Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 1.0, Report Date: 10/28/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
8,900.00Cum Field Est To Date (Cost)
8,900.00Daily Contacts
Job Contact Title Mobile
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
R/U ARCHER WIRELINE. TIH WITH CBL/CNL TAGGED BOTTOM AND LOGGED TO SURFACEOperations at Report Time
Operations suspendedOperations Next Report Period
Operations suspended
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
06:00 07:00 1.00 1.00 NO ACTIVITY
No Operations
No activity
07:00 13:00 6.00 7.00 WLWK Wireline R/U ARCHER WIRELINE. TIH WITH CBL/CNL TAGGED BOTTOM AND LOGGED TO SURFACE
13:00 06:00 17.00 24.00 NO ACTIVITY
No Operations
Operations suspended
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 2.0, Report Date: 11/6/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
4,400.00Cum Field Est To Date (Cost)
13,300.00Daily Contacts
Job Contact Title Mobile
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
INSTALLED FRAC STACK AND TESTED TO 6500 PSI FOR 15 MINOperations at Report Time
No operationsOperations Next Report Period
Continue R/U to frac
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
06:00 08:00 2.00 2.00 NO ACTIVITY
No Operations
No activity
08:00 12:00 4.00 6.00 FRAC Frac Job INSTALLED FRAC STACK AND TESTED TO 6500 PSI FOR 15 MINSupply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 3.0, Report Date: 11/9/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
1,400.00Cum Field Est To Date (Cost)
14,700.00Daily Contacts
Job Contact Title Mobile
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
R/U ARCHER WIRELINE. TIH AND PERF STAGE 1Operations at Report Time
No operationsOperations Next Report Period
Continue frac job
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/2 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 4.0, Report Date: 11/10/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
250,900.00Cum Field Est To Date (Cost)
265,600.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Frac stages 1-4Operations at Report Time
Preparing to fracOperations Next Report Period
Continue frac
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
06:00 19:00 13.00 13.00 FRAC Frac Job STAGE 1, CLINE, PERFS 10768-71, 10822-25, 10880-83, 10930-33 4 SPF 12 HOLES/GUN. BREAKDOWN 71 BBL OF 15% HCL. BROKE @ 4738 PSI. 130,305 LBS IN FORMATION (25,371-40/70 WHITE / 84,875 -30/50 WHITE / 20,059 30/50 SLC) 4492 bbl To Recover. AVE PSI 2382. MAX PSI 6238 AVE RATE 76.8 BPM MAX RATE 82 BPM. NOTE: PUMPED 1.5# SLICKWATER, ISIP 3483, FG 0.76
STAGE 2, CLINE / WC C, PERFS 10520-23, 10596-99, 10646-49, 10706-09 4 SPF 12 HOLES/GUN. BREAKDOWN 71 BBL OF 15% HCL. BROKE @ 4481. 138,069 LBS IN FORMATION (24,962 40/70 WHITE / 85,476 30/50 WHITE / 20,118 30/50 SLC) 4442 BBL TO RECOVER. AVE PSI 2445 MAX PSI 5540 AVE RATE 64.5 BPM MAX RATE 74 BPM NOTE: PUMPED 1.5# SLICKWATER. ISIP 3484, FG 0.77
STAGE 3, LOWER WC B, PERFS 10226-29, 10304-07, 10364-67, 10444-47 4 SPF 12 HOLES/GUN. BREAKDOWN 71 BBL OF 15% HCL. BROKE @ 3404. 125,007 LBS IN FORMATION (25012 40/70 WHITE / 86044 30/50 WHITE / 0 30/50 SLC) 4179 BBL TO RECOVER. AVE PSI 5241 MAX PSI 5987 AVE RATE 73.4 BPM MAX RATE 82 BPM NOTE: PUMPED 1.5# SLICKWATER. ISIP 2951, FG 0.72 NO SLC SAND IN-FORMATION DUE TO PRESSURE INCREASING
STAGE 4, WC A, PERFS 10036-39, 10084-87, 10116-19, 10168-71 4 SPF 12 HOLES/GUN. BREAKDOWN 71 BBL OF 15% HCL. BROKE @ 2909. 145,011 LBS IN FORMATION (24,899 40/70 WHITE / 99,947 30/50 WHITE / 20,165 30/50 SLC) 4498 BBL TO RECOVER. AVE PSI 4593 MAX PSI 5980 AVE RATE 71.8 BPM MAX RATE 80 BPM NOTE: PUMPED 2# SLICKWATER. ISIP 2922, FG 0.72
TIH SHOT STAGE 5. S/D FOR NIGHT
19:00 06:00 11.00 24.00 NO ACTIVITY
No Operations
Shut down for the night
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Page 2/2 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 4.0, Report Date: 11/10/2014
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/2 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 5.0, Report Date: 11/11/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
307,900.00Cum Field Est To Date (Cost)
573,500.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Frac stages 5-10Operations at Report Time
Rig DownOperations Next Report Period
RDMO
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
06:00 22:00 16.00 16.00 FRAC Frac Job STAGE 5. WC B, PERFS 9810-13, 9867-70, 9926-29, 9976-79. 4 SPF. 12 HOLES/GUN. BREAKDOWN 71 BBL OF 15% HCL. BROKE @ 4736. 145369 LBS IN FORMATION ( 25118 - 40/70 WHITE / 100223 - 30/50 WHITE / 20028 - 30/50 SLC ). 5020 BBL TO RECOVER. AVE PSI 5226 MAX PSI 5820 AVE RATE 76.1 BPM MAX RATE 82.0 BPM. NOTE: PUMPED 2#, ISIP 2089, FG 0.65 PSI/FT. AFTER .5# SAND CONC HAD TO FLUSH SAND AWAY. PUMPS KEPT SHUTTING OFF AND COULD NOT KEEP 80 BPM.
STAGE 6. L. SPRABERRY SHALE. PERFS 9596-99, 9644-47, 9688-91, 9748-51. 4 SPF. 12 HOLES/GUN. BREAKDOWN 71 BBL OF 15% HCL. BROKE @ 1648. 142330 LBS IN FORMATION ( 22390 - 40/70 WHITE / 99989 - 30/50 WHITE / 19951 - 30/50 SLC ). 4547 BBL TO RECOVER. AVE PSI 4370 MAX PSI 5075 AVE RATE 82.9 BPM MAX RATE 84.0 BPM. NOTE: PUMPED 2#, ISIP 1387, FG 0.58 PSI/FT.
STAGE 7. L SPRABERRY. PERFS 9304-06, 9376-78, 9448-52, 9510-14. 3 SPF. 36 HOLES. BREAKDOWN 24 BBL OF 7.5% HCL. BROKE @ 1115. 146008 LBS IN FORMATION ( 125879 - 20/40 WHITE / 20129 - 30/50 SLC ). 1987 BBL TO RECOVER. AVE PSI 2091 MAX PSI 4144 AVE RATE 52.4 BPM MAX RATE 53.0 BPM NOTE: PUMPED 4#, PUMP 12# XL, ISIP 1362, FG 0.58 PSI/FT.
STAGE 8. M SPRABERRY. PERFS 9014-16, 9084-86, 9150-54, 9202-06. 3 SPF. 36 HOLES. BREAKDOWN 24 BBL OF 7.5% HCL. BROKE @ 1480. 120300 LBS IN FORMATION ( 99957 - 20/40 BROWN / 20342 - 30/50 SLC ). 1816 BBL TO RECOVER. AVE PSI 2253 MAX PSI 3286 AVE RATE 52.6 BPM MAX RATE 54.0 BPM. NOTE: PUMPED 4#, PUMP 12# XL, ISIP 1158, FG 0.56 PSI/FT.
STAGE 9. U SPRABERRY. PERFS 8752-54, 8832-34, 8884-88, 8936-40. 3 SPF. 36 HOLES. BREAKDOWN 24 BBL OF 7.5% HCL. BROKE @ 894. 119858 LBS IN FORMATION ( 99943 - 20/40 BROWN / 19916 - 30/50 SLC ). 1817 BBL TO RECOVER. AVE PSI 2155 MAX PSI 3116 AVE RATE 51.0 BPM MAX RATE 57.0 BPM. NOTE: PUMPED 4#, PUMP 12# XL, ISIP 801, FG 0.52 PSI/FT.
22:00 01:30 3.50 19.50 FRAC Frac Job STAGE 10. OPAL SPRABERRY. PERFS 8140-42, 8202-04, 8270-74, 8338-42. 3 SPF. 36 HOLES. BREAKDOWN 24 BBL OF 7.5% HCL. BROKE @ 6089. 113449 LBS IN FORMATION ( 93960 - 20/40 BROWN / 19489 - 30/50 SLC ). 1757 BBL TO RECOVER. AVE PSI 1932 MAX PSI 6089 AVE RATE 51.6 BPM MAX RATE 53.0 BPM. NOTE: PUMPED 4#, PUMP 12# XL, ISIP 635, FG 0.51 PSI/FT.
RIH AND SET CAP PLUG @ 8040'. POOH.
RDMO AST, ARCHER, WATER TRANSFER LLC, WADECO.
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Page 2/2 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 5.0, Report Date: 11/11/2014
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/2 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 6.0, Report Date: 11/12/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
60,500.00Cum Field Est To Date (Cost)
634,000.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Drilled out frac plugsOperations at Report Time
Moving tanks on locationOperations Next Report Period
Flowback well
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
06:00 01:00 19.00 19.00 DRLFRAC Drill Frac Plugs
ND FRAC STACK. NU 5K MASTER VALVE.MIRU PRO PETRO CTU. MAKE UP TOOLS. TEST VALVE TO 3000 PSI FOR 5 MINUTES ( GOOD ). OPEN WELL.TIH TO FIRST PLUG @ 7998'.
PLUG 1. NO FILL. DT = 4 MIN. 400 CSG PSI. PUMPED HEAVY GEL SWEEP.
PLUG 2. 10' OF FILL. WT = 3 MIN. DT = 15 MIN. 425 CSG PSI. PUMPED HEAVY GEL SWEEP.
PLUG 3. 31' OF FILL. WT = 8 MIN. DT = 8 MIN. 450 CSG PSI. PUMPED HEAVY GEL SWEEP.
PLUG 4. NO FILL. DT = 4 MIN. 450 CSG PSI. PUMPED HEAVY GEL SWEEP.
PLUG 5. 53' OF FILL. WT = 8 MIN. DT = 8 MIN. 450 CSG PSI. PUMPED HEAVY GEL SWEEP.
PLUG 6. 99' OF FILL. WT = 12 MIN. DT = 6 MIN. 450 CSG PSI. PUMPED HEAVY GEL SWEEP.
PLUG 7. NO FILL. DT = 10 MIN. 450 CSG PSI. PUMPED HEAVY GEL SWEEP.
PLUG 8. NO FILL. DT = 4 MIN. 525 CSG PSI. PUMPED HEAVY GEL SWEEP.
PLUG 9. 14' OF FILL. WT = 4 MIN. DT = 12 MIN. 525 CSG PSI. PUMPED HEAVY GEL SWEEP.
PLUG 10. NO FILL. DT = 13 MIN. 525 CSG PSI. PUMPED HEAVY GEL SWEEP.
TIH TO PBTD @ 10986' AND P/U 10'. PUMPED HEAVY GEL SWEEP. CIRC BOTTOMS UP WITH 260 BBL OF F/W. PUMPED NITROGEN AND FOAMER. POOH.RDMO PRO PETRO CT UNIT.
01:00 06:00 5.00 24.00 NO ACTIVITY
No Operations
Shut down for night
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Page 2/2 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 6.0, Report Date: 11/12/2014
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 7.0, Report Date: 11/23/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
2,550.00Cum Field Est To Date (Cost)
636,550.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total: 0 BBLSAccumulated Water: 616 BBLSFlowing Casing Pressure: 0 PSILOAD RECOVERED: 1.7%Well shut in-pressure build upOperations at Report Time
Well shut in-pressure build upOperations Next Report Period
Well shut in
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 8.0, Report Date: 11/24/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
636,740.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total: 0 BBLSAccumulated Water: 616 BBLSFlowing Casing Pressure: 0 PSILOAD RECOVERED: 1.7%Well shut in-pressure build upOperations at Report Time
Well shut in-pressure build upOperations Next Report Period
Well shut in. Pressure build up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 9.0, Report Date: 11/25/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
636,930.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total: 134 BBLSAccumulated Water: 750 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 2.2%Well shut in-pressure build upOperations at Report Time
Opened well upOperations Next Report Period
Opened well up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 10.0, Report Date: 11/26/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
637,120.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total: 0 BBLSAccumulated Water: 750 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 2.2%Well shut in-pressure build upOperations at Report Time
Well shut in-pressure build upOperations Next Report Period
Well shut in. Pressure build up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 11.0, Report Date: 11/27/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
637,310.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total: 0 BBLSAccumulated Water: 750 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 2.2%Casing Pressure: 120Well shut in-pressure build up.Operations at Report Time
Well shut in-pressure build upOperations Next Report Period
Well shut in. Pressure build up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 12.0, Report Date: 11/28/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
637,500.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total: 0 BBLSAccumulated Water: 750 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 2.2%Casing Pressure: 220Well shut in-pressure build up.Operations at Report Time
Well shut in-pressure build upOperations Next Report Period
Well shut in. Pressure build up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 13.0, Report Date: 11/29/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
637,690.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:46 BBLSAccumulated Water: 796 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 2.3%Casing Pressure: 10Opened up to tanks.Operations at Report Time
Opened up to tanks.Operations Next Report Period
Opened well up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 14.0, Report Date: 11/30/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
637,880.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:0 BBLSAccumulated Water: 796 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 2.3%Casing Pressure: 10Shut in for buildup.Operations at Report Time
Shut in for Buildup.Operations Next Report Period
Well shut in. Pressure build up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 15.0, Report Date: 12/1/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
638,070.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:0 BBLSAccumulated Water: 796 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 2.3%Casing Pressure: 10Shut in for buildup.Operations at Report Time
Shut in for Buildup.Operations Next Report Period
Well shut in. Pressure build up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 16.0, Report Date: 12/2/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
638,260.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:0 BBLSAccumulated Water: 796 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 2.3%Casing Pressure: 70Shut in for buildup.Operations at Report Time
Shut in for Buildup.Operations Next Report Period
Well shut in. Pressure build up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 17.0, Report Date: 12/3/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
638,450.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:0 BBLSAccumulated Water: 796 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 2.3%Casing Pressure: 140Shut in for buildup.Operations at Report Time
Shut in for Buildup.Operations Next Report Period
Well shut in. Pressure build up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 18.0, Report Date: 12/4/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
638,640.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:0 BBLSAccumulated Water: 796 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 2.3%Casing Pressure: 140Shut in for buildup.Operations at Report Time
Shut in for Buildup.Operations Next Report Period
Well shut in. Pressure build up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 19.0, Report Date: 12/5/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
638,830.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:0 BBLSAccumulated Water: 796 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 2.3%Casing Pressure: 140Shut in for buildup.Operations at Report Time
Shut in for Buildup.Operations Next Report Period
Well shut in. Pressure build up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 20.0, Report Date: 12/6/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
639,020.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:0 BBLSAccumulated Water: 796 BBLSFlowing Casing Pressure: 200LOAD RECOVERED: 2.3%Shut in for buildup.Operations at Report Time
Shut in for Buildup.Operations Next Report Period
Well shut in. Pressure build up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 21.0, Report Date: 12/7/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
190.00Cum Field Est To Date (Cost)
639,210.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:0 BBLSAccumulated Water: 796 BBLSFlowing Casing Pressure: 200LOAD RECOVERED: 2.3%Shut in for buildup.Operations at Report Time
Shut in for Buildup.Operations Next Report Period
Well shut in. Pressure build up.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 22.0, Report Date: 12/8/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
61,823.00Cum Field Est To Date (Cost)
701,033.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:0 BBLSAccumulated Water: 796 BBLSFlowing Casing Pressure: 210LOAD RECOVERED: 2.3%Shut in for buildup.
Rod up well.Operations at Report Time
Shut in for Buildup. Rod Up well.Operations Next Report Period
Well shut in. Pressure build up. Continue to rod up well.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
06:00 18:00 12.00 12.00 RURDEQ RU & RD Equip.
MOVE IN WAIT FOR RIG MAT, RIG UP UNIT PREPARE WORK FLOOR & TONGS, TALLY TUBING PREPARE TO PICK UP PRODUCTION.
DIESEL USAGE:16 DAILY PREV.16 OVERALL
18:00 06:00 12.00 24.00 WOD Waiting On Daylight
SION.
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/2 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 23.0, Report Date: 12/9/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
61,895.00Cum Field Est To Date (Cost)
762,928.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:0 BBLSAccumulated Water: 796 BBLSFlowing Casing Pressure: 210LOAD RECOVERED: 2.3%Shut in for buildup.
Rod Up Well.Operations at Report Time
Shut in for Buildup. Rod Up well.Operations Next Report Period
Well shut in. Pressure build up. Continue to rod up well.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
06:00 18:00 12.00 12.00 RUTB Run Tubing RIG UP PUMP TRUCK TO PUMP 30 BBLS TO KILL WELL PICK UP MUD JOINT w/ BULL PLUG,4' PERF SUB, TAC, SN, 5 1/2" ROTATIONAL PAKER, 2 7/8" DON-NAN GAS SEPARATOR, 4' TBG SUB, MECHANICAL SEAT NIPPLE, 1 ENDURANCE JOINT, 229 JOINTS NIPPLE DOWN BOPE NIPPLE UP WELL HEAD SET TAC & PACKER w/ 29" OF TENSION, PREPARE RODS & PICK UP PUMP, 4' STABILIZER SUB, 3/4"X21k SHEAR TOOL 18-1 1/2" SINKER BARS w/ 4' STABILIZER SUB BETWEEN EACH 62-7/8" KD's RODS 1-1.2" FLEX RODS PICK UP POLISH ROD TO SECURE WELL SION.
18:00 06:00 12.00 24.00 WOD Waiting On Daylight
SION.
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Page 2/2 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 23.0, Report Date: 12/9/2014
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 24.0, Report Date: 12/10/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
23,752.00Cum Field Est To Date (Cost)
786,680.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:0 BBLSAccumulated Water: 796 BBLSFlowing Casing Pressure: 210LOAD RECOVERED: 2.3%Shut in for buildup.
Rod up well.Operations at Report Time
Shut in for Buildup. Rod Up well.Operations Next Report Period
Well shut in. Pressure build up. Continue to rod up well.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
06:00 18:00 12.00 12.00 RURP Run Rods & Pump
CONTINUED TO PICK UP RODS SPACE PUMP OUT w/ 6' OF SUBS, RIG UP PUMP TRUCK TO PUMP 6 BBLS PRESSURE TEST TO 500 PSI HELD OK CHECK PUMP ACTION 4 STROKES GET TO 550 PSI HANG RODS, WAIT ON ELECTRICIAN TO HOOK ELECTICITY ON PUMPING UNIT MOTOR, START PUMPING UNIT WEIGHTS ARE TO HEAVY, RIG UP NOLAN H BRONSON TO REMOVE 2 WIEGHT FROM PUMPING UNIT, LET PUMP FOR 25 MINUTES, SECURE CABLES, ELECTRICIAN STILL WORKING ON UNIT SION.
18:00 06:00 12.00 24.00 WOD Waiting On Daylight
SION.
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 25.0, Report Date: 12/11/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
174,117.00Cum Field Est To Date (Cost)
960,797.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:0 BBLSAccumulated Water: 796 BBLSFlowing Casing Pressure: 210LOAD RECOVERED: 2.3%Shut in for buildup.Rod Up well.Operations at Report Time
Shut in for Buildup. Rod Up well.Operations Next Report Period
Well shut in. Pressure build up. Rod up completed.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
06:00 18:00 12.00 12.00 MR Move Rig CHECH PUMP ACTION STILL PUMPING GOOD RIG DOWN UNIT CLEAN LOCATION MOVE OFF.
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 26.0, Report Date: 12/12/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
790.00Cum Field Est To Date (Cost)
961,587.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:318 BBLSAccumulated Water: 1114 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 3.2%Shut in for buildup.
Operations at Report Time
ppng to frac tanksOperations Next Report Period
Ppng to frac tanks.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 27.0, Report Date: 12/13/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
530.00Cum Field Est To Date (Cost)
962,117.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:324 BBLSAccumulated Water: 1438 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 4.2%Shut in for buildup.
Operations at Report Time
ppng to frac tanks
Operations Next Report Period
Ppng to frac tanks.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 28.0, Report Date: 12/14/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
570.00Cum Field Est To Date (Cost)
962,687.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 12Hourly Oil: 0.0 BBLS Current Daily Oil Total: 0 BBLSAccumulated Oil: 0 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:324 BBLSAccumulated Water: 1762 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 5.1%Shut in for buildup.Operations at Report Time
ppng to frac tanks
Operations Next Report Period
PPNG to frac tanks.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 29.0, Report Date: 12/15/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
570.00Cum Field Est To Date (Cost)
963,257.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 3.0 BBLS Current Daily Oil Total: 72 BBLSAccumulated Oil: 72 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:284 BBLSAccumulated Water: 2046 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 5.9%PPNG to frac tanks.Operations at Report Time
ppng to frac tanksOperations Next Report Period
PPNG to frac tanks.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 30.0, Report Date: 12/16/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
570.00Cum Field Est To Date (Cost)
963,827.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 1.75 BBLS Current Daily Oil Total:42 BBLSAccumulated Oil:114 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:279 BBLSAccumulated Water: 2325 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 6.8%PPNG to frac tanks.Operations at Report Time
ppng to frac tanksOperations Next Report Period
PPNG to frac tanks.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 31.0, Report Date: 12/17/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
510.00Cum Field Est To Date (Cost)
964,337.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 2.25 BBLS Current Daily Oil Total:54 BBLSAccumulated Oil:168 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:208 BBLSAccumulated Water: 2533 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 7.3%PPNG to frac tanks.Operations at Report Time
ppng to frac tanksOperations Next Report Period
PPNG to frac tanks.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 32.0, Report Date: 12/18/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
310.00Cum Field Est To Date (Cost)
964,647.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 2 BBLS Current Daily Oil Total:48 BBLSAccumulated Oil:216 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:220 BBLSAccumulated Water: 2753 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 8%PPNG to frac tanks.Operations at Report Time
ppng to frac tanksOperations Next Report Period
PPNG to frac tanks.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 33.0, Report Date: 12/19/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
310.00Cum Field Est To Date (Cost)
964,957.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 2.3 BBLS Current Daily Oil Total:56 BBLSAccumulated Oil:272 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:220 BBLSAccumulated Water: 2973 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 8.7%PPNG to frac tanks.Operations at Report Time
ppng to frac tanksOperations Next Report Period
PPNG to frac tanks.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 34.0, Report Date: 12/20/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
310.00Cum Field Est To Date (Cost)
965,267.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 2.5 BBLS Current Daily Oil Total:61 BBLSAccumulated Oil:333 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:190 BBLSAccumulated Water: 3163 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 9.2%PPNG to frac tanks.Operations at Report Time
ppng to frac tanksOperations Next Report Period
PPNG to frac tanks.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 35.0, Report Date: 12/21/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
310.00Cum Field Est To Date (Cost)
965,577.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 2.7 BBLS Current Daily Oil Total:65 BBLSAccumulated Oil:398 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:198 BBLSAccumulated Water: 3361 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 9.8%PPNG to frac tanks.Operations at Report Time
ppng to frac tanksOperations Next Report Period
PPNG to frac tanks.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 36.0, Report Date: 12/22/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
570.00Cum Field Est To Date (Cost)
966,147.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 3.08 BBLS Current Daily Oil Total:74 BBLSAccumulated Oil:472 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:176 BBLSAccumulated Water: 3537 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 10%PPNG to frac tanks.Operations at Report Time
ppng to frac tanksOperations Next Report Period
PPNG to frac tanks.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 37.0, Report Date: 12/23/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
310.00Cum Field Est To Date (Cost)
966,457.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 2.79 BBLS Current Daily Oil Total:67 BBLSAccumulated Oil:539 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:184 BBLSAccumulated Water: 3721 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 10.9%PPNG to frac tanks.Operations at Report Time
ppng to frac tanksOperations Next Report Period
PPNG to frac tanks.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)
Page 1/1 Report Printed: 1/27/2015www.peloton.com
Daily Completion
Well API/UWI
42-317-39312Surface Legal Location
18.6 miles NW direction fromn Tarzan
Field Name
Sprayberry TrendLease
University LandsState/Province
TexasWell Configuration Type
VerticalOriginal KB Elevation (ft)
2,928.00KB-Tubing Head Distance (ft) Rig Release Date
10/24/2014 12:00Spud Date
10/1/2014 12:30PBTD (All) (ftKB)
Original Hole - 11,140.0Total Depth (ftKB)
11,095.0
Well Name: University Lands 6-28A #1 Report # 38.0, Report Date: 12/24/2014
Primary Job Type
Completion - OriginalObjective
Completion - OrginalAFE Number
C14053Total AFE + Supp Amount (Cost)
1,338,000.00Daily Field Est Total (Cost)
310.00Cum Field Est To Date (Cost)
966,767.00Daily Contacts
Job Contact Title Mobile
Marco Davis Comp. Contractor 325-338-8775
Daily ReadingsTubing Pressure (psi) Casing Pressure (psi) Rig Time (hr)
Daily OperationsOperations Summary
Choke Size: 14Hourly Oil: 0.0 BBLS Current Daily Oil Total:0.0 BBLSAccumulated Oil:539 BBLSTotal Water To Recover: 34,236 BBLSCurrent Daily Water Total:184 BBLSAccumulated Water: 3721 BBLSFlowing Casing Pressure: 0LOAD RECOVERED: 10.9%Well going to battery, emptying frac tanks.Operations at Report Time
Well going to battery, emptying frac tanks.Operations Next Report Period
Well going to battery. Emptying frac tanks.
Time Log
Start Time End Time Dur (hr) Cum Dur (hr) Activity CodeActivity
Description Comments
Supply Item Description Consumed Cum Consumed
Personnel LogCompany Head count Total Working Time (hr)
Head Count Personnel Total Hours (hr) Cum Personnel Total Hours (hr)
Rig Contractor Rig Number Rig Supervisor
Pump Number / Unit Strokes (spm) Stroke Length (in)
Tubing RunRun Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade String Length (ft)
Tubing PulledPull Time Tubing Description Set Depth (ftKB) String Max Nominal OD (in) Weight/Length (lb/ft) String Grade
Rod RunRun Date Rod Description Set Depth (ftKB) In Tubing String
Rod ComponentsItem Description OD Nominal (in) Grade Length (ft) Joints
Other in Hole Run (Bridge Plugs, etc)Run Time Des OD (in) Top (ftKB) Btm (ftKB)