Daily Report (Dec 2011)

Embed Size (px)

Citation preview

  • 8/2/2019 Daily Report (Dec 2011)

    1/26

    Production Supervisor Daily Report

    Date :

    Department :

    Attendant : Group A & C

    AL : MC: ABS :

    Profile rolling:

    From To From To

    1 8:00 AM 8:30 AM 0:30 8:00 AM 8:30 AM 0:30 0:00 Briefing

    2 8:30 AM 9:30 AM 1:00 8:30 AM 11:40 AM 3:10 2:10Change saw blade flying saw, Repair trimming scrap reeler holder(

    Wear and tear),

    3 11:40 AM 12:10 PM 0:30 11:40 AM 12:30 PM 0:50 0:20 Dismantle trimming scrap reeler (OPR side)

    4 12:30 PM 1:30 PM 1:00 12:30 PM 1:10 PM 0:40 -0:20

    5 1:10 PM 1:40 PM 0:30 1:10 PM 1:40 PM 0:30 0:00

    6 1:40 PM 2:40 PM 1:00 1:40 PM 2:20 PM 0:40 -0:20

    7 2:20 PM 2:50 PM 0:30 2:20 PM 2:50 PM 0:30 0:00

    8 2:50 PM 3:50 PM 1:00 2:50 PM 3:40 PM 0:50 -0:10 Trimming scrap problem

    9 3:40 PM 4:10 PM 0:30 3:40 PM 4:10 PM 0:30 0:00

    10 4:10 PM 4:30 PM 0:20 4:10 PM 4:30 PM 0:20 0:00

    11 4:30 PM 5:00 PM 0:30 4:30 PM 5:00 PM 0:30 0:00

    12 5:00 PM 5:40 PM 0:40 5:00 PM 6:00 PM 1:00 0:20

    13 6:00 PM 6:30 PM 0:30 6:00 PM 7:20 PM 1:20 0:50 Transfer sheet pile from production to yard

    14 7:20 PM 7:30 PM 0:10 7:20 PM 7:30 PM 0:1015

    16

    17

    N/S Task

    Run production

    Joint coil

    Run production

    Joint coil

    Run production

    Joint coil

    Variance Remark

    1/12/2011

    Production

    OZ31A

    Target Complete Time Total Target

    Time

    Actual Complete Time Total Target

    Time

    Report By: Fairuz

    Time of Report:7:30pm

    Joint coil

    Run production

    Joint coil

    Run production

    Break

    Continued run production

    Houskeeping

    Joint coil

  • 8/2/2019 Daily Report (Dec 2011)

    2/26

    Production Supervisor Daily Report

    Date :

    Department :

    Attendant : Group C

    AL : MC: ABS :

    Profile rolling:

    From To From To

    1 8:00 AM 8:30 AM 0:30 8:00 AM 8:30 AM 0:30 0:00 Briefing

    2 8:30 AM 9:00 AM 0:30 8:30 AM 9:20 AM 0:50 0:20 Plasma cutting machine problem

    3 9:20 AM 10:20 AM 1:00 9:20 AM 10:15 AM 0:55 -0:05

    4 10:15 AM 10:45 AM 0:30 10:15 AM 11:20 AM 1:05 0:35 Change plasma cutting machine

    5 11:20 AM 12:20 PM 1:00 11:20 AM 12:10 PM 0:50 -0:10

    6 12:10 PM 12:40 PM 0:30 12:10 PM 12:40 PM 0:30 0:00

    7 12:40 PM 2:15 PM 1:35 12:40 PM 2:15 PM 1:35 0:00

    8 2:15 PM 3:15 PM 1:00 2:15 PM 4:30 PM 2:15 1:15Roller shaft station 7B and 8 B problem (shaft move to gear side and

    miss one process forming)

    9 4:30 PM 5:00 PM 0:30 4:30 PM 5:00 PM 0:30 0:00

    10 5:00 PM 5:30 PM 0:30 5:00 PM 5:30 PM 0:30 0:00

    11 5:30 PM 6:00 PM 0:30 5:30 PM 6:00 PM 0:30 0:00

    12 6:00 PM 7:00 PM 1:00 6:00 PM 7:20 PM 1:20 0:20 Safety plate broken station 10 (OPR side)

    13 7:20 PM 7:30 PM 0:10 7:20 PM 7:30 PM 0:10 0:00 to be continued (night shift)

    1415

    16

    17

    N/S Task Variance Remark

    2/12/2011

    Production

    OZ31A (ASTM COIL)

    Joint coil

    Target Complete Time Total Target

    Time

    Actual Complete Time Total Target

    Time

    Run production

    Joint coil

    Run production

    Joint coil

    Run production

    Break (Friday)

    Run production

    Break

    Continued run production

    Joint coil

    Time of Report:7:30pm

    Run production

    Joint coil

    Report By: Fairuz

  • 8/2/2019 Daily Report (Dec 2011)

    3/26

    Production Supervisor Daily Report

    Date :

    Department :

    Attendant : Group C

    AL : MC: ABS :

    Profile rolling:

    From To From To

    1 8:00 AM 8:30 AM 0:30 8:00 AM 9:20 AM 1:20 0:50 Briefing,Nylon break at station10 and install new nylon

    2 9:20 AM 9:50 AM 0:30 9:20 AM 10:30 AM 1:10 0:40Coil opened and auto rotate at uncoiler machine.Use wire rope for

    pull coil inside flatterning machine.

    3 10:30 AM 11:30 AM 1:00 10:30 AM 11:40 AM 1:10 0:10 Uncoiler machine problem

    4 11:40 AM 12:00 PM 0:20 11:40 AM 12:00 PM 0:20 0:00

    5 12:00 PM 12:30 PM 0:30 12:00 PM 12:30 PM 0:30 0:00

    6 12:30 PM 4:30 PM 4:00

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    N/S Task Remark

    3/12/2011

    Production

    OZ31A (ASTM COIL)

    Target Complete Time Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance

    Run production

    Joint coil

    run production

    Repair uncoiler machine

    Break

    Continued repair uncoiler machine

    Time of Report:7:30pm

    Report By: Fairuz

  • 8/2/2019 Daily Report (Dec 2011)

    4/26

    Production Supervisor Daily Report

    Date :

    Department :

    Attendant : Group C

    AL : MC: ABS :Profile rolling:

    From To From To

    1 4:00 PM 4:30 PM 0:30 4:00 PM 4:30 PM 0:30 0:00

    2 4:30 PM 5:00 PM 0:30 4:30 PM 5:00 PM 0:30 0:00

    3 5:00 PM 6:00 PM 1:00 5:00 PM 6:00 PM 1:00 0:00

    4 6:00 PM 12:30 AM 6:30 6:00 PM 12:30 AM 6:30 0:00

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    Time of Report:7:30pm

    Report By: Fairuz

    Joint coil

    Break

    Run production

    Service and repair electrical supply

    N/S Task Remark

    5/12/2011

    Production

    OZ31A (ASTM COIL)

    Target Complete Time Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance

  • 8/2/2019 Daily Report (Dec 2011)

    5/26

    Production Supervisor Daily Report

    Date :

    Department :

    Attendant : Group C

    AL : MC: ABS :Profile rolling:

    From To From To

    1 8:00 AM 11:30 AM 3:30 8:00 AM 11:30 AM 3:30 0:00

    2 11:30 AM 12:00 PM 0:30 11:30 AM 12:00 PM 0:30 0:00

    3 12:00 PM 12:30 PM 0:30 12:00 PM 12:30 PM 0:30 0:00

    4 12:30 PM 1:30 PM 1:00 12:30 PM 1:30 PM 1:00 0:00

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    Time of Report:7:30pm

    Report By: Fairuz

    Housekeeping and check forming line

    Joint coil

    Break

    Run production

    N/S Task Remark

    6/12/2011

    Production

    OZ31A (ASTM COIL)

    Target Complete Time Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance

  • 8/2/2019 Daily Report (Dec 2011)

    6/26

    Production Supervisor Daily Report

    Date :

    Department :

    Attendant : Group A & C

    AL : MC: ABS :Profile rolling:

    From To From To

    Repair base vertical roller before forming

    Support maintenance install coupler flattening machine

    repair and fabricated uncoiler base

    repair vertical roller before trimming machine

    2 4:00 PM 12:30 AM 8:30 4:00 PM 12:30 AM 8:30 0:00 forming machine 3,4,18,16 and 15

    N/S TaskActual Complete Time Total Target

    TimeVariance Remark

    7/12/2011

    Production

    OZ31A (ASTM COIL)

    Recycle Oil

    Target Complete Time Total Target

    Time

    8:30 8:00 AM 4:30 PM 8:30 0:001

    Time of Report:4:30pm

    Repair,fabricated and housekeeping production

    line8:00 AM 4:30 PM

    Report By: Fairuz

  • 8/2/2019 Daily Report (Dec 2011)

    7/26

    Production Supervisor Daily Report

    Date :

    Department :

    Attendant : Group A & C

    AL : MC: ABS :Profile rolling:

    From To From To

    Dismantle uncoiler coupler and bearing spoket

    Support maintenance install coupler flattening machine

    Install uncoiler machine

    Install and fitting uncoiler base

    repair vertical roller before trimming machine

    forming machine 14,13,11,10 and 9

    Install mold OTL

    Install bearing vertical roller shaft before trimming

    Install vertical roller before station roller guard 1

    N/S Task Remark

    8/12/2011

    Production

    OZ31A (ASTM COIL)

    Target Complete Time Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance

    4:30 PM 8:30 0:001Repair,fabricated and housekeeping production

    line8:00 AM 4:30 PM 8:30 8:00 AM

    Time of Report:4:30pm

    Report By: Fairuz

    12:30 AM4:00 PMRecycle Oil2 0:008:3012:30 AM4:00 PM8:30

  • 8/2/2019 Daily Report (Dec 2011)

    8/26

    Production Supervisor Daily Report

    Date :

    Department :

    Attendant : Group A & C

    AL : MC: ABS :Profile rolling:

    From To From To

    Install uncoiler coupler and bearing

    Support maintenance install coupler flattening machine

    Install chain uncoiler machine

    leveling coupler uncoiler and fitting motor uncoiler

    Install flying saw blade shaft

    Dismantle clamp (B1) welding carcheck and repair clamp (B1) welding car

    Install and fitting clamp (B1) welding car

    Install new chain for rubber roller

    Repair and fabricated clamp (PRO) at welding car

    Time of Report:5:00pm

    0:008:3012:30 AM4:00 PM8:3012:30 AM4:00 PMRepair,fabricated and housekeeping production

    line2

    Report By: Fairuz

    4:30 PM 8:30 0:001Repair,fabricated and housekeeping production

    line8:00 AM 4:30 PM 8:30 8:00 AM

    N/S Task Remark

    9/12/2011

    Production

    OZ31A (ASTM COIL)

    Target Complete Time Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance

  • 8/2/2019 Daily Report (Dec 2011)

    9/26

    Production Supervisor Daily Report

    Date :

    Department :

    Attendant : Group A & C

    AL : MC: ABS :Profile rolling:

    From To From To

    Dismantle mold OT light and Install mold OT22

    Transfer sheet pile scrap

    Transfer mold OZ100 and old mold

    Check hydraulic at preparation

    Change fuse 160A at forming penal

    Reapir and fitting chain at conveyer roller

    Fabricated base for trimming scrap gear

    housekeeping at preparation (Hydraulic oil Leaking)

    housekeeping at conveyer area and finishing area

    install trimming scrap reeler handle and holder

    N/S Task Remark

    12/12/2011

    Production

    OZ31A (ASTM COIL)

    Target Complete Time Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance

    4:30 PM 8:30 0:00

    2 support tooling,check and repair conveyer 4:00 PM 12:30 AM 8:30 4:00 PM 12:30 AM

    1 support tooling 8:00 AM 4:30 PM 8:30 8:00 AM

    Time of Report:4:30pm

    8:30 0:00

    Report By: Fairuz

  • 8/2/2019 Daily Report (Dec 2011)

    10/26

    Production Supervisor Daily Report

    MC: ABS :

    From To From To

    Dismantle mold OT light and Install mold OT22

    cutting grass and repair fencing factory oriental

    cutting grass and repair fencing factory oriental

    Housekeeping finishing area

    Fabricated fencing at car park area

    2 fabricated , check and repair 4:00 PM 12:30 AM 8:30

    1

    Group A & C

    OZ31A (ASTM COIL)

    7:00:00 PMMohd FairuzReport By:

    Time of Report:

    0:00

    fabricated base trimming,support maintenance

    building and support tooling8:00 AM 4:30 PM 8:30 8:00 AM 4:30 PM 8:30 0:00

    4:00 PM 12:30 AM 8:30

    RemarkN/S Task

    13/12/2011

    Production

    Target Complete Time Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance

    Date :

    Department :

    Attendant :

    AL :

    Profile rolling:

  • 8/2/2019 Daily Report (Dec 2011)

    11/26

    Production Supervisor Daily Report

    MC: ABS :

    From To From To

    Fabricated fencing at car park area

    Fabricatedand repair fencing at yard area

    cutting grass and repair fencing factory oriental

    fabricated trimming base

    Check roller forming line

    Housekeeping finishing area

    Date : 14/12/2011

    Department : Production

    Attendant : Group A & C

    Variance Remark

    AL :Profile rolling: OZ31A (ASTM COIL)

    N/S Task

    8:00 AM

    Target Complete Time Total Target

    Time

    Actual Complete Time Total Target

    Time

    4:30 PM 8:30 0:00

    2fabricated,support maintenance building and

    support tooling4:00 PM 12:30 AM 8:30 4:00 PM 12:30 AM

    1 fabricated , check and repair 8:00 AM 4:30 PM 8:30

    8:30 0:00

    Time of Report: 4:30:00 PM

    Report By: Mohd Fairuz

  • 8/2/2019 Daily Report (Dec 2011)

    12/26

    Production Supervisor Daily Report

    MC: ABS :

    From To From To

    1 8:00 PM 8:30 PM 0:30 8:00 PM 8:40 PM 0:40 0:10 Transfer sheet pile at yard and plasma cutter problem

    Cut material at station 7,Adjust station 7B (Shim drop),fitting roller

    (30min),

    Safety plate broken station 8,adjust spaces opr side and fitting nut

    roller station 8B(20min)

    4 10:30 PM 11:00 PM 0:30 10:30 PM 11:00 PM 0:30 0:00 plasma cutter problem5 11:00 PM 12:00 AM 1:00 11:00 PM 12:15 AM 1:15 0:15 Rotate break

    6 12:15 AM 12:45 AM 0:30 12:15 AM 1:00 AM 0:45 0:15 plasma cutter problem

    7 1:00 AM 2:00 AM 1:00 1:00 AM 2:10 AM 1:10 0:10Bearing roller station 10B broken(planning to dismantle after joint

    coil no.4)

    8 2:10 AM 2:40 AM 0:30 2:10 AM 2:40 AM 0:30 0:00 plasma cutter problem

    9 2:40 AM 6:10 AM 3:30 2:40 AM 6:10 AM 3:30 0:00Change new shaft for 10B(Shaft A move),setting roller station

    10,fitting roller 9A(shaft move) and 11B

    machine cannot move at station 8,cut trimming by oxy 6meter at

    gear box side for pull material,cut front material for inside material

    at station 18 and flying saw machine.(6.10am to 8.00am)

    To be continues by day shift

    Report By: Mohd Fairuz

    Time of Report: 8:00:00 AM

    Joint coil

    Joint coilRun production

    Joint coil

    Run production

    Run production

    Run production

    Joint coil

    Dismantle roller station 10B,adjust roller station

    9A,11B and setting roller station 10

    Remark

    AL :Profile rolling: OZ31A (ASTM COIL)

    N/S TaskTarget Complete Time Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance

    Date : 15/12/2011

    Department : Production

    Attendant : Group A

    10:30 PM 1:50 0:502 8:40 PM 9:40 PM 1:00 8:40 PM

    10 6:10 AM 7:10 AM 1:00

  • 8/2/2019 Daily Report (Dec 2011)

    13/26

    Production Supervisor Daily Report

    MC: ABS :

    From To From To

    1 8:00 PM 9:00 PM 1:00 8:00 PM 9:00 PM 1:00 0:00check sheet pile,Transfer sheet pile at yard and overhead crane 10T

    problem(up and down)

    2 9:00 PM 9:30 PM 0:30 9:00 PM 9:30 PM 0:30 0:00 plasma cutter problem

    3 9:30 PM 10:30 PM 1:00 9:30 PM 10:10 PM 0:40 0:20

    4 10:10 PM 10:40 PM 0:30 10:10 PM 10:40 PM 0:30 0:00 plasma cutter problem

    5 10:40 PM 11:40 PM 1:00 10:40 PM 11:10 PM 0:30 0:306 11:10 PM 11:40 PM 0:30 11:10 PM 11:40 PM 0:30 1:30 plasma cutter problem

    7 11:40 PM 12:00 AM 0:20 11:40 PM 12:00 AM 0:20 0:00

    8 12:00 AM 12:30 AM 0:30 12:00 AM 12:30 AM 0:30 0:00

    9 12:30 AM 1:10 AM 0:40 12:30 AM 1:00 AM 0:30 0:10

    10 1:00 AM 1:30 AM 0:30 1:00 AM 1:30 AM 0:30 0:00 plasma cutter problem

    11 1:30 AM 2:30 AM 1:00 1:30 AM 2:40 AM 1:10 0:10 Nylon break at station 10

    12 2:30 AM 3:00 AM 0:30 2:30 AM 3:00 AM 0:30 0:00 plasma cutter problem

    13 3:00 AM 4:00 AM 1:00 3:00 AM 4:20 AM 1:20 0:20 Nylon break at station 10 (2X)

    14 4:20 AM 4:50 AM 0:30 4:20 AM 4:50 AM 0:30 0:00 plasma cutter problem

    15 4:50 AM 5:20 AM 0:30 4:50 AM 5:20 AM 0:30 0:00

    16 5:20 AM 6:20 AM 1:00 5:20 AM 6:30 AM 1:10 0:10 Nylon break at station 10

    17 6:30 AM 7:00 AM 0:30 6:30 AM 7:00 AM 0:30 0:00

    18 7:00 AM 8:00 AM 1:00 7:00 AM 7:50 AM 0:50 0:10

    19 7:50 AM 8:00 AM 0:10 To be continues by day shift

    20

    Time of Report: 8:00:00 AM

    Break

    Continues run production

    Joint coil

    Run production

    Joint coil

    Report By: Mohd Fairuz

    Run production

    Run production

    Joint coil

    Break

    Run production

    Joint coil

    Variance Remark

    AL :Profile rolling: OZ31A (ASTM COIL)

    N/S TaskTarget Complete Time Total Target

    Time

    Actual Complete Time Total Target

    Time

    Joint coil

    Date : 16/12/2011

    Department : Production

    Attendant : Group A

    Run production

    Joint coil

    Run productionJoint coil

    Run production

    Joint coil

    Run production

  • 8/2/2019 Daily Report (Dec 2011)

    14/26

    Production Supervisor Daily Report

    MC: ABS :

    From To From To

    1 8:00 PM 8:30 PM 0:30 8:00 PM 8:30 PM 0:30 0:00 plasma cutter problem

    2 8:30 PM 9:30 PM 1:00 8:30 PM 9:30 PM 1:00 0:00

    3 9:30 PM 10:00 PM 0:30 9:30 PM 10:20 PM 0:50 0:20 plasma cutter problem and transfer sheet pile

    4 10:20 PM 11:20 PM 1:00 10:20 PM 11:30 PM 1:10 0:10nylon break at station 10,flying saw electrical powersupply trip and

    'ON' electrical power supply at MSSB room.

    5 11:30 PM 12:00 AM 0:30 11:30 PM 12:00 AM 0:30 0:00 plasma cutter problem and transfer sheet pile6 12:00 AM 12:30 AM 0:30 12:00 AM 12:30 AM 0:30 0:00

    7 12:30 AM 1:30 AM 1:00 12:30 AM 1:30 AM 1:00 0:00

    8 1:30 AM 2:00 AM 0:30 1:30 AM 2:10 AM 0:40 0:10 plasma cutter problem and transfer sheet pile

    9 2:10 AM 3:10 AM 1:00 2:10 AM 3:30 AM 1:20 0:20 nylon break at station 10

    10 3:30 AM 4:00 AM 0:30 3:30 AM 4:20 AM 0:50 0:20 plasma cutter problem and transfer sheet pile

    11 4:20 AM 4:50 AM 0:30 4:20 AM 4:50 AM 0:30 0:00

    12 4:50 AM 5:20 AM 0:30 4:50 AM 5:20 AM 0:30 0:00

    13 5:20 AM 5:50 AM 0:30 5:10 AM 5:50 AM 0:40 0:10

    14 5:50 AM 7:20 AM 1:30 5:50 AM 6:50 AM 1:00 -0:30

    plasma cutter problem,transfer sheet pile and To be continues by

    day shift

    15 6:50 AM 7:50 AM 1:00 6:50 AM 7:50 AM 1:00 0:00 nylon break at station 10

    16 7:50 AM 8:00 AM 0:10 To be continues by day shift

    17

    18

    19

    20

    Report By: Mohd FairuzTime of Report: 8:00:00 AM

    Run production

    Joint coil

    Run production

    Joint coil

    Run production

    Break

    Continues run production

    Joint coil and Change saw blade flying saw

    Run production

    Joint coil

    Break

    Target Complete Time Total Target

    Time

    Actual Complete Time Total Target

    Time

    Joint coil

    Run production

    Joint coil

    Run production

    Joint coil

    Variance Remark

    AL :Profile rolling: OZ31A (ASTM COIL)

    N/S Task

    Date : 17/12/2011

    Department : Production

    Attendant : Group A

  • 8/2/2019 Daily Report (Dec 2011)

    15/26

    Production Supervisor Daily Report

    MC: ABS :

    From To From To

    1 8:00 PM 9:00 PM 1:00 8:00 PM 9:10 PM 1:10 0:10 Transfer sheet pile at finishing area

    2 9:10 PM 9:40 PM 0:30 9:10 PM 10:00 PM 0:50 0:20 plasma cutter problem and take out trimming scrap

    3 10:00 PM 11:00 PM 1:00 10:00 PM 11:10 PM 1:10 0:10 Transfer sheet pile at finishing area

    4 11:10 PM 11:40 AM 0:30 11:10 PM 12:10 AM 0:50 0:20 plasma cutter problem and take out trimming scrap

    5 12:10 AM 12:40 AM 0:30 12:10 AM 12:40 AM 0:30 0:00

    6 12:40 AM 1:40 AM 1:00 12:40 AM 2:00 AM 1:20 0:20 Transfer sheet pile at finishing area7 2:00 AM 2:30 AM 0:30 2:00 AM 2:50 AM 0:50 0:20 plasma cutter problem and take out trimming scrap

    8 2:50 AM 3:50 AM 1:00 2:50 AM 4:10 AM 1:20 0:20 Transfer sheet pile at finishing area

    9 4:10 AM 4:40 AM 0:30 4:10 AM 4:50 AM 0:40 0:10 plasma cutter problem and take out trimming scrap

    10 4:50 AM 5:20 AM 0:30 4:50 AM 5:20 AM 0:30 0:00

    11 5:20 AM 6:20 AM 1:00 5:20 AM 6:50 AM 1:30 0:30run production slow because sheet pile at finishing area full and

    trimming scrap problem

    12 6:50 AM 7:20 AM 0:30 6:50 AM 7:30 AM 0:40 0:10 plasma cutter problem and take out trimming scrap

    13 To be continues by day shift

    14

    15

    16

    17

    18

    19

    20

    Report By: Mohd Fairuz

    Time of Report: 7:30:00 AM

    Joint coil

    Run production

    Joint coil

    Break

    Run production

    Joint coil

    Run production

    Run production

    Target Complete Time Total Target

    Time

    Actual Complete Time Total Target

    Time

    Run production

    Joint coil

    Run production

    Joint coil

    Break

    Variance Remark

    AL :Profile rolling: OZ31A (ASTM COIL)

    N/S Task

    Date : 19/12/2011

    Department : Production

    Attendant : Group C

  • 8/2/2019 Daily Report (Dec 2011)

    16/26

    Production Supervisor Daily Report

    MC: ABS :

    From To From To

    1 8:00 PM 9:00 PM 1:00 8:00 PM 9:20 PM 1:20 0:20 Transfer sheet pile at finishing area

    2 9:20 PM 9:50 PM 0:30 9:20 PM 10:00 PM 0:40 0:10 plasma cutter problem and take out trimming scrap

    3 10:00 PM 11:30 PM 1:30 10:00 PM 11:30 PM 1:30 0:00 Adjust trimming withd from 1158mm to 1114mm

    4 11:30 PM 12:00 AM 0:30 11:30 PM 12:00 AM 0:30 0:00

    5 12:00 AM 12:30 AM 0:30 12:00 AM 12:30 AM 0:30 0:00

    6 12:30 AM 2:30 AM 2:00 12:30 AM 1:30 AM 1:00 -0:307 1:30 AM 4:30 AM 3:00 1:30 AM 4:30 AM 3:00 0:00

    8 4:30 AM 5:00 AM 0:30 4:30 AM 5:00 AM 0:30 0:00

    9 5:00 AM 7:30 AM 2:30 5:00 AM 7:30 AM 2:30 0:00 To be continues by day shift

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    Report By: Mohd Fairuz

    Time of Report: 7:30:00 AM

    Dismantle forming cap and unversal shaft

    Break

    Dismantle roller from machine forming and

    dismantle mold from roller

    Dismantle forming roller shaft nut

    Target Complete Time Total Target

    Time

    Actual Complete Time Total Target

    Time

    Run production

    Joint coil (OT22=10.0X1130)

    Adjust trimming box and change trimming blade

    Cut material at station RG2

    Break

    Variance Remark

    AL :

    Profile rolling:

    N/S Task

    OZ31A (ASTM COIL) and change profile

    Date : 20/12/2011

    Department : Production

    Attendant : Group C

  • 8/2/2019 Daily Report (Dec 2011)

    17/26

    Production Supervisor Daily Report

    MC: ABS : EL : Kyaw Moe Win

    From To From To

    Remove roller station 13 to 18

    Dismantle mold from roller shaft (9 shaft)

    Install mold OT-optimize at roller shaft (9 roller)

    Install roller at forminig machine (station 3 to 6)

    1 0:0012:008:00 AM8:00 PM12:008:00 AM

    Report By: Mohd Fairuz

    Time of Report: 8:00:00 AM

    8:00 PMChange profile (OT-Optimize)

    Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance Remark

    AL :

    Profile rolling: Change profile (OT22)

    N/S TaskTarget Complete Time

    Date : 21/12/2011

    Department : Production

    Attendant : Group C

  • 8/2/2019 Daily Report (Dec 2011)

    18/26

    Production Supervisor Daily Report

    MC: ABS : EL :

    From To From To

    Install roller at forminig machine

    Install and fitting forming cap (all station)

    Joint unversal shaft at forming roller

    Transfer sheet pile OZ31A at yard

    Dismantle roller sizing

    Date : 22/12/2011

    Department : Production

    Attendant : Group C

    Total Target

    TimeVariance Remark

    AL :

    Profile rolling: Change profile (OT22)

    N/S TaskTarget Complete Time

    8:00 AM8:00 PMChange profile (OT-Optimize)

    Total Target

    Time

    Actual Complete Time

    0:0012:008:00 AM8:00 PM12:00

    Time of Report: 8:00:00 AM

    1

    Report By: Mohd Fairuz

  • 8/2/2019 Daily Report (Dec 2011)

    19/26

    Production Supervisor Daily Report

    MC: ABS : Saharudin EL :

    From To From To

    grind at hold shaft forming cap wear and tear

    2 12:00 AM 12:30 AM 0:30 12:00 AM 12:30 AM 0:30 0:00

    3 12:30 AM 3:00 AM 2:30 12:30 AM 3:00 AM 2:30 0:00

    4 3:00 AM 4:30 AM 1:30 3:00 AM 4:30 AM 1:30 0:00 Material swing at preparation area (5.0mm)

    5 4:30 AM 5:00 AM 0:30 4:30 AM 5:00 AM 0:30 0:00

    6 5:00 AM 7:30 AM 2:30 5:00 AM 7:30 AM 2:30 0:00Adjust trimming box because spring back material and trimming scrap

    big.

    Report By: Mohd FairuzTime of Report: 8:00:00 AM

    Adjust trimming box 10.0mm to operator side

    and vertical roller (3 worker)

    Total Target

    Time

    Actual Complete Time Total Target

    Time

    8:00 PM 12:00 AM 4:00 8:00 PM 12:00 AM 4:00

    Break

    Setting roller station 12 to 18 (7 worker)

    Install material at ST 10 to 18 (7 worker)

    Break

    Setting roller station 6 to 12 (5 worker)

    Remark

    AL :

    Profile rolling: Setting roller OT22

    N/S TaskTarget Complete Time

    0:001

    Date : 23/12/2011

    Department : Production

    Attendant : Group C

    Variance

    Repair forming cap and install unversal shaft at ST

    11 (2 worker)

  • 8/2/2019 Daily Report (Dec 2011)

    20/26

    Production Supervisor Daily Report

    MC: ABS : EL :

    From To From To

    Adjust and fitting roller station 6 (Shaft move,nut roller wear and tear)

    Adjust and fitting roller station 5 (Shaft move)

    2 12:00 AM 12:30 AM 0:30 12:00 AM 12:30 AM 0:30 0:00

    Adjust and fitting roller station 4 (Mold to mold open at gear side)

    Adjust and fitting roller station 6 (Shaft move,take out 4mm shim at gear

    side)

    Adjust and fitting all Vertical roller at forming

    4 4:30 AM 5:00 AM 0:30 4:30 AM 5:00 AM 0:30 0:00

    6 5:00 AM 7:30 AM 2:30 5:00 AM 7:30 AM 2:30 0:00 Adjust and fitting roller station 9 and 13 (Shaft move)

    Time of Report: 7:30:00 AM

    Run production and check interlock sheet pile (6

    worker)12:30 AM 3:00 AM

    Report By: Mohd Fairuz

    3

    Break

    Run production and check interlock sheet pile (4

    worker)

    12:30 AM 4:30 AM 4:00 1:302:30

    Actual Complete Time Total Target

    TimeVariance Remark

    Break

    Run production and check interlock sheet pile (7

    worker)8:00 PM 12:00 AM 8:00 PM 12:00 AM 4:00 0:001

    Total Target

    Time

    AL : Suhaimi

    Profile rolling: Setting roller OT22

    N/S TaskTarget Complete Time

    4:00

    Date : 24/12/2011

    Department : Production

    Attendant : Group C

  • 8/2/2019 Daily Report (Dec 2011)

    21/26

    Production Supervisor Daily Report

    MC: ABS : EL :

    From To From To

    Adjust and fitting roller station 5 (Shaft move)

    Adjust and fitting roller station 6 (Shaft move, mold wear and tear )

    Adjust and fitting all Vertical roller at forming

    2 12:00 PM 12:30 PM 0:30 12:00 PM 12:30 PM 0:30 0:00

    Adjust and fitting roller station 9,11,12,13 and 14 (Shaft move)

    Adjust and fitting all Vertical roller at forming

    4 4:00 PM 4:30 PM 0:30 4:00 PM 4:30 PM 0:30 0:00

    5 4:30 PM 5:00 PM 0:30 4:30 PM 5:00 PM 0:30 0:00

    6 5:00 PM 6:00 PM 1:00 5:00 PM 6:00 PM 1:00 0:00Inspection Sheet pile (interlock at OPR side 20 to 23 and gear side 18 to

    21)

    7 6:00 PM 7:00 PM 1:00 6:00 PM 7:00 PM 1:00 0:00

    8 7:00 PM 7:30 PM 0:30 7:00 PM 7:20 PM 0:20 -0:10

    9 7:20 PM 7:30 PM 0:10 Run production To be continues by night shift

    Report By: Mohd Fairuz

    Time of Report: 7:30:00 PM

    3

    Joint Coil

    Change saw blade flying saw

    Run production

    Joint Coil

    12:30 PM 4:00 PM 3:30 0:00

    Break

    Run production and check interlock sheet pile (3

    worker)

    8:00 AM 12:00 PM 4:00 0:00

    Break

    Run production,adjust roller and check interlock

    sheet pile (6 worker)12:30 PM 4:00 PM 3:30

    Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance Remark

    1Run production,adjust roller and check interlock

    sheet pile (6 worker)8:00 AM 12:00 PM 4:00

    AL : Suhaimi,zin wine,hissam

    Profile rolling: Setting roller OT22

    N/S TaskTarget Complete Time

    Date : 26/12/2011

    Department : Production

    Attendant : Group C

  • 8/2/2019 Daily Report (Dec 2011)

    22/26

    Production Supervisor Daily Report

    MC: ABS : EL :

    From To From To

    1 8:00 AM 8:50 AM 0:50 8:00 AM 8:50 AM 0:50 0:00 Flying saw shaft not stable

    2 8:50 AM 9:20 AM 0:30 8:50 AM 9:20 AM 0:30 0:00

    3 9:20 AM 10:20 AM 1:00 9:20 AM 10:46 AM 1:26 0:26 Flying saw shaft not stable

    4 10:46 AM 11:16 AM 0:30 10:46 AM 11:23 AM 0:37 0:07 Inside trimming scrap at scrap reeler

    5 11:23 AM 12:23 PM 1:00 11:23 AM 1:55 PM 2:32 1:32 Flying saw shaft not stable and repair support roller conveyer

    6 1:55 PM 2:25 PM 0:30 1:55 PM 2:35 PM 0:40 0:10 Inside trimming scrap at scrap reeler

    7 2:35 PM 3:35 PM 1:00 2:35 PM 3:50 PM 1:15 0:15 Flying saw shaft not stable and take out trimming scrap (full)

    8 3:50 PM 4:20 PM 0:30 3:50 PM 4:30 PM 0:40 0:10

    9 4:30 PM 5:00 PM 0:30 4:30 PM 5:00 PM 0:30 0:00

    5:00 PM 6:30 PM 1:30

    Date : 27/12/2011

    Department : Production

    Attendant : Group C

    AL :

    Profile rolling: Run production (OT22)

    N/S TaskTarget Complete Time Actual Complete Time Total Target

    TimeVariance Remark

    Run production (8 worker)

    Joint Coil (4 worker) and transfer sheet pile (4

    worker)Run production (8 worker) and rotate break

    Joint Coil (4 worker) and transfer sheet pile (4

    worker)

    Run production (8 worker)

    Total Target

    Time

    Joint Coil (4 worker) and transfer sheet pile (4

    worker)

    Run production (8 worker)

    Joint Coil (4 worker) and transfer sheet pile (4

    worker)

    Break

    Run production ( 4 worker)

    Report By: Mohd FairuzTime of Report: 5:30:00 PM

  • 8/2/2019 Daily Report (Dec 2011)

    23/26

    Production Supervisor Daily Report

    MC: ABS : EL :

    From To From To

    1 8:00 AM 8:30 AM 0:30 8:00 AM 8:30 AM 0:30 0:00 Briefing and Inside trimming scrap at scrap reeler

    2 8:30 AM 9:30 AM 1:00 8:30 AM 9:30 AM 1:00 0:00 Flying saw shaft not stable

    3 9:30 AM 10:00 AM 0:30 9:30 AM 11:30 AM 2:00 1:30 Change scrap reeler and Arrange sheet pile on-hold at finishing

    4 11:30 AM 12:30 PM 1:00 11:30 AM 1:00 PM 1:30 0:30

    5 1:00 PM 1:30 PM 0:30 1:00 PM 1:30 PM 0:30 0:00

    6 1:30 PM 2:30 PM 1:00 1:30 PM 2:40 PM 1:10 0:10

    7 2:40 PM 3:10 PM 0:30 2:40 PM 3:40 PM 1:00 0:30 Change vertical roller before trimming box

    8 3:40 PM 4:30 PM 0:50 3:40 PM 4:30 PM 0:50 0:00

    9 4:30 PM 5:00 PM 0:30 4:30 PM 5:00 PM 0:30 0:00

    10 5:00 PM 5:30 PM 0:30 5:00 PM 5:20 PM 0:20 -0:10

    11 5:20 PM 5:50 PM 0:30 5:20 PM 6:00 PM 0:40 0:10 install flux core MIG welding at welding car

    12 6:00 PM 7:00 PM 1:00 6:00 PM 6:50 PM 0:50 -0:10

    13 6:50 PM 7:20 PM 0:30 6:50 PM 7:30 PM 0:40 0:10 To be continues by night shift

    14

    15

    Time of Report: 7:30:00 PM

    Report By: Mohd Fairuz

    Joint Coil (3 worker) and transfer sheet pile (4

    worker)

    Run production (7 worker)

    Joint Coil (3 worker) and transfer sheet pile (4

    worker)

    Run production (7 worker) and rotate break

    Joint Coil (3 worker) and transfer sheet pile (4worker)

    Run production (7 worker)

    Joint Coil (3 worker) and transfer sheet pile (4

    worker)

    Run production (7 worker)

    Break

    Continue run production (7 worker)

    Joint Coil (3 worker) and transfer sheet pile (4

    worker)

    Run production (7 worker)

    Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance Remark

    Joint Coil (7 worker)

    AL :

    Profile rolling: Run production (OT22)

    N/S TaskTarget Complete Time

    Date : 28/12/2011

    Department : Production

    Attendant : Group C

  • 8/2/2019 Daily Report (Dec 2011)

    24/26

    Production Supervisor Daily Report

    MC: ABS : EL :

    From To From To

    1 8:00 AM 8:30 AM 0:30 8:00 AM 8:30 AM 0:30 0:00 Briefing

    2 8:30 AM 9:30 AM 1:00 8:30 AM 9:30 AM 1:00 0:00

    3 9:30 AM 10:30 AM 1:00 9:30 AM 10:30 AM 1:00 0:00

    4 10:30 AM 11:00 AM 0:30 10:30 AM 11:00 AM 0:30 0:00

    5 11:00 AM 12:00 PM 1:00 11:00 AM 12:00 PM 1:00 0:00

    6 12:00 PM 12:30 PM 0:30 12:00 PM 12:45 PM 0:45 0:15

    7 12:45 PM 1:45 PM 1:00 12:45 PM 1:45 PM 1:00 0:00

    8 1:45 PM 2:15 PM 0:30 1:45 PM 2:15 PM 0:30 0:00

    9 2:15 PM 3:15 PM 1:00 2:15 PM 3:15 PM 1:00 0:00

    10 3:15 PM 3:45 PM 0:30 3:15 PM 3:45 PM 0:30 0:00

    11 3:45 PM 4:30 PM 0:45 3:45 PM 4:30 PM 0:45 0:00

    12 4:30 PM 5:00 PM 0:30 4:30 PM 5:00 PM 0:30 0:00

    13 5:00 PM 5:30 PM 0:30 5:00 PM 5:30 PM 0:30 0:00 Trimming scrap break

    14 5:30 PM 6:00 PM 0:30 5:30 PM 6:00 PM 0:30 0:00

    15 6:00 PM 7:15 PM 1:15 Coil 25mt

    16 7:15 PM 7:30 PM 0:15 To be continue by night shift

    17

    Date : 29/12/2011

    Department : Production

    Attendant : Group C

    Continue run production (7 worker)

    AL : Kamarudin

    Profile rolling: Run production (OT22)

    N/S TaskTarget Complete Time Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance Remark

    Continue run production (7 worker)

    Joint Coil, transfer sheet pile and change saw

    blade flying saw (7 worker)

    Run production (7 worker)

    Joint Coil (3 worker) and transfer sheet pile (4

    worker)Run production (7 worker)

    Joint Coil, transfer sheet pile and rotate break (7

    worker)

    Run production (7 worker)

    Joint Coil (3 worker) and transfer sheet pile (4

    worker)

    Run production (7 worker)

    Joint Coil (3 worker) and transfer sheet pile (4

    worker)

    Run production (7 worker)

    Break

    Joint Coil (3 worker) and transfer sheet pile (4

    worker)

    Report By: Mohd Fairuz

    Time of Report: 6:30:00 PM

    Run production (7 worker)

    Joint Coil (3 worker) and transfer sheet pile (4

    worker)

  • 8/2/2019 Daily Report (Dec 2011)

    25/26

    Production Supervisor Daily Report

    MC: Zin wine ABS : EL :

    From To From To

    1 8:00 AM 10:00 AM 2:00 8:00 AM 10:00 AM 2:00 0:00 Briefing and take out saw blade broken at flying saw machine

    2 10:00 AM 11:00 AM 1:00 10:00 AM 11:15 AM 1:15 0:15

    3 11:15 AM 11:45 AM 0:30 11:15 AM 11:45 AM 0:30 0:00

    4 11:45 AM 12:40 PM 0:55 11:45 AM 12:40 PM 0:55 0:005 12:40 PM 2:15 PM 1:35 12:40 PM 2:15 PM 1:35 0:00

    6 2:15 PM 2:45 PM 0:30 2:15 PM 2:45 PM 0:30 0:00

    7 2:45 PM 3:45 PM 1:00 2:45 PM 3:45 PM 1:00 0:00

    8 3:45 PM 4:15 PM 0:30 3:45 PM 4:30 PM 0:45 0:15

    9 4:30 PM 5:00 PM 0:30 4:30 PM 5:00 PM 0:30 0:00

    10 5:00 PM 6:00 PM 1:00 5:00 PM 6:00 PM 1:00 0:00

    11 6:00 PM 6:30 PM 0:30 6:00 PM 6:30 PM 0:30 0:00

    12 6:30 PM 7:30 PM 1:00 6:30 PM 7:30 PM 1:00 0:00 Flying saw cutting problem and To be continue by night shift

    13

    14

    15

    16

    17

    Time of Report: 7:30:00 PM

    Report By: Mohd Fairuz

    Run production (7 worker)

    Joint Coil (3 worker) and transfer sheet pile (4

    worker)

    Run production (7 worker)Break (Friday)

    Joint Coil (3 worker) and transfer sheet pile (4

    worker)

    Run production (7 worker)

    Joint Coil (3 worker) and transfer sheet pile (4

    worker)

    Break

    Run production (7 worker)

    Joint Coil (3 worker) and transfer sheet pile (4

    worker)

    Run production (7 worker)

    Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance Remark

    Change saw blade

    AL :

    Profile rolling: Run production (OT22)

    N/S TaskTarget Complete Time

    Date : 30/12/2011

    Department : Production

    Attendant : Group C

  • 8/2/2019 Daily Report (Dec 2011)

    26/26

    Production Supervisor Daily Report

    MC: ABS : EL :

    From To From To

    1 8:00 AM 9:30 AM 1:30 8:00 AM 9:30 AM 1:30 0:00 Briefing and Transfer sheet pile

    2 9:30 AM 10:30 AM 1:00 9:30 AM 10:50 AM 1:20 0:20 Flying saw shaft not stable

    3 10:50 AM 11:20 AM 0:30 10:50 AM 11:30 AM 0:40 0:10 Trimming scrap problem

    4 11:30 AM 12:30 PM 1:00 11:30 AM 12:30 PM 1:00 0:00 Flying saw shaft not stable

    5 12:30 PM 1:00 PM 0:30 12:30 PM 1:10 PM 0:40 0:10

    6 1:10 PM 2:10 PM 1:00 1:10 PM 3:00 PM 1:50 0:50 Refill hydraulic flying saw and Flying saw shaft not stable

    7 3:00 PM 3:30 PM 0:30 3:00 PM 3:30 PM 0:30 0:00

    8 3:30 PM 4:30 PM 1:00 3:30 PM 4:30 PM 1:00 0:00 Flying saw shaft not stable and trimming scrap full

    9 4:30 PM 5:00 PM 0:30 4:30 PM 5:00 PM 0:30 0:00

    10 5:00 PM 5:30 PM 0:30 5:00 PM 5:30 PM 0:30 0:00Take out out trimming scrap, Safety plate broken station 14B and roller

    shaft bearing station 13B broken at gear box side

    11 5:30 PM 8:00 PM 2:30 To be continue by night shift

    *1) fitting and setting roller station 13

    *2) shim fall at station 4 and need to adjust

    Date : 31/12/2011

    Department : Production

    Attendant : Group C

    Change saw blade (8 worker)

    AL :

    Profile rolling: Run production (OT22)

    N/S TaskTarget Complete Time Total Target

    Time

    Actual Complete Time Total Target

    TimeVariance Remark

    Run production (8 worker)

    Break

    Continue run production (5 worker)

    Change roller shaft station 14B

    Run production (8 worker)

    Joint Coil (4 worker) and transfer sheet pile (4

    worker)

    Run production (8 worker)Joint Coil (4 worker), transfer sheet pile (4

    worker) and rotate break

    Run production (8 worker)

    Joint Coil (4 worker) and transfer sheet pile (4

    worker)

    Time of Report: 8:30:00 PM

    To be continue by night shift12

    Report By: Mohd Fairuz