IS S

HO

WN

, TH

E SH

EET

SIZE

HAS

BEE

N M

OD

IFIE

D F

RO

M: I

SO A

3

14514340349CONTROL0002-HS-0002

DRAWING

2-

2015-05-18

GM

EW

HDL / RF

JD

SITE LAYOUT PLAN

1:1,500

0 25 50

METRES

PPC PERMIT BOUNDARY

OWNERSHIP BOUNDARY

RIVER / DITCH / BODY OF WATER

FUEL TANK OR GENERATOR

CHEMICAL TANK OR STORAGE AREA

LEGEND

MILK STORAGE AREA

SOLID WASTE TEMPORARY STORAGE AREA

SURFACE WATER SAMPLING POINTS

AREA EXCLUDED FROM PPC PERMIT BOUNDARY

mark.poole
Text Box
W1
mark.poole
Text Box
W5
mark.poole
Snapshot
mark.poole
Text Box
W3
mark.poole
Text Box
W2
mark.poole
Text Box
S1
mark.poole
Ellipse
mark.poole
Line
mark.poole
Line
mark.poole
Snapshot
mark.poole
Text Box
W
mark.poole
Text Box
S
mark.poole
Ellipse
mark.poole
Line
mark.poole
Line
mark.poole
Text Box
DISCHARGE TO SEWER SAMPLING POINT
mark.poole
Text Box
CDC AREA
mark.poole
Text Box
MILK INTAKE
mark.poole
Text Box
TECHNICAL BUILDING
mark.poole
Text Box
JUICE CONC.
mark.poole
Text Box
LPG1
mark.poole
Text Box
LPG2
mark.poole
Text Box
PLANT ROOM BOILER HOUSE
mark.poole
Text Box
CHEMICAL COMPOUND
mark.poole
Text Box
ENGINEERING
mark.poole
Text Box
SITE PROTECTION AND MONITORING PLAN
mark.poole
Snapshot
mark.poole
Text Box
BASEMAP PREPARED BY:
mark.poole
Rectangle
mark.poole
Image
mark.poole
Text Box
2018-10-30
mark.poole
Text Box
MP
mark.poole
Rectangle
mark.poole
Rectangle
mark.poole
Rectangle
mark.poole
Text Box
A111058
mark.poole
Rectangle
mark.poole
Text Box
FIGURE 1

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 24

Figure 2 Site Drainage Plan

0

.4

m

*

0.9m* Ï150

0.7m* Ï150

0.7m* Ï150

0

.1

5

m

*

1

.

6

5

m

*

1

.

6

m

*

1

.

6

m

*

Ï

2

2

5

1

.6

m

*

1

.

1

m

*

Ï

3

0

0

1

.

7

m

*

1.7m* Ï750

1

.

6

5

m

*

2

.

0

5

m

*

1

.

6

m

*

1.2

m

*

1

.

0

5

m

*

1

.2

m

*

1

.0

5

m

*

1

.

1

5

m

*

1

.2

m

*

1

.

1

m

*

0

.2

m

* Ï

1

5

0

0.6m* Ï100

0.7m* Ï100

1

.

5

m

*

Ï

1

5

0

1.55m

*

1

.5

m

*

1.3m

*

1.3m* Ï150

1

.5

m

*

1

.

3

m

*

1

.

6

m

*

Ï

1

5

0

1.6m* Ï150

1.5m* Ï150

0

.2

m

*

0.2m* Ï100

1

.

2

m

*

1.2m* Ï150

0

.

3

m

*

0

.

7

m

*

Ï

2

2

5

0

.

7

m

*

0

.

4

m

*

1

.

6

5

m

*

1

.

5

m

*

Ï

1

0

0

0

.8

5

m

*

0

.

4

m

*

Ï

2

2

5

0

.9

5

m

*

0

.2

m

*

0

.

9

m

*

1

.

1

m

*

Ï

2

2

5

0

.

1

5

m

*

1.0m* Ï150

1

.2

m

*

1.0m* Ï1501

.0

m

*

1

.0

5

m

*

0.6m*

0

.

7

5

m

*

0

.

7

m

*

0

.6

m

*

0

.2

m

*

Ï

1

0

0

0

.

2

m

*

0

.

3

m

*

0

.

3

5

m

*

0

.

7

m

*

0

.

2

5

m

*

Ï

1

5

0

0

.

2

5

m

*

1

.

4

m

*

1

.4

m

*

1

.

5

m

*

Ï

3

0

0

1

.

4

5

m

*

1

.0

m

1.1m

*

1.0m

*

1

.0

m

*

0

.

9

5

m

*

1

.0

m

*

0

.6

m

*

1

.

8

m

*

1

.

8

m

*

0

.

4

m

*

0.4

m

*

0.65m* Ï150

0.65m* Ï150

1

.

0

m

*

1

.

0

m

*

0.15m

*

1

.

0

m

*

0

.

6

m

*

0

.

3

m

*

0.8m* Ï100

0

.

9

m

*

0.1

5m

*

0.3m* Ï100

0.35m* Ï100

0.7m* Ï100

0

.

8

5

m

*

0

.8

m

*

0.6m* Ï100

1

.1

m

*

0.9m* Ï100

Ï

1

0

0

0

.

9

m

*

0.5m* Ï100

0.5m* Ï150

1.05m* Ï150

0.15m*

0.4m* Ï100

0.6m* Ï100

0.6m* Ï100

1

.

5

5

m

*

Ï

3

0

0

1

.5

5

m

*

Ï

3

0

0

1

.

9

m

*

2

2

5

Ï

0

.

2

m

*

0.2m

*

0

.

2

m

*

0

.

6

m

1

.

7

m

*

0.1m*

1

.

8

5

m

*

0

.5

m

*

1

.

0

m

*

1.3m* Ï150

1

.

5

m

*

0

.

6

m

*

0

.6

m

Ï

1

5

0

0

.

1

m

*

Ï

1

5

0

0

.

1

5

m

*

Ï

225

0

.

9

m

*

Ï

2

2

5

Ï

1

5

0

Ï

1

5

0

Ï

3

0

0

Ï

2

2

5

Ï

1

5

0

Ï

1

0

0

Ï

150

Ï

1

5

0

Ï

1

5

0

Ï

2

2

5

Ï

2

2

5

Ï

2

2

5

Ï

2

2

5

Ï

225

Ï

2

2

5

Ï100

Ï

1

5

0

Ï

1

5

0

Ï

1

5

0

Ï

7

5

0

Ï

2

2

5

Ï

1

0

0

Ï

2

2

5

Ï225

Ï

2

2

5

Ï

1

5

0

Ï

1

0

0

Ï

1

0

0

Ï

1

0

0

Ï

2

2

5

Ï

1

0

0

Ï

2

2

5

Ï

1

5

0

Ï

2

2

5

0

.9

m

Ï

2

2

5

0

.4

m

*

Ï

1

5

0

0.9m* Ï150

0.7m* Ï150

0.7m* Ï150

1

.

5

5

m

*

Ï

1

5

0

0

.

7

m

*

Ï

2

2

5

Ï

2

2

5

0

.

7

m

*

0

.

4

m

*

Ï

1

0

0

0

.8

5

m

*

0

.

4

m

*

Ï

2

2

5

0

.9

5

m

*

0

.2

m

*

0

.

9

m

*

1

.

1

m

*

Ï

2

2

5

0

.

1

5

m

*

Ï

1

0

0

1.0m* Ï150

Ï150 0.4m*

1.0m* Ï150

Ï

1

0

0

0

.

2

m

*

0

.6

m

*

Ï

1

5

0

Ï

1

5

0

1

.

6

5

m

*

1

.

0

m

*

Ï

2

2

5

Ï

1

0

0

0

.

1

m

*

1

.

0

m

*

Ï

1

5

0

0.5m* Ï150

Ï150

150Ï 0.3m

1

.

2

m

1

0

0

Ï

1

0

0

Ï

1

.2

m

1

5

0

Ï

1

.2

m

1

5

0

Ï

1

.

1

5

m

150Ï 1.1m

1

.

1

5

m

1

5

0

Ï

0.3m

1

0

0

Ï

1

.

0

5

m

100Ï 0.7m

0

.

2

m

0

.

3

m

0

.

4

5

m

1

5

0

Ï

1

5

0

Ï

1

.

3

m

0

.

4

m

1

5

0

Ï

0

.

2

5

m

1

5

0

Ï

1.6m 150Ï

1

5

0

Ï

1

.

4

m

1

5

0

Ï

1

.

3

m

1

5

0

Ï

1

.

3

m

1

.

4

m

1

5

0

Ï

1

5

0

Ï

1

.

2

m

0

.

3

m

1

.

5

m

2

2

5

Ï

0

.3

5

m

0

.3

m

0.4m

0

.

2

m

1

.

4

m

1

5

0

Ï

2

2

5

Ï

2

.

1

m

2

.

1

m

0

.2

m

2.1m 150Ï

0

.2

m

0.5m

0.2m

1

5

0

Ï

0

.

4

5

m

1.6m Ï150

2.5m

4

0

0

Ï

2

.4

m

0

.

3

m

1

5

0

Ï

1

.1

5

m

1

5

0

Ï

0

.2

5

m

0

.

3

5

m

1

.

9

m

1

.

9

m

1

.

9

m

1.9m 150Ï

150Ï 1.9m

1

5

0

Ï

1

5

0

Ï

0

.

8

5

m

1

.

3

m

2

2

5

Ï

2

2

5

Ï

1

.

3

m

0

.

3

m

0

.

1

m

1

.

6

5

m

3

0

0

Ï

1

.

7

m

3

0

0

Ï

1

5

0

Ï

1

.

6

m

0

.

1

5

m

0

.

1

5

m

0

.3

m

0

.3

m

1

5

0

Ï

0

.

3

m

1

.1

5

m

1

5

0

Ï

1

.

2

m

1

5

0

Ï

1

.6

5

m

1

.9

m

2

2

5

Ï

1

.

9

m

2

2

5

Ï

1

.8

m

2

2

5

Ï

1

.8

m

1

.8

m

0

.

3

m

1

5

0

Ï

0.25m 150Ï

0

.

2

5

m

1

5

0

Ï

2.5m 300Ï

2.8m

0

.

3

m

1

5

0

Ï

1.9m

1

5

0

Ï

0

.

2

5

m

300Ï 3.1m

300Ï 3.3m

2.3m

2.9m

2

.5

m

0

.

7

m

*

Ï

2

2

5

0

.6

m

*

Ï

1

5

0

0

.

6

m

*

0

.

7

m

*

Ï

1

5

0

0

.

6

m

*

0

.

6

m

*

Ï

1

5

0

Ï

1

5

0

0.55m*

Ï

2

2

5

0

.6

m

*

0.15m* Ï150

0.7m* Ï150

0.35m* Ï150

0

.3

5

m

*

0

.

6

m

Ï

2

5

0

0

.

6

m

Ï

2

5

0

N

e

w

s

t

a

i

n

l

e

s

s

s

t

e

e

l

p

i

p

e

N

e

w

s

t

a

i

n

l

e

s

s

s

t

e

e

l

p

i

p

e

0

.

2

m

Ï

2

5

0

0

.

3

m

Ï

1

5

0

0

.

2

5

m

S

t

a

i

n

l

e

s

s

s

t

e

e

l

p

i

p

e

0

.

0

5

m

Ï

1

0

0

0

.

6

m

Ï

1

0

0

0

.

6

m

Ï

1

0

0

0

.

6

m

Ï

1

0

0

0

.

6

m

0

.

6

m

Ï

1

5

0

Ï

1

5

0

0

.

7

5

m

Ï

1

0

0

0.15m

*

Ï150

Ï

1

0

0

0

.6

m

*

Ï

1

5

0

0

.

7

m

*

0

.

7

5

m

*

Ï

1

5

0

Ï

1

5

0

0

.5

m

*

Ï

1

0

0

0

.

2

5

m

*

0.7m* Ï150

0.85m* Ï100

0.8m* Ï100

0.8m* Ï100

Ï150 1.0m*

Ï

1

0

0

0

.

9

m

*

Ï

1

0

0

0

.

8

m

*

1

.

0

m

*

Ï

1

5

0

Ï

1

5

0

1

.

4

m

*

1

.5

m

* Ï

2

5

0

1

.5

m

* Ï

2

5

0

1

.

5

m

*

Ï

1

0

0

1

.

2

m

Ï

1

5

0

1

.

1

5

m

1

.

4

m

Ï

1

5

0

1

.

3

m

Ï

1

5

0

Ï

1

5

0

2.1m Ï150

2.0m Ï150

2

.

5

m

Ï

1

5

0

1.6m Ï150

1

.3

m

Ï

2

5

0

1.0m

2

.5

m

Ï

4

0

0

2.6m

1.4m

Ï

225

2

.

0

m

Ï

1

5

0

2

.

0

m

Ï

1

5

0

1

.0

m

Ï

1

5

0

0

.9

m

Ï

1

5

0

1

.4

m

Ï

1

5

0

2.5m Ï300

0

.

6

m

Ï

1

5

0

0

.7

5

m

Ï

1

5

0

2

.

1

m

Ï

1

5

0

Ï

225

2

.

0

m

Ï

7

5

0

1

.

0

m

Ï

2

5

0

0

.

8

m

0.55m

Ï

250

0

.

4

m

Ï

1

5

0

0

.

5

5

m

Ï

1

5

0

0

.

5

m

Ï

1

5

0

0

.

6

m

Ï

1

0

0

1

.

9

m

Ï

4

5

0

1

.

9

m

Ï

3

0

0

0

.

2

m

Ï

1

0

0

2

.

1

m

Ï

4

5

0

0

.

6

m

Ï

1

5

0

0.2m Ï150 2

.

3

m

Ï

3

0

0

0

.

7

m

Ï

1

5

0

Ï

2

5

0

FRIDGE

STORAGE

FRIDGE

STORAGE

FRIDGE

STORAGE

FRIDGE

STORAGE

FRIDGE

STORAGE

FILLING

HALL

FILLING

HALL

FILLING

HALL

BLOW

MOULDING

DRY GOODS

STORE

GROUP TECH

CENTRE & LABS

SERVICES

BLOCK

LORRY

PARK

DAF

PLANT

COMPOUND

STORAGE

LORRY

PARK

LORRY

PARK

LORRY

PARK

LORRY

WASH

MILK

INTAKE

CREAM

ROOM

Client: Site:

Project No: Date:

Sheet No: Scale:

Drawn by: Approved by:

Note Initial Date

001

Other services are present.

Survey undertaken to locate drainage only.

1306s025K January 2017

1 of 5 A0 Sheet @ 1:100

AC 26.06.13

Details

ABAC

GEOTEC

SHEET LAYOUT

LEGEND

Foul Water Sewer

Surface Water Drain

Culvert

Manhole

Electricity Pole

Invert Level

Fire Hydrant

Gas Valve

Inspection Cover

Lamp Post

Earth Rod

Telegraph Pole

Unable to Lift

Marker

Road Sign

Vent Pipe

Wash Out

Stop Tap

Sign Post

Water Meter

Traffic Light

Rain Gully

Rodding Eye

Survey Station

Post

Telephone Call Box

IC

GV

FH

ER

EP

WO

WM

VP

UTL

TP

TL

TC

STN

ST

SP

RS

RG

P

MKR

LP

RE

Top of Chamber

ABBREVIATIONS (where applicable)

AV

BH

BOL

BT

CAB

BC

CATV

CL

DIA

DP

Cover Level

Air Valve

British Telecom Cover

Cable Television Cover

Cabinet

Bollard

Borehole

Bottom of Chamber

Diameter

Down Pipe

IL

Illuminated Road SignIRS

MH

SV Sluice Valve

TCB

CCTV Closed Circuit TV

Variations in ground conditions, density of services and/or other external influences may

affect the accuracy of the data recorded for this non-invasive survey. The detection and

accuracy of any subsurface feature detected using non-invasive techniques is not

Underground services shown on this drawing are illustrated by an individual service line.

This does not necessarily represent number of cables and/or ducts.

of the detected feature depth, in both the vertical and horizontal planes. All depths

Pipe sizes are shown only from visual inspection or taken from statutory records.

change in uniform data from its surrounding area. These areas could be voids, heavily

The definition of an anomalous area is an area where the radar data shows a substantial

saturated ground, buried tanks or other subsurface features.

Depths shown are to top of service or feature unless otherwise stated. Generally +/- 10%

obtained both through direct measurement and non-invasive detection are as accurate as

can be achieved at the time of survey.

using all reasonable skill and care, in order to obtain the underground information

NOTES

Depending on their individual suitability, a variety of detection methods were applied

needed to produce these survey results.

guaranteed.

ALWAYS EXERCISE CAUTION WHEN EXCAVATING.

IF IN DOUBT ASK

Junction BoxJB

BB Belisha Beacon

46 Tullymacnous Road, Killyleagh, Co Down. BT30 9PW

02844 821 565FAX:

EMAIL: [email protected]

www.geotecsurveys.comWEB:

02844 828 258TEL:

Dale Farm

Pennybridge Industrial Estate

Ballymena

Co Antrim

Dale Farm

Pennybridge Industrial Estate

Ballymena

Co Antrim

Scale bar

6.0m 8.0m7.0m 9.0m 10.0m4.0m3.0m2.0m 5.0m1.0m0.0m

W2

W1

W3

W5

AUG2015

RAW CIP

ROOM

P

R

O

P

O

S

E

D

N

E

W

S

/

S

P

I

P

E

A

U

G

.

2

0

1

8

N

E

W

S

/

S

M

A

N

H

O

L

E

O

L

D

L

I

N

E

W

O

U

L

D

C

O

M

E

R

E

D

U

N

D

A

N

T

P

R

O

P

O

S

E

D

N

E

W

S

/

S

P

I

P

E

A

U

G

.

2

0

1

8

0

.6

m

*

Ï

1

5

0

ARTS 16.06.2017

A

R

T

S

IN

S

T

A

L

L

E

D

N

E

W

L

IN

K

L

IN

E

1

2

.0

6

.2

0

1

7

0

.

7

5

m

*

Ï

1

5

0

NEW EFFLUENT LINE AND

MANHOLE INSTALLED

BY ARTS APR2018

NEW EFFLUENT LINE AND

MANHOLE INSTALLED

BY ARTS APR2018

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 25

8.0 Appendices

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 26

Appendix A: Dale Farm Environmental Monitoring, Inspection, and

Reporting Procedure

SAMPLING PROTOCOLS

B1 Soil

Any soil samples will be collected under the supervision of a qualified experienced site

investigation engineer.

All samples will be collected as either disturbed samples from an excavator bucket, or from a

window sample tube. The samples will be logged and stored as appropriate prior to being sent

for analysis at an accredited lab.

Each sample will be collected using a clean disposable container and tested for conductivity

prior to being sent for analysis.

B2 Groundwater

Ground water if appropriate may be lifted at the window sampling points and analysed as per

standards current at the time in an accredited lab.

Each sample will be collected using a clean disposable container and tested for conductivity

prior to being sent for analysis. The sample will be logged and the conductivity recorded.

B Surface Water

Surface water will be collected from the points identified in figure 2

Each sample will be collected using a clean disposable container and tested for conductivity

prior to being sent for analysis. The sample will be logged and the conductivity recorded.

B5 Infrastructure

Infrastructure monitoring comprises a program of visual inspections.

Environmental Work Instruction

EWI 02

Issue No 5 Date of Issue October 2015 Revised 29th Oct 2018

Prepared By G.McAuley Authorised By G.Bates

1

TITLE: BUNDWATER INSPECTION AND REMOVAL

1.0 INTRODUCTION

Bulk tanks are contained within a bunded area or on a spill pallet to provide secondary

containment in the event of a spill or breach from the tank.

The purpose of checking bunds is to:

• Check for bund integrity ie no cracks or holes that could allow liquid to escape

• Establish if the bund contains liquid and may require emptying

A bund may contain liquid because of the leak of the primary containment vessel or from

rain water where the bund is exposed to the elements.

Filling the bund with liquid reduces the volume that can be contained in the event of a

leak and thus, in the event of a major spill or breach of the tank, the bund would overflow

and cause a potential pollution incident.

Therefore, bunds must be regularly checked for accumulated rainwater (Weekly) and

emptied in a controlled manner.

Valves and taps in bunds must NEVER be left open but must always be closed and

locked to prevent vandalism. These should be preferably avoided when purchasing new

bunds

2.0 SCOPE

This procedure covers all bunds

3.0 RESPONSIBILITIES

It is the responsibility of the Yardman / Production Manager or delegate to carry out the

inspections detailed here.

• Failure to carry out such inspections and to maintain this site infrastructure in

adequate condition may result in pollution incidents which could lead to

prosecutions, large fines and clean up costs.

Environmental Work Instruction

EWI 02

Issue No 5 Date of Issue October 2015 Revised 29th Oct 2018

Prepared By G.McAuley Authorised By G.Bates

2

• Inspections of tanks, bunds must be carried out according to the inspection

schedule

• Ensure records are maintained to demonstrate that this maintenance has been

carried out in full, and with the required frequency. Ref SPMP1 Date Rev

04/01/2019

• All inspections detailed here must be carried out in daylight hours only.

• Do not enter confined space without a permit to work.

All observations, defects and necessary remedial work must be recorded on a non-

conformance report form. This must be passed to a manager for action at the earliest

opportunity. Any defects which present a risk of causing pollution must be reported

immediately to the unit manager and any necessary remedial work undertaken as a matter

of priority.

4.0 PROCEDURE

The list of uncovered bunds which require regular checking is detailed on the Bund check

sheet Doc Ref SPMP1.

These frequency of carrying out checks will be dependant on weather conditions but must

be checked on a regular basis, as a minimum this should be monthly in summer months

or daily in the event of significant rainfall.

It is the responsibility of the Production Manager to ensure these checks are completed

and log that the check has been carried out and any action taken to remove bundwater.

This must include details of relevant checks on contamination ( as indicated below) and

the nature of the action taken because of these checks.

Bundwater contamination and appropriate disposal option

Prior to emptying any accumulated water in bunds, the liquid must be checked for

contamination. The appropriate method of disposal of this liquid is dependant on the

nature of contamination. This is summarised in the table 1:

Type of tank in Indicator of contamination Disposal option if contaminated

Environmental Work Instruction

EWI 02

Issue No 5 Date of Issue October 2015 Revised 29th Oct 2018

Prepared By G.McAuley Authorised By G.Bates

3

bund

Fuel / oil Visual check for the presence of

fuel or oil slicks on the surface of

the water

Categorised as hazardous waste

Pump out into sealable container

and dispose of as special waste

For small slicks use an oil

skimmer

Milk / milk products Visual check for discolouration -

milky white water

Presence of odour

(a) If low level of contamination,

bundwater can be disposed of to

EFFLUENT drain RED

(b) If highly contaminated,

transfer to mobile tanker for

disposal

Chemicals Visual check for signs damage,

particularly to valves or pipework

Other indications of

contamination, for instance

particularly large amount of

liquid in bund in relation to

rainfall

Smell of chemicals

Check or confirm contamination

using pH indication strip.

Acceptable levels of pH range

from 5.0 to 10

(a) If low level of contamination,

bundwater can be disposed of to

EFFLUENT drain

RED

(b) If highly contaminated, pump

out into sealable container and

dispose of as HAZARDOUS

waste

If the water is clean with no evidence of contamination as described above this water may

be discharged to drain.

UNDER NO CIRCUMSTANCES MUST ANY WATER NO MATTER HOW

CLEAN IT APPEARS BE DISPOSED OF BY PUMPING INTO A STORM

DRAIN (MARKED BLUE)

In the case of the bund water being contaminated as described above, report this to

management. Management shall investigate the cause of the contamination and take any

necessary corrective and preventative action to prevent a reoccurrence. A non-

conformance report and corrective action sheet must be completed.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 27

Appendix B: Previous SPMP (2014)

Integrated Pollution Prevention and Control

(IPPC)

REVIEWED: AUGUST 2014

DALE FARM LTD

PENNYBRIDGE FACTORY: DESIGN OF A SITE

PROTECTION AND MONITORING PROGRAMME THAT DOES

NOT REQUIRE REFERENCE DATA TO BE COLLECTED

Page 2 of 17

SUMMARY

This document represents the part of the design Site Protection and Monitoring Programme

(SPMP) for Dale Farm Ltd - Pennybridge submitted to the Chief Inspector in pursuance of

Condition 4.1.7 of the Permit No P0093/05A (the "Permit") authorising the operation of Dale

Farm Ltd – Pennybridge (the "installation").

This design document is required by Condition 4.6 to be submitted to the Agency within 2

months of the date of issue of the Permit.

An Environmental Monitoring program is presented in section 4 and appendices A – D. This

will not require ground reference samples to be taken, it is proposed that samples will taken

where subsequent ground works are implemented and used as benchmarks for the site closure

plan.

Effluent and surface water sampling will be undertaken as part of the SPMP and the permit

conditions.

Infrastructure monitoring will be undertaken on all aspects of the site that may be a source of

pollution.

Page 3 of 17

Contents

Summary

1.0 Introduction

1.1 Site Location

1.2 Details of the Installation

2.0 Objectives

3.0 Summary of application site report

3.1 Activities to be operated within the installation

3.2 Site Zoning

3.3 Planned Improvements

3.4 Assessment of the need to collect further reference samples

3.5 Updated Conceptual site Model

3.6 Uncertainties and Assumptions in CSM

4.0 Monitoring Program

4.1 Objectives of the Monitoring Program

4.1.1 Objectives of Environmental Monitoring Program

4.1.2 Objectives of the Infrastructure Monitoring Program

4.2 Environmental Monitoring Infrastructure

4.2.1 Location

4.2.2 Surface Water Monitoring

4.2.3 Effluent water monitoring

4.2.4 Soil Monitoring

4.3 Environmental Monitoring Program

4.3.1 Monitoring frequency

4.3.2 Sampling and analysis protocols

4.3.3 Personnel Issues

4.4 Infrastructure Monitoring Program

4.4.1 Personnel Issues

4.5 Assessment and Reporting Procedures

4.5.1 Assessment Procedure

Page 4 of 17

4.5.2 Reporting procedure

4.5.3 Recording and data management

5.0 References

6.0 Glossary

Appendices

Appendix A - Figures and Plans

Appendix B - Investigation and Sampling Protocols

Appendix C - Analytical Protocols and Laboratory Accreditation

Appendix D - Quality Assurance and Quality Control

Page 5 of 17

1.0 Introduction

This Site Protection and Monitoring Program has been designed by Geoffrey Bates

Compliance Manager Dale Farm Ltd. The following documents have been used in the

preparation of the program

The application site report prepared by Enviros Consulting Ltd as part of the permit

application

• Accident plan in section B2.8 of the permit application

• PPC permit No P0093/05A

• Glover site investigations Ltd 09 - 0439

1.1 Site Location

The installation is located at Pennybridge Industrial Estate Larne Rd Ballymena Co Antrim

BT42 3HB. The centre of the site is at National Grid Reference IJ 31164019. The site covers

an area of approximately 5.5 Ha and can be seen in Figure 1 of Appendix A1.

Pennybridge Factory

1.2 Details of Installation

Details of the operations conducted under the permit were provided in the PPC permit

application (Ref. 1) and ASR (Ref. 2). The main activities operated are as follows

Page 6 of 17

• Milk intake/reception;

• Milk pasteurisation and separation;

• Cream production;

• Orange concentrate processing;

• Packaging lines;

• Chilled storage;

• Plant washing activities;

• Boiler house;

• Packaging and distribution; and

• Engineering/maintenance areas.

In addition, there are a number of small operations that are being undertaken within the area

of the installation, which are outside of the scope of the PPC permit. These mainly relate to

vehicle haulage activities undertaken by contractors and NAMPAK blow moulding facility.

2.0 Objectives

The objectives of this report are:

To design a monitoring programme for the installation to:

Monitor the effectiveness of pollution prevention infrastructure and management procedures

to provide an early warning of any loss of containment.

To review and if necessary amend the inspection, testing and maintenance programme for

pollution prevention infrastructure at the installation to ensure their continued integrity

To collect data on the natural ground conditions at the installation to verify the conceptual

site model and to assist in the permit surrender process

3.0 Summary of the application site report

The main findings of the Application report are summarised in this chapter

3.1 Activities to be operated within the installation

Site operations were reviewed by Enviros Consulting to identify activities operated within the

PPC installation that could lead to future ground contamination

The assessment indicated that there was a reasonable possibility of future land pollution

occurring for the following activities under current conditions

1. Storage of milk

2. Delivery of diesel

3. Storage of waste oil and

Page 7 of 17

4. Potential leakage from effluent drainage systems

3.2 Site Zoning

The site has been divided into four zones based on the site setting and the location of

potentially polluting substances. These zones are shown on figure 2 of appendix A and are

listed below

1. Raw milk storage area

2. Diesel storage

3. Waste oil storage area and

4. Effluent drains

3.3 Planned improvements

Improvements since 2006

1. Construction of the NAMPAK facility

2. Conversion of boilers to natural Gas

3. Construction of new central distribution store including new drainage and new oil

interceptor

4. Construction of new lorry park, including new oil interceptor

5. Upgrade of cream effluent drainage system

6. Upgrade of effluent drains at intake

Table 1 Assessment of the need to collect reference data

Potential future

source identified

Relevant

substance

Planned improvements Soil and ground

water reference

data required?

Bulk milks intake

storage and despatch

Biological

Oxygen Demand

Formal documented visual

inspections

N

Diesel delivery and

storage

Hydrocarbons Inspection and reporting of

tank and bund condition.

Improvements

implemented when

necessary. Trained staff to

oversee all deliveries

N

Effluent Biological

Oxygen Demand

5 year rolling program

inspections

N

Page 8 of 17

3.5 Updated Conceptual site Model

Key elements of the conceptual site model are summarised in table 2.

Aspect Details

Geology Drift – Alluvium (laminated silt, fine sand and

gravel)

Solid – Lower Basalt Formation

Hydrogeology Site underlain by a locally important aquifer in

which groundwater flow is dominantly through

fissures and other discontinuities. It has been

classified as moderately permeable.

Surface Water Features The closest watercourse is an unnamed

tributary of the Deerfin Burn and runs along

the north-western side of the installation

boundary. The Deerfin Burn has a ‘Fair’

Biological classification and a ‘Fairly Good’

chemical classification.

Ecological Receptors No ecologically sensitive areas within 500m of

the site.

Summary of Receptors (Pathways) Land (spills and leaks to ground);

Locally important aquifer (leaching from soils,

and percolation through permeable ground);

Unnamed tributary of the Deerfin Burn and the

undesignated stream/drain to the North-west of

the site (site drainage and groundwater flow).

Activities Identified with

Reasonable Possibility of Future

Pollution Occurring

Storage of milk;

Delivery of diesel;

Storage of waste oil;

Potential leakage from effluent drainage

systems.

Potential spillage into storm drains

Land Pollution History & Main

Pollution Incidents

Agricultural use:

Industrial estate construction; and

Redundant oil storage area.

Contamination Identified in

Previous Investigations

Ground analysis was carried out in 2009

during the construction of the blow moulding

facility and in 2010 for the construction of the

distribution depot, no contamination identified

3.6 Uncertainties and Assumptions in CSM

The following uncertainties and assumptions are implicit in the CSM described:

• Thickness and composition of Made Ground and Boulder Clay across the site is not

known in the absence of intrusive investigation data;

• The depth to groundwater is not known;

• Site personnel report that there have been no known pollution incidents but it is

possible that other incidents have occurred since the current factory existed; and

Page 9 of 17

• Pollution incidents may have occurred from before the current factory existed

4.0 Monitoring Programme

4.1 Objectives of the Monitoring Programme

The objectives of the monitoring program are to demonstrate that the pollution prevention

measures will be inspected and maintained over the lifetime of the permit in such a way that

future pollution to land is not caused by installation activities

4.1.1 Objectives of Environmental Monitoring Programme

The requirement for an ongoing monitoring program will be assessed using the results of the

updated CSM in relation to any site works or site ground investigation. The monitoring

program will determine the effectiveness of the pollution control infrastructure and

containment measures and will assist in determining potential emissions.. The program will

allow for the determination and indication of potential pollutants within the site and provide

details on long term changes in ground conditions

4.1.2 Objectives of Infrastructure Monitoring Programme

To test the integrity of the pollution infrastructure currently in place and evaluate the

monitoring, inspection and testing program in place.

4.2 Environmental Monitoring Infrastructure

4.2.1 Location

Figure 1 of Appendix A1 shows the proposed location of monitoring points at the installation.

Table 3

Sampling Location summary

Emission point reference Source Receiving water

W1 Storm water run off Unnamed tributary of the

Deerfin burn

W2 Storm water run off Unnamed tributary of the

Deerfin burn

4.2.2 Surface Water monitoring

The proposed completion details of each groundwater monitoring installation are as detailed

in the permit as follows

Table 4

Emission limits

Page 10 of 17

Release point Parameter Value requirement

W1 & W2 Suspended

solids

50mg/l Quarterly spot

BOD 50mg/l Quarterly spot

pH 6 – 9 Quarterly spot

VOG None Weekly spot

Temperature 25Deg C Weekly spot

.4.2.3 Effluent Water Monitoring

Trade effluent is discharged off site to NI water

Table 5

Emission limits

Release point Parameter Value Monitoring

Requirement

S1 COD 4000mg/l Monthly spot

sample Suspended

solids

800mg/l

pH 5 - 10

Temperature <45 Deg C

Max daily

volume

550m3

4.2.4 Soil Monitoring

Soil samples will be taken from site works on the zoned areas as and when site works are

undertaken eg for infrastructure improvements

Should soil monitoring be required other than after a spillage or pollution incident then

samples will be analysed typically for the following

• Total petroleum hydrocarbons

• Heavy fuel oil, diesel range organics

• PAH, PTE’s and nitrogen compounds

• TN, NO3, NH4 and pH

These will form the base data for the site. The sampling protocol is detailed in appendix B

and analytical Techniques in Appendix C

4.3 Environmental Monitoring Programme

Page 11 of 17

4.3.1 Monitoring Frequency

The proposed environmental monitoring programme

Table 4

Monitoring Frequency

Surface water Quarterly/weekly

Emissions from effluent

drainage system

Monthly

Soil samples from zoned

areas

During ground works

4.3.2 Sampling and Analysis Protocols

The protocols for analysis are summarised below and reproduced in Appendix C.

Sampling protocols are contained within Appendix B.

4.3.3 Personnel Issues

Personnel responsible for sampling, maintenance and inspection will be trained in

environmental monitoring to an appropriate level to ensure compliance with the quality

assurance and quality control plan.

4.4 Infrastructure Monitoring Programme

As detailed within section B2.3 of the main application there are documented procedures to

control process operations. The following table will summarise the inspection procedures

Table 5

Activity Inspection details

Diesel fuel delivery Checks are made at each delivery, all suppliers are trained

in procedures and visual checks are made before, during

and after transfer of diesel. Tank bunds will be inspected

every month

Diesel fuel storage Tank bunds will be checked each month, level gauges are

fitted

Delivery of bulk milk

products

Bulk products will only be transferred when personnel are

present and a spill kit available. The tanker will be

inspected prior to filling or despatch.

Despatch of bulk milk

products

Bulk products will only be transferred when personnel are

present and a spill kit available. The tanker will be

inspected prior to filling or despatch.

Trade effluent drains A visual inspection of the drainage system will be carried

Page 12 of 17

out quarterly. Any drains, which is reported to be damaged,

or not free flowing will be cleaned and further inspection

completed if necessary.

Storm drains A visual inspection of the drainage system will be carried

out quarterly. Any drains, which are reported to be

damaged, or not free flowing will be cleaned and further

inspection completed if necessary.

Internal flooring A visual inspection of the internal flooring will be carried

out monthly. Any flooring which is reported to be in a poor

condition will be repaired

hardstanding A visual inspection of the external yard will be carried out

monthly. Any flooring which is reported to be in a poor

condition will be repaired

Chemical bunds Various areas around the site as identified in the ASR,

these will be checked monthly

Milk storage Milk is stored in 10 external tanks, 5 raw milk and

5processed milk. The tanks are visually inspected prior to

filling, all tanks have high level alarms and are checked

annually

Waste oil storage The waste oil storage is located in the oil store and is on

hard standing, the tank is manually filled and inspected on

a monthly basis

4.4.1 Personnel Issues

Personnel responsible for the inspection, testing and maintenance of pollution prevention

infrastructure are to be trained to an appropriate level to ensure compliance with the

Infrastructure Monitoring Programme. Roles and responsibilities for undertaking the

Programme (including reporting) and ensuring adequate competence of staff are shown in

Appendix E2.

4.5 Assessment and Reporting Procedures

4.5.1 Assessment Procedure

Checklists for the inspection and recording of fixed bunds, hard surfacing in relevant areas

and maintenance will be kept on site. The inspections will be primarily visual to identify any

signs of corrosion, cracks or other damage. Should any damage be identified that could affect

the integrity of the bunds this will be checked through water testing. Damaged hard standing

will be sealed and repaired.

The effluent drainage system will be visually checked every 3 mts to ensure manholes are

clear and free flowing. The system will be maintained in good working order. Manual

inspection of the storm drains will be made every month. Any suspected leaks would be

investigated and remedial action taken as necessary. The site drainage plan will be

maintained and any changes made to the drainage system incorporated.

Ref Environmental Work Instruction EWI No1 ref 3

Page 13 of 17

4.5.2 Reporting Procedure

Summaries of the monitoring data will be sent to the EHS on the 31st of January each year

along with the results of the data assessment, and any recommendations for amendments to

the Monitoring Programme.

4.5.3 Recording and Data Management

Inspection and assessment records of all of the above will be maintained and stored on site.

Records of the infrastructure monitoring will be retained at the installation for a minimum

period of 3 years. The SPMP will be maintained with regular reviews completed at least

every 2yrs. The results of the review and any proposed changes will be discussed with the

regulator.

5.0 References

.

• Dale farm ltd – Pennybridge PPC Permit Application September 2005

• Enviros Consulting Limited, Dale Farm Ltd - Pennybridge PPC ASR 19/9/05

• Environmental Work instruction 01

6.0 Glossary

PPC – Pollution Prevention Control

CSM – Conceptual Site Model

BAT – Best Available Techniques

ASR – Application Site Reports

Page 14 of 17

APPENDIX A

FIGURES AND PLANS

Contents

Figure 1 Site Layout and sampling points

Figure 2 Site zoning

Page 15 of 17

APPENDIX B

SAMPLING PROTOCOLS

Contents

B1 Soil

Any soil samples will be collected under the supervision of a qualified experienced site

investigation engineer.

All samples will be collected as either disturbed samples from an excavator bucket, or from a

window sample tube. The samples will be logged and stored as appropriate prior to being sent

for analysis at an accredited lab.

Each sample will be collected using a clean disposable container and tested for conductivity

prior to being sent for analysis.

B2 Groundwater

Ground water if appropriate may be lifted at the window sampling points and analysed as per

standards current at the time in an accredited lab.

Each sample will be collected using a clean disposable container and tested for conductivity

prior to being sent for analysis. The sample will be logged and the conductivity recorded.

B Surface Water

Surface water will be collected from the points identified in figure 2

Each sample will be collected using a clean disposable container and tested for conductivity

prior to being sent for analysis. The sample will be logged and the conductivity recorded.

B5 Infrastructure

Infrastructure monitoring comprises a program of visual inspections.

Page 16 of 17

APPENDIX C

ANALYTICAL PROTOCOLS AND LABORATORY ACCREDITATION

Contents

In house laboratory facilities will be used where applicable

An accredited laboratory (UKAS) will be used for soil, waste and water

Page 17 of 17

APPENDIX D

QUALITY ASSURANCE AND QUALITY CONTROL

Contents

Where possible the analysis will be conducted in laboratories with the appropriate level of

approved accreditation. Detection limits, analysis protocols and accreditation status will be

provided with all reported data.

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 28

Appendix C: Site Investigation Reports

FINAL FOR ISSUE

Dale Farm Pennybridge Industrial Estate Site Investigation

Primary Author: John Cameron Client: Dale Farm Client‟s Representative: Albert Fry Associates Completed: October 2014 Report No.: 14-742 File Location: 14-742 report

Dale Farm, Pennybridge Industrial Estate

Report No.: 14-742

October 2014 Page 1

CONTENTS Document Control Sheet Note on: Methods of describing soils and rocks & abbreviations used on exploratory hole logs

1 AUTHORITY ............................................................................................................ 4

2 SCOPE .................................................................................................................. 4

3 DESCRIPTION OF SITE ............................................................................................. 4

4 SITE OPERATIONS ................................................................................................... 4 4.1 Boreholes ........................................................................................................ 5

5 LABORATORY WORK................................................................................................ 5

6 GROUND CONDITIONS ............................................................................................. 6 6.1 Groundwater .................................................................................................... 6

7 DISCUSSION ........................................................................................................... 6 7.1 Proposed construction ........................................................................................ 6

7.2 Recommendations for construction ......................................................................... 6

7.2.1 Foundations and ground floor construction ........................................................ 6

7.2.2 Soil aggressivity ........................................................................................ 7

7.2.3 Waste disposal ......................................................................................... 7

Soil quality ....................................................................................................... 7

8 REFERENCES ......................................................................................................... 8

APPENDICES Appendix A Site and exploratory hole location plans

Appendix B Borehole and dynamic probe logs

Appendix C Laboratory test results

Appendix D SPT hammer energy measurement report

Dale Farm, Pennybridge Industrial Estate

Report No.: 14-742

October 2014 Page 2

Document Control Sheet Report No.:

14-742

Project title:

Dale Farm, Pennybridge Industrial Estate

Client:

Dale Farm

Client‟s Representative:

Albert Fry Associates

Revision

Status

Report prepared by:

Report reviewed by:

Issue date

0

Final

John Cameron BSc CEng MIEI

Paul Dunlop BEng PhD CEng MIEI

8th October 2014

The works were conducted in accordance with:

Site Investigation in Construction Part 3: Specification for Ground Investigation, Site Investigation Steering Group, published by Thomas Telford Ltd (1993) British Standards Institute (2010) BS 5930:1999 + A2: 2010, Code of practice for site investigations. Incorporating Amendment Nos. 1 and 2, as partially replaced by:

BS EN 1997-2:2007: Eurocode 7. Geotechnical design. Ground investigation and testing

BS EN ISO 22475-1:2006: Geotechnical investigation and testing. Sampling methods and groundwater measurements. Technical principles for execution

BS EN ISO 14688-1:2002: Geotechnical investigation and testing. Identification and classification of soil. Identification and description

BS EN ISO 14688-2:2004: Geotechnical investigation and testing. Identification and classification of soil. Principles for a classification

BS EN ISO 14689-1:2003: Geotechnical investigation and testing. Identification and classification of rock. Identification and description

BS EN ISO 22476-2:2005: Geotechnical investigation and testing. Field testing. Dynamic probing

BS EN ISO 22476-3:2005: Geotechnical investigation and testing. Field testing. Standard penetration test

Dale Farm, Pennybridge Industrial Estate

Report No.: 14-742

October 2014 Page 3

Methods of describing soils and rocks Soil and rock descriptions are based on the guidance in Section 6 of BS 5930: 1999 + A2: 2010, The Code of Practice for Site Investigation. The amendments revised the Standard to remove text superseded by BS EN ISO 14688-1:2002, BS EN ISO 14688-2:2004 and EN ISO 14689-1:2003 and refers to the relevant standard for each affected subclause. However, the following terms are used in the description of fine-grained soils, where applicable: soft to firm: fine-grained soil with consistency description close to the boundary between

soft and firm soil (Table 13 of BS5930). firm to stiff: fine-grained soil with consistency description close to the boundary between

firm and stiff soil (Table 13 of BS5930).

Abbreviations used on exploratory hole logs

U Nominal 100mm diameter undisturbed open tube sample

P Nominal 100mm diameter undisturbed piston sample

B Bulk disturbed sample

D Small disturbed sample

W Water sample

ES / EW Soil sample for environmental testing / Water sample for environmental testing

SPT Standard penetration test using a split spoon sampler (small disturbed sample obtained)

SPT (C) Standard penetration test using 60 degree solid cone

x,x/x,x,x,x Blows per increment during the standard penetration test. The initial two values relate to the seating drive (150mm) and the remaining four to the 75mm increments of the test length. The length achieved is stated (mm) for any test increment less than 75mm

N=X SPT blow count „N‟ given by the summation of the blows „X‟ required to drive the full test length (300mm)

N=X/Z Incomplete standard penetration test where the full test length was not achieved. The blows „X‟ represent the total blows for the given test length „Z‟ (mm)

V VR

Shear vane test (borehole) Hand vane test (trial pit) Shear strength stated in kPa V: undisturbed vane shear strength VR: remoulded vane shear strength

dd/mm/yy: 1.0 dd/mm/yy: dry

Date & water level at the borehole depth at the end of shift and the start of the following shift

Abbreviations relating to rock core – reference Clause 44.4.4 of BS 5930: 1999

TCR (%) Total Core Recovery: Ratio of rock/soil core recovered (both solid and non-intact) to the total length of core run.

SCR (%) Solid Core Recovery: Ratio of solid core to the total length of core run. Solid core has a full diameter, uninterrupted by natural discontinuities, but not necessarily a full circumference and is measured along the core axis between natural fractures.

RQD (%) Rock Quality Designation: Ratio of total length of solid core pieces greater than 100mm to the total length of core run.

FI Fracture Index: Number of natural discontinuities per metre over an indicated length of core of similar intensity of fracturing.

NI Non Intact: Used where the rock material was recovered fragmented, for example as fine to coarse gravel size particles.

AZCL Assessed zone of core loss: The estimated depth range where core was not recovered.

DIF Drilling induced fracture: A fracture of non-geological origin brought about by the rock coring.

Dale Farm, Pennybridge Industrial Estate

Report No.: 14-742

October 2014 Page 4

Dale Farm, Pennybridge Industrial Estate

1 AUTHORITY On the instructions of Consulting Engineers, Albert Fry Associates (“the Client‟s Representative”), on behalf of Dale Farm (“the Client”), a ground investigation was undertaken at the above location to provide geotechnical and environmental information the site. This report details the work carried out both on site and in the geotechnical and chemical testing laboratories; it contains a description of the site and the works undertaken, the exploratory hole logs and the laboratory test results. A discussion on the recommendation for construction is also provided. All information given in this report is based upon the ground conditions encountered during the site investigation works, and on the results of the laboratory and field tests performed. However, there may be conditions at the site that have not been taken into account, such as unpredictable soil strata, contaminant concentrations, and water conditions between or below exploratory holes. It should be noted that groundwater levels usually vary due to seasonal and/or other effects and may at times differ to those measured during the investigation. This report was prepared by Causeway Geotech Ltd for the use of the Client and the Client‟s Representative in response to particular instructions. Any other parties using the information contained in this report do so at their own risk and any duty of care to those parties is excluded.

2 SCOPE The extent of the investigation, as instructed by the Client‟s Representative, included boreholes, soil sampling, in-situ and laboratory testing, and the preparation of a report on the findings including recommendations for construction.

3 DESCRIPTION OF SITE As shown on the site location plan in Appendix A, the works were conducted on the site at Dale Farm‟s existing plant at Pennybridge Industrial Estate in Ballymena.

4 SITE OPERATIONS The Site Operations, conducted on 8th September 2014, comprised: four percussion boreholes;

The exploratory holes and insitu tests were located as instructed by the Client‟s Representative, as shown on the exploratory hole location plan in Appendix A.

Dale Farm, Pennybridge Industrial Estate

Report No.: 14-742

October 2014 Page 5

4.1 Boreholes Four boreholes (BH01 – BH04) were put down in 150mm diameter using Dando Terrier percussion boring rig. BH01, BH03 and BH04 were down through Made Ground varying between 0.6m and 2.5m in thickness. All four boreholes terminated in very stiff glacial till. Disturbed (small and bulk bag) samples and environmental samples were taken within the encountered strata. Standard penetration tests were carried out at 1m depth intervals using the split spoon sampler (SPT). The penetrations are stated for those tests for which the full 150mm seating drive or 300mm test drive was not possible. The N-values provided on the borehole logs are uncorrected and no allowance has been made for energy ratio corrections. Any water strikes encountered during boring were recorded along with any changes in their levels as the borehole proceeded. Appendix B presents the borehole logs. The SPT hammer energy measurement report is provided in Appendix D. Details of the SPT hammer used is provided on the individual borehole logs.

5 LABORATORY WORK Upon their receipt in the laboratory, all disturbed samples were carefully examined and accurately described and their descriptions incorporated into the borehole logs. Laboratory testing of soils comprised: Moisture content Atterberg Limit Particle size distribution analysis. pH and water soluble sulphate content. In addition, environmental screening and WAC testing was conducted on selected environmental samples by Chemtest at its laboratory in Newmarket, Suffolk. The test results are presented in Appendix C.

Dale Farm, Pennybridge Industrial Estate

Report No.: 14-742

October 2014 Page 6

6 GROUND CONDITIONS The exploratory holes encountered the following ground types: Made Ground: identified in boreholes BH01, BH03 & BH04 to depths ranging from 0.60m to

2.50m, generally comprised of reworked Glacial Till (boulder Clay) Glacial Till: as soft to firm becoming very stiff sandy gravelly clay or silt with low cobble and

boulder content to 3.3m in BH03.

6.1 Groundwater Groundwater was not encountered, during exploration.

7 DISCUSSION

7.1 Proposed construction No construction details were available to Causeway Geotech Ltd when preparing this Report.

7.2 Recommendations for construction

7.2.1 Foundations and ground floor construction Foundations should transfer loading to below Made Ground. The recommended foundation construction and allowable bearing pressure (ABP) at the four borehole locations are as follows: Table 1: Construction recommendations

Borehole

Depth Below

EGL* to Suitable Bearing Stratum

Estimated ABP (kPa)

Strata description

Foundation type

Ground floor construction Groundwater

BH01 1.80 200 Very stiff glacial till

Strip and Pad or trench

fill Suspended

Not present during

exploration

BH02 1.40 200 Very stiff glacial till

Strip and Pad or trench fill

Suspended Not present

during exploration

BH03 2.40 200 Very stiff glacial till

Strip and Pad or trench fill

Suspended Not present

during exploration

BH04 2.50 200 Very stiff glacial till

Strip and Pad or trench fill

Suspended Not present

during exploration

* Existing Ground Level

Dale Farm, Pennybridge Industrial Estate

Report No.: 14-742

October 2014 Page 7

The depth of Made Ground across the site indicates the use of strip and pad or deep trench foundations are recommended along with suspended floors.

7.2.2 Soil aggressivity An assessment of the Aggressive Chemical Environment for Concrete (ACEC) was undertaken through reference to the Building Research Establishment (BRE) Special Digest 1 (2005). As noted by BRE Special Digest 1, sulphates in the soil and groundwater are the chemical agents most likely to attack concrete. The extent to which sulphates affect concrete is linked to their concentrations, the type of ground, the presence of groundwater, the type of concrete and the form of construction in which concrete is used. BRE Special Digest 1 identifies four different categories of site which require specific procedures for investigation for aggressive ground conditions:

Sites not subjected to previous development and not perceived as containing pyrite; Sites not subjected to previous development and perceived as containing pyrite; Brownfield sites not perceived as containing pyrite; Brownfield sites perceived as containing pyrite.

For the purposes of this report the site was classified as having been subject to previous development and not perceived as containing pyrite. The results of chemical tests (pH and water soluble sulphate contents) on soil samples indicate Design Sulphate Class DS-1 and ACEC Class AC-1 – reference Table C2 of BRE Special Digest 1 (Building Research Establishment, 2005). The Special Digest does not require any measures to protect underground concrete elements greater that 140mm thick.

7.2.3 Waste disposal

Four samples were sent for Environmental Screening and Two samples were analysed for WAC analysis, the results of which are presented in Appendix E. Considering the results for the two samples analysed the soils on site may be disposed of as non-hazardous waste subject to the receiving landfill permitting the material on receipt of the laboratory results.

Soil quality Selected soil samples were analysed for a range of potential contaminants including: Metals; Speciated total petroleum hydrocarbons (TPH); Speciated polycyclic aromatic hydrocarbons (PAH); and Cyanide.

Dale Farm, Pennybridge Industrial Estate

Report No.: 14-742

October 2014 Page 8

In the initial examination of the potential risk of site contamination, the laboratory results have been compared to the following available assessment criteria relevant to the proposed land use: the Environment Agency Soil Guideline Values (SGVs) published, in 2009. These relate to

arsenic, nickel, mercury, selenium, cadmium, benzene, toluene, ethylbenzene, xylenes, and phenol.

The results from the selected samples do not identify significantly elevated concentrations for the compounds analysed considering a commercial redevelopment. It should be noted that the above assessment is based on the results of the selected soil samples and available SGVs. Any potential contamination identified during site development by visual or olfactory means should be further investigated, including additional laboratory testing, and appropriate health & safety, waste disposal and remediation measures adopted. Where site levels are to be reduced as part of development work the soil chemistry results indicate the material is likely to be considered non-hazardous waste n. It is recommended that the results of this report are presented to the landfill operator prior to disposal to ensure they are informed of the potential waste classification enabling them to remain in compliance with their relevant permits.

8 REFERENCES BS 1377: 1990: Methods of test for soils for civil engineering purposes. British Standards Institution. BS 5930+A2: 2010: Code of practice for site investigations (Amendment 2). British Standards Institution. BS EN 1997-2: 2007: Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing. British Standards Institution. BS EN ISO 14688-1: 2002: Geotechnical investigation and testing - Identification and classification of soil - Part 1 Identification and description. British Standards Institution. Building Research Establishment (2005) BRE Special Digest 1, Concrete in aggressive ground.

Appendix A Site and exploratory hole location plans

Appendix B Borehole logs

Causeway Geotech LtdProject no.

14-742

ProjectName:

Dale Farm, Pennybridge Industrial Estate, Ballymena

Borehole No.

BH01

Method:

0.00 1.00 Hand Excavated

Plant:

Inspection Pit

Co-ords:

mE

mN

Ground Level:

MOD

Client: Dale Farm

Client's Representative: Albert Fry Associates

Dates: 08/09/2014

Sheet 1 of 1

Scale: 1:50

Crew: JS

Logged By:

Depth (m)

0.50

1.001.001.00

1.45

2.002.00

2.452.502.60

Sample / Test

ES

SPT(S)DES

D

SPT(S)D

DSPT(S)D

CasingDepth

(m)

1.00

2.00

2.50

WaterDepth

(m)Field Records

N=12 (2,2/3,3,3,3)

N=55 (4,11/11,14,14,16)

50 (25 for 75mm/50 for 75mm)

Level & Depth

(0.30)

(0.30)

(1.20)

(0.30)

(0.50)

0.30

0.60

1.80

2.10

2.60

Stratum Description

TOPSOIL

Possible MADE GROUND: Firm brown sandy gravelly CLAY. Sand is fine to coarse. Gravel is subangular to subrounded fine to coarse

Firm brown sandy gravelly clayey SILT with some cobbles. Sand is fine to coarse. Gravel is subangular to subrounded fine to coarse. Cobbles are subangular to subrounded

Firm to stiff brown sandy gravelly CLAY with some cobbles. Sand is fine to coarse. Gravel is subangular to subrounded fine to coarse. Cobbles are subangular to subroundedVery stiff brown sandy gravelly CLAY. Sand is fine to coarse. Gravel is angular to subangular fine to medium (possible weathered bedrock)

End of borehole at 2.60 m

Legend &Water

Strikes

BackfillInstalls

Remarks

Standpipe installedRefusal met on possible large boulder or bedrock

Chiselling:

From(m)

To(m)

Time(hh:mm)

Water Added:

From (m) To (m)

Water Strikes:

Struck(m)

Rose to(m)

Time(min)

Casing:

To (m) Diameter (mm)

2.60 150www.causewaygeotech.com

© Causeway Geotech Ltd

Causeway Geotech LtdProject no.

14-742

ProjectName:

Dale Farm, Pennybridge Industrial Estate, Ballymena

Borehole No.

BH02

Method:

0.001.00

1.002.60

Hand ExcavatedLight Percussion

Plant:

Inspectin Pit+Dando Terrier

Co-ords:

mE

mN

Ground Level:

MOD

Client: Dale Farm

Client's Representative: Albert Fry Associates

Dates: 08/09/2014

Sheet 1 of 1

Scale: 1:50

Crew: JS

Logged By:

Depth (m)

0.50

1.001.001.00 - 2.00

1.45

2.00

2.452.502.60

Sample / Test

ES

SPT(S)ESB

D

SPT(S)

DSPT(S)D

CasingDepth

(m)

1.00

2.00

2.50

WaterDepth

(m)Field Records

N=18 (2,3/3,3,5,7)

N=55 (3,7/11,14,14,16)

50 (25 for 75mm/50 for 75mm)

Level & Depth

(0.20)

(0.70)

(0.50)

(0.80)

(0.40)

0.20

0.90

1.40

2.20

2.60

Stratum Description

TOPSOIL

Soft to firm orange brown sandy gravelly CLAY. Sand is fine to coarse. Gravel is subangular to subrounded fine to medium

Firm to stiff brown sandy gravelly CLAY with occasional cobbles. Sand is fine to coarse. Gravel is angular to subangular fine to coarse. Cobbles are angular to subangular (possible weathered bedrock)

Stiff to very stiff brown sandy gravelly CLAY/ SILT with occasional cobbles. Sand is fine to coarse. Gravel is angular to subangular fine to coarse. Cobbles are angular to subangular (possible weathered bedrock)

Very stiff brown sandy gravelly CLAY with occasional cobbles. Sand is fine to coarse. Gravel is angular to subangular fine to coarse. Cobbles are angular to subangular (possible weathered bedrock)

End of borehole at 2.60 m

Legend &Water

Strikes

BackfillInstalls

Remarks

Refusal met on possible large boulder or bedrock

Chiselling:

From(m)

To(m)

Time(hh:mm)

Water Added:

From (m) To (m)

Water Strikes:

Struck(m)

Rose to(m)

Time(min)

Casing:

To (m) Diameter (mm)

2.60 150www.causewaygeotech.com

© Causeway Geotech Ltd

Causeway Geotech LtdProject no.

14-742

ProjectName:

Dale Farm, Pennybridge Industrial Estate, Ballymena

Borehole No.

BH03

Method:

0.001.00

1.003.30

Hand ExcavatedLight Percussion

Plant:

Inspection Pit+Dando Terrier

Co-ords:

mE

mN

Ground Level:

MOD

Client: Dale Farm

Client's Representative: Albert Fry Associates

Dates: 08/09/2014

Sheet 1 of 1

Scale: 1:50

Crew: JS

Logged By:

Depth (m)

0.50

1.00

1.00

1.00 - 2.00

1.45

1.50

2.00

2.00

2.40 - 3.00

2.45

2.50

3.00

3.30

Sample / Test

ES

SPT(S)ESB

DES

SPT(S)ES

BDES

SPT(S)

D

CasingDepth

(m)

1.00

2.00

3.00

WaterDepth

(m)Field Records

N=12 (1,2/2,4,3,3)

N=17 (2,4/2,3,5,7)

72 (5,14/72 for 150mm)

Level & Depth

(0.20)

(2.20)

(0.90)

0.20

2.40

3.30

Stratum Description

TOPSOIL

MADE GROUND: Firm brown sandy gravelly CLAY with some cobbles. Sand is fine to coarse. Gravel is subrounded to subangular fine to coarse. Cobbles are subrounded to subangular

Stiff to very stiff brown sandy gravelly clayey SILT with some cobbles and boulders. Sand is fine to coarse. Gravel is angular to subangular fine to coarse. Cobbles and boulders are subrounded to subangular (Possible weathered bedrock)

End of borehole at 3.30 m

Legend &Water

Strikes

BackfillInstalls

Remarks

Refusal met on possible bedrock

Chiselling:

From(m)

To(m)

Time(hh:mm)

Water Added:

From (m) To (m)

Water Strikes:

Struck(m)

Rose to(m)

Time(min)

Casing:

To (m) Diameter (mm)

3.30 150www.causewaygeotech.com

© Causeway Geotech Ltd

Causeway Geotech LtdProject no.

14-742

ProjectName:

Dale Farm, Pennybridge Industrial Estate, Ballymena

Borehole No.

BH04

Method:

0.001.00

1.002.60

Hand ExcavatedLight Percussion

Plant:

Inspection Pit+Dando Terrier

Co-ords:

mE

mN

Ground Level:

MOD

Client: Dale Farm

Client's Representative: Albert Fry Associates

Dates: 08/09/2014

Sheet 1 of 1

Scale: 1:50

Crew: JS

Logged By:

Depth (m)

0.50

1.001.001.00 - 2.00

1.451.50

2.002.002.00 - 2.50

2.452.502.502.60

Sample / Test

ES

SPT(S)ESB

DES

SPT(S)ESB

DESSPT(S)D

CasingDepth

(m)

1.00

2.00

2.50

WaterDepth

(m)Field Records

N=16 (2,3/6,3,3,4)

N=25 (2,4/7,5,6,7)

50 (25 for 75mm/50 for 75mm)

Level & Depth

(0.20)

(2.30)

(0.10)

0.20

2.502.60

Stratum Description

TOPSOIL

MADE GROUND: Firm to stiff orange brown sandy gravelly CLAY with some cobbles and boulders. Sand is fine to coarse. Gravel is subangular to subrounded fine to coarse. Cobbles and boulders are subangular to subrounded

Very stiff brown sandy gravelly CLAY with occasional cobbles. Sand is fine to coarse. Gravel is angular to subangular fine to coarse. Cobbles are angular to subangular (possible weathered bedrock)

End of borehole at 2.60 m

Legend &Water

Strikes

BackfillInstalls

Remarks

Refusal met on possible large boulder or bedrock

Chiselling:

From(m)

To(m)

Time(hh:mm)

Water Added:

From (m) To (m)

Water Strikes:

Struck(m)

Rose to(m)

Time(min)

Casing:

To (m) Diameter (mm)

2.60 150www.causewaygeotech.com

© Causeway Geotech Ltd

Appendix C Laboratory Test Results

Sheet 1 of 1

Contract: Dale Farm, Pennybridge Industrial Estate, Ballymena Causeway Geotech Ltd

Job No.: 14-742

Moisture content, Atterberg Limits & Particle Density

Tests 3.2, 4.3, 5.3 & 8.3 of BS 1377 : Part 2 : 1990

EH Moisture Passing Liquid Plastic Plasticity Casagrande Particle

No. Content 425μm Limit Limit Index Classification Density

Type No. at (m) to (m) (%) Sieve (%) (%) (%) (%) (Mg/m3)

SampleSample

Depth

BH01 D 1.00 34 60 50 37 13 MI/MH

BH02 D 1.45 20 51 37 NP NP

BH03 B 1.00 18

BH03 B 2.40 17 35 34 26 8 ML

BH04 B 1.00 29

BH04 D 2.45 19 62 41 25 16 CI

NP non-plastic soil

$ Insufficient material for Limits tests.

Cause

way G

eote

ch L

tdPart

icle

Siz

e D

istr

ibuti

on

BS1377:1

990 P

art

2 C

lause

9.2

and 9

.5

125

100

90

100

75

100

63

100

50

100

37.5

96

28

96

20

94

14

89

10

85

6.3

81

580

3.3

578

274

1.1

871

0.6

66

0.4

25

63

0.3

59

0.2

12

56

0.1

553

0.0

63

48

0.0

345

38.3

0.0

181

26.5

0.0

096

19.2

0.0

054

13.3

0.0

032

5.9

0.0

016

2.9

Sand

26%

Cla

y

3%

Silt

45%

fine

mediu

mcoars

e

Gra

vel 2

6%

Part

icle

siz

e

(mm

)

%

pass

ing

sedim

enta

tion

si

eve s

izes

(mm

)

coars

efi

ne

mediu

mCobble

s

0%

to (

m)

B2

2.0

0

Pro

ject:

Dale

Farm

, Pennybri

dge Indust

rial Est

ate

,

Ballym

ena

Explo

rato

ry

Hole

No.:

BH

04

Job N

o.:

14-7

42

Sam

ple

Type

No.

at

(m)

6.3

5

3.35

2

1.18

0.600

0.425

0.300

0.212

0.150

0.063

0

10

20

30

40

50

60

70

80

90

100 0.001

0.01

0.1

1

% passing

part

icle

siz

e (

mm

)

Cause

way G

eote

ch L

tdPart

icle

Siz

e D

istr

ibuti

on

BS1377:1

990 P

art

2 C

lause

9.2

and 9

.5

125

100

90

100

75

100

63

100

50

100

37.5

100

28

100

20

96

14

92

10

88

6.3

83

581

3.3

579

276

1.1

873

0.6

69

0.4

25

67

0.3

64

0.2

12

60

0.1

557

0.0

63

50

0.0

345

41.4

0.0

180

30.3

0.0

098

15.9

0.0

055

8.0

0.0

032

4.8

0.0

016

3.2

Sand

26%

Cla

y

3%

Silt

47%

fine

mediu

mcoars

e

Gra

vel 2

4%

Part

icle

siz

e

(mm

)

%

pass

ing

sedim

enta

tion

si

eve s

izes

(mm

)

coars

efi

ne

mediu

mCobble

s

0%

to (

m)

B1

1.0

0

Pro

ject:

Dale

Farm

, Pennybri

dge Indust

rial Est

ate

,

Ballym

ena

Explo

rato

ry

Hole

No.:

BH

04

Job N

o.:

14-7

42

Sam

ple

Type

No.

at

(m)

6.3

5

3.35

2

1.18

0.600

0.425

0.300

0.212

0.150

0.063

0

10

20

30

40

50

60

70

80

90

100 0.001

0.01

0.1

1

% passing

part

icle

siz

e (

mm

)

Cause

way G

eote

ch L

tdPart

icle

Siz

e D

istr

ibuti

on

BS1377:1

990 P

art

2 C

lause

9.2

and 9

.5

125

100

90

100

75

100

63

100

50

94

37.5

91

28

87

20

82

14

79

10

72

6.3

65

562

3.3

557

250

1.1

844

0.6

38

0.4

25

35

0.3

32

0.2

12

29

0.1

526

0.0

63

19

0.0

347

14.0

0.0

184

8.4

0.0

098

5.6

0.0

055

3.9

0.0

032

1.7

0.0

016

0.6

Sand

31%

Cla

y

1%

Silt

18%

fine

mediu

mcoars

e

Gra

vel 5

0%

Part

icle

siz

e

(mm

)

%

pass

ing

sedim

enta

tion

si

eve s

izes

(mm

)

coars

efi

ne

mediu

mCobble

s

0%

to (

m)

B2

2.4

0

Pro

ject:

Dale

Farm

, Pennybri

dge Indust

rial Est

ate

,

Ballym

ena

Explo

rato

ry

Hole

No.:

BH

03

Job N

o.:

14-7

42

Sam

ple

Type

No.

at

(m)

6.3

5

3.35

2

1.18

0.600

0.425

0.300

0.212

0.150

0.063

0

10

20

30

40

50

60

70

80

90

100 0.001

0.01

0.1

1

% passing

part

icle

siz

e (

mm

)

Cause

way G

eote

ch L

tdPart

icle

Siz

e D

istr

ibuti

on

BS1377:1

990 P

art

2 C

lause

9.2

and 9

.5

125

100

90

100

75

89

63

74

50

70

37.5

67

28

62

20

53

14

48

10

42

6.3

37

536

3.3

533

229

1.1

826

0.6

23

0.4

25

21

0.3

20

0.2

12

18

0.1

517

0.0

63

15

SE

D

Sand

15%

Fin

es

15%

fine

mediu

mcoars

e

Gra

vel 4

4%

Part

icle

siz

e

(mm

)

%

pass

ing

sedim

enta

tion

si

eve s

izes

(mm

)

coars

efi

ne

mediu

mCobble

s

26%

to (

m)

B1

1.0

0

Pro

ject:

Dale

Farm

, Pennybri

dge Indust

rial Est

ate

,

Ballym

ena

Explo

rato

ry

Hole

No.:

BH

03

Job N

o.:

14-7

42

Sam

ple

Type

No.

at

(m)

6.3

5

3.35

2

1.18

0.600

0.425

0.300

0.212

0.150

0.063

0

10

20

30

40

50

60

70

80

90

100 0.001

0.01

0.1

1

% passing

part

icle

siz

e (

mm

)

Cause

way G

eote

ch L

tdPart

icle

Siz

e D

istr

ibuti

on

BS1377:1

990 P

art

2 C

lause

9.2

and 9

.5

125

100

90

100

75

100

63

100

50

100

37.5

100

28

90

20

85

14

80

10

77

6.3

74

573

3.3

570

260

1.1

848

0.6

38

0.4

25

34

0.3

30

0.2

12

27

0.1

525

0.0

63

20

0.0

345

16.2

0.0

181

11.2

0.0

096

8.1

0.0

054

5.6

0.0

032

2.5

0.0

016

1.2

Sand

40%

Cla

y

3%

Silt

17%

fine

mediu

mcoars

e

Gra

vel 4

0%

Part

icle

siz

e

(mm

)

%

pass

ing

sedim

enta

tion

si

eve s

izes

(mm

)

coars

efi

ne

mediu

mCobble

s

0%

to (

m)

B1

1.0

0

Pro

ject:

Dale

Farm

, Pennybri

dge Indust

rial Est

ate

,

Ballym

ena

Explo

rato

ry

Hole

No.:

BH

02

Job N

o.:

14-7

42

Sam

ple

Type

No.

at

(m)

907563

50

37.5

28

20

14

10

6.3

5

3.35

2

1.18

0.600

0.425

0.300

0.212

0.150

0.0630

10

20

30

40

50

60

70

80

90

100 0.001

0.01

0.1

110

100

% passing

part

icle

siz

e (

mm

)

Sheet 1 of 1

Contract: Causeway Geotech Ltd

Job No.: 14-742

CHEMICAL TESTS

Tests 3, 4, 5 & 9 of BS 1377 : Part 3 : 1990

Passing Organic Mass pH

2mm Matter Loss on Soil/water Value

at to Sieve Content Ignition extract @

(m) (m) (%) * (%) # (%) $ (mg/l)

Dale Farm, Pennybridge Industrial Estate, Ballymena

EH

No.

Sulfate Content SO4

Groundwater

(mg/l)

Sample

Depth Sample

Type No.

BH01 D 1.45 108 7.5

BH02 B 1.00 78 7.0

BH03 B 1.00 72 7.5

BH04 B 1.00 95 7.5

* Walkley and Black's dichromate method–Clause 3

# Average of 3 specimens-Clause 4

$ Water soluble SO4 from 2:1 water-soil extract-Clause 5.5

@ Average of 2/3 specimens-Clause 9.5

Clause Nos. of BS1377:Part 3:1990

Unit 7-8 Hawarden Business Park

Manor Road (off Manor Lane)

Hawarden

Deeside

CH5 3US

Tel: (01244) 528700

Fax: (01244) 528701

email: [email protected]

Website: www.alcontrol.com

Causeway Geotech Ltd

8 Drumahiskey Road

Ballymoney

Co. Antrim

BT53 7QL

Attention: Stephen Franey

CERTIFICATE OF ANALYSIS

Location:

Your Reference:

Sample Delivery Group (SDG):

Customer:

Date: 03 October 2014

D_CAUSWY_BAL

140911-76

Dale Farm, Ballymena

We received 14 samples on Wednesday September 10, 2014 and 4 of these samples were scheduled for analysis which

was completed on Friday October 03, 2014. Accredited laboratory tests are defined within the report, but opinions,

interpretations and on-site data expressed herein are outside the scope of ISO 17025 accreditation.

Should this report require incorporation into client reports, it must be used in its entirety and not simply with the data

sections alone.

All chemical testing (unless subcontracted) is performed at ALcontrol Hawarden Laboratories.

Report No: 286477

Operations Manager

Sonia McWhan

Approved By:

Alcontrol Laboratories is a trading division of ALcontrol UK Limited

Registered Office: Units 7 & 8 Hawarden Business Park, Manor Road, Hawarden, Deeside, CH5 3US. Registered in England and Wales No.

Page 1 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

Received Sample OverviewSampled DateLab Sample No(s) Customer Sample Ref. AGS Ref. Depth (m)

9970929 BH01 0.50 08/09/2014

9970932 BH01 1.00 08/09/2014

9970933 BH02 0.50 08/09/2014

9970936 BH02 1.00 08/09/2014

9970937 BH03 0.50 08/09/2014

9970942 BH03 1.00 08/09/2014

9970946 BH03 1.50 08/09/2014

9970948 BH03 2.00 08/09/2014

9970949 BH03 2.50 08/09/2014

9970952 BH04 0.50 08/09/2014

9970953 BH04 1.00 08/09/2014

9970954 BH04 1.50 08/09/2014

9970955 BH04 2.00 08/09/2014

9970957 BH04 2.50 08/09/2014

Only received samples which have had analysis scheduled will be shown on the following pages.

13:23:21 03/10/2014

Page 2 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

SOLID

Results Legend

X Test

NNo Determination

Possible

Lab Sample No(s)

Customer

Sample Reference

Depth (m)

Container

AGS Reference

9970929

9970936

9970937

9970953

BH

01

BH

02

BH

03

BH

04

0.5

0

1.0

0

0.5

0

1.0

0

25

0g

Am

be

r Ja

r (AL

40

0g

Tu

b (A

LE

21

4)

60

g V

OC

(AL

E2

15

)2

50

g A

mb

er J

ar (A

L4

00

g T

ub

(AL

E2

14

)6

0g

VO

C (A

LE

21

5)

25

0g

Am

be

r Ja

r (AL

40

0g

Tu

b (A

LE

21

4)

60

g V

OC

(AL

E2

15

)2

50

g A

mb

er J

ar (A

L4

00

g T

ub

(AL

E2

14

)6

0g

VO

C (A

LE

21

5)

ANC at pH4 and ANC at pH 6 All NDPs: 0

Tests: 4

X

X

X

X

Anions by Kone (soil) All NDPs: 0

Tests: 4

X

X

X

X

Anions by Kone (w) All NDPs: 0

Tests: 4

X

X

X

X

CEN Readings All NDPs: 0

Tests: 4

X

X

X

X

Cyanide

Comp/Free/Total/Thiocyanate

All NDPs: 0

Tests: 4

X

X

X

X

Dissolved Metals by ICP-MS All NDPs: 0

Tests: 4

X

X

X

X

Dissolved Organic/Inorganic

Carbon

All NDPs: 0

Tests: 4

X

X

X

X

Easily Liberated Sulphide All NDPs: 0

Tests: 4

X

X

X

X

EPH CWG (Aliphatic) GC (S) All NDPs: 0

Tests: 4

X

X

X

X

EPH CWG (Aromatic) GC (S) All NDPs: 0

Tests: 4

X

X

X

X

Fluoride All NDPs: 0

Tests: 4

X

X

X

X

GRO by GC-FID (S) All NDPs: 0

Tests: 4

X

X

X

X

Loss on Ignition in soils All NDPs: 0

Tests: 4

X

X

X

X

Mercury Dissolved All NDPs: 0

Tests: 4

X

X

X

X

Metals in solid samples by OES All NDPs: 0

Tests: 4

X

X

X

X

13:23:21 03/10/2014

Page 3 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

SOLID

Results Legend

X Test

NNo Determination

Possible

Lab Sample No(s)

Customer

Sample Reference

Depth (m)

Container

AGS Reference

9970929

9970936

9970937

9970953

BH

01

BH

02

BH

03

BH

04

0.5

0

1.0

0

0.5

0

1.0

0

25

0g

Am

be

r Ja

r (AL

40

0g

Tu

b (A

LE

21

4)

60

g V

OC

(AL

E2

15

)2

50

g A

mb

er J

ar (A

L4

00

g T

ub

(AL

E2

14

)6

0g

VO

C (A

LE

21

5)

25

0g

Am

be

r Ja

r (AL

40

0g

Tu

b (A

LE

21

4)

60

g V

OC

(AL

E2

15

)2

50

g A

mb

er J

ar (A

L4

00

g T

ub

(AL

E2

14

)6

0g

VO

C (A

LE

21

5)

Mineral Oil All NDPs: 0

Tests: 4

X

X

X

X

Organic matter by BS1377* All NDPs: 0

Tests: 4

X

X

X

X

PAH by GCMS All NDPs: 0

Tests: 4

X

X

X

X

PAH Value of soil All NDPs: 0

Tests: 4

X

X

X

X

PCBs by GCMS All NDPs: 0

Tests: 4

X

X

X

X

pH All NDPs: 0

Tests: 4

X

X

X

X

Phenols by HPLC (S) All NDPs: 0

Tests: 4

X

X

X

X

Phenols by HPLC (W) All NDPs: 0

Tests: 4

X

X

X

X

Sample description All NDPs: 0

Tests: 4

X

X

X

X

Total Dissolved Solids All NDPs: 0

Tests: 4

X

X

X

X

Total Organic Carbon All NDPs: 0

Tests: 4

X

X

X

X

Total Sulphate All NDPs: 0

Tests: 4

X

X

X

X

TPH CWG GC (S) All NDPs: 0

Tests: 4

X

X

X

X

13:23:21 03/10/2014

Page 4 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

Sample Descriptions

very fine <0.063mm 0.063mm - 0.1mm 0.1mm - 2mm 2mm - 10mm >10mmfine medium coarse very coarse

Grain Sizes

Colour Description Grain size Inclusions Inclusions 2

9970929 BH01 0.50 Dark Brown Loamy Sand 0.1 - 2 mm Stones Vegetation

9970936 BH02 1.00 Dark Brown Loamy Sand 0.1 - 2 mm Stones Vegetation

9970937 BH03 0.50 Dark Brown Silt Loam 0.063 - 0.1 mm Stones Vegetation

9970953 BH04 1.00 Dark Brown Sandy Loam 0.1 - 2 mm Stones None

Customer Sample Ref. Depth (m)Lab Sample No(s)

These descriptions are only intended to act as a cross check if sample identities are questioned, and to provide a log of

sample matrices with respect to MCERTS validation. They are not intended as full geological descriptions.

We are accredited to MCERTS for sand, clay and loam/topsoil, or any of these materials - whether these are derived from

naturally ocurring soil profiles, or from fill/made ground, as long as these materials constitute the major part of the sample.

Other coarse granular materials such as concrete, gravel and brick are not accredited if they comprise the major part of the

sample.

13:23:21 03/10/2014

Page 5 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

ISO17025 accredited.

mCERTS accredited.

Aqueous / settled sample.

Dissolved / filtered sample.

Total / unfiltered sample.

Subcontracted test.

% recovery of the surrogate standard to

check the efficiency of the method. The

results of individual compounds within

samples aren't corrected for the recovery

Trigger breach confirmed

Sample deviation (see appendix)

#

M

aq

diss.filt

tot.unfilt

*

**

(F)

1-5&♦§@

Results Legend

AGS Reference

Lab Sample No.(s)

SDG Ref

Date Received

Date Sampled

Sample Type

Depth (m)

Customer Sample R

MethodLOD/UnitsComponent

Sample Time

BH01

0.50

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970929

BH02

1.00

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970936

BH03

0.50

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970937

BH04

1.00

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970953

Moisture Content Ratio (%

of as received sample)

% PM024 23

14

17

21

Organic matter (BS1377)* <0.1 % SUB 3.1

1

1.7

0.4

Loss on ignition <0.7 % TM018 13.7

M

9.99

M

8.98

M

8.46

M

Mineral oil >C10-C40 <1 mg/kg TM061 28.8

&

1.38

&

7.86

&

18.5

&

Phenols, Total Detected

monohydric

<0.035

mg/kg

TM062 (S) <0.035

& M

<0.035

& M

<0.035

& M

<0.035

& M

Organic Carbon, Total <0.2 % TM132 1.21

M

<0.2

M

0.506

M

<0.2

M

pH 1 pH

Units

TM133 5.98

M

6.44

M

7.81

M

7.19

M

Cyanide, Free <1 mg/kg TM153 <1

& M

<1

& M

<1

& M

<1

& M

Cyanide, Complex <1 mg/kg TM153 <1

<1

<1

<1

Thiocyanate <1 mg/kg TM153 <1

& M

<1

& M

<1

& M

<1

& M

PCB congener 28 <3 µg/kg TM168 <3

M

<3

M

<3

M

<3

M

PCB congener 52 <3 µg/kg TM168 <3

M

<3

M

<3

M

<3

M

PCB congener 101 <3 µg/kg TM168 <3

M

<3

M

<3

M

<3

M

PCB congener 118 <3 µg/kg TM168 <3

M

<3

M

<3

M

<3

M

PCB congener 138 <3 µg/kg TM168 <3

M

<3

M

<3

M

<3

M

PCB congener 153 <3 µg/kg TM168 <3

M

<3

M

<3

M

<3

M

PCB congener 180 <3 µg/kg TM168 <3

M

<3

M

<3

M

<3

M

Sum of detected PCB 7

Congeners

<21 µg/kg TM168 <21

<21

<21

<21

Sulphide, Easily liberated <15

mg/kg

TM180 <15

& #

<15

& #

<15

& #

<15

& #

Arsenic <0.6

mg/kg

TM181 <6

M

<6

M

<6

M

<6

M

Cadmium <0.02

mg/kg

TM181 1.06

M

0.999

M

0.94

M

0.951

M

Chromium <0.9

mg/kg

TM181 71.2

M

41.5

M

67.5

M

99.5

M

Copper <1.4

mg/kg

TM181 81.2

M

106

M

86.5

M

77.1

M

Lead <0.7

mg/kg

TM181 24.6

M

21.8

M

20.9

M

16.9

M

Mercury <0.14

mg/kg

TM181 <0.14

M

<0.14

M

<0.14

M

<0.14

M

Nickel <0.2

mg/kg

TM181 126

M

116

M

136

M

147

M

Selenium <1 mg/kg TM181 <10

#

<10

#

<10

#

<10

#

Zinc <1.9

mg/kg

TM181 78

M

73.8

M

72.8

M

73.7

M

ANC @ pH 4 <0.03

mol/kg

TM182 0.0874

0.0501

0.103

0.0629

ANC @ pH 6 <0.03

mol/kg

TM182 <0.03

<0.03

0.0348

<0.03

Polyaromatic

hydrocarbons, Total 17

<10

mg/kg

TM213 <10

<10

<10

<10

Sulphate, Total <48

mg/kg

TM221 387

M

239

M

157

M

<48

M

13:23:21 03/10/2014

Page 6 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

ISO17025 accredited.

mCERTS accredited.

Aqueous / settled sample.

Dissolved / filtered sample.

Total / unfiltered sample.

Subcontracted test.

% recovery of the surrogate standard to

check the efficiency of the method. The

results of individual compounds within

samples aren't corrected for the recovery

Trigger breach confirmed

Sample deviation (see appendix)

#

M

aq

diss.filt

tot.unfilt

*

**

(F)

1-5&♦§@

Results Legend

AGS Reference

Lab Sample No.(s)

SDG Ref

Date Received

Date Sampled

Sample Type

Depth (m)

Customer Sample R

MethodLOD/UnitsComponent

Sample Time

BH01

0.50

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970929

BH02

1.00

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970936

BH03

0.50

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970937

BH04

1.00

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970953

Water Soluble Sulphate

as SO4 2:1 Extract

<0.004 g/l TM243 0.0044

M

0.0282

M

0.0233

M

<0.004

M

13:23:21 03/10/2014

Page 7 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

PAH by GCMS

ISO17025 accredited.

mCERTS accredited.

Aqueous / settled sample.

Dissolved / filtered sample.

Total / unfiltered sample.

Subcontracted test.

% recovery of the surrogate standard to

check the efficiency of the method. The

results of individual compounds within

samples aren't corrected for the recovery

Trigger breach confirmed

Sample deviation (see appendix)

#

M

aq

diss.filt

tot.unfilt

*

**

(F)

1-5&♦§@

Results Legend

AGS Reference

Lab Sample No.(s)

SDG Ref

Date Received

Date Sampled

Sample Type

Depth (m)

Customer Sample R

MethodLOD/UnitsComponent

Sample Time

BH01

0.50

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970929

BH02

1.00

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970936

BH03

0.50

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970937

BH04

1.00

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970953

Naphthalene-d8 %

recovery**

% TM218 104

97

105

109

Acenaphthene-d10 %

recovery**

% TM218 105

97

106

111

Phenanthrene-d10 %

recovery**

% TM218 100

93.2

102

106

Chrysene-d12 %

recovery**

% TM218 96.1

88.9

98.6

106

Perylene-d12 %

recovery**

% TM218 101

91.7

104

114

Naphthalene <9 µg/kg TM218 <9

& M

<9

& M

<9

& M

<9

& M

Acenaphthylene <12 µg/kg TM218 <12

& M

<12

& M

<12

& M

<12

& M

Acenaphthene <8 µg/kg TM218 <8

& M

<8

& M

<8

& M

<8

& M

Fluorene <10 µg/kg TM218 <10

& M

<10

& M

<10

& M

<10

& M

Phenanthrene <15 µg/kg TM218 <15

& M

<15

& M

23

& M

<15

& M

Anthracene <16 µg/kg TM218 <16

& M

<16

& M

<16

& M

<16

& M

Fluoranthene <17 µg/kg TM218 <17

& M

<17

& M

86.6

& M

<17

& M

Pyrene <15 µg/kg TM218 <15

& M

<15

& M

75.8

& M

<15

& M

Benz(a)anthracene <14 µg/kg TM218 <14

& M

<14

& M

62

& M

<14

& M

Chrysene <10 µg/kg TM218 <10

& M

<10

& M

49.4

& M

<10

& M

Benzo(b)fluoranthene <15 µg/kg TM218 <15

& M

<15

& M

74.9

& M

<15

& M

Benzo(k)fluoranthene <14 µg/kg TM218 <14

& M

<14

& M

29.5

& M

<14

& M

Benzo(a)pyrene <15 µg/kg TM218 <15

& M

<15

& M

58.7

& M

<15

& M

Indeno(1,2,3-cd)pyrene <18 µg/kg TM218 <18

& M

<18

& M

35.4

& M

<18

& M

Dibenzo(a,h)anthracene <23 µg/kg TM218 <23

& M

<23

& M

<23

& M

<23

& M

Benzo(g,h,i)perylene <24 µg/kg TM218 <24

& M

<24

& M

45.7

& M

<24

& M

PAH, Total Detected

USEPA 16

<118

µg/kg

TM218 <118

<118

541

<118

13:23:21 03/10/2014

Page 8 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

TPH CWG (S)

ISO17025 accredited.

mCERTS accredited.

Aqueous / settled sample.

Dissolved / filtered sample.

Total / unfiltered sample.

Subcontracted test.

% recovery of the surrogate standard to

check the efficiency of the method. The

results of individual compounds within

samples aren't corrected for the recovery

Trigger breach confirmed

Sample deviation (see appendix)

#

M

aq

diss.filt

tot.unfilt

*

**

(F)

1-5&♦§@

Results Legend

AGS Reference

Lab Sample No.(s)

SDG Ref

Date Received

Date Sampled

Sample Type

Depth (m)

Customer Sample R

MethodLOD/UnitsComponent

Sample Time

BH01

0.50

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970929

BH02

1.00

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970936

BH03

0.50

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970937

BH04

1.00

Soil/Solid

08/09/2014

.

10/09/2014

140911-76

9970953

GRO Surrogate %

recovery**

% TM089 78

&

127

&

121

&

152

&

GRO TOT (Moisture

Corrected)

<44 µg/kg TM089 <44

& M

<44

& M

<44

& M

<44

& M

Methyl tertiary butyl ether

(MTBE)

<5 µg/kg TM089 <5

& M

<5

& M

<5

& M

<5

& M

Benzene <10 µg/kg TM089 <10

& M

<10

& M

<10

& M

<10

& M

Toluene <2 µg/kg TM089 <2

& M

<2

& M

<2

& M

<2

& M

Ethylbenzene <3 µg/kg TM089 <3

& M

<3

& M

<3

& M

<3

& M

m,p-Xylene <6 µg/kg TM089 <6

& M

<6

& M

<6

& M

<6

& M

o-Xylene <3 µg/kg TM089 <3

& M

<3

& M

<3

& M

<3

& M

sum of detected mpo

xylene by GC

<9 µg/kg TM089 <9

&

<9

&

<9

&

<9

&

sum of detected BTEX by

GC

<24 µg/kg TM089 <24

&

<24

&

<24

&

<24

&

Aliphatics >C5-C6 <10 µg/kg TM089 <10

&

<10

&

<10

&

<10

&

Aliphatics >C6-C8 <10 µg/kg TM089 <10

&

<10

&

<10

&

<10

&

Aliphatics >C8-C10 <10 µg/kg TM089 <10

&

<10

&

<10

&

<10

&

Aliphatics >C10-C12 <10 µg/kg TM089 <10

&

<10

&

<10

&

<10

&

Aliphatics >C12-C16 <100

µg/kg

TM173 <100

<100

<100

<100

Aliphatics >C16-C21 <100

µg/kg

TM173 <100

<100

<100

<100

Aliphatics >C21-C35 <100

µg/kg

TM173 10500

<100

2920

<100

Aliphatics >C35-C44 <100

µg/kg

TM173 <100

<100

<100

<100

Total Aliphatics >C12-C44 <100

µg/kg

TM173 10500

<100

2920

<100

Aromatics >EC5-EC7 <10 µg/kg TM089 <10

&

<10

&

<10

&

<10

&

Aromatics >EC7-EC8 <10 µg/kg TM089 <10

&

<10

&

<10

&

<10

&

Aromatics >EC8-EC10 <10 µg/kg TM089 <10

&

<10

&

<10

&

<10

&

Aromatics >EC10-EC12 <10 µg/kg TM089 <10

&

<10

&

<10

&

<10

&

Aromatics >EC12-EC16 <100

µg/kg

TM173 <100

<100

<100

<100

Aromatics >EC16-EC21 <100

µg/kg

TM173 <100

<100

<100

<100

Aromatics >EC21-EC35 <100

µg/kg

TM173 4840

<100

4600

1890

Aromatics >EC35-EC44 <100

µg/kg

TM173 5290

<100

<100

<100

Aromatics >EC40-EC44 <100

µg/kg

TM173 2980

<100

<100

<100

Total Aromatics

>EC12-EC44

<100

µg/kg

TM173 10100

<100

4600

1890

Total Aliphatics &

Aromatics >C5-C44

<100

µg/kg

TM173 20700

<100

7530

1890

Aromatics >EC16-EC35 <100

µg/kg

TM173 4840

<100

4600

1890

13:23:21 03/10/2014

Page 9 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

-

-

-

-

-

-

-

-

-

CEN 10:1 SINGLE STAGE LEACHATE TEST

WAC ANALYTICAL RESULTS REF : BS EN 12457/2

Client Reference

Mass Sample taken (kg)

Mass of dry sample (kg)

Particle Size <4mm

0.175

>95%

Site Location

Natural Moisture Content (%)

Dry Matter Content (%)

52.4

65.6

Case

Depth (m)

Customer Sample Ref.

Sampled Date

Lab Sample Number(s)

SDG 140911-76

9970929

08-Sep-2014

BH01

0.50

Solid Waste Analysis

ANC to pH 4 (mol/kg)

ANC to pH 6 (mol/kg)

pH (pH Units)

PAH Sum of 17 (mg/kg)

Mineral Oil (mg/kg)

Sum of 7 PCBs (mg/kg)

Sum of BTEX (mg/kg)

Loss on Ignition (%)

Total Organic Carbon (%)

Eluate Analysis

Leach Test Information

Date Prepared

pH (pH Units)

Conductivity (µS/cm)

Temperature (ºC)

Volume Leachant (Litres)

Solid Results are expressed on a dry weight basis, after correction for moisture content where applicable

Stated limits are for guidance only and ALcontrol cannot be held responsible for any discrepancies with current legislation

Mcerts Certification does not apply to leachates

03/10/2014 13:23:30

24-Sep-2014

6.91

0.853

20.90

22.10

0.0874

<0.03

5.98

<10

28.8

<0.021

<0.024

13.7

1.21 -

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Dale Farm, Ballymena

0.137

Result ResultLimit of Detection Limit of Detection

C2 Concⁿ in 10:1 eluate (mg/l) A2 10:1 concⁿ leached (mg/kg)

Result

Limit values for compliance leaching test

using BS EN 12457-3 at L/S 10 l/kg

Hazardous

Waste Landfill

Stable

Non-reactive

Hazardous

Waste in Non-

Hazardous

Landfill

Inert Waste

Landfill

<6 or >9

100

500

1

6

10

653

Landfill Waste Acceptance

Criteria Limits

-----Arsenic <0.00012 <0.0012 0.5<0.00012 <0.0012 2 25

-----Barium 0.00153 0.0153 20<0.00003 <0.0003 100 300

-----Cadmium <0.0001 <0.001 0.04<0.0001 <0.001 1 5

-----Chromium 0.000487 0.00487 0.5<0.00022 <0.0022 10 70

-----Copper 0.0017 0.017 2<0.00085 <0.0085 50 100

-----Mercury Dissolved (CVAF) <0.00001 <0.0001 0.01<0.00001 <0.0001 0.2 2

-----Molybdenum <0.00024 <0.0024 0.5<0.00024 <0.0024 10 30

-----Nickel 0.000548 0.00548 0.4<0.00015 <0.0015 10 40

-----Lead 0.0076 0.076 0.5<0.00002 <0.0002 10 50

-----Antimony <0.00016 <0.0016 0.06<0.00016 <0.0016 0.7 5

-----Selenium <0.00039 <0.0039 0.1<0.00039 <0.0039 0.5 7

-----Zinc 0.00322 0.0322 4<0.00041 <0.0041 50 200

-----Chloride <2 <20 800<2 <20 15000 25000

-----Fluoride <0.5 <5 10<0.5 <5 150 500

-----Sulphate (soluble) <2 <20 1000<2 <20 20000 50000

-----Total Dissolved Solids 27.8 278 4000<5 <50 60000 100000

-----Total Monohydric Phenols (W) <0.016 <0.16 1<0.016 <0.16 - -

-----Dissolved Organic Carbon <3 <30 500<3 <30 800 1000

13:23:21 03/10/2014

Page 10 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

-

-

-

-

-

-

-

-

-

CEN 10:1 SINGLE STAGE LEACHATE TEST

WAC ANALYTICAL RESULTS REF : BS EN 12457/2

Client Reference

Mass Sample taken (kg)

Mass of dry sample (kg)

Particle Size <4mm

0.175

>95%

Site Location

Natural Moisture Content (%)

Dry Matter Content (%)

24.3

80.5

Case

Depth (m)

Customer Sample Ref.

Sampled Date

Lab Sample Number(s)

SDG 140911-76

9970936

08-Sep-2014

BH02

1.00

Solid Waste Analysis

ANC to pH 4 (mol/kg)

ANC to pH 6 (mol/kg)

pH (pH Units)

PAH Sum of 17 (mg/kg)

Mineral Oil (mg/kg)

Sum of 7 PCBs (mg/kg)

Sum of BTEX (mg/kg)

Loss on Ignition (%)

Total Organic Carbon (%)

Eluate Analysis

Leach Test Information

Date Prepared

pH (pH Units)

Conductivity (µS/cm)

Temperature (ºC)

Volume Leachant (Litres)

Solid Results are expressed on a dry weight basis, after correction for moisture content where applicable

Stated limits are for guidance only and ALcontrol cannot be held responsible for any discrepancies with current legislation

Mcerts Certification does not apply to leachates

03/10/2014 13:23:30

23-Sep-2014

7.04

0.878

21.00

12.00

0.0501

<0.03

6.44

<10

1.38

<0.021

<0.024

9.99

<0.2 -

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Dale Farm, Ballymena

0.112

Result ResultLimit of Detection Limit of Detection

C2 Concⁿ in 10:1 eluate (mg/l) A2 10:1 concⁿ leached (mg/kg)

Result

Limit values for compliance leaching test

using BS EN 12457-3 at L/S 10 l/kg

Hazardous

Waste Landfill

Stable

Non-reactive

Hazardous

Waste in Non-

Hazardous

Landfill

Inert Waste

Landfill

<6 or >9

100

500

1

6

10

653

Landfill Waste Acceptance

Criteria Limits

-----Arsenic <0.00012 <0.0012 0.5<0.00012 <0.0012 2 25

-----Barium 0.000041 0.00041 20<0.00003 <0.0003 100 300

-----Cadmium <0.0001 <0.001 0.04<0.0001 <0.001 1 5

-----Chromium <0.00022 <0.0022 0.5<0.00022 <0.0022 10 70

-----Copper <0.00085 <0.0085 2<0.00085 <0.0085 50 100

-----Mercury Dissolved (CVAF) <0.00001 <0.0001 0.01<0.00001 <0.0001 0.2 2

-----Molybdenum <0.00024 <0.0024 0.5<0.00024 <0.0024 10 30

-----Nickel 0.000344 0.00344 0.4<0.00015 <0.0015 10 40

-----Lead <0.00002 <0.0002 0.5<0.00002 <0.0002 10 50

-----Antimony <0.00016 <0.0016 0.06<0.00016 <0.0016 0.7 5

-----Selenium <0.00039 <0.0039 0.1<0.00039 <0.0039 0.5 7

-----Zinc <0.00041 <0.0041 4<0.00041 <0.0041 50 200

-----Chloride <2 <20 800<2 <20 15000 25000

-----Fluoride <0.5 <5 10<0.5 <5 150 500

-----Sulphate (soluble) <2 <20 1000<2 <20 20000 50000

-----Total Dissolved Solids 15.6 156 4000<5 <50 60000 100000

-----Total Monohydric Phenols (W) <0.016 <0.16 1<0.016 <0.16 - -

-----Dissolved Organic Carbon <3 <30 500<3 <30 800 1000

13:23:21 03/10/2014

Page 11 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

-

-

-

-

-

-

-

-

-

CEN 10:1 SINGLE STAGE LEACHATE TEST

WAC ANALYTICAL RESULTS REF : BS EN 12457/2

Client Reference

Mass Sample taken (kg)

Mass of dry sample (kg)

Particle Size <4mm

0.175

>95%

Site Location

Natural Moisture Content (%)

Dry Matter Content (%)

27.4

78.5

Case

Depth (m)

Customer Sample Ref.

Sampled Date

Lab Sample Number(s)

SDG 140911-76

9970937

08-Sep-2014

BH03

0.50

Solid Waste Analysis

ANC to pH 4 (mol/kg)

ANC to pH 6 (mol/kg)

pH (pH Units)

PAH Sum of 17 (mg/kg)

Mineral Oil (mg/kg)

Sum of 7 PCBs (mg/kg)

Sum of BTEX (mg/kg)

Loss on Ignition (%)

Total Organic Carbon (%)

Eluate Analysis

Leach Test Information

Date Prepared

pH (pH Units)

Conductivity (µS/cm)

Temperature (ºC)

Volume Leachant (Litres)

Solid Results are expressed on a dry weight basis, after correction for moisture content where applicable

Stated limits are for guidance only and ALcontrol cannot be held responsible for any discrepancies with current legislation

Mcerts Certification does not apply to leachates

03/10/2014 13:23:30

23-Sep-2014

7.23

0.875

21.00

51.80

0.103

0.0348

7.81

<10

7.86

<0.021

<0.024

8.98

0.506 -

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Dale Farm, Ballymena

0.114

Result ResultLimit of Detection Limit of Detection

C2 Concⁿ in 10:1 eluate (mg/l) A2 10:1 concⁿ leached (mg/kg)

Result

Limit values for compliance leaching test

using BS EN 12457-3 at L/S 10 l/kg

Hazardous

Waste Landfill

Stable

Non-reactive

Hazardous

Waste in Non-

Hazardous

Landfill

Inert Waste

Landfill

<6 or >9

100

500

1

6

10

653

Landfill Waste Acceptance

Criteria Limits

-----Arsenic <0.00012 <0.0012 0.5<0.00012 <0.0012 2 25

-----Barium 0.000993 0.00993 20<0.00003 <0.0003 100 300

-----Cadmium <0.0001 <0.001 0.04<0.0001 <0.001 1 5

-----Chromium 0.00121 0.0121 0.5<0.00022 <0.0022 10 70

-----Copper 0.0062 0.062 2<0.00085 <0.0085 50 100

-----Mercury Dissolved (CVAF) <0.00001 <0.0001 0.01<0.00001 <0.0001 0.2 2

-----Molybdenum 0.000277 0.00277 0.5<0.00024 <0.0024 10 30

-----Nickel 0.00235 0.0235 0.4<0.00015 <0.0015 10 40

-----Lead <0.00002 <0.0002 0.5<0.00002 <0.0002 10 50

-----Antimony <0.00016 <0.0016 0.06<0.00016 <0.0016 0.7 5

-----Selenium <0.00039 <0.0039 0.1<0.00039 <0.0039 0.5 7

-----Zinc <0.00041 <0.0041 4<0.00041 <0.0041 50 200

-----Chloride <2 <20 800<2 <20 15000 25000

-----Fluoride <0.5 <5 10<0.5 <5 150 500

-----Sulphate (soluble) <2 <20 1000<2 <20 20000 50000

-----Total Dissolved Solids 45 450 4000<5 <50 60000 100000

-----Total Monohydric Phenols (W) <0.016 <0.16 1<0.016 <0.16 - -

-----Dissolved Organic Carbon 4.43 44.3 500<3 <30 800 1000

13:23:21 03/10/2014

Page 12 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

-

-

-

-

-

-

-

-

-

CEN 10:1 SINGLE STAGE LEACHATE TEST

WAC ANALYTICAL RESULTS REF : BS EN 12457/2

Client Reference

Mass Sample taken (kg)

Mass of dry sample (kg)

Particle Size <4mm

0.175

>95%

Site Location

Natural Moisture Content (%)

Dry Matter Content (%)

33.8

74.7

Case

Depth (m)

Customer Sample Ref.

Sampled Date

Lab Sample Number(s)

SDG 140911-76

9970953

08-Sep-2014

BH04

1.00

Solid Waste Analysis

ANC to pH 4 (mol/kg)

ANC to pH 6 (mol/kg)

pH (pH Units)

PAH Sum of 17 (mg/kg)

Mineral Oil (mg/kg)

Sum of 7 PCBs (mg/kg)

Sum of BTEX (mg/kg)

Loss on Ignition (%)

Total Organic Carbon (%)

Eluate Analysis

Leach Test Information

Date Prepared

pH (pH Units)

Conductivity (µS/cm)

Temperature (ºC)

Volume Leachant (Litres)

Solid Results are expressed on a dry weight basis, after correction for moisture content where applicable

Stated limits are for guidance only and ALcontrol cannot be held responsible for any discrepancies with current legislation

Mcerts Certification does not apply to leachates

03/10/2014 13:23:30

23-Sep-2014

7.11

0.870

21.00

8.93

0.0629

<0.03

7.19

<10

18.5

<0.021

<0.024

8.46

<0.2 -

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Dale Farm, Ballymena

0.120

Result ResultLimit of Detection Limit of Detection

C2 Concⁿ in 10:1 eluate (mg/l) A2 10:1 concⁿ leached (mg/kg)

Result

Limit values for compliance leaching test

using BS EN 12457-3 at L/S 10 l/kg

Hazardous

Waste Landfill

Stable

Non-reactive

Hazardous

Waste in Non-

Hazardous

Landfill

Inert Waste

Landfill

<6 or >9

100

500

1

6

10

653

Landfill Waste Acceptance

Criteria Limits

-----Arsenic <0.00012 <0.0012 0.5<0.00012 <0.0012 2 25

-----Barium 0.000327 0.00327 20<0.00003 <0.0003 100 300

-----Cadmium <0.0001 <0.001 0.04<0.0001 <0.001 1 5

-----Chromium 0.00129 0.0129 0.5<0.00022 <0.0022 10 70

-----Copper <0.00085 <0.0085 2<0.00085 <0.0085 50 100

-----Mercury Dissolved (CVAF) <0.00001 <0.0001 0.01<0.00001 <0.0001 0.2 2

-----Molybdenum <0.00024 <0.0024 0.5<0.00024 <0.0024 10 30

-----Nickel 0.00123 0.0123 0.4<0.00015 <0.0015 10 40

-----Lead <0.00002 <0.0002 0.5<0.00002 <0.0002 10 50

-----Antimony 0.000311 0.00311 0.06<0.00016 <0.0016 0.7 5

-----Selenium <0.00039 <0.0039 0.1<0.00039 <0.0039 0.5 7

-----Zinc <0.00041 <0.0041 4<0.00041 <0.0041 50 200

-----Chloride <2 <20 800<2 <20 15000 25000

-----Fluoride <0.5 <5 10<0.5 <5 150 500

-----Sulphate (soluble) <2 <20 1000<2 <20 20000 50000

-----Total Dissolved Solids 12.6 126 4000<5 <50 60000 100000

-----Total Monohydric Phenols (W) <0.016 <0.16 1<0.016 <0.16 - -

-----Dissolved Organic Carbon <3 <30 500<3 <30 800 1000

13:23:21 03/10/2014

Page 13 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

Table of Results - AppendixMethod No Reference Description

Wet/Dry

Sample ¹

Surrogate

Corrected

PM001 Preparation of Samples for Metals Analysis

PM024 Modified BS 1377 Soil preparation including homogenisation, moisture screens of

soils for Asbestos Containing Material

PM115 Leaching Procedure for CEN One Stage Leach Test 2:1 & 10:1

1 Step

SUB Subcontracted Test

TM018 BS 1377: Part 3 1990 Determination of Loss on Ignition

TM061 Method for the Determination of

EPH,Massachusetts Dept.of EP, 1998

Determination of Extractable Petroleum Hydrocarbons by

GC-FID (C10-C40)

TM062 (S) National Grid Property Holdings Methods for the

Collection & Analysis of Samples from National

Grid Sites version 1 Sec 3.9

Determination of Phenols in Soils by HPLC

TM089 Modified: US EPA Methods 8020 & 602 Determination of Gasoline Range Hydrocarbons (GRO) and

BTEX (MTBE) compounds by Headspace GC-FID (C4-C12)

TM090 Method 5310, AWWA/APHA, 20th Ed., 1999 /

Modified: US EPA Method 415.1 & 9060

Determination of Total Organic Carbon/Total Inorganic Carbon

in Water and Waste Water

TM104 Method 4500F, AWWA/APHA, 20th Ed., 1999 Determination of Fluoride using the Kone Analyser

TM123 BS 2690: Part 121:1981 The Determination of Total Dissolved Solids in Water

TM132 In - house Method ELTRA CS800 Operators Guide

TM133 BS 1377: Part 3 1990;BS 6068-2.5 Determination of pH in Soil and Water using the GLpH pH

Meter

TM152 Method 3125B, AWWA/APHA, 20th Ed., 1999 Analysis of Aqueous Samples by ICP-MS

TM153 Method 4500A,B,C, I, M AWWA/APHA, 20th

Ed., 1999

Determination of Total Cyanide, Free (Easily Liberatable)

Cyanide and Thiocyanate using the Skalar SANS+ System

Segmented Flow Analyser

TM168 EPA Method 8082, Polychlorinated Biphenyls by

Gas Chromatography

Determination of WHO12 and EC7 Polychlorinated Biphenyl

Congeners by GC-MS in Soils

TM173 Analysis of Petroleum Hydrocarbons in

Environmental Media – Total Petroleum

Hydrocarbon Criteria

Determination of Speciated Extractable Petroleum

Hydrocarbons in Soils by GC-FID

TM180 Sulphide in waters and waste waters 1991 ISBN

01 175 7186 SCA rec. 2007 (unpublished)'

The Determination Of Easily Liberated Sulphide In Soil

Samples by Ion Selective Electrode Technique

TM181 US EPA Method 6010B Determination of Routine Metals in Soil by iCap 6500 Duo

ICP-OES

TM182 CEN/TC 292 - WI 292046-chacterization of

waste-leaching Behaviour Tests- Acid and Base

Neutralization Capacity Test

Determination of Acid Neutralisation Capacity (ANC) Using

Autotitration in Soils

TM183 BS EN 23506:2002, (BS 6068-2.74:2002) ISBN

0 580 38924 3

Determination of Trace Level Mercury in Waters and Leachates

by PSA Cold Vapour Atomic Fluorescence Spectrometry

TM184 EPA Methods 325.1 & 325.2, The Determination of Anions in Aqueous Matrices using the

Kone Spectrophotometric Analysers

TM213 In-house Method Rapid Determination of PAHs by GC-FID

TM218 Microwave extraction – EPA method 3546 Microwave extraction - EPA method 3546

TM221 Inductively Coupled Plasma - Atomic Emission

Spectroscopy. An Atlas of Spectral Information:

Winge, Fassel, Peterson and Floyd

Determination of Acid extractable Sulphate in Soils by IRIS

Emission Spectrometer

TM243 Mixed Anions In Soils By Kone

TM259 by HPLC Determination of Phenols in Waters and Leachates by HPLC

¹ Applies to Solid samples only. DRY indicates samples have been dried at 35°C. NA = not applicable.

13:23:21 03/10/2014

Page 14 of 20

CERTIFICATE OF ANALYSISSDG:

Job:

Client Reference:

140911-76 Location:

Customer:

Attention:

Order Number:

Report Number:D_CAUSWY_BAL-22 Causeway Geotech LtdDale Farm, Ballymena

Stephen Franey

286477

Superseded Report:

Validated

Test Completion DatesLab Sample No(s)

Customer Sample Ref.

Depth

Type

AGS Ref.

9970929 9970936 9970937 9970953

BH01 BH02 BH03 BH04

0.50 1.00 0.50 1.00

SOLID SOLID SOLID SOLID

ANC at pH4 and ANC at pH 6 24-Sep-2014 24-Sep-2014 24-Sep-2014 24-Sep-2014

Anions by Kone (soil) 26-Sep-2014 25-Sep-2014 26-Sep-2014 25-Sep-2014

Anions by Kone (w) 26-Sep-2014 26-Sep-2014 26-Sep-2014 26-Sep-2014

CEN 10:1 Leachate (1 Stage) 24-Sep-2014 23-Sep-2014 23-Sep-2014 23-Sep-2014

CEN Readings 27-Sep-2014 27-Sep-2014 27-Sep-2014 27-Sep-2014

Cyanide Comp/Free/Total/Thiocyanate 25-Sep-2014 25-Sep-2014 25-Sep-2014 25-Sep-2014

Dissolved Metals by ICP-MS 30-Sep-2014 29-Sep-2014 29-Sep-2014 29-Sep-2014

Dissolved Organic/Inorganic Carbon 29-Sep-2014 29-Sep-2014 29-Sep-2014 29-Sep-2014

Easily Liberated Sulphide 24-Sep-2014 26-Sep-2014 26-Sep-2014 26-Sep-2014

EPH CWG (Aliphatic) GC (S) 30-Sep-2014 30-Sep-2014 30-Sep-2014 30-Sep-2014

EPH CWG (Aromatic) GC (S) 30-Sep-2014 30-Sep-2014 30-Sep-2014 30-Sep-2014

Fluoride 26-Sep-2014 26-Sep-2014 26-Sep-2014 26-Sep-2014

GRO by GC-FID (S) 28-Sep-2014 30-Sep-2014 28-Sep-2014 29-Sep-2014

Loss on Ignition in soils 25-Sep-2014 26-Sep-2014 26-Sep-2014 26-Sep-2014

Mercury Dissolved 30-Sep-2014 30-Sep-2014 30-Sep-2014 30-Sep-2014

Metals in solid samples by OES 26-Sep-2014 26-Sep-2014 26-Sep-2014 26-Sep-2014

Mineral Oil 29-Sep-2014 29-Sep-2014 29-Sep-2014 29-Sep-2014

Organic matter by BS1377* 03-Oct-2014 03-Oct-2014 03-Oct-2014 03-Oct-2014

PAH by GCMS 28-Sep-2014 28-Sep-2014 28-Sep-2014 28-Sep-2014

PAH Value of soil 26-Sep-2014 26-Sep-2014 26-Sep-2014 26-Sep-2014

PCBs by GCMS 26-Sep-2014 26-Sep-2014 26-Sep-2014 26-Sep-2014

pH 27-Sep-2014 27-Sep-2014 27-Sep-2014 27-Sep-2014

Phenols by HPLC (S) 24-Sep-2014 24-Sep-2014 24-Sep-2014 24-Sep-2014

Phenols by HPLC (W) 29-Sep-2014 29-Sep-2014 29-Sep-2014 29-Sep-2014

Sample description 22-Sep-2014 22-Sep-2014 22-Sep-2014 22-Sep-2014

Total Dissolved Solids 26-Sep-2014 26-Sep-2014 26-Sep-2014 26-Sep-2014

Total Organic Carbon 24-Sep-2014 24-Sep-2014 24-Sep-2014 24-Sep-2014

Total Sulphate 25-Sep-2014 25-Sep-2014 25-Sep-2014 25-Sep-2014

TPH CWG GC (S) 30-Sep-2014 30-Sep-2014 30-Sep-2014 30-Sep-2014

13:23:21 03/10/2014

Page 15 of 20

Tel: Fax:

BH01 Soil/Solid 0.5 08/09/2014 07/10/2014 NS Z 1

BH02 Soil/Solid 1 08/09/2014 07/10/2014 NS Z 1

BH03 Soil/Solid 0.5 08/09/2014 07/10/2014 NS Z 1

BH04 Soil/Solid 1 08/09/2014 07/10/2014 NS Z 1

Ref

eren

ce

10057657

Sam

ple

Type

Org

anic

mat

ter (

BS1

377)

*

Consignment No.: 4474778

Turnaround: STANDARD

P.O No.:

01207 582444 email: [email protected]

GEOTRACE - ANALYSIS REQUEST FORM AND SAMPLE CUSTODY SHEET Derwentside Environmental Testing Services Project Ref: 140911-76

Derwentside Environmental Testing Services, Park Road Industrial Estate, Consett, County Durham, DH8 5PY.

CofC No.: 11624

AG

S R

ef.

Scheduled Analysis

Units 7 - 8 Hawarden Business Park,Requisition No.: 268664 Manor Road (Off Manor Lane),

Hawarden, Deeside, CH5 3US01207 582333

Tel : 01244 528 700 Fax : 01244 528 701

Sam

ple

No.

Dep

th

Sam

pled

Dat

e

Haz

ard

(Bla

nk if

Non

e Kn

own)

Due

dat

e

10057755

AG

S Ty

pe

10057696

10057741

[email protected]

Impo

rted

(Y -

orig

inat

ed o

utsi

de U

K)

Job No.Please Report Sample No. and Reference on Report Date Received: Time: Signature:

Results for the attention of - Hawarden Subcontracting Please Copy Confirmation of receipt of sample to :

[email protected]

Sam

ple

Not

es

Print Workbook

Page 16 of 20

Page 17 of 20

Appendix D SPT Hammer Test Certificate

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 29

Appendix D: Dale Farm Quality Assurance

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 30

Appendix E: Laboratory Accreditation

Assessment Manager: LH2 Page 1 of 4

Schedule of Accreditation issued by

United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

4209

Accredited to

ISO/IEC 17025:2005

McQuillan Envirocare Ltd

Issue No: 019 Issue date: 04 September 2017

Caulside Drive

Newpark Industrial Estate

Antrim

Northern Ireland

BT41 2DU

Contact: Mr N McCauley Tel: +44 (0)28 9446 6708 Fax: +44 (0)28 9442 9580 E-Mail: [email protected] Website: www.mcquillanenvirocare.com

Testing performed at the above address only

DETAIL OF ACCREDITATION

Materials/Products tested

Type of test/Properties

measured/Range of measurement

Standard specifications/

Equipment/Techniques used SOILS Chemical Tests Hydrocarbons >C10-C40

Documented In-house method SAM 014 using GC-FID

Loss on Ignition Documented In-house method

SAM 002 using gravimetry SOILS, GRANULAR WASTE AND SLUDGES

Dry Matter Content Documented In-house method SAM 003 using gravimetry

GROUNDWATERS, SURFACE WATER, WASTE WATERS, TRADE EFFLUENTS, PREPARED AND LANDFILL LEACHATES

Chemical Tests Chemical Oxygen Demand Documented In-house method

SAM 009 using colorimetry Chemical Oxygen Demand (Settled) Documented In-house method

SAM 009 using colorimetry Ammonia

Total Oxidised Nitrogen Nitrite Phosphate Alkalinity Chloride Sulphate Nitrate (Calculation)

Documented in house method SAM 031 using discrete analyser

Conductivity @25C Documented In-house method

SAM 005 using conductivity meter pH Documented In-house method

SAM 004 using pH meter Biochemical Oxygen Demand Documented in house method

SAM016 using a DO meter

4209

Accredited to

ISO/IEC 17025:2005

Schedule of Accreditation issued by

United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

McQuillan Envirocare Ltd

Issue No: 019 Issue date: 04 September 2017

Testing performed at main address only

Assessment Manager: LH2 Page 2 of 4

Materials/Products tested

Type of test/Properties

measured/Range of measurement

Standard specifications/

Equipment/Techniques used Chemical Tests (cont’d) GROUNDWATERS, SURFACE WATER, WASTE WATERS, TRADE EFFLUENTS, PREPARED AND LANDFILL LEACHATES (cont’d)

Suspended solids Documented in house method SAM001 by gravimetry

GROUNDWATERS, SURFACE WATER, TRADE EFFLUENTS, PREPARED AND LANDFILL LEACHATES

Fluoride Documented in house method SAM 007 by ion selective electrode

Total Dissolved Solids Documented in house method

SAM 028 by Gravimetry Phenol Index Documented in house method

SAM 029 by sealed tube colorimetry

Total Organic Carbon Documented in house method

SAM 034 using Vario TOC cube analyser

Dissolved Organic Carbon Documented in house method

SAM 034 using Vario TOC cube analyser

Total TPH (>C10 - <C40) Documented In-house method

SAM 022 using GC-FID

4209

Accredited to

ISO/IEC 17025:2005

Schedule of Accreditation issued by

United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

McQuillan Envirocare Ltd

Issue No: 019 Issue date: 04 September 2017

Testing performed at main address only

Assessment Manager: LH2 Page 3 of 4

Materials/Products tested

Type of test/Properties

measured/Range of measurement

Standard specifications/

Equipment/Techniques used Chemical Tests (cont’d) GROUNDWATER, SURFACE WATER, TRADE EFFLUENTS PREPARED AND LANDFILL LEACHATES (cont’d)

Dissolved Metals: Calcium Magnesium Potassium

Documented In-house method SAM 038 by ICPMS

Sodium Silver Aluminium Arsenic Barium Beryllium Cadmium Chromium Cobalt Copper Iron Lead Lithium Manganese Molybdenum Nickel Antimony Selenium Tin Strontium Vanadium Zinc

Total Metals:

Calcium Magnesium Potassium Sodium

4209

Accredited to

ISO/IEC 17025:2005

Schedule of Accreditation issued by

United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

McQuillan Envirocare Ltd

Issue No: 019 Issue date: 04 September 2017

Testing performed at main address only

Assessment Manager: LH2 Page 4 of 4

Materials/Products tested

Type of test/Properties

measured/Range of measurement

Standard specifications/

Equipment/Techniques used Chemical Tests (cont’d) GROUNDWATER, SURFACE WATER, TRADE EFFLUENTS AND LANDFILL LEACHATES

Total Metals: Silver Aluminium Arsenic Barium Beryllium

Documented In-house method SAM 038 by ICPMS

Cadmium Chromium Cobalt Copper Iron Lead Lithium Manganese Molybdenum Nickel Antimony Selenium Tin Strontium Vanadium Zinc

END

Dale Farm – Pennybridge Factory, Site Protection and Monitoring Plan

www.wyg.com creative minds safe hands 31

Appendix F: Data Recording Sheets

Prepared By G McAuley Authorised By B Spence

Bund Check Sheet Doc Ref SPMP 1 Rev.4 Issue Date 04/01/2016

Month Bund Date Is the

bund

sound

Is the bund

overfull or

showing

signs of

previous

overfilling

Is there any

damage/cracks

to the floor

within the bund

Are all the

pipes from

the tank

sound and

without

leaks

Are all

pipes

to/from

the IBC

sound and

without

leaks

Are there drips and

spills near the

loading/unloading

area

Record

Temp

Evidence

of VoG

Are the

IBC sound

and without

leaks

Signed

MIP IBC

Bund

Bulk Caustic

Bund

Peracetic

acid IBC

Chemical

bunds in

compound

Diesel tank

Wagon

Wash Chem

Vehicle Oil

Storage

DAF Bund

DAF IBC

bunds

Note:

Consider the condition of the internal lining of the bunds

Pipes will include all feed and discharge line to and from permanent bunds and IBCs investigate for signs of corrosion / damage

Complete visual inspection of any rainwater to identify any contamination of oil, use phenolphthalein for chemicals

Where any damage is noted report as an action to the engineering manager

Use photographs to identify damage