    No Name Sub-Department Job

    1 Anang Wirdianto Mechanical Balance of Plant Turbine & Generator - Erection

    2 Suswono Mechanical Balance of Plant BQ Cooling Water Distribution System

    3 Eko Setioro Mechanical Balance of Plant BQ Low Compressed Air System4 Yulianus Sampe Rea Mechanical Balance of Plant BQ Fire Fighting System

    5 Subair Mechanical Balance of Plant BQ Lub. Oil System

    6 Ihrar Nuzul Azis Mechanical Balance of Plant BQ HVAC System

    7 Ayana Mechanical Balance of Plant Check Drawing Turbine 2.5 MW

    8 Guruh Prasetya Mechanical Balance of Plant Drawing Dewatering System

    9 Gherry Adrian Mechanical Balance of Plant Redraw Drawing Turbine 2.5 MW

    10 Muhammad Faisal Mechanical Balance of Plant Drawing Low Compressed Air System-Pneumatic Device

    1 Anang Wirdianto Mechanical Balance of Plant Turbine & Generator - Erection

    2 Suswono Mechanical Balance of Plant BQ Cooling Water Distribution System

    3 Eko Setioro Mechanical Balance of Plant Valve List Low Compressed Air System

    4 Yulianus Sampe Rea Mechanical Balance of Plant Valve List Fire Fighting System

    5 Subair Mechanical Balance of Plant BQ Servomotor Oil (SR - S2- A029)

    6 Ihrar Nuzul Azis Mechanical Balance of Plant Revisi - Tech. Specification CO2 System

    7 Ayana Mechanical Balance of Plant Check Drawing Turbine 2.5 MW

    8 Guruh Prasetya Mechanical Balance of Plant Drawing Dewatering System

    9 Gherry Adrian Mechanical Balance of Plant Redraw Drawing Turbine 2.5 MW

    10 Muhammad Faisal Mechanical Balance of Plant Drawing Low Compressed Air System-Pneumatic Device

    1 Anang Wirdianto Mechanical Balance of Plant Revisi P&ID Low Compressed Air System for Pneumatic devic

    2 Suswono Mechanical Balance of Plant Check Drawing Cooling Water System ( China Refence)

    3 Eko Setioro Mechanical Balance of Plant Prepared P&ID Low Compressed Air System for Pneumatic d

    4 Yulianus Sampe Rea Mechanical Balance of Plant Fire Fighting System Calculation

    5 Subair Mechanical Balance of Plant BQ Servomotor Oil (SR - S2- A029) - China Refence

    6 Ihrar Nuzul Azis Mechanical Balance of Plant Revisi - Tech. Specification CO2 System

    7 Ayana Mechanical Balance of Plant Check drawing - Draft tube cone Turbine 3 x 65 MW

    Check drawing - stator Turbine 2.5 MW

    Check drawing - Embeded pipe el. +285.150

    8 Guruh Prasetya Mechanical Balance of Plant Revisi Drawing Drainage System

    9 Gherry Adrian Mechanical Balance of Plant Redrawing Turbine 2.5 MW

    10 Muhammad Faisal Mechanical Balance of Plant Drawing Low Compressed Air System-Pneumatic Device

    1 Anang Wirdianto Mechanical Balance of Plant Turbine & Generator - Erection

    2 Suswono Mechanical Balance of Plant Check Drawing Dewatering System

    3 Eko Setioro Mechanical Balance of Plant Revisi - B Q - Low Compressed Air System for Pneumatic devi

    4 Yulianus Sampe Rea Mechanical Balance of Plant Fire Fighting System Calculation

    5 Subair Mechanical Balance of Plant Oil Pipe Servomotor

    6 Ihrar Nuzul Azis Mechanical Balance of Plant Data Sheet - Blower

    7 Ayana Mechanical Balance of Plant Check drawing - Draft tube cone Turbine 3 x 65 MW

    Check drawing - Embeded pipe el. +285.1508 Guruh Prasetya Mechanical Balance of Plant Revisi Drawing Drainage System

    9 Gherry Adrian Mechanical Balance of Plant Redrawing Turbine 2.5 MW

    10 Muhammad Faisal Mechanical Balance of Plant Drawing Low Compressed Air System-Pneumatic Device (OK)

    1 Anang Wirdianto Mechanical Balance of Plant Turbine & Generator Erection - List Tools

    2 Suswono Mechanical Balance of Plant Check Drawing Drainage System + BQ Cooling Water Supply S

    3 Eko Setioro Mechanical Balance of Plant Update - BQ Low Compressed Air System for Pneumatic dev

    4 Yulianus Sampe Rea Mechanical Balance of Plant Fire Fighting System Calculation + BQ (Per-Floor)

    5 Subair Mechanical Balance of Plant Update - BQ Dewatering & Drainage System + BQ (Per-Floor

    6 Ihrar Nuzul Azis Mechanical Balance of Plant Data Sheet - Blower

    7 Ayana Mechanical Balance of Plant Check drawing - Turbine 2.5 MW + Pipe Joint (Turbine 3x65 M

    8 Guruh Prasetya Mechanical Balance of Plant Revisi Drawing Drainage & Dewatering System

    9 Gherry Adrian Mechanical Balance of Plant Drawing - General Assembly & Frame Stator Turbine 2.5 MW10 Muhammad Faisal Mechanical Balance of Plant Drawing - Oil Pipe Servomotor

    Tanggal : 7 April 2009

    Tanggal : 8 April 2009

    MECHANICAL ENGINEERING - DAILY ACTIVITIES REPORT

    Tanggal : 1 April 2009

    Tanggal : 2 April 2009

    Tanggal : 3 April 2009

    Tanggal : 6 April 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    2/58

    10 Gherry Adrian Mechanical Balance of Plant Drawing Oil Level Window Holding Plate + Oil Holding Cover

    10 Gherry Irhamsyah Mechanical Balance of Plant On the JOB Trainning - Embeded Pipe

  • 7/27/2019 Daily Activities Report 2009.xls

    3/58

    Responsibility Remark

    Engineer SPJ

    Engineer PE

    Engineer PEEngineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer SPJ

    Engineer PE

    Engineer PE

    Engineer PE

    Engineer PE

    Engineer PEChecker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer PE

    Engineer PE

    Engineer PE

    Engineer PE

    Engineer PE

    Checker PE

    PE

    PE

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer SPJ

    Engineer PE

    Engineer PE

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJDrafter SPJ

    Drafter SPJ

    Engineer SPJ

    Engineer PE

    Engineer PE

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

  • 7/27/2019 Daily Activities Report 2009.xls

    4/58

    Drafter SPJ

    Drafter SPJ

  • 7/27/2019 Daily Activities Report 2009.xls

    5/58

    No Name Sub-Department

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Gherry Adrian Mechanical Balance of Plant

    10 Muhammad Faisal Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Gherry Adrian Mechanical Balance of Plant

    10 Muhammad Faisal Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant8 Guruh Prasetya Mechanical Balance of Plant

    9 Gherry Adrian Mechanical Balance of Plant

    10 Muhammad Faisal Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    MEC

    Tanggal : 1 May 2009

    Tanggal : 4 May 2009

    Tanggal : 5 May 2009

    Tanggal : 6 May 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    6/58

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Gherry Adrian Mechanical Balance of Plant

    10 Muhammad Faisal Mechanical Balance of Plant11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant9 Gherry Adrian Mechanical Balance of Plant

    10 Muhammad Faisal Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    Tanggal : 7 May 2009

    Tanggal : 8 May 2009

    Tanggal : 11 May 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    7/58

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    Tanggal : 12 May 2009

    Tanggal : 13 May 2009

    Tanggal : 14 May 2009

    Tanggal : 15 May 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    8/58

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    Tanggal : 18 May 2009

    Tanggal : 19 May 2009

    Tanggal : 20 May 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    9/58

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    Tanggal : 27 May 2009

    Tanggal : 25 May 2009

    Tanggal : 22 May 2009

    Tanggal : 26 May 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    10/58

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    Tanggal : 28 May 2009

    Tanggal : 29 May 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    11/58

    Job

    Check Pipe Routing High Compresseed air supply system for Head Cover

    Design - BQ online

    .- Cross Check Doc Design Drawing From Dc

    - Check Revisi Doc & Drawing

    - Updated Drawing List

    Tech. Spec Fire Fighting System (Hydrant)

    Layout Peti Kemas - Flange - Container - BJP

    Update BQ Cooling Water Distribution System Inlet - China

    Interface Turbine 3x65MW

    Update Drawing screen for Fire Fighting System (Hydrant)

    Rev. Drawing Bearing Base - Turbine 2.5 MW

    Rev. Drawing Compressed Air System for Head Cover

    Drawing assembly embeded pipe

    Cuti

    BQ-Online

    Cross check Hard copy All document MBOP in EDC, Check status revision document

    Tech. Spec Fire Fighting System (Hydrant)

    Update Packing List & Cost Estimate Drainage

    BQ Cooling Water System Inlet $ Outlet

    Site

    BQ Screen Pipe for Cooling Water Supply & Hydrant

    Drawing General Assembly Turbine 2.5MW

    Drawing Pipe Routing brake & jack device

    Rev. Drawing - assembly embeded pipe el. 285.150-289.000

    Cuti

    BQ-Online

    - Check Doc System All Mbop In Dc (Hard And Soft Copy)

    - Updated Doc & Draw List Mbop

    - Check & Updated Status Revision Doc Mbop Dc.

    BQ in Pitliner High Compressed Air system

    BQ in Pitliner Drainage system

    BQ Cooling Water System Inlet $ Outlet

    SiteDetail Drawing Cooling Water Distribution System - InLet

    Drawing General Assembly Turbine 2.5MW

    Drawing Pipe Routing brake & jack device

    Drawing HVAC

    Cuti

    BQ-Online

    ANICAL ENGINEERING - DAILY ACTIVITIES REPORT

  • 7/27/2019 Daily Activities Report 2009.xls

    12/58

    Site - Riau

    BQ in Pitliner High Compressed Air system

    BQ in Pitliner Drainage system

    BQ in Pitliner Pressurize Oil

    Site - Poso

    Detail Drawing Cooling Water Distribution System - InLet

    Drawing thrust bearing Turbine

    Drawing Compress air for brake & Jacking DeviceDrawing HVAC

    Cuti

    BQ-Online & Update Drawing List MBOP

    Site - Riau

    BQ in Pitliner High Compressed Air system

    Update - BQ Drainage System in Pit Liner & Cost Estimate

    Check-BQ in Pitliner - Cooling Water System

    Site - Poso

    Revisi Drawing Screen Fire Fighting SystemDrawing Lower bearing segment dan upper oil cover Turbine 2.5 MW

    Drawing Compress air for brake & Jacking Device

    Drawing HVAC - B2 Floor

    Cuti

    BQ-Online & Check Drawing

    Site - Riau

    BQ High Compressed Air for Head Cover in Pit Liner (Done) & Low Compressed

    Review - Drawing Lub. Oil System (BQ-In Pit Liner)

    Update vendor evaluation

    Site - Poso

    Detail Drawing Cooling Water Distribution System - InLet

    Drawing Compressed Air System for Shaft Seal

    Drawing Cover,Oil baffle, Upper oil cover, Upper bearing segment, & Ring Turbine 2,5 MW

    Detail Drawing HVAC - B2 Floor

    1. Check P&ID high Pressurized oil for Thrust bearing

    2. Check Pipe Routing Pressurized Oil for Thrust Bearing

    3. Check Pipe routing Low Compressed air supply system

    4. Check Pipe Routing Lubricating Oil Supply and Drain System

    BQ-OnLine -Material IDSite - Riau

    BQ - Low Compressed Air System - In Pit Liner

    BQ & automation list lubricating oil

    BQ - High Pressurzed Oil for Thrust Bearing

    Site - Poso

    Detail Drawing cooling water inlet(B2)

    Revisi Low Compress Air Pipe Routing

    Revisi Thrust Bearing Pipe Routing

  • 7/27/2019 Daily Activities Report 2009.xls

    13/58

    Detail Drawing thrust bearing Turbine 2.5MW

    Detail Drawing exhaust ventilation system

    Check pipe routing Low compressed air supply system

    Update Progress Report MBOP

    Site - Riau

    Update bq low compressed air for brake & jack deviceUpdate BQ governing system

    Calculation - Exhaust ventilation system

    Site - Poso

    Revisi cooling water supply(finish)

    Revisi screen pipe cooling water supply

    Update Drawing -Pipe Routing Co2

    Detail Drawing General Assembly & Pedestal bearing Turbine 2.5MW

    Detail Drawing exhaust ventilation system

    Check Pipe routing for Brake and Jack deviceConfirm to China about Brake and Jack device system

    Update Drawing List & BQ Online

    Site - Riau

    BQ - Low Compressed Air Supply For Shaft Seal

    Update BQ-Governing System (Per-floor)

    Calculation - Exhaust ventilation system

    Site - Poso

    -Revisi detail Screen Pipe for Cooling water (finish)

    -detail cooling water inlet

    Update Drawing -Pipe Routing Co2

    Drawing Cooller - Pedestal Turbine 2.5 MW

    Detail Drawing exhaust ventilation system

    Check water and air piping in pit

    Update Drawing List & BQ Online

    Site - Riau

    BQ - Low Compressed Air Supply For Shaft Seal

    Update BQ-Governing System (Per-floor)

    Ducting fabrication procedure

    Site - Poso

    Detail Drawing Cooling Water Distribution System - Inlet

    Update Drawing -Pipe Routing Co2Drawing Hand Rail - General Facility

    Detail Drawing exhaust ventilation system B1-B2-B3

    Check Pipe routing of governor and servomotor system

    Update Drawing List - SUBMISSION SCHEDULE & BQ Online

    Site - Riau

    BQ - Low Compressed Air Supply For Pneumatic Device

  • 7/27/2019 Daily Activities Report 2009.xls

    14/58

    Update BQ-Governing System (Per-floor)

    Check Drawing -Pipe Routing Co2

    Site - Poso

    Detail Drawing Cooling Water Distribution System - Inlet

    Update Drawing -Pipe Routing Co2 & Revisi - Drawing Title

    Drawing Hand Rail - General Facility

    Detail Drawing exhaust ventilation system - Ground Floor

    1. check pipe routing for Low compressed air supply system for pneumatic devices

    2. Check pipe routing for Low compressed air supply system

    3. Check pipe routing for servo motor

    4. Check pipe routing for High pressurized oil for thrust bearing

    5. prepare interface pipe list of GB standart (supplied by Seri) and JIS standart (supplied by Bukaka)

    Check - Drawing Dewatering, Drainage, Cooling & BQ Online

    Site - Riau

    Chech Drawing Drainage, Dewatering, Cooling, & BQ Online

    Review Drawing Lub Oil System & Governing System - Pipe RoutingCheck - Drawing exhaust ventilation system - Ground Floor

    Site - Poso

    detail Drawing cooling water outlet b2 floor

    Update Drawing -Compress Air System for Thrust Bearing

    Drawing Loadding Lopper - General Facility

    Detail Drawing exhaust ventilation system - Ground Floor

    Check pipe routing for Low compressed air supply system for pneumatic devices + Cuti

    BQ Online, Check Detail Drawing Screen Pipe Cooling & Hydrant

    Site - Riau

    BQ Low Comp. Air for Pneumatic Devices

    Update BQ-Drainage & Dewatering System (Per-floor)

    Update BQ-Cooling Water System (Per-floor)

    Site - Poso

    Detail Drawing Cooling Distribution Outlet B2 & B3 floor

    Drawing Pipe Routing Servo Motor - Governing System

    Drawing GE Loading Hopper

    Detail Drawing embeded Pipe - B3

    Cuti

    Check Embeded Pipe & UpdateSite - Riau

    BQ Low Comp. Air for Pneumatic Devices

    Update BQ-Drainage & Dewatering System (Per-floor)

    Update BQ-CO2 (Per-floor) - Calculation HVAC

    Site - Poso

    Detail Drawing Cooling Water Outlet

    Drawing Pipe Routing Servo Motor - Governing System

    Drawing GE Loading Hopper

  • 7/27/2019 Daily Activities Report 2009.xls

    15/58

    Detail Drawing embeded Pipe - B2-B3

    Cuti

    Check Embeded Pipe Calculation

    Site - Riau

    BQ Low Comp. Air for Pneumatic Devices

    Update BQ - Governing SystemCheck Drawing HVAC

    Site - Poso

    Detail Drawing Fire Fighting System

    Update Drawing -Compress Air System for Thrust Bearing

    Drawing GE Loading Hopper

    Detail Drawing embeded Pipe - B2-B3

    Cuti

    Check Embeded Pipe Calculation

    Site - RiauPart list supplied by china (MBOP)

    Update BQ - Governing System

    Update Tech. Spec. HVAC

    Chech Anchor Block

    Update Drawing lubricating oil inlet

    Revisi Thrust Bearing Pipe Routing

    Pedestal bearing dan detail tower crane

    Detail Drawing embeded Pipe - B2

    Cuti

    Check Material ID's for BQ OnlineSite - Riau

    Update Material ID's for BQ Online

    Update BQ - Lub. Oil System & Governing System

    Update Tech. Spec. HVAC

    Revisi intergated MBOP

    Detail Drawing lubricatiing Oil inlet b1 floor

    Revisi Head Cover Pipe Routing

    Detail Tower Crane

    Detail Drawing embeded Pipe El+294.500

    Cuti

    BQ Online & Embeded Pipe

    Site - Riau

    Update Material ID's for BQ

    Governing system & Packing BJP

    Update Tech. Spec. HVAC

    Check anchor block penstock - design drawing diverter gate batching plant

    Detail Drawing lubricatiing Oil inlet b1 floor

  • 7/27/2019 Daily Activities Report 2009.xls

    16/58

    Revisi servomotor pipe routing

    Absent

    Detail Drawing embeded Pipe - B2-B3

    Cuti

    Inspection (pipe) - PT Paradise Perkasa

    Site - Riau

    Inspection (pipe) - PT Paradise Perkasa

    Governing system & Packing BJP

    Check Drawing HVAC

    Check anchor block penstock - design drawing diverter gate batching plant

    lubricating Oil Inlet Elevation on axis

    Revisi servomotor pipe routing

    Drawing Conveyor Accessories

    Detail drawing section embeded pipe GF,B1,B2

    CutiBQ Online & Embeded Pipe

    Site - Riau

    Tech. Spec. Fire Fighting System

    BQ and Scematic Governing system

    Check Drawing HVAC

    Drawing batching plant

    Drawing lubricating Oil Outlet b1 & b2 floor

    Drawing servomotor pipe routing & suport location

    Drawing Conveyor Accessories

    Detail drawing section embeded pipe B1,B2

  • 7/27/2019 Daily Activities Report 2009.xls

    17/58

    Responsibility Remark

    Engineer SPJ

    Engineer PE

    Engineer PE

    Engineer PE

    Engineer SPJ

    Engineer PE

    Checker PE

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Engineer SPJ

    Engineer PE

    Checker -

    Drafter PE

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer

    Engineer PE

    Engineer PE

    Engineer PE

    Engineer PE

    Engineer PE

    Checker -Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer -

    Engineer PE

  • 7/27/2019 Daily Activities Report 2009.xls

    18/58

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker -

    Drafter SPJ

    Drafter SPJ

    Drafter SPJDrafter SPJ

    Engineer -

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker -

    Drafter SPJDrafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer -

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker -Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer PEEngineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker -

    Drafter SPJ

    Drafter SPJ

  • 7/27/2019 Daily Activities Report 2009.xls

    19/58

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer PE

    Engineer -

    Engineer PEEngineer PE

    Engineer PE

    Checker -

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker -

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker -

    Drafter SPJ

    Drafter SPJDrafter SPJ

    Drafter SPJ

    Engineer SPJ

    Engineer PE

    Engineer -

    Engineer

  • 7/27/2019 Daily Activities Report 2009.xls

    20/58

    Engineer PE

    Engineer SPJ

    Checker -

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PEEngineer PE

    Checker -

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer -

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker -

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer -

    Engineer PEEngineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker -

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

  • 7/27/2019 Daily Activities Report 2009.xls

    21/58

    Drafter SPJ

    Engineer -

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PEEngineer SPJ

    Checker -

    Drafter SPJ

    Drafter SPJ

    Drafter spj

    Drafter SPJ

    Engineer -

    Engineer PE

    Engineer -Engineer PE

    Engineer PE

    Engineer PE

    Checker PE

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer -

    Engineer PEEngineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker PE

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    SPJ

    Engineer -

    Engineer PE

    Engineer -

    Engineer SPJ

    Engineer SPJ

    Engineer PE

    Checker SPJ

    Drafter SPJ

  • 7/27/2019 Daily Activities Report 2009.xls

    22/58

    Drafter SPJ

    Drafter -

    Drafter SPJ

    Engineer -

    Engineer PE

    Engineer -Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer -Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer SPJ

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

  • 7/27/2019 Daily Activities Report 2009.xls

    23/58

    No Name Sub-Department

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Gherry Adrian Mechanical Balance of Plant

    10 Muhammad Faisal Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Gherry Adrian Mechanical Balance of Plant

    10 Muhammad Faisal Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Gherry Adrian Mechanical Balance of Plant

    10 Muhammad Faisal Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    MEC

    Tanggal : 1 Juni 2009

    Tanggal : 2 Juni 2009

    Tanggal : 3 Juni 2009

    Tanggal : 4 Juni 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    24/58

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Gherry Adrian Mechanical Balance of Plant

    10 Muhammad Faisal Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Gherry Adrian Mechanical Balance of Plant10 Muhammad Faisal Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    Tanggal : 5 Juni 2009

    Tanggal : 8 Juni 2009

    Tanggal : 9 Juni 2009

    Tanggal : 10 Juni 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    25/58

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    Tanggal : 11 Juni 2009

    Tanggal : 12 Juni 2009

    Tanggal : 15 Juni 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    26/58

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Anang Wirdianto Mechanical Balance of Plant

    2 Suswono Mechanical Balance of Plant

    3 Eko Setioro Mechanical Balance of Plant

    4 Yulianus Sampe Rea Mechanical Balance of Plant

    5 Subair Mechanical Balance of Plant

    6 Ihrar Nuzul Azis Mechanical Balance of Plant

    7 Ayana Mechanical Balance of Plant

    8 Guruh Prasetya Mechanical Balance of Plant

    9 Muhammad Faisal Mechanical Balance of Plant

    10 Gherry Adrian Mechanical Balance of Plant

    11 Gherry Irhamsyah Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Eko Setioro Mechanical Balance of Plant

    3 Yulianus Sampe Rea Mechanical Balance of Plant

    4 Subair Mechanical Balance of Plant

    5 Ihrar Nuzul Azis Mechanical Balance of Plant

    6 Ayana Mechanical Balance of Plant

    7 Guruh Prasetya Mechanical Balance of Plant

    8 Muhammad Faisal Mechanical Balance of Plant

    9 Gherry Adrian Mechanical Balance of Plant

    10 Gherry Irhamsyah Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Eko Setioro Mechanical Balance of Plant

    3 Yulianus Sampe Rea Mechanical Balance of Plant

    4 Subair Mechanical Balance of Plant

    5 Ihrar Nuzul Azis Mechanical Balance of Plant

    6 Ayana Mechanical Balance of Plant

    7 Guruh Prasetya Mechanical Balance of Plant

    8 Muhammad Faisal Mechanical Balance of Plant9 Gherry Adrian Mechanical Balance of Plant

    10 Gherry Irhamsyah Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Eko Setioro Mechanical Balance of Plant

    3 Yulianus Sampe Rea Mechanical Balance of Plant

    4 Subair Mechanical Balance of Plant

    Tanggal : 16 Juni 2009

    Tanggal : 17 Juni 2009

    Tanggal : 18 Juni 2009

    Tanggal : 19 Juni 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    27/58

    5 Ihrar Nuzul Azis Mechanical Balance of Plant

    6 Ayana Mechanical Balance of Plant

    7 Guruh Prasetya Mechanical Balance of Plant

    8 Muhammad Faisal Mechanical Balance of Plant

    9 Gherry Adrian Mechanical Balance of Plant

    10 Gherry Irhamsyah Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Eko Setioro Mechanical Balance of Plant

    3 Yulianus Sampe Rea Mechanical Balance of Plant

    4 Subair Mechanical Balance of Plant

    5 Ihrar Nuzul Azis Mechanical Balance of Plant

    6 Ayana Mechanical Balance of Plant

    7 Guruh Prasetya Mechanical Balance of Plant

    8 Muhammad Faisal Mechanical Balance of Plant

    9 Gherry Adrian Mechanical Balance of Plant

    10 Gherry Irhamsyah Mechanical Balance of Plant

    11 Andriansah Mechanical Balance of Plant

    12 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Eko Setioro Mechanical Balance of Plant

    3 Yulianus Sampe Rea Mechanical Balance of Plant

    4 Subair Mechanical Balance of Plant

    5 Ihrar Nuzul Azis Mechanical Balance of Plant

    6 Ayana Mechanical Balance of Plant

    7 Guruh Prasetya Mechanical Balance of Plant

    8 Muhammad Faisal Mechanical Balance of Plant

    9 Gherry Adrian Mechanical Balance of Plant

    10 Gherry Irhamsyah Mechanical Balance of Plant

    11 Andriansah Mechanical Balance of Plant

    12 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Eko Setioro Mechanical Balance of Plant

    3 Yulianus Sampe Rea Mechanical Balance of Plant

    4 Subair Mechanical Balance of Plant

    5 Ihrar Nuzul Azis Mechanical Balance of Plant6 Ayana Mechanical Balance of Plant

    7 Guruh Prasetya Mechanical Balance of Plant

    8 Muhammad Faisal Mechanical Balance of Plant

    9 Gherry Irhamsyah Mechanical Balance of Plant

    10 Andriansah Mechanical Balance of Plant

    11 Mumud Mahmudin Mechanical Balance of Plant

    Tanggal : 22 Juni 2009

    Tanggal : 23 Juni 2009

    Tanggal : 24 Juni 2009

    Tanggal : 25 Juni 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    28/58

    1 Suswono Mechanical Balance of Plant

    2 Eko Setioro Mechanical Balance of Plant

    3 Yulianus Sampe Rea Mechanical Balance of Plant

    4 Subair Mechanical Balance of Plant

    5 Ihrar Nuzul Azis Mechanical Balance of Plant

    6 Ayana Mechanical Balance of Plant

    7 Guruh Prasetya Mechanical Balance of Plant

    8 Muhammad Faisal Mechanical Balance of Plant

    9 Gherry Irhamsyah Mechanical Balance of Plant

    10 Andriansah Mechanical Balance of Plant

    11 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Eko Setioro Mechanical Balance of Plant

    3 Yulianus Sampe Rea Mechanical Balance of Plant

    4 Subair Mechanical Balance of Plant

    5 Ihrar Nuzul Azis Mechanical Balance of Plant

    6 Ayana Mechanical Balance of Plant7 Guruh Prasetya Mechanical Balance of Plant

    8 Muhammad Faisal Mechanical Balance of Plant

    9 Gherry Irhamsyah Mechanical Balance of Plant

    10 Andriansah Mechanical Balance of Plant

    11 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Eko Setioro Mechanical Balance of Plant

    3 Yulianus Sampe Rea Mechanical Balance of Plant

    4 Subair Mechanical Balance of Plant

    5 Ihrar Nuzul Azis Mechanical Balance of Plant

    6 Ayana Mechanical Balance of Plant

    7 Guruh Prasetya Mechanical Balance of Plant

    8 Muhammad Faisal Mechanical Balance of Plant

    9 Gherry Irhamsyah Mechanical Balance of Plant

    10 Andriansah Mechanical Balance of Plant

    11 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Eko Setioro Mechanical Balance of Plant

    3 Yulianus Sampe Rea Mechanical Balance of Plant

    4 Subair Mechanical Balance of Plant

    5 Ihrar Nuzul Azis Mechanical Balance of Plant

    6 Ayana Mechanical Balance of Plant

    7 Guruh Prasetya Mechanical Balance of Plant

    8 Muhammad Faisal Mechanical Balance of Plant

    9 Gherry Irhamsyah Mechanical Balance of Plant

    10 Andriansah Mechanical Balance of Plant

    Tanggal : 29 Juni 2009

    Tanggal : 30 Juni 2009

    Tanggal : 26 Juni 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    29/58

    11 Mumud Mahmudin Mechanical Balance of Plant

  • 7/27/2019 Daily Activities Report 2009.xls

    30/58

    Job

    Cuti

    Check Document (EDC) + Progress Report MBOP - Fabrication Drawing

    Site - Riau

    Tech. Spec. Fire Fighting System

    Scematic Governing system

    Check Drawing HVAC

    Drawing batching plant

    Drawing lubricating Oil inlet

    Drawing drive pulley

    Drawing High Compressed Air For Head Cover

    Detail drawing section embeded pipe B1,B2

    CutiAbsent

    Site - Riau

    Maintenance Computer

    Maintenance Computer

    Check Drawing HVAC

    Check Drawing Embeded Pipe

    Revisi detail drawing screen hydrant

    Drawing Accessories Conveyor

    Cuti

    Detail drawing section embeded pipe B2

    Cuti

    Training - SOLIDWORK

    Site - Riau

    Training - SOLIDWORK

    Training - SOLIDWORK

    Training - SOLIDWORK

    Chech Grawing Fuvi

    Revisi Drawing screen cooling water System - Supply

    Print out - Drawing Turbin 2,5 MW

    Drawing Low Compressed Air Supply System For Brake & Jack Device

    Detail drawing section embeded pipe B1,GF

    Approval high compressed air supply system

    Approval Low compressed air supply system

    Training - SOLIDWORK

    Site - Riau

    Training - SOLIDWORK

    Training - SOLIDWORK

    ANICAL ENGINEERING - DAILY ACTIVITIES REPORT

  • 7/27/2019 Daily Activities Report 2009.xls

    31/58

    Training - SOLIDWORK

    Chech Grawing Fuvi

    Update Drawing hydrant routing

    FV 150x1000 mm

    Absent

    Detail drawing section embeded pipe B1,GF

    Approva ig pressurize oi system or t rust earing.

    Approval lub oil supply and drain system.

    Approval P&ID high compressed air supply system

    Training - SOLIDWORK

    Site - Riau

    Training - SOLIDWORK

    Training - SOLIDWORK

    Training - SOLIDWORK

    Facilitator-Training - SOLIDWORK

    Revisi Drawing Fire Fighting System - GF

    Drawing FV 200x1000 mmCuti

    Detail drawing section embeded pipe B3

    Erection Turbine & Generator

    Check Progress Report

    Site - Riau

    Review All BQ Hi & Low Comp. Air

    BQ Governing System & Formwork

    Check Drawing HVAC

    Chech Grawing FuviRevisi Drawing Fire Fighting System - GF

    High Compressed Air For Head Cover - Pipe Support Location

    Drawing FV 200x1000 mm

    Detail drawing section embeded pipe B1,B2

    Prepare Flowchart erection turbine & generator

    Check Progress Report

    Site - Riau

    Solid Form Work Type 900

    Solid Form Work Type 900

    Check Drawing HVAC

    Interfce PH

    Revisi Drawing Fire Fighting System - GF

    High Compressed Air For Pneumatic Device

    Drawing FV 200x200

    Detail drawing section embeded pipe EL+285.150

  • 7/27/2019 Daily Activities Report 2009.xls

    32/58

    Absent

    Solid 3D Dewatering System

    Site - Riau

    fuvi formwork 50 x 50 x 1000 solid 3d

    fuvi formwork 100 x 100 x 50 solid 3d

    fuvi formwork 100 x 100 x 50 solid 3d

    Check Solid 3D Fuvi & Formwork

    Revisi Drawing Fire Fighting System - GFHigh Compressed Air For Pneumatic Device

    Rev. Drawing - EH (20X20), EH (20x25), EH (20x30)

    Detail drawing section embeded pipe EL+285.150

    Check Compress Air System for Pneumatic Device

    Check BQ Embeded Pipe EL. 282.700-292.500

    Site - Riau

    Review Valve List Hi Comp. Air & BQ Embedded

    fuvi formwork 50 x 50 x 1000 solid 3d

    fuvi formwork 100 x 100 x 50 solid 3dfuvi formwork 100 x 100 x 50 solid 3d

    Revisi Drawing Fire Fighting System - GF

    High Compressed Air For Pneumatic Device

    Drawing EH 20X50 , EH 20X100 dan revisi gambar PV 200 x 1000 !

    Detail drawing section embeded pipe B3

    Persentasi Compress Air System

    Drawing 3D Dewatering System

    Site - Riau

    fuvi formwork 50 x 50 x 1000 solid 3d

    fuvi formwork 100 x 100 x 50 solid 3d

    fuvi formwork 100 x 100 x 50 solid 3d

    Check Solid 3D Fuvi & Formwork

    Revisi Drawing Fire Fighting System - GF

    Drawing Pipe Support Compress Air System for Head Cover

    Drawing EH 25-25, EH25-30 dan EH50-200

    - Revisi detail & section embeded pipe el.285.150

    - Section &detail embeded pipe el.289.000

    Absent

    Drawing 3D Dewatering SystemSite - Riau

    Fuvi 12x20 & 12x25

    fuvi formwork 100 x 100 x 50 solid 3d

    Drawing EH Panel 500x2000

    fuvi formwork 100 x 100 x 50 solid 3d

    Revisi Drawing Fire Fighting System - B3

  • 7/27/2019 Daily Activities Report 2009.xls

    33/58

    High compress air for head cover pipe routing ok (revisi)

    High compress air for head cover pipe support ok ( tunggu approval p'ay)

    High pressurized oil for thrust bearing pipe routing ok (revisi)

    High pressurized oil for thrust bearing pipe support location ok (tunggu approval p'a

    Drawing EH 1000X200

    - Revisi detail & section embeded pipe el.285.150

    Absent

    3D Dewatering System

    Site - Riau

    Fuvi EH 40x100

    Fu vi corner 50 dgn 100

    Solid Panel EH

    Check cad fuvi, check drawing stone crusher cap.170 tph, interface

    Revisi Drawing Fire Fighting System

    Co2 fire extinguishers system pipe support location

    Drawing Accesories I-PIN dan modifikasi gambar EH Panel 20x20, EH 20X25, EH 20X30

    - Revisi detail & section embeded pipe el.285.150

    Pipe Line Number Dewatering System & Update Detail Fabrication Drawing List

    Site - Riau

    Pipe Line Number Compress Air System

    Pipe Line Number Drainage System

    Pipe Line Number HVAC, CO2, High Pressurised Oil

    Check cad fuvi, check drawing stone crusher cap.170 tph, interface

    Revisi Drawing Fire Fighting System B3 & GF

    Drawing Governor & servomotor pipe support location

    Drawing PA06, SA03, PA12, PA09, PA03 dan PA07

    - Revisi detail & section embeded pipe el.289

    Pipe Line Number Drainage System & Update Detail Fabrication Drawing List

    Site - Riau

    Pipeline High & Low Comp. Air Supply, Pipeline Low Comp. Air Supply for Brake & Jack Device, Shaft

    Seal.

    Lub Oil Pipe Plan Number

    Draw. Duct solid

    Drawing batching plant

    Revition Draw. Piezometer Pipe

    Drawing Governor & servomotor pipe support locationDraw. SA101, SA02 dan SA06

    - Revisi detail & section embeded pipe EL+289.000 S/D EL+294.500

    Rev. P&ID Cooling Water System & BQ Online

    Site - Riau

    Pipeline Number Low Comp. Air for Pneumatic Devices

    Pipeline Number Lub Oil System

  • 7/27/2019 Daily Activities Report 2009.xls

    34/58

    Rev. Pipe Line No. HVAC & CO2

    Chechk Spoolgen & Fuvi

    Detail Drawing Piezometer Pipe

    Drawing Governor & servomotor pipe support location

    Detail Drawing Cooling Water Distribution System Outlet

    - Revisi detail & section embeded pipe EL+289.000 S/D EL+299

    Rev. P&ID Cooling Water System & Update Detail Fabrication Drawing List

    Site - Riau

    P&ID Piezometre

    P&ID Governing System

    Draw. 3D Solid HVAC

    Draw. Spool Embeded Pipe

    Drawing lubricating Oil System

    Drawing Compress Air System for Pneumatic Device pipe support location

    Cooling water distribution system outlet

    - Revisi gambar embeded b3...

    - buat elevasi,section & detail embeded b2Dewatering System - Detail of Spool

    Cooling water distribution system inlet

    3D Dewatering System

    Site - Riau

    Revisi Tech. Spec. Hydrant (ACC)

    Pipe Line No. - Governing System

    3D Solid HVAC

    Interface

    Drawing lubricating Oil System

    Thrust bearing pipe support location

    Cooling water distribution system outlet

    Detail & section embeded pipe B2 - Floor

    Dewatering System - Detail of Spool

    Cooling water distribution system inlet

    3D Dewatering System

    Site - Riau

    Update BQ - Piezometer Pipe

    Pipe Line No. - Governing System

    3D Solid HVACCheck frame cone crusher

    Detail Spool - Piezometer Pipe

    Low compress air for brake & jack pipe support location

    Detail & section embeded pipe B2 - Floor

    Dewatering System - Detail of Spool

    Cooling water distribution system inlet

  • 7/27/2019 Daily Activities Report 2009.xls

    35/58

    Pipe Line No. System - Drainage

    Site - Riau

    P&ID Piezometric

    Drafting 3d drainage water system, pid governing system

    3D Solid HVAC

    Diverter gate design drawing

    Detail Spool - Piezometer Pipe - Cooling Water System

    Pipe Support Location - Brake & Jacking Device

    Detail & section embeded pipe B2 - Floor

    Drainage System - Detail of Spool

    Low Compress Air Supply System for Pneumatic Device - Detail of Spool

    Pipe Line No. System - Dewatering - Cooling Water System

    Site - Riau

    Review Pipe Routing Piezometric

    Drafting 3d drainage water system, review routing high compress air supply to governour

    3D Solid HVAC

    Check MBOPDetail Spool - Piezometer Pipe

    High compress air pipe support location

    Detail & section embeded pipe B2 - Floor

    Drainage System - Detail of Spool

    Low Compress Air Supply System for Pneumatic Device - Detail of Spool

    3D Dewatering System

    Site - Riau

    Review Pipe Routing Hydrant

    Review instalation methode for electromechanical equipment, & instalation manual for generator &

    pipe routing & support governing systemTurbine & Generator - Instalation

    Check pipe spool

    Detail spool cooling water supply & ouotlet & Revisi drainage

    Absent

    Detail & section embeded pipe B2 - Floor

    Cooling Water Supply System - Detail of Spool

    Low Compress Air Supply System for Pneumatic Device - Detail of Spool

    Rev. Draw. & Doc No. System

    Site - Riau

    Review pipe routing Low compressed air system

    P&ID High Compressed Air System (Rev.) - Pipe Routing

    Turbine & Generator - Instalation

    Check pipe spool

    Update ref. Power House

    Draw. low compress air pipe routing

    Detail & section embeded pipe B2 - Floor

    Cooling Water Supply System - Detail of Spool

  • 7/27/2019 Daily Activities Report 2009.xls

    36/58

    Low Compress Air Supply System for Pneumatic Device - Detail of Spool

  • 7/27/2019 Daily Activities Report 2009.xls

    37/58

    Responsibility Remark

    Engineer -

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer -Engineer -

    Engineer -

    Engineer -

    Engineer -

    Engineer SPJ

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter

    Drafter SPJ

    Engineer -

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer -

    Engineer -

    Engineer -

    Engineer -

  • 7/27/2019 Daily Activities Report 2009.xls

    38/58

    Engineer -

    Checker

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer -

    Engineer -

    Engineer -

    Engineer -

    Engineer -

    Checker -

    Drafter SPJ

    Drafter SPJDrafter -

    Drafter SPJ

    Engineer SPJ

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer SPJ

    Checker SPJDrafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer SPJ

    Engineer PE

    Engineer -

    Engineer SPJ

    Engineer SPJ

    Engineer PE

    Checker PE

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

  • 7/27/2019 Daily Activities Report 2009.xls

    39/58

    Engineer -

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker PE

    Drafter PEDrafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PEChecker PE

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker PE

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer

    Engineer PEEngineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker PE

    Drafter

  • 7/27/2019 Daily Activities Report 2009.xls

    40/58

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer -

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJDrafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

  • 7/27/2019 Daily Activities Report 2009.xls

    41/58

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker PE

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PEChecker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    SPJ

  • 7/27/2019 Daily Activities Report 2009.xls

    42/58

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker PEDrafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter -

    Drafter SPJ

    Drafter SPK

    Drafter SPJ

    Engineer PE

    Engineer -

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter PE

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

  • 7/27/2019 Daily Activities Report 2009.xls

    43/58

    Drafter SPJ

  • 7/27/2019 Daily Activities Report 2009.xls

    44/58

    No Name Sub-Department

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    MECH

    Tanggal : 9 July 2009

    Tanggal : 1 July 2009

    Tanggal : 3 July 2009

    Tanggal : 6 July 2009

    Tanggal : 7 July 2009

  • 7/27/2019 Daily Activities Report 2009.xls

    45/58

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Ayana Mechanical Balance of Plant

    4 Guruh Prasetya Mechanical Balance of Plant

    5 Muhammad Faisal Mechanical Balance of Plant

    6 Gherry Irhamsyah Mechanical Balance of Plant

    7 Andriansah Mechanical Balance of Plant

    8 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    Tanggal : 10 July 2009

    Tanggal : 13 - 22 July 2009

    Tanggal :

  • 7/27/2019 Daily Activities Report 2009.xls

    46/58

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    Tanggal :

    Tanggal :

    Tanggal :

    Tanggal :

    Tanggal :

  • 7/27/2019 Daily Activities Report 2009.xls

    47/58

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    Tanggal :

    Tanggal : 30 Juni 2009

    Tanggal :

    Tanggal :

  • 7/27/2019 Daily Activities Report 2009.xls

    48/58

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant

    6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    1 Suswono Mechanical Balance of Plant

    2 Yulianus Sampe Rea Mechanical Balance of Plant

    3 Subair Mechanical Balance of Plant

    4 Ayana Mechanical Balance of Plant

    5 Guruh Prasetya Mechanical Balance of Plant6 Muhammad Faisal Mechanical Balance of Plant

    7 Gherry Irhamsyah Mechanical Balance of Plant

    8 Andriansah Mechanical Balance of Plant

    9 Mumud Mahmudin Mechanical Balance of Plant

    Tanggal :

    Tanggal :

    Tanggal :

    Tanggal :

  • 7/27/2019 Daily Activities Report 2009.xls

    49/58

    Job

    PipeLine No. Cooling Water Distribution System

    Pipe line & Vendor Evaluation for Compressed air

    PipeLine No. High Compressed Air System & Lub. Oil System

    Check Pipe Spool

    Rev. Draw. Drainage System

    P&ID Low Compressed Air for Brack & Jackin Device

    Draw. Detail Plan & Section Embeded Pipe B1&B2

    Draw. Detail Spool Cooling Water Supply System

    Low Compress Air Supply System for Pneumatic Device - Detail of Spool

    Pipe Line No. System - Cooling Water Distribution System - Outlet

    3D Cooling Wtaer system

    Rev. P&ID Lub Oil SystemCheck Pipe Spool

    Rev. Draw. Drainage System

    Low compress air pipe support location

    Detail embeded pipe B2&B1

    Draw. Detail Spool Cooling Water Supply System

    Low Compress Air Supply System for Pneumatic Device - Detail of Spool

    Pipe Line No. System - Cooling Water Distribution System - Intlet

    3D SolidWork

    3D SolidWork Drainage System

    Check Draw. Fasility, Pipe Spool, Mark Pipe

    Draw. Detail Spool Piezometer Pipe

    Rev. low compress air for brake & jacking Device

    Detail embeded pipe B2

    Detail Draw. Dewatering & Cooling Water Supply System

    Detail Draw. High Pressurized Oil System

    Pipe Line No. System - Cooling Water Distribution System - Outlet

    Pipe Line Number Low Compress System

    pipe line number drainage

    Check Detail of Pipe SpoolDraw. Detail Spool Piezometer Pipe

    CO2 pipe support location

    Detail embeded pipe B1

    Detail Draw. Dewatering & Cooling Water Supply System

    Detail Draw. High Pressurized Oil System

    Color of Pipe MBOP

    ANICAL ENGINEERING - DAILY ACTIVITIES REPORT

  • 7/27/2019 Daily Activities Report 2009.xls

    50/58

    Pipe line number per Spull Low Comp. for Brake and Jack Device, & Shaft Seal

    3D SolidWork Drainage System

    Design drawing cone crusher frame

    Draw. Detail Spool Piezometer Pipe

    Governing System - Detail of Spool

    Detail embeded pipe B1 + B2

    Detail Draw. Dewatering System

    Detail Draw. Cooling Water Distribution System

    Check CO2 Extinguisher System - routing

    DPT Pilpres

    DPT Pilpres

    Cone chrusher assembly drawing

    Draw. Detail Spool Piezometer Pipe

    Governing System - Detail of Spool

    Detail embeded pipe B1 + B2

    Detail spool dewatering & low compress air supply system

    Detail Draw. Cooling Water Distribution System

    Ijin/ Sakit

    3D Part Hydrant

    Service Komp.

    3D Part Hydrant

    3D Hydrant Assem

    3D Hydrant Assem

    Check Piezometre Pipe Detail of Spool

    Check line number spool

    Detail spool n revisi piezometer pipe

    Spool of governing system

    Contruction drawing low compress air suppy for shaft seal

    Contruction drawing high compress air supply system

    Contruction drawing high compress air for head cover

    Contruction drawing lubricating inlet

    Contruction drawing lubricating outlet

    Revisi detail &section embeded part el. 290.900 m - 299.580 m

    Detail&section embeded part el.299.580m - 303.900m

    cooling water supply pipe routing pipe line nomber & detail of spool ,low compress air supply

    system for pneumatic device pipe routing line nomber & detail of spool, drainage system pipe

    routing plan line nomber & detail of spool

    cooling water distribution outlet & cooling water distribution inlet

  • 7/27/2019 Daily Activities Report 2009.xls

    51/58

  • 7/27/2019 Daily Activities Report 2009.xls

    52/58

  • 7/27/2019 Daily Activities Report 2009.xls

    53/58

  • 7/27/2019 Daily Activities Report 2009.xls

    54/58

    Responsibility Remark

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer PE

    Engineer PEChecker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer PE

    Engineer PE

    Checker SPJDrafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

  • 7/27/2019 Daily Activities Report 2009.xls

    55/58

    Engineer PE

    Engineer PE

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer PE

    Engineer -

    Engineer -

    Checker SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Drafter SPJ

    Engineer -

    Engineer PE

    Checker SPJ

    Drafter PE

    Drafter PE

    Drafter PE

    Drafter PE

    Drafter PE

    Engineer

    Engineer

    Engineer

    Checker

    Drafter

    Drafter

  • 7/27/2019 Daily Activities Report 2009.xls

    56/58

    Drafter

    Drafter

    Drafter

    Engineer

    Engineer

    EngineerChecker

    Drafter

    Drafter

    Drafter

    Drafter

    Drafter

    Engineer

    Engineer

    EngineerChecker

    Drafter

    Drafter

    Drafter

    Drafter

    Drafter

    Engineer

    Engineer

    Engineer

    Checker

    Drafter

    Drafter

    Drafter

    Drafter

    Drafter

    Engineer

    Engineer

    Engineer

    CheckerDrafter

    Drafter

    Drafter

    Drafter

    Drafter

    Engineer

  • 7/27/2019 Daily Activities Report 2009.xls

    57/58

    Engineer

    Engineer

    Checker

    Drafter

    Drafter

    Drafter

    Drafter

    Drafter

    Engineer

    Engineer

    Engineer

    Checker

    Drafter

    Drafter

    Drafter

    Drafter

    Drafter

    Engineer

    Engineer

    Engineer

    Checker

    Drafter

    Drafter

    Drafter

    Drafter

    Drafter

    Engineer

    Engineer

    Engineer

    Checker

    Drafter

    Drafter

    Drafter

    Drafter

    Drafter

    Engineer

    Engineer

    Engineer

    Checker

    Drafter

    Drafter

    Drafter

  • 7/27/2019 Daily Activities Report 2009.xls

    58/58

    Drafter

    Drafter

    Engineer

    Engineer

    Engineer

    CheckerDrafter

    Drafter

    Drafter

    Drafter

    Drafter

    Engineer

    Engineer

    Engineer

    CheckerDrafter

    Drafter

    Drafter

    Drafter

    Drafter

    Engineer

    Engineer

    Engineer

    Checker

    Drafter

    Drafter

    Drafter

    Drafter

    Drafter

    Engineer

    Engineer

    Engineer

    Checker

    DrafterDrafter

    Drafter

    Drafter