Daily Progress Report - 12.6.14

  • Upload
    bulzae

  • View
    236

  • Download
    0

Embed Size (px)

Citation preview

  • 8/11/2019 Daily Progress Report - 12.6.14

    1/13

    BALANCE

    1 Earthworks (at Zero Point) CM 56,000 77%

    BALANCE

    1 Asphalt MT 13,086 37%

    BALANCE

    1 Road Crossing Nos 172 72%

    2 MV/Telecom Duct at NW Apron RM 1,378 15%

    3 LV cable installed in Footpath RM 11,462 0%

    UNIT TOTAL

    1 Finishing works Nos 55

    2 Plumbing & Electrical works Nos 55

    TOTAL TODAY TILL DATE BALANCE

    1Rip Rap / Stone Dumping (300mm

    thick)CM 14,271 13,442 829 94.19%

    2Grouting of 300mm thick stone on

    slopes of embankmentSM 45,454 42,581 2,873 93.68%

    3 Hexagonal Tiles 50mm thick SM 35,535 22,736 12,799 63.98%

    4 Hand Railing along R1 & UPs RM 2,873 2,438 435 84.86%

    Surface

    Repair Water Filling Foam Injection Dewatering

    Internal

    Coating

    1 Tank Repair 7.224 100% 100% 100% 93% 86%

    Sr DESCRIPTION UNITQUANTITIES

    % COMPLETE

    WATER WORKS - TANK REPAIR - WATER PROOFING

    Sr DESCRIPTIONCAPACITY IN

    M.GALLONS

    Percentage Complete

    HAND RAILING ALONG ROAD 1 & UNDER PASSES

    WATCH TOWERS

    43,338

    HAND BACK BY PACKAGE-8B/SIEMENS

    123

    210

    UNITQUANTITIES PERCENTAGE

    COMPLETE

    PACKAGE 8A

    ACHIEVED TILL DATESr #

    0

    NEW ISLAMABAD INTERNATIONAL AIRPORT PROJECT

    Sr # DESCRIPTION UNITQUANTITIES

    ACHIEVED TILL DATE

    PERCENTAGE

    COMPLETE

    DAILY PROGRESS REPORT

    PACKAGE 1

    DESCRIPTION

    ACHIEVED TILL DATE

    4,898

    Sr # DESCRIPTION UNITQUANTITIES PERCENTAGE

    COMPLETE

    ACTIVTIES

    HEXAGONAL TILES INSTALLATION

    STONE PITCHING AND GROUTING

    % COMPLETE

    73%

    30%

  • 8/11/2019 Daily Progress Report - 12.6.14

    2/13

    Package-8A: Security Watch Tower Status Sheet

    Int

    erior

    Plaster

    Exterior

    Plaster

    ME

    PWORKS

    SepticTank

    Int

    ernal&

    External

    Pa

    int

    Flo

    orTile

    Terrazo

    BathTile

    1 WT # 01 100% 100% 30% 100% 70% 100% 100%

    2 WT # 02 100% 100% 30% 100% 70% 100% 100%

    3 WT # 03 100% 100% 30% 100% 70% 100% 100%

    4 WT # 04 100% 100% 30% 100% 70% 100% 100%

    5 WT # 05 100% 100% 30% 100% 70% 100% 100%

    6 WT # 06 100% 100% 30% 100% 70% 100% 100%

    7 WT # 07 100% 100% 30% 100% 70% 100% 100%

    8 WT # 08 100% 100% 30% 100% 70% 100% 100%

    10 WT # 10 100% 100% 30% 100% 70% 100% 100%

    11 WT # 11 100% 100% 30% 100% 70% 100% 100%

    12 WT # 12 100% 100% 30% 100% 70% 100% 100%

    13 WT # 13 100% 100% 30% 100% 70% 100% 100%

    14 WT # 14 100% 100% 30% 100% 70% 100% 100%

    15 WT # 15 100% 100% 30% 100% 70% 100% 100%

    16 WT # 16 100% 100% 30% 100% 70% 100% 100%

    17 WT # 17 100% 100% 30% 100% 70% 100% 100%

    18 WT # 18 100% 100% 30% 100% 70% 100% 100%

    19 WT # 19 100% 100% 30% 100% 70% 100% 100%

    20 WT # 20 100% 100% 30% 100% 70% 100% 100%

    21 WT # 21 100% 100% 30% 100% 70% 100% 100%

    22 WT # 22 100% 100% 30% 100% 70% 100% 100%

    23 WT # 23 100% 100% 30% 100% 70% 100% 100%

    9

    24

    Sr. No

    Description of Work

    Watch Tower No's

  • 8/11/2019 Daily Progress Report - 12.6.14

    3/13

    61

    24 WT # 25

    25 WT # 26

    26 WT # 27

    27 WT # 28

    28 WT # 29

    29 WT # 62 100% 100% 30% 100% 70% 100% 100%

    30 WT # 63 100% 100% 20% 100% 70% 100% 70%

    31 WT # 64 100% 100% 30% 100% 70% 100% 100%

    32 WT # 65 100% 100% 30% 100% 50% 100% 100%

    33 WT # 66 100% 100% 30% 100% 100% 100%

    34 WT # 67 100% 100% 30% 100% 100% 100%

    35 WT # 68 100% 100% 30% 100% 100% 100%

    36 WT # 69 100% 100% 30% 100% 100% 100%

    30%

    62

    27

    72

    OVER ALL PERCENTAGE

    LIVEABLE WATCH TOWER MEP OVERALL %

    Liveable+Non Liveable A+B Average %

  • 8/11/2019 Daily Progress Report - 12.6.14

    4/13

    Ste

    elRailing

    Ste

    elStair

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    100% 100% 96%

    0%

    0%

    Ov

    erall

    percentage

  • 8/11/2019 Daily Progress Report - 12.6.14

    5/13

    0%

    0%

    0%

    0%

    0%

    0%

    100% 100% 96%

    100% 100% 93%

    100% 100% 96%

    100% 100% 94%

    100% 100% 100%

    100% 100% 100%

    100% 100% 100%

    100% 100% 100%

    76%

    73%

  • 8/11/2019 Daily Progress Report - 12.6.14

    6/13

    NL - Finishing Works

    Package-8A: Security Watch Tower Status Sheet

    Internal &

    External

    Plaster

    Roof

    water i/c

    Tile work Flooring

    Roof

    water

    proofing

    Steel Stair

    & Railing

    1 WT # 38 100% 100% 100% 100% 50%

    2 WT # 39

    3 WT # 40 100% 0% 100% 0% 50%

    4 WT # 41

    5 WT # 42

    6 WT # 43 0% 0% 50% 0% 0%

    7 WT # 44 0% 0% 50% 0% 0%

    8 WT # 45 0% 0% 50% 0% 0%

    10 WT # 46

    11 WT # 47 0% 0% 50% 0% 0%

    12 WT # 48 0% 0% 50% 0% 0%

    13 WT # 49

    14 WT # 50

    15 WT # 51 100% 100% 100% 100% 100%

    16 WT # 52 100% 100% 100% 100% 100%

    17 WT # 53 100% 100% 100% 100% 100%

    18 WT # 54

    19 WT # 55 100% 100% 100% 100% 100%

    20 WT # 56 100% 100% 100% 100% 100%

    21 WT # 57 100% 100% 100% 100% 0%

    22 WT # 58 100% 100% 100% 100% 100%

    23 WT # 59

    24 WT # 60 100% 100% 100% 100% 100%

    Existing

    Existing

    Location will be decided after completion of

    Boundary wall (Boundary wall design issue)

    Location will be decided after completion of

    Boundary wall (Boundary wall design issue)

    Sr. No Watch Tower No's

    Description of Work

    Existing

    Existing

    Existing

    Existing

  • 8/11/2019 Daily Progress Report - 12.6.14

    7/13

    OVER ALL PERCENTAGE

  • 8/11/2019 Daily Progress Report - 12.6.14

    8/13

    90%

    0%

    50%

    0%

    0%

    10%

    10%

    10%

    0%

    10%

    10%

    0%

    0%

    100%

    100%

    100%

    0%

    100%

    100%

    75%

    100%

    0%

    100%

    Ov

    erall

    percentage

  • 8/11/2019 Daily Progress Report - 12.6.14

    9/13

    42%

  • 8/11/2019 Daily Progress Report - 12.6.14

    10/13

  • 8/11/2019 Daily Progress Report - 12.6.14

    11/13

  • 8/11/2019 Daily Progress Report - 12.6.14

    12/13

    Surface

    Repair

    Water

    Filling

    Foam

    Injection

    1 Potable Water Tank 1.1 0.615 8.5% 100% 100% 100%

    2 Potable Water Tank 1.2 0.615 8.5% 100% 100% 100%

    3 Potable Water Tank 1.3 0.615 8.5% 100% 100% 100%4 Potable Water Tank 2.1 0.615 8.5% 100% 100% 100%

    5 Potable Water Tank 2.2 0.615 8.5% 100% 100% 100%

    6 Potable Water Tank 2.3 0.615 8.5% 100% 100% 100%

    7 Raw Water Tank 1.1 0.503 7.0% 100% 100% 100%

    8 Raw Water Tank 1.2 0.503 7.0% 100% 100% 100%

    9 Raw Water Tank 1.3 0.503 7.0% 100% 100% 100%

    10 Raw Water Tank 2.1 0.503 7.0% 100% 100% 100%

    11 Raw Water Tank 2.2 0.503 7.0% 100% 100% 100%

    12 Raw Water Tank 2.3 0.503 7.0% 100% 100% 100%

    13 Potable Water Pumphouse -1 0.260 3.6% 100% 100% 100%

    14 Potable Water Pumphouse -2 0.260 3.6% 100% 100% 100%

    7.224 100.0% 100% 100% 100%Total

    WATER WORKS - TANK REPAIR - WATER PROOFING

    Sr DESCRIPTIONCAPACITY IN

    M.GALLONS

    WEIGHT

    FACTOR

    Percentage C

  • 8/11/2019 Daily Progress Report - 12.6.14

    13/13

    DewateringInternal

    Coating

    100% 0% 6.8%

    100% 100% 8.5%

    100% 100% 8.5%100% 100% 8.5%

    100% 100% 8.5%

    100% 100% 8.5%

    100% 100% 7.0%

    100% 100% 7.0%

    100% 100% 7.0%

    100% 100% 7.0%

    100% 100% 7.0%

    100% 100% 7.0%

    100% 100% 3.6%

    0% 0% 2.2%

    93% 86% 97%

    mplete Total

    Percentage

    Complete