7/24/2019 Daily Progress 03-01-2016 Page 2
1/1
Page 2 of 2
Prod. Date :
Date of Issue :
Repair d. Accum After Rep. Accum
After Rep.Bal an ce Re je ct d . A ccumul at io n Str ip o ff Bal an ce Rep ai r d . A ccum A ft er Rep .
Accum
After Rep.Balance Reject d. Accum Strip off Balance
( pc s) ( pc s) ( pc s) (pc s) (pc s) (pc s) ( pc s) (p cs) (pc s) (p cs ) (p cs) (p cs ) (p cs ) (p cs ) (pc s) (pc s) (p cs ) (p cs ) (pc s) (p cs ) (p cs ) ( pc s) (p cs) (p cs )
1 10 0 0 0 0 0 0 0 0 0 0 10 PQT Asphalt Enamel Coating
2 38 6 6 0 0 0 4 4 0 4 4 48 3 0 0 0 0 0 0 0 0 0 0 3 PQT Concrete Weight Coating
3 78 2 8 0 0 0 1 5 0 5 5 81 2 0 0 0 0 0 0 0 0 0 0 2 Continues to PQT Concrete Weight Coating (Thickness 90 mm) = 2 pcs
4 18 47 55 0 0 0 15 20 0 20 20 80 0
5 35 20 75 0 0 0 21 41 0 41 41 76 0
6 57 20 95 0 0 0 3 44 0 44 44 80 0
7 42 15 110 0 0 0 1 45 0 45 45 58 0
8 44 23 133 0 0 0 5 50 0 50 50 72 0
9 89 12 145 42 42 103 3 53 0 53 156 104 0
10 91 10 155 48 90 65 3 56 0 56 121 104 0
11 93 7 162 26 116 46 0 56 0 56 102 100 0
12 79 11 173 32 148 25 0 56 0 56 81 90 0
13 82 12 185 25 173 12 0 56 0 56 68 94 0
14 103 10 195 0 173 22 0 56 0 56 78 113 0
15 106 11 206 15 188 18 0 56 0 56 74 117 0
16 40 4 210 10 198 12 0 56 0 56 68 44 0
17 51 4 214 0 198 16 6 62 0 62 78 61 0
18 40 9 223 0 198 25 0 62 0 62 87 49 0
19 0 0
20 0 0
21 0 0
22 0 0
23 0 0
1096 223 1294 62 1381 5 0 0 0 5
Remarks
WIP
(Repair
+Reject)
Total
Reject WIP
(Repair
+Reject)
Total
Reject
PT. COOEC INDONESI A
M. YUSUF
TOTAL PRODUCTION
ACC
Prod
Repair
Total ACC : Prpd +After Repair
Thursday, December 31, 2015
Saturday, January 02, 2016
Repair
Production Date
Asphalt Enamel Coating
PT. KHI Pipe Industr ies HCML
GATOT, S SRIMULJANTO
Sunday, January 03, 2016
Monday, December 21, 2015
Tuesday, December 22, 2015
Wednesday, December 23, 2015
Saturday, December 26, 2015
Sunday, December 27, 2015
Monday, December 28, 2015
Tuesday, December 29, 2015
Wednesday, December 30, 2015
Friday, December 18, 2015
Friday, December 11, 2015
ACC
Prod.No
DAILY PROGRESS PQT and Production Asphalt Enamel Coating
Saturday, December 12, 2015
Monday, December 14, 2015
Tuesday, December 15, 2015
Wednesday, December 16, 2015
Thursday, December 17, 2015
Madura BD Field Development - EPCI ProjectPT. COOEC INDONESIA
4-Jan-16
3-Jan-16
Summary Production of sphalt Enamel and Concrete Production
Concrete Weight Coating